CP ENGENHARIA LTDA
INSTITUTO FEDERAL DO PIAU - VALENA DO PIAU
ITEM
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
SOMA
DISCRIMINAO
Servios Preliminares
II
Guarita
III
Salas de Aula
IV
Laboratrios
VI
Refeitrio
VII
Vestirio
VII
Ginsio
IX
Urbanizao
XI
Instalaes Prediais
CP ENGENHARIA LTDA
CONSTRUO DO CAMPUS DE COCAL
Obra:
10/22/2012
Data
ITEM
1
2
3
4
5
6
7
8
9
10
11
VALOR ATUAL
ACUMULADO
165,590.36
5,177.06
368,809.09
309,374.85
304,766.50
122,305.01
31,851.75
124,711.66
537,690.05
1,970,276.33
consolidado
CP ENGENHARIA LTDA
ITEM
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.8
DISCRIMINAO
SERVIOS PRELIMINARES
Taxas e Emolumentos
Instalao provisria (Canteiro de Obra)
Tapume com chapa de madeirite, inclusive porto
de entrada
Instalaes de Luz
Instalaes de gua
Consumo de gua e Luz
EPI's e Equipamentos
Vigilancia
Placa da Obra
1.9
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
BLOCOS
Guarita
Salas de Aula
Laboratrios
Administrao
Refeitrio
Vestirio
Ginsio
Ligaes, Cisterna e Caixa D'gua
Urbanizao
Instalaes Prediais
TOTAL (R$)
UNID.
QUANT.
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
un
m
1.00
400.00
5,750.00
190.38
399,725.12
5,750.00
76,152.00
34.61%
3.00%
100.00%
138,328.46
172.50
76,152.00
518.72
31.59
16,386.36
100.00%
16,386.36
un
un
ms
ms
ms
m2
1.00
1.00
11.00
11.00
11.00
6.00
184.77
184.14
1,725.00
1,725.00
2,925.48
192.82
184.77
184.14
18,975.00
18,975.00
32,180.28
1,156.92
100.00%
100.00%
18.18%
18.18%
18.18%
100.00%
184.77
184.14
3,449.66
3,449.66
5,850.37
1,156.92
0.00%
0.00%
9.09%
9.09%
9.09%
0.00%
ms
11.00
20,889.15
229,780.65
13.64%
31,342.08
un
un
un
un
un
un
un
un
un
un
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
29,158.59
807,252.00
876,135.76
859,993.71
469,210.03
125,574.43
571,908.53
251,507.14
1,103,633.10
1,035,479.07
6,129,852.36
29,158.59
807,252.00
876,135.76
859,993.71
469,210.03
125,574.43
571,908.53
251,507.14
1,103,633.10
1,035,479.07
14.87%
13.34%
19.21%
10.38%
9.31%
7.35%
0.00%
1.69%
0.00%
48.72%
0.00%
911,813.41
3,889.76
155,073.11
90,942.89
80,065.41
34,486.94
9,665.25
537,690.05
-
6,529,577.48
16.08%
1,050,141.86
6.82%
0.00%
0.00%
VALOR (R$)
27,261.90
-
ACUMULADO ATUAL
PERCEN
VALOR (R$)
TUAL
41.43%
3.00%
100.00%
165,590.36
172.50
76,152.00
100.00%
16,386.36
1,724.83
1,724.83
2,925.19
-
100.00%
100.00%
27.27%
27.27%
27.27%
100.00%
184.77
184.14
5,174.48
5,174.48
8,775.56
1,156.92
9.09%
20,887.06
22.73%
52,229.14
14.57%
4.41%
26.48%
24.93%
26.13%
18.72%
25.36%
20.12%
0.00%
0.00%
892,872.56
1,287.31
213,735.98
218,431.96
224,701.09
87,818.07
31,851.75
115,046.41
-
29.44%
17.75%
45.69%
35.31%
35.44%
26.07%
25.36%
21.81%
0.00%
48.72%
0.00%
14.09%
920,134.47
30.17%
1,804,685.97
5,177.06
368,809.09
309,374.85
304,766.50
122,305.01
31,851.75
124,711.66
537,690.05
1,970,276.33
guarita
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
58.89
4.77
280.91
280.91
0.00%
100.00%
280.91
280.91
0.00%
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro
11.34
11.34
1.94
0.50
1.00
13.00
1.00
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
5,678.63
219.88
2,696.77
692.25
165.93
1,264.41
623.22
16.17
63.55%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
3,608.90
219.88
2,696.77
692.25
-
22.67%
m
m
m
m
m
m
m
3.0
3.1
ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas/Laje)
2.55
1,350.49
3,443.75
3,443.75
0.00%
0.00%
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm
86.73
50.21
4,354.71
4,354.71
0.00%
0.00%
5.0
5.1
20.54
30.38
1,925.32
624.01
0.00%
0.00%
18.02
67.67
1,219.41
0.00%
5.3
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=12mm
Piso Cermico 20x20 - Incl. Regularizao
2.52
32.50
81.90
0.00%
6.0
6.1
6.2
6.3
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
m
m
m
173.52
173.52
17.16
3.10
14.58
55.45
4,019.35
537.91
2,529.92
951.52
0.00%
0.00%
0.00%
0.00%
7.0
ESQUADRIAS
3,672.63
0.00%
7.1
4.83
335.40
1,619.98
0.00%
0.00%
0.00%
7.2
7.3
m
m
5.59
5.59
294.27
72.93
1,644.97
407.68
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.2
90.00%
90.00%
1,287.31
149.34
1,137.97
-
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4,896.21
219.88
2,696.77
692.25
149.34
1,137.97
-
0.00%
0.00%
0.00%
0.00%
86.22%
100.00%
100.00%
100.00%
90.00%
90.00%
0.00%
0.00%
280.91
280.91
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
8.0
DISCRIMINAO
8.2
8.3
COBERTURA
Estrutura Metlica p/ Cobertura de Telha de
Alumnio
Cobertura com Telha Ondulada de Alumnio
Calha Metlica
8.4
9.0
9.1
9.2
PINTURA
Ltex Acrlico duas Demos com Emassamento
Pintura Texturizada Acrlica c/ Quartzo
Esmalte sinttico Acetinado com Emassamento em
Esquadria de Madeira
Esmalte Sinttico Acetinado sem Emassamento em
Esquadria Metlica
8.1
9.3
9.4
10.0
10.1
10.2
10.3
DIVERSOS
Bancada em Granito Cinza Andorinha
Rodap em alumnio
Limpeza Permanente e Geral da Obra
TOTAL (R$)
QUANT.
PREO (R$)
UNITRIO
TOTAL
3,131.56
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-
21.21
69.66
1,477.49
0.00%
0.00%
m
m
21.21
10.50
51.24
36.47
1,086.80
382.94
0.00%
0.00%
0.00%
0.00%
8.16
22.59
184.33
0.00%
0.00%
m
m
54.00
62.00
12.35
12.64
1,647.91
666.90
783.68
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.83
12.73
61.49
0.00%
0.00%
0.00%
11.18
12.15
135.84
0.00%
0.00%
0.00%
m
m
m
3.06
20.80
23.87
239.97
9.17
3.30
1,003.82
734.31
190.74
78.77
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
29,158.59
9.25%
2,696.77
4.41%
1,287.31
9.25%
2,696.77
salas de aula
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
1,397.40
4.77
6,665.60
6,665.60
100.00%
100.00%
6,665.60
6,665.60
0.00%
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro
206.40
136.80
57.60
34.80
7.00
664.80
69.60
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
110,483.11
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
31,870.51
1,125.43
85.07%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
50.00%
93,985.14
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
15,935.26
562.72
28.37%
m
m
m
m
m
m
m
3.0
3.1
ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)
70.00
1,350.49
94,534.30
94,534.30
30.00%
30.00%
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm
1,731.51
50.21
86,939.12
86,939.12
30.00%
30.00%
5.0
5.1
900.00
30.38
88,097.29
27,342.00
0.00%
0.00%
0.00%
0.00%
0.00%
895.80
67.67
60,618.79
0.00%
0.00%
0.00%
5.3
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm
Piso Cermico 20x20 - Incl. Regularizao
4.20
32.50
136.50
0.00%
0.00%
0.00%
6.0
6.1
6.2
6.3
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
2,738.86
2,738.86
886.76
3.10
14.58
55.45
97,593.89
8,490.47
39,932.58
49,170.84
0.00%
m
m
m
38.52%
90.00%
75.00%
0.00%
7.0
ESQUADRIAS
68,833.03
0.00%
0.00%
0.00%
7.1
9.87
335.40
3,310.40
0.00%
0.00%
0.00%
7.2
7.3
Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
m
m
8.64
149.61
385.92
294.27
3,334.35
44,025.73
0.00%
0.00%
0.00%
0.00%
0.00%
5.2
ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%
6,665.60
6,665.60
95.00%
95.00%
31,346.14
30,276.98
1,069.16
113.44%
100.00%
100.00%
100.00%
100.00%
100.00%
145.00%
145.00%
125,331.28
4,002.10
32,532.41
20,553.41
11,548.38
8,850.87
46,212.24
1,631.87
28,360.29
28,360.29
75.00%
75.00%
70,900.73
70,900.73
105.00%
105.00%
99,261.02
99,261.02
26,081.74
26,081.74
85.00%
85.00%
73,898.25
73,898.25
115.00%
115.00%
99,979.99
99,979.99
37,590.86
7,641.42
29,949.44
-
38.52%
90.00%
75.00%
0.00%
37,590.86
7,641.42
29,949.44
-
CP ENGENHARIA LTDA
ITEM
7.4
7.5
8.0
8.1
8.2
DISCRIMINAO
Porta lisa em madeira com revestimento melamnico
com visor 17x 35cm
Vidro Liso Transparente e=4mm
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
18.90
381.40
7,208.46
0.00%
0.00%
150.20
72.93
10,954.09
0.00%
0.00%
m
m
1,097.90
102.10
106.85
38.43
180,588.11
117,310.62
3,923.70
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
kg
2,401.39
6.63
15,921.22
kg
m
4,724.24
102.10
6.63
6.98
31,321.71
712.66
0.00%
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
0.00%
8.4
8.5
COBERTURA
Cobertura com telha termoacstica
Rufo topo
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
Trelia Metlica
Pingadeira p/telha termoacstica
8.6
kg
217.04
5.83
1,265.34
8.7
8.8
8.9
8.10
kg
m
m
m
149.54
68.00
68.00
24.00
5.83
69.66
53.66
36.47
871.82
4,736.88
3,648.88
875.28
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.0
9.1
9.2
PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
m
m
1,280.75
1,342.50
12.35
12.64
36,788.22
15,817.26
16,969.20
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
28.77
12.73
366.24
0.00%
0.00%
0.00%
299.22
12.15
3,635.52
0.00%
0.00%
0.00%
36,729.33
0.00%
0.00%
0.00%
8.3
9.3
9.4
10.0
10.1
10.2
10.3
10.4
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Limpeza Permanente e Geral da Obra
TOTAL (R$)
889.93
25.15
22,381.74
0.00%
0.00%
0.00%
m
m
m
5.52
32.28
900.00
239.97
311.43
3.30
1,324.63
10,052.96
2,970.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
807,252.00
19.21%
155,092.77
26.48%
213,735.98
45.69%
368,828.74
LABORATRIOS
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
1,832.00
4.77
8,738.64
8,738.64
100.00%
100.00%
8,738.64
8,738.64
0.00%
0.00%
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro
m
m
m
m
m
m
m
192.00
122.40
51.60
34.80
6.00
767.50
69.60
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
108,297.47
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
36,793.95
1,125.43
64.99%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
70,378.09
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
-
31.51%
0.00%
0.00%
3.0
3.1
ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)
66.44
1,350.49
89,726.56
89,726.56
0.00%
0.00%
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm
1,565.96
50.21
78,626.85
78,626.85
15.00%
15.00%
5.0
5.1
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm
1,222.58
30.38
119,873.97
37,141.98
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,222.58
67.67
82,731.99
0.00%
0.00%
0.00%
m
m
m
2,606.67
2,606.67
1,014.70
3.10
14.58
55.45
102,351.05
8,080.68
38,005.25
56,265.12
0.00%
0.00%
0.00%
0.00%
36.42%
85.00%
80.00%
0.00%
5.2
11,794.03
11,794.03
ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%
8,738.64
8,738.64
90.00%
90.00%
34,127.44
33,114.56
1,012.89
96.50%
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
90.00%
104,505.53
3,722.88
29,107.94
18,412.43
11,548.38
7,586.46
33,114.56
1,012.89
85.00%
85.00%
76,267.58
76,267.58
85.00%
85.00%
76,267.58
76,267.58
90.00%
90.00%
70,764.17
70,764.17
105.00%
105.00%
82,558.19
82,558.19
6.0
6.1
6.2
6.3
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
7.0
ESQUADRIAS
78,482.46
0.00%
0.00%
0.00%
7.1
3.80
335.40
1,274.52
0.00%
0.00%
0.00%
7.2
7.3
Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Porta lisa em madeira com revestimento melamnico
com visor 17x 35cm
m
m
15.36
168.41
385.92
294.27
5,927.73
49,558.01
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
24.60
381.40
9,382.44
0.00%
0.00%
0.00%
7.4
37,272.78
6,868.58
30,404.20
-
36.42%
85.00%
80.00%
0.00%
37,272.78
6,868.58
30,404.20
-
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
7.5
8.0
8.1
8.2
8.3
COBERTURA
Cobertura com telha termoacstica
Rufo topo
Rufo lateral
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
8.4
QUANT.
PREO (R$)
UNITRIO
TOTAL
72.93
12,339.76
ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
-
3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
-
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-
169.20
m
m
m
1,369.90
67.20
67.80
106.85
38.43
44.18
211,633.74
146,373.82
2,582.50
2,995.40
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
kg
3,112.70
6.63
20,637.20
0.00%
0.00%
0.00%
8.5
kg
274.87
5.83
1,602.49
0.00%
0.00%
0.00%
8.6
8.7
8.8
8.9
kg
kg
m
m
191.05
5,229.00
24.30
115.80
5.83
6.63
35.06
6.98
1,113.82
34,668.27
851.96
808.28
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.0
9.1
9.2
PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
m
m
675.00
912.00
12.35
12.64
24,317.19
8,336.25
11,527.68
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
28.35
12.73
360.90
0.00%
0.00%
0.00%
336.82
12.15
4,092.36
0.00%
0.00%
0.00%
54,087.83
0.00%
0.00%
0.00%
9.3
9.4
10.0
10.1
10.2
10.3
10.4
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Limpeza Permanente e Geral da Obra
TOTAL (R$)
1,222.58
25.15
30,747.89
0.00%
0.00%
0.00%
m
m
m
4.80
58.65
1,188.70
239.97
311.43
3.30
1,151.86
18,265.37
3,922.71
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
876,135.76
10.38%
90,910.76
24.93%
218,431.96
35.31%
309,342.72
ADMINISTRAO
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
1,832.00
4.77
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro
m
m
m
m
m
m
m
213.60
144.00
60.00
34.80
7.00
981.60
69.60
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
3.0
3.1
ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)
66.33
1,350.49
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm
1,751.00
50.21
5.0
5.1
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm
Piso Cermico 20x20 - Incl. Regularizao
Calada de piso cimentado semi-spero, inclusive
camada de regularizao, elementos de conteno,
aterro e reaterro
1,126.00
5.2
5.3
5.4
6.0
6.1
6.2
6.3
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
7.0
ESQUADRIAS
7.1
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
100.00%
100.00%
8,738.64
8,738.64
0.00%
0.00%
55.57%
100.00%
100.00%
100.00%
100.00%
71,344.52
4,141.70
34,244.64
21,409.80
11,548.38
-
39.98%
0.00%
30.38
8,738.64
8,738.64
128,378.72
4,141.70
34,244.64
21,409.80
11,548.38
8,850.87
47,057.90
1,125.43
89,578.00
89,578.00
87,917.71
87,917.71
110,337.48
34,207.88
1,124.10
67.67
1.90
32.50
249.60
ACUMULADO ATUAL
%
VALOR (R$)
100.00%
100.00%
8,738.64
8,738.64
90.00%
90.00%
90.00%
51,330.78
7,965.78
42,352.11
1,012.89
95.56%
100.00%
100.00%
100.00%
100.00%
90.00%
90.00%
90.00%
122,675.30
4,141.70
34,244.64
21,409.80
11,548.38
7,965.78
42,352.11
1,012.89
0.00%
65.00%
65.00%
58,225.70
58,225.70
65.00%
65.00%
58,225.70
58,225.70
0.00%
90.00%
90.00%
79,125.94
79,125.94
90.00%
90.00%
79,125.94
79,125.94
0.00%
0.00%
76,067.85
0.00%
61.75
-
m
m
m
2,716.34
2,716.34
404.22
3.10
14.58
55.45
70,438.89
8,420.65
39,604.24
22,414.00
62,785.67
49.40
335.40
16,568.76
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
51.13%
75.00%
75.00%
36,018.67
6,315.49
29,703.18
-
51.13%
75.00%
75.00%
0.00%
36,018.67
6,315.49
29,703.18
-
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
7.2
7.3
7.4
Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Vidro Liso Transparente e=4mm
8.0
8.1
8.2
8.3
COBERTURA
Cobertura com telha termoacstica
Rufo topo
Rufo lateral
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
8.4
QUANT.
PREO (R$)
UNITRIO
TOTAL
385.92
5,927.73
294.27
32,287.30
72.93
8,001.88
ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
0.00%
-
m
m
m
15.36
109.72
109.72
m
m
m
1,369.90
67.20
67.80
106.85
38.43
44.18
211,721.52
146,373.82
2,582.50
2,995.40
0.00%
0.00%
0.00%
kg
3,112.70
6.63
20,637.20
0.00%
0.00%
3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
0.00%
0.00%
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
-
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.5
kg
274.87
5.83
1,602.49
8.6
8.7
8.8
8.9
kg
kg
m
m
191.05
5,242.24
24.30
115.80
5.83
6.63
35.06
6.98
1,113.82
34,756.05
851.96
808.28
9.0
9.1
9.2
PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
m
m
1,735.00
831.41
12.35
12.64
35,231.33
21,427.25
10,509.02
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
49.40
12.73
628.86
0.00%
0.00%
0.00%
219.44
12.15
2,666.20
0.00%
0.00%
0.00%
54,865.75
0.00%
0.00%
0.00%
9.3
9.4
10.0
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
10.1
sustentao
10.2
0.00%
931.60
25.15
23,429.74
0.00%
194.40
15.51
3,015.14
0.00%
0.00%
0.00%
m
m
4.80
57.91
239.97
311.43
1,151.86
18,034.91
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00
368.66
1,843.30
0.00%
0.00%
0.00%
m
m
378.20
1,188.70
9.17
3.30
3,468.09
3,922.71
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
TOTAL (R$)
QUANT.
PREO (R$)
UNITRIO
TOTAL
859,993.71
ACUMULADO ANTERIOR
%
VALOR (R$)
9.31%
80,083.16
3 MEDIO - 22/10/2012
%
VALOR (R$)
26.13%
224,701.09
ACUMULADO ATUAL
%
VALOR (R$)
35.44%
304,784.25
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
733.07
4.77
3,496.74
3,496.74
100.00%
100.00%
3,496.74
3,496.74
0.00%
0.00%
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado com Emprstimo
Reaterro
112.80
74.40
31.20
19.20
4.00
324.33
38.40
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
58,611.82
2,187.19
17,693.06
11,133.10
6,371.52
5,057.64
15,548.38
620.93
52.91%
100.00%
100.00%
100.00%
0.00%
31,013.35
2,187.19
17,693.06
11,133.10
-
47.09%
m
m
m
m
m
m
m
3.0
3.1
ESTRUTURA
Concreto Armado (Pilares / Vigas / Vergas)
1,350.49
0.00%
43.20
58,341.17
58,341.17
0.00%
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm
965.40
50.21
48,472.73
48,472.73
0.00%
80.00%
80.00%
5.0
5.1
458.00
30.38
44,759.19
13,914.04
0.00%
0.00%
0.00%
0.00%
0.00%
453.80
67.67
30,708.65
0.00%
0.00%
0.00%
5.3
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm
Piso Cermico 20x20 - Incl. Regularizao
4.20
32.50
136.50
0.00%
0.00%
0.00%
6.0
6.1
6.2
6.3
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
1,617.00
1,617.00
907.59
3.10
14.58
55.45
78,914.43
5,012.70
23,575.86
50,325.87
0.00%
m
m
m
0.00%
27.17%
75.00%
75.00%
0.00%
7.0
ESQUADRIAS
34,828.89
0.00%
0.00%
0.00%
7.1
39.90
335.40
13,382.46
0.00%
0.00%
0.00%
7.2
7.3
Porta de Alumnio
Esquadria de Metalon tipo Maxim'ar
Grade de metalon (parede 18) e tela de ao
galvanizado
m
m
8.70
45.10
385.92
294.27
3,357.50
13,271.58
0.00%
0.00%
0.00%
0.00%
0.00%
5.60
171.14
958.38
0.00%
0.00%
0.00%
5.2
7.4
100.00%
100.00%
100.00%
100.00%
ACUMULADO ATUAL
%
VALOR (R$)
27,598.47
6,371.52
5,057.64
15,548.38
620.93
38,778.18
38,778.18
21,441.42
3,759.53
17,681.90
-
100.00%
100.00%
3,496.74
3,496.74
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
58,611.82
2,187.19
17,693.06
11,133.10
6,371.52
5,057.64
15,548.38
620.93
0.00%
0.00%
80.00%
80.00%
27.17%
75.00%
75.00%
0.00%
38,778.18
38,778.18
21,441.42
3,759.53
17,681.90
-
CP ENGENHARIA LTDA
ITEM
7.5
7.6
7.7
8.0
8.1
8.2
8.3
DISCRIMINAO
Porta de metalon (parede 18) e tela de ao
galvanizado
Porto de ferro em chapa dupla
Vidro Liso Transparente e=4mm
COBERTURA
Cobertura com telha termoacstica
Rufo topo
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
1.90
171.14
325.17
0.00%
0.00%
0.00%
m
m
1.90
45.10
128.77
72.93
244.66
3,289.14
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
597.35
55.55
106.85
38.43
93,419.76
63,826.85
2,134.79
0.00%
0.00%
0.00%
0.00%
m
m
0.00%
0.00%
0.00%
0.00%
kg
1,306.54
6.63
8,662.36
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.4
kg
122.46
5.83
713.94
8.5
8.6
8.7
kg
kg
m
98.70
2,582.00
55.55
5.83
6.63
6.98
575.42
17,118.66
387.74
9.0
9.1
9.2
PINTURA
Ltex acrlico 02 demos com emassamento
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
m
m
767.61
507.96
12.35
12.64
17,732.87
9,479.98
6,420.61
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
39.90
12.73
507.93
0.00%
0.00%
0.00%
109.00
12.15
1,324.35
0.00%
0.00%
0.00%
30,632.43
0.00%
0.00%
0.00%
9.3
9.4
10.0
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Divisrias em Granito Cinza Andorinha
Coifa de ao inoxidvel (2,2x1,40)m inclusive
exaustor, dutos e cabos de sustentao
Bancada em Tampo de inoxidvel
Rodap em alumnio
Prateleiras em Concreto Pr-moldado Aparente
Limpeza Permanente e Geral da Obra
TOTAL (R$)
458.00
25.15
11,518.70
0.00%
0.00%
0.00%
m
m
12.77
22.00
239.97
311.43
3,064.42
6,851.46
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
um
1.00
4,663.07
4,663.07
0.00%
0.00%
0.00%
m
m
m
m
2.60
51.10
10.40
498.00
459.56
9.17
118.07
3.30
1,194.86
468.59
1,227.93
1,643.40
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469,210.03
7.35%
34,510.09
18.72%
87,818.07
26.07%
122,328.16
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da obra
194.88
4.77
929.58
929.58
0.00%
100.00%
100.00%
929.58
929.58
100.00%
100.00%
929.58
929.58
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ fundao corrida e cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro
25.47
25.47
4.84
3.24
2.42
23.26
20.00
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40
0.00%
m
m
m
m
m
m
m
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
13,851.48
493.86
6,057.02
1,727.06
1,075.19
3,059.87
1,115.08
323.40
3.0
ESTRUTURA
7,103.58
0.00%
0.00%
3.1
5.26
1,350.49
7,103.58
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14cm
275.87
50.21
13,851.43
13,851.43
5.0
5.1
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14 mm
94.05
30.38
9,221.60
2,857.24
94.05
67.67
m
m
m
451.70
451.70
308.88
3.10
14.58
55.45
5.2
0.00%
0.00%
0.00%
80.00%
80.00%
11,081.14
11,081.14
0.00%
0.00%
0.00%
0.00%
6,364.36
0.00%
0.00%
0.00%
25,113.46
1,400.27
6,585.79
17,127.40
0.00%
23.85%
75.00%
75.00%
0.00%
REVESTIMENTO
Chapisco
Reboco
Revestimento Cermico 10x10cm
7.0
ESQUADRIAS
7.1
3.78
335.40
1,267.81
0.00%
0.00%
0.00%
7.2
7.5
7.3
7.4
Porta de Alumnio
Porto Tipo Grade de Ferro
Esquadria de Metalon tipo Maximar
Vidro Liso Transparente e=4mm
m
m
m
m
19.20
7.50
14.40
14.40
385.92
186.91
294.27
72.93
7,409.66
1,401.83
4,237.49
1,050.19
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15,366.98
23.85%
75.00%
75.00%
0.00%
11,081.14
11,081.14
6.0
6.1
6.2
6.3
0.00%
5,989.55
1,050.20
4,939.34
-
80.00%
80.00%
5,989.55
1,050.20
4,939.34
-
CP ENGENHARIA LTDA
ITEM
8.0
8.1
8.2
DISCRIMINAO
COBERTURA
Cobertura com telha termoacstica
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
QUANT.
PREO (R$)
UNITRIO
TOTAL
20,440.90
106.85
16,189.91
ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
0.00%
-
3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
-
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
-
151.52
kg
439.49
6.63
2,913.82
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.3
kg
23.74
5.83
138.40
8.4
8.5
8.6
kg
kg
m
22.32
21.80
43.60
5.83
35.06
6.98
130.13
764.31
304.33
9.0
9.1
PINTURA
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado com emassamento em
esquadrias de madeira
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
242.90
12.64
3,650.55
3,070.26
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.78
12.73
48.12
0.00%
0.00%
0.00%
43.80
12.15
532.17
0.00%
0.00%
0.00%
16,044.87
0.00%
0.00%
0.00%
9.2
9.3
10.0
10.1
10.2
10.3
10.4
10.5
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
sustentao
Bancadas em Granito Cinza Andorinha
Banco em alvenaria com tampo em granito cinza
andorinha
Divisrias em Granito Cinza Andorinha (WC's)
Limpeza Permanente e Geral da Obra
TOTAL (R$)
94.05
25.15
2,365.36
0.00%
0.00%
0.00%
5.44
239.97
1,305.44
0.00%
0.00%
0.00%
4.05
205.81
833.53
0.00%
0.00%
0.00%
m
m
36.06
94.05
311.43
3.30
11,230.17
310.37
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
125,574.43
0.00%
25.36%
31,851.75
25.36%
31,851.75
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da obra
1,725.00
4.77
8,228.25
8,228.25
100.00%
100.00%
8,228.25
8,228.25
100.00%
100.00%
8,228.25
8,228.25
200.00%
200.00%
16,456.50
16,456.50
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Aterro Apiloado
Alvenaria de pedra argamassada
Baldrame
Concreto Ciclpico
Concreto Ciclpico fck = 10MPa, com forma
Reaterro
Concreto Armado Cintas
m
m
m
m
m
m
m
m
75.09
948.95
42.39
31.76
36.79
32.73
445.49
6.76
19.39
47.94
237.81
356.83
331.85
649.32
16.17
1,264.41
117,574.33
1,456.00
45,492.66
10,080.77
11,332.92
12,208.76
21,252.24
7,203.57
8,547.41
1.24%
100.00%
1,456.00
1,456.00
-
73.26%
100.00%
100.00%
90.00%
86,136.25
1,456.00
45,492.66
9,072.69
10,987.89
19,127.02
-
74.50%
200.00%
100.00%
90.00%
0.00%
90.00%
90.00%
0.00%
0.00%
87,592.25
2,911.99
45,492.66
9,072.69
10,987.89
19,127.02
-
3.0
3.3
INFRA-ESTRUTURA
Concreto Armado (Pilares/Vigas/Vergas/Lajes)
22.11
1,350.49
29,859.33
29,859.33
0.00%
45.00%
45.00%
13,436.70
13,436.70
45.00%
45.00%
13,436.70
13,436.70
4.0
179,414.02
0.00%
0.00%
4.3
4.4
4.5
4.6
COBERTURA
Estrutura metlica para galpes vos at 30m
incluindo fornecimento, montagem e pintura
anticorrosiva
Estrutura Metlica p/ Cobertura de Telha de Ao
Galvanizado
Telha de Ao Galvanizado
Cobertura com Telha Ondulada de Alumnio
Platibanda de Chapa Metlica h=0,40m
Calha Metlica
5.0
5.1
PAREDES DE PAINIS
Alvenaria de Tijolo Cermico, esp = 10 cm
6.0
6.1
PAVIMENTAO
Lastro de impermeabilizao, e=7cm
Piso de Alta ResistnciaTipo Granilite - Inclusive
Regularizao esp=14mm
4.1
4.2
6.2
7.0
7.1
REVESTIMENTO
Chapisco
kg
17,597.44
6.63
15.60
m
m
m
m
1,620.00
15.60
4.14
5.20
90.00%
90.00%
0.00%
0.00%
116,671.03
0.00%
69.66
1,086.70
0.00%
37.26
53.66
64.82
36.47
60,361.20
837.10
268.35
189.64
0.00%
0.00%
0.00%
0.00%
29.95
14,490.41
14,490.41
0.00%
483.82
50.00%
50.00%
30.38
0.00%
1,071.60
105,070.38
32,555.21
0.00%
m
m
1,071.60
67.67
72,515.17
1,175.37
3.10
20,780.54
3,643.65
0.00%
0.00%
7,245.20
7,245.20
50.00%
50.00%
7,245.20
7,245.20
0.00%
0.00%
0.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
7.2
Reboco
8.0
ESQUADRIAS
Porto Metlico de Metalon e Chapa Dupla de
Correr
8.1
QUANT.
PREO (R$)
UNITRIO
TOTAL
14.58
17,136.89
1,175.37
15.00
221.41
3,321.15
1,175.37
12.64
28,044.77
14,856.68
3,321.15
ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
9.2
1,047.94
12.15
12,732.47
0.00%
9.3
37.50
12.15
455.63
0.00%
0.00%
17,805.62
0.00%
0.00%
0.00%
PINTURA
Pintura Texturizada Acrlica c/ Quartzo
INSTALAO ELTRICA
Refletor Redondo Pendente, em Alumnio com
10.1 Suporte e Ala Regulvel para Fixao, com
Lmpada Vapor de Mercrio 250W
9.0
9.1
10.0
0.00%
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
-
0.00%
un
35.00
153.77
5,381.95
0.00%
un
1.00
176.77
176.77
0.00%
un
35.00
53.90
1,886.50
0.00%
un
1.00
224.07
224.07
0.00%
m
m
m
un
un
un
un
500.00
1,040.00
360.00
5.00
2.00
1.00
1.00
2.17
2.84
3.91
8.13
8.13
54.13
54.13
1,085.00
2,953.60
1,407.60
40.65
16.26
54.13
54.13
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
10.12
10.13
10.14
10.15
10.16
10.17
DISCRIMINAO
UNID.
QUANT.
ACUMULADO ANTERIOR
%
VALOR (R$)
-
3 MEDIO - 22/10/2012
%
VALOR (R$)
-
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-
m
m
m
un
un
un
65.00
110.00
260.00
10.00
10.00
60.00
un
10.00
1.94
19.40
0.00%
un
10.00
3.86
38.60
0.00%
un
un
10.00
2.00
5.30
5.88
53.00
11.76
0.00%
0.00%
un
5.00
169.28
846.40
0.00%
un
1.00
7.31
7.31
0.00%
un
8.00
8.13
65.04
0.00%
un
35.00
6.98
244.30
0.00%
0.00%
10.18
10.19
10.20
10.21
11.0
INSTALAO DE SPDA
11.1
59.76
7.06
421.91
0.00%
11.2
207.76
11.66
2,422.48
0.00%
un
18.00
169.53
3,051.54
0.00%
un
18.00
36.65
659.70
0.00%
un
un
18.00
72.00
10.07
6.40
181.26
460.80
0.00%
0.00%
0.00%
12.0
DIVERSOS
7,197.69
40,122.03
0.00%
0.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
12.1
DISCRIMINAO
Alambrado para quadra poliesportiva, estruturada
em tubo de ao galv. c/costura din 2440, dimetro
2", e tela em arame galvanizado 14 bwg, malha
quadrada com abertura de 2".
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
284.00
86.19
24,477.96
0.00%
650.00
4.74
3,081.00
0.00%
cj
1.00
1,632.25
1,632.25
0.00%
cj
1.00
434.03
434.03
0.00%
15.60
25.15
392.34
0.00%
12.80
368.66
4,718.85
0.00%
1,632.00
3.30
5,385.60
0.00%
571,908.53
1.69%
9,684.25
20.12%
115,046.41
21.81%
124,730.65
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
1.0
1.1
SERVIOS PRELIMINARES
Locao da Obra
4.77
0.00%
377.51
1,800.72
1,800.72
0.00%
0.00%
0.00%
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
FUNDAES
Escavao Manual p/ Fundao Corrida e Cinta
Alvenaria de Pedra Argamassada
Baldrame
Concreto Ciclpico
Concreto Armado Cintas
Aterro Apiloado
Reaterro
19.39
237.81
356.83
331.85
1,264.41
47.94
16.17
0.00%
172.80
21.60
9.60
13.20
1.00
172.80
98.40
27,432.85
3,350.59
5,136.70
3,425.57
4,380.42
1,264.41
8,284.03
1,591.13
0.00%
m
m
m
m
m
m
m
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.0
3.1
3.2
ESTRUTURA
Concreto Armado (Pilares/ Vigas/ Vergas)
Laje pr-moldado
1,350.49
65.84
0.00%
0.00%
60.00
16.81
82,136.17
81,029.40
1,106.77
0.00%
m
m
0.00%
0.00%
0.00%
4.0
4.1
ALVENARIA
Alvenaria de Tijolo Cermico esp=14 cm
163.50
50.21
8,209.34
8,209.34
0.00%
0.00%
0.00%
0.00%
5.0
5.1
PAVIMENTAO
Lastro de Impermeabilizao e=7cm
Piso de Alta Resistncia tipo Granilite - Incl.
Regularizao esp=14mm
361.00
30.38
35,396.05
10,967.18
0.00%
0.00%
0.00%
0.00%
0.00%
361.00
67.67
24,428.87
0.00%
0.00%
0.00%
0.00%
0.00%
5.2
0.00%
6.0
6.1
6.2
REVESTIMENTO
Chapisco
Reboco
518.72
518.72
3.10
14.58
9,170.97
1,608.03
7,562.94
0.00%
0.00%
0.00%
0.00%
m
m
7.0
7.1
ESQUADRIAS
Porta de ferro com guarnio, completa
2.32
186.91
433.63
433.63
0.00%
0.00%
0.00%
0.00%
0.00%
8.0
8.1
COBERTURA
Cobertura com telha termoacstica
Teras metlicas de 4", perfil U enrijecido,
100x40x40x17, chapa 14
337.42
106.85
58,327.11
36,053.33
0.00%
0.00%
0.00%
0.00%
kg
1,120.22
6.63
7,427.06
0.00%
0.00%
0.00%
kg
79.13
5.83
461.33
0.00%
0.00%
0.00%
8.2
8.3
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
8.4
8.5
8.6
8.6
8.7
9.0
9.1
PINTURA
Pintura texturizada acrlica c/quartzo
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
9.2
DIVERSOS
Forro de PVC, inclusive estrutura metlica de
10.1
sustentao
Impermeabilizao de Laje (Regularizao, manta e
10.2
proteo)
Escada de marinheiro com cano galvanizado, com
10.3
proteo
QUANT.
PREO (R$)
UNITRIO
TOTAL
5.83
318.08
6.63
9,991.41
35.06
1,171.71
6.98
466.54
36.47
2,437.65
TOTAL (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
0.00%
0.00%
-
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
0.00%
0.00%
0.00%
0.00%
-
kg
kg
kg
m
m
54.56
1,507.00
33.42
66.84
66.84
345.74
12.64
4,426.53
4,370.15
0.00%
0.00%
0.00%
0.00%
0.00%
4.64
12.15
56.38
0.00%
0.00%
0.00%
24,173.77
0.00%
0.00%
10.0
ACUMULADO ANTERIOR
%
VALOR (R$)
0.00%
-
361.00
25.15
9,079.15
0.00%
0.00%
0.00%
195.28
62.33
12,171.80
0.00%
0.00%
0.00%
10.00
151.36
1,513.60
0.00%
0.00%
0.00%
un
3.00
72.64
217.92
0.00%
0.00%
0.00%
361.00
3.30
1,191.30
0.00%
0.00%
0.00%
251,507.14
0.00%
0.00%
0.00%
CP ENGENHARIA LTDA
ITEM
1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1
DISCRIMINAO
SERVIOS PRELIMINARES
Mobilizao e desmobilizao
Desmatamento, limpeza do terreno e destoc. de
rvores at 15cm
Escavao, carga e transp. de mat. de 1 cat. com
DMT de 3000 a 5000m com carregadeira
Transporte de Material 1 cat.DMT 5,00 Km
Compactao aterro 100% do Proctor Normal
Regularizao do subleito
QUANT.
PREO (R$)
UNITRIO
TOTAL
ACUMULADO ANTERIOR
%
VALOR (R$)
1.00
5,175.00
143,227.31
5,175.00
34.58%
50.00%
49,529.86
2,587.50
0.00%
0.00%
34.58%
50.00%
49,529.86
2,587.50
57,787.00
0.37
21,381.19
100.00%
21,381.19
0.00%
100.00%
21,381.19
7,303.19
3.50
25,561.17
100.00%
25,561.17
100.00%
25,561.17
txk
m
m
63,902.92
5,842.55
24,598.00
0.48
4.45
1.40
30,673.40
25,999.35
34,437.20
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
34.38
0.00%
3,770.46
319,637.73
129,628.41
0.00%
2,266.00
78.87
178,719.42
3,010.64
3.75
11,289.90
2.3
3.0
3.1
3.2
REVESTIMENTO
Chapisco
Reboco
m
m
7,051.84
7,051.84
3.10
14.58
124,676.53
21,860.70
102,815.83
100.00%
100.00%
100.00%
4.0
4.1
ESQUADRIAS
Grade Frontal
183.68
171.14
31,435.00
31,435.00
0.00%
5.0
5.1
PINTURA
Pintura texturizada acrilica c/quartzo
Esmalte sinttico acetinado sem emassamento em
esquadrias metlica
7,051.84
12.64
93,598.68
89,135.26
0.00%
m
m
367.36
12.15
4,463.42
5.2
ACUMULADO ATUAL
%
VALOR (R$)
un
PAVIMENTAO
Pavimentao com Paraleleppedo
Calada de piso cimentado semi-spero, inclusive
camada de regularizao, elementos de conteno,
aterro e reaterro
Pavimentao com brita
2.2
3 MEDIO - 22/10/2012
%
VALOR (R$)
6.0
6.1
DIVERSOS + URBANIZAO
Meio - fio
808.62
19.23
389,269.28
15,549.76
6.2
un
1.00
771.16
771.16
6.3
ml
1,762.96
198.34
349,665.49
124,676.53
21,860.70
102,815.83
0.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
90.56%
352,516.36
-
0.00%
100.00%
349,665.49
124,676.53
21,860.70
102,815.83
90.56%
0.00%
0.00%
100.00%
352,516.36
349,665.49
CP ENGENHARIA LTDA
ITEM
DISCRIMINAO
QUANT.
PREO (R$)
UNITRIO
TOTAL
6.4
100.00
204.32
20,432.00
6.5
um
1.00
999.75
999.75
6.6
um
1.00
1,851.12
1,851.12
7.0
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
MASTROS
Escavao manual
Baldrame
Aterro apiloado com emprstimo
Lastro de impermeabilizacao e=7cm
Piso cimentado alisado c/ acabadora mecanica
Chapisco
Reboco
Concreto ciclpico
Mastro
m
m
m
m
m
m
m
m
un
0.90
1.20
1.80
6.00
6.00
3.00
3.00
0.19
3.00
19.39
356.83
47.94
30.38
19.96
3.10
14.58
331.85
279.50
1,788.57
17.45
428.20
86.29
182.28
119.76
9.30
43.74
63.05
838.50
TOTAL (R$)
1,103,633.10
ACUMULADO ANTERIOR
%
VALOR (R$)
3 MEDIO - 22/10/2012
%
VALOR (R$)
ACUMULADO ATUAL
%
VALOR (R$)
0.00%
100.00%
999.75
100.00%
999.75
100.00%
1,851.12
100.00%
1,851.12
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
47.73%
47.73%
526,722.75
0.00%
0.00%
526,722.75