OPTIMIZING SUMMARY
WEB PORTAL
IMPROVING THE EFFICIENCY AND ERGONOMICS FOR A WEB PORTAL ABOUT ENERGY PERFORMANCE.
... p.8
- IDENTIFYING THE OPPORTUNITY FOR A NATURAL HYBRID VENTILATION SYSTEM AND OPTIMIZING ITS REGULATION
VENTILATION SYSTEM
... p.24
- ENHANCING THE EFFICIENCY FOR A HEAT RECOVERY VENTILATION SYSTEM DURING THE INTERMEDIARY SEASON
... p.32
- ADJUSTING THE RUNNING TIME OF THE SYSTEMS FOR VENTILATION AND HEATING AFTER A REFURBISHMENT
... p.28
INSULATION
- IMPLEMENTING SMALL COMPLEMENTARY INTERVENTIONS ON A REFURBISHED BUILDING WITHOUT HAVING TO OPERATE WITHIN THE APPARTMENTS
... p.26
TENANTS EDUCATION
- ENHANCING THE COMMUNICATION AND THE KNOWLEDGE OF THE USERS. IN A UNIVERSITY ENERGY EFFICIENT BUILDING
... p.10
- RAISING TENANTS ATTENTION IN A POST-REFURBISHED BUILDING ABOUT THE IMPACT OF VENTILATION
BOILER
- IMPROVING A NEW HEATING SYSTEM (CONDENSING BOILER) WITH SPECIFIC LOW-COST INTERVENTIONS ON MISSING INSULATION ... p.20 - ADJUSTING THE RUNNING TIME OF THE SYSTEMS FOR VENTILATION AND HEATING AFTER A REFURBISHMENT ... p.26
HYDRAULIC BALANCING
IMPROVING THE BALANCING OF THE HEATING SYSTEMS ... detecting errors in its scheme ... p.12 ... lower adjustments regulating the heating curve ... p.14 & p.16 & p.22 ... in a low energy building ... p.38
HEATING CONTRACT
- ASSESSING THE EFFICIENCY OF THE MAINTENANCE INTERVENTIONS IN A PROFIT-SHARING HEATING CONTRACT
... p.6
- UPDATING CONTRACT AFTER REFURBISHMENT IN A RENEWABLE ENERGY-BASED DISTRICT HEATING SYSTEM
... p.24
WP3: RAMEAUX
OPERATING MANAGEMENT: ASSESSING THE EFFICIENCY OF THE MAINTENANCE INTERVENTIONS IN AN PROFIT-SHARING HEATING CONTRACT.
ADRESS NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: ALAIN GORAGUER NUMBER OF INHABITANTS
Les Rameaux, Alle des Monts Dors, 63370 LEMPDES. France. 70 1970 (refurbishment: 2005) Appartment blocks : 3 low-rise horizontal blocks (3 stories) + 1 low-rise block (4 stories). 4590 not identified
CLERMONT-FERRAND FRANCE
OPTIMIZATION SUGGESTION
OBJECTIVE/ To assess the benefits of the profit-sharing contract for the tenants and the SHO identify and quantifying actual energy savings obtained thanks to a regular follow-up of the maintenance interventions made by the energy supplier on the heating system. HOW ?/ - Implementation of a weekly on-site visit by the energy provider and heating system manager in order to compare the objective of consumption (overmentionned NB) and the actual energy consumptions. - Monitoring of this follow-up(and the corrective actions implemented) and assessment of the correlated savings thanks to the weekly report prepared by the energy provider using with an efficiency indicator. -Assessment and prospective diagnosis regarding the potential impact for disorders spared thanks the implementation of the corrective actions. Correlation between identified savings and the profit-sharing costs.
6
+ + +
HEATING CONSUMPTIONS
2009: 527,820 MWh (HDD = 2315) 2010: 587, 736 MWh (HDD = 2721) 2011: 411, 632 MWh (HDD = 1978) - 89, 68 KWh/m2/y
SO
EXPECTED OUTPUTS
Model for a profit-sharing heating contract between SHO and heating provider integrating maintenance aspects. Complete annual follow-up of the maintenance tasks regarding heating systems activities and their impacts in terms of energy efficiency.
ST
CI
CO
AL
ENERGY.
+ !
More accurated monitoring of the maintenance actions and calculation of its efficiency. More readibility for the SHO and the tenants on the maintenance of the system and its efficiency improving the energysavings.
PLANNING
#1: ESM / IMPLEMENTATION OF THE NEW ENERGY CONTRACT (INCLUDING THE RAMEAUX BUILDING) BETWEEN AUVERGNE HABITAT - SOCIAL HOUSING ORGANIZATION - AND COFELY - ENERGY PROVIDER. #2: meeting between auvergne habitat and cofely with the definition of a work plan and an agreement about the open card approach of the exchanges between the sho and its energy provider. #3: SUPPLY BY THE ENERGY PROVIDER OF WEEKLY REPORTS ABOUT THE EFFICIENCY INDICATORS AND THE CORRECTIONS ACTIONS IMPLEMENTED. FORMATION OF A DATA BASIS. #4: ANALYSIS OF THE FIRST HEATING SEASON. INTERMEDIARY ASSESSMENT OF THE EXPERIMENT AND ADJUSTMENT FOR THE 2ND HEATING SEASON. MEETING WITH THE TENANTS REPRESENTATIVES TO COMMUNICATE THE FIRST RESULTS. #5: ANALYSIS OF THE DATA COLLECTED ON THE COMPLETE REPORTING PERIOD AND FINAL ASSESSMENT OF THE OPTIMIZATION. TENANTS WORKSHOP ON SITE WITH A PRESENTATION WORKSHOP INVOLVING ALL THE FAMILIES AND PARTICIPATION OF THE LOCAL TENANTS REPRESENTATIVES (CLCV). FINAL ASSESSMENT WITH THE TENANTS REPRESENTATIVES
JAN. 2012
JAN. 2013
JUNE 2013
WP3: JABURKOVE
OPERATING MANAGEMENT: IMPROVING THE EFFICIENCY FOR A WEB PORTAL ABOUT ENERGY PERFORMANCE.
ADRESS NUMBER OF APARTMENTS Havirov Czech Republic YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: MONIKA KWAPULINSKA NUMBER OF INHABITANTS
J.Jaburkov 1,3,5, 736 01 HAVIROV. Czech Republic. 36 1962 (refurbishment: 2009) 4 Apartment block. External walls made of panel blocks. Flat roof. 1758,7 (apartments) + 1,9 (commercial space) 73
OPTIMIZATION SUGGESTION
OBJECTIVE/ To increase the control of the tenants about their consumption and to motivate the tenants to save energy thanks to a pro-active behavior. To complete the Internet interactive tool with a interpersonal communication. HOW ?/ - New introduction webpage with energy and water saving tips and recommendations combined with a hard paper energy saving containing tips distributed to the tenants and on notice board, - Benchmarking: comparison with the other apartments energy consumption in the building (anonymously) thanks to a report put on the notice board of the building. - Paper reports distributed to tenants to complete the Internet access to the data (helping for example ederly people). - Personal advising for the most energy-consuming tenants by the staff of the SHO.
8
+ + +
HEATING CONSUMPTIONS
2009: 247, 780 MWh (HDD = 3336) 2010: 232, 500 MWh (HDD = 3987) 2011: 186, 944 MWh (HDD = 3307) - 106, 30 KWh/m2/y
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
Assessment of the efficiency of a web tool regarding tenants energy awareness and consumptions (complementary with the ICT-PSP BECA project) toolbox for direct information toward tenants (routines, interview guides, papers, etc.)
ENERGY.
+ !
Direct involvement of the tenants and more precise knowledge of their consumptions. The results may be difficult to assess in the global energy savings of the building. Complementary approach between an Internet portal and more interpersonal involvement bet the SHO and the energy staff.
PLANNING
#1: ESM/ INSTALLATION OF THE SYSTEM FOR REMOTE READING #2: BASELINE DATA COLLECTION #3: SURVEY AMONG TENANTS & PRESENTATION OF THE PORTAL #4: START OF THE SERVICE - DISTRIBUTION OF ACCESS DATA, MANUAL, ENERGY SAVING TIPS TO TENANTS #5: DISTRIBUTION OF OTHER EDUCATION MATERIALS AND POSTER #6: DISTRIBUTION OF THE MONTHLY PAPER REPORTS #7: PERSONAL COMMUNICATION WITH THE PILOT SITE TENANTS (ESPECIALLY THE MOST-ENERGY CONSUMING) #8: PUBLIC PRESENTATION OF THE UP-TO-NOW SAVINGS TO THE TENANTS #9: MONITORING OF THE MONTHLY HEATING ENERGY AND WATER CONSUMPTION DATA + LOGGING OF THE TENANTS ON THE INTERNET PORTAL
14 NOV. 2011 JAN. 2012 TO DEC. 2012 AUG. 2012 TO SEPT. 2012 15 NOV. 2012 DEC. 2012 / FEB. 2013 / FEB. 2014 TO APR. 2014 JAN. 2013 TO APR. 2014 JUNE 2013
ADRESS NUMBER OF APARTMENTS HERNING DENMARK YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA NUMBER OF INHABITANTS
H2-College Birk Centerpark 77, 79, 81, 83 + 93, 7400 HERNING. Denmark. 66 2009 2 College building. Prefabricated Elements. Passive House building. 4 low-rise horizontal blocks. 2498 66
OPTIMIZATION SUGGESTION
OBJECTIVE/ Energy data shows an unacceptable difference between highest and lowest energy consumptions among tenants inducing issues of satisfaction regarding the economic, energy and comfort performance of the building. Soft corrective actions need to be implemented with the tenants in order to correct these overconsumptions (tips and information). To do so, a precise knowledge of the real use of the building is needed to improve its efficiency and the tenants behaviors. HOW ?/ - Implementation of a survey regarding the tenants behaviors and patterns of energy consumptions with personal interviews, online and postal questionnaires and implementation of a submetering system in dwellings in order to identify and separate energy consumptions for heating (electricity) and other personal consumptions such as computers, hi-fi, electric hardware. - 2 comparative experiments in 2 different buildings with additional tenants information in building 1 and no additional information in building 2.
10
+ + +
CO
EXPECTED OUTPUTS
Assessment of the impacts for a short-term information strategy regarding energy consumptions. Improvement the knowledge regarding users behaviors in high performance building (the fact that tenants are students is interesting regarding a prospective approach)
ST
ENERGY.
SO CI AL
+ !
More precise knowledge and awareness regarding the tenants behaviors (students are important for educational aspects regarding their future uses).Strong impact of the behaviors in highly efficient energy buildings.
PLANNING
#1: DESIGN FOR THE RIGHT SUBMETERING SYSTEM AND SELECTION OF THE COMPANY THAT WILL INSTALL THE SYSTEM 2#: installation of sub metering in 10 apartments for allocating heat consumption for each of the 10 apartments 3#: measure the heat consumption without influence the tenants behaviour about how they use the heat during the cold month. 4#: measure the heat consumption where we influence 5 of the tenants behaviour thru a lot of information about energy savings and using energy right. #5: CAMPAIN VIA MAIL TO THE TENANTS TO PARTICIPATE IN THE INTERNET SURVEY AND IDENTIFY THEIR MOTIVATION REGARDING ENERGY-FRIENDLY BEHAVIORS. GIFT AND GIFT CARDS PROPOSED FOR A COMPLETE PARTICPATION TO THE SURVEY (8 MONTHS) #6: ONLINE INFORMATION CAMPAIN TO INFLUENCE BEHAVIORS BEFORE THE BEGINING OF THE NEW HEATING SEASON #7: COMPLEMENTARY INFORMATION ABOUT BEST PRACTICES AND COMPETITION ORGANIZED WITH A CHANCE TO WIN PRICES FOR PARTICIPANTS TO THE SURVEY #8: PERSONAL INTERVIEWS BY SHO STAFF WITH THE TENANTS OR BY PHONE INCLUNDING THE OUTPUTS FROM THE FIRST PHASE OF THE SURVEY. PORTAL
APR. 2013 TO MAY 2013 & SEPT. 2013 TO DEC. 2013 1 APR. 2013
NOV. 2013
11
WP4: UZAVRENA
RUNNING MAINTENANCE: IMPROVING THE BALANCING OF A HEATING SYSTEM CORRECTING DEFICIENCIES IN ITS SCHEME.
ADRESS Havirov Czech Republic NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: MONIKA KWAPULINSKA NUMBER OF INHABITANTS
Uzavren 2,4,6, 736 01 HAVIROV. Czech Republic. 36 1962 (refurbishment: 2009) Apartment block. External walls made of panel blocks. Flat roof. 1780 72 to 74
OPTIMIZATION SUGGESTION
OBJECTIVE/ Control of the balanced heating system scheme and technical inspection of the balanced heating system during operation period. HOW ?/ - Detection of imperfections and errors in the scheme and/or compare the scheme with the real situation of the heating system (parameters and visual inspection of the system) and implement inspection of the system. For example: propose the correct positioning and dimensions of heating circuit elements, especially the pressure regulators: the differential pressure regulator was installed on the return branch and connected with capillary to the incoming flow pipe. The connection point was upstream of the circulation pump. This wrong position was impacting unfavourably the operation conditions for the pump. Correct connection point was defined ahead of the circulation pump. The life expectancy of circulation pump prolongated, less energy consumed by circulation pump and correct hydraulic conditions were established.
12
+ + +
HEATING CONSUMPTIONS
to be completed - new Pilot Site
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
Technical process for the inspection of a balanced heating system Example of a corrected scheme for heating systems and assessment of its impacts
ENERGY.
+ !
Improvement of the balancing between the different parts of the building. Reduction of the energy consumptions and corelated economic impacts obtained thanks to small investment costs.
PLANNING
#1: Baseline data collection: Inside, outside temperatures, temperatures of heating water incoming, returncoming and desired, Monthly heating energy consumption, HEATING degree days. 2#: Elaboration of the project of hydraulic balancing of the pilot site. PROPOSAL FOR A NEW SCHEME. 3#: Purchase of the material. #4: Realisation of the NEW hydraulic balancing. #5: Monitoring of the heating energy consumption data and temperatures, check of the balanced heating system.
MARCH 2013
13
WP4: RIESI
RUNNING MAINTENANCE: COMPLETING THE ACTION OF A ADAPTER SYSTEM ON A BUILDING WITH A MANUAL INTERVENTION
ADRESS TORINO ITALY NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: GIANFRANCO TARABUZZI NUMBER OF INHABITANTS
VIa Riesi 5, 10043 ORBASSANO, Italy. 51 1995 10 51 dwellings, traditional construction 1807,6 145
OPTIMIZATION SUGGESTION
OBJECTIVE/ To improve the balancing of the new heating system thanks to a smart metering system based on individual heat cost allocators. Tenants still complain about thermal discomfort, higher costs than before and too many differences of consumption rates among apartments. This situation has to be resolved thanks to a better thermoregulation of the boiler. HOW ?/ An ADAPTERM system implemented in the building (description from the TECHEM website - http://www.techem.com/):
- the data collector gathers the summarized temperature data from the radio heat cost allocators (1a) and the heating systems flow temperature data (1b) and then determines the total heat demand in the building based on this information. - the adapterm module determines the outdoor temperature (from the heating controller or via sensor) and sends it to the data collector. - based on all the information received, the data collector calculates whether there is an oversupply of heat in the building. If so, it sends a correction value for the reduction of the flow temperature to the adapterm module. - the adapterm module lowers the flow temperature to its optimal level. - via radio remote access, the Techem operation control center ensures the adapterm system operates properly and efficiently. 14
+ + +
HEATING CONSUMPTIONS
2008: 482, 610 MWh 2009: 403, 790 MWh 2010: 420, 050 MWh 2011: 360, 240 MWh (HDD = 1829) (HDD = 2198) (HDD = 2181) (HDD = 2298) - 199, 36 KWh/m2/y
SO
CO
CI AL
EXPECTED OUTPUTS
Assessment of the efficiency for a smart metering system with adapter and its impact on the heating curves (complementary with the ICT-IPS BECA project)
ENERGY.
+ !
Automatic management of the thermoregulation improving the energy savings and the comfort in the building. Better and continuous monitoring of the efficiency of the system with an efficiency indicator.
PLANNING
#1: Meeting with person(s) in charge for the information of the tenants, for the optimization of the ESM decided and for monitoring electricity, heating etc. 2#: first tenants survey 3#: MONTHLY MONITORING FOR THE PARAMETERS BY ATC TECHNICIAN AND A BOILER TECHNICIAN: - AUTOMATIC REGULATION OF THE THERMOREGULATION CURVE OF THE HEATING SYSTEM THANKS TO THE ADAPTERM SYSTEM. - read heating consumption (and dhw) parameters. - download data measurement of humidity and temperature from dataloggers #4: Realisation of the NEW hydraulic balancing.
NOV. 2012
DEC. 2013
15
WP4: TR16
RUNNING MAINTENANCE: ADAPTING THE HEATING CURVES TO THE DESIGN OF A HEATING SYSTEM WITH A LOWER ADJUSTMENT
ADRESS TRBOVLJE SLOVENIA NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING SHO CONTACT: DAMIJAN ARNSEK CONDITIONNED FLOOR AREA NUMBER OF INHABITANTS
Trg Revolucije 16, 1420 Trbovlje, Slovenia 52 1970 14 Apartment block with concrete walls ad facade bricks, flat roof 2969,73 102
OPTIMIZATION SUGGESTION
OBJECTIVE/ The heating curves are usually set according to the design of the heating system. Often there is no check whether this setting is indeed correct in practice. Retrofit of buildings such as replacement of windows require re-tuning of the heating curves. Use of general common (standard) heating curves may lead to tenants complaints and excessive heat consumption. Due to safety margins in the design, in practice a lower adjustment of heating curve is often possible. HOW ?/ - According to the assessment from an energy expert, the heating system is overdimensioned by factor 4, therefore the temperature of distributed water throughout the building is too high, resulting in thermal losses of the pipelines. Conversion to low temperature heating was suggested, instead of 80/65 (dT 52,5C) regime 50/40 (dT 25C) will be implemented, reducing heating power of radiators to 1/3. Heating curve will be lifted for 5C. - Also, direct actions on tenants awareness and education, teaching them (with a meeting or written instructions) what they need to do and most of all - avoid to keep the optimization implementation efficient and effective. SHO will present the main characteristics of optimization done to heating system to the tenants and give them instructions (for example with flyers, tips, a small guide easy understandable) to explain which are the best behaviours to perfectly use the ESM and save energy.
16
+ + +
HEATING CONSUMPTIONS
second half 2008: 96,800 MWh (HDD = to be completed) 2009: 224, 900 MWh (HDD = to be completed) 2010: 236, 500 MWh (HDD = to be completed) first half 2011: 129, 300 MWh (HDD = to be completed)
TS
SO
CO S
CI AL
EXPECTED OUTPUTS
Inspection report regarding an overdimensioned heating system and corresponding corrections Process to improve the awareness of the tenants (interviews, meeting, information supports, etc.)
ENERGY.
+ !
Reduction of the energy consumptions and linked economic impacts with small investment costs in an oversized heating system. Low-temperature heating regulation may not be able to cope with the low outside temperature in bad insulated building.
PLANNING
#1: implementation of the esm hydraulic balancing of the system 2#: Meeting with local energy specialist to agree on the parameters to be monitored (number of loggers to be used , position of loggers, frequency of reading) #3: Meeting with person(s) in charge for the information of the tenants about the monitoring of the operation of the heating system and other related parameters #4: Getting the baseline data #5: Agreement on the survey and how to distribute questionnaires #6: FIRST TENANTS SURVEY #7: NEW HYDRAULIC BALANCING #8: Monitoring heating consumption, indoor temperature, outdoor temperature, indoor %RH #9: SECOND TENANTS SURVEY
NOV. 2012 TO JAN. 2013 NOV. 2012 TO JAN. 2013 DEC. 2012 TO JAN. 2013 DEC. 2012 DEC. 2012 TO DEC. 2013 MAY 2013 TO DEC. 2013
17
WP5: BERGSON
REPLACEMENT OF SYSTEMS: IDENTIFYING THE OPPORTUNITY FOR A NATURAL HYBRID VENTILATION SYSTEM AND ADAPTING ITS REGULATION
ADRESS NUMBER OF APARTMENTS CLERMONT-FERRAND FRANCE YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: ALAIN GORAGUER NUMBER OF INHABITANTS Place Bergson .63000 CLERMONT-FERRAND. France. 162 1967 (refurbishment: 2010) Appartment blocks : 3 low-rise horizontal blocks (9 stories + 4 stories+ 9 stories). 10 579 not identified
OPTIMIZATION SUGGESTION
OBJECTIVE/ To compare MCV and NHV regarding economic, energy and comfort indicators. To improve the energy and comfort performance of the new NHV with more precise settings adapted to the building. HOW ?/ - Comparative monitoring between two ventilation columns in the building .One ventilation column is equipped with a classic Mechanical Controlled Ventilation System active all time. One ventilation column is equipped with a Natural Hybrid Ventilation VNHy. Indicators will include heat loses, electric consumptions, and temperature/humidity/CO2 emissions. - Improvement of the savings realized thanks to the Natural Hybrid Ventilation. Adaption of the settings will be done after obtaining the first results: adaptation of the working hours for the system, assessment of the link between the working time of the ventilation system to several parameters (e.g. hygrometry).
18
+ + +
HEATING CONSUMPTIONS
2009: 994, 224 MWh (HDD = 2315) 2010: 961, 000 MWh (HDD = 2721) 2011: 777, 336 MWh (HDD = 1978) - 73, 48 KWh/m2/y
ST S
SO
EXPECTED OUTPUTS
Complete comparative performace analysis between mechanical controlled ventilation and hybrid natural ventilation. Example of a adaptation/regulation process for an hybrid ventilation
CO
CI AL
ENERGY.
+ !
Reduction of the electric consumptions and heating losings for the ventilation in an energy efficient refurbished building with a special attention to the air comfort for the tenants.
PLANNING
#1:End of the refurbishment #2: Meeting between Auvergne Habitat and ITS HEATING PROVIDER in order to define the expectations of the SHO and to propose a model to collect data. #3: Presentation of the ESM and the optimization plan to the Tenants Council of Auvergne Habitat. #4: Works and metering systems installed on the column 8 and 9 of the building #4: Analysis of the first results and synthesis of the data collected. #5: Metering of the enclosed indicators: heating savings (dbitmtre extracted air + delta between outdoor temperature air and indoor extracted temperature), electric consumptions , indoor air quality. Analysis and assessment of the first results by Auvergne Habitat (containing one visualisation of the first results + comments) Workshop with the tenants of LAiguillade to present the measure and the contextual information (on site, all tenants invited, participation Tenants representatives). Complete data analysis for the reporting period. Synthesis document provided to the tenants + FINAL Meeting WITH TENANTS
APR. 2013 JUNE 2013 APR. 2013 TO JUNE 2013 & SEPT. 2013 TO DEC. 2013
JULY 2013
SEPT. 2013
WP5: PASSONI
REPLACEMENT OF SYSTEMS: IMPROVE A NEW HEATING SYSTEM (CONDENSING BOILER) WITH SPECIFIC LOW-COST INTERVENTIONS ON MISSING INSULATION
ADRESS TORINO ITALY NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: GIANFRANCO TARABUZZI NUMBER OF INHABITANTS
Via Passoni 14. 10146 TORINO, Italy. 12 1978 4 Prefabricated building. 1636 26
OPTIMIZATION SUGGESTION
OBJECTIVE/ The SHO has identified complaints by tenants about heating and bills, the variety of consumptions among single apartments is higher from what was expected. To identify examples for small interventions that can be implemented on the existing heating system (as no removal of the boiler can be expected). The new condensing boiler has been widespread in the strategy of ATC for the replacement of heating systems. The identification of small insulation operation on the boiler (with low cost of implementation) can be extented to a majorpart of this housing stock and realize some significant energy savings at the scale of the global housing stock. HOW ?/ - Installation of an insulation cap for the not insulated heat exchanger (cf. photo). This insulation cap will reduce the thermic losings and improve the energy efficiency of the system (cf. thermography before and after). - Monitoring of the temperatures in several dwellings in order to better understand the differences between the tenants and resolve the complaints by a futur hydraulic balancing.
20
+ + +
HEATING CONSUMPTIONS
2008: 102, 950 MWh 2009: 90, 970 MWh 2010: 100, 050 MWh 2011: 94, 620 MWh (HDD = to complete) (HDD = to complete) (HDD = to complete) (HDD = to complete) - 57, 84 KWh/m2/y
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
Example for low-cost interventions on heating system and assessment of its potentials at a larger scale.
ENERGY.
+ !
Low cost investment improving the efficiency of a heating system. Metering system implemented to better understand the differences of temperatures between dwellings, explain and improve the comfort in the appartments.
PLANNING
#1: INSTALLATION OF THE NEW CONDENSING BOILER 2#: Getting the baseline data 3#: Awareness of tenants #4: Installation of an insulation cap for the heat exchanger #5: Thermography (before, after)
2009 NOV. 2012 NOV. 2012 DEC. 2012 DEC. 2012 DEC. 2012
#6: Meeting with person(s) in charge for the information of the tenants about the monitoring of the operation of the heating system and other related parameters #7: Meeting with local energy specialist to agree on the parameters to be monitored (number of loggers to be used , position of loggers, frequency of reading) #8: MONITORING PHASE: The heating energy, incoming and return temperature of water and flow of water (calorimeter) and consumption of gas, outside temperature, Indoor temperature and RH in problematical flats. #9: FIRST Tenants survey (questionnaire) #10: Tenants survey (questionnaire)
DEC. 2012
21
WP5: HEINHEIMER
REPLACEMENT OF SYSTEMS: ADJUSTING A HEATING SYSTEM AFTER THE IMPLEMENTATION OF A NEW GAS CALORIFIC BOILER BUT WITH OLD RADIATORS
ADRESS NUMBER OF APARTMENTS DARMSTADT GERMANY YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING SHO CONTACT: ARNE SCHREIER CONDITIONNED FLOOR AREA NUMBER OF INHABITANTS
Heinheimer Strae 57-61. D-64289, Darmstadt. Germany. 30 1957 5 Simple family house from the 50s: ceilings in concrete, brickwalls and gable roof with tiles. 1582,40 75
OPTIMIZATION SUGGESTION
OBJECTIVE/ A calorific boiler has been installed in the building, which leads to a lower flow temperature than the previous standard boiler. The potential for a hydraulic balancing has to be analyzed. It is also interesting to know if the thermostatic valves are suitable for this purpose, otherwise old valves must be replaced. Hydraulic balancing is a very interesting opportunity for this action: the radiators have not been replaced and are still sized according to the old supply temperature. By hydraulic balancing it will be ensured that each radiator will get the same amount of heat. HOW ?/ The subcontractor Energie & Haus has implemented its analytical method for heating systems Heating ECG (DIN 15378) to define the basis for an optimal operation of heating systems. By heating ECG we can determine how efficiently a heating system is actually working. For 24 hours, the provider measures all the relevant data and temperatures of the heating system. From the results it errors are detected and recommendations are defined: - hydraulic balancing of heating pipeline through installation of modern thermostatic valves and adjustment of volume flow / pump speed. - revision of the control technology with the aim of a longer burner running time in modulating operation by low flow temperature. - gradual reduction of the heating curve.
22
+ + +
HEATING CONSUMPTIONS
2008: 207, 910 MWh (HDD = to be completed) 2009: 108, 323MWh (HDD = to be completed) 2010: 216, 302 MWh (HDD = to be completed) 2011: 104, 403 MWh (HDD = to be completed) - 65, 99 KWh/m2/y
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
Implementation of an analytical method to identify the deficiencies of a heating system. Decision process for the implementation of thermostatic valves and adjustement of the balancing for a heating system.
ENERGY.
+ !
Improvement of the efficiency of the heating system with a lower flow and less consumption of energy. Adaptation of the temperatures in all the dwellings.
PLANNING
#1: INSTALLATION OF THE NEW CALORIFIC BOILER #2: IMPLEMENTATION OF THE ENERGIE & HAUS ANALYTICAL METHOD HEATING ECG AND DETECTION OF THE ERRORS IN THE HEATING SYSTEM + COMPLETE REPORT REGARDING THE PERFORMANCE OF THE HEATING SYSTEM AND RECOMMANDATIONS TO IMPROVE IT #3: review of the plant on site with an engineer and a heating installer after the results of the heating ecg AND IDENTIFICATION OF THE ISSUES ON FIELD #3: GRADUAL REDUCTION OF THE HEATING CURVE #4: Revision of the control technology with the aim of long burner running time in modulating operation by low flow temperature. #5: Hydraulic balancing of heating pipeline through installation of modern thermostatic valves and adjustment of volume flow / pump speed. Building behaviour IS monitored through the collection of energy consumption data. timing of data updates every 2 weeks.
21 FEB. 2013
MAY-JUNE 2013
23
WP6: AIGUILLADE
RECENTLY REFURBISHED BUILDINGS: UPDATING CONTRACT AFTER REFURBISHMENT IN A RENEWABLE ENERGY-BASED DISTRICT HEATING SYSTEM
ADRESS CLERMONT-FERRAND FRANCE NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING SHO CONTACT: ALAIN GORAGUER CONDITIONNED FLOOR AREA NUMBER OF INHABITANTS
Rue de lAiguillade, Entre 2 17, 63000 CLERMONT-FERRAND, France 196 1965 7 Apartment block with external thermic insulation. 9408 not know
OPTIMIZATION SUGGESTION
OBJECTIVE/ The subscription to the district heating system (which is owned by the Municipality but managed by a private company) is calculated on two basis and prices: price R1 (costs proportional to the energy consumption - energy charge depending on the fuels used and the variable costs in heat procurement) ; price R2 (fix costs calculated on a theoretical contracted capacity - power charge which is tied to the contracted capacity or contracted water flow). To identify and quantify the energy performance obtained thanks to the refurbishment of the building in order to modify the price R2 in the contract. To highlight the progresses realized thanks to the new energy mix in terms of sustainability. HOW ?/ - Estimation and assessment of the improvements related to the refurbishment of the building in terms of energy consumptions. Thanks to the monitoring of the consumptions, calculation of the new heat flow requested by the substation of the building (puissances moyennes appeles = ratio consumption/working time) to obtain the legal temperature in the apartments. - Assessment of CO2 emissions impacts of the refurbishment. link with CO2 impacts for the new energy mix. - Update of the power charge (theoritical contracted flow capacity) and estimation the cost savings related to this negociation for a new R2 with the Municipality.
24
+ + +
!
HEATING CONSUMPTIONS
2009: to be completed by the SHO 2010: to be completed by the SHO 2011: to be completed by the SHO
CO S
EXPECTED OUTPUTS
General and interdisciplinary assessment (energy savings, CO2 emissions, costs savings) of the performance resulting of a global refurbishment connected to a district heating system.
TS
ENERGY.
SO CI AL
+ !
Link between energy savings and the optimization of a district contract in terms of costs savings (widely spread accross Europe). Promotion of an new sustainable energy mix. Awareness campaign towards tenants in order to inform them about the advantages of a refurbishment in terms of costs.
PLANNING
#1:End of the refurbishment of the building. The main improvements related to this refurbishment are : refurbishment of the insulation, improvement of the ventilation system (hybrid ventilation), external thermic insulation, windows replacement (double-glazing). #2: New boiler for the district heating system (managed by the Municipality of Clermont-Ferrand with a delegation to the private company Dalkia) with a new energy mix : 80% wood/20% gas. #3: Beginning of the monitoring of energy consumptions for the building = energy savings for the building (kWh), CO2 Emissions, requested heat flow by the heating system (kW). #4: Presentation of the ESM and the optimization plan to the Tenants Council of Auvergne Habitat. #5: Synthesis of the heating season with an estimation of the expected cost savings regarding the 2 main components of the subscription to the district heating system: R1 (energy charge) + R2 (power charge). #6: Workshop with the tenants of LAiguillade to present the measure and the contextual information (on site, all the tenants invited) #7: Final estimation of the expected cost savings regarding the 2 main components of the subscription to the district heating system: R1 + R2. Assessment of the energy savings and the CO2 emissions. #8: Negotiation for a new additional clause with the district heating system manager with a new power charge. #9: Synthesis document provided to the tenants + Meeting
OCT. 2012
NOV. 2012
SEPT. 2013
DEC. 2013
WP6: TOLSTEHO
RECENTLY REFURBISHED BUILDINGS: IMPLEMENTING SMALL COMPLEMENTARY INTERVENTIONS ON A REFURBISHED BUILDING WITHOUT HAVING TO OPERATE WITHIN THE APPARTMENTS
ADRESS HAVIROV, FRANCE NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: MONIKA KWAPULINSKA NUMBER OF INHABITANTS Tolsteho 1, 3, 5, 36 01 HAVIROV. Czech Republic. 34 1960 5 Apartment block with external thermic insulation. 1708,46 m2 (flats) + 8,04 m2 (commercial space)= 1716,86 m2 not know
OPTIMIZATION SUGGESTION
OBJECTIVE/ To resolve the deficiencies of the facade refurbishment thanks to a thermovision with a diagnosis on the weak points of the insulation of the facade (specific control of windows seals and visual integrity of the coat). The objective is to improve energy savings and ESMs efficiency with a corrective approach on the issues identified on the external insulation, but also to make the indoor comfort and quality of life better. Integrating the results for this process, SHO may decide to generalize this process to its whole housing stock. HOW ?/ - Thermographic active detection, to determine the fluxes of heat affecting the various constituent parts of the building envelope (coat, fixtures, roof ..), in presence of indoor environments with heating in function: heat loss due to deficiencies in insulation, presence of thermal bridges, moisture in walls, search for water infiltration. - Intervention on the building, through the rehabilitation of those parts affected by a thermal behaviour problematic, perhaps without having to enter into the appartments: reinforcement of the joints related to the windows frame is one the most common. Other possible actions are: resolution of any thermal bridges detected, with the creation of new thermal insulation ; restoration of damaged areas of thermal coat ; replacement of seals on doors and windows.
26
+ + +
HEATING CONSUMPTIONS
2009: 324, 722 MWh (HDD = 3336) 2010: 373, 889 MWh (HDD = 3987) 2011: 238, 611 MWh (HDD = 3307) - 139, 70 KWh/m2/y
TS
SO
CO S
CI
EXPECTED OUTPUTS
Assessment of a thermography impacts (costs/energy savings realized after intervention) with possibility to expand it to a larger scale Installation of thermostatic valves and adjustment of the balancing of the heating system
AL
ENERGY.
+ !
Micro-correction of the deficiencies after an insulation (technical outputs to be generalized and corrective process). Improvemet of these deficiencies with low cost intervention. Control of the air flow circulating in the apartments through the leaks in the windows frames.
PLANNING
#1: Date of completion of the global refurbishment #2: Baseline data collection #3: Thermovision realisation: outside temp. -5C, inside temp. 21C 24C. Measurement took place inside the apartments. Focused on tightness of the windows, balcony doors and details around windows. #4: Repairs of the errors found by the thermovision: leaksaround contact ofwindow sash (wing)andwindow frame, leaks around window frame, leaks under window sills and in contact of window frame and sill. resealing windows of all apartments in the house andrepairs of leaks around internal window sills have been realised. #5: Distribution of the education materials about correct heating and ventilation. #7: Survey among the tenants distribution of the questionnaires #7: Thermovision after repairs #8:Monitoring of the heating energy consumption data
13 APR. 2013
WP6: MATHILDE
RECENTLY REFURBISHED BUILDINGS: ADJUSTING THE RUNNING TIME OF THE SYSTEMS FOR VENTILATION AND HEATING AFTER A REFURBISHMENT
ADRESS DARMSTADT GERMANY NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: ARNE SCHREIER NUMBER OF INHABITANTS
Mathildenstrae 36-40. D-64285 , Darmstadt. Germany. 19 1955 4 to 5 Apartment block. 1209,44 around 40
OPTIMIZATION SUGGESTION
OBJECTIVE/ To adapt - potentially - the ventilation system to tenants behaviour (switch off in summer) - this option will not be implemented due to too much important maintenance and adjustment costs. To regulate the heating systems control (shut down at night) in order to realize energy savings and improve ESMs efficiency, but also indoor comfort and quality of life. HOW ?/ - Specific control of all the ESM (global refurbishment) such as windows and visual integrity of the coat, central heating, ventilation system, water system. Review of the control of the heating system (using the heating ECG method). - Repair of the windows in basement (reduction of the open area to reduce the required combustion air input). - Lowering of the heating characteristics. Revision of the boiler control with the aim of a longer, modulating burner running time during the heat operation. - If possible, restriction of the exhaust gas volume flow and possibly using a heat pump to utilize the exhaust gaz energy.
28
+ + +
HEATING CONSUMPTIONS
2009: to be completed 2010: to be completed 2011: to be completed
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
Implementation of analytical method (heathing ECG) to identify the deficiencies of the heating system Example of process of concertation with the tenants regarding the adjustment of the systems (ventilation + heating)
ENERGY.
+ !
Structured process to analyze the real efficiency of heating system and adjust it in order to reduce the energy consumptions and their costs.
PLANNING
#1: Date of completion of the global refurbishment #2: Meeting with person(s) in charge for the information of the tenants, for the optimization of the ESM decided and for monitoring electricity, heating etc. Apply the optimization suggested.
#3: IMPLEMENTATION OF THE ENERGIE & HAUS ANALYTICAL METHOD HEATING ECG AND DETECTION OF THE ERRORS IN THE HEATING SYSTEM + COMPLETE REPORT REGARDING THE PERFORMANCE OF THE HEATING SYSTEM AND RECOMMANDATIONS TO IMPROVE IT #4: ReducTION OF the flow temperature FOR THE HEATING SYSTEM. intermittent water heating Building behaviour IS monitored through the collection of energy consumption data. timing of data updates every 2 weeks.
JAN. 2013
29
WP6: PICCO
RECENTLY REFURBISHED BUILDINGS: RAISING TENANTS ATTENTION IN A POST-REFURBISHED BUILDING ABOUT THE IMPACT OF VENTILATION
ADRESS TORINO ITALY NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: GIANFRANCO TARABUZZI NUMBER OF INHABITANTS
Via Picco 53-55-62-64, 10078 VENARIA REALE, Italy 28 1966 4 Apartment block 1807,6 58
OPTIMIZATION SUGGESTION
OBJECTIVE/ The SHO has been aware of existing complaints about condensation (tenants) and external insulation issues. No low-cost interventions can be applied on the building due to the recent refurbishment and the cost of the initial investment. Nevertheless the objective is to use another lever in order to improve the energy efficiency of the refurbishment, tenants awareness, in order to see how energy and comfort can be improved thanks to soft investment, information, coaching and education. HOW ?/ - 1 to 1 tenants awareness raising is to present the main characteristics of the refurbishment done to their building and give them some instructions to explain which are the best behaviours to perfectly use the ESM and save energy. - Identification of the most performing behaviors, education/training of tenants and monitoring of best practices
+ + +
30
HEATING CONSUMPTIONS
2009: no data 2010: no data 2011: 162, 029 MWh (HDD = 2298) - 89, 67 KWh/m2/y
SO
ST
CI
CO
AL
EXPECTED OUTPUTS
1 to 1 direct communication process with the tenants. Methodology to improve the tenants awareness after a refurbishment Correction an recommendations regarding the ventilation and the carpentries for the next refurbishment operations
ENERGY.
+ !
Improvement of the knowledge of the tenants behiaviors and individual and specific action towards them. Involvement of the tenants in the energy efficiency of the buildings.
PLANNING
#1: Date of completion of the global refurbishment #2: Meeting with person(s) in charge for the information of the tenants, for the optimization of the ESM decided and for monitoring electricity, heating etc. Apply the optimization suggested. #3: FIRST Tenants survey/meeting #4: SECOND Tenants survey/meeting #5: MONITORING PHASE: The heating energy, incoming and return temperature of water and flow of water (calorimeter) and consumption of gas, outside temperature, Indoor temperature and RH in problematical flats.
31
WP6: LYSTRUP
RECENTLY REFURBISHED BUILDINGS: ENHANCING THE EFFICIENCY FOR HEAT RECOVERY VENTILATION SYSTEM DURING THE INTERMEDIARY SEASON (TARGET: SENIORS)
ADRESS NUMBER OF APARTMENTS LYSTRUP DENMARK YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: FRANK KEJBERG NUMBER OF INHABITANTS
Lystrup Centervej 30-56, 8520 LYSTRUP, Denmark 14 1984 1 14 houses for senior housing. Brick building. 924 14
OPTIMIZATION SUGGESTION
OBJECTIVE/ The energy supply used by the heating coil in the ventilation is regulated by the demand for energy of the floor heating, resulting in unheated air in ventilation when floor heat is not running. The problem raised up by Aarhus is a general lack of regulation of heating system and ventilation. When the first is not working the second one doesnt work too. So tenants complain about thermal discomfort. Through the intervention suggested there will be a separation between the heating recovering system and the underfloor heating system in order to improve the situation. HOW ?/ Separation between the heating recovering system and the underfloor heating system adding a control valve for the heating coil of the ventilation system in order to make its control independent (to save energy at the beginning and at the end of the heating season).
32
+ + +
HEATING CONSUMPTIONS
2009: to be completed 2010: to be completed 2011: to be completed
TS
SO
CO S
CI
EXPECTED OUTPUTS
Example for the improvement of a refurbished building during the intermediary season and overview of the deficiencies that can reduce the efficiency for a heat recovery ventilation.
AL
ENERGY.
+ !
Improvement of the energy savings during the intermediary season with a special attention to the comfort of the tenants reducing the overheating.
PLANNING
#1: Date of completion of the global refurbishment 2#: RETROCOMMISSIONING WITH TENANTS INTERVIEW WHICH IDENTIFIED PROBLEM WITH THE DRAFT FROM THE VENTILATION (FINAL CONCLUSION: SEPT. 2012) #3: NEGOTIATIONS WITH CONTRACTERS AND ENGINEERS REGARDING TECHNICAL SOLUTIONS. ESTABLISHING SEPARATE CONTROL-VALVE FOR THE HEATING SURFACE IN THE VENTILATION SYSTEM. 4#: SUBMETERS ADDED FOR THE METERING OF THE M3 IN DHW AND THE KWh OF THE DISTRICT HEATING USE TIO HEAT IT UP, IN ORDER TO SEPARATE ENERGY FOR DHW FROM THE ENERGY FOR ROOM-HEATING. #5: THE EXTRA CONTROL-VALVE IS ADDED AND THE HEATING-SURFACE IN THE VENTILATION SYSTEM CAN PRE-HEAT THE INLET AIR WITHOUT THE UNDER-FLOOR HEATING BEING TURN DOWN. #6: ALL DHW-EXCHANGERS SET FOR 55-58C - VENTILATION INLET TEMPERATURES SET FOR MINIMUM 23,5C #7: CORRECT METER FOR M3 OF DHW INSTALLED #8: EFECT INVERTER FOR SOLAR PANNELS - INVERTER EXCHANGED (MAY 2013) #9: TENANTS SURVEY #10: DEFECT METER FOR DISTRICT HEATING - METER EXCHANGED #11: TEMPERATURE OF DHW WILL BE CHECKED AND CORRECTED IF NECESSARY #12: TENANTS INTERVIEW FOCUSING ON OVERHEATING FROM THE SUN EXPERIENCED IN THE SUMMER #13: BEFORE THE HEATING SEASON, ALL THE VENTILATION INLET TEMPERATURES (THE HEATING SURFACE) WILL BE CHECKED AND CORRECTED #14: SECOND TENANTS SURVEY
NOV. 2012
DEC. 2012
JAN. 2013 FEB. 2013 MARCH 2013 APR. 2013 MAY 2013 JULY 2013 SEPT. 2013
DEC. 2013 33
WP6: TFF2a
RECENTLY REFURBISHED BUILDINGS: RAISING TENANTS ATTENTION IN A POST-REFURBISHED BUILDING (comparing with WP6 Pilot ESM #2)
ADRESS NUMBER OF APARTMENTS Trbovlje SLOVENIA YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING SHO CONTACT: DAMIJAN ARNSEK CONDITIONNED FLOOR AREA NUMBER OF INHABITANTS
Trg Franca Fakina 2a, Trbovlje, Slovenia 31 1990 8 Apartment block with concrete walls 1830 79
OPTIMIZATION SUGGESTION
OBJECTIVE/ TFF2a is a spread ownership building, 50 % of the consent of the owners is claimed for any intervention on the common parts of the building. In case of smaller interventions (like checking and repair/replace the windows seals), the owners choice is priviledged. As a consequence no direct interventions can be implemented on the building: the SHO cant force the tenants to intervene on their own property. Raising tenants awareness and teaching them (door-to-door visits and written instructions parallel to tenants survey) what they need to do and most of all- avoid in order to keep the ESM efficient and effective for as long as possible as be recommanded by the technicians of the buildings who have noticed a number of tilted windows during the last thermography implemented on the building. HOW ?/ - Thermographic detection carried out in order to identify thermal bridges and eventual defects of seals, possible eliminations of thermal bridges and replacement/maintenance of windows and door seals. - Tenants awareness and education with a meeting and providing of written instructions. During this meeting it will be possible to present the main characteristics of the refurbishment done to their building and give them some instructions to explain which are the best behaviours to perfectly use the ESM and save energy. At the end of the heating season, SHO will arrange a new meeting to present some results to the tenants, to show them if they have saved energy and which are the actions to take if they want to improve their behaviour (and saving) more.
34
+ + +
HEATING CONSUMPTIONS
2008: 115, 930 2009: 110, 324 2010: 111, 268 2011: 105, 011 MWh (HDD = to be completed) MWh (HDD = to be completed) MWh (HDD = to be completed) MWh (HDD = to be completed) - 57, 38 KWh/m2/y
ST S
SO CI
CO
AL
EXPECTED OUTPUTS
ENERGY.
1 to 1 direct communication process with the tenants. Methodology to improve the tenants awareness after a refurbishment Correction an recommendations regarding the ventilation and the carpentries for the next refurbishment operations (comparative approach with the WP6 ESM Picco implemented in Torino).
+ !
Improvement of the knowledge of the tenants behiaviors and individual and specific action toward them. Involvement of the tenats in the efficiency of their building and assessment of the potential savings linked to their beheaviors.
PLANNING
#1: Date of completion of the global refurbishment #2: FIRST MEETING WITH THE TENANTS (PERSONAL VISITS IN 25 OUT OF 31 APARTMENTS) 3#: Thermography on buildings shell #6: Heating energy consumption (kWh) and its cost Heating degree days (C) , Reference values for indoor temperatures and humidity #6: Tenants survey (questionnaire)
DEC. 2013
35
WP7: MAARSLET
LOW-ENERGY BUILDINGS: OPTIMIZING THE ENERGY CONSUMPTION REQUESTED BY DHW PRODUCTION IN A LOW-ENERGY BUILDING
ADRESS MAARSLET, DENMARK NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: FRANK KEJBERG NUMBER OF INHABITANTS
Kildevang, Langballevej 9A-9H, 8320 Mrslet. Denmark. 8 2011 0 Low-energy houses for seniors 65m2/dwelling 8 to 16
OPTIMIZATION SUGGESTION
OBJECTIVE/ Domestic hot water heat exchanger is designed to keep water warm at all time: heat exchanger for Domestic Hot Water is equiped with a comfort valve allowing the exchanger to run idle and ensuring short waiting time for hot water at the tap but with a larger energy consumption. Heat exchanger may better be cold until DHW is required in order to save energy, but using more water due to delay in temperature increase.
These valves open / close depending on the temperature of the water which contacts them and rely on the systems heater mounted pumps pressure to overcome the opposing pressure of the cold water line at the bypass valve. 1st Inefficiency inherent with these valves is they cannot maintain positive closure when a certain ammount of pressure is forced on them ( e.g.: when a faucet or tap is open. Thus, leaching between hot and cold water lines occur every time the water lines pressure drops, (e.g.: laundry, dishwasher, icebox refill, toilet flush, sprinkler system, etc.). 2nd Inefficiency inherent with this type of recirculation system is that during scheduled-on periods the pump runs continuously consuming valuable electrical energy even when hot water has filled the hot water pipes. This also causes undo wear on the pump shortening its lifespan. ( as quoted on the specialized website: http://www.diybanter.com/)
+ + +
HOW ?/ - Changing the design of the system: implementation of a new valve on the exchanger in order to prevent idle. This implementation will cause a longer waiting time for hot water and will increase the water consumption but will also lower the energy consumption.
36
OVERALL CONSUMPTION
2011: 25, 688 MWh (HDD: to be completed) - 49, 4 KWh/m2/y
TS
EXPECTED OUTPUTS
Improvement of a domestic hot water system in a lowenergy building - how to save more in a already efficient building - thanks to a new design scheme and the comparison between the energy efficiency of two types of valves (including a comfort/bypass valve). Dialogue process with a special target (seniors) regarding a modification in their daily comfort (DHW).
SO
CO S
CI AL
ENERGY.
+ !
Improvement of the knowledge of the tenants behiaviors and individual and specific action toward them. Energy savings realized thanks to the replacement of valve in the DHW system. More time to have hot water for the tenants but dialogue process with them.
PLANNING
37
WP7: SC9b
LOW-ENERGY BUILDINGS: UPGRADE AN EXISTING LOW-ENERGY BUILDING TO A NEW LEVEL OF PERFORMANCE THAKS TO A BETTER BALANCING OF THE HEATING SYSTEM
ADRESS Trbovlje SLOVENIA NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: DAMIJAN ARNSEK NUMBER OF INHABITANTS
Savinjska cesta 9b, Trbovlje, Slovenia 13 2006 5 Apartment block of reinforced concrete 785,55 38
OPTIMIZATION SUGGESTION
OBJECTIVE/ The heating curves are usually set according to the design of the heating system. Often there is no check whether this setting is indeed correct in practice. Retrofit of buildings such as replacement of windows require re-tuning of the heating curves. Use of general common (standard) heating curves may lead to tenants complaints and excessive heat consumption. Due to safety margins in the design, in practice often a lower adjustment of heating curve is possible. HOW ?/ - According to assessment from energy expert, the heating system is overdimensioned by factor 4, therefore the temperature of distributed water throughout the building is too high, resulting in thermal losses of the pipelines. Conversion to low temperature heating was suggested, instead of 90/70 (dT 60C) regime 50/40 (dT 25C) will be implemented, reducing heating power of radiators to 1/2. Heating curve will be lifted for 5C. - SHO will present the main characteristics of optimization done to heating system to the tenants and give them instructions (for example with flyers, tips, a small guide easy understandable) to explain which are the best behaviours to perfectly use the ESM and save energy.
38
+ + +
OVERALL CONSUMPTION
2008: 44, 160 MWh (HDD = to be completed) 2009: 42, 900 MWh (HDD = to be completed) 2010: 51, 220 MWh (HDD = to be completed) - 65, 20 KWh/m2/y first half 2011: 27, 800 MWh (HDD = to be completed)
ST S
SO CI
CO
AL
EXPECTED OUTPUTS
ENERGY.
Inspection report regarding an overdimensioned heating system and corresponding corrections. Process (interviews, meeting, information supports, etc.) in order ti improve the awareness of the tenants.
+ !
Reduction of the energy consumptions and linked economic impacts with small investment costs in an oversized heating system. Possible complaints because of slower heating up of appartments in case of absence of lower temperature outside
PLANNING
#1: implementation of the esm hydraulic balancing of the system 2#: Meeting with local energy specialist to agree on the parameters to be monitored (number of loggers to be used , position of loggers, frequency of reading) #3: Meeting with person(s) in charge for the information of the tenants about the monitoring of the operation of the heating system and other related parameters #4: Getting the baseline data #5: Agreement on the survey and how to distribute questionnaires #6: FIRST TENANTS SURVEY #7: NEW HYDRAULIC BALANCING #8: Monitoring heating consumption, indoor temperature, outdoor temperature, indoor %RH #9: SECOND TENANTS SURVEY
NOV. 2012 TO JAN. 2013 NOV. 2012 TO JAN. 2013 DEC. 2012 TO JAN. 2013 DEC. 2012 DEC. 2012 TO DEC. 2013 MAY 2013 TO DEC. 2013
39
WP7: WohnArt3
LOW-ENERGY BUILDINGS: ADJUSTING THE RUNNING TIME OF THE SYSTEMS FOR DOMESTIC HOT WATER IN A PASSIVE HOUSE
ADRESS DARMSTADT GERMANY NUMBER OF APARTMENTS YEAR OF CONSTRUCTION NUMBER OF STORIES AND DESCRIPTION OF THE BUILDING CONDITIONNED FLOOR AREA SHO CONTACT: ARNE SCHREIER NUMBER OF INHABITANTS
Elisabeth-Selbert-Strae 6-8, 64289 Darmstadt, Germany 44 2010 4 Multi-family building with units spread over two buildings 3457,10 around 90
OPTIMIZATION SUGGESTION
OBJECTIVE/ In a passive house, the hot water consumption in relation to total heating consumption is around 50% therefore it is very important to check and optimize the hot water and the running times of the circulation pumps. To find a better regulation of the circulation pumps for DHW in order to save energy in a highly efficient building in coordination with a discussion involving the acceptance of the tenants. HOW ?/ - Checking to what extent the circulation pump can be turned off, for example in the night time. During the day, we have some hours in which we dont need hot water. During this time, the water in the pipes is still heated causing some losings. The pump for Domestic Hot Water heater can be switched off between 11. 00 pm and 4.00 am. Tenants who will need hot water must wait a little bit more. By this optimization solution, the heat losses are reduced significantly in the hot water pipes. Another advantage is that the pumps are protected and thus have a longer life, will fall an additional maintenance costs - however marginally. - Habits of the tenants must be considered thanks to a dialogue with the tenants in order to identify how and when the running time of the circulation pump can be changed. Tenants shall become aware of the relation between the running of the circulation pumps and individual water consumptions.
40
+ + +
OVERALL CONSUMPTION
2011: 230, 995 MWh (HDD = not completed) - 66, 82 KWh/m2/y
ST
EXPECTED OUTPUTS
Improvement of a domestic hot water system in a low energy building - how to save more in an efficient building - thanks to new running times. + Example of process of concertation with the tenants regarding the adjustment of the systems.
SO CI
CO
AL
ENERGY.
+ !
Improvement of the water energy consumption in highly efficient building where this consumption cover 50% of the total energy consumption. More time to have hot water for the tenants but dialogue process with them.
PLANNING
#1: NEW BUILDING #2: Meeting with the persons in charge for the assessment,preparation, #3: optimization of the ESM decided and for monitoring of the water consumption #4: Commissioning of Energy &Haus on? #5: Application of they the optimization (operation of circulation pump to be restricted to 6 hours per day) FROM 11.00 PM TO 4. AM #6: HEATING CONSUMPTIONS FOR HOT WATER AND COSTS TO BE MONITORED #7: Meeting with person(s) in charge for the information of the tenants AND Questions to be prepared - Decision on survey execution. #8: 1st. before the beginning of the optimisation #9: 2nd meeting at beginning for assessment and satisfaction #10: 3rd meeting at the end of next heating period/end of the project(may 2014) reporting results as a means of incentive and support for tenants
41
OPT.
With the support of
The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.