POLITEKNIK TUANKU SULTANAH BAHIYAH COURSE OUTLINE Lecturer Course Prerequisite A) SYNOPSIS: ENGINEERING SURVEYING 2 gives knowledge and

understanding about control survey, detail survey, data collection or acquisition, calculation and plotting of survey works. The module puts emphasis on the method used to carry out surveying works especially data collection or acquisition to produce plan based on the scope of work. It also gives exposure to the need for accurate data to be used for other surveying works. B) LEARNING OUTCOMES: Upon completion of this course, students should be able to:1. Explain briefly the basic distance measurement, difference in height and figure of the terrain (C2). 2. Calculate correctly the coordinates of survey stations or areas and volumes of traverse or control point for curve raging or setting out (C3). 3. Describe the basic principles of Electronic Distance Measurement (EDM) (C2). 4. Work collaboratively in groups to complete the field work (A3). 5. Conduct field works that yield the valid results (P2). : : : Mohd Zaim b. Zakaria CC201- Engineering Survey 2 CC103 ENGINEERING SURVEY 1 E-mail Session Programme & Class : : : zaim@ptsb.edu.my December 2012 DKA & DKA 2A

C) ASSESSMENT: No 1 Types of assessment Continuous Assessment (CA) a. Theory Test T1 T2 Q1 Q2 A1 A2 Pl P2 P3 P4 Final Examination (FE) FE1 Topic 1,2 & 3 Topic 4 , 5 & 6 Topic 1,2 & 3 Topic 4 , 5 & 6 Topic 1,2 & 3 Topic 4 , 5 & 6 i. ii. iii. iv. Tachymetry Curve Setting Out EDM 50% 100% 60% 20% Item Criteria % Total 50%

b. Quiz c. Other Assignment

10% 10%

d. Practical

Cover all topics

TOTAL CA + FE

D) REFFERENCES: 1. Jerry Nathanson (2006). Surveying Fundamentals and Practices. Pearson Education Inc., NJ. 2. Charles D. Ghilani, Paul R. Wolf (2006). Elementary Surveying : An Introduction to Geomatics. Pearson Prentice Hall, NJ. 3. R. Agor (2005). A Textbook of Advanced Surveying. Khanna, New Delhi. 4. Ab. Hamid Mohamed (2000). Asas Ukur Kejuruteraan.UTM, Skudai. 5. Barry F. Kavanagh, S.J. Glenn Bird (2000). Surveying : Principles and Applications. Prentice Hall, NJ. 6. Arthur Bannister (1998). Surveying. Addison Wesley Longman Ltd., Endland.

E)

COURSE CONTENT:

POLITEKNIK TUANKU SULTANAH BAHIYAH COURSE TEACHING PLAN CLO/ LD/ GSA Teaching & Learning strategy

Weeks (Duration)

Specific Outcome

Execution date

Assessment Task

Remarks

1 09 -13 DECEMBER 2012 2 16 -20 DECEMBER 2012 PRACTICAL 1: Tachymetry 1. Know the following field work: a. Tachymetry by vertical staff fixed stadia method. b. Tachymetry by tangential 2. Follow the standard procedure. 3. Conduct the task according to the requirement 4. Accomplish the task within a given time frame. Objectives: At the end of this sessions student will be able to : a. Do Tachymetry by vertical staff fixed stadia method. b. Do Tachymetry by Tangential c. Know the standard procedure d. Conduct the task according to the requirement e. Accomplish the task within a given time frame.

REGISTRATION OF NEW STUDENT

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

3 23 -27 DECEMBER 2012 4 30/12/1203/01 JANUARY 2013

25/12/12 MID SEM BREAK I


Christmas

PRACTICAL 1: Tachymetry 1. Know the following field work: a. Tachymetry by vertical staff fixed stadia method. b. Tachymetry by tangential 2. Follow the standard procedure. 3. Conduct the task according to the requirement 4. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

3/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy

Assessment Task

Remarks

Objectives: At the end of this sessions student will be able to : a. Do Tachymetry by vertical staff fixed stadia method. b. Do Tachymetry by Tangential c. Know the standard procedure d. Conduct the task according to the requirement e. Accomplish the task within a given time frame.

5 06 -10 JANUARY 2013

PRACTICAL 1: Tachymetry 1. Know the following field work: a. Tachymetry by vertical staff fixed stadia method. b. Tachymetry by tangential 2. Follow the standard procedure. 3. Conduct the task according to the requirement 4. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

Objectives: At the end of this sessions student will be able to : a. b. c. d. e. Do Tachymetry by vertical staff fixed stadia method. Do Tachymetry by Tangential Know the standard procedure Conduct the task according to the requirement Accomplish the task within a given time frame.

6 PRACTICAL 1: Tachymetry 13 -17 JANUARY 2013 1. Know the following field work: a. Tachymetry by vertical staff fixed stadia method. b. Tachymetry by tangential 2. Follow the standard procedure. 3. Conduct the task according to the requirement 4. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

4/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy

Assessment Task

Remarks

Objectives: At the end of this sessions student will be able to : a. b. c. d. e. Do Tachymetry by vertical staff fixed stadia method. Do Tachymetry by Tangential Know the standard procedure Conduct the task according to the requirement Accomplish the task within a given time frame.

7 20 -24 JANUARY 2013

PRACTICAL 1: Tachymetry Document the task and produce the report. Objective: At the end of this sessions student will be able to : a. Do document the task and produce the report. PRACTICAL 2: Curve Ranging 1. Know the following curve ranging field works: a. Offset from deflection angle b. Offset from tangent line c. Offset from the cord produced d. Offset from the long chord 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

24/01/13 Maulidur Rasul

Q&A , Field work, Discussion, Project, assignment.

8 27 -31 JANUARY 2013

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

Objective: At the end of this session, the student will be able to : a. Do curve ranging using the deflection angle using the tangent line using the cord produced using the long chord b. Know the standard procedure c. conduct the field work according to the requirement d. Accomplish the task within a given time frame.

5/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy


Demonstratio n

Assessment Task

Remarks

9 03 -07 FEBRUARY 2013

PRACTICAL 2: Curve Ranging 1. Know the following curve ranging field works: a. Offset from deflection angle b. Offset from tangent line c. Offset from the cord produced d. Offset from the long chord 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame.

CLO 4, CLO 5

Q&A , Field work, Discussion, Project, assignment.

Objective: At the end of this session, the student will be able to : a. Do curve ranging using the deflection angle using the tangent line using the cord produced using the long chord b. Know the standard procedure c. conduct the field work according to the requirement a. Accomplish the task within a given time frame. 10 10 -14 FEBRUARY 2013

10 -11/02 MID SEM BREAK II 2013 Chinese new year


PRACTICAL 2: Curve Ranging 1. Know the following curve ranging field works: a. Offset from deflection angle b. Offset from tangent line c. Offset from the cord produced d. Offset from the long chord 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame.

11 17 -21 FEBRUARY 2013

6/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy


Demonstratio n

Assessment Task

Remarks

Objective: At the end of this session, the student will be able to : a. Do curve ranging using the deflection angle using the tangent line using the cord produced using the long chord b. Know the standard procedure c. conduct the field work according to the requirement d. Accomplish the task within a given time frame.

CLO 4, CLO 5

Q&A , Field work, Discussion, Project, assignment.

12 24 -28 FEBRUARY 2013 PRACTICAL 2: Curve Ranging 1. Know the following curve ranging field works: a. Offset from deflection angle b. Offset from tangent line c. Offset from the cord produced d. Offset from the long chord 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame. Objectives: At the end of this session, the student will be able to : a. Do curve ranging using the deflection angle using the tangent line using the cord produced using the long chord b. Know the standard procedure c. conduct the field work according to the requirement d. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

13 03 -07 MARCH 2013

PRACTICAL 2: Curve Ranging 1. Document the task and produce the report. Objective: At the end of this session, the student will be able to : a. Do document the task and produce the report.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

7/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy


Demonstratio n

Assessment Task

Remarks

14 10 -14 MARCH 2013

PRACTICAL 3: Setting Out 1. Understand the checking on the existing structure: a. Trench b. Drain c. Pipe 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame. Objective: At the end of this session, the student should be able to : a. Checking on the existing structure: a. Trench b. Drain c. Pipe b. Follow the standard procedure. c. Conduct the field work according to the requirement d. Accomplish the task within a given time frame.

CLO 4, CLO 5

Q&A , Field work, Discussion, Project, assignment.

15 17 -21 MARCH 2013

PRACTICAL 3: Setting Out 1. Understand the checking on the existing structure: a. Trench b. Drain c. Pipe 2. Follow the standard procedure. 3. Conduct the field work according to the requirement 4. Accomplish the task within a given time frame. Objective: At the end of this session, the student should be able to : a. Checking on the existing structure: a. Trench b. Drain c. Pipe b. Follow the standard procedure. c. Conduct the field work according to the requirement d. Accomplish the task within a given time frame.

CLO 4, CLO 5

Demonstratio n

Q&A , Field work, Discussion, Project, assignment.

8/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy


Demonstratio n

Assessment Task

Remarks

16 24 -28 MARCH 2013

PRACTICAL 3: Setting Out 1. Document the task and produce the report. Objective: At the end of this session, the student should be able to : a. do document the task and produce the report.

CLO 4, CLO 5

Q&A , Field work, Discussion, Project, assignment.

17 31/04 04 APRIL 2013

PRACTICAL 4: EDM/Total Station

CLO 4, CLO 5

Demonstratio n

1. Understand the distance measurement by using EDM/Total Station. 2. Follow the standard procedure. 3. Conduct the experiment according to the requirement 4. Accomplish the task within a given time frame. Objective: At the end of this session, the student should be able to : a. Measurement by using EDM/Total Station. 2. Follow the standard procedure. 3. Conduct the experiment according to the requirement 4. Accomplish the task within a given time frame.

Q&A , Field work, Discussion, Project, assignment.

18 07 - 11
APRIL 2

PRACTICAL 4: EDM/Total Station 1. Document the task and produce the report. Objective: At the end of this session, the student should be able to : a. do document the task and produce the report.

CLO 4, CLO 5

Demonstratio n

2013

Q&A , Field work, Discussion, Project, assignment.

19 14 - 18
APRIL

STUDY WEEKS

2013

9/17

Weeks (Duration)

Specific Outcome

Execution date

CLO/ LD/ GSA

Teaching & Learning strategy

Assessment Task

Remarks

01/05/13
20 - 21 21/04 05
MAY

FINAL EXAMINATION ( 21/04 -05/05/2013)

Labours day

2013

Prepared by :

Approved by :

...................................................... ( MOHD ZAIM BIN ZAKARIA )

............................................ Deputy Director(Academic) / Head Of Department / Head Of Unit / Head Of Programme Date :

Date :

10/17

También podría gustarte