Está en la página 1de 24

CRONOGRAMA FSICO

CP ENGENHARIA LTDA
INSTITUTO FEDERAL DO PIAU - VALENA DO PIAU

ITEM

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Jan-13

Feb-13

Mar-13

Apr-13

May-13

Jun-13

SOMA

DISCRIMINAO

Servios Preliminares

II

Guarita

III

Salas de Aula

IV

Laboratrios

Administrao e Controle Pedaggico

VI

Refeitrio

VII

Vestirio

VII

Ginsio

IX

Ligaes, Cisterna e Caixa D'gua

Urbanizao

XI

Instalaes Prediais

CP ENGENHARIA LTDA
CONSTRUO DO CAMPUS DE COCAL
Obra:
10/22/2012
Data
ITEM
1
2
3
4
5
6
7
8
9
10
11

PLANILHA RESUMO - 3 MEDIO


VALOR DO
VALOR ANTERIOR
3 MEDIO DISCRIMINAO
CONTRATO
ACUMULADO
22/10/2012
SERVIOS PRELIMINARES
399,725.12
138,328.46
27,261.90
Guarita
29,158.59
3,889.76
1,287.31
Salas de Aula
807,252.00
155,073.11
213,735.98
Laboratrios
876,135.76
90,942.89
218,431.96
Administrao e Controle Pedaggico
859,993.71
80,065.41
224,701.09
Refeitrio
469,210.03
34,486.94
87,818.07
Vestirio
125,574.43
31,851.75
Ginsio
571,908.53
9,665.25
115,046.41
Ligaes, Cisterna e Caixa D'gua
251,507.14
Urbanizao
1,103,633.10
537,690.05
Instalaes Prediais
1,035,479.07
Total Geral da Obra:
6,529,577.48
1,050,141.86
920,134.47
SEISCENTOS E VINTE E QUATRO MIL OITOCENTOS E TRINTA REAIS VINTE E CINCO CENTAVOS

VALOR ATUAL
ACUMULADO
165,590.36
5,177.06
368,809.09
309,374.85
304,766.50
122,305.01
31,851.75
124,711.66
537,690.05
1,970,276.33

consolidado
CP ENGENHARIA LTDA

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


PREO (R$)

ITEM

1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.8

DISCRIMINAO

SERVIOS PRELIMINARES
Taxas e Emolumentos
Instalao provisria (Canteiro de Obra)
Tapume com chapa de madeirite, inclusive porto
de entrada
Instalaes de Luz
Instalaes de gua
Consumo de gua e Luz
EPI's e Equipamentos
Vigilancia
Placa da Obra

1.9

Administrao do Canteiro de Obra (Engenheiro ou


Arquiteto habilitado e residente na Obra)

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10

BLOCOS
Guarita
Salas de Aula
Laboratrios
Administrao
Refeitrio
Vestirio
Ginsio
Ligaes, Cisterna e Caixa D'gua
Urbanizao
Instalaes Prediais
TOTAL (R$)

UNID.

QUANT.

UNITRIO

TOTAL

ACUMULADO ANTERIOR
%

VALOR (R$)

3 MEDIO - 22/10/2012
%

un
m

1.00
400.00

5,750.00
190.38

399,725.12
5,750.00
76,152.00

34.61%
3.00%
100.00%

138,328.46
172.50
76,152.00

518.72

31.59

16,386.36

100.00%

16,386.36

un
un
ms
ms
ms
m2

1.00
1.00
11.00
11.00
11.00
6.00

184.77
184.14
1,725.00
1,725.00
2,925.48
192.82

184.77
184.14
18,975.00
18,975.00
32,180.28
1,156.92

100.00%
100.00%
18.18%
18.18%
18.18%
100.00%

184.77
184.14
3,449.66
3,449.66
5,850.37
1,156.92

0.00%
0.00%
9.09%
9.09%
9.09%
0.00%

ms

11.00

20,889.15

229,780.65

13.64%

31,342.08

un
un
un
un
un
un
un
un
un
un

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

29,158.59
807,252.00
876,135.76
859,993.71
469,210.03
125,574.43
571,908.53
251,507.14
1,103,633.10
1,035,479.07

6,129,852.36
29,158.59
807,252.00
876,135.76
859,993.71
469,210.03
125,574.43
571,908.53
251,507.14
1,103,633.10
1,035,479.07

14.87%
13.34%
19.21%
10.38%
9.31%
7.35%
0.00%
1.69%
0.00%
48.72%
0.00%

911,813.41
3,889.76
155,073.11
90,942.89
80,065.41
34,486.94
9,665.25
537,690.05
-

6,529,577.48

16.08%

1,050,141.86

6.82%
0.00%
0.00%

VALOR (R$)

27,261.90
-

ACUMULADO ATUAL
PERCEN
VALOR (R$)
TUAL
41.43%
3.00%
100.00%

165,590.36
172.50
76,152.00

100.00%

16,386.36

1,724.83
1,724.83
2,925.19
-

100.00%
100.00%
27.27%
27.27%
27.27%
100.00%

184.77
184.14
5,174.48
5,174.48
8,775.56
1,156.92

9.09%

20,887.06

22.73%

52,229.14

14.57%
4.41%
26.48%
24.93%
26.13%
18.72%
25.36%
20.12%
0.00%
0.00%

892,872.56
1,287.31
213,735.98
218,431.96
224,701.09
87,818.07
31,851.75
115,046.41
-

29.44%
17.75%
45.69%
35.31%
35.44%
26.07%
25.36%
21.81%
0.00%
48.72%
0.00%

14.09%

920,134.47

30.17%

1,804,685.97
5,177.06
368,809.09
309,374.85
304,766.50
122,305.01
31,851.75
124,711.66
537,690.05
1,970,276.33

guarita
CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

58.89

4.77

280.91
280.91

0.00%
100.00%

280.91
280.91

0.00%

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro

11.34
11.34
1.94
0.50
1.00
13.00
1.00

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

5,678.63
219.88
2,696.77
692.25
165.93
1,264.41
623.22
16.17

63.55%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%

3,608.90
219.88
2,696.77
692.25
-

22.67%

m
m
m
m
m
m
m

3.0
3.1

ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas/Laje)

2.55

1,350.49

3,443.75
3,443.75

0.00%
0.00%

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm

86.73

50.21

4,354.71
4,354.71

0.00%
0.00%

5.0
5.1

20.54

30.38

1,925.32
624.01

0.00%
0.00%

18.02

67.67

1,219.41

0.00%

5.3

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=12mm
Piso Cermico 20x20 - Incl. Regularizao

2.52

32.50

81.90

0.00%

6.0
6.1
6.2
6.3

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

m
m
m

173.52
173.52
17.16

3.10
14.58
55.45

4,019.35
537.91
2,529.92
951.52

0.00%
0.00%
0.00%
0.00%

7.0

ESQUADRIAS

3,672.63

0.00%

7.1

Porta lisa em madeira com revestimento melamnico

4.83

335.40

1,619.98

0.00%

0.00%

0.00%

7.2
7.3

Esquadria de Metalon tipo Maxim'ar


Vidro Liso Transparente e=4mm

m
m

5.59
5.59

294.27
72.93

1,644.97
407.68

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

5.2

90.00%
90.00%

1,287.31
149.34
1,137.97
-

0.00%

0.00%
0.00%

0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%

0.00%

4,896.21
219.88
2,696.77
692.25
149.34
1,137.97
-

0.00%
0.00%

0.00%

0.00%

86.22%
100.00%
100.00%
100.00%
90.00%
90.00%
0.00%
0.00%

280.91
280.91

0.00%
0.00%

100.00%
100.00%

0.00%

0.00%

CP ENGENHARIA LTDA
ITEM
8.0

DISCRIMINAO

8.2
8.3

COBERTURA
Estrutura Metlica p/ Cobertura de Telha de
Alumnio
Cobertura com Telha Ondulada de Alumnio
Calha Metlica

8.4

Algeroz de Concreto Aparente L=30cm e E=4cm

9.0
9.1
9.2

PINTURA
Ltex Acrlico duas Demos com Emassamento
Pintura Texturizada Acrlica c/ Quartzo
Esmalte sinttico Acetinado com Emassamento em
Esquadria de Madeira
Esmalte Sinttico Acetinado sem Emassamento em
Esquadria Metlica

8.1

9.3
9.4

10.0
10.1
10.2
10.3

DIVERSOS
Bancada em Granito Cinza Andorinha
Rodap em alumnio
Limpeza Permanente e Geral da Obra
TOTAL (R$)

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
3,131.56

ACUMULADO ANTERIOR 3 MEDIO - 22/10/2012


%
VALOR (R$)
%
VALOR (R$)
0.00%
0.00%
-

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-

21.21

69.66

1,477.49

0.00%

0.00%

m
m

21.21
10.50

51.24
36.47

1,086.80
382.94

0.00%
0.00%

0.00%
0.00%

8.16

22.59

184.33

0.00%

0.00%

m
m

54.00
62.00

12.35
12.64

1,647.91
666.90
783.68

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

4.83

12.73

61.49

0.00%

0.00%

0.00%

11.18

12.15

135.84

0.00%

0.00%

0.00%

m
m
m

3.06
20.80
23.87

239.97
9.17
3.30

1,003.82
734.31
190.74
78.77

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

29,158.59

9.25%

2,696.77

4.41%

1,287.31

9.25%

2,696.77

salas de aula
CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

1,397.40

4.77

6,665.60
6,665.60

100.00%
100.00%

6,665.60
6,665.60

0.00%

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro

206.40
136.80
57.60
34.80
7.00
664.80
69.60

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

110,483.11
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
31,870.51
1,125.43

85.07%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
50.00%

93,985.14
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
15,935.26
562.72

28.37%

m
m
m
m
m
m
m

3.0
3.1

ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)

70.00

1,350.49

94,534.30
94,534.30

30.00%
30.00%

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm

1,731.51

50.21

86,939.12
86,939.12

30.00%
30.00%

5.0
5.1

900.00

30.38

88,097.29
27,342.00

0.00%
0.00%

0.00%

0.00%
0.00%

895.80

67.67

60,618.79

0.00%

0.00%

0.00%

5.3

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm
Piso Cermico 20x20 - Incl. Regularizao

4.20

32.50

136.50

0.00%

0.00%

0.00%

6.0
6.1
6.2
6.3

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

2,738.86
2,738.86
886.76

3.10
14.58
55.45

97,593.89
8,490.47
39,932.58
49,170.84

0.00%

m
m
m

38.52%
90.00%
75.00%

0.00%

7.0

ESQUADRIAS

68,833.03

0.00%

0.00%

0.00%

7.1

Porta lisa em madeira com revestimento melamnico

9.87

335.40

3,310.40

0.00%

0.00%

0.00%

7.2
7.3

Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar

m
m

8.64
149.61

385.92
294.27

3,334.35
44,025.73

0.00%
0.00%

0.00%

0.00%
0.00%

5.2

ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%

6,665.60
6,665.60

95.00%
95.00%

31,346.14
30,276.98
1,069.16

113.44%
100.00%
100.00%
100.00%
100.00%
100.00%
145.00%
145.00%

125,331.28
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
46,212.24
1,631.87

28,360.29
28,360.29

75.00%
75.00%

70,900.73
70,900.73

105.00%
105.00%

99,261.02
99,261.02

26,081.74
26,081.74

85.00%
85.00%

73,898.25
73,898.25

115.00%
115.00%

99,979.99
99,979.99

37,590.86
7,641.42
29,949.44
-

38.52%
90.00%
75.00%
0.00%

37,590.86
7,641.42
29,949.44
-

CP ENGENHARIA LTDA
ITEM
7.4
7.5
8.0
8.1
8.2

DISCRIMINAO
Porta lisa em madeira com revestimento melamnico
com visor 17x 35cm
Vidro Liso Transparente e=4mm

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

18.90

381.40

7,208.46

0.00%

0.00%

150.20

72.93

10,954.09

0.00%

0.00%

m
m

1,097.90
102.10

106.85
38.43

180,588.11
117,310.62
3,923.70

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

kg

2,401.39

6.63

15,921.22

kg
m

4,724.24
102.10

6.63
6.98

31,321.71
712.66

0.00%

ACUMULADO ATUAL
%
VALOR (R$)

0.00%

0.00%
0.00%
0.00%

0.00%

8.4
8.5

COBERTURA
Cobertura com telha termoacstica
Rufo topo
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
Trelia Metlica
Pingadeira p/telha termoacstica

8.6

Separador em cantoneira em "L" 30x30, chapa 14

kg

217.04

5.83

1,265.34

8.7
8.8
8.9
8.10

Contraventamento em barra 3/8"


Estrutura metlica p/cobertura telha de alumnio
Cobertura com telha ondulada de alumnio
Calha Metlica

kg
m
m
m

149.54
68.00
68.00
24.00

5.83
69.66
53.66
36.47

871.82
4,736.88
3,648.88
875.28

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

9.0
9.1
9.2

PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

m
m

1,280.75
1,342.50

12.35
12.64

36,788.22
15,817.26
16,969.20

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

28.77

12.73

366.24

0.00%

0.00%

0.00%

299.22

12.15

3,635.52

0.00%

0.00%

0.00%

36,729.33

0.00%

0.00%

0.00%

8.3

9.3
9.4

10.0
10.1
10.2
10.3
10.4

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Limpeza Permanente e Geral da Obra
TOTAL (R$)

889.93

25.15

22,381.74

0.00%

0.00%

0.00%

m
m
m

5.52
32.28
900.00

239.97
311.43
3.30

1,324.63
10,052.96
2,970.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

807,252.00

19.21%

155,092.77

26.48%

213,735.98

45.69%

368,828.74

LABORATRIOS
CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

1,832.00

4.77

8,738.64
8,738.64

100.00%
100.00%

8,738.64
8,738.64

0.00%
0.00%

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro

m
m
m
m
m
m
m

192.00
122.40
51.60
34.80
6.00
767.50
69.60

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

108,297.47
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
36,793.95
1,125.43

64.99%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%

70,378.09
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
-

31.51%
0.00%
0.00%

3.0
3.1

ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)

66.44

1,350.49

89,726.56
89,726.56

0.00%
0.00%

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm

1,565.96

50.21

78,626.85
78,626.85

15.00%
15.00%

5.0
5.1

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm

1,222.58

30.38

119,873.97
37,141.98

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

1,222.58

67.67

82,731.99

0.00%

0.00%

0.00%

m
m
m

2,606.67
2,606.67
1,014.70

3.10
14.58
55.45

102,351.05
8,080.68
38,005.25
56,265.12

0.00%
0.00%
0.00%
0.00%

36.42%
85.00%
80.00%
0.00%

5.2

11,794.03
11,794.03

ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%

8,738.64
8,738.64

90.00%
90.00%

34,127.44
33,114.56
1,012.89

96.50%
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
90.00%

104,505.53
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
33,114.56
1,012.89

85.00%
85.00%

76,267.58
76,267.58

85.00%
85.00%

76,267.58
76,267.58

90.00%
90.00%

70,764.17
70,764.17

105.00%
105.00%

82,558.19
82,558.19

6.0
6.1
6.2
6.3

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

7.0

ESQUADRIAS

78,482.46

0.00%

0.00%

0.00%

7.1

Porta lisa em madeira com revestimento melamnico

3.80

335.40

1,274.52

0.00%

0.00%

0.00%

7.2
7.3

Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Porta lisa em madeira com revestimento melamnico
com visor 17x 35cm

m
m

15.36
168.41

385.92
294.27

5,927.73
49,558.01

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

24.60

381.40

9,382.44

0.00%

0.00%

0.00%

7.4

37,272.78
6,868.58
30,404.20
-

36.42%
85.00%
80.00%
0.00%

37,272.78
6,868.58
30,404.20
-

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

7.5

Vidro Liso Transparente e=4mm

8.0
8.1
8.2
8.3

COBERTURA
Cobertura com telha termoacstica
Rufo topo
Rufo lateral
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14

8.4

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
72.93
12,339.76

ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
-

3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
-

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-

169.20

m
m
m

1,369.90
67.20
67.80

106.85
38.43
44.18

211,633.74
146,373.82
2,582.50
2,995.40

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

kg

3,112.70

6.63

20,637.20

0.00%

0.00%

0.00%

8.5

Separador em cantoneira em "L" 30x30, chapa 14

kg

274.87

5.83

1,602.49

0.00%

0.00%

0.00%

8.6
8.7
8.8
8.9

Contraventamento em barra 3/8"


Trelia Metlica
Cumeeira termoacstica
Pingadeira p/telha termoacstica

kg
kg
m
m

191.05
5,229.00
24.30
115.80

5.83
6.63
35.06
6.98

1,113.82
34,668.27
851.96
808.28

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

9.0
9.1
9.2

PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

m
m

675.00
912.00

12.35
12.64

24,317.19
8,336.25
11,527.68

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

28.35

12.73

360.90

0.00%

0.00%

0.00%

336.82

12.15

4,092.36

0.00%

0.00%

0.00%

54,087.83

0.00%

0.00%

0.00%

9.3
9.4

10.0
10.1
10.2
10.3
10.4

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Limpeza Permanente e Geral da Obra
TOTAL (R$)

1,222.58

25.15

30,747.89

0.00%

0.00%

0.00%

m
m
m

4.80
58.65
1,188.70

239.97
311.43
3.30

1,151.86
18,265.37
3,922.71

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

876,135.76

10.38%

90,910.76

24.93%

218,431.96

35.31%

309,342.72

ADMINISTRAO
CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

1,832.00

4.77

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro

m
m
m
m
m
m
m

213.60
144.00
60.00
34.80
7.00
981.60
69.60

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

3.0
3.1

ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)

66.33

1,350.49

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm

1,751.00

50.21

5.0
5.1

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm
Piso Cermico 20x20 - Incl. Regularizao
Calada de piso cimentado semi-spero, inclusive
camada de regularizao, elementos de conteno,
aterro e reaterro

1,126.00

5.2
5.3
5.4

6.0
6.1
6.2
6.3

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

7.0

ESQUADRIAS

7.1

Porta lisa em madeira com revestimento melamnico

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

100.00%
100.00%

8,738.64
8,738.64

0.00%
0.00%

55.57%
100.00%
100.00%
100.00%
100.00%

71,344.52
4,141.70
34,244.64
21,409.80
11,548.38
-

39.98%
0.00%

30.38

8,738.64
8,738.64
128,378.72
4,141.70
34,244.64
21,409.80
11,548.38
8,850.87
47,057.90
1,125.43
89,578.00
89,578.00
87,917.71
87,917.71
110,337.48
34,207.88

1,124.10

67.67

1.90

32.50

249.60

ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%

8,738.64
8,738.64

90.00%
90.00%
90.00%

51,330.78
7,965.78
42,352.11
1,012.89

95.56%
100.00%
100.00%
100.00%
100.00%
90.00%
90.00%
90.00%

122,675.30
4,141.70
34,244.64
21,409.80
11,548.38
7,965.78
42,352.11
1,012.89

0.00%

65.00%
65.00%

58,225.70
58,225.70

65.00%
65.00%

58,225.70
58,225.70

0.00%

90.00%
90.00%

79,125.94
79,125.94

90.00%
90.00%

79,125.94
79,125.94

0.00%

0.00%

76,067.85

0.00%

61.75
-

m
m
m

2,716.34
2,716.34
404.22

3.10
14.58
55.45

70,438.89
8,420.65
39,604.24
22,414.00
62,785.67

49.40

335.40

16,568.76

0.00%
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

51.13%
75.00%
75.00%

36,018.67
6,315.49
29,703.18
-

51.13%
75.00%
75.00%
0.00%

36,018.67
6,315.49
29,703.18
-

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

7.2
7.3
7.4

Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Vidro Liso Transparente e=4mm

8.0
8.1
8.2
8.3

COBERTURA
Cobertura com telha termoacstica
Rufo topo
Rufo lateral
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14

8.4

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
385.92
5,927.73
294.27
32,287.30
72.93
8,001.88

ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
0.00%
-

m
m
m

15.36
109.72
109.72

m
m
m

1,369.90
67.20
67.80

106.85
38.43
44.18

211,721.52
146,373.82
2,582.50
2,995.40

0.00%
0.00%
0.00%

kg

3,112.70

6.63

20,637.20

0.00%

0.00%

3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
0.00%
0.00%

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
-

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

8.5

Separador em cantoneira em "L" 30x30, chapa 14

kg

274.87

5.83

1,602.49

8.6
8.7
8.8
8.9

Contraventamento em barra 3/8"


Trelia Metlica
Cumeeira termoacstica
Pingadeira p/telha termoacstica

kg
kg
m
m

191.05
5,242.24
24.30
115.80

5.83
6.63
35.06
6.98

1,113.82
34,756.05
851.96
808.28

9.0
9.1
9.2

PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

m
m

1,735.00
831.41

12.35
12.64

35,231.33
21,427.25
10,509.02

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

49.40

12.73

628.86

0.00%

0.00%

0.00%

219.44

12.15

2,666.20

0.00%

0.00%

0.00%

54,865.75

0.00%

0.00%

0.00%

9.3
9.4

10.0

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
10.1
sustentao
10.2

Forro de gesso liso em placas pr-moldadas


macho/fmea, bisotado e fixado em ao galvanizado

10.3 Bancadas em Granito Cinza Andorinha


10.4 Divisrias em Granito Cinza Andorinha
Corrimo em tubo inox 3" fixado em estrutura
10.5
metlica de tubo inox 2"
10.6 Rodap em alumnio
10.7 Limpeza Permanente e Geral da Obra

0.00%

931.60

25.15

23,429.74

0.00%

194.40

15.51

3,015.14

0.00%

0.00%

0.00%

m
m

4.80
57.91

239.97
311.43

1,151.86
18,034.91

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

5.00

368.66

1,843.30

0.00%

0.00%

0.00%

m
m

378.20
1,188.70

9.17
3.30

3,468.09
3,922.71

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO
TOTAL (R$)

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
859,993.71

ACUMULADO ANTERIOR
%
VALOR (R$)
9.31%
80,083.16

3 MEDIO - 22/10/2012
%
VALOR (R$)
26.13%
224,701.09

ACUMULADO ATUAL
%
VALOR (R$)
35.44%
304,784.25

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

733.07

4.77

3,496.74
3,496.74

100.00%
100.00%

3,496.74
3,496.74

0.00%
0.00%

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro

112.80
74.40
31.20
19.20
4.00
324.33
38.40

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

58,611.82
2,187.19
17,693.06
11,133.10
6,371.52
5,057.64
15,548.38
620.93

52.91%
100.00%
100.00%
100.00%
0.00%

31,013.35
2,187.19
17,693.06
11,133.10
-

47.09%

m
m
m
m
m
m
m

3.0
3.1

ESTRUTURA
Concreto Armado (Pilares / Vigas / Vergas)

1,350.49

0.00%

43.20

58,341.17
58,341.17

0.00%

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm

965.40

50.21

48,472.73
48,472.73

0.00%

80.00%
80.00%

5.0
5.1

458.00

30.38

44,759.19
13,914.04

0.00%
0.00%

0.00%

0.00%
0.00%

453.80

67.67

30,708.65

0.00%

0.00%

0.00%

5.3

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm
Piso Cermico 20x20 - Incl. Regularizao

4.20

32.50

136.50

0.00%

0.00%

0.00%

6.0
6.1
6.2
6.3

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

1,617.00
1,617.00
907.59

3.10
14.58
55.45

78,914.43
5,012.70
23,575.86
50,325.87

0.00%

m
m
m

0.00%

27.17%
75.00%
75.00%
0.00%

7.0

ESQUADRIAS

34,828.89

0.00%

0.00%

0.00%

7.1

Porta lisa em madeira com revestimento melamnico

39.90

335.40

13,382.46

0.00%

0.00%

0.00%

7.2
7.3

Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Grade de metalon (parede 18) e tela de ao
galvanizado

m
m

8.70
45.10

385.92
294.27

3,357.50
13,271.58

0.00%
0.00%

0.00%

0.00%
0.00%

5.60

171.14

958.38

0.00%

0.00%

0.00%

5.2

7.4

100.00%
100.00%
100.00%
100.00%

ACUMULADO ATUAL
%
VALOR (R$)

27,598.47
6,371.52
5,057.64
15,548.38
620.93
38,778.18
38,778.18

21,441.42
3,759.53
17,681.90
-

100.00%
100.00%

3,496.74
3,496.74

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

58,611.82
2,187.19
17,693.06
11,133.10
6,371.52
5,057.64
15,548.38
620.93

0.00%
0.00%
80.00%
80.00%

27.17%
75.00%
75.00%
0.00%

38,778.18
38,778.18

21,441.42
3,759.53
17,681.90
-

CP ENGENHARIA LTDA
ITEM
7.5
7.6
7.7
8.0
8.1
8.2
8.3

DISCRIMINAO
Porta de metalon (parede 18) e tela de ao
galvanizado
Porto de ferro em chapa dupla
Vidro Liso Transparente e=4mm
COBERTURA
Cobertura com telha termoacstica
Rufo topo
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

1.90

171.14

325.17

0.00%

0.00%

0.00%

m
m

1.90
45.10

128.77
72.93

244.66
3,289.14

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

597.35
55.55

106.85
38.43

93,419.76
63,826.85
2,134.79

0.00%
0.00%
0.00%

0.00%

m
m

0.00%

0.00%
0.00%
0.00%

kg

1,306.54

6.63

8,662.36

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%
0.00%

8.4

Separador em cantoneira em "L" 30x30, chapa 14

kg

122.46

5.83

713.94

8.5
8.6
8.7

Contraventamento em barra 3/8"


Trelia Metlica
Pingadeira p/telha termoacstica

kg
kg
m

98.70
2,582.00
55.55

5.83
6.63
6.98

575.42
17,118.66
387.74

9.0
9.1
9.2

PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

m
m

767.61
507.96

12.35
12.64

17,732.87
9,479.98
6,420.61

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

39.90

12.73

507.93

0.00%

0.00%

0.00%

109.00

12.15

1,324.35

0.00%

0.00%

0.00%

30,632.43

0.00%

0.00%

0.00%

9.3
9.4

10.0
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Coifa de ao inoxidvel (2,2x1,40)m inclusive
exaustor, dutos e cabos de sustentao
Bancada em Tampo de inoxidvel
Rodap em alumnio
Prateleiras em Concreto Pr-moldado Aparente
Limpeza Permanente e Geral da Obra
TOTAL (R$)

458.00

25.15

11,518.70

0.00%

0.00%

0.00%

m
m

12.77
22.00

239.97
311.43

3,064.42
6,851.46

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

um

1.00

4,663.07

4,663.07

0.00%

0.00%

0.00%

m
m
m
m

2.60
51.10
10.40
498.00

459.56
9.17
118.07
3.30

1,194.86
468.59
1,227.93
1,643.40

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

469,210.03

7.35%

34,510.09

18.72%

87,818.07

26.07%

122,328.16

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da obra

194.88

4.77

929.58
929.58

0.00%

100.00%
100.00%

929.58
929.58

100.00%
100.00%

929.58
929.58

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ fundao corrida e cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro

25.47
25.47
4.84
3.24
2.42
23.26
20.00

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40

0.00%

m
m
m
m
m
m
m

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40

3.0

ESTRUTURA

7,103.58

0.00%

0.00%

3.1

Concreto Armado (Pilares/ Vigas/ Vergas/ Cintas)

5.26

1,350.49

7,103.58

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm

275.87

50.21

13,851.43
13,851.43

5.0
5.1

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm

94.05

30.38

9,221.60
2,857.24

94.05

67.67

m
m
m

451.70
451.70
308.88

3.10
14.58
55.45

5.2

0.00%

0.00%

0.00%

80.00%
80.00%

11,081.14
11,081.14

0.00%

0.00%

0.00%
0.00%

6,364.36

0.00%

0.00%

0.00%

25,113.46
1,400.27
6,585.79
17,127.40

0.00%

23.85%
75.00%
75.00%
0.00%

REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm

7.0

ESQUADRIAS

7.1

Porta lisa em madeira com revestimento melamnico

3.78

335.40

1,267.81

0.00%

0.00%

0.00%

7.2
7.5
7.3
7.4

Porta de Alumnio
Porto Tipo Grade de Ferro
Esquadria de Metalon tipo Maximar
Vidro Liso Transparente e=4mm

m
m
m
m

19.20
7.50
14.40
14.40

385.92
186.91
294.27
72.93

7,409.66
1,401.83
4,237.49
1,050.19

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

15,366.98

23.85%
75.00%
75.00%
0.00%

11,081.14
11,081.14

6.0
6.1
6.2
6.3

0.00%

5,989.55
1,050.20
4,939.34
-

80.00%
80.00%

5,989.55
1,050.20
4,939.34
-

CP ENGENHARIA LTDA
ITEM
8.0
8.1
8.2

DISCRIMINAO
COBERTURA
Cobertura com telha termoacstica
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
20,440.90
106.85
16,189.91

ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
0.00%
-

3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
-

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
-

151.52

kg

439.49

6.63

2,913.82

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%
0.00%

8.3

Separador em cantoneira em "L" 30x30, chapa 14

kg

23.74

5.83

138.40

8.4
8.5
8.6

Contraventamento em barra 3/8"


Cumeeira termoacstica
Pingadeira p/telha termoacstica

kg
kg
m

22.32
21.80
43.60

5.83
35.06
6.98

130.13
764.31
304.33

9.0
9.1

PINTURA
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

242.90

12.64

3,650.55
3,070.26

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

3.78

12.73

48.12

0.00%

0.00%

0.00%

43.80

12.15

532.17

0.00%

0.00%

0.00%

16,044.87

0.00%

0.00%

0.00%

9.2
9.3

10.0
10.1
10.2
10.3
10.4
10.5

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Banco em alvenaria com tampo em granito cinza
andorinha
Divisrias em Granito Cinza Andorinha (WC's)
Limpeza Permanente e Geral da Obra
TOTAL (R$)

94.05

25.15

2,365.36

0.00%

0.00%

0.00%

5.44

239.97

1,305.44

0.00%

0.00%

0.00%

4.05

205.81

833.53

0.00%

0.00%

0.00%

m
m

36.06
94.05

311.43
3.30

11,230.17
310.37

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

125,574.43

0.00%

25.36%

31,851.75

25.36%

31,851.75

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da obra

1,725.00

4.77

8,228.25
8,228.25

100.00%
100.00%

8,228.25
8,228.25

100.00%
100.00%

8,228.25
8,228.25

200.00%
200.00%

16,456.50
16,456.50

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Aterro Apiloado
Alvenaria de pedra argamassada
Baldrame
Concreto Ciclpico
Concreto Ciclpico fck = 10MPa, com forma
Reaterro
Concreto Armado Cintas

m
m
m
m
m
m
m
m

75.09
948.95
42.39
31.76
36.79
32.73
445.49
6.76

19.39
47.94
237.81
356.83
331.85
649.32
16.17
1,264.41

117,574.33
1,456.00
45,492.66
10,080.77
11,332.92
12,208.76
21,252.24
7,203.57
8,547.41

1.24%
100.00%

1,456.00
1,456.00
-

73.26%
100.00%
100.00%
90.00%

86,136.25
1,456.00
45,492.66
9,072.69
10,987.89
19,127.02
-

74.50%
200.00%
100.00%
90.00%
0.00%
90.00%
90.00%
0.00%
0.00%

87,592.25
2,911.99
45,492.66
9,072.69
10,987.89
19,127.02
-

3.0
3.3

INFRA-ESTRUTURA
Concreto Armado (Pilares/Vigas/Vergas/Lajes)

22.11

1,350.49

29,859.33
29,859.33

0.00%

45.00%
45.00%

13,436.70
13,436.70

45.00%
45.00%

13,436.70
13,436.70

4.0

179,414.02

0.00%

0.00%

4.3
4.4
4.5
4.6

COBERTURA
Estrutura metlica para galpes vos at 30m
incluindo fornecimento, montagem e pintura
anticorrosiva
Estrutura Metlica p/ Cobertura de Telha de Ao
Galvanizado
Telha de Ao Galvanizado
Cobertura com Telha Ondulada de Alumnio
Platibanda de Chapa Metlica h=0,40m
Calha Metlica

5.0
5.1

PAREDES DE PAINIS
Alvenaria de Tijolo Cermico, esp = 10 cm

6.0
6.1

PAVIMENTAO
Lastro de impermeabilizao, e=7cm
Piso de Alta ResistnciaTipo Granilite - Inclusive
Regularizao esp=14mm

4.1
4.2

6.2

7.0
7.1

REVESTIMENTO
Chapisco

kg

17,597.44

6.63

15.60

m
m
m
m

1,620.00
15.60
4.14
5.20

90.00%
90.00%
0.00%

0.00%

116,671.03

0.00%

69.66

1,086.70

0.00%

37.26
53.66
64.82
36.47

60,361.20
837.10
268.35
189.64

0.00%
0.00%
0.00%
0.00%

29.95

14,490.41
14,490.41

0.00%

483.82

50.00%
50.00%

30.38

0.00%

1,071.60

105,070.38
32,555.21

0.00%

m
m

1,071.60

67.67

72,515.17

1,175.37

3.10

20,780.54
3,643.65

0.00%

0.00%

7,245.20
7,245.20

50.00%
50.00%

7,245.20
7,245.20

0.00%
0.00%

0.00%

0.00%
0.00%

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

7.2

Reboco

8.0

ESQUADRIAS
Porto Metlico de Metalon e Chapa Dupla de
Correr

8.1

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
14.58
17,136.89

1,175.37

15.00

221.41

3,321.15

1,175.37

12.64

28,044.77
14,856.68

3,321.15

ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%

3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%

0.00%

0.00%
0.00%

9.2

Esmalte duas Demos em Estrutura Metlica,


Inclusive Tratamento Anti-ferrugem com Zarco

1,047.94

12.15

12,732.47

0.00%

9.3

Esmalte Sinttico Acetinado sem Emassamento em


Esquadria Metlica

37.50

12.15

455.63

0.00%

0.00%

Luminria para 1x32/36/40W, de sobrepor; corpo em


chapa de ao galvanizado com pintura eletrosttica
em p polister epxi; refletor em chapa de ao
10.2 pintada; com medida externa LxCxH = 110x1500x60
mm;soquetes em policarbonato, com contatos em
bronze fosforoso; modelo LRC132. Reator Eletronico
incluso
10.3

Reator Vapor de Mercrio Alto Fator de Potncia,


uso Interno, 250W/220V

Quadro de distribuio p/ 12 circ. Trifsico com


10.4 proteo geral de 350A / 20kA e barramento de
cobre, bitola 38,1x4,77mm
10.5 Cabo flexvel de 2,5 mm
10.6 Cabo flexvel de 4 mm
10.7 Condutor eltrico 6 mm
10.8 Disjuntor termomagntico monofsico de 25A
10.9 Disjuntor termomagntico monofsico de 20A
10.10 Disjuntor termomagntico trifsico de 40A
10.11 Disjuntor NO FUSE tripolar de 40A

17,805.62

0.00%

0.00%

0.00%

PINTURA
Pintura Texturizada Acrlica c/ Quartzo

INSTALAO ELTRICA
Refletor Redondo Pendente, em Alumnio com
10.1 Suporte e Ala Regulvel para Fixao, com
Lmpada Vapor de Mercrio 250W

9.0
9.1

10.0

0.00%

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-

0.00%

un

35.00

153.77

5,381.95

0.00%

un

1.00

176.77

176.77

0.00%

un

35.00

53.90

1,886.50

0.00%

un

1.00

224.07

224.07

0.00%

m
m
m
un
un
un
un

500.00
1,040.00
360.00
5.00
2.00
1.00
1.00

2.17
2.84
3.91
8.13
8.13
54.13
54.13

1,085.00
2,953.60
1,407.60
40.65
16.26
54.13
54.13

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

CP ENGENHARIA LTDA
ITEM
10.12
10.13
10.14
10.15
10.16
10.17

DISCRIMINAO

UNID.

QUANT.

ACUMULADO ANTERIOR
%
VALOR (R$)
-

3 MEDIO - 22/10/2012
%
VALOR (R$)
-

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-

m
m
m
un
un
un

65.00
110.00
260.00
10.00
10.00
60.00

un

10.00

1.94

19.40

0.00%

un

10.00

3.86

38.60

0.00%

un
un

10.00
2.00

5.30
5.88

53.00
11.76

0.00%
0.00%

10.22 Caixa de passagem de alvenaria de 60x60x60cm

un

5.00

169.28

846.40

0.00%

10.23 Interruptor simples


Tomada de embutir 2P+T universal com placa, 10
10.24
A, 250V
10.25 Condulete PVC

un

1.00

7.31

7.31

0.00%

un

8.00

8.13

65.04

0.00%

un

35.00

6.98

244.30

0.00%

0.00%

10.18
10.19
10.20
10.21

Eletroduto de PVC rgido roscvel de 1 1/2"


Eletroduto de PVC rgido roscvel de 1 "
Eletroduto de PVC rgido roscvel de 3/4"
Bucha e arruela galvanizada de 1 1/2"
Bucha e arruela galvanizada de 1"
Bucha e arruela galvanizada de 3/4"
Luva para Eletroduto PVC rgido tipo roscvel
dimetro 3/4"
Curva para Eletroduto PVC rgido tipo roscvel
dimetro 3/4"
Caixa de passagem metlicar 4x2"
Caixa de passagem estampada 4"x4"

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


PREO (R$)
UNITRIO
TOTAL
14.67
953.55
7.55
830.50
5.14
1,336.40
1.94
19.40
1.71
17.10
1.37
82.20

11.0

INSTALAO DE SPDA

11.1

Fornecimento e instalao de cabo de cobre nu


tmpera mole, #16mm e demais acessrios (Pirelli)

59.76

7.06

421.91

0.00%

11.2

Fornecimento e instalao de cabo de cobre nu


tmpera mole, #50mm e demais acessrios (Pirelli)

207.76

11.66

2,422.48

0.00%

Fornecimento e instalao de caixa de inspeo


tipo suspensa de FF, de 16 x 0,16cm para
11.3 eletroduto de 50mm (TEL-540), abraadeira tipo
"U" 2" (TEL-093), conector de medio (TEL-560)
e demais acessrios.

un

18.00

169.53

3,051.54

0.00%

un

18.00

36.65

659.70

0.00%

un
un

18.00
72.00

10.07
6.40

181.26
460.80

0.00%
0.00%

0.00%

Instalao de haste de terra cobreada 5/8"x2,40m,


Copperweld ou equivalente
11.5 Conector de medio
11.6 Fornecimento e aplicao de solda exotrmica
11.4

12.0

DIVERSOS

7,197.69

40,122.03

0.00%

0.00%

0.00%

0.00%

CP ENGENHARIA LTDA
ITEM

12.1

DISCRIMINAO
Alambrado para quadra poliesportiva, estruturada
em tubo de ao galv. c/costura din 2440, dimetro
2", e tela em arame galvanizado 14 bwg, malha
quadrada com abertura de 2".

12.2 Demarcao da quadra


Traves ferro galvanizado p/ futebol de salo,
12.3 inclusive pintura (Traves FoGo 300X200, redes
4,0mm)
Conjunto de mastros p/ voleibol de ferro
12.4 galvanizado, inclusive pintura (Postes FoGo H=
2,55m, rede nylon 2,0mm)
Forro de PVC, inclusive estrutura metlica de
12.5
sustentao
Corrimo em tubo inox 3" fixado em estrutura
12.6
metlica em tubo inox 2"
12.7 Limpeza permanente e final da obra
TOTAIS (R$)

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

284.00

86.19

24,477.96

0.00%

650.00

4.74

3,081.00

0.00%

cj

1.00

1,632.25

1,632.25

0.00%

cj

1.00

434.03

434.03

0.00%

15.60

25.15

392.34

0.00%

12.80

368.66

4,718.85

0.00%

1,632.00

3.30

5,385.60

0.00%

571,908.53

1.69%

9,684.25

20.12%

115,046.41

21.81%

124,730.65

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

1.0
1.1

SERVIOS PRELIMINARES
Locao da Obra

4.77

0.00%

377.51

1,800.72
1,800.72

0.00%

0.00%
0.00%

2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7

FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro

19.39
237.81
356.83
331.85
1,264.41
47.94
16.17

0.00%

172.80
21.60
9.60
13.20
1.00
172.80
98.40

27,432.85
3,350.59
5,136.70
3,425.57
4,380.42
1,264.41
8,284.03
1,591.13

0.00%

m
m
m
m
m
m
m

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.0
3.1
3.2

ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)
Laje pr-moldado

1,350.49
65.84

0.00%

0.00%

60.00
16.81

82,136.17
81,029.40
1,106.77

0.00%

m
m

0.00%
0.00%
0.00%

4.0
4.1

ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm

163.50

50.21

8,209.34
8,209.34

0.00%
0.00%

0.00%

0.00%

5.0
5.1

PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm

361.00

30.38

35,396.05
10,967.18

0.00%
0.00%

0.00%
0.00%

0.00%

361.00

67.67

24,428.87

0.00%

0.00%

0.00%

0.00%
0.00%

5.2

0.00%

6.0
6.1
6.2

REVESTIMENTO
Chapisco
Reboco

518.72
518.72

3.10
14.58

9,170.97
1,608.03
7,562.94

0.00%
0.00%
0.00%

0.00%

m
m

7.0
7.1

ESQUADRIAS
Porta de ferro com guarnio, completa

2.32

186.91

433.63
433.63

0.00%
0.00%

0.00%
0.00%

0.00%

8.0
8.1

COBERTURA
Cobertura com telha termoacstica
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14

337.42

106.85

58,327.11
36,053.33

0.00%
0.00%

0.00%

0.00%

kg

1,120.22

6.63

7,427.06

0.00%

0.00%

0.00%

kg

79.13

5.83

461.33

0.00%

0.00%

0.00%

8.2
8.3

Separador em cantoneira em "L" 30x30, chapa 14

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

8.4
8.5
8.6
8.6
8.7

Contraventamento em barra 3/8"


Trelia metlica
Cumeeira termoacstica
Pingadeira p/telha termoacstica
Calha Metlica

9.0
9.1

PINTURA
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

9.2

DIVERSOS
Forro de PVC, inclusive estrutura metlica de
10.1
sustentao
Impermeabilizao de Laje (Regularizao, manta e
10.2
proteo)
Escada de marinheiro com cano galvanizado, com
10.3
proteo

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL
5.83
318.08
6.63
9,991.41
35.06
1,171.71
6.98
466.54
36.47
2,437.65

TOTAL (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
0.00%
-

ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
0.00%
-

kg
kg
kg
m
m

54.56
1,507.00
33.42
66.84
66.84

345.74

12.64

4,426.53
4,370.15

0.00%
0.00%

0.00%
0.00%

0.00%

4.64

12.15

56.38

0.00%

0.00%

0.00%

24,173.77

0.00%

0.00%

10.0

Tampa de inspeo articulada, com fecho,


10.4 executada com chapa de ao galvanizado 1/16" de
75x75cm
10.5 Limpeza Permanente e Geral da Obra

ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
-

361.00

25.15

9,079.15

0.00%

0.00%

0.00%

195.28

62.33

12,171.80

0.00%

0.00%

0.00%

10.00

151.36

1,513.60

0.00%

0.00%

0.00%

un

3.00

72.64

217.92

0.00%

0.00%

0.00%

361.00

3.30

1,191.30

0.00%

0.00%

0.00%

251,507.14

0.00%

0.00%

0.00%

CP ENGENHARIA LTDA
ITEM

1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1

DISCRIMINAO

SERVIOS PRELIMINARES
Mobilizao e desmobilizao
Desmatamento, limpeza do terreno e destoc. de
rvores at 15cm
Escavao, carga e transp. de mat. de 1 cat. com
DMT de 3000 a 5000m com carregadeira
Transporte de Material 1 cat.DMT 5,00 Km
Compactao aterro 100% do Proctor Normal
Regularizao do subleito

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

ACUMULADO ANTERIOR
%
VALOR (R$)

1.00

5,175.00

143,227.31
5,175.00

34.58%
50.00%

49,529.86
2,587.50

0.00%
0.00%

34.58%
50.00%

49,529.86
2,587.50

57,787.00

0.37

21,381.19

100.00%

21,381.19

0.00%

100.00%

21,381.19

7,303.19

3.50

25,561.17

100.00%

25,561.17

100.00%

25,561.17

txk
m
m

63,902.92
5,842.55
24,598.00

0.48
4.45
1.40

30,673.40
25,999.35
34,437.20

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%

34.38

0.00%

3,770.46

319,637.73
129,628.41

0.00%

2,266.00

78.87

178,719.42

3,010.64

3.75

11,289.90

2.3
3.0
3.1
3.2

REVESTIMENTO
Chapisco
Reboco

m
m

7,051.84
7,051.84

3.10
14.58

124,676.53
21,860.70
102,815.83

100.00%
100.00%
100.00%

4.0
4.1

ESQUADRIAS
Grade Frontal

183.68

171.14

31,435.00
31,435.00

0.00%

5.0
5.1

PINTURA
Pintura texturizada acrilica c/quartzo
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica

7,051.84

12.64

93,598.68
89,135.26

0.00%

m
m

367.36

12.15

4,463.42

5.2

ACUMULADO ATUAL
%
VALOR (R$)

un

PAVIMENTAO
Pavimentao com Paraleleppedo
Calada de piso cimentado semi-spero, inclusive
camada de regularizao, elementos de conteno,
aterro e reaterro
Pavimentao com brita

2.2

3 MEDIO - 22/10/2012
%
VALOR (R$)

6.0
6.1

DIVERSOS + URBANIZAO
Meio - fio

808.62

19.23

389,269.28
15,549.76

6.2

Motor Automatizador Para Porto Metlico de Correr

un

1.00

771.16

771.16

6.3

Muro Incl. fundao, baldrame, pilares e alvenaria


(h = 2m) esp=10cm

ml

1,762.96

198.34

349,665.49

124,676.53
21,860.70
102,815.83

0.00%

100.00%
100.00%
100.00%

0.00%

0.00%

0.00%

0.00%

90.56%

352,516.36
-

0.00%

100.00%

349,665.49

124,676.53
21,860.70
102,815.83

90.56%
0.00%
0.00%

100.00%

352,516.36
349,665.49

CP ENGENHARIA LTDA
ITEM

DISCRIMINAO

PLANILHA MEDIO DO INSTITUTO FEDERAL DO PIAU CAMPUS DE COCAL


UNID.

QUANT.

PREO (R$)
UNITRIO
TOTAL

6.4

Perfurao de poo tubular, incluindo perfurao,


revestimento, teste de vazo,tubulaes, tampa do
poo, anlise fsico-qumica da gua e licena
ambiental

100.00

204.32

20,432.00

6.5

Fornecimento e instalao de QUADRO DE


COMANDO com partida rpida e carcaa em chapa
de ao e pintura anticorrosiva com os
componentes:ampermetro, voltmetro, contator de
380v, rels de fase e nvel trmico,disjuntor tripolar,
fusveis, botoeiras liga x desliga

um

1.00

999.75

999.75

6.6

Fornecimento e instalao de conjunto MOTOBOMBA-TRIFSICO tipo submersvel,com as


caractersticas: Q=5,00 m/h; AMT=65,00 m e P= 2
Hp, inclusive instalao eltrica

um

1.00

1,851.12

1,851.12

7.0
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9

MASTROS
Escavao manual
Baldrame
Aterro apiloado com emprstimo
Lastro de impermeabilizacao e=7cm
Piso cimentado alisado c/ acabadora mecanica
Chapisco
Reboco
Concreto ciclpico
Mastro

m
m
m
m
m
m
m
m
un

0.90
1.20
1.80
6.00
6.00
3.00
3.00
0.19
3.00

19.39
356.83
47.94
30.38
19.96
3.10
14.58
331.85
279.50

1,788.57
17.45
428.20
86.29
182.28
119.76
9.30
43.74
63.05
838.50

TOTAL (R$)

1,103,633.10

ACUMULADO ANTERIOR
%
VALOR (R$)

3 MEDIO - 22/10/2012
%
VALOR (R$)

ACUMULADO ATUAL
%
VALOR (R$)

0.00%

100.00%

999.75

100.00%

999.75

100.00%

1,851.12

100.00%

1,851.12

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

47.73%

47.73%

526,722.75

0.00%

0.00%

526,722.75

También podría gustarte