OWNER: STATUS:
MM OK
RUN DATE: April25 2013 Input Value: Results PRECIS PR COAL00000001 (COAL) 9000 MT(Metric Tonne) _____________ (todays date + 10) 10005(Fuel)
OWNER:
Click data) (Check
MM
Save
OWNER: STATUS:
MM OK
OWNER:
Logistics Materia ls Management Purchasing Purchase Order Create Vendor/Supplying Plant Known (ME21n) Create purchase order Doc Type Vendor Org. Data: Purchasing organization Purchasing group Company code Copy/Drag PR Request to PRECIS Import PO 5110000000 1000 PG3 1000 __________ ___ (**)
MM
ROBERT
Click
(Check data)
Document is OK
Click
4400000008
OWNER: STATUS:
PP OK
TARA
Initial Scree n
1000041
Change process order screen will open up. Click the green flag Observe that process order release carried out massage displayed. Process Order 1000041 Released. Check the status in production order Rel.
OWNER: STATUS:
PP OK
TARA
Initial Scree n
1000041
Storage Location : SF01 & RM02; ITEM Select Ok check box and click OK: on Check tab. Green signal the
Click the execute button Enter the details in each field work is good. Click on the post Tab and Check the message
OWNER: STATUS:
PP OK
TARA
Logistics Quality Management Quality Inspection Worklist Ins pection QA32- Change Data
Inspection lot selection screen will open up. Plant Material Highlight the inspection lot under test and click on record result. Evaluate by selecting the result and clicking on , then making a decision and clicking Lock by clicking on the Then click on Save. Highlight the inspection lot again and click on usage decision Usage decision Code new Accept 1100 PPC32.5NBULK
Click on execute button. and observe that list of inspection lists are shown
Click Enter and Save Usage decision for a lot 1100 4000000051
OWNER: STATUS:
PP OK
RUN DATE: April 26 2013 Input Value: Results Create process order confirmation screen will open up and press enter
TARA
Initial Scree n
Process order :
1000041
Press enter and process order confirmation create Actual data screen will open up Select Final Confirmation. In Yield to conf., enter the yield , then choose the Goods Movement button. Input storage location for the confirmed Semi or finished product. Click Enter and save 1 MT
process order confirmation create Goods movement screen will open up Observe that the goods movement Posted. The system status of the process order has been changed to include CNF
OWNER: STATUS:
PP OK
TARA
Open Transaction Initial Screen and enter Scree T code MIGO. n Press enter Goods receipt order screen open up
receipt 1000041 Check the movement type 101 and Press enter.
Storage Location : Select Ok check box and click FM01; ITEM on Check tab. Green signal the OK: work is good.
Choose stock type based on your quality result and Click on the post Tab and Check the
OWNER: STATUS:
PP OK
TARA
Open Transaction Initial Screen and enter Scree n T code COR2. Press enter Goods receipt order screen open up
1000041
Click enter and observe that change process order screen is opened
After opening the order in Change Mode, from the pull down menu select, Functions->Restrict Processing -> Technically Complete.
You can see now that the Order Status has now changed to TECO. Click save