Detailed Report for Valve: FCV-1

Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y
Elevation
Minor Loss

3,131.72 m
3,061.61 m
2,390.00 m
0.00

From Pipe
To Pipe
Diameter

P-10
P-11
150 mm

Initial Condition Summary


Status

Inactive

Flow

6.0000 m/s

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Constituent
(mg/l)

Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

From
Grade
(m)

To
Grade
(m)

2,402.78
2,402.78
2,402.77
2,402.76
2,402.76
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,400.00
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75

2,402.77
2,402.76
2,402.75
2,402.74
2,402.74
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,400.00
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73

c:\...\deposito intermedio.wcd
29/05/13 18:48:55
Haestad Methods, Inc.

Flow
(m/s)
7.1607
7.1510
7.1417
7.1327
7.1240
7.1156
7.1111
7.1109
7.1105
7.1107
7.1099
7.1098
7.1120
7.1117
7.1106
7.1124
7.1106
7.1111
7.1115
7.1108
7.1113
7.1116
7.1109
7.1098
0.0000
7.1102
7.1106
7.1115
7.1098
7.1114
7.1112
7.1108
7.1104

Headloss Setting
(m)
(m/s)
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 1

Detailed Report for Valve: FCV-1


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Constituent
(mg/l)

Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

From
Grade
(m)
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,400.00

To
Grade
(m)

Flow
(m/s)

2,402.73
7.1109
2,402.73
7.1111
2,402.73
7.1108
2,402.73
7.1102
2,402.73
7.1112
2,402.73
7.1103
2,402.73
7.1098
2,402.73
7.1108
2,402.73
7.1102
2,402.73
7.1108
2,402.73
7.1113
2,402.73
7.1111
2,402.73
7.1109
2,402.73
7.1098
2,402.73
7.1106
2,400.00 0.5408e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:55
Haestad Methods, Inc.

Headloss Setting
(m)
(m/s)
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 2

Detailed Report for Valve: FCV-2


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y
Elevation
Minor Loss

3,067.77 m
3,068.11 m
2,530.00 m
0.00

From Pipe
To Pipe
Diameter

P-12
P-13
150 mm

Initial Condition Summary


Status

Inactive

Flow

6.0000 m/s

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Constituent
(mg/l)

Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

From
Grade
(m)
2,544.62
2,544.26
2,543.92
2,543.58
2,543.26
2,542.95
2,542.79
2,542.79
2,542.78
2,542.79
2,542.77
2,542.78
2,542.87
2,542.86
2,542.83
2,542.90
2,542.84
2,542.87
2,542.89
2,542.87
2,542.87
2,542.84
2,542.77
2,542.69
2,540.00
2,542.70
2,542.72
2,542.76
2,542.71
2,542.78
2,542.78
2,542.77
2,542.76

To
Grade
(m)

Flow
(m/s)

2,544.61
6.1942
2,544.25
6.2190
2,543.90
6.2429
2,543.57
6.2660
2,543.25
6.2884
2,542.94
6.3100
2,542.77
6.3257
2,542.77
6.3349
2,542.76
6.3443
2,542.78
6.3526
2,542.76
6.3623
2,542.76
6.3708
2,542.85
6.3760
2,542.85
6.3846
2,542.81
6.3942
2,542.89
6.3995
2,542.83
6.4100
2,542.85
6.4170
2,542.87
6.4240
2,542.85
6.4326
2,542.85
6.4119
2,542.82
6.3644
2,542.76
6.3182
2,542.68
6.2726
2,540.00 0.1099e-5
2,542.68
6.2626
2,542.71
6.2719
2,542.75
6.2803
2,542.69
6.2923
2,542.76
6.2994
2,542.76
6.3090
2,542.76
6.3187
2,542.74
6.3284

c:\...\deposito intermedio.wcd
29/05/13 18:48:55
Haestad Methods, Inc.

Headloss Setting
(m)
(m/s)
0.01
0.01
0.01
0.01
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.01
0.00
0.01
0.01
0.01
0.01
0.02
0.02
0.02
0.02

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 3

Detailed Report for Valve: FCV-2


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Constituent
(mg/l)

Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive
Inactive

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

From
Grade
(m)
2,542.79
2,542.80
2,542.80
2,542.78
2,542.83
2,542.80
2,542.79
2,542.84
2,542.82
2,542.85
2,542.88
2,542.85
2,542.80
2,542.72
2,542.71
2,540.00

To
Grade
(m)

Flow
(m/s)

2,542.77
6.3365
2,542.79
6.3451
2,542.78
6.3541
2,542.77
6.3635
2,542.82
6.3703
2,542.79
6.3799
2,542.78
6.3888
2,542.82
6.3952
2,542.81
6.4040
2,542.83
6.4109
2,542.86
6.4178
2,542.83
6.3984
2,542.79
6.3514
2,542.70
6.3059
2,542.70
6.2574
2,540.00 0.2747e-6

c:\...\deposito intermedio.wcd
29/05/13 18:48:55
Haestad Methods, Inc.

Headloss Setting
(m)
(m/s)
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.01
0.01
0.00

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 4

Detailed Report for Junction: J-1


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,015.99 m
3,068.36 m

Elevation
Zone

2,600.00 m
Zone-1

Connecting Pipes
P-3
P-14

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,618.30
2,618.53
2,618.75
2,618.97
2,619.18
2,619.39
2,619.60
2,619.82
2,620.04
2,620.26
2,620.47
2,620.68
2,620.90
2,621.10
2,621.30
2,621.51
2,621.70
2,621.90
2,622.09
2,622.28
2,621.78
2,620.59
2,619.41
2,618.23
2,540.00
2,618.00
2,618.25
2,618.49
2,618.72
2,618.96
2,619.19
2,619.42
2,619.64

18
18
19
19
19
19
20
20
20
20
20
21
21
21
21
21
22
22
22
22
22
21
19
18
-60
18
18
18
19
19
19
19
20

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

18.30
18.53
18.75
18.97
19.18
19.39
19.60
19.82
20.04
20.26
20.47
20.68
20.90
21.10
21.30
21.51
21.70
21.90
22.09
22.28
21.78
20.59
19.41
18.23
-60.00
18.00
18.25
18.49
18.72
18.96
19.19
19.42
19.64

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 5

Detailed Report for Junction: J-1


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,619.86
2,620.09
2,620.30
2,620.51
2,620.73
2,620.93
2,621.13
2,621.34
2,621.54
2,621.73
2,621.93
2,621.43
2,620.24
2,619.06
2,617.89
2,540.00

20
20
20
20
21
21
21
21
21
22
22
21
20
19
18
-60

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

19.86
20.09
20.30
20.51
20.73
20.93
21.13
21.34
21.54
21.73
21.93
21.43
20.24
19.06
17.89
-60.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 6

Detailed Report for Junction: J-2


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,050.66 m
3,064.46 m

Elevation
Zone

2,500.00 m
Zone-1

Connecting Pipes
P-15
P-12

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,559.75
2,559.52
2,559.29
2,559.07
2,558.85
2,558.65
2,558.57
2,558.61
2,558.65
2,558.71
2,558.73
2,558.78
2,558.89
2,558.93
2,558.95
2,559.05
2,559.04
2,559.10
2,559.16
2,559.18
2,559.08
2,558.81
2,558.51
2,558.21
2,540.00
2,558.17
2,558.23
2,558.32
2,558.32
2,558.42
2,558.47
2,558.51
2,558.55

60
59
59
59
59
59
58
58
59
59
59
59
59
59
59
59
59
59
59
59
59
59
58
58
40
58
58
58
58
58
58
58
58

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

59.75
59.52
59.29
59.07
58.85
58.65
58.57
58.61
58.65
58.71
58.73
58.78
58.89
58.93
58.95
59.05
59.04
59.10
59.16
59.18
59.08
58.81
58.51
58.21
40.00
58.17
58.23
58.32
58.32
58.42
58.47
58.51
58.55

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 7

Detailed Report for Junction: J-2


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,558.62
2,558.68
2,558.72
2,558.75
2,558.83
2,558.85
2,558.88
2,558.96
2,558.99
2,559.05
2,559.11
2,558.99
2,558.71
2,558.40
2,558.15
2,540.00

58
59
59
59
59
59
59
59
59
59
59
59
59
58
58
40

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

58.62
58.68
58.72
58.75
58.83
58.85
58.88
58.96
58.99
59.05
59.11
58.99
58.71
58.40
58.15
40.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 8

Detailed Report for Junction: J-4


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,086.71 m
3,063.14 m

Elevation
Zone

2,500.00 m
Zone-1

Connecting Pipes
P-6
P-7

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,528.48
2,528.13
2,527.80
2,527.48
2,527.17
2,526.88
2,526.72
2,526.71
2,526.70
2,526.70
2,526.68
2,526.67
2,526.75
2,526.74
2,526.70
2,526.76
2,526.70
2,526.72
2,526.73
2,526.71
2,526.72
2,526.73
2,526.71
2,526.67
2,400.00
2,526.69
2,526.70
2,526.73
2,526.67
2,526.73
2,526.72
2,526.71
2,526.69

28
28
28
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
-100
27
27
27
27
27
27
27
27

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

28.48
28.13
27.80
27.48
27.17
26.88
26.72
26.71
26.70
26.70
26.68
26.67
26.75
26.74
26.70
26.76
26.70
26.72
26.73
26.71
26.72
26.73
26.71
26.67
-100.00
26.69
26.70
26.73
26.67
26.73
26.72
26.71
26.69

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 9

Detailed Report for Junction: J-4


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,526.71
2,526.72
2,526.71
2,526.69
2,526.72
2,526.69
2,526.67
2,526.71
2,526.69
2,526.71
2,526.73
2,526.72
2,526.71
2,526.67
2,526.70
2,400.00

27
27
27
27
27
27
27
27
27
27
27
27
27
27
27
-100

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

26.71
26.72
26.71
26.69
26.72
26.69
26.67
26.71
26.69
26.71
26.73
26.72
26.71
26.67
26.70
-100.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 10

Detailed Report for Junction: J-5


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,109.87 m
3,057.65 m

Elevation
Zone

2,350.00 m
Zone-1

Connecting Pipes
P-7
P-8

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,508.20
2,507.91
2,507.63
2,507.36
2,507.10
2,506.85
2,506.71
2,506.71
2,506.69
2,506.70
2,506.68
2,506.67
2,506.74
2,506.73
2,506.70
2,506.75
2,506.70
2,506.71
2,506.72
2,506.70
2,506.72
2,506.73
2,506.71
2,506.67
2,400.00
2,506.69
2,506.70
2,506.72
2,506.67
2,506.72
2,506.72
2,506.70
2,506.69

158
158
157
157
157
156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
50
156
156
156
156
156
156
156
156

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

158.20
157.91
157.63
157.36
157.10
156.85
156.71
156.71
156.69
156.70
156.68
156.67
156.74
156.73
156.70
156.75
156.70
156.71
156.72
156.70
156.72
156.73
156.71
156.67
50.00
156.69
156.70
156.72
156.67
156.72
156.72
156.70
156.69

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 11

Detailed Report for Junction: J-5


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,506.71
2,506.71
2,506.70
2,506.69
2,506.72
2,506.69
2,506.67
2,506.70
2,506.69
2,506.70
2,506.72
2,506.71
2,506.71
2,506.67
2,506.70
2,400.00

156
156
156
156
156
156
156
156
156
156
156
156
156
156
156
50

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

156.71
156.71
156.70
156.69
156.72
156.69
156.67
156.70
156.69
156.70
156.72
156.71
156.71
156.67
156.70
50.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 12

Detailed Report for Junction: J-6


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,125.83 m
3,056.74 m

Elevation
Zone

2,250.00 m
Zone-1

Connecting Pipes
P-8
P-10

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,410.16
2,410.13
2,410.11
2,410.08
2,410.06
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02

160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
150
160
160
160
160
160
160
160
160

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

160.16
160.13
160.11
160.08
160.06
160.03
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.03
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
150.00
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 13

Detailed Report for Junction: J-6


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00

160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
150

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
160.02
150.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 14

Detailed Report for Junction: J-7


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,032.98 m
3,065.12 m

Elevation
Zone

2,467.00 m
Zone-1

Connecting Pipes
P-14
P-15

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,597.77
2,597.83
2,597.90
2,597.96
2,598.03
2,598.09
2,598.20
2,598.36
2,598.52
2,598.68
2,598.82
2,598.98
2,599.16
2,599.30
2,599.44
2,599.61
2,599.73
2,599.88
2,600.02
2,600.15
2,599.79
2,598.93
2,598.05
2,597.18
2,540.00
2,597.02
2,597.20
2,597.39
2,597.54
2,597.73
2,597.90
2,598.06
2,598.22

130
131
131
131
131
131
131
131
131
131
131
132
132
132
132
132
132
133
133
133
132
132
131
130
73
130
130
130
130
130
131
131
131

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

130.77
130.83
130.90
130.96
131.03
131.09
131.20
131.36
131.52
131.68
131.82
131.98
132.16
132.30
132.44
132.61
132.73
132.88
133.02
133.15
132.79
131.93
131.05
130.18
73.00
130.02
130.20
130.39
130.54
130.73
130.90
131.06
131.22

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 15

Detailed Report for Junction: J-7


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Pressure


Demand
Pressure
(mg/l)
Hydraulic (m H2O) (Calculated)
Head
Grade
(m/s)
(m)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,598.39
2,598.55
2,598.71
2,598.86
2,599.02
2,599.16
2,599.31
2,599.47
2,599.60
2,599.75
2,599.90
2,599.53
2,598.66
2,597.79
2,596.94
2,540.00

131
131
131
132
132
132
132
132
132
132
133
132
131
130
130
73

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

131.39
131.55
131.71
131.86
132.02
132.16
132.31
132.47
132.60
132.75
132.90
132.53
131.66
130.79
129.94
73.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 16

Detailed Report for Pipe: P-1


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

R-1
PMP-1-In
No
10.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.5764
N/A
7.5685
N/A
7.5608
N/A
7.5532
N/A
7.5458
N/A
7.5385
N/A
7.5314
N/A
7.5245
N/A
7.5176
N/A
7.5108
N/A
7.5040
N/A
7.4974
N/A
7.4908
N/A
7.4844
N/A
7.4779
N/A
7.4716
N/A
7.4653
N/A
7.4592
N/A
7.4531
N/A
7.4471
N/A -0.284e-6
N/A -0.1618e-5
N/A -0.1161e-5
N/A -0.7272e-7
N/A
7.5909
N/A
7.5814
N/A
7.5738
N/A
7.5663
N/A
7.5589
N/A
7.5516
N/A
7.5443
N/A
7.5372
N/A
7.5301

Velocity
(m/s)
2.98
2.97
2.97
2.97
2.97
2.96
2.96
2.96
2.95
2.95
2.95
2.95
2.94
2.94
2.94
2.94
2.93
2.93
2.93
2.93
0.11e-6
0.64e-6
0.46e-6
0.29e-7
2.98
2.98
2.98
2.97
2.97
2.97
2.96
2.96
2.96

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00

2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,375.00
2,375.00
2,375.00
2,375.00
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96

Friction
Loss
(m)
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.00
0.00
0.00
0.00
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.00
0.00
0.00
0.00
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.78
3.78
3.77
3.77
3.75
3.75
3.74
3.74
3.72
3.72
3.71
3.71
3.69
3.69
3.69
3.68
3.68
3.66
3.66
3.66
0.00
0.00
0.00
0.00
3.80
3.78
3.78
3.77
3.77
3.75
3.75
3.75
3.74

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 17

Detailed Report for Pipe: P-1


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.5232
7.5163
7.5095
7.5028
7.4962
7.4896
7.4832
7.4769
7.4706
7.4644
7.4583
-0.5696e-6
-0.4119e-6
-0.5696e-6
-0.4059e-6
-0.1626e-5

Velocity
(m/s)
2.96
2.95
2.95
2.95
2.95
2.94
2.94
2.94
2.94
2.93
2.93
0.22e-6
0.16e-6
0.22e-6
0.16e-6
0.64e-6

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00

2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00

Friction
Loss
(m)
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.00
0.00
0.00
0.00
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.74
3.72
3.72
3.71
3.71
3.69
3.69
3.69
3.68
3.68
3.66
0.00
0.00
0.00
0.00
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 18

Detailed Report for Pipe: P-2


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

PMP-1-Out
T-1
No
20,000.00 m

Diameter
Material
Roughness
Minor Loss

2,100 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.5764
7.5685
7.5608
7.5532
7.5458
7.5385
7.5314
7.5245
7.5176
7.5108
7.5040
7.4974
7.4908
7.4844
7.4779
7.4716
7.4653
7.4592
7.4531
7.4471
-0.2378e-6
-0.2342e-6
-0.2342e-6
-0.2342e-6
7.5909
7.5814
7.5738
7.5663
7.5589
7.5516
7.5443
7.5372
7.5301

Velocity
(m/s)
2.19
2.19
2.18
2.18
2.18
2.18
2.17
2.17
2.17
2.17
2.17
2.16
2.16
2.16
2.16
2.16
2.16
2.15
2.15
2.15
0.69e-7
0.68e-7
0.68e-7
0.68e-7
2.19
2.19
2.19
2.18
2.18
2.18
2.18
2.18
2.17

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,658.02
2,658.22
2,658.42
2,658.61
2,658.80
2,658.98
2,659.16
2,659.34
2,659.52
2,659.69
2,659.86
2,660.03
2,660.20
2,660.36
2,660.52
2,660.68
2,660.84
2,660.99
2,661.15
2,661.30
2,627.88
2,626.61
2,625.34
2,624.08
2,657.65
2,657.89
2,658.08
2,658.28
2,658.47
2,658.65
2,658.84
2,659.02
2,659.20

2,624.00
2,624.27
2,624.54
2,624.80
2,625.05
2,625.30
2,625.55
2,625.79
2,626.02
2,626.26
2,626.49
2,626.71
2,626.94
2,627.16
2,627.38
2,627.59
2,627.81
2,628.01
2,628.22
2,628.43
2,627.88
2,626.61
2,625.34
2,624.08
2,623.50
2,623.83
2,624.09
2,624.35
2,624.60
2,624.86
2,625.10
2,625.35
2,625.59

Friction
Loss
(m)
34.02
33.95
33.88
33.81
33.74
33.68
33.62
33.56
33.49
33.43
33.37
33.32
33.26
33.20
33.14
33.09
33.03
32.98
32.93
32.87
0.00
0.00
0.00
0.00
34.15
34.06
33.99
33.93
33.86
33.80
33.73
33.67
33.61

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

34.02
33.95
33.88
33.81
33.74
33.68
33.62
33.56
33.49
33.43
33.37
33.32
33.26
33.20
33.14
33.09
33.03
32.98
32.93
32.87
0.00
0.00
0.00
0.00
34.15
34.06
33.99
33.93
33.86
33.80
33.73
33.67
33.61

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

1.70
1.70
1.69
1.69
1.69
1.68
1.68
1.68
1.67
1.67
1.67
1.67
1.66
1.66
1.66
1.65
1.65
1.65
1.65
1.64
0.00
0.00
0.00
0.00
1.71
1.70
1.70
1.70
1.69
1.69
1.69
1.68
1.68

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 19

Detailed Report for Pipe: P-2


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.5232
7.5163
7.5095
7.5028
7.4962
7.4896
7.4832
7.4769
7.4706
7.4644
7.4583
-0.2305e-6
-0.2342e-6
-0.2342e-6
-0.2305e-6
-0.2305e-6

Velocity
(m/s)
2.17
2.17
2.17
2.17
2.16
2.16
2.16
2.16
2.16
2.16
2.15
0.67e-7
0.68e-7
0.68e-7
0.67e-7
0.67e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:56
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,659.37
2,659.55
2,659.72
2,659.89
2,660.06
2,660.23
2,660.39
2,660.55
2,660.71
2,660.86
2,661.02
2,627.51
2,626.23
2,624.96
2,623.71
2,623.50

2,625.83
2,626.07
2,626.30
2,626.53
2,626.76
2,626.98
2,627.20
2,627.41
2,627.63
2,627.84
2,628.05
2,627.51
2,626.23
2,624.96
2,623.71
2,623.50

Friction
Loss
(m)
33.54
33.48
33.42
33.36
33.30
33.25
33.19
33.13
33.08
33.02
32.97
0.00
0.00
0.00
0.00
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

33.54
33.48
33.42
33.36
33.30
33.25
33.19
33.13
33.08
33.02
32.97
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

1.68
1.67
1.67
1.67
1.67
1.66
1.66
1.66
1.65
1.65
1.65
0.00
0.00
0.00
0.00
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 20

Detailed Report for Pipe: P-3


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

T-1
J-1
No
5,000.00 m

Diameter
Material
Roughness
Minor Loss

2,100 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

Status

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Temporarily Closed
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
6.1942
6.2190
6.2429
6.2660
6.2884
6.3100
6.3257
6.3349
6.3443
6.3526
6.3623
6.3708
6.3760
6.3846
6.3942
6.3995
6.4100
6.4170
6.4240
6.4326
6.4119
6.3644
6.3182
6.2726
0.0000
6.2626
6.2719
6.2803
6.2923
6.2994
6.3090
6.3187
6.3284

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

Velocity
(m/s)
1.79
1.80
1.80
1.81
1.82
1.82
1.83
1.83
1.83
1.83
1.84
1.84
1.84
1.84
1.85
1.85
1.85
1.85
1.85
1.86
1.85
1.84
1.82
1.81
0.00
1.81
1.81
1.81
1.82
1.82
1.82
1.82
1.83

From
Grade
(m)

To
Grade
(m)

2,624.00
2,624.27
2,624.54
2,624.80
2,625.05
2,625.30
2,625.55
2,625.79
2,626.02
2,626.26
2,626.49
2,626.71
2,626.94
2,627.16
2,627.38
2,627.59
2,627.81
2,628.01
2,628.22
2,628.43
2,627.88
2,626.61
2,625.34
2,624.08
2,623.50
2,623.83
2,624.09
2,624.35
2,624.60
2,624.86
2,625.10
2,625.35
2,625.59

2,618.30
2,618.53
2,618.75
2,618.97
2,619.18
2,619.39
2,619.60
2,619.82
2,620.04
2,620.26
2,620.47
2,620.68
2,620.90
2,621.10
2,621.30
2,621.51
2,621.70
2,621.90
2,622.09
2,622.28
2,621.78
2,620.59
2,619.41
2,618.23
2,540.00
2,618.00
2,618.25
2,618.49
2,618.72
2,618.96
2,619.19
2,619.42
2,619.64

Friction
Loss
(m)
5.70
5.75
5.79
5.83
5.88
5.92
5.95
5.96
5.98
6.00
6.01
6.03
6.04
6.06
6.07
6.08
6.10
6.12
6.13
6.15
6.11
6.02
5.93
5.85
0.00
5.83
5.85
5.86
5.88
5.90
5.91
5.93
5.95

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

5.70
5.75
5.79
5.83
5.88
5.92
5.95
5.96
5.98
6.00
6.01
6.03
6.04
6.06
6.07
6.08
6.10
6.12
6.13
6.15
6.11
6.02
5.93
5.85
0.00
5.83
5.85
5.86
5.88
5.90
5.91
5.93
5.95

1.14
1.15
1.16
1.17
1.18
1.18
1.19
1.19
1.20
1.20
1.20
1.21
1.21
1.21
1.21
1.22
1.22
1.22
1.23
1.23
1.22
1.20
1.19
1.17
0.00
1.17
1.17
1.17
1.18
1.18
1.18
1.19
1.19

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 21

Detailed Report for Pipe: P-3


Calculated Results Summary
Time

Status

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Temporarily Closed

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
6.3365
6.3451
6.3541
6.3635
6.3703
6.3799
6.3888
6.3952
6.4040
6.4109
6.4178
6.3984
6.3514
6.3059
6.2574
0.0000

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

Velocity
(m/s)
1.83
1.83
1.83
1.84
1.84
1.84
1.84
1.85
1.85
1.85
1.85
1.85
1.83
1.82
1.81
0.00

From
Grade
(m)

To
Grade
(m)

2,625.83
2,626.07
2,626.30
2,626.53
2,626.76
2,626.98
2,627.20
2,627.41
2,627.63
2,627.84
2,628.05
2,627.51
2,626.23
2,624.96
2,623.71
2,623.50

2,619.86
2,620.09
2,620.30
2,620.51
2,620.73
2,620.93
2,621.13
2,621.34
2,621.54
2,621.73
2,621.93
2,621.43
2,620.24
2,619.06
2,617.89
2,540.00

Friction
Loss
(m)
5.97
5.98
6.00
6.02
6.03
6.05
6.06
6.08
6.09
6.11
6.12
6.08
5.99
5.91
5.82
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

5.97
5.98
6.00
6.02
6.03
6.05
6.06
6.08
6.09
6.11
6.12
6.08
5.99
5.91
5.82
0.00

1.19
1.20
1.20
1.20
1.21
1.21
1.21
1.22
1.22
1.22
1.22
1.22
1.20
1.18
1.16
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 22

Detailed Report for Pipe: P-6


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

T-3
J-4
No
4,000.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

Status

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Temporarily Closed
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.1607
7.1510
7.1417
7.1327
7.1240
7.1156
7.1111
7.1109
7.1105
7.1107
7.1099
7.1098
7.1120
7.1117
7.1106
7.1124
7.1106
7.1111
7.1115
7.1108
7.1113
7.1116
7.1109
7.1098
0.0000
7.1102
7.1106
7.1115
7.1098
7.1114
7.1112
7.1108
7.1104

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

Velocity
(m/s)
2.81
2.81
2.81
2.80
2.80
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.00
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79

From
Grade
(m)

To
Grade
(m)

2,542.00
2,541.62
2,541.25
2,540.90
2,540.56
2,540.23
2,540.05
2,540.05
2,540.03
2,540.04
2,540.01
2,540.00
2,540.09
2,540.08
2,540.03
2,540.11
2,540.04
2,540.05
2,540.07
2,540.04
2,540.06
2,540.07
2,540.05
2,540.00
2,540.00
2,540.02
2,540.04
2,540.07
2,540.00
2,540.07
2,540.06
2,540.04
2,540.02

2,528.48
2,528.13
2,527.80
2,527.48
2,527.17
2,526.88
2,526.72
2,526.71
2,526.70
2,526.70
2,526.68
2,526.67
2,526.75
2,526.74
2,526.70
2,526.76
2,526.70
2,526.72
2,526.73
2,526.71
2,526.72
2,526.73
2,526.71
2,526.67
2,400.00
2,526.69
2,526.70
2,526.73
2,526.67
2,526.73
2,526.72
2,526.71
2,526.69

Friction
Loss
(m)
13.52
13.49
13.45
13.42
13.38
13.35
13.34
13.34
13.33
13.34
13.33
13.33
13.34
13.34
13.33
13.34
13.34
13.34
13.34
13.34
13.34
13.34
13.34
13.33
0.00
13.33
13.34
13.34
13.33
13.34
13.34
13.34
13.33

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

13.52
13.49
13.45
13.42
13.38
13.35
13.34
13.34
13.33
13.34
13.33
13.33
13.34
13.34
13.33
13.34
13.34
13.34
13.34
13.34
13.34
13.34
13.34
13.33
0.00
13.33
13.34
13.34
13.33
13.34
13.34
13.34
13.33

3.38
3.37
3.36
3.35
3.35
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 23

Detailed Report for Pipe: P-6


Calculated Results Summary
Time

Status

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Temporarily Closed

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.1109
7.1111
7.1108
7.1102
7.1112
7.1103
7.1098
7.1108
7.1102
7.1108
7.1113
7.1111
7.1109
7.1098
7.1106
0.0000

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

Velocity
(m/s)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.00

From
Grade
(m)

To
Grade
(m)

2,540.05
2,540.05
2,540.04
2,540.02
2,540.06
2,540.02
2,540.00
2,540.04
2,540.02
2,540.04
2,540.06
2,540.05
2,540.05
2,540.00
2,540.04
2,540.00

2,526.71
2,526.72
2,526.71
2,526.69
2,526.72
2,526.69
2,526.67
2,526.71
2,526.69
2,526.71
2,526.73
2,526.72
2,526.71
2,526.67
2,526.70
2,400.00

Friction
Loss
(m)
13.34
13.34
13.34
13.33
13.34
13.33
13.33
13.34
13.33
13.34
13.34
13.34
13.34
13.33
13.34
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

13.34
13.34
13.34
13.33
13.34
13.33
13.33
13.34
13.33
13.34
13.34
13.34
13.34
13.33
13.34
0.00

3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 24

Detailed Report for Pipe: P-7


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-4
J-5
No
6,000.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1607
N/A
7.1510
N/A
7.1417
N/A
7.1327
N/A
7.1240
N/A
7.1156
N/A
7.1111
N/A
7.1109
N/A
7.1105
N/A
7.1107
N/A
7.1099
N/A
7.1098
N/A
7.1120
N/A
7.1117
N/A
7.1106
N/A
7.1124
N/A
7.1106
N/A
7.1111
N/A
7.1115
N/A
7.1108
N/A
7.1113
N/A
7.1116
N/A
7.1109
N/A
7.1098
N/A 0.126e-6
N/A
7.1102
N/A
7.1106
N/A
7.1115
N/A
7.1098
N/A
7.1114
N/A
7.1112
N/A
7.1108
N/A
7.1104

Velocity
(m/s)
2.81
2.81
2.81
2.80
2.80
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.5e-7
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,528.48
2,528.13
2,527.80
2,527.48
2,527.17
2,526.88
2,526.72
2,526.71
2,526.70
2,526.70
2,526.68
2,526.67
2,526.75
2,526.74
2,526.70
2,526.76
2,526.70
2,526.72
2,526.73
2,526.71
2,526.72
2,526.73
2,526.71
2,526.67
2,400.00
2,526.69
2,526.70
2,526.73
2,526.67
2,526.73
2,526.72
2,526.71
2,526.69

2,508.20
2,507.91
2,507.63
2,507.36
2,507.10
2,506.85
2,506.71
2,506.71
2,506.69
2,506.70
2,506.68
2,506.67
2,506.74
2,506.73
2,506.70
2,506.75
2,506.70
2,506.71
2,506.72
2,506.70
2,506.72
2,506.73
2,506.71
2,506.67
2,400.00
2,506.69
2,506.70
2,506.72
2,506.67
2,506.72
2,506.72
2,506.70
2,506.69

Friction
Loss
(m)
20.28
20.23
20.18
20.13
20.08
20.03
20.00
20.00
20.00
20.00
20.00
20.00
20.01
20.01
20.00
20.01
20.00
20.00
20.01
20.00
20.01
20.01
20.00
20.00
0.00
20.00
20.00
20.01
20.00
20.01
20.01
20.00
20.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20.28
20.23
20.18
20.13
20.08
20.03
20.00
20.00
20.00
20.00
20.00
20.00
20.01
20.01
20.00
20.01
20.00
20.00
20.01
20.00
20.01
20.01
20.00
20.00
0.00
20.00
20.00
20.01
20.00
20.01
20.01
20.00
20.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.38
3.37
3.36
3.35
3.35
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.34
3.33
3.33
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 25

Detailed Report for Pipe: P-7


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1109
N/A
7.1111
N/A
7.1108
N/A
7.1102
N/A
7.1112
N/A
7.1103
N/A
7.1098
N/A
7.1108
N/A
7.1102
N/A
7.1108
N/A
7.1113
N/A
7.1111
N/A
7.1109
N/A
7.1098
N/A
7.1106
N/A 0.126e-6

Velocity
(m/s)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.5e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,526.71
2,526.72
2,526.71
2,526.69
2,526.72
2,526.69
2,526.67
2,526.71
2,526.69
2,526.71
2,526.73
2,526.72
2,526.71
2,526.67
2,526.70
2,400.00

2,506.71
2,506.71
2,506.70
2,506.69
2,506.72
2,506.69
2,506.67
2,506.70
2,506.69
2,506.70
2,506.72
2,506.71
2,506.71
2,506.67
2,506.70
2,400.00

Friction
Loss
(m)
20.00
20.00
20.00
20.00
20.01
20.00
20.00
20.00
20.00
20.00
20.01
20.00
20.00
20.00
20.00
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20.00
20.00
20.00
20.00
20.01
20.00
20.00
20.00
20.00
20.00
20.01
20.00
20.00
20.00
20.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 26

Detailed Report for Pipe: P-8


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-5
J-6
No
29,000.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1607
N/A
7.1510
N/A
7.1417
N/A
7.1327
N/A
7.1240
N/A
7.1156
N/A
7.1111
N/A
7.1109
N/A
7.1105
N/A
7.1107
N/A
7.1099
N/A
7.1098
N/A
7.1120
N/A
7.1117
N/A
7.1106
N/A
7.1124
N/A
7.1106
N/A
7.1111
N/A
7.1115
N/A
7.1108
N/A
7.1113
N/A
7.1116
N/A
7.1109
N/A
7.1098
N/A 0.1302e-6
N/A
7.1102
N/A
7.1106
N/A
7.1115
N/A
7.1098
N/A
7.1114
N/A
7.1112
N/A
7.1108
N/A
7.1104

Velocity
(m/s)
2.81
2.81
2.81
2.80
2.80
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.51e-7
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,508.20
2,507.91
2,507.63
2,507.36
2,507.10
2,506.85
2,506.71
2,506.71
2,506.69
2,506.70
2,506.68
2,506.67
2,506.74
2,506.73
2,506.70
2,506.75
2,506.70
2,506.71
2,506.72
2,506.70
2,506.72
2,506.73
2,506.71
2,506.67
2,400.00
2,506.69
2,506.70
2,506.72
2,506.67
2,506.72
2,506.72
2,506.70
2,506.69

2,410.16
2,410.13
2,410.11
2,410.08
2,410.06
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02

Friction
Loss
(m)
98.03
97.77
97.52
97.27
97.04
96.81
96.69
96.68
96.67
96.68
96.66
96.66
96.72
96.71
96.68
96.73
96.68
96.69
96.70
96.68
96.70
96.70
96.68
96.66
0.00
96.67
96.68
96.70
96.66
96.70
96.69
96.68
96.67

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

98.03
97.77
97.52
97.27
97.04
96.81
96.69
96.68
96.67
96.68
96.66
96.66
96.72
96.71
96.68
96.73
96.68
96.69
96.70
96.68
96.70
96.70
96.68
96.66
0.00
96.67
96.68
96.70
96.66
96.70
96.69
96.68
96.67

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.38
3.37
3.36
3.35
3.35
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.34
3.33
3.33
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 27

Detailed Report for Pipe: P-8


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Flow
(m/s)
7.1109
7.1111
7.1108
7.1102
7.1112
7.1103
7.1098
7.1108
7.1102
7.1108
7.1113
7.1111
7.1109
7.1098
7.1106
0.126e-6

Velocity
(m/s)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.5e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,506.71
2,506.71
2,506.70
2,506.69
2,506.72
2,506.69
2,506.67
2,506.70
2,506.69
2,506.70
2,506.72
2,506.71
2,506.71
2,506.67
2,506.70
2,400.00

2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00

Friction
Loss
(m)
96.68
96.69
96.68
96.67
96.69
96.67
96.66
96.68
96.67
96.68
96.70
96.69
96.69
96.66
96.68
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

96.68
96.69
96.68
96.67
96.69
96.67
96.66
96.68
96.67
96.68
96.70
96.69
96.69
96.66
96.68
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 28

Detailed Report for Pipe: P-10


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-6
FCV-1-In
No
2,182.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1607
N/A
7.1510
N/A
7.1417
N/A
7.1327
N/A
7.1240
N/A
7.1156
N/A
7.1111
N/A
7.1109
N/A
7.1105
N/A
7.1107
N/A
7.1099
N/A
7.1098
N/A
7.1120
N/A
7.1117
N/A
7.1106
N/A
7.1124
N/A
7.1106
N/A
7.1111
N/A
7.1115
N/A
7.1108
N/A
7.1113
N/A
7.1116
N/A
7.1109
N/A
7.1098
N/A 0.7001e-7
N/A
7.1102
N/A
7.1106
N/A
7.1115
N/A
7.1098
N/A
7.1114
N/A
7.1112
N/A
7.1108
N/A
7.1104

Velocity
(m/s)
2.81
2.81
2.81
2.80
2.80
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.28e-7
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,410.16
2,410.13
2,410.11
2,410.08
2,410.06
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.03
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02

2,402.78
2,402.78
2,402.77
2,402.76
2,402.76
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,400.00
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75

Friction
Loss
(m)
7.38
7.36
7.34
7.32
7.30
7.28
7.28
7.27
7.27
7.27
7.27
7.27
7.28
7.28
7.27
7.28
7.27
7.28
7.28
7.27
7.28
7.28
7.27
7.27
0.00
7.27
7.27
7.28
7.27
7.28
7.28
7.27
7.27

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7.38
7.36
7.34
7.32
7.30
7.28
7.28
7.27
7.27
7.27
7.27
7.27
7.28
7.28
7.27
7.28
7.27
7.28
7.28
7.27
7.28
7.28
7.27
7.27
0.00
7.27
7.27
7.28
7.27
7.28
7.28
7.27
7.27

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.38
3.37
3.36
3.35
3.35
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 29

Detailed Report for Pipe: P-10


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1109
N/A
7.1111
N/A
7.1108
N/A
7.1102
N/A
7.1112
N/A
7.1103
N/A
7.1098
N/A
7.1108
N/A
7.1102
N/A
7.1108
N/A
7.1113
N/A
7.1111
N/A
7.1109
N/A
7.1098
N/A
7.1106
N/A 0.1227e-6

Velocity
(m/s)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.48e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,410.02
2,400.00

2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,402.75
2,400.00

Friction
Loss
(m)
7.27
7.28
7.27
7.27
7.28
7.27
7.27
7.27
7.27
7.27
7.28
7.28
7.27
7.27
7.27
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7.27
7.28
7.27
7.27
7.28
7.27
7.27
7.27
7.27
7.27
7.28
7.28
7.27
7.27
7.27
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 30

Detailed Report for Pipe: P-11


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

FCV-1-Out
R-2
No
818.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1607
N/A
7.1510
N/A
7.1417
N/A
7.1327
N/A
7.1240
N/A
7.1156
N/A
7.1111
N/A
7.1109
N/A
7.1105
N/A
7.1107
N/A
7.1099
N/A
7.1098
N/A
7.1120
N/A
7.1117
N/A
7.1106
N/A
7.1124
N/A
7.1106
N/A
7.1111
N/A
7.1115
N/A
7.1108
N/A
7.1113
N/A
7.1116
N/A
7.1109
N/A
7.1098
N/A -0.5022e-6
N/A
7.1102
N/A
7.1106
N/A
7.1115
N/A
7.1098
N/A
7.1114
N/A
7.1112
N/A
7.1108
N/A
7.1104

Velocity
(m/s)
2.81
2.81
2.81
2.80
2.80
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.80
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.2e-6
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,402.77
2,402.76
2,402.75
2,402.74
2,402.74
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,400.00
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73

2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00

Friction
Loss
(m)
2.77
2.76
2.75
2.74
2.74
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
0.00
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.77
2.76
2.75
2.74
2.74
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
0.00
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.38
3.37
3.36
3.35
3.35
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.34
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 31

Detailed Report for Pipe: P-11


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
7.1109
N/A
7.1111
N/A
7.1108
N/A
7.1102
N/A
7.1112
N/A
7.1103
N/A
7.1098
N/A
7.1108
N/A
7.1102
N/A
7.1108
N/A
7.1113
N/A
7.1111
N/A
7.1109
N/A
7.1098
N/A
7.1106
N/A -0.6975e-6

Velocity
(m/s)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
0.27e-6

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,402.73
2,400.00

2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00

Friction
Loss
(m)
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
2.73
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 32

Detailed Report for Pipe: P-12


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-2
FCV-2-In
No
5,971.50 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.1942
N/A
6.2190
N/A
6.2429
N/A
6.2660
N/A
6.2884
N/A
6.3100
N/A
6.3257
N/A
6.3349
N/A
6.3443
N/A
6.3526
N/A
6.3623
N/A
6.3708
N/A
6.3760
N/A
6.3846
N/A
6.3942
N/A
6.3995
N/A
6.4100
N/A
6.4170
N/A
6.4240
N/A
6.4326
N/A
6.4119
N/A
6.3644
N/A
6.3182
N/A
6.2726
N/A 0.1093e-6
N/A
6.2626
N/A
6.2719
N/A
6.2803
N/A
6.2923
N/A
6.2994
N/A
6.3090
N/A
6.3187
N/A
6.3284

Velocity
(m/s)
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.51
2.52
2.52
2.52
2.53
2.52
2.50
2.48
2.46
0.43e-7
2.46
2.46
2.47
2.47
2.48
2.48
2.48
2.49

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,559.75
2,559.52
2,559.29
2,559.07
2,558.85
2,558.65
2,558.57
2,558.61
2,558.65
2,558.71
2,558.73
2,558.78
2,558.89
2,558.93
2,558.95
2,559.05
2,559.04
2,559.10
2,559.16
2,559.18
2,559.08
2,558.81
2,558.51
2,558.21
2,540.00
2,558.17
2,558.23
2,558.32
2,558.32
2,558.42
2,558.47
2,558.51
2,558.55

2,544.62
2,544.26
2,543.92
2,543.58
2,543.26
2,542.95
2,542.79
2,542.79
2,542.78
2,542.79
2,542.77
2,542.78
2,542.87
2,542.86
2,542.83
2,542.90
2,542.84
2,542.87
2,542.89
2,542.87
2,542.87
2,542.84
2,542.77
2,542.69
2,540.00
2,542.70
2,542.72
2,542.76
2,542.71
2,542.78
2,542.78
2,542.77
2,542.76

Friction
Loss
(m)
15.13
15.25
15.37
15.48
15.59
15.70
15.78
15.82
15.87
15.91
15.96
16.00
16.03
16.07
16.12
16.15
16.20
16.23
16.27
16.31
16.21
15.97
15.74
15.52
0.00
15.47
15.51
15.55
15.61
15.65
15.70
15.74
15.79

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15.13
15.25
15.37
15.48
15.59
15.70
15.78
15.82
15.87
15.91
15.96
16.00
16.03
16.07
16.12
16.15
16.20
16.23
16.27
16.31
16.21
15.97
15.74
15.52
0.00
15.47
15.51
15.55
15.61
15.65
15.70
15.74
15.79

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.53
2.55
2.57
2.59
2.61
2.63
2.64
2.65
2.66
2.66
2.67
2.68
2.68
2.69
2.70
2.70
2.71
2.72
2.72
2.73
2.71
2.67
2.64
2.60
0.00
2.59
2.60
2.60
2.61
2.62
2.63
2.64
2.64

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 33

Detailed Report for Pipe: P-12


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.3365
N/A
6.3451
N/A
6.3541
N/A
6.3635
N/A
6.3703
N/A
6.3799
N/A
6.3888
N/A
6.3952
N/A
6.4040
N/A
6.4109
N/A
6.4178
N/A
6.3984
N/A
6.3514
N/A
6.3059
N/A
6.2574
N/A 0.6335e-7

Velocity
(m/s)
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.52
2.52
2.52
2.51
2.50
2.48
2.46
0.25e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,558.62
2,558.68
2,558.72
2,558.75
2,558.83
2,558.85
2,558.88
2,558.96
2,558.99
2,559.05
2,559.11
2,558.99
2,558.71
2,558.40
2,558.15
2,540.00

2,542.79
2,542.80
2,542.80
2,542.78
2,542.83
2,542.80
2,542.79
2,542.84
2,542.82
2,542.85
2,542.88
2,542.85
2,542.80
2,542.72
2,542.71
2,540.00

Friction
Loss
(m)
15.83
15.87
15.92
15.97
16.00
16.05
16.09
16.12
16.17
16.20
16.24
16.14
15.91
15.68
15.44
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15.83
15.87
15.92
15.97
16.00
16.05
16.09
16.12
16.17
16.20
16.24
16.14
15.91
15.68
15.44
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.65
2.66
2.67
2.67
2.68
2.69
2.69
2.70
2.71
2.71
2.72
2.70
2.66
2.63
2.59
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 34

Detailed Report for Pipe: P-13


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

FCV-2-Out
T-3
No
1,028.50 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.1942
N/A
6.2190
N/A
6.2429
N/A
6.2660
N/A
6.2884
N/A
6.3100
N/A
6.3257
N/A
6.3349
N/A
6.3443
N/A
6.3526
N/A
6.3623
N/A
6.3708
N/A
6.3760
N/A
6.3846
N/A
6.3942
N/A
6.3995
N/A
6.4100
N/A
6.4170
N/A
6.4240
N/A
6.4326
N/A
6.4119
N/A
6.3644
N/A
6.3182
N/A
6.2726
N/A 0.6801e-6
N/A
6.2626
N/A
6.2719
N/A
6.2803
N/A
6.2923
N/A
6.2994
N/A
6.3090
N/A
6.3187
N/A
6.3284

Velocity
(m/s)
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.51
2.52
2.52
2.52
2.53
2.52
2.50
2.48
2.46
0.27e-6
2.46
2.46
2.47
2.47
2.48
2.48
2.48
2.49

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,544.61
2,544.25
2,543.90
2,543.57
2,543.25
2,542.94
2,542.77
2,542.77
2,542.76
2,542.78
2,542.76
2,542.76
2,542.85
2,542.85
2,542.81
2,542.89
2,542.83
2,542.85
2,542.87
2,542.85
2,542.85
2,542.82
2,542.76
2,542.68
2,540.00
2,542.68
2,542.71
2,542.75
2,542.69
2,542.76
2,542.76
2,542.76
2,542.74

2,542.00
2,541.62
2,541.25
2,540.90
2,540.56
2,540.23
2,540.05
2,540.05
2,540.03
2,540.04
2,540.01
2,540.00
2,540.09
2,540.08
2,540.03
2,540.11
2,540.04
2,540.05
2,540.07
2,540.04
2,540.06
2,540.07
2,540.05
2,540.00
2,540.00
2,540.02
2,540.04
2,540.07
2,540.00
2,540.07
2,540.06
2,540.04
2,540.02

Friction
Loss
(m)
2.61
2.63
2.65
2.67
2.69
2.70
2.72
2.73
2.73
2.74
2.75
2.76
2.76
2.77
2.78
2.78
2.79
2.80
2.80
2.81
2.79
2.75
2.71
2.67
0.00
2.66
2.67
2.68
2.69
2.70
2.70
2.71
2.72

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.61
2.63
2.65
2.67
2.69
2.70
2.72
2.73
2.73
2.74
2.75
2.76
2.76
2.77
2.78
2.78
2.79
2.80
2.80
2.81
2.79
2.75
2.71
2.67
0.00
2.66
2.67
2.68
2.69
2.70
2.70
2.71
2.72

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.53
2.55
2.57
2.59
2.61
2.63
2.64
2.65
2.66
2.66
2.67
2.68
2.68
2.69
2.70
2.70
2.71
2.72
2.72
2.73
2.71
2.67
2.64
2.60
0.00
2.59
2.60
2.60
2.61
2.62
2.63
2.64
2.64

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 35

Detailed Report for Pipe: P-13


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.3365
N/A
6.3451
N/A
6.3541
N/A
6.3635
N/A
6.3703
N/A
6.3799
N/A
6.3888
N/A
6.3952
N/A
6.4040
N/A
6.4109
N/A
6.4178
N/A
6.3984
N/A
6.3514
N/A
6.3059
N/A
6.2574
N/A 0.6687e-6

Velocity
(m/s)
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.52
2.52
2.52
2.51
2.50
2.48
2.46
0.26e-6

c:\...\deposito intermedio.wcd
29/05/13 18:48:57
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,542.77
2,542.79
2,542.78
2,542.77
2,542.82
2,542.79
2,542.78
2,542.82
2,542.81
2,542.83
2,542.86
2,542.83
2,542.79
2,542.70
2,542.70
2,540.00

2,540.05
2,540.05
2,540.04
2,540.02
2,540.06
2,540.02
2,540.00
2,540.04
2,540.02
2,540.04
2,540.06
2,540.05
2,540.05
2,540.00
2,540.04
2,540.00

Friction
Loss
(m)
2.73
2.73
2.74
2.75
2.76
2.76
2.77
2.78
2.78
2.79
2.80
2.78
2.74
2.70
2.66
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.73
2.73
2.74
2.75
2.76
2.76
2.77
2.78
2.78
2.79
2.80
2.78
2.74
2.70
2.66
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.65
2.66
2.67
2.67
2.68
2.69
2.69
2.70
2.71
2.71
2.72
2.70
2.66
2.63
2.59
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 36

Detailed Report for Pipe: P-14


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-1
J-7
No
18,000.00 m

Diameter
Material
Roughness
Minor Loss

2,100 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.1942
N/A
6.2190
N/A
6.2429
N/A
6.2660
N/A
6.2884
N/A
6.3100
N/A
6.3257
N/A
6.3349
N/A
6.3443
N/A
6.3526
N/A
6.3623
N/A
6.3708
N/A
6.3760
N/A
6.3846
N/A
6.3942
N/A
6.3995
N/A
6.4100
N/A
6.4170
N/A
6.4240
N/A
6.4326
N/A
6.4119
N/A
6.3644
N/A
6.3182
N/A
6.2726
N/A 0.9256e-7
N/A
6.2626
N/A
6.2719
N/A
6.2803
N/A
6.2923
N/A
6.2994
N/A
6.3090
N/A
6.3187
N/A
6.3284

Velocity
(m/s)
1.79
1.80
1.80
1.81
1.82
1.82
1.83
1.83
1.83
1.83
1.84
1.84
1.84
1.84
1.85
1.85
1.85
1.85
1.85
1.86
1.85
1.84
1.82
1.81
0.27e-7
1.81
1.81
1.81
1.82
1.82
1.82
1.82
1.83

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,618.30
2,618.53
2,618.75
2,618.97
2,619.18
2,619.39
2,619.60
2,619.82
2,620.04
2,620.26
2,620.47
2,620.68
2,620.90
2,621.10
2,621.30
2,621.51
2,621.70
2,621.90
2,622.09
2,622.28
2,621.78
2,620.59
2,619.41
2,618.23
2,540.00
2,618.00
2,618.25
2,618.49
2,618.72
2,618.96
2,619.19
2,619.42
2,619.64

2,597.77
2,597.83
2,597.90
2,597.96
2,598.03
2,598.09
2,598.20
2,598.36
2,598.52
2,598.68
2,598.82
2,598.98
2,599.16
2,599.30
2,599.44
2,599.61
2,599.73
2,599.88
2,600.02
2,600.15
2,599.79
2,598.93
2,598.05
2,597.18
2,540.00
2,597.02
2,597.20
2,597.39
2,597.54
2,597.73
2,597.90
2,598.06
2,598.22

Friction
Loss
(m)
20.53
20.69
20.85
21.00
21.15
21.30
21.40
21.46
21.53
21.58
21.65
21.71
21.74
21.80
21.87
21.90
21.97
22.02
22.07
22.13
21.99
21.66
21.35
21.05
0.00
20.98
21.04
21.10
21.18
21.23
21.29
21.36
21.42

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20.53
20.69
20.85
21.00
21.15
21.30
21.40
21.46
21.53
21.58
21.65
21.71
21.74
21.80
21.87
21.90
21.97
22.02
22.07
22.13
21.99
21.66
21.35
21.05
0.00
20.98
21.04
21.10
21.18
21.23
21.29
21.36
21.42

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

1.14
1.15
1.16
1.17
1.18
1.18
1.19
1.19
1.20
1.20
1.20
1.21
1.21
1.21
1.21
1.22
1.22
1.22
1.23
1.23
1.22
1.20
1.19
1.17
0.00
1.17
1.17
1.17
1.18
1.18
1.18
1.19
1.19

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 37

Detailed Report for Pipe: P-14


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.3365
N/A
6.3451
N/A
6.3541
N/A
6.3635
N/A
6.3703
N/A
6.3799
N/A
6.3888
N/A
6.3952
N/A
6.4040
N/A
6.4109
N/A
6.4178
N/A
6.3984
N/A
6.3514
N/A
6.3059
N/A
6.2574
N/A 0.6298e-7

Velocity
(m/s)
1.83
1.83
1.83
1.84
1.84
1.84
1.84
1.85
1.85
1.85
1.85
1.85
1.83
1.82
1.81
0.18e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,619.86
2,620.09
2,620.30
2,620.51
2,620.73
2,620.93
2,621.13
2,621.34
2,621.54
2,621.73
2,621.93
2,621.43
2,620.24
2,619.06
2,617.89
2,540.00

2,598.39
2,598.55
2,598.71
2,598.86
2,599.02
2,599.16
2,599.31
2,599.47
2,599.60
2,599.75
2,599.90
2,599.53
2,598.66
2,597.79
2,596.94
2,540.00

Friction
Loss
(m)
21.48
21.53
21.59
21.66
21.70
21.77
21.83
21.87
21.93
21.98
22.03
21.89
21.58
21.27
20.95
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

21.48
21.53
21.59
21.66
21.70
21.77
21.83
21.87
21.93
21.98
22.03
21.89
21.58
21.27
20.95
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

1.19
1.20
1.20
1.20
1.21
1.21
1.21
1.22
1.22
1.22
1.22
1.22
1.20
1.18
1.16
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 38

Detailed Report for Pipe: P-15


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
From Node
To Node
Check Valve
Length

J-7
J-2
No
15,000.00 m

Diameter
Material
Roughness
Minor Loss

1,800 mm
Ductile Iron
0.53e-3 m
0.00

Initial Condition Summary


Status

Open

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.1942
N/A
6.2190
N/A
6.2429
N/A
6.2660
N/A
6.2884
N/A
6.3100
N/A
6.3257
N/A
6.3349
N/A
6.3443
N/A
6.3526
N/A
6.3623
N/A
6.3708
N/A
6.3760
N/A
6.3846
N/A
6.3942
N/A
6.3995
N/A
6.4100
N/A
6.4170
N/A
6.4240
N/A
6.4326
N/A
6.4119
N/A
6.3644
N/A
6.3182
N/A
6.2726
N/A 0.9754e-7
N/A
6.2626
N/A
6.2719
N/A
6.2803
N/A
6.2923
N/A
6.2994
N/A
6.3090
N/A
6.3187
N/A
6.3284

Velocity
(m/s)
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.51
2.52
2.52
2.52
2.53
2.52
2.50
2.48
2.46
0.38e-7
2.46
2.46
2.47
2.47
2.48
2.48
2.48
2.49

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,597.77
2,597.83
2,597.90
2,597.96
2,598.03
2,598.09
2,598.20
2,598.36
2,598.52
2,598.68
2,598.82
2,598.98
2,599.16
2,599.30
2,599.44
2,599.61
2,599.73
2,599.88
2,600.02
2,600.15
2,599.79
2,598.93
2,598.05
2,597.18
2,540.00
2,597.02
2,597.20
2,597.39
2,597.54
2,597.73
2,597.90
2,598.06
2,598.22

2,559.75
2,559.52
2,559.29
2,559.07
2,558.85
2,558.65
2,558.57
2,558.61
2,558.65
2,558.71
2,558.73
2,558.78
2,558.89
2,558.93
2,558.95
2,559.05
2,559.04
2,559.10
2,559.16
2,559.18
2,559.08
2,558.81
2,558.51
2,558.21
2,540.00
2,558.17
2,558.23
2,558.32
2,558.32
2,558.42
2,558.47
2,558.51
2,558.55

Friction
Loss
(m)
38.01
38.32
38.61
38.90
39.17
39.44
39.63
39.75
39.87
39.97
40.09
40.20
40.26
40.37
40.49
40.56
40.69
40.78
40.87
40.98
40.71
40.12
39.54
38.98
0.00
38.85
38.97
39.07
39.22
39.31
39.43
39.55
39.67

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

38.01
38.32
38.61
38.90
39.17
39.44
39.63
39.75
39.87
39.97
40.09
40.20
40.26
40.37
40.49
40.56
40.69
40.78
40.87
40.98
40.71
40.12
39.54
38.98
0.00
38.85
38.97
39.07
39.22
39.31
39.43
39.55
39.67

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.53
2.55
2.57
2.59
2.61
2.63
2.64
2.65
2.66
2.66
2.67
2.68
2.68
2.69
2.70
2.70
2.71
2.72
2.72
2.73
2.71
2.67
2.64
2.60
0.00
2.59
2.60
2.60
2.61
2.62
2.63
2.64
2.64

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 39

Detailed Report for Pipe: P-15


Calculated Results Summary
Time

33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Constituent
(mg/l)

Flow
(m/s)

N/A
6.3365
N/A
6.3451
N/A
6.3541
N/A
6.3635
N/A
6.3703
N/A
6.3799
N/A
6.3888
N/A
6.3952
N/A
6.4040
N/A
6.4109
N/A
6.4178
N/A
6.3984
N/A
6.3514
N/A
6.3059
N/A
6.2574
N/A 0.6503e-7

Velocity
(m/s)
2.49
2.49
2.50
2.50
2.50
2.51
2.51
2.51
2.52
2.52
2.52
2.51
2.50
2.48
2.46
0.26e-7

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

From
Grade
(m)

To
Grade
(m)

2,598.39
2,598.55
2,598.71
2,598.86
2,599.02
2,599.16
2,599.31
2,599.47
2,599.60
2,599.75
2,599.90
2,599.53
2,598.66
2,597.79
2,596.94
2,540.00

2,558.62
2,558.68
2,558.72
2,558.75
2,558.83
2,558.85
2,558.88
2,558.96
2,558.99
2,559.05
2,559.11
2,558.99
2,558.71
2,558.40
2,558.15
2,540.00

Friction
Loss
(m)
39.77
39.88
39.99
40.11
40.19
40.31
40.42
40.50
40.61
40.70
40.79
40.54
39.95
39.39
38.79
0.00

Minor
Total
Headloss
Loss Headloss Gradient
(m)
(m)
(m/km)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

39.77
39.88
39.99
40.11
40.19
40.31
40.42
40.50
40.61
40.70
40.79
40.54
39.95
39.39
38.79
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

2.65
2.66
2.67
2.67
2.68
2.69
2.69
2.70
2.71
2.71
2.72
2.70
2.66
2.63
2.59
0.00

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 40

Detailed Report for Pump: PMP-1


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y
Elevation

2,984.70 m
3,060.80 m
2,375.00 m

From Pipe
To Pipe

P-1
P-2

Initial Condition Summary


Status

On

Relative Speed Factor

1.00

Pump Definition Summary


Pump Type
Design Point (1 Point)
Shutoff Head
380.00 m
Design Head
285.00 m
Maximum Operating Head
0.00 m

Shutoff Discharge
Design Discharge
Maximum Operating Discharge

0.0000 m/s
7.5000 m/s
15.0000 m/s

Pump Curve
PMP-1

400.0

350.0

300.0

Head
(m)

250.0

200.0

150.0

100.0

50.0

0.0
0.0

2.0

4.0

6.0

8.0
Discharge
(m/s)

10.0

12.0

14.0

16.0

Operating Controls
Summary
Controls

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 41

Detailed Report for Pump: PMP-1


Operating Controls
Summary
Controls
On at time 0.00 hr
Off at time 19.50 hr
On at time 24.00 hr
Off at time 43.50 hr

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr
33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Status

On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
Off
Off
Off
Off
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
On
Off
Off
Off
Off
Off

Constituent
(mg/l)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

From
Grade
(m)

To
Grade
(m)

Flow
(m/s)

Head
(m)

2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,375.00
2,375.00
2,375.00
2,375.00
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,374.96
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00

2,658.02
2,658.22
2,658.42
2,658.61
2,658.80
2,658.98
2,659.16
2,659.34
2,659.52
2,659.69
2,659.86
2,660.03
2,660.20
2,660.36
2,660.52
2,660.68
2,660.84
2,660.99
2,661.15
2,661.30
2,627.88
2,626.61
2,625.34
2,624.08
2,657.65
2,657.89
2,658.08
2,658.28
2,658.47
2,658.65
2,658.84
2,659.02
2,659.20
2,659.37
2,659.55
2,659.72
2,659.89
2,660.06
2,660.23
2,660.39
2,660.55
2,660.71
2,660.86
2,661.02
2,627.51
2,626.23
2,624.96
2,623.71
2,623.50

7.5764
7.5685
7.5608
7.5532
7.5458
7.5385
7.5314
7.5245
7.5176
7.5108
7.5040
7.4974
7.4908
7.4844
7.4779
7.4716
7.4653
7.4592
7.4531
7.4471
0.0000
0.0000
0.0000
0.0000
7.5909
7.5814
7.5738
7.5663
7.5589
7.5516
7.5443
7.5372
7.5301
7.5232
7.5163
7.5095
7.5028
7.4962
7.4896
7.4832
7.4769
7.4706
7.4644
7.4583
0.0000
0.0000
0.0000
0.0000
0.0000

283.05
283.26
283.45
283.65
283.84
284.02
284.20
284.38
284.55
284.73
284.90
285.07
285.23
285.40
285.56
285.72
285.88
286.03
286.18
286.34
0.00
0.00
0.00
0.00
282.68
282.93
283.12
283.31
283.50
283.69
283.87
284.05
284.23
284.41
284.59
284.76
284.93
285.10
285.26
285.43
285.59
285.74
285.90
286.05
0.00
0.00
0.00
0.00
0.00

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

Relative
Speed
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00

Useful
Power
(kW)
20,992.43
20,985.49
20,978.65
20,971.94
20,965.35
20,958.84
20,952.40
20,946.10
20,939.74
20,933.51
20,927.26
20,921.11
20,914.96
20,908.90
20,902.84
20,896.85
20,890.86
20,884.99
20,879.10
20,873.31
0.00
0.00
0.00
0.00
21,004.97
20,996.73
20,990.14
20,983.56
20,977.01
20,970.51
20,964.05
20,957.65
20,951.22
20,944.90
20,938.60
20,932.36
20,926.13
20,919.97
20,913.86
20,907.81
20,901.83
20,895.86
20,889.95
20,884.08
0.00
0.00
0.00
0.00
0.00

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 42

Detailed Report for Reservoir: R-1


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

2,976.88 m
3,060.80 m

Hydraulic Grade Line


Zone

2,375.00 m
Zone-1

Connecting Pipes
P-1

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr
33.00 hr

Constituent Calculated Reservoir Reservoir


(mg/l)
Hydraulic
Inflow
Outflow
Grade
(m/s)
(m/s)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00 0.284e-6
2,375.00 0.1618e-5
2,375.00 0.1161e-5
2,375.00 0.7272e-7
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A
2,375.00
N/A

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

7.5764
7.5685
7.5608
7.5532
7.5458
7.5385
7.5314
7.5245
7.5176
7.5108
7.5040
7.4974
7.4908
7.4844
7.4779
7.4716
7.4653
7.4592
7.4531
7.4471
N/A
N/A
N/A
N/A
7.5909
7.5814
7.5738
7.5663
7.5589
7.5516
7.5443
7.5372
7.5301
7.5232

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 43

Detailed Report for Reservoir: R-1


Calculated Results Summary
Time

34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Reservoir Reservoir


(mg/l)
Hydraulic
Inflow
Outflow
Grade
(m/s)
(m/s)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00
2,375.00

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0.5696e-6
0.4119e-6
0.5696e-6
0.4059e-6
0.1626e-5

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

7.5163
7.5095
7.5028
7.4962
7.4896
7.4832
7.4769
7.4706
7.4644
7.4583
N/A
N/A
N/A
N/A
N/A

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 44

Detailed Report for Reservoir: R-2


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,134.87 m
3,064.76 m

Hydraulic Grade Line


Zone

2,400.00 m
Zone-1

Connecting Pipes
P-11

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr
21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr
33.00 hr

Constituent Calculated Reservoir Reservoir


(mg/l)
Hydraulic
Inflow
Outflow
Grade
(m/s)
(m/s)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00

7.1607
N/A
7.1510
N/A
7.1417
N/A
7.1327
N/A
7.1240
N/A
7.1156
N/A
7.1111
N/A
7.1109
N/A
7.1105
N/A
7.1107
N/A
7.1099
N/A
7.1098
N/A
7.1120
N/A
7.1117
N/A
7.1106
N/A
7.1124
N/A
7.1106
N/A
7.1111
N/A
7.1115
N/A
7.1108
N/A
7.1113
N/A
7.1116
N/A
7.1109
N/A
7.1098
N/A
N/A 0.5022e-6
7.1102
N/A
7.1106
N/A
7.1115
N/A
7.1098
N/A
7.1114
N/A
7.1112
N/A
7.1108
N/A
7.1104
N/A
7.1109
N/A

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 45

Detailed Report for Reservoir: R-2


Calculated Results Summary
Time

34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Reservoir Reservoir


(mg/l)
Hydraulic
Inflow
Outflow
Grade
(m/s)
(m/s)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00
2,400.00

7.1111
N/A
7.1108
N/A
7.1102
N/A
7.1112
N/A
7.1103
N/A
7.1098
N/A
7.1108
N/A
7.1102
N/A
7.1108
N/A
7.1113
N/A
7.1111
N/A
7.1109
N/A
7.1098
N/A
7.1106
N/A
N/A 0.6975e-6

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 46

Detailed Report for Tank: T-1


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,001.16 m
3,072.79 m

Base Elevation
Zone

2,630.00 m
2,624.00 m
2,623.50 m

Maximum Level
Initial Level
Minimum Level

2,622.50 m
Zone-1

Connecting Pipes
P-2
P-3
Operating Range Summary
Maximum Elevation
Initial Elevation
Minimum Elevation

7.50 m
1.50 m
1.00 m

Storage Summary
Type
Cross Section
Inactive Volume
Total Storage Capacity

Constant Area
Non-Circular
7,692.00 m
124,691.99 m

Average Area
Total Active Volume

18,000.0 m
116,999.99 m

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr

Constituent Calculated Tank Pressure Percent


(mg/l)
Hydraulic Level (m H2O)
Full
Grade
(m)
(%)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,624.00
2,624.27
2,624.54
2,624.80
2,625.05
2,625.30
2,625.55
2,625.79
2,626.02
2,626.26
2,626.49
2,626.71
2,626.94
2,627.16
2,627.38
2,627.59
2,627.81
2,628.01
2,628.22
2,628.43
2,627.88

1.50
1.77
2.04
2.30
2.55
2.80
3.05
3.29
3.52
3.76
3.99
4.21
4.44
4.66
4.88
5.09
5.31
5.51
5.72
5.93
5.38

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

1
2
2
2
3
3
3
3
4
4
4
4
4
5
5
5
5
6
6
6
5

13.4
17.3
21.2
24.9
28.6
32.2
35.7
39.2
42.6
46.0
49.3
52.6
55.8
59.0
62.1
65.2
68.3
71.3
74.3
77.3
69.5

Current
Storage
Volume
(m)

Tank
Inflow
(m/s)

16,691.69
21,610.16
26,410.76
31,098.85
35,679.78
40,158.91
44,546.96
48,838.56
53,119.46
57,298.55
61,456.21
65,533.51
69,573.30
73,538.08
77,481.43
81,344.41
85,191.32
88,947.15
92,692.26
96,351.64
86,605.78

1.3823
1.3495
1.3178
1.2871
1.2574
1.2286
1.2058
1.1896
1.1733
1.1582
1.1417
1.1266
1.1148
1.0998
1.0837
1.0721
1.0554
1.0422
1.0291
1.0145
N/A

Tank
Outflow
(m/s)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
6.4119

Status

Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Draining

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 47

Detailed Report for Tank: T-1


Calculated Results Summary
Time

21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr
33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated Tank Pressure Percent


(mg/l)
Hydraulic Level (m H2O)
Full
Grade
(m)
(%)
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,626.61
2,625.34
2,624.08
2,623.50
2,623.83
2,624.09
2,624.35
2,624.60
2,624.86
2,625.10
2,625.35
2,625.59
2,625.83
2,626.07
2,626.30
2,626.53
2,626.76
2,626.98
2,627.20
2,627.41
2,627.63
2,627.84
2,628.05
2,627.51
2,626.23
2,624.96
2,623.71
2,623.50

4.11
2.84
1.58
1.00
1.33
1.59
1.85
2.10
2.36
2.60
2.85
3.09
3.33
3.57
3.80
4.03
4.26
4.48
4.70
4.91
5.13
5.34
5.55
5.01
3.73
2.46
1.21
1.00

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

4
3
2
1
1
2
2
2
2
3
3
3
3
4
4
4
4
4
5
5
5
5
6
5
4
2
1
1

51.0
32.7
14.5
6.2
10.9
14.7
18.4
22.1
25.7
29.3
32.9
36.4
39.8
43.2
46.6
49.9
53.2
56.4
59.6
62.7
65.8
68.8
71.8
64.0
45.6
27.3
9.2
6.2

Current
Storage
Volume
(m)
63,610.05
40,769.70
18,095.44
7,695.92
13,610.95
18,320.47
22,971.05
27,578.76
32,095.40
36,579.89
40,978.65
45,355.99
49,642.24
53,896.34
58,075.43
62,217.02
66,294.32
70,291.24
74,256.03
78,140.44
81,992.71
85,780.68
89,531.15
79,854.94
56,869.92
34,061.72
11,419.60
7,695.92

Tank
Inflow
(m/s)

Tank
Outflow
(m/s)

N/A
6.3644
N/A
6.3182
N/A
6.2726
7.5909
N/A
1.3188
N/A
1.3019
N/A
1.2860
N/A
1.2665
N/A
1.2522
N/A
1.2353
N/A
1.2185
N/A
1.2017
N/A
1.1867
N/A
1.1712
N/A
1.1554
N/A
1.1393
N/A
1.1258
N/A
1.1098
N/A
1.0944
N/A
1.0816
N/A
1.0666
N/A
1.0535
N/A
1.0405
N/A
N/A
6.3984
N/A
6.3514
N/A
6.3059
N/A
6.2574
N/A 0.3081e-6

Status

Draining
Draining
Draining
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Filling
Draining
Draining
Draining
Draining
Empty

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 48

Detailed Report for Tank: T-3


Scenario Summary
Label
Demand Alternative
Physical Alternative
Initial Settings Alternative
Operational Alternative
Age Alternative
Constituent Alternative
Trace Alternative
Fire Flow Alternative

Base
Base-Average Daily
Base-Physical
Base-Initial Settings
Base-Operational
Base-Age Alternative
Base-Constituent
Base-Trace Alternative
Base-Fire Flow

Calibration Summary
Demand

<none>

Roughness

<none>

Geometric Summary
X
Y

3,072.18 m
3,069.19 m

Base Elevation
Zone

2,546.50 m
2,542.00 m
2,540.00 m

Maximum Level
Initial Level
Minimum Level

2,540.00 m
Zone-1

Connecting Pipes
P-13
P-6
Operating Range Summary
Maximum Elevation
Initial Elevation
Minimum Elevation

6.50 m
2.00 m
0.00 m

Storage Summary
Type
Cross Section
Inactive Volume
Total Storage Capacity

Constant Area
Non-Circular
0.00 m
58,500.00 m

Average Area
Total Active Volume

9,000.0 m
58,500.00 m

Calculated Results Summary


Time

0.00 hr
1.00 hr
2.00 hr
3.00 hr
4.00 hr
5.00 hr
6.00 hr
7.00 hr
8.00 hr
9.00 hr
10.00 hr
11.00 hr
12.00 hr
13.00 hr
14.00 hr
15.00 hr
16.00 hr
17.00 hr
18.00 hr
19.00 hr
20.00 hr

Constituent Calculated
(mg/l)
Hydraulic
Grade
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,542.00
2,541.62
2,541.25
2,540.90
2,540.56
2,540.23
2,540.05
2,540.05
2,540.03
2,540.04
2,540.01
2,540.00
2,540.09
2,540.08
2,540.03
2,540.11
2,540.04
2,540.05
2,540.07
2,540.04
2,540.06

Tank
Level
(m)
2.00
1.62
1.25
0.90
0.56
0.23
0.05
0.05
0.03
0.04
0.01
0.44e-2
0.09
0.08
0.03
0.11
0.04
0.05
0.07
0.04
0.06

Pressure Percent
(m H2O)
Full
(%)
2
2
1
1
1
0.0e0
1.0e-1
0.0e-1
0.0e-1
0.0e-1
1.0e-2
0.0e-2
1.0e-1
1.0e-1
0.0e-1
0.0e0
0.0e-1
1.0e-1
1.0e-1
0.0e-1
1.0e-1

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

Current
Storage
Volume
(m)

30.8 17,998.68
24.9 14,577.71
19.3 11,279.98
13.8 8,100.12
8.6 5,035.45
3.6 2,077.94
0.8
489.35
0.7
414.34
0.5
272.36
0.6
350.04
0.1
79.47
0.1
39.29
1.4
802.78
1.2
698.30
0.5
309.86
1.6
950.12
0.5
317.90
0.8
481.31
1.1
631.33
0.6
363.44
0.9
550.96

Tank
Inflow
(m/s)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Tank
Outflow
(m/s)

Status

0.9665
0.9320
0.8987
0.8666
0.8356
0.8056
0.7854
0.7760
0.7662
0.7581
0.7477
0.7390
0.7360
0.7271
0.7164
0.7129
0.7006
0.6941
0.6875
0.6782
0.6994

Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 49

Detailed Report for Tank: T-3


Calculated Results Summary
Time

21.00 hr
22.00 hr
23.00 hr
24.00 hr
25.00 hr
26.00 hr
27.00 hr
28.00 hr
29.00 hr
30.00 hr
31.00 hr
32.00 hr
33.00 hr
34.00 hr
35.00 hr
36.00 hr
37.00 hr
38.00 hr
39.00 hr
40.00 hr
41.00 hr
42.00 hr
43.00 hr
44.00 hr
45.00 hr
46.00 hr
47.00 hr
48.00 hr

Constituent Calculated
(mg/l)
Hydraulic
Grade
(m)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

2,540.07
2,540.05
2,540.00
2,540.00
2,540.02
2,540.04
2,540.07
2,540.00
2,540.07
2,540.06
2,540.04
2,540.02
2,540.05
2,540.05
2,540.04
2,540.02
2,540.06
2,540.02
2,540.00
2,540.04
2,540.02
2,540.04
2,540.06
2,540.05
2,540.05
2,540.00
2,540.04
2,540.00

Tank
Level
(m)
0.07
0.05
0.44e-2
-0.99e-4
0.02
0.04
0.07
0.35e-2
0.07
0.06
0.04
0.02
0.05
0.05
0.04
0.02
0.06
0.02
0.38e-2
0.04
0.02
0.04
0.06
0.05
0.05
0.29e-2
0.04
-0.99e-4

Pressure Percent
(m H2O)
Full
(%)
1.0e-1
0.0e-1
0.0e-2
0
0.0e-1
0.0e-1
1.0e-1
0.0e-2
1.0e-1
1.0e-1
0.0e-1
0.0e-1
0.0e-1
1.0e-1
0.0e-1
0.0e-1
1.0e-1
0.0e-1
0.0e-2
0.0e-1
0.0e-1
0.0e-1
1.0e-1
1.0e-1
0.0e-1
0.0e-2
0.0e-1
0

c:\...\deposito intermedio.wcd
29/05/13 18:48:58
Haestad Methods, Inc.

1.1
0.7
0.1
-0.2e-2
0.3
0.5
1.1
0.1
1.0
0.9
0.7
0.4
0.7
0.8
0.6
0.3
0.9
0.4
0.1
0.7
0.3
0.7
1.0
0.8
0.7
0.4e-1
0.6
-0.2e-2

Current
Storage
Volume
(m)

Tank
Inflow
(m/s)

652.76
N/A
406.30
N/A
39.29
N/A
-0.89
0.55e-6
178.59
N/A
315.22
N/A
620.61
N/A
31.25
N/A
588.47
N/A
524.17
N/A
392.91
N/A
224.14
N/A
414.34
N/A
473.27
N/A
374.15
N/A
170.56
N/A
534.89
N/A
213.42
N/A
33.93
N/A
398.26
N/A
181.27
N/A
382.19
N/A
572.39
N/A
473.27
N/A
430.41
N/A
25.90
N/A
325.93
N/A
-0.89 0.5387e-6

Tank
Outflow
(m/s)

Status

0.7472
0.7927
0.8373
N/A
0.8476
0.8387
0.8312
0.8175
0.8120
0.8022
0.7921
0.7819
0.7744
0.7660
0.7567
0.7467
0.7409
0.7304
0.7211
0.7156
0.7062
0.6999
0.6935
0.7126
0.7595
0.8039
0.8532
N/A

Draining
Draining
Draining
Empty
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Draining
Empty

FERROVIAL S.A.
37 Brookside Road Waterbury, CT 06708 USA

(203) 755-1666

Project Engineer: INCISA


WaterCAD v3.1 [071]
Page 50