PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL04) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer SITE DEVELOPMENT Earthworks, concrete works, water proofing, moisture protection for foundations works are measured in BOQ AP06 The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions Site clearance and demolitions 02 Demolish and clear away existing structures, pavings, electrical lighting, pavements or upstands, cut and plug or reroute existing service lines or utilities inside property line, clear site of rubbish or any impediments, loose top soil and as deemed necessary, for the total site cluster number 4 (CL04) area, approximately (22650m2), subject to engineer approval and as coordinated with public pension agency as shown on drawing CL04- XC-01 1 Item Note Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 01 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Note DESCRIPTION QTY UNIT RATE AMOUNT SR

Note

55

M3

02

60789

M3

Note Work on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT PAVING AND SURFACING 01 Supply and install 400x400x30mm thk polished granite paving dark &light colors w.\ granite band dark color including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. C2 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install 400x400x60mm thk precast conc. w./ photocatalytic titanium dioxide coating beige color shotblasted including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A1 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install 400x400x60mm thk precast conc. w./ photocatalytic titanium dioxide coating beige & brown colors shotblasted including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A5 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install 400x400x60mm thk precast conc. w./ photocatalytic titanium dioxide coating light grey & grey color shotblasted including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A6 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 DESCRIPTION QTY UNIT RATE AMOUNT SR

380

M2

02

2318

M2

03

200

M2

04

1650

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT PAVING AND SURFACING 01 Supply and install 400x400x60mm thk precast conc. w./ photocatalytic titanium dioxide coating beige & light beige w./grey granite band 200x200x30m thk. including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. B3 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install cast in place concrete paving smooth finish light grey w.\ brick edge band 60mm thick including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. G7 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install 50mm thk rubber pavement color green & blue including adhesive mixture,100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. E4 on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install asphalt paving including 80mm bituminous wearing course, bituminous prime coat, granular base course, 3mm water proofing membrane on R.C. slab as per detail no. F on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 Supply and install concrete screed with epoxy coat finish including 100mm thick cast-in-place concrete slab with A193-WWF reinforcement mesh, polyethylene moisture barrier, compacted sub grade, 3mm water proofing membrane on R.C. slab as per detail no. D on drawing CL04-XL301 to suit required locations as shown on drawing CL04-XL101 DESCRIPTION QTY UNIT RATE AMOUNT SR

583

M2

02

143

M2

03

198

M2

04

396

M2

05

13392

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT SUNDRIES CURBS AND EDGING 01 Supply and install precast concrete road curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on R.C. slab as per detail no.1 on drawing CL04-XL302 to suit required locations as shown on drawing CL04-XL101 Supply and install precast concrete mowing edge, size 200X100X65 mm including concrete base, 20mm thick cement mortar setting bed, cast in place concrete base on R.C. slab, as per detail no. 2 on drawing CL04-XL302 to suit required locations as shown on drawing CL04-XL101 TENSILE STRUCTURE Supply and install tent structure comprising columns, tent fabric, foundation, earthwork, and all required to compleet and fix the work as per detail 3 on drawing CL04-XL302, manufacturer's recommendations and subject to engineer's approoval Contractor shall submitt shop drawings for approval before supply 03 Tensile structure to suit required locations as shown on drawing CL04-XL101 (Area measured on plan) RAISED CONC. PLANTER & WOODEN BENCH Supply and install raised concrete planter with granite cladding brown color, 50x75mm interior wood rails (wooden bench) including soil mix, drainage layer, filter , membrane, sealant and all required to complete and finish the work as per detail 4 on drawing CL04-XL302 04 Raised planter, approximate area 490 m2 on plan t to suit required locations as shown on drawing CL04-XL101 DESCRIPTION QTY UNIT RATE AMOUNT SR

2312

02

16

55

M2

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT SUNDRIES EARTH MOUNT Supply and formation of 500-1500 mm height earth mount including compacted sub base layer, 100 mmm thick layer of sand and gravel mix, and all required to complete and finish the work as per detail 5 on drawing CL04-XL302 and detail P5 on drawing CL04-XL401 (Softscape and planting soil mix are measured elsewhere) 01 Earth mount, approximate area 50 m2 on plan to suit required locations as shown on drawing CL04-XL101 WOODEN SHADE STRUCTURE Supply and install wooden shade structure comprising 50x100mm artificial wooden louvers every 150mm o.c.(typ.) with 60 angle on horizontal beam, 100x200 mm artificial wooden beam(typ.) fixed w/ steel bolts, 200x200mm artificial wooden post including concrete footings, earthworks, insulation, finishing, fixing, and all required to complete the work as per detail 6 on drawing CL04-XL302 02 Wooden shade structure, approximate area 90 m2 on plan to suit required locations as shown on drawing CL04-XL101 DESCRIPTION QTY UNIT RATE AMOUNT SR

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT SITE SIGNAGE Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL04-XC-04, CL04-XC-05 and as per specifications WARNING SIGNS 01 Ref. type W11-1 ( PEDESTRAIN CROSSING ) REGULATORY SIGNS 02 03 Ref. type R2-1 (GIVE WAY ) Ref. type R5-1 ( ENTRY PROHIBTED ) INFORMATIVE SIGNS 04 05 Ref. type I-1 (PARKING) Ref. type I-2 (ENTRY ) Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL04-XL601, CL04-XL602 and as per specifications 06 07 08 09 10 11 RESIDENTIAL SIGN, as per detail (1) CENTRAL PLAZA SIGN, as per detail (2) CENTRAL PLAZA PARKING SIGN, as per detail (3) DIRECTIONAL SIGN, as per detail (4) ADVERTISING PANEL, as per detail (5) EAST GATE SIGN, as per detail (6) DESCRIPTION QTY UNIT RATE AMOUNT SR

15

No.

9 1

No. No.

2 5

No. No.

17 3 1 4 4 1

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT ROAD SIGNAGE & PAVEMENTMARKING Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL04-XC-05 and as per specifications DESCRIPTION QTY UNIT RATE AMOUNT SR

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Yellow edge line, ref. detail 1 White edge line, ref. detail 2 Lane marking, ref. detail 3 Direction separation lines (passing permitted), ref. detail 4 Direction separation lines (passing prohibited), ref. detail 5 White stop line, ref. detail 6 Dotted line marking, ref. detail 7 Pedestrain crossing, ref. detail 8 Through traffic arrow, ref. detail 9-1 Right turn arrow, ref. detail 9-2 Left turn arrow, ref. detail 9-3 Through & right turn arrow, ref. detail 9-4 Through & left turn arrow, ref. detail 9-5 Right & left turn arrow, ref. detail 9-6 Speed control hump including cut & removal of existing wearing (0.05m) course & add a new course, tack coat and 0.10m of bituminous wearing course, ref. 10 detail G

1991 1485 660 275 143 96 957 786 45 5 11 4 7 2 15

M M M M M M M M No. No. No. No. No. No. M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT LANDSCAPING Trees including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1 on drawing CL04-XL-401 01 02 03 T/Fm T/Po T/Tp Shrubs including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P2, on drawing CL04-XL-401 04 05 06 07 S/Hs S/Iha S/Pav S/Mc Ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P2, on drawing CL04-XL-401 08 09 10 G/As G/Ggp G/Cm (R) DESCRIPTION QTY UNIT RATE AMOUNT SR

45 1 16

No. No. No.

236 21 43 130

No. No. No. No.

1024 943 1469

No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT LANDSCAPING Lawn planting, including soil planting mix, filter membrane and drainage layer, screed sloped to drain all as per details and planting schedule as per detail P3, on drawing CL04-XL-401 01 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

978

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 100 mm dia. 150 mm dia. Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 03 Inspection chamber, ref. (IC) 600x600mm WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 04 100 mm dia Drainage installation to the external drainage network Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 05 Slow down chamber 5 No 90 M 9 No 120 410 M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 01 02 Sewer manhole, ref. (SMH) Sewer manhole, ref. (MH) POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 03 100 mm dia. Reinforced concrete under ground water tank and pump room with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, sump pit, and submersible pump internal lining and water proofing, access ladders, pipework and valving, test main fold vent pipes, truck fill pipework with back flow preventer, ventilating fan and duct work within tank and pump room structure, and UPVC schedule 80 drainge pipe from submersible pump to the nearest sewer manhole and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 04 Fire water tank 1 No. 255 M 3 2 No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION Supply, installation and test Electrically driven horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 01 02 Ref. FP1 CAP 75 KW electrically driven Ref. FP2 CAP 75 KW fuel diesel driven Supply, installation and test Electrically driven peripheral turbine Jockey pump, including piping network and valving within pump chamber, complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 03 Ref. JP CAP 5 KW 1 No 1 1 No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 05 32 mm dia. 40 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. Accessories 06 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and install bubbler for shrubs, ground cover and succulents Supply and installation bubbler for trees Supply and installation spray lawn sprinkler Gate valve W/valve box 40 mm dia., Gate valve W/valve box 63 mm dia., Gate valve W/valve box 75 mm dia., Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 13 14 15 Ref. RCV 32mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. 1 10 1 No. No. No. 1 No. 90 965 35 65 50 M M M M M QTY UNIT RATE AMOUNT SR

07 08 09 10 11 12

497 285 32 2 1 1

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM SITE DEVELOPMENT Collection Sheet -1 Sheet -2 Sheet -3 Sheet -4 Sheet -5 Sheet -6 Sheet -7 Sheet -8 Sheet -9 Sheet -10 Sheet -11 Sheet -12 Sheet -13 Sheet -14 DESCRIPTION QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 2 - SITE WORK SITE GRADING All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 01 Excavation for foundations commencing from existing grade level Backfilling 02 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Approved fill material selected from excavated material including compaction as per specification section 02200 Soil treatment application for termite control 04 To subgrades of slabs and along periphery of building Note QTY UNIT RATE AMOUNT SR

Note

30668

440

03

price only

18227

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 2 - SITE WORK TRAFFIC MARKING DIMENSION Thermoplastic paint for traffic marking on parking pavement as detail 11 shown on drawing CL-GA-901 and specification 01 02 03 04 05 06 07 08 09 Straight arrows Straight & curved arrows Turning arrows Parking lane marking Handicapped marking on floor ENTRY (text) NO ENTRY (text) EXIT (text) Lane numbers QTY UNIT RATE AMOUNT SR

83 4 2 4964 17 2 4 2
388

No. No. No. M No. No. No. No.


No

To Collection Collection Sheet - 16 Sheet - 17

SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Catch basins and side walks 40 Mpa a) Footings b) Columns and R.C. walls c) Floor and roof slabs, beams, girders, stairs d) Concrete topping or structural screed e) Slab on grade f) Water tanks QTY UNIT RATE AMOUNT SR

Note

Water stops including junction accessories are not measured separately The cost of water stop items are to be included in the unit rates of the related concrete items

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 3 - CONCRETE Plain insitu concrete, 20 Mpa, cement type V as per specifications section 03300 01 02 Screed, 50mm thick Blinding beds, 100mm thick Insitu reinforced concrete, 40 Mpa cement type V including formwork and steel reinforcements conforming to ASTMA615and A185 as per specifications sections 03100, 03200 & 03300 03 Raft foundation various thickening including depression areas, sump pits and elevators pits Retaining walls as detail M shown on drawing CL-GS-03 Reinforced concrete for gray water tanks No.1,3 (cluster) (Base-wall-slab) as detail N shown on drawing CL-GS-03 Reinforced concrete for gray water tanks No.2,4 (under apartment) (Base-wall-slab) as detail Q shown on drawing CL-GS-03 Reinforced concrete for electric cable trench QTY UNIT RATE AMOUNT SR

880 1749

M M

13486

04 05

935 137

M M3

06

110

M3

07

71

M3

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 as per specifications sections 03100, 03200 & 03300 01 02 03 04 05 06 07 08 Columns Shear wall Beams Suspended slabs (flat slabs) 300mm thick including drop panel Suspended slabs (flat slabs) 350mm thick including drop panel Suspended slabs (flat slabs) 380mm thick including drop panel Ramps Stairs including landings PRECAST CONCRETE Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 21 on drawing CL-GA-901 and specification 09 Precast concrete wheel stopper including fixings 1941 286 22 5632 990 88 88 121 M M M M M M M M QTY UNIT RATE AMOUNT SR

388

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK SUNDRIES EQUIPMENT PADS 01 Allow for reinforced concrete equipment pads including upstand surrounds and anti-vibration accessories as required CURB RAMP 02 150mm thick raised slabs, Handicapped`s ramps and curbs to suit required areas as per detail 10,14, 20 on drawing CL-GA-901 1500 M 8 M QTY UNIT RATE AMOUNT SR

To Collection

SR

Collection Sheet - 18 Sheet - 19 Sheet - 20 Sheet - 21

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 4 - MASONRY UNIT MASONRY Supply and fix concrete masonry blocks in courses with cement lime mortar including concrete lintels over openings , horizontal and vertical reinforcement, fixings, fillers, sealants and grout to complete the work according to specifications and drawings 01 02 03 200 mm thick wall 200 mm thick wall, one hour fire rated Ditto, but two hour fire rated QTY UNIT RATE AMOUNT SR

41 423 495

M M M

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DIVISION 5 - METALS Steel cover as per details on drawings 01 02 03 To suit electrical cable trench To suit PG. trench at basement`s ramps To suit sump pits as required dimensions at basement EXPANSION JOINT COVER Supply and install aluminium cover for expansion joints including, seals, fire barrier, stainless steel clip, gaskets and all required materials and equipments to complete and fix the work as shown on drawing CL-GA-902 and according to specifiactions, and code of practice DESCRIPTION QTY UNIT RATE AMOUNT SR

71 16 12

M No

04 05 06 07 08 09

Floor to floor as per detail 1a Wall to wall as per detail 1b Ceiling to ceiling as per detail 1c Floor to wall as per detail 1d Wall to wall as per detail 1e wall to Ceiling as per detail 1h

2500 1754 1250 800 1985 400

M M M M M M

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 7 - THERMAL AND MOISTURE PROTECTION MEMBRANE WATERPROOFING 01 Membrane waterproofing as per specifications to suit raft, tanks and retainig walls Protection board to suit raft, tanks and retainig walls QTY UNIT RATE AMOUNT SR

35585

02

3410

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 8-DOORS AND WINDOWS DOOR SETS Supply and install all doors to suit masonry openings and approved samples including fixings, decorations, frames, architrave, hardwares and saddles and all required to complete and finish the work as detailed on drawing CL-GA-801 and according to specifications and code of practice TYPE B : 44mm thick painted hollow metal insulated door including door grill (where required) 01 02 Type B1, single leaf door, size 900x2150mm and 45 min. fire rated Type B6, double leaves door, leaf size 950x2150mm and 45 min. fire rated TYPE C : 44mm thk. fully louvered painted hollow metal door. motorized adjustable louvers panel working upon signal from fire alarm system for generator . 03 Type C1, double leaves door, leaf size 950x2400mm and 45 min. fire rated Type C2, double leaves door, leaf size 1050x2400mm and 45 min. fire rated WINDOWS 24mm thick double tempered glazed sliding window, tinted outside clear inside on powder coated aluminum frame 05 Type W02, size 1200x1000mm QTY UNIT RATE AMOUNT SR

Note

6 8

No. No.

No.

04

No.

No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of bounding materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per ID drawing and specification 01 02 03 04 Epoxy paint on cement screed. , ref. EC Non toxic epoxy paint on structure , ref. NE Anti carbonation protection epoxy coating for pavement. , ref. AEC 8mm thk. heavy duty multi component epoxy screed with polyurethane base on concrete screed for car ramps,supported with linear metal strip for non sliding. , ref.HES Multi component epoxy coating on concrete screed for drive way & turns. , ref. MEC Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds 06 07 08 Cement plaster to suit walls Paint on cement plaster ,ref. W01 Non toxic epoxy paint on structure ,ref. W07 Finishings : ceilings 09 10 11 Cement plaster to suit ceiling Paint on cement plaster, ref.C01 Non toxic epoxy paint on structure, ref.C08 DESCRIPTION QTY UNIT RATE AMOUNT SR

660 192 9200 302

M M M M

05

10800

1265 3872 253

M M M

15851 15851 192

M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DIVISION 9 - FINISHES EXTERNAL FINISHES Finishing : walls including metal angle beads and lathing at junctions of differing backgrounds 01 02 Cement plaster to suit external surface External Paint on cement plaster to suit external surface DESCRIPTION QTY UNIT RATE AMOUNT SR

70 70

M2 M2

To Collection

SR

Collection Sheet - 25 Sheet - 26 Sheet - 27

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES CORNER & COLUMN GUARD Corner guards install at 600 high from finish floor heavy duty rubber guard bumper, including all associated works, as per detail 18 shown on drawing CL-GA-901 and as specification 01 To suit column location as required as shown on drawings CL04-i201-i216 ALUMINUM LOUVERS SCREEN Supply and install fixed anodized aluminum sand trap louvers panels on anodized aluminum frames including finishes and all associated works to complete and fix the works as per details on drawing CL-GA-802 and specification 02 03 04 05 Ref. L03, size 4500x2600mm to suit required locations Ref. L04, size 1600x1600mm to suit required locations Ref. L06, size 4500x2600mm to suit required locations Ref. L08, size 1600x1600mm to suit required locations 4 4 3 8 No No No No 1073 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES SIGNAGE Manufacturer's standard indoor signs, letters and plaques including fixings, finishes, accessories complete as per interior design drawings CL04-i901 to CL04-i916 and all required materials and equipments to complete and finish the works according to specifications, drawings and code of practice 01 02 03 04 05 06 07 08 Ref. type S01 Ref. type S02 Ref. type S07 Ref. type S09 Ref. type S10 Ref. type S11 Ref. type S12 Ref. type S13 68 44 8 2 105 30 5 2 No No No No No No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Collection Sheet - 28 Sheet - 29

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:01 Discharge valve room with basement floor including all required works as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste from tower chute to pipe networks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Discharge valve room without basement floor including required earthworks, concrete works for the vacuum room masonry for the vacuum room and electromechanical works and all required works as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from tower chute to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant 03 508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover steel rungs and all required to complete the work. 04 RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016 755 M 13 No. QTY UNIT RATE AMOUNT SR

02

No.

23

No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 05 32 mm dia. 50 mm dia. 75 mm dia. 100 mm dia. 150 mm dia. Accesssories 06 07 08 09 10 11 12 13 14 15 Floor drain 50mm dia., ref. FD Parking drain, 150mm dia., ref. PD Floor cleanout 50 mm dia, ref. FCO Floor cleanout 100 mm dia, ref. FCO Floor cleanout 150 mm dia, ref. FCO Cleanout 50 mm dia., ref. CO Cleanout 75 mm dia., ref. CO Cleanout 100 mm dia., ref. CO Gully trap, ref. GT Trench drain outlet, 100mm dia., ref. TDO 18 40 1 50 12 4 8 162 4 2 No No No No No No No No No. No. 135 180 505 3200 640 M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, installation and test discharge pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 01 100 mm dia Reinforced concrete gray water tank with required capacity and proprietary medium duty cast iron manhole cover and frame, including sump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 02 03 04 05 06 Gray water tank CAP. 31 m3 Gray water tank CAP. 45 m3 Gray water tank CAP. 48 m3 Gray water tank CAP. 51 m3 Gray water tank CAP. 56 m3 Packaged type variable speed discharge pressure system Gray water lift pumps, including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 07 08 Gray water lift pumps CAP. 5 KW Gray water lift pumps CAP. 6 KW 5 1 Set Set 2 1 1 1 1 No No No No No 500 M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Reinforced concrete sump pit including internal lining, proprietary galvanized steel manhole cover and frame, guide bar, lifting chain and all associated works, valves pipework within sump pit chamber as detailed on drawings (concrete work & earthwork, waterproofing measured elsewhere) 01 Sump pit Submersible pumps (one duty and one stand-by) including associated valves, pipework, valves controllers and accessories within sump pit chamber as described on drawings (sump pit measured separately) 02 Ref. SP1 capacity 1.5 HP Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 03 04 05 06 07 Packaged water treatment unit. Cap. 31 m3/day Packaged water treatment unit. Cap. 45 m3/day Packaged water treatment unit. Cap. 48 m3/day Packaged water treatment unit. Cap. 51 m3/day Packaged water treatment unit. Cap. 56 m3/day 2 1 1 1 1 No. No. No. No. No. 12 Set 12 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS NON-POTABLE WATER INSTALLATION Supply, installation and test pipework, plypropylene for non-potable water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 04 05 06 07 08 08 01 02 03 04 20 mm dia. 25 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. Accessories 05 06 07 08 09 Water meter assembly 63mm dia., Isolating valve, 50 mm dia, ref. (IV) Isolating valve, 75 mm dia, ref. (IV) IV & CV assembly 100 mm dia., Hose bib 20mm dia., ref. (HB) 16 54 26 4 71 No. No. No. No. No. 710 185 370 370 50 460 1185 80 320 730 M M M M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS Packaged type duplex unit discharge pressure system potable water lift pumps, (one duty & one stand by) including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing and specification section 15453 01 02 Potable water pump CAP. 7.17 KW Circulating potable water pump CAP. 0.5 HP Reinforced concrete under ground water tank and pump room with required capacity and proprietary cast iron manhole covers and frames, including internal lining access ladders, pipework submersible pump, ventilating fans with exhaust and fresh air pipework, valves, vent pipes and truck fill pipework as detailed on drawings (concrete work & earthwork, water proofing measured elsewhere) 03 Potable Water tank 2 No. 2 2 Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, installation and test Pipework, UPVC class 5 including fittings, trenching, back fill supports system and all associate works as per code standard 01 02 03 04 05 06 07 08 09 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. Accessories 10 11 12 13 14 15 Pendent sprinkler head Upright sprinkler head Side wall sprinkler head 100mm Fire departement valve , ref. FDV Floor control valve assembly 100mm dia., ref. FCVA Fire department connection, 2 way fire department inlet connection type with gate and check valve 150mm dia. 120 1187 13 29 4 No No No No 3080 415 627 275 27 6 1585 235 235 M M M M M M M M M QTY UNIT RATE AMOUNT SR

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, install, testing and commissioning proprietary integrated fire hose reel and fire extinguisher cabinet the work shall include but not limited to fire extinguisher, hose reel nozzle, fixings, isolating valve 40 mm dia., trims and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 Ref. FHC Supply, install, testing and commissioning portable multipurpose fire extinguisher the work shall include but not limited to fixing to wall, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 Ref. CO2 CO2 system Supply, install and test CO2 cylinders including pipe work, black steel seamless for CO2 fittings, supports valves, regulators, sleeves, as shown on drawings and as per specification 03 04 05 06 07 08 09 CO2 cylinders CAP 45 KG Control panel Remote manual release Abort switch Alarm bell 4-port nozzle Ioization detector 33 13 13 13 13 13 13 34 No 17 No QTY UNIT RATE AMOUNT SR

No. No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 01 02 Proprietary tank units CAP. 2800 Lit. Proprietary tank units CAP. 3780 Lit. 2 1 No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Collection Sheet -31 Sheet -32 Sheet -33 Sheet -34 Sheet -35 Sheet -36 Sheet -37 Sheet -38

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test black steel pipework including fittings thermal insulation, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 06 07 08 09 10 15 mm dia. 25 mm dia. 32 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 300 mm dia. 350 mm dia. 400 mm dia. QTY UNIT RATE AMOUNT SR

330 10 225 700 395 435 60 55 100 550

M M M M M M M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply and install valve / BTU meter Butterfly valve 01 Ref. MBFV 400 mm dia., Isolating valve 02 32mm dia., Check valve 03 32mm dia., BTU meter 04 32mm dia., Supply and install heat exchanger including valves and short length piping as detailed on drawings and as per specifications 05 Ref. HEX-01 to 05, 1920 KW capacity Supply, install, test and commission, variable speed chilled water centrifugal inline pumps unit including valves, flexible connections, Y-striners, mounting and fixing to pads (measured separately) as detailed on drawing and specifications 06 Ref. CWP-01 to 05, 50.96 L/S capacity 45 m TDH QTY UNIT RATE AMOUNT SR

No.

34

No.

17

No.

17

No.

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and commission, expansion tank as detailed on drawings and specifications 01 Ref. ET, 1200 liter capacity Supply, install and commission, air separator tank as detailed on drawings and specifications 02 Ref. AS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 03 04 05 06 Ref. FCU-02, 17.1 KW cooling capacity Ref. FCU-03, 3.1 KW cooling capacity Ref. FCU-04, 4.3 KW cooling capacity Ref. FCU-05, 5.3 KW cooling capacity Supply, install, test and commission DX-ducted split unit including control, pipes and fixing as per drawing and specifications 07 Ref. RAC-01, 3.51 KW nominal coollling capacity Supply, install, test and commission, DX-ducted split unit including control, pipes and fixing as per drawings and specifications section 15781 08 Ref. FCU-01/ACCU-01 , 4 KW capacity Supply, install, test and commission automatic chemical dosing unit as detailed on drawings and specifications 09 Ref. ACDU To Collection QTY UNIT RATE AMOUNT SR

No.

No.

2 13 13 4

No. No. No. No.

34

No.

No.

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Ventilating fans as details on drawings and specifications, section 15860 01 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and CAP. Ref. EF- 01, 50 LPS capacity Ref. EF- 02, 1600 LPS capacity Ref. EF- 03, 160 LPS capacity Ref. EF- 04, 125 LPS capacity Ref. EF- 05, 40 LPS capacity Ref. EF- 06, 30 LPS capacity Ref. EF- 07, 95 LPS capacity Ref. BIF-01, 3680 LPS capacity Supply, install, test and commission, Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 10 11 12 Ref. SD1 Ref. SD2 Ref. SD3 QTY UNIT RATE AMOUNT SR

No.

02 03 04 05 06 07 08 09

3 4 4 3 13 9 4 30

No. No. No. No. No. No. No. No.

26 26 8

No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, supply air register as detailed on drawings and specification 01 Ref. SR 7 / RR7 Supply, install, test and commission, Return round louver face ceiling diffusers as detailed on drawing and specification 02 03 04 Ref. RD1 Ref. RD2 Ref. RD3 Supply, install, test and commission, door grill as detalied and specificaitons 05 Ref. DG1 Supply, install and test motorized door louver as detailed on drawing and specification QTY UNIT RATE AMOUNT SR

No.

26 26 8

No. No. No.

19

No.

7
06 size 950 x 2200 mm Supply and install Galvanized steel sheet rectangular ductwork, including supports and volume damper , and bill mouth opening as per drawings and specification 07 Various gauges Supply and install Duct insulation 08 Thermal semi-rigid insulation to rectangular ductwork Supply, install and test generator exhaust ductwork with canvass connection as detailed on drawing and specification 09 To suit generator room

No.

960

Kg

250

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including power cables, wiring and conduits and cable trays from the MCC to HVAC equipment, interlocks, earthing ...etc, all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 01 Ref. MCC- CWP QTY UNIT RATE AMOUNT SR

No.

To Collection Collection Sheet - 39 Sheet - 40 Sheet - 41 Sheet - 42 Sheet - 43 Sheet - 44

SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION MVSWGR (medium voltage switchgear) Supply , install , testing and commissioning 13.8 KV, 3 phase, 60 Hz,SF6 MVSWGR with 2 cells including all associated works to complete installation as per drawings and specifications. The contractor shall prepare sketches and details for approval from SEC and shall make arrangement and required coordination with supervising engineer to complete the work 01 Ref (MVSWGR/CL-04) RING MAIN UNIT Only installation, testing and commissioning for 13.8 KV, 3 phase, 60 Hz SF6 ring main unit including all associated works for complete installation as per drawings and specifications and required coordination (supply will be by client) 02 Ring Main Units , ref (RMU3-CL4 ,RMU2-CL4 ,RMU1-CL4 &RMU4-CL4) Supply , install, testing and commissioning of the following equipment including grounding, all accessories and necessary works required for installation as per SEC regulation and as shown on the drawings and as described in specifications and required coordination 03 Dry type transformer 1600 KVA, 13.8KV -400/230V, 3PH, 60HZ , ref (TR1-CL4 ,TR2-CL4 ,TR3-CL4&TR4-CL4) 4 No 4 No 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION Supply , install and test medium voltage copper Cables 15KV/ XLPE/STA/PVC, between medium voltage equipments as shown on drawings and coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ PVC, cables route from RMU up to transformers Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ PVC, cables Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 03 04 05 Electronic KWH meters M-bus master controller complete with software M-bus IP router 21 21 21 Note 20 M QTY UNIT RATE AMOUNT SR

02

310

No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit or cable tray (measured elsewhere ) , including earth cable, junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 4C-16mm2-CU/XLPE/PVC+16mm2G/ cable trench 4C-35mm2-CU/XLPE/PVC+16mm2G/ cable tray 4C-50mm2-CU/XLPE/PVC+25mm2G / cable tray 4C-50mm2-CU/XLPE/PVC+25mm2G / cable trench 4C-95 mm2-CU/XLPE/PVC+ 50 mm2G / cable trench 4C-95mm2-CU/XLPE/PVC+50mm2G / cable tray 4C-120mm2-CU/XLPE/PVC+70mm2G / cable trench 4C-150mm2-CU/XLPE/PVC+70mm2G / cable trench 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable tray 4C-185mm2-CU/XLPE/PVC+95mm2G / cable tray 4C-185mm2-CU/XLPE/PVC+95mm2G / cable trench 4C-240mm2-CU/XLPE/PVC+120mm2G / cable tray 2(4X1C-240mm2)-CU/XLPE/PVC / cable trench 4C-300mm2-CU/XLPE/PVC+150mm2G / cable trench 40 5 600 475 10 25 150 10 15 930 530 5 700 20 5 M M M M M M M M M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit or cable tray (measured elsewhere ) , including earth cable, junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 4C-300mm2-CU/XLPE/PVC+150mm2G / cable tray 2(4C-300mm2)-CU/XLPE/PVC / cable trench 3(4X1C-630mm2)-CU/XLPE/PVC / cable trench The following items listed below shown in drawing AP03 - E701 , AP04 - E701 &AP06 - E701(inside each apartment building AP03, AP04 &AP06.) 04 05 06 07 08 4C-10mm2-CU/XLPE/PVC+10 mm2G/ cable tray 4C-25mm+1C-16mmG-CU/XLPE/PVC / cable tray 4C-35mm+1C-16mmG-CU/XLPE/PVC/ cable tray 4C-50mm+1C-25mmG-CU/XLPE/PVC / cable tray 4C-70mm+1C-35mmG-CU/XLPE/PVC / cable tray 130 20 40 65 45 M M M M M 210 10 40 M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply and install an Emergency Power Generating Sets including associated Generator Control Panel . In addition to circuit breakers, pads, supports, controls, daily and diesel fuel with necessary connections to earth as per the manufacture including all necessary equipment, accessories and associated works, as shown on drawings and as described in specifications. sections 01 02 03 (GEN.SET-1),450 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. (GEN.SET-3),437 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. (GEN.SET-2), 626 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. MAN / HAND HOLE Supply, install, testing and commissioning reinforced concrete manholes and hand holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power and communication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 Power manhole (1800x1800x1800mm) ( Ref.PMH). Communication hand hole (600x600x600mm) ( Ref.CHH). 12 6 No No 1 1 1 No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Ref. MDP-P3 Ref. DP61 Ref. PPSE Ref.SLPE ( listed in bill of site lighting package ) Ref. EPSE with ATS (built-in ) Ref. DP62 Ref. MDP-P2 Ref. DP31 Ref. PPSC Ref. SLPC ( listed in bill of site lighting package ) Ref. EDPS3 with ATS (built-in ) Ref. EPSC Ref. DP32 Ref. DPSB2 1 4 4 4 4 4 1 9 9 9 9 9 9 1 No No No No No No No No No No No No No No NIC NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Ref. PPSB2 Ref. EDPSB2 with ATS (built-in ) Ref. EPSB2 Ref. EPMSB2 Ref. EPMSB2A Ref. EMDP-P2 Ref. MDP-P1 Ref. DP41 Ref. PPSC1 Ref.SLPC1 ( listed in bill of site lighting package ) Ref. EPSC1 with ATS (built-in ) Ref. DP42 Ref. MCC ( supplied and installed by others ) Ref. DPSB1 Ref. PPSB1 1 1 1 1 1 1 1 4 4 4 4 4 1 1 1 No No No No No No No No No No No No No No No NIC NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Ref.SLP4B ( listed in bill of site lighting package ) Ref. EDPSB1 with ATS (built-in ) Ref. EPSB1 Ref. EPMSB1 Ref. EMDP-P1 Ref. MDP-P4 Ref. DPSB3 Ref. SLP4A ( listed in bill of site lighting package ) Ref. PPSB3 Ref. EDPSB3 with ATS (built-in ) Ref. EPSB3 Ref. EPMSB3 Ref. EPP (IP54) Ref. EMDP-P3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No No No No No No No No No No No No No No NIC NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

52 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of circuit breaker including cables, conduits, fittings, supports, fixings, tapes, connections enclosures and all necessary works required to suit the locations shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 200AT /250AF Rating. Sub-Main circuit :Supply , install, Power & Communication distribution galvanized steel cable trays, including fittings, supports and all accessories as described on drawing Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 02 03 04 05 06 200 mm wide 300 mm wide 400 mm wide double layer 600 mm wide 1000 mm wide 1180 1720 200 160 5 M M M M M 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

53 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Above false ceiling disconnect switch, non-fused with pilot light, 20A, 1P, 230V for FCU-03,04 Above false ceiling disconnect switch, non-fused with pilot light, 20A, 3P, 400V for BIF'S-01 Disconnect switch, non-fused with pilot light, 16 A, 1P, 230V for waste collection equ. Disconnect switch, non-fused with pilot light, 20A, 1P, 230V for FDB-1,2, FACP,FD4G , FD3G , FD6G , BD-4,5,6 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for submersible pump,2 submersible pumps,fuel pump Disconnect switch, non-fused with pilot light, weatherproof, 20A,3P, 400V for2gray pumps control panel&2potable pumps control panel Disconnect switch, non-fused, with pilot light ,weatherproof, 50 A, 3P, 400V for PEF-01 Disconnect switch, non-fused t, weatherproof, 400A, 3P, 400V for fire pump & jockey pumps 30 No Note QTY UNIT RATE AMOUNT SR

02

22

No

03

17

No

04

32

No

05

16

No

06

10

No

07

No

08

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

54 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Disconnect switch, non-fused t, weatherproof, 500A, 3P, 400V for fire MCC-CWP Disconnect switch, fused with pilot light, 20A, 1P, 230V for RAC-01 Disconnect switch, fused with pilot light ,weatherproof, 20 A, 1P, 230V for FCU-02 Disconnect switch, fused with pilot light, 32 A, 1P, 230V for FCU-01 Floor mounted ,Junction box, Ceiling mounted junction box Wall mounted junction box Single socket outlet, 10A, 230V, grounding type Single socket outlet, weatherproof , 10A, 230V, grounding type Duplex socket outlet,16A,230V, grounding type 1 No QTY UNIT RATE AMOUNT SR

02 03

47 2

No No

04 05 06 07 08 09 10

3 3 30 65 258 141 3

No No. No No No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

55 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 Single pole one-way switch (13A) Single pole one-way switch weatherproof (13A) Single pole , two gang, switch (13A) Single pole , two gang, switch weatherproof (13A) Push button switch Motor switch with built-in overload protection (tumbler switch) Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 07 08 Lighting fixture outlets Lighting fixture outlets type FT1 (cove light ) 1,564 32 No No 84 16 13 7 39 29 No. No. No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

56 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Ref. EX (Exit light wall mounted, single sided) Ref. EX (Exit light ceiling mounted, double sided ) Ref. F1 Ref. F1E Ref. F2 Ref. F2E Ref. F3E Ref. F7E Ref. F8E Ref. NE Ref. WL3 Ref. WL4 Ref. WL4E Ref. FT1 63 53 519 162 307 104 3 119 104 23 48 21 38 1,010 No No No No No No No No No No No No No M. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

57 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply, install , testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panels, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit system network equipped with: 01 02 Wall mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Ceiling mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Wall mounted telecommunication outlet for intercom system Ref. (T0 )I Wall mounted telecommunication outlet, 1 ports ( one data, one tel ) Ref.( T02 ) Wall mounted telecommunication outlet, 3 ports ( two data,one telephone. ) Ref.( T04 ) Wall mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) but weatherproof for ATM Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P) , data switch CAT6 a 1x24 RJ45 ports ,UTP patch panel CAT6 a 1x24 RJ45 ports, with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FDB1 ) 30 76 No No QTY UNIT RATE AMOUNT SR

03

21

No

04

17

No

05

17

No

06

No

07

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

58 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panel, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P) , data switch CAT6 a 1x36 RJ45 ports ,UTP patch panel CAT6 a 1x36 RJ45 ports, with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FDB2 ) The following items listed below shown in drawing AP03 - E801 , AP04 - E801 &AP06 - E801(inside each apartment building AP03, AP04 &AP06.) 02 Building distributor (BD3,BD4&BD6) ( Includes main F. O. P. P. and all necessary works required for installation as shown on drawings, on single line diagram in AP -03-E801,AP -04-E801&AP -06-E801) to form a complete and fully operative system Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P. (2 x 4 port)) , data switch cable 1x24 RJ45portss ,UTP patch panel (24 ports) with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FD3G ,FD4G &FD6G) Data and voice system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 17 No 1 No QTY UNIT RATE AMOUNT SR

03

17

No

04

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

59 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

To suit fire alarm system network equipped with: 01 02 03 04 05 06 07 08 09 10 Ceiling mounted optical smoke detector, Sounder with strobe light Fire alarm bell Fire alarm manual call station Fire alarm interface module Ceiling mounted multi sensor ( heat , smoke ) Ceiling mounted multi sensor ( CO ,heat , smoke ) Fire fighting telephone panel ref (FFT) Fire man's telephone jack Master analogue fire alarm control panel-MFACP comprising of TCP-IP interface and power supply unit with complete PC work station , interfacing to auto - dialer to local fire department, Analogue terminal adapter (interfacing with auto - dialer ) 92 11 39 67 28 77 123 17 39 1 No No No No No No No No No No

11

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

60 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

The following items listed below shown in drawing AP03 - E801 , AP04 - E801 &AP06 - E801(inside each apartment building AP03, AP04 &AP06.) 01 Master analogue addressable fire alarm control panel-FACP comprising of TCP-IP interface and power supply unit, automatic dialer ,analogue terminal adapter interfacing to auto - dialer to local fire department, Fire alarm system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 17 No

02

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

61 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL VOICE EVACUATION SYSTEM Supply , installation, testing and commissioning of voice evacuation system complete with all accessories required for installation including distribution panel for voice evacuation system , pull boxes, loudspeaker , microphone, cable/ wire and conducting supports, fittings, interfacing units , and all required to suit the locations shown on drawings. Coordination and integration with other systems shall be conducted during work execution, as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit evacuation system network equipped with: 01 Master voice evacuation distribution panel ref. MVP complete with fire phone, power supply unit with battery backup (3-hours continuance operation), including master mic with zone selection, master mic control, 96 switch control, dual channel , integrated fire phone & interface to fire alarm control panel (FACP). Voice evacuation distribution panel (ref.VDP) with3x100W amplifier, and power supply unit Voice evacuation distribution panel (ref.VDP) with 2x100W amplifier, and power supply unit 2 Watts, voice evacuation speaker, ceiling mounted 2 Watts, voice evacuation speaker, wall mounted Voice evacuation system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No. QTY UNIT RATE AMOUNT SR

02

No.

03

17

No.

04 05 06

47 54 1

No. No. Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

62 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL AUDIO / VIDEO IP INTERCOM SYSTEM Supply , installation testing and commissioning of audio / video IP intercom system comprising of outdoor station unit with built-in color camera, indoor station units with built -in monitors, electrical door lock , AC power supply, cables and conduits and associated works as required to suit the locations shown on drawings and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit audio /video phone IP intercom system network equipped with: The following items listed below shown in drawing AP03- E801 , AP04 - E801 &AP06 - E801(inside each apartment building AP03, AP04 &AP06.) 01 Waterproof outdoor station unit (48 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, , etc. in drawing AP03- E801&AP06- E801 , Waterproof outdoor station unit (32 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, etc.in drawing AP04- E801 , Electric door lock Network controller with power supply Exit push button Electric door strike Audio / video IP intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 22 No QTY UNIT RATE AMOUNT SR

02

No

03 04 05 06 07

26 17 26 34 1

No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

63 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL INTEGRATED SECURITY SYSTEM Supply , installation testing and commissioning of integrated security system comprising of CCTV IP cameras, network video recorder with built in motion detection, CCTV monitors, video display unit, keypad, system controllers, readers, readers interface modules, push buttons, electro magnetic locks, encoders, security server, workstations, wire, power supplies, conduits, interfaces and all accessories required for the system as per drawings, riser diagrams and specifications To suit system consisting of ,but not limited to: 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Intelligent security controller (ref. ISC) Reader interface module (ref. RIM) Double reader interface module (ref. DRIM) Card reader ref. (CR) Exit push button (ref. PB) Electromagnetic lock Magnetic door contact(ref. DC) Electromagnetic lock for double side door with electric lock (D) Ceiling mounted indoor IP CCD day / night camera Outdoor ceiling mounted IP CCD day / night camera Outdoor wall mounted IP CCD day / night camera Ceiling mounted IP fixed dome camera Outdoor type motion sensor Security system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 19 25 52 No No No QTY UNIT RATE AMOUNT SR

129
81

No.
No

39
39 42 21 30 21 26 34 1

No.
No No No No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

64 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN TELECOMMUNICATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for data and telephone system to connect all buildings/floor distributers BD/FD to the primary/secondary active switch as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system MAIN FIRE ALARM SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for fire alarm system to connect all FACPs in all buildings with each other as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible To suit all network system 02 Supply and install a fire alarm system to suit external feeder network 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

65 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN VOICE EVACUATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for voice evacuation system to connect all voice evacuation distribution panels. in all buildings with master voice evacuation panel. as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 02 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

66 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL GROUNDING SYSTEM Supply, install, test and commissioning a grounding system for cluster comprising bare copper conductors for grounding all electrical and mechanical equipments in the cluster and all required works for connecting in one grounding system In addition to all earthwork, connections, clips, copper clad steel rods in ground test wells with cast iron covers situated around the building as required and all associated works as necessary to provide a complete grounding system, all as shown on drawing . Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 To suit grounding system for network of cluster 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

67 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Collection Sheet - 45 Sheet - 46 Sheet - 47 Sheet - 48 Sheet - 49 Sheet - 50 Sheet - 51 Sheet - 52 Sheet - 53 Sheet - 54 Sheet - 55 Sheet - 56 Sheet - 57 Sheet - 58 Sheet - 59 Sheet - 60 Sheet - 61 Sheet - 62 Sheet - 63 Sheet - 64 Sheet - 65 Sheet - 66 Sheet - 67 To Bill Summary SR QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

68 / 69 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL04) ITEM DESCRIPTION AMOUNT S.R.

BILL SUMMARY Sheet - 16 Sheet - 17 Sheet - 21 Sheet - 22 Sheet - 23 Sheet - 24 Sheet - 25 Sheet - 27 Sheet - 29 Sheet - 30 Sheet - 38 Sheet - 44 Sheet - 68 SITE DEVELOPMENT SITEWORK CONCRETE MASONRY METALS THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES CONVEYING SYSTEMS PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

69 / 69 REVISED PAGE

Date: MAY 2012