Documentos de Académico
Documentos de Profesional
Documentos de Cultura
4/6/2013
AutoEdge
Step No SAP Role AutoEdg e Process No. 233 Process Activity Pre-Requisite Data Work step SAP Transaction
Production Planner
Production Planning
Planner received a notification that KANBAN Bin in Wait Status He analyze the situation in system Check the stock available Decide the further actions for stock replenishment
MD04
Production planner
233
Set the container status to Empty for required material Expected Result Setting an available kanban to EMPTY creates a requirement (Schedule Line)
PK13N
Production planner
233
Production Planner
232
Replenishment has been triggered through KANBAN board Goods have been received
Display and confirmation of requirement generated (Schedule line) for the material by action of setting Kanban Empty Goods have been received now stock needs to updated Click the kanban that has been previously set to EMPTY
4/6/2013
MD04
PK13N
AutoEdge
Step No SAP Role AutoEdg e Process No. Process Activity Pre-Requisite Data Work step SAP Transaction
Choose To FULL. Refresh the KANBAN Board. Note that the status has changed to FULL Expected Result System should update the stock in back ground Display stock overview. Stock is updated in system.
Production Planner
233
Stock Overview
MMBE
4/6/2013