Está en la página 1de 18

FACULTAD DE ARQUITECTURA Y URBANISMO

ESTRUCTURAS 5
CARACTERSTICAS DE LA EDIFICACION

D ATOS
u n id .
# D E P I S OS

P I S OS

S/C

200

k g / c m2

LOS A e= 2 0 c m

300

k g / c m2

P t er min ad o

100

k g / c m2

Fm

65

k g / c m2

Ea

32500

k g / c m2

1900

k g / c m3

fc

210

k g / c m2

Ec

217371

k g / c m2

2400

k g / c m3

4200

k g / c m2

M ATE R I ALE S
ALB A I LE R I A

C O N C R E TO

AC E R O
Fy

Pgina 1

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

6.00
1.90

1.20

1.20

2.55

1.20

1.95
1.20

1.20

10.15
11.30
1.95

1.40

1.47
1.20

1.20

1.95

Pgina 2

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
1. ESTRUCTURACION EN PLANTA

Z:

0.4

U:

S:

1.2

FACTOR DE ZONA

ZONA 3

USO

EDIFICACION COMUN CATEGORIA C

PARAMETRO DEL SUELO

SUELO INTERMEDIO TIPO S-2 TP=0.6

N:

NUMERO DE PISOS

Ap:

63.15

AREA EN PLANTA

AREA DE LA PLANTA TIPICA

ZUSN/Ap:

L.t/Ap

0.015

ZUSN/Ap

COMPROBACION EN LA DIRECCION XX Y DIRECCION YY

EJE XX
MURO

L(m)

t(m)

AREA(m2)

X-1

1.20

0.14

0.168

X-2

1.20

0.14

0.168

X-3

1.95

0.14

0.273

X-4

1.95

0.14

0.273

X-5

1.20

0.14

0.168

X-6

1.20

0.14

0.168

X-7

1.95

0.14

0.273

X-8

1.20

0.14

0.168

X-9

1.90

0.14

0.266

X-10

1.20

0.14

0.168

X-11

1.20

0.14

0.168

SUMA=

2.261

Ap=

63.15

L.t/Ap

0.036

Pgina 3

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
EJE YY
MURO

L(m)

t(m)

AREA(m2)

Y-1

10.15

0.14

1.421

Y-2

1.47

0.14

0.2058

Y-3

1.4

0.14

0.196

Y-4

2.03

0.14

0.2842

Y-5

2.55

0.14

0.357

Y-6

11.3

0.14

1.582

L.t/Ap

SUMA=

4.046

Ap=

63.15

L.t/Ap

0.064

NORMA

EJE XX

0.036

0.0152

OK

EJE YY

0.064

0.0152

OK

2. ESFUERZO AXIAL MAXIMO

PARA MUROS DE t=0.14 cm

98.81

tonf/m2

0.15.fm=

97.5

tonf/m2

=0.2fm(1-(h/(35t))^2)

Pgina 4

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

Pgina 5

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

Area=9.18

Area=19.59

Area=8.57

Area=6.74

Area=6.19

Pgina 6

Area=12.88

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

X-9

X-10

X-11

Y-5

X-8

X-5

X-6

Y-1

X-7

Y-4

Y-6

X-4
Y-3

Y-2

X-1

X-2

X-3

Pgina 7

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
PM=100%CM+100%CV
EJE XX
MURO

P.P (tonf) PM PM/Lt

0.15.fm=

X-1

1.53

1.53

9.12

98.81

97.5

OK

X-2

1.53

1.53

9.12

98.81

97.5

OK

X-3

2.49

2.49

9.12

98.81

97.5

OK

X-4

2.49

2.49

9.12

98.81

97.5

OK

X-5

1.53

1.53

9.12

98.81

97.5

OK

X-6

1.53

1.53

9.12

98.81

97.5

OK

X-7

2.49

2.49

9.12

98.81

97.5

OK

X-8

1.53

1.53

9.12

98.81

97.5

OK

X-9

2.43

2.43

9.12

98.81

97.5

OK

X-10

1.53

1.53

9.12

98.81

97.5

OK

X-11

1.53

1.53

9.12

98.81

97.5

OK

EJE YY

MURO

P.P (tonf) AREA(m2) CM (tonf) CV (tonf)

PM

PM/Lt

0.15.fm

Y-1

12.96

19.59

15.67

6.86

35.49

24.97

98.81

97.5

OK

Y-2

1.88

6.19

4.95

2.17

9.00

43.71

98.81

97.5

OK

Y-3

1.79

6.74

5.39

2.36

9.54

48.67

98.81

97.5

OK

Y-4

2.59

8.57

6.86

3.00

12.45

43.80

98.81

97.5

OK

Y-5

3.26

9.18

7.34

3.21

13.81

38.69

98.81

97.5

OK

Y-6

14.43

12.88

10.30

4.51

29.24

18.48

98.81

97.5

OK

Pgina 8

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
3. REQUISITOS DE MURO PORTANTE

ESPESOR EFECTIVO

T H/20 =2.4/20 =0.12 UNSAR MUTO


t=13 CORRECTO
MUROS PORTANTES L 1.20 CORRECTO

CALCULO DE RIGIDECEZ
ANALISIS ESTATICO: CALCULO DE LA CORTANTE BASAL Y LA
DISTRIBUCION DE FUERZAS SISMICAS POR PISO

K=Em.t.(4+(h/L)^3+3.h/L)^-1
PRIMER PISO

Em:

325000 tonf/m2

DIRECCION XX
EJE XX

MURO

L(m)

X-1

1.20

X-2

P.P (tonf)

P.X

Kx (ton/m)

Kx.Y

0.77

0.60

1.23

0.46

1197.37

1472.76

1.20

0.77

2.55

1.23

1.95

1197.37

1472.76

X-3

1.95

1.24

5.03

0.00

6.26

4080.81

0.00

X-4

1.95

1.24

5.03

4.85

6.26

4080.81

19791.92

X-5

1.20

0.77

0.60

7.73

0.46

1197.37

9255.66

X-6

1.20

0.77

2.55

7.73

1.95

1197.37

9255.66

X-7

1.95

1.24

5.03

7.73

6.26

4080.81

31544.65

X-8

1.20

0.77

3.60

8.83

2.76

1197.37

10572.76

X-9

1.90

1.21

0.95

11.23

1.15

3839.24

43114.71

X-10

1.20

0.77

3.60

11.23

2.76

1197.37

13446.45

X-11

1.20

0.77

5.40

11.23

4.14

1197.37

13446.45

10.31
Xcg

Pgina 9

34.42

24463.25

153373.79

3.34

Ycr

6.27

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
YRR=Ycm-Yi

Kx.YRR^2

Vx

V-xt

4.83

27930.1

1.61

-0.04

1.65

4.83

27930.1

1.61

-0.04

1.65

6.06

149848.3

5.47

-0.17

5.64

1.21

5972.0

5.47

-0.04

5.51

-1.67

3340.4

1.61

0.01

1.62

-1.67

3340.4

1.61

0.01

1.62

-1.67

11384.7

5.47

0.04

5.51

-2.77

9189.1

1.61

0.02

1.63

-5.17

102629.8

5.15

0.13

5.28

-5.17

32007.8

1.61

0.04

1.65

-5.17

32007.8

1.61

0.04

1.65

405580.5

EJE YY
MURO

L(m)

P.P (tonf)

P.Y

Ky (ton/m)

Ky.X

Y-1

10.2

6.48

0.08

6.23

40.37

59692.48

4476.94

Y-2

1.47

0.94

4.13

1.89

1.77

2039.84

8424.54

Y-3

1.4

0.89

4.13

4.22

3.77

1798.81

7429.10

Y-4

2.03

1.30

4.13

6.79

8.80

4479.73

18501.29

Y-5

2.55

1.63

3.08

10.03

16.33

7388.34

22756.08

Y-6

11.3

7.21

5.93

5.65

40.76

67358.41

399435.35

18.45
Ycg

Pgina
10

111.80

142757.60

461023.28

6.06

Xcr

3.23

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
XRR=Ycm-Yi

Ky.XRR^2

Vy

V-yt

3.26

635599.3

13.72

-2.33

16.05

-0.79

1279.2

0.47

0.02

0.49

-0.79

1128.0

0.41

0.02

0.43

-0.79

2809.2

1.03

0.05

1.08

0.26

492.2

1.70

-0.01

1.71

-2.59

452506.1

15.48

2.25

17.73

1093814.0

1499394.5

CG

3.34

6.06

CR

3.23

6.27

0.11

-0.21

Lx

6.00

Ly

11.30
e=0.05.L

0.30

0.57

USAREMOS POR SER MAYORES

DE LAS FUERZAS DE SIMO TENEMOS


NIVEL

Ha

32.82

M=Ha.e
M1X

9.85

M1Y

18.54

Pgina
11

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
PRIMER NIVEL
EJE XX
MURO

EJE YY
P.P (tonf)

MURO

P.P (tonf)

AREA(m2)

CM (tonf)

CV (tonf)

X-1

0.77

Y-1

6.48

19.59

15.67

1.22

X-2

0.77

Y-2

0.94

6.19

4.95

0.39

X-3

1.24

Y-3

0.89

6.74

5.39

0.42

X-4

1.24

Y-4

1.30

8.57

6.86

0.54

X-5

0.77

Y-5

1.63

9.18

7.34

0.57

X-6

0.77

Y-6

7.21

12.88

10.30

0.81

X-7

1.24

X-8

0.77

X-9

1.21

X-10

0.77

X-11

0.77

ppCM

1ER NIVEL
ppCM

PT=

69.0

3.95

PCV 25%

83.23

10.31

SEGUNDO NIVEL
EJE XX
MURO

EJE YY
P.P (tonf)

MURO

P.P (tonf)

AREA(m2)

CM (tonf)

CV (tonf)

X-1

0.77

Y-1

6.48

19.59

15.67

0.49

X-2

0.77

Y-2

0.94

6.19

4.95

0.15

X-3

1.24

Y-3

0.89

6.74

5.39

0.17

X-4

1.24

Y-4

1.30

8.57

6.86

0.21

X-5

0.77

Y-5

1.63

9.18

7.34

0.23

X-6

0.77

Y-6

7.21

12.88

10.30

0.32

X-7

1.24

X-8

0.77

X-9

1.21

X-10

0.77

X-11

0.77

ppCM

1ER NIVEL
ppCM

PT=

10.31

ANALISIS ESTATICO

Pgina
12

69.0

80.86

PCV 25%

1.58

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

0.4

1.2

2.5

SISMO MODERADO

ZUCS/R

0.2

V=(ZUCS/R)*P

P=100%CM+25%CV

V:

32.8

NIVEL

P.H

Fi

Ha

83.23

2.5

208.1

11.0

32.81709

80.86

5.1

412.4

21.8

21.81186

SUMA=

164.09

SUMA=

620.45

CALCULO DE CORTANTES FINALES PRIMER PISO


MUROS EN XX
YRR=Ycm-Yi

Kx.YRR^2

Vx

V-xt

4.83

27930.1

1.61

-0.04

1.65

4.83

27930.1

1.61

-0.04

1.65

6.06

149848.3

5.47

-0.17

5.64

1.21

5972.0

5.47

-0.04

5.51

-1.67

3340.4

1.61

0.01

1.62

-1.67

3340.4

1.61

0.01

1.62

-1.67

11384.7

5.47

0.04

5.51

-2.77

9189.1

1.61

0.02

1.63

-5.17

102629.8

5.15

0.13

5.28

-5.17

32007.8

1.61

0.04

1.65

-5.17

32007.8

1.61

0.04

1.65

405580.5

MUROS EN YY

Pgina
13

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
XRR=Ycm-Yi

Ky.XRR^2

Vy

V-yt

3.26

635599.3

13.72

-2.33

16.05

-0.79

1279.2

0.47

0.02

0.49

-0.79

1128.0

0.41

0.02

0.43

-0.79

2809.2

1.03

0.05

1.08

0.26

492.2

1.70

-0.01

1.71

-2.59

452506.1

15.48

2.25

17.73

1093814.0

1499394.5

CG

3.34

6.06

CR

3.23

6.27

0.11

-0.21

Lx

6.00

Ly

11.30
e=0.05.L

0.30

0.57

USAREMOS POR SER MAYORES

DE LAS FUERZAS DE SIMO TENEMOS


NIVEL

Ha

32.82

M=Ha.e
M1X

9.85

M1Y

18.54

CORTANTES FINALES SEGUNDO PISO

Pgina
14

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
MUROS EN XX
YRR=Ycm-Yi

Kx.YRR^2

Vx

V-xt

4.83

27930.1

1.07

-0.03

1.09

4.83

27930.1

1.07

-0.03

1.09

6.06

149848.3

3.64

-0.11

3.75

1.21

5972.0

3.64

-0.03

3.66

-1.67

3340.4

1.07

0.01

1.08

-1.67

3340.4

1.07

0.01

1.08

-1.67

11384.7

3.64

0.03

3.66

-2.77

9189.1

1.07

0.01

1.08

-5.17

102629.8

3.42

0.08

3.51

-5.17

32007.8

1.07

0.03

1.09

-5.17

32007.8

1.07

0.03

1.09

405580.5

MUROS EN

YY

XRR=Ycm-Yi

Ky.XRR^2

Vy

V-yt

3.26

635599.3

13.72

-2.74

16.46

-0.79

1279.2

0.47

0.03

0.50

-0.79

1128.0

0.41

0.02

0.44

-0.79

2809.2

1.03

0.06

1.09

0.26

492.2

1.70

-0.02

1.71

-2.59

452506.1

15.48

2.65

18.13

1093814.0

1499394.5

Pgina
15

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5
X

CG

3.34

6.06

CR

3.23

6.27

0.11

-0.2098

Lx

6.00

Ly

11.30
e=0.05.L

0.30

0.57

USAREMOS POR SER MAYORES

DE LAS FUERZAS DE SIMO TENEMOS


NIVEL

Ha

21.81

M=Ha.e
M1X

6.54

M1Y

12.32

Pgina
16

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

FUERZAS DE CALCULO

EJE XX
1er PISO

2 do PISO

MURO

L (m)

P 100%+25

P 100%+25

X-1

1.20

1.65

1.53

6.96

1.09

0.77

2.84

X-2

1.20

1.65

1.53

6.96

1.09

0.77

2.84

X-3

1.95

5.64

2.49

23.86

3.75

1.24

9.75

X-4

1.95

5.51

2.49

23.31

3.66

1.24

9.53

X-5

1.20

1.62

1.53

6.84

1.08

0.77

2.80

X-6

1.20

1.62

1.53

6.84

1.08

0.77

2.80

X-7

1.95

5.51

2.49

23.31

3.66

1.24

9.53

X-8

1.20

1.63

1.53

6.88

1.08

0.77

2.81

X-9

1.90

5.28

2.43

22.30

3.51

1.21

9.12

X-10

1.20

1.65

1.53

6.96

1.09

0.77

2.84

X-11

1.20

1.65

1.53

6.96

1.09

0.77

2.84

MURO

L (m)

P 100%+25

P 100%+25

Y-1

10.15

16.05

29.86

82.93

16.46

22.64

42.80

Y-2

1.47

0.49

7.22

2.52

0.50

6.05

1.29

Y-3

1.4

0.43

7.60

2.22

0.44

6.45

1.14

Y-4

2.03

1.08

9.98

5.53

1.09

8.37

2.83

Y-5

2.55

1.71

11.17

8.74

1.71

9.20

4.46

Y-6

11.3

17.73

25.54

91.47

18.13

17.84

47.14

EJE YY

Pgina
17

FACULTAD DE ARQUITECTURA Y URBANISMO


ESTRUCTURAS 5

Pgina
18

También podría gustarte