x 5.75
x 5.75
element
element
Swell Packer Predictor
Swell Packer Predictor
Typical Bakken Frac Design
Typical Bakken Frac Design
1.8 Million lbs proppant
600,000 lbs 100 mesh
1,200,000 lbs 20/40 sand
18,000 barrels fluid
30-40 BPM
Continuous 10-12 hrs. pumping
"Hybrid" Frac design
8 stage frac
8 stage frac
3/14/2008
10:00 12:00 14:00 16:00 18:00
3/14/2008
20:00
Time
0
2000
4000
6000
8000
10000
12000
A
0
10
20
30
40
50
B
0
2
4
6
8
10
12
14
16
18
20
C
Treating Pressure (psi)
Calc'd Bottomhole Pr (psi)
Slurry Rate (bpm)
Slurry Proppant Conc (lb/gal)
Bottomhole Proppant Conc (lb/gal)
Hydrostatic Pressure (psi)
A
A
B
C
C
D
11
10
9
8 7 6 5 4
3
2
1
1
Two Frac stages
Two Frac stages
with varying treating Pressures
with varying treating Pressures
12/4/2007
18:40 19:00 19:20 19:40 20:00
12/4/2007
20:20
Time
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
A
0
10
20
30
40
50
B
0
5
10
15
20
25
30
C
Treating Pressure (psi) Calc'd Bottomhole Pr (psi)
Slurry Rate (bpm) Slurry Proppant Conc (lb/gal)
Bottomhole Proppant Conc (lb/gal)
A A
B C
C
16 16
Wellbore Diagram
Wellbore Diagram
80'' 16" Conductor
13-1/2" Hole
2,000' Surface:
9-5/8" 36# J55 LTC
8 3/4" Hole
Est. TOC 1,000' above Dakota Silt
2-7/8" production tubing to KOP
build rate 11/100 ft.
PRODUCTION CASING: TD @ 20,000' MD
7" 29# N-80 LTC 10,300' TVD
17 17
Surface Hole
Surface Hole
13
13
hole
hole
-
-
50
50
2,000
2,000
9
9
-
-
5/8
5/8
36# J
36# J
-
-
55 STC
55 STC
Problems
Problems
- - Lost Returns Lost Returns
Drill blind if possible Drill blind if possible
Cement if needed Cement if needed
18 18
Vertical Section
Vertical Section
OBM in 8
OBM in 8
hole
hole
MW 9.6 to 9.8
MW 9.6 to 9.8
Unmanned MWD for surveys
Unmanned MWD for surveys
Dakota Silt
Dakota Silt
Salts
Salts
- - Dunham, Pine, Opeche, Charles Dunham, Pine, Opeche, Charles
Nitrogen kicks
Nitrogen kicks
-
-
Minnekahta
Minnekahta
Lost Circ
Lost Circ
-
-
Mission Canyon
Mission Canyon
H
H
2 2
S
S
-
-
(Bakken is Sweet)
(Bakken is Sweet)
19 19
Directional Plan
Directional Plan
20 20
Build Section
Build Section
11
11
/100
/100
build rate
build rate
2.38
2.38
fixed motor
fixed motor
PDC bit
PDC bit
Raise MW to 10.1+
Raise MW to 10.1+
Casing Point must cross hard line
Casing Point must cross hard line
21 21
7
7
Casing
Casing
7
7
29# L
29# L
-
-
80 LTC
80 LTC
7
7
32# HCL
32# HCL
-
-
80 LTC
80 LTC
-
-
200
200
above salt
above salt
Top of lead cement
Top of lead cement
-
-
1,000
1,000
above
above
Dakota
Dakota
22 22
Why Underbalanced Drilling?
Why Underbalanced Drilling?
Not an issue until you hit a fracture
Not an issue until you hit a fracture
Pore Pressure
Pore Pressure
-
-
West Side
West Side
12.5 lb/gal
12.5 lb/gal
-
-
East Side
East Side
14.0 lb/gal
14.0 lb/gal
Ballooning?
Ballooning?
-
-
Lost circ
Lost circ
vs
vs
Flow
Flow
23 23
Underbalanced Drilling
Underbalanced Drilling
Rotating head rated to 2,500 psi.
Rotating head rated to 2,500 psi.
Hold 500 psi on annulus
Hold 500 psi on annulus
Drill w/5
Drill w/5
-
-
30
30
flare
flare
Trip w/800 psi to casing shoe
Trip w/800 psi to casing shoe
Spot Kill mud in casing
Spot Kill mud in casing
11 11 5000 psi 5000 psi
rotating head & BOP system rotating head & BOP system
7 casing rams
Blind Rams
Variable pipe rams
Annular
Rotating
head
Ground level
23
59
83
116
140
188
285
269
Table level
Casing bowl & head
30 Ft
Spacer spool
Mud cross drilling choke
Mud cross Choke & kill lines
7 orbit valve
91
Well press gauges
Pioneer rig 66
318
263
247
180
Speed spool
25 25
Drill Lateral
Drill Lateral
6
6
bent motor
bent motor
Max dogleg 5.0
Max dogleg 5.0
/100 ft
/100 ft
4
4
16,000
16,000
Max Torque
Max Torque
20,000 ft/lbs
20,000 ft/lbs
Lube sweeps
Lube sweeps
-
-
various brands
various brands
Agitator / shock sub
Agitator / shock sub
Beads
Beads
-
-
Bead recovery units
Bead recovery units
28 28
4
4
Liner
Liner
Reamer run
Reamer run
-
-
3 x 5
3 x 5
-
-
7/8
7/8
mills
mills
Spot lube
Spot lube
Work liner if necessary
Work liner if necessary
Buckling problem at 16,000
Buckling problem at 16,000
+
+
29 29
Drilling Curve
Drilling Curve
Kinnoin 11-14H
0 ft
2,000 ft
4,000 ft
6,000 ft
8,000 ft
10,000 ft
12,000 ft
14,000 ft
16,000 ft
18,000 ft
20,000 ft
0 5 10 15 20 25 30 35 40 45 50 55 60
Days
D
e
p
t
h
Plan
Kinnoin 11-14H
Surface Csg @ 2100 ft
KOP #1 @ 9294 ft
7" casing @ 10112 ft
TD @ 19813 ft
Sanish Field Well Results
Sanish Field Well Results
31 31
Questions?
Questions?