DESCRIPCION
ESTRUCTURAS
TRABAJOS PRELIMINARES
CARTEL DE OBRA 7.20 X 3.60 SEGUN MODELO
und
01.01.04
01.02
01.02.01
01.02.02
MOVIMIENTO DE TIERRAS
CORTE Y PERFILADO DE TERRENO A SUB RASANTE
01.03
01.03.01
NIVELACION Y COMPACTACION
1.00
94.98
67.22
6,384.56
1.00
94.98
67.22
6,384.56
1.00
94.98
67.22
0.20
1,276.91
2.00
1.00
1.00
1.00
1.00
1.00
35.00
60.00
172.05
27.30
54.60
261.32
0.40
0.40
0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
0.20
0.20
11.20
9.60
6.88
1.09
2.18
10.45
1.00
1.00
1.00
1.00
8.00
18.00
13.00
area
area
area
24.00
22.00
1,358.53
126.18
41.40
6,384.56
6,384.56
1,276.91
41.41
2,533.91
432.00
286.00
1,358.53
126.18
331.20
1,318.32
1,647.90
1,318.32
1,647.90
CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO DE SARDINEL
1,647.90
1,647.90
m2
309.16
2.00
515.27
1.00
1.00
1.00
1.00
172.05
27.30
54.60
261.32
1.00
1.00
18.00
13.00
9.00
7.00
8.00
5.00
18.00
0.30
309.16
0.15
0.15
0.15
0.15
0.40
0.40
0.40
0.40
10.32
1.64
3.28
15.68
24.00
22.00
0.20
0.20
86.40
57.20
0.20
0.20
0.20
0.20
32.40
33.60
20.80
22.00
m3
30.92
m3
pelotaris
voleyball
01.03.03.02
6,384.56
SARDINEL 01
SARDINEL 02
SARDINEL 03
SARDINEL 04
01.03.03
01.03.03.01
67.22
m2
SARDINEL
01.03.02
94.98
m3
pelotaris
voleyball
vereda y Pisos
Acceso a Ambiente
Pisos en Bancas
01.02.05
6,384.56
1.00
m3
143.60
M2
pelotaris
voleyball
108.80
24.00
13.00
22.00
01.04
01.04.01
01.04.02
und
und
2.00
1.00
2.00
1.00
01.05
01.05.01
VARIOS
LIMPIEZA FINAL
GLB
1.00
1.00
01.05.02
ML
01.05.01
02
02.01
02.01.01
PLACA RECORDATORIA
ARQUITECTURA
PISOS Y PAVIMENTOS
PISO ADOQUINADO
GLB
m2
2.00
1.00
1.00
425.00
7.00
5.00
7.00
4.00
voleyball
TOTAL
1.00
m2
SARDINEL 01
SARDINEL 02
SARDINEL 03
SARDINEL 04
01.02.04
1.00
m2
Area de drenaje
01.02.03
ALTO PARCIAL
m2
Area total del terreno
01.01.03
ANCHO
1.00
18.00
24.00
13.00
22.00
126.00
120.00
91.00
88.00
1.00
1.00
1,815.91
PLANILLA DE METRADOS
PROYECTO: "TERMINACION Y MEJORAMIENTO DEL COMPLEJO POLIDEPORTIVO DEL BARRIO PORVENIR-HUANCAN"
UBICACIN DPTO: JUNIN, PROVINCIA: HUANCAYO, DISTRITO: HUANCAN, LUGAR: BARRIO PORVENIR
FECHA:
MARZO DEL 2012
FORMULA: 01 OBRAS EXTERIORES Y CAMPO DE PELOTARIS
ITEM
DESCRIPCION
vereda y Pisos
Acceso a Ambiente
Pisos en Bancas
02.02
02.02.01
JARDINERIA
SEMBRIO DE GRASS
02.05
02.05.01
02.05.01
03
03.01
03.01.01
03.02
03.02.01
03.02.02
03.03
03.03.01
03.04
03.04.01
04
04.01
04.01.01
04.02
04.02.01
area
area
area
area
571.78
22.36
199.18
1,062.70
und
PINTURA
PINTURA EN LOSA
114.00
30.00
2.00
12.00
70.00
30.00
2.00
12.00
70.00
m2
LOSA DEPORTIVA/PELOTARIS
02.04
02.04.01
571.78
22.36
199.18
1,062.70
BANCAS DE CONCRETO
BANCAS DE CONCRETO INCL. ACABADO E INSTALACION
JUEGOS INFANTILES
CAJA DE ARENA EN PISO
INSTALACIONES ELECTRICAS
CANALIZACION Y/O TUBERIA
TUBERIA DIAMETRO 3/4" PVC SEL
CONDUCTORES Y/O CABLES
CONDUCTOR TW 4.0 MM2
CONDUCTOR Cu 10 mm2 DESNUDO
TABLEROS Y CUCHILLAS
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A
ARTEFACTOS ELECTRICOS
POSTE CON REFLECTORES
SISTEMA DE DRENAJE
TUBERIA DE DRENAJE
TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 4"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA
TOTAL
1,856.02
1.00
1.00
1.00
1.00
JARDIN 01
JARDIN 02
JARDIN 03
JARDIN 04
02.03
02.03.01
ALTO PARCIAL
1,358.53
126.18
331.20
m2
JARDIN 01
JARDIN 02
JARDIN 03
JARDIN 04
02.02.02
ANCHO
1,358.53
126.18
41.40
16.80
1.00
1.00
18.00
24.00
0.40
0.40
7.20
9.60
1.00
7.00
1.00
AREA
1.00
1.00
1.00
und
7.00
7.00
m2
451.65
450.65
450.65
GLB
1.00
ml
1.00
96.05
96.05
96.05
ml
ml
1.00
2.00
96.05
96.05
96.05
192.10
96.05
192.10
pza
1.00
1.00
1.00
und
4.00
4.00
4.00
ml
2.00
1.00
und
1.00
18.10
20.00
3.00
36.20
20.00
56.20
3.00
3.00
PLANILLA DE METRADOS
PROYECTO: "TERMINACION Y MEJORAMIENTO DEL COMPLEJO POLIDEPORTIVO DEL BARRIO PORVENIR-HUANCAN"
UBICACIN DPTO: JUNIN, PROVINCIA: HUANCAYO, DISTRITO: HUANCAN, LUGAR: BARRIO PORVENIR
FECHA:
MARZO DEL 2012
FORMULA: 02 CAMPO DE GRASS SINTETICO
ITEM
01
01.01
02
02.01
02.02
DESCRIPCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO
30.00
1.00
18.00
30.00
0.25
135.00
1.00
2.00
30.00
0.50
0.40
0.30
0.50
1.50
6.00
0.45
1.00
18.00
30.00
540.00
1.00
18.00
30.00
540.00
1.00
18.00
30.00
540.00
141.45
176.81
1.25
141.45
176.81
2.00
30.00
2.00
2.00
1.00
0.80
30.00
30.00
0.40
0.40
0.40
1.00
18.00
30.00
2.00
30.00
MOVIMIENTO DE TIERRAS
CORTE Y PERFILADO DE TERRENO A SUB RASANTE
02.05
03
03.01
06
06.01
176.81
176.81
m2
24.00
0.40
24.00
0.10
0.10
0.08
0.06
2.40
0.96
m3
3.42
m2
CARPINTERIA METALICA
REJILLA METALICA PARA CUNETA SEGUN DISEO INCL. INSTALACION ml
Cuneta
ACCESORIOS Y ACABADOS EN CAMPO DEPORTIVO
ARCO DE FULBITO
540.00
m3
Campo deportivo
05
05.01
540.00
m2
caja de registro
Laterales
Base
04
04.01
540.00
m3
Cuneta
03.02
6.45
m2
Campo deportivo
02.05
135.00
m3
Campo deportivo
02.05
540.00
m3
und
TOTAL
540.00
18.00
Campo deportivo
02.04
ALTO PARCIAL
1.00
Area de drenaje
cajas de registro
02.03
ANCHO
m2
540.00
540.00
60.00
2.00
60.00
2.00
2.00
PLANILLA DE METRADOS
PROYECTO: "TERMINACION Y MEJORAMIENTO DEL COMPLEJO POLIDEPORTIVO DEL BARRIO PORVENIR-HUANCAN"
UBICACIN DPTO: JUNIN, PROVINCIA: HUANCAYO, DISTRITO: HUANCAN, LUGAR: BARRIO PORVENIR
FECHA:
MARZO DEL 2012
FORMULA: 02 CAMPO DE GRASS SINTETICO
ITEM
07
07.01
07.01.01
07.02
07.02.01
07.02.02
07.03
07.03.01
07.04
07.04.01
08
08.01
08.01.01
08.02
08.02.01
DESCRIPCION
INSTALACIONES ELECTRICAS
CANALIZACION Y/O TUBERIA
TUBERIA DIAMETRO 3/4" PVC SEL
CONDUCTORES Y/O CABLES
CONDUCTOR TW 4.0 MM2
CONDUCTOR Cu 10 mm2 DESNUDO
TABLEROS Y CUCHILLAS
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A
ARTEFACTOS ELECTRICOS
POSTE CON REFLECTORES
SISTEMA DE DRENAJE
TUBERIA DE DRENAJE
TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 4"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA
ANCHO
ALTO PARCIAL
TOTAL
ml
1.00
96.05
96.05
96.05
ml
ml
1.00
2.00
96.05
96.05
96.05
192.10
96.05
192.10
pza
1.00
1.00
1.00
und
4.00
4.00
4.00
ml
2.00
1.00
und
1.00
18.10
20.00
3.00
36.20
20.00
56.20
3.00
3.00
PLANILLA DE METRADOS
PROYECTO: "TERMINACION Y MEJORAMIENTO DEL COMPLEJO POLIDEPORTIVO DEL BARRIO PORVENIR-HUANCAN"
UBICACIN DPTO: JUNIN, PROVINCIA: HUANCAYO, DISTRITO: HUANCAN, LUGAR: BARRIO PORVENIR
FECHA:
MARZO DEL 2012
FORMULA: 03 ACCESO Y CERCO PERIMETRICO
ITEM
DESCRIPCION
01
01.01
01.01.01
ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR
LADO A-B
LADO B-C
LADO C-D
01.02
01.02.01
01.02.02
01.02.03
01.03
01.03.01
01.03.02
01.03.03
02
02.01
02.01.01
02.01
02.01.01
02.01.01
02.01.01
02.02
02.02.02
02.10.02
ml
160.23
1.00
1.00
1.00
91.75
4.25
64.23
1.00
1.00
1.00
91.75
4.25
64.23
0.40
0.40
0.40
0.80
0.80
0.80
29.36
1.36
20.55
m3
1.00
1.00
1.00
91.75
4.25
64.23
0.25
0.25
0.25
0.20
0.20
0.20
4.59
0.21
3.21
m3
1.25
43.26
1.00
1.00
1.00
91.75
4.25
64.23
0.40
0.40
0.40
0.60
0.60
0.60
22.02
1.02
15.42
1.00
1.00
1.00
88.25
4.25
60.73
0.15
0.15
0.15
1.00
1.00
1.00
13.24
0.64
9.11
2.00
2.00
2.00
88.75
4.25
61.23
1.00 177.50
1.00
8.50
1.00 122.46
2.00
2.00
2.00
88.75
4.25
61.23
0.90 159.75
0.90
7.65
0.90 110.21
MOVIMIENTO DE TIERRAS
8.01
54.08
54.08
m3
m3
m2
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN SOBRECIMIENTO CON C:A - 1:5 E=1.5 CM
LADO A-B
LADO B-C
LADO C-D
51.27
38.46
22.98
308.46
m2
277.61
1.00
2.00
2.00
2.00
m2
1.00
153.23
3.50 536.31
536.31
1.00
32.00
5.00 160.00
160.00
1.00
696.31
696.31
696.31
277.61
277.61
277.61
1.00
1.00
PINTURA
PINTURA ESMALTE Y ANTICORROSIVO EN CARPINTERIA METALICA
PINTURA EN SOBRECIMIENTO EXTERIORES C/ ESMALTE
m2
m2
1.00
03
03.01
91.75
4.25
64.23
FLETE TERRESTRE
FLETE TERRESTRE
glb
1.00
1.00
PLANILLA DE METRADOS
PROYECTO:
UBICACIN
FECHA:
FORMULA:
ITEM
01
01.01
01.01.03
DESCRIPCION
ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.02
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
N VEC
LARGO
ANCHO
1.00
-1.00
10.00
2.90
10.00
2.90
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00m A 1.90m DE PROFUNDIDAD EN TERRENO
m3 NORMAL
Z-1
10.00
1.00
1.00
1.70
17.00
7.77
3.70
2.84
7.77
6.76
4.05
3.05
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
2.49
1.18
0.91
2.49
2.16
1.30
0.98
1.25
28.50
35.63
m3
1.25
28.50
35.63
m2
1.00
1.00
1.00
6.20
AREA
3.36
3.85
51.62
3.70
23.87
51.62
12.43
m2
1.00
1.00
1.00
6.20
AREA
3.36
3.85
51.62
3.70
23.87
51.62
12.43
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10.19
3.70
2.84
10.19
9.01
4.55
3.79
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2.45
0.89
0.68
2.45
2.16
1.09
0.91
1.00
1.00
1.00
1.00
1.00
1.00
3.75
3.70
2.84
3.75
8.11
4.55
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.30
0.30
0.30
0.30
0.17
0.17
0.13
0.17
0.36
0.20
2.00
2.00
2.00
2.00
2.00
2.00
3.75
3.70
2.84
3.75
8.11
4.55
0.30
0.30
0.30
0.30
0.30
0.30
2.25
2.22
1.70
2.25
4.87
2.73
10.00
1.00
1.00
10.00
1.00
1.00
1.00
6.20
AREA
3.36
3.85
51.62
3.70
23.87
51.62
12.43
10.00
1.00
1.00
0.60
6.00
10.00
1.00
14.00
1.02
142.80
10.00
0.25
0.25
4.30
2.69
10.00
1.00
4.30
43.00
10.00
10.00
4.00
0.95
4.60
27.00
1.02
0.56
187.68
143.64
3.00
1.00
2.00
2.00
2.00
9.00
3.80
7.15
10.00
3.80
0.25
0.25
0.25
0.25
0.25
0.40
0.40
0.35
0.35
0.35
2.70
0.38
1.25
1.75
0.67
UND
m2
m2
m2
COLUMNAS
CONCRETO PARA COLUMNAS f'c=210 kg/cm2
COLUMNA C-1
17.00
11.50
35.63
35.63
87.92
87.92
10.62
1.20
16.02
10.00
87.92
6.00
kg
142.80
m3
m2
kg
VIGAS
CONCRETO PARA VIGAS f'c=210 kg/cm2
VP 101 (0.25x0.40)
VP 102 (0.25x0.40)
VS 101 (0.25x0.35)
VS 102 (0.25x0.35)
VS 103 (0.25x0.35)
91.59
m3
TOTAL
100.00
-8.41
m3
m3
PARCIAL
m2
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS f'c=210 kg/cm2
Z-1
ALTO
2.69
43.00
331.32
m3
6.75
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.03
02
02.01
02.01.01
02.02
02.02.01
m2
kg
LOSA ALIGERADA
CONCRETO PARA LOSA ALIGERADA f'c=210 kg/cm2
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A-1:4 x 1.5 CM.
EJE 1 TRAMO EJES A - D
EJE 3 TRAMO EJES A - B
ENTRE EJE 3 Y 4 TRAMO EJES A - B
EJE 4 TRAMO EJES A - D
EJE A TRAMO EJES 1 - 4
EJE B TRAMO EJES 1 - 4
DESCUENTO PUERTAS
P-01
P-02
DESCUENTO VENTANAS
V-01
V-02
V-03
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MUROS INTERIORES CON C:A - 1:5 E=1.5 CM
EJE 1 TRAMO EJES A - D
EJE 3 TRAMO EJES A - B
ENTRE EJE 3 Y 4 TRAMO EJES A - B
EJE 4 TRAMO EJES A - D
EJE A TRAMO EJES 1 - 4
EJE B TRAMO EJES 1 - 4
96.47
2.00
5.00
2.00
2.00
2.00
18.11
3.55
7.15
10.00
3.80
1.05
1.05
0.95
0.95
0.95
38.03
18.64
13.59
19.00
7.22
3.00
3.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
4.00
1.25
4.00
1.25
4.00
1.15
4.00
1.15
4.00
1.15
9.30
62.00
4.10
28.00
7.45
49.00
10.30
68.00
4.10
27.00
1.56
0.56
1.56
0.56
1.02
0.56
1.02
0.56
1.02
0.56
174.10
130.20
25.58
19.60
60.79
63.11
84.05
87.58
33.46
34.78
1.00
-762.69
AREA
0.30
91.56
0.30
0.20
0.15
18.31
-10.30
1.00
AREA
91.56
CANT
1.00
1.00
LONG
10.00
8.50
N VEC
50.00
50.00
ACERO
1.02
1.02
510.00
433.50
1.00
AREA
91.56
8.33
762.69
1.00
1.00
1.00
1.00
1.00
1.00
3.75
3.70
2.84
3.75
8.11
4.55
3.00
3.00
3.00
3.00
3.00
3.00
11.25
11.10
8.52
11.25
24.33
13.65
-1.00
-2.00
0.90
0.70
2.10
2.10
-1.89
-2.94
-1.00
-1.00
-1.00
2.64
2.61
2.83
1.90
0.60
1.90
-5.02
-1.57
-5.38
1.00
2.00
2.00
1.00
1.00
2.00
3.75
3.70
2.84
3.75
8.11
4.55
3.00
3.00
3.00
3.00
3.00
3.00
11.25
22.20
17.04
11.25
24.33
27.30
713.25
m3
8.02
m2
kg
91.56
91.56
943.50
Und
762.69
m2
63.31
m2
36.88
DESCUENTO PUERTAS
P-01
P-02
DESCUENTO VENTANAS
V-01
V-02
V-03
COCINA
SS.HH PUBLICO
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.03
02.03.01
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.07
02.07.01
02.08
02.08.01
02.08.02
02.08.03
02.09
02.09.01
02.09.02
-1.00
-4.00
0.90
0.70
2.10
2.10
-1.89
-5.88
-1.00
-1.00
-1.00
-1.00
-2.00
2.64
2.61
2.83
13.85
11.15
1.90
0.60
1.90
1.20
1.80
-5.02
-1.57
-5.38
-16.62
-40.14
1.00
1.00
1.00
3.75
3.75
8.11
3.00
3.00
3.00
11.25
11.25
24.33
-1.00
0.90
2.10
-1.89
-1.00
-1.00
-1.00
2.64
2.61
2.83
1.90
0.60
1.90
-5.02
-1.57
-5.38
1.00
2.00
13.85
11.15
1.20
1.80
16.62
40.14
0.75
2.80
21.00
18.11
3.55
7.15
10.00
3.80
0.65
0.65
0.55
0.55
0.55
23.54
11.54
7.87
11.00
4.18
0.90
0.70
2.10
2.10
5.10
9.80
2.64
2.61
2.83
1.90
0.60
1.90
9.08
6.42
9.46
2.80
22.40
36.22
7.10
m2
m2
32.98
56.76
58.13
2.00
5.00
2.00
2.00
2.00
CIELORRASOS
CIELORRASO CON MEZCLA C:A .1:5 E=1.5CM
COCINA
COMEDOR
SS.HH PUBLICO
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 mm BASE 3 CM MEZC. 1:5 ACAB 1CM , PASTA 1:2
COCINA
COMEDOR
SS.HH PUBLICO
m2
6.20
AREA
3.36
3.85
51.62
3.70
23.87
51.62
12.43
1.00
1.00
1.00
6.20
AREA
3.36
3.85
51.62
3.70
23.87
51.62
12.43
1.00
1.00
6.20
3.36
3.85
3.70
23.87
12.43
1.00
AREA
51.62
51.62
1.00
2.00
13.85
11.15
1.00
4.50
1.00
2.00
0.90
0.70
2.10
2.10
1.89
2.94
1.00
1.00
1.00
2.90
3.80
3.80
2.60
2.65
2.60
7.54
10.07
9.88
1.00
1.00
1.00
2.64
2.61
2.83
1.90
0.60
1.90
5.02
1.57
5.38
2.00
3.10
1.80
11.16
1.00
2.00
3.00
3.00
87.92
87.92
36.30
51.62
56.76
1.20
1.80
16.62
40.14
ml
4.50
4.50
m2
4.83
m2
m2
m2
1.00
1.00
1.00
m2
CERRAJERIA
BISAGRAS ALUMINIZADAS TIPO CAPUCHINA DE 3 1/2"X 3 1/2"
P-01
P-02
18.11
3.55
m2
PISO DE PORCELANATO 40 x 40 cm
COMEDOR
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELADA SEGUN DISEO
P-01
P-02
65.72
8.00
2.00
2.00
m2
m2
39.86
ml
ZOCALOS Y CONTRAZOCALOS
ZOCALO CON CERAMICO PARA PARED 0.20 X 0.30
COCINA
SS.HH PUBLICO
21.00
27.49
11.96
11.16
pza
und
9.00
3.00
6.00
1.00
02.09.03
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.10.06
02.11
02.11.01
03
03.01
03.01.01
PINTURA
PINTURA EN MUROS INTERIORES C/ LATEX LAVABLE
INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES
SALIDA DE TECHO PARA CENTRO DE LUZ
COMEDOR
COCINA
SS.HH. DAMAS
SS.HH. VARONES
1.00
32.98
32.98
1.00
79.13
79.13
1.00
39.86
39.86
1.00
65.72
65.72
1.00
87.92
87.92
32.98
79.13
39.86
65.72
87.92
1.00
1.00
1.00
6.00
2.00
2.00
2.00
6.00
2.00
2.00
2.00
3.00
3.00
2.00
2.00
6.00
6.00
2.00
2.00
pto
pto
03.01.05
pto
03.05
ARTEFACTOS ELECTRICOS
03.05.01
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA
04
INSTALACIONES SANITARIAS
04.01
SISTEMA DE DESAGUE
04.01.01
APARATOS Y ACCESORIOS SANITARIOS
04.01.01.01
INODORO TANQUE BAJO SIFONT JET
04.01.01.02
LAVATORIO DE PARED DE CERAMICO COLOR BLANCO INCL/ACCESORIO
04.01.01.03
LAVADERO DE ACERO INOXIDABLE INCL/ACCESORIO
04.01.02
DESAGUE Y VENTILACION
04.01.02.01
SALIDA DE DESAGUE DE PVC 2"
04.01.02.02
SALIDA DE DESAGUE DE PVC 4"
04.01.02.03
SALIDA DE VENTILACION EN PVC SAL 2"
04.01.03
REDES DE DISTRIBUCION
04.01.03.01
RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4"
04.01.03.02
RED DE DISTRIBUCION TUBERIA PVC SAP PARA DESAGUE DE 2"
04.01.04
ACCESORIOS
04.01.04.01
CODOS
04.01.04.01.01
CODO PVC SAL 4"x 45
04.01.04.02
YEES
04.01.04.02.01
YEE PVC-SAL DE 2"
04.01.04.02.02
YEE PVC SAL 4"
04.01.04.02.03
YEE PVC-SAL DE 4" A 2"
04.01.05
ADITAMENTOS VARIOS
04.01.05.01
SUMIDERO DE BRONCE 2"
04.01.05.02
REGISTROS DE BRONCE DE 4"
04.01.05.03
SOMBRERO VENTILACION PVC DE 2"
04.01.06
CAMARAS DE INSPECCION
04.01.06.01
CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA
04.02
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
04.02.01
SALIDA PARA AGUA
04.02.01.01
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
04.02.02
REDES DE DISTRIBUCION
04.02.02.01
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
04.02.03
ACCESORIOS
04.02.03.01
CODOS
04.02.03.01.01
CODO PVC-SAP 1/2"
04.02.03.02
TEES
04.02.03.02.01
TEE PVC-SAP 1/2"
04.02.04
LLAVES Y VALVULAS
04.02.04.01
VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2"
04.03
SISTEMA DE AGUA DE LLUVIA
04.03.01
TUBERIA DE BAJADA Y DISTRIBUCION
04.03.01.01
TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 3"
04.03.02
ACCESORIOS
04.03.02.01
CODO PVC-SAL 3" * 90
36.88
glb
03.01.03
36.88
m2
pto
03.04.02
36.88
1.00
ml
pto
TABLEROS Y CUCHILLAS
TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA
2.00
ml
03.04
03.04.01
2.00
m2
03.03
03.03.01
2.00
m2
03.01.02
1.00
m2
03.01.02
03.02
03.02.01
1.00
pza
12.00
3.00
2.00
6.00
2.00
ml
33.00
1.00
33.00
33.00
2.00
3.00
33.00
24.00
66.00
72.00
ml
138.00
und
1.00
1.00
1.00
1.00
1.00
und
12.00
12.00
12.00
und
pza
pza
4.00
4.00
1.00
4.00
4.00
1.00
4.00
4.00
1.00
pto
pto
pto
5.00
5.00
2.00
5.00
5.00
2.00
5.00
5.00
2.00
ml
ml
1.00
1.00
17.50
16.30
17.50
16.30
pza
2.00
2.00
2.00
pza
pza
pza
7.00
3.00
6.00
7.00
3.00
6.00
7.00
3.00
6.00
pza
pza
pza
3.00
3.00
2.00
3.00
3.00
2.00
3.00
3.00
2.00
und
1.00
1.00
1.00
pto
6.00
6.00
6.00
ml
1.00
17.50
17.50
17.50
pza
1.00
4.00
4.00
4.00
pza
1.00
8.00
8.00
8.00
pza
1.00
3.00
3.00
3.00
ml
2.00
3.30
6.60
6.60
pza
2.00
2.00
4.00
4.00
pza
1.00
17.50
16.30
PLANILLA DE METRADOS
PROYECTO:
UBICACIN
FECHA:
FORMULA:
ITEM
01
01.01
01.01.03
DESCRIPCION
ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.02
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
N VEC
LARGO
ANCHO
1.00
19.36
4.03
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00m A 1.90m DE PROFUNDIDAD EN TERRENO
m3 NORMAL
Z-1
10.00
0.80
0.80
1.70
10.88
16.16
6.80
16.16
3.23
3.20
3.23
3.23
3.23
3.23
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
5.17
2.18
5.17
1.03
1.02
1.03
1.03
1.03
1.03
1.25
29.59
36.99
m3
1.25
29.59
36.99
m2
1.00
1.00
9.70
5.10
3.70
3.70
35.89
18.87
m2
1.00
1.00
9.70
5.10
3.70
3.70
35.89
18.87
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.86
6.80
17.86
3.53
3.53
3.53
3.53
3.53
3.53
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
4.29
1.63
4.29
0.85
0.85
0.85
0.85
0.85
0.85
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13.86
5.90
13.86
3.53
3.53
3.53
3.53
3.53
3.53
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.62
0.27
0.62
0.16
0.16
0.16
0.16
0.16
0.16
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
13.86
5.90
13.86
3.53
3.53
3.53
3.53
3.53
3.53
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
1.25
0.53
1.25
0.32
0.32
0.32
0.32
0.32
0.32
10.00
0.80
0.80
6.40
1.00
1.00
9.70
5.10
3.70
3.70
35.89
18.87
10.00
0.80
0.80
0.60
3.84
10.00
0.80
10.00
1.02
81.60
10.00
0.25
0.25
4.30
2.69
10.00
1.00
4.30
43.00
10.00
4.00
1.02
187.68
UND
m2
m2
m2
COLUMNAS
CONCRETO PARA COLUMNAS f'c=210 kg/cm2
COLUMNA C-1
78.02
10.88
18.71
36.99
36.99
54.76
54.76
15.29
2.47
4.93
6.40
54.76
m3
3.84
kg
81.60
m3
m2
kg
TOTAL
78.02
m3
m3
PARCIAL
m2
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS f'c=210 kg/cm2
Z-1
ALTO
2.69
43.00
331.32
4.60
ESTRIBOS
10.00
0.95
27.00
0.56
143.64
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.03
02
02.01
02.01.01
02.02
02.02.01
VIGAS
CONCRETO PARA VIGAS f'c=210 kg/cm2
VP 101 (0.25x0.40)
VS 101 (0.25x0.35)
m3
m2
kg
LOSA ALIGERADA
CONCRETO PARA LOSA ALIGERADA f'c=210 kg/cm2
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A-1:4 x 1.5 CM.
EJE 1 TRAMO EJES A - E
ENTRE EJE 1 Y EJE 2 TRAMO EJES A - C
EJE 2 TRAMO EJES A - E
EJE A TRAMO EJES 1 - 2
ENTRE EJE A Y EJE B TRAMO EJES 1 - 2
EJE B TRAMO EJES 1 - 2
EJE C TRAMO EJES 1 - 2
EJE D TRAMO EJES 1 - 2
EJE E TRAMO EJES 1 - 2
PARAPETO
EJE 1 TRAMO EJES A - E
EJE 2 TRAMO EJES A - E
EJE A TRAMO EJES 1 - 2
EJE E TRAMO EJES 1 - 2
DESCUENTO PUERTAS
P-01
P-02
DESCUENTO VENTANAS
V-01
V-02
V-03
V-04
V-05
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MUROS INTERIORES CON C:A - 1:5 E=1.5 CM
EJE 1 TRAMO EJES A - E
ENTRE EJE 1 Y EJE 2 TRAMO EJES A - C
EJE 2 TRAMO EJES A - E
EJE A TRAMO EJES 1 - 2
ENTRE EJE A Y EJE B TRAMO EJES 1 - 2
EJE B TRAMO EJES 1 - 2
EJE C TRAMO EJES 1 - 2
EJE D TRAMO EJES 1 - 2
EJE E TRAMO EJES 1 - 2
DESCUENTO PUERTAS
P-01
P-02
DESCUENTO VENTANAS
V-01
V-02
V-03
V-04
V-05
SS.HH GUARDIANIA
SS.HH PUBLICO
5.18
2.00
5.00
18.11
3.55
2.00
5.00
18.11
3.55
2.00
2.00
5.00
5.00
4.00
1.25
4.00
1.15
1.00
-535.54
0.25
0.25
0.40
0.35
3.62
1.55
1.05
0.95
38.03
16.86
18.41
120.00
3.85
23.00
1.56
0.56
1.02
0.56
229.76
168.00
78.54
74.06
18.11
0.30
3.55
0.30
0.20
0.15
12.86
-7.23
1.00
18.11
3.55
CANT
1.00
1.00
LONG
19.56
4.25
N VEC
21.00
98.00
ACERO
1.02
1.02
418.98
424.83
1.00
18.11
3.55
8.33
535.54
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13.86
5.90
13.86
3.53
3.53
3.53
3.53
3.53
3.53
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
38.81
16.52
38.81
9.88
9.88
9.88
9.88
9.88
9.88
1.00
1.00
1.00
1.00
13.86
13.86
3.53
3.53
0.30
0.30
0.30
0.30
4.16
4.16
1.06
1.06
-2.00
-3.00
0.90
1.60
2.10
2.10
-3.78
-10.08
-1.00
-1.00
-1.00
-1.00
-2.00
3.63
1.82
2.25
0.90
1.30
1.90
1.90
1.90
0.60
0.60
-6.90
-3.46
-4.28
-0.54
-1.56
1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
13.86
5.90
13.86
3.53
3.53
3.53
3.53
3.53
3.53
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
38.81
33.04
38.81
9.88
19.77
19.77
19.77
19.77
9.88
-3.00
-3.00
0.90
1.60
2.10
2.10
-5.67
-10.08
-1.00
-1.00
-1.00
-1.00
-2.00
-1.00
-2.00
3.63
1.82
2.25
0.90
1.30
6.30
11.15
1.90
1.90
1.90
0.60
0.60
1.80
1.80
-6.90
-3.46
-4.28
-0.54
-1.56
-11.34
-40.14
54.89
550.36
m3
5.63
m2
kg
64.29
64.29
843.81
Und
535.54
m2
133.28
m2
125.54
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.03
02.03.01
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.07
02.07.01
02.08
02.08.01
02.08.05
02.09
02.09.01
m2
m2
89.55
1.00
1.00
1.00
1.00
13.86
13.86
3.53
3.53
2.80
2.80
2.80
2.80
38.81
38.81
9.88
9.88
2.00
2.00
2.00
2.00
13.86
13.86
3.53
3.53
0.30
0.30
0.30
0.30
8.32
8.32
2.12
2.12
-1.00
-3.00
0.90
1.60
2.10
2.10
-1.89
-10.08
-1.00
-1.00
-1.00
-1.00
-2.00
3.63
1.82
2.25
0.90
1.30
1.90
1.90
1.90
0.60
0.60
-6.90
-3.46
-4.28
-0.54
-1.56
1.00
2.00
6.30
11.15
1.80
1.80
11.34
40.14
0.75
2.80
21.00
18.11
3.55
0.65
0.55
23.54
9.76
0.90
0.70
1.60
2.10
2.10
2.10
20.40
4.90
17.40
3.63
1.82
2.25
0.90
1.30
1.90
1.90
1.90
0.60
0.60
11.06
7.44
8.30
3.00
7.60
2.80
56.00
72.44
28.40
51.48
33.31
2.00
5.00
CIELORRASOS
CIELORRASO CON MEZCLA C:A .1:5 E=1.5CM
GUARDIANIA Y SSHH
DULCERIA
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 mm BASE 3 CM MEZC. 1:5 ACAB 1CM , PASTA 1:2
GUARDIANIA Y SSHH
DULCERIA
m2
CERRAJERIA
BISAGRAS ALUMINIZADAS TIPO CAPUCHINA DE 3 1/2"X 3 1/2"
P-01
P-02
18.11
3.55
1.00
1.00
9.70
5.10
3.70
3.70
35.89
18.87
1.00
1.00
9.70
5.10
3.70
3.70
35.89
18.87
1.00
2.00
2.40
AREA
1.20
6.65
2.88
13.30
1.00
1.00
1.00
2.80
2.40
5.10
3.72
2.38
3.70
10.42
5.71
18.87
1.00
2.00
6.30
11.15
1.00
1.00
1.00
11.24
7.96
12.80
4.00
1.00
3.00
0.90
0.70
1.60
2.10
2.10
2.10
7.56
1.47
10.08
1.00
1.00
1.00
1.00
2.00
3.63
1.82
2.25
0.90
1.30
1.90
1.90
1.90
0.60
0.60
6.90
3.46
4.28
0.54
1.56
2.00
3.10
1.80
11.16
4.00
1.00
3.00
3.00
54.76
m2
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELADA SEGUN DISEO
P-01
P-02
P-03
156.84
20.00
4.00
8.00
m2
m2
80.10
ml
ZOCALOS Y CONTRAZOCALOS
ZOCALO CON CERAMICO PARA PARED 0.20 X 0.30
SS.HH GUARDIANIA
SS.HH PUBLICO
21.00
54.76
16.18
35.00
m2
51.48
1.80
1.80
11.34
40.14
ml
32.00
11.24
7.96
12.80
m2
19.11
m2
16.73
m2
11.16
pza
24.00
12.00
3.00
P-03
02.09.02
02.09.03
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.10.06
02.11
02.11.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.03
03.03.01
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.05.02
03.06
03.06.01
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.03
04.01.03.01
04.01.03.02
04.01.04
04.01.04.01
04.01.04.01.01
04.01.04.02
04.01.04.02.01
04.01.04.02.02
04.01.04.02.03
04.01.05
04.01.05.01
04.01.05.02
04.01.05.03
04.01.06
04.01.06.01
04.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.03
04.02.03.01
04.02.03.01.01
04.02.03.02
04.02.03.02.01
PINTURA
PINTURA EN MUROS INTERIORES C/ LATEX LAVABLE
INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES
SALIDA DE TECHO PARA CENTRO DE LUZ
GUARDIANIA
DORMITORIO
SS.HH. GUARDIANIA
SS.HH. DAMAS
SS.HH. VARONES
DULCERIA
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA DE PARED PARA TOMACORRIENTE BIPOLARES
CANALIZACION Y/O TUBERIA
TUBERIA DIAMETRO 3/4" PVC SEL
GUARDIANIA
CONDUCTORES Y/O CABLES
CONDUCTOR TW 2.5MM2
TABLEROS Y CUCHILLAS
TABLERO DE GENERAL DE ENERGIA ELECTRICA
TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A
EN ACCESO
ARTEFACTOS ELECTRICOS
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA
SPOT LIGHT
EN ACCESO
PUESTA A TIERRA
POZO A TIERRA
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO SIFONT JET
LAVATORIO DE PARED DE CERAMICO COLOR BLANCO INCL/ACCESORIO
DESAGUE Y VENTILACION
SALIDA DE DESAGUE DE PVC 2"
SALIDA DE DESAGUE DE PVC 4"
SALIDA DE VENTILACION EN PVC SAL 2"
REDES DE DISTRIBUCION
RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4"
RED DE DISTRIBUCION TUBERIA PVC SAP PARA DESAGUE DE 2"
ACCESORIOS
CODOS
CODO PVC SAL 4"x 45
YEES
YEE PVC-SAL DE 2"
YEE PVC SAL 4"
YEE PVC-SAL DE 4" A 2"
ADITAMENTOS VARIOS
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO VENTILACION PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
SALIDA PARA AGUA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
ACCESORIOS
CODOS
CODO PVC-SAP 1/2"
TEES
TEE PVC-SAP 1/2"
3.00
3.00
9.00
und
6.00
6.00
6.00
2.00
2.00
pza
2.00
m2
125.54
1.00
125.54
125.54
1.00
89.55
89.55
1.00
54.31
54.31
1.00
80.10
80.10
1.00
156.84
156.84
1.00
54.76
54.76
m2
89.55
m2
54.31
ml
80.10
ml
156.84
m2
54.76
glb
1.00
1.00
1.00
2.00
1.00
1.00
2.00
2.00
4.00
2.00
1.00
1.00
2.00
2.00
4.00
11.00
11.00
6.00
6.00
pto
12.00
pto
11.00
pto
6.00
ml
33.00
1.00
33.00
33.00
2.00
3.00
33.00
24.00
66.00
72.00
ml
138.00
und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
11.00
11.00
und
1.00
pza
und
und
1.00
11.00
1.00
1.00
1.00
und
1.00
1.00
1.00
und
pza
5.00
5.00
5.00
5.00
5.00
5.00
pto
pto
pto
5.00
5.00
2.00
5.00
5.00
2.00
5.00
5.00
2.00
ml
ml
1.00
1.00
17.50
16.30
17.50
16.30
pza
2.00
2.00
2.00
pza
pza
pza
7.00
3.00
6.00
7.00
3.00
6.00
7.00
3.00
6.00
pza
pza
pza
3.00
3.00
2.00
3.00
3.00
2.00
3.00
3.00
2.00
und
1.00
1.00
1.00
pto
6.00
6.00
6.00
ml
1.00
17.50
17.50
17.50
pza
1.00
4.00
4.00
4.00
pza
1.00
8.00
8.00
8.00
17.50
16.30
04.02.04
04.02.04.01
04.03
04.03.01
04.03.01.01
04.03.02
04.03.02.01
LLAVES Y VALVULAS
VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2"
SISTEMA DE AGUA DE LLUVIA
TUBERIA DE BAJADA Y DISTRIBUCION
TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 3"
ACCESORIOS
CODO PVC-SAL 3" * 90
pza
1.00
3.00
3.00
3.00
ml
2.00
3.30
6.60
6.60
pza
2.00
2.00
4.00
4.00
PLANILLA DE METRADOS
PROYECTO:
UBICACIN
FECHA:
FORMULA:
ITEM
01
01.01
01.01.03
DESCRIPCION
ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.02
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
N VEC
LARGO
ANCHO
1.00
13.70
9.25
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00m A 1.90m DE PROFUNDIDAD EN TERRENO
m3 NORMAL
Z-1
12.00
1.00
1.00
1.70
20.40
5.00
5.00
3.05
5.00
5.00
10.44
10.44
5.65
10.44
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
1.60
1.60
0.98
1.60
1.60
3.34
3.34
1.81
3.34
1.25
39.61
49.51
m3
1.25
39.61
49.51
m2
2.00
2.00
2.00
3.87
3.87
2.60
3.90
2.90
2.90
30.19
22.45
15.08
m2
2.00
2.00
2.00
3.87
3.87
2.60
3.90
2.90
2.90
30.19
22.45
15.08
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.50
6.50
3.05
6.50
6.50
13.00
13.00
4.25
13.00
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.56
1.56
0.73
1.56
1.56
3.12
3.12
1.02
3.12
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.50
4.80
3.05
4.80
6.50
7.35
11.20
5.65
13.00
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.29
0.22
0.14
0.22
0.29
0.33
0.50
0.25
0.59
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
6.50
4.80
3.05
4.80
6.50
7.35
11.20
5.65
13.00
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.59
0.43
0.27
0.43
0.59
0.66
1.01
0.51
1.17
12.00
1.00
1.00
12.00
2.00
2.00
2.00
3.87
3.87
2.60
3.90
2.90
2.90
30.19
22.45
15.08
12.00
1.00
1.00
0.60
7.20
12.00
1.00
14.00
1.02
171.36
12.00
0.25
0.25
7.10
5.33
12.00
1.00
7.10
85.20
UND
m2
m2
m2
COLUMNAS
CONCRETO PARA COLUMNAS f'c=210 kg/cm2
COLUMNA C-1
ENCOFRADO Y DESENCOFRADO DE COLUMNAS
COLUMNA C-1
TOTAL
126.73
126.73
20.40
19.21
49.51
49.51
67.71
67.71
m3
m3
PARCIAL
m2
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS f'c=210 kg/cm2
Z-1
ALTO
17.35
2.83
5.66
12.00
67.71
m3
7.20
kg
171.36
m3
5.33
m2
85.20
01.04.02.03
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
kg
m2
kg
DESCANSO
TRAMO 02
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.05.03
02
02.01
02.01.01
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A-1:4 x 1.5 CM.
PRIMER NIVEL
EJE 1 TRAMO EJES A - C
EJE 2 TRAMO EJES A - C
ENTRE EJE 2 Y EJE 3 TRAMO EJES B - C
EJE 3 TRAMO EJES A - C
EJE 4 TRAMO EJES A - C
EJE A TRAMO EJES 1 - 4
EJE B TRAMO EJES 1 - 4
ENTRE EJE B Y EJE C TRAMO EJES 2 - 3
EJE C TRAMO EJES 1 - 4
SEGUNDO NIVEL
EJE 1 TRAMO EJES VOLAD - C
ENTRE EJE 1 Y EJE 2 TRAMO EJES A - B
EJE 2 TRAMO EJES A - C
EJE 4 TRAMO EJES A - C
VOLADO TRAMO EJES 1 - 4
EJE A TRAMO EJES 1 - 4
ENTRE EJE A Y B TRAMO EJES 1 - 2
EJE B TRAMO EJES 1 - 2
EJE C TRAMO EJES 1 - 4
DESCUENTO PUERTAS
P-01
P-02
DESCUENTO VENTANAS
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
1.02
0.56
362.30
300.05
1.00
7.00
6.00
6.50
8.50
13.00
0.25
0.25
0.25
0.40
0.40
0.35
0.65
5.95
6.83
1.00
7.00
6.00
6.50
8.50
13.00
1.05
1.05
0.95
6.83
62.48
74.10
1.00
1.00
7.00
7.00
6.00
6.00
4.00
1.25
4.00
1.25
4.00
1.15
6.80
45.00
8.80
58.00
13.30
88.00
1.56
0.56
1.56
0.56
1.02
0.56
42.43
31.50
384.38
284.20
325.58
340.03
1.00
16.00
1.00
1.00
16.00
1.00
1.00
0.25
2.00
2.00
0.25
2.00
0.50
0.50
1.00
1.00
0.50
1.00
0.60
0.18
0.10
0.10
0.18
0.10
0.30
0.35
0.20
0.20
0.35
0.20
12.78
143.40
1,334.20
1.60
m2
TRAMO 01
01.04.04.03
7.40
47.00
m3
DESCANSO
TRAMO 02
01.04.04.02
4.00
0.95
m3
ESCALERA
CONCRETO PARA ESCALERA f'c=210 kg/cm2
CIMIENTO
TRAMO 01
662.35
12.00
12.00
7.40
32.00
1.00
1.00
32.00
1.00
0.25
2.00
2.00
0.25
2.00
0.50
1.00
1.00
0.50
1.00
0.18
1.00
1.60
70.00
1.00
1.00
-1.00
-2,111.24
13.70
13.70
4.50
0.30
9.25
9.25
2.00
0.30
1.00
1.00
-1.00
1.00
13.70
13.70
4.50
17.70
9.25
9.25
2.00
CANT
2.00
2.00
LONG
13.70
9.25
N VEC
46.00
68.00
ACERO
1.02
1.02
1,285.61
1,283.16
2.00
13.70
9.25
8.33
2,111.24
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.50
4.80
3.05
4.80
6.50
7.35
11.20
5.65
13.00
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
18.20
13.44
8.54
13.44
18.20
20.58
31.36
15.82
36.40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
8.50
1.05
5.60
6.50
3.92
5.77
3.77
1.86
13.00
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
23.80
2.94
15.68
18.20
10.98
16.16
10.56
5.21
36.40
-1.00
-1.00
0.90
0.70
2.10
2.10
-1.89
-1.47
-4.00
-2.00
-2.00
-2.00
-2.00
-1.00
-2.00
-1.00
-1.00
-1.00
-1.00
1.50
2.56
3.67
2.60
2.00
2.80
2.70
3.35
3.67
2.60
1.05
0.60
0.60
0.60
0.60
1.90
1.90
1.90
1.90
1.90
1.90
0.60
-3.60
-3.07
-4.40
-3.12
-7.60
-5.32
-10.26
-6.37
-6.97
-4.94
-0.63
0.18
0.70
2.00
2.00
0.70
2.00
kg
112.00
112.00
m3
20.39
0.20
0.20
0.20
0.15
25.35
25.35
-1.80
-28.50
0.20
126.73
126.73
-9.00
3.54
m2
kg
247.99
2,568.77
Und
2,111.24
m2
256.25
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
m2
m2
m2
229.30
1.00
2.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
6.50
4.80
3.05
4.80
6.50
7.35
11.20
5.65
13.00
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
18.20
26.88
17.08
26.88
18.20
20.58
62.72
31.64
36.40
1.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
1.00
8.50
1.05
5.60
6.50
3.92
5.77
3.77
1.86
13.00
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
23.80
5.88
31.36
18.20
10.98
16.16
21.11
10.42
36.40
-2.00
-2.00
0.90
0.70
2.10
2.10
-3.78
-2.94
-4.00
-2.00
-2.00
-2.00
-2.00
-1.00
-2.00
-1.00
-1.00
-1.00
-1.00
-2.00
-2.00
-2.00
-1.00
1.50
2.56
3.67
2.60
2.00
2.80
2.70
3.35
3.67
2.60
1.05
perim
perim
perim
perim
0.60
0.60
0.60
0.60
1.90
1.90
1.90
1.90
1.90
1.90
0.60
1.80
1.80
1.80
1.80
-3.60
-3.07
-4.40
-3.12
-7.60
-5.32
-10.26
-6.37
-6.97
-4.94
-0.63
-56.16
-45.86
-29.52
-9.04
1.00
1.00
1.00
1.00
6.50
6.50
7.35
13.00
2.80
2.80
2.80
2.80
18.20
18.20
20.58
36.40
1.00
1.00
1.00
1.00
1.00
8.50
6.50
3.92
5.77
13.00
2.80
2.80
2.80
2.80
2.80
23.80
18.20
10.98
16.16
36.40
-4.00
-2.00
-2.00
-2.00
-2.00
-1.00
-2.00
-1.00
-1.00
-1.00
-1.00
1.50
2.56
3.67
2.60
2.00
2.80
2.70
3.35
3.67
2.60
1.05
0.60
0.60
0.60
0.60
1.90
1.90
1.90
1.90
1.90
1.90
0.60
-3.60
-3.07
-4.40
-3.12
-7.60
-5.32
-10.26
-6.37
-6.97
-4.94
-0.63
2.00
2.00
2.00
1.00
perim
perim
perim
perim
1.80
1.80
1.80
1.80
56.16
45.86
29.52
9.04
0.75
2.80
25.20
6.50
8.50
13.00
0.65
0.65
0.55
4.23
16.58
21.45
15.60
12.74
8.20
5.02
142.63
140.58
15.60
12.74
8.20
5.02
25.20
42.25
196.63
0.90
0.70
2.10
2.10
30.60
4.90
3.25
1.85
3.67
2.60
2.65
2.60
8.45
7.15
8.87
1.50
2.56
3.67
2.60
2.00
2.80
2.70
3.35
3.67
2.60
1.05
0.60
0.60
0.60
0.60
1.90
1.90
1.90
1.90
1.90
1.90
0.60
16.80
12.64
17.08
12.80
15.60
9.40
18.40
10.50
11.14
9.00
3.30
02.02.07
02.03
02.03.01
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
BRUAS DE 1"
CIELORRASOS
CIELORRASO CON MEZCLA C:A .1:5 E=1.5CM
PRIMER NIVEL
SEGUNDO NIVEL
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 mm BASE 3 CM MEZC. 1:5 ACAB 1CM , PASTA 1:2
SS.HH
VESTUARIOS
DUCHAS
HALL
SECRETARIA Y ESPERA
SS.HH ADMINISTRACION
ADMINISTRACION
SALA DE REUNIONES
PISO DE CERAMICO ANTIDESLIZANTE 30 x 30 CM
SS.HH
VESTUARIOS
DUCHAS
SS.HH ADMINISTRACION
PISO DE PORCELANATO 40 x 40 cm
HALL
SECRETARIA Y ESPERA
ADMINISTRACION
SALA DE REUNIONES
ZOCALOS Y CONTRAZOCALOS
ZOCALO CON CERAMICO PARA PARED 0.20 X 0.30
SS.HH
VESTUARIOS
DUCHAS
SS.HH ADMINISTRACION
CONTRAZOCALO DE CERAMICO H=15CM
HALL
SECRETARIA Y ESPERA
ADMINISTRACION
SALA DE REUNIONES
ml
214.80
14.00
2.00
6.00
6.00
2.00
6.50
8.50
13.00
2.60
72.80
13.00
51.00
78.00
1.00
1.00
-1.00
13.70
13.70
4.50
9.25
9.25
2.00
126.73
126.73
-9.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
3.87
3.87
2.60
2.00
4.70
1.05
AREA
6.93
3.90
2.90
2.90
5.45
3.92
1.80
13.12
9.48
30.19
22.45
15.08
10.90
18.42
1.89
13.12
65.70
2.00
2.00
2.00
1.00
3.87
3.87
2.60
1.05
3.90
2.90
2.90
1.80
30.19
22.45
15.08
1.89
1.00
1.00
1.00
1.00
2.00
4.70
AREA
6.93
5.45
3.92
13.12
9.48
10.90
18.42
13.12
65.70
2.00
2.00
2.00
1.00
perim
perim
perim
perim
15.60
12.74
8.20
5.02
1.00
1.00
1.00
1.00
1.00
2.00
PERIM
PERIM
5.45
3.92
11.32
30.20
m2
244.45
m2
177.74
m2
69.60
m2
108.14
m2
140.58
1.80
1.80
1.80
1.80
56.16
45.86
29.52
9.04
ml
54.81
5.45
7.84
11.32
30.20
02.07
02.07.01
02.08
02.08.01
02.08.02
02.08.03
02.09
02.09.01
02.09.02
02.09.03
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.10.06
02.11
02.11.01
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELADA SEGUN DISEO
P-01
P-02
CARPINTERIA METALICA Y HERRERIA
MAMPARA DE ALUMINIO SEGUN DISEO
M-01
M-02
M-03
VENTANA DE ALUMINIO SEGUN DISEO
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
DIVISIONES METALICAS EN SS.HH. SEGN DISEO INCLUYE INST.
CERRAJERIA
BISAGRAS ALUMINIZADAS TIPO CAPUCHINA DE 3 1/2"X 3 1/2"
P-01
P-02
CHAPA DE PARCHE 3 GOLPES
PINTURA
PINTURA EN MUROS INTERIORES C/ LATEX LAVABLE
m2
12.81
6.00
1.00
0.90
0.70
2.10
2.10
11.34
1.47
1.00
1.00
1.00
3.25
1.85
3.67
2.60
2.65
2.60
8.45
4.90
9.54
4.00
2.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.50
2.56
3.67
2.60
2.00
2.80
2.70
3.35
3.67
2.60
1.05
0.60
0.60
0.60
0.60
1.90
1.90
1.90
1.90
1.90
1.90
0.60
3.60
3.07
4.40
3.12
7.60
5.32
10.26
6.37
6.97
4.94
0.63
2.00
4.00
7.31
0.90
1.80
1.80
26.32
6.48
6.00
1.00
3.00
3.00
m2
22.89
m2
29.17
m2
32.80
pza
21.00
und
4.00
4.00
4.00
1.00
1.00
pza
1.00
m2
229.30
1.00
229.30
229.30
1.00
142.63
142.63
1.00
67.45
67.45
1.00
196.63
196.63
1.00
214.80
214.80
1.00
244.45
244.45
m2
142.63
m2
67.45
ml
196.63
ml
214.80
m2
244.45
glb
1.00
1.00
03
03.01
03.01.01
03.01.02
INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES
SALIDA DE TECHO PARA CENTRO DE LUZ
SS.HH
VESTUARIOS
DUCHAS
HALL
SECRETARIA Y ESPERA
SS.HH ADMINISTRACION
ADMINISTRACION
SALA DE REUNIONES
SALIDA PARA INTERRUPTOR SIMPLE
03.01.03
pto
03.01.05
pto
03.04
03.04.01
TABLEROS Y CUCHILLAS
TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA
03.04.02
03.05
03.05.01
03.05.02
03.06
03.06.01
2.00
2.00
2.00
3.00
2.00
1.00
2.00
4.00
4.00
4.00
4.00
6.00
2.00
1.00
2.00
4.00
pto
pto
03.03
03.03.01
27.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
pto
03.01.02
03.02
03.02.01
18.00
3.00
15.00
15.00
15.00
2.00
2.00
2.00
13.00
13.00
13.00
12.00
12.00
12.00
ml
92.00
2.00
46.00
92.00
2.00
3.00
92.00
48.00
184.00
144.00
ml
328.00
und
1.00
1.00
1.00
1.00
1.00
21.00
21.00
6.00
6.00
1.00
1.00
pza
und
und
und
1.00
21.00
6.00
1.00
04
INSTALACIONES SANITARIAS
04.01
SISTEMA DE DESAGUE
04.01.01
APARATOS Y ACCESORIOS SANITARIOS
04.01.01.01
INODORO TANQUE BAJO SIFONT JET
04.01.01.02
LAVATORIO DE PARED DE CERAMICO COLOR BLANCO INCL/ACCESORIO
04.01.02
DESAGUE Y VENTILACION
04.01.02.01
SALIDA DE DESAGUE DE PVC 2"
04.01.02.02
SALIDA DE DESAGUE DE PVC 4"
04.01.02.03
SALIDA DE VENTILACION EN PVC SAL 2"
04.01.03
REDES DE DISTRIBUCION
04.01.03.01
RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4"
04.01.03.02
RED DE DISTRIBUCION TUBERIA PVC SAP PARA DESAGUE DE 2"
04.01.04
ACCESORIOS
04.01.04.01
CODOS
04.01.04.01.01
CODO PVC SAL 4"x 45
04.01.04.02
YEES
04.01.04.02.01
YEE PVC-SAL DE 2"
04.01.04.02.02
YEE PVC SAL 4"
04.01.04.02.03
YEE PVC-SAL DE 4" A 2"
04.01.05
ADITAMENTOS VARIOS
04.01.05.01
SUMIDERO DE BRONCE 2"
04.01.05.02
REGISTROS DE BRONCE DE 4"
04.01.05.03
SOMBRERO VENTILACION PVC DE 2"
04.01.06
CAMARAS DE INSPECCION
04.01.06.01
CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA
04.02
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
04.02.01
SALIDA PARA AGUA
04.02.01.01
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
04.02.02
REDES DE DISTRIBUCION
04.02.02.01
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
04.02.03
ACCESORIOS
04.02.03.01
CODOS
04.02.03.01.01
CODO PVC-SAP 1/2"
04.02.03.02
TEES
04.02.03.02.01
TEE PVC-SAP 1/2"
04.02.04
LLAVES Y VALVULAS
04.02.04.01
VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2"
04.03
SISTEMA DE AGUA DE LLUVIA
04.03.01
TUBERIA DE BAJADA Y DISTRIBUCION
04.03.01.01
TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 3"
04.03.02
ACCESORIOS
04.03.02.01
CODO PVC-SAL 3" * 90
und
pza
9.00
7.00
9.00
7.00
9.00
7.00
pto
pto
pto
7.00
9.00
2.00
7.00
9.00
2.00
7.00
9.00
2.00
ml
ml
2.00
2.00
35.00
32.60
35.00
32.60
pza
8.00
8.00
8.00
pza
pza
pza
7.00
3.00
6.00
7.00
3.00
6.00
7.00
3.00
6.00
pza
pza
pza
15.00
5.00
2.00
15.00
5.00
2.00
15.00
5.00
2.00
und
1.00
1.00
1.00
pto
24.00
24.00
24.00
ml
2.00
17.50
35.00
35.00
pza
2.00
4.00
8.00
8.00
pza
2.00
8.00
16.00
16.00
pza
7.00
3.00
21.00
21.00
ml
4.00
3.30
13.20
13.20
pza
2.00
4.00
8.00
8.00
17.50
16.30