Está en la página 1de 13

NO.

DESCRIPTION Earthworks Concrete Works Penstocks 760mm nominal bore Penstocks 900mm nominal bore Gauge Wells (Complete) 1.0m high GMS handrails GMS Open grid flooring 1200x2250mm GMS Coarse Screens 1200x2250mm GMS Fine Screens MS Weir Plate (Complete) MS Calibrated Measuring Scale

2 3 4 5 6 7 8 9 10 11

STATUS AUGUST 2012 PROGRESS By 2.8.12 6.9.12 100% 100% N/A 100% 100% N/A 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

INLET WORKS: BOQ Bill No. 2

NO. 1 3 4 5.2 5.3 5.4

DESCRIPTION Testing of Concrete Pipes Ground Investigation Demolition & Site Clearance Filling with Selected Excavated Material other than topsoil (in layers n.e.
200mm thick)

STATUS By 2.8.12 6.9.12 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

AUGUST 2012 PROGRESS N/A N/A N/A N/A N/A

Clay /core Filling General filling with Excavated Topsoil Material (to make up levels around the site) General filling with non-selected Excavated Material other than topsoil or rock (to make up levels around the site) Filling with Selected Excavated Material other than topsoil or rock
(300mm thick)

5.5

100%

100%

N/A

5.6

100%

100%

N/A

5.7

Filling with Selected Excavated Material other than topsoil or rock


(300mm thick on slopes)

100% 100% 100%

100% 100% 100%

N/A N/A N/A

5.8

Filling with Murram (150mm thick to


embankments)

5.9

Filling with imported natural Material other than topsoil or rock (thickness
300mm)

5.10

Filling with imported natural Material other than topsoil or rock (300mm on
Slopes)

0%

0%

0%

5.11

Filling with imported natural Material other than topsoil or rock (thickness
500mm)

0%

10%

10%

5.12

Filling with imported natural Material other than topsoil or rock (thickness
500mm on slopes)

0%

10%

10%

012 PROGRESS

Item of Works Testing

NO. 1.0 1.1 1.2 2.0

DESCRIPTION
Testing of Concrete Pipes (600 NID) Testing of Concrete Pipes (760 NID) Testing of Steel Pipes Excavation (Cutting & Foundation) Excavation Ancillaries (Incl. Trimming, Preparation & Disposal
of Excavated Material)

STATUS By 2.8.12 6.9.12 96% 96% 100% 100% 0% 0% 100% 100% 100% 100% 100% 100%

Earthworks

2.1 3.1

Stone Pitching Landscaping & Grassing

4.0 5.0 6.0 7.1 7.2

Excavated Rock filling under pond structures Fillings for the Anaerobic ponds are assessed along with other ponds in the STW. Stone Pitching on slopes (300mm thick on slopes) Lanscaping (Incl. fertilizing, trimming & preparation of surfaces) Grassing Mass concrete (Drainage Platform) Reinforced concrete Grd. 25/20 (Drainage Platform) Mass concrete (incl. erosion protection works) Reinforced concrete Grd. 25/20 (Access Ramp ) Concrete for pipe support piers (Types 1 & 2) Concrete Ancillaries: (Rough & Fair Finish) Concrete Ancillaries: (Reinforcement for Item 3.21 above) Concrete Accessories (Wood float & Steel trowe & screed finish) Precast Concrete Pipes 600 NID (208m length) Precast Concrete Pipes 760 NID (288m length) Steel Pipes NID 600mm Penstocks 600mm nominal bore Penstocks 760mm nominal bore Manholes size 1200mm of RC Cover. 1No. Manholes size 1500mm of RC Cover. 3No. Flow Dividing Chamber Type 2 (depth n.e. 1.5m) Inlet to Anaerobic Pond Outlet to Anaerobic Pond 1m high GMS hand rails to (anaerobic ponds sump platform) GMS open grid flooring (to anaerobic pond sump platform) MS Weir plate (Complete) MS Calibrated measuring scale(Complete)

0% 0% 0% 100% 100% 0% 0% 100%

0% 0% 0% 100% 100% 0% 0% 100%

Concrete Works

7.3 7.4 7.5 7.6 7.7 7.8

Concrete Pipes Steel Pipes Penstocks Manholes FDC's Inlet & Outlet Structures Handrails

8.0 8.1 9.0 10.0 10.1 11.0 11.1 12.0 13.0 14.0 15.0 15.1

96% 100% 0% 0% 0% 50% 100% 100% 100% 100% 0% 0% 0% 0%

96% 100% 100% 0% 0% 100% 100% 100% 100% 100% 0% 0% 0% 0%

Weir Plate M-Scale

16.0 16.1

AUG 2012 PROGRESS 0% N/A 0% N/A N/A N/A

0% 0% 0% N/A N/A 0% 0% N/A

N/A N/A 100% 0% 0% 50% N/A N/A N/A N/A 0% 0% 0% 0%

Item of Works Testing of Pipes


G-Investigations

NO. 1.1 1.2 2.0 3.0 3.1 3.2

DESCRIPTION
Testing of 225mm Concrete Pipes Testing of 300mm Concrete Pipes Ground Investigations Filling with Selected Excavated Material other than topsoil (in layers n.e. 200mm thick) Filling with Murram (150mm thick to embankments) Filling with imported natural material / road wearing course other than topsoil or rock (150mm
thick)

STATUS By 2.8.12 6.9.12 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 100% 100% 100% 100%

Earthworks

Fillings

3.3

Grassing Precast Slabs


Laying of Concrete Pipes

4.0 5.0 6.0 6..1 7.0 8.0

Manholes Rubble Drain

Filling with imported natural material / lateritic other than topsoil or rock (150mm thick) Grassing 600x600x50mm precast concrete slabs Laying 225mm Concrete Pipes Laying of 300mm Concrete Pipes Manholes Type A size 1070mm (9No.) French Rubble Drain

AUG 2012 PROGRESS N/A N/A N/A N/A N/A 100% 100% 0% 0% N/A N/A N/A N/A

Item of Works

NO. 1.0 2.0 3.0

DESCRIPTION
Earthworks Concrete Concrete Ancillaries Paving Slabs Timber Brickwork, Blockwork & Masonry Painting Waterproofing Simple Works (Excluding BOQ item Z519.1 & Z519.2) Wastewater internal plumbing services (Z519.1) Wash Hand Basin (Z519.2)

Various Items completed by 2.8.12

4.0 5.0 6.0 7.0 8.0 9.0

Simple Works

9.1 9.2

STATUS By 2.8.12 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0%

STATUS 6.9.12 AUG 2012 PROGRESS 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 0% 0% 0% 0%

Item of Works

NO. 1.0 2.0 3.0

DESCRIPTION
Earthworks Concrete Concrete Ancillaries Paving Slabs Timber Brickwork, Blockwork & Masonry Painting Waterproofing Simple Works (Excluding BOQ item Z519.1, Z524.1, Z524.2 &Z530.1) Wastewater internal plumbing services (Z519.1) Fibre glass cold water storage tank (Z524.1) 20 gallons GMS hot water cylinder (complete with 25KW
immersion heater Z524.2)

Various Items completed by 2.8.12

4.0 5.0 6.0 7.0 8.0 9.0 9.1 9.2

STATUS By 2.8.12 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0%

Simple Works

9.3 9.4

Wash Hand Basin (Z530.1)

STATUS 6.9.12 AUG 2012 PROGRESS 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% N/A 100% 0% 0% 0% 0% N/A 0% 0% 0% 0%

Item of Works Site Clearance Testing of Works

NO. 1.1 2.1 2.2 2.3 2.4 3.1

DESCRIPTION
Demolition and Site Clearance 100mm NID uPVC pipe up to elevated steel tank 80mm NID GI pipe to elevated steel tank 25mm NID water pipeline Testing of 4000 litre plastic elevated water tank 50mm NID GI pipe depth n.e. 1.5m 80mm NID GI pipe depth n.e. 1.5m 100mm NID uPVC pipe depth n.e. 1.5m 100mm NID uPVC pipe depth n.e. 1.5-2.0m 50 x 25 GI tee 80 x 25 GI tee 80 x 80 GI tee 100 x 100 GI tee 80 x 50 GI reducer 22.5o Upvc horizontal bend NID 100mm Gate valve NID 25mm Gate valve NID 50mm Gate valve NID 80mm Gate valve NID 100mm End caps GI 50mm NID

STATUS By 2.8.12 100% 0% 0% 0% 0% 0% 0% 10% 14% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100%

Pipework Fittings and Valves

STATUS 6.9.12 AUG 2012 PROGRESS 100% N/A 0% 0% 0% 0% 0% 0% 10% 14% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% N/A 0% 0% N/A