Está en la página 1de 3

s

l
.c
c

p
p

m
Arched GreenHouse

p
o

m
n

n
Material List:

v
c

s
.c

c
l
Page 1 of 3

a
o

p
p

o
All Pipe is 1" Sch 40 PVC
v

v
m n
s
l
(unless otherwise specified)

l
.c

.c
p

m
p
ASSEMBLE BASE FRAME:

.c p
a
n
Item Qty Description

v
(Do Not Glue any Parts)
s

c
c

c
l
a
A 2 138" Pipe 1. Slide 3 Slip T's (J) onto 148.5" Pipes (B)

o
p
o

p
n

.
v

v
and 2 Slip T's (J) onto 135" Pipes (A)

m n
s
B 2 148-1/2" Pipe

l
(Space as Noted on Drawing)
c

c
p

o
m

p
C 5 228" Pipe

a
n
2. Connect Pipes at Corners with 3-Way's (K)
.

v
D 4 36" Pipe 3. Drive 5 Stakes (M) into the Ground on

c
s

.c
c

l
m

a
E 4 72" Pipe Each Long Side the Base.
o

v
m n
m n

Leave 2" of Stake Above Ground to Secure Base

s
F 10 27" Pipe

l
.c

p
p

a
p
a

o
m
G 2 67" Pipe

v
H 10 4" Pipe (1-1/4" Sch 40 PVC)

s
s

l
.c
l

p
I 100-130 1-1/4" Snap Clamps 4" (Circo Item #13)
p

p
v
n

m n
s
J 30 1" Slip-T's (Circo Item #63)

c
.c

o
p

p
a

a
o

m
K 4 1" 3-way Connector (Circo Item #33)

v
L 8 1" 90 deg. Elbow

.c
s

c
.c

l
m

p
p

p
M 10 12+" Ground Stake (Wood or Metal)
o
v
m n

s
s

P 1 20'x13'-4" Top Cover (Plastic,Netting or Shade)

l
c

c
J
c
o

o
m
p

.c p
a

S 2 12-1/2'x7' End Cover

n
v

v
.

T 1 78"x38" Door Cover C


.c

.c
s

l
l

a
o
p

p
p

U 1 38"x38" Window Cover 27"


v
n
s

s
l
W 100-130 Self Tapping Screws (3/4" Long)
c

c
p

m
p
o

Z PVC Glue
n

n
v

v
D
s

c
c

l
a

a
INSTALL ARCHES:
p m

o
p

p
p

v
m n

.
.

(Do Not Glue any Parts)

s
s
l

l
.c
c

1. Slide 2 Slip T's (J) onto Middle Arches


p

p
a

m
m

n
n

228" Pipes (C)

v
C
v

Centered
s

c
l

and 3 Slip T's (J) onto End Arches


.c

a
a

p
o
o

228" Pipes (C)


p

v
m n

(Space as noted on Drawing)


s

l
l

c
p
o

2. Assemble Arches To Base as Shown

p
a

m
p

m n

3. Attach 36" Pipes (D) Between Arches,


.
c

c
l
c

Centered on Top as Shown to

a
a

o
o

Connect Arches Together.


v
m n
v

l
l

.c
c
.c

p
p
o
p

m
p

c
s

.c

l
c

a
o

o
v
m n
n

s
l
.c

.c
c
p

p
a
o
m
p

v
s

c
.c

l
a

p
p
o
v
n

v
n
s
l

36"
c
.c
p

p
a

p
o

a
m

Spacing
n

27"
v
s

.c
c
l

s
l
m
a
m
p

K
p

p
o
v
n

A
m n
s

B
l
c

M
c
.c

J
p

o
m
p
a
o

a
n

.c
s

c
.c

l
a
m

Plans prepared by: Dean Hunt/JC Designs


o
p

hunt4jc@ncws.com December 2002


v
n

s
s

l
.c
c

o
p
o

p
a

n
s
l

l
.c
c

p
p

p
o

m
n
Arched GreenHouse

n
Hinge

v
c

s
.c

c
l
a

a
o
Page 2 of 3

p
p

o
v

v
m n
s
l

l
.c

.c
p

m
p
m

.c p
a
Latch

v
s

c
c

c
l
ASSEMBLE DOOR & DOOR FRAME:

o
p
o

p
n

.
v

v
m n
s
Fig. 1

l
c
1. Glue 2 Pieces of 1-1/4" PVC x 4" (H) Together

c
p

o
m

p
a
n
To Create Hinges as Shown. Make 4 Hinges. Fig. 3
.

s
2. Glue 1 Piece 1-1/4" x 4" (H) to 1 SnapClamp (I)

c
s

.c
c

l
m

a
To Create Latches as Shown. Make 2 Latches
o

v
m n
Fig. 2
m n

3. Slide a Slip-T (J) onto each Door Frame Side (E)

s
l
.c

c
Locate 4" Down from Top.

p
p

a
p
a

o
m
F

n
4. Slide Hinges and Latch onto Door Frame Sides

v
L

s
s

l
.c
l

Positioned as Shown in Fig. 3

p
p

p
5. Connect the Two Door Frames with 27" Pipe (F)
v
n

m n
Assemble into Slip-T's on Arch and Base on

s
l

c
.c
F

o
p

p
Front of GreenHouse.
a

a
o

m
G

v
6. Slide Door Side Pipe (G) Through Hinges on J

.c
s

c
.c

l
Door Frame and Then Assemble Door as Shown
m

p
p

p
in Fig 1. with Middle Support Pipe (F) Located in
o
v
m n

s
s

l
the Center of the Door. Adjust Latch as Needed.
c

c
c
o

o
m
p

.c p
a

7. Slide Hinges to Farthest Positions Up & Down

n
E
v

v
.

to Hold Door in Position Securely.


.c

.c
s

l
l

a
o
p

p
p

v
n

J
s

s
l
c

c
p

m
p
o

a
n

n
Fig. 4 Latch
v

v
s

c
c

l
a

a
p m

o
p

p
p

v
m n

.
.

s
s
l

l
.c
c

p
a

m
m

Hinge

n
n

v
v

c
l
.c

a
a

p
o
o

v
m n

Latch
s

l
l

c
p
o

p
a

m
p

m n

F
c

c
l
c

a
a

o
o

Hinge L
.

v
m n
v

l
l

.c
c
.c

p
p
o
p

m
p

ASSEMBLE WINDOW & WINDOW FRAME:


s

c
s

.c

l
c

a
o

o
F
v
m n
n

1. Slide 2 Slip-T's (J) onto Window Frame Sides (E)


l
.c

.c
c

F
p

Locate 4" Down from Top and 27" Apart.


p
a
o
m
p

2. Slide Latch onto 27" Window Frame Top (F) and


v

J
s

c
.c

2 Hinges onto 27" Window Frame Bottom (F)


a

p
p
o

Connect Top and Bottom Window Frame to Side


v
n

v
n
s
l

Window Frames and Assemble into Slip-T's on


c
.c

E
p

p
a

p
o

Arch and Base on Back of GreenHouse.


m

3. Slide Window Bottom Pipe (F) Through Hinges on


s

.c
c
l

s
l

Window Frame and Then Assemble Window as


m
a
m
p

p
o
v

Shown in Fig 4. Adjust Latch as Needed.


n

m n
s
l

4. Slide Hinges to Farthes Positions Side to Side


c

c
.c
p

o
m
p
a
o

To Hold Window in Position Securely.


n

.c
s

c
.c

l
a

Plans prepared by: Dean Hunt/JC Designs


m

o
p

hunt4jc@ncws.com December 2002


v
n

s
s

l
.c
c

o
p
o

p
a

n
s
l

l
.c
c

p
p

p
o

m
n

n
Arched GreenHouse

v
c

s
.c

c
l
a

a
o

p
p
Page 3 of 3

o
v

v
m n
s
l

l
.c

.c
p

m
p
m

.c p
a
n

v
s

c
c

c
l
a

o
p
o

p
n

.
v

v
m n
s
l
COVER AND SECURE THE ARCHED GREEN HOUSE:
c

c
p

o
m

p
a
n
.

s
1. Cover the Door with Covering (T) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Door.

c
s

.c
c

l
m

a
2. Cover the Window with Covering (U) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Window.
o

v
m n
m n

3. Cover the Top with Covering (P) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Top.

s
l
.c

c
4. Cover the Ends with Covering (S) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Ends.

p
p

a
p
a

o
m

n
5. Glue Fittings as Needed.

s
s

l
.c
l

6. Screw Self Tapping Screw (W) into any Clamps, Hinges, or Latches as Needed.

p
p

o
7. Secure Green House to Gound with Stakes, Sandbags or Blocks.

p
v
n

m n
8. Trim Excess Coverings.

s
l

c
.c

o
p

p
a

a
o

v
These Plans are Free and Therfore we do not Warrent or Garauntee the Structure Built from Them.

.c
s

c
.c

l
m

p
p

p
o
v
m n

s
s

l
c

c
c
o

o
m
p

.c p
a

n
v

v
.
.c

.c
s

l
l

a
o
p

p
p

v
n
s

s
l
c

c
p

m
p
o

a
n

n
v

v
s

c
c

l
a

a
p m

o
p

p
p

v
m n

.
.

s
s
l

l
.c
c

p
a

m
m

n
n

v
v

c
l
.c

a
a

p
o
o

v
m n
s

l
l

c
p
o

p
a

m
p

m n

.
c

c
l
c

a
a

o
o

v
m n
v

l
l

.c
c
.c

p
p
o
p

m
p

c
s

.c

l
c

a
o

o
v
m n
n

s
l
.c

.c
c
p

p
a
o
m
p

v
s

c
.c

l
a

p
p
o
v
n

v
n
s
l

c
.c
p

p
a

p
o

a
m

v
s

.c
c
l

s
l
m
a
m
p

p
o
v
n

m n

Plans prepared by: Dean Hunt/JC Designs


s
l
c

hunt4jc@ncws.com December 2002


c
.c
p

o
m
p
a
o

a
n

.c
s

c
.c

l
a
m

o
p

p
v
n

s
s

l
.c
c

o
p
o

p
a

También podría gustarte