Está en la página 1de 6

Parker Associates Pvt. Ltd.

1509, Suketu Lane Subhash Chandra Marg Calcutta-110090 T-190-274-569 Fax (190) 274-570 E-mail: parkerassociates@gmail.com

05 October 2012

Mr. Sanjay Iyer AGI Corporation Ltd. 13 Park Street Calcutta-110092

Dear Mr. Iyer, Subject: Proposal No. A-1008 for AGI Corporation Ltd. Parker Associates Pvt. Ltd. Is pleased to submit the following proposal to provide Construction testing services at AGI Corporations Manufacturing Campus located at 13 Park Street. Parker Associates Pvt. Ltd. has been providing. Our company is providing software solutions since 1978 and has performed over

Parker Associates Pvt. Ltd.

05 October 2012

Page 2

200 successful investigations in India and abroadincluding Indira Gandhi International Airport (India) and OHare International Airport (Illinois, USA). Background It is our understanding that the work provides:1) the mass grading operations will require approximately six months, and 2) the utility work will require approximately three months. The two operations are scheduled as follows: Mass Grading Operation Utility Work November-2012 to January 2013 February 2013 to

Parker Associates Pvt. Ltd.

05 October 2012

Page 3

Proposed Approach and Work Plan Parker Associates Pvt. Ltd. will perform observation and testing services during both the mass grading operations and backfilling of underground utilities. We will perform the field density tests using the compacted material as required by the job specifications using a nuclear moisture/density gauge. We will also conduct appropriate laboratory tests such as ASTM-1557 Modified Practors. We will provide qualified personnel to perform the entire operation. Mr. Harsh Patel will be the lead field technician responsible for the project. A copy of his resume is included with this proposal for your review. Mr. Harsh Patel will work in close coordination with your Sr. superintendent to ensure rapid quality work. Overall Project management responsibility lies with Mr. Hiten Pandey and Mr. Amit Mishra would be responsible for Project Engineering Services. Their detailed job profile is available on our website and you could refer to the same to have an idea of their experience and efficiency.

Parker Associates Pvt. Ltd.

05 October 2012

Page 3

Our Qualifications Parker Associates Pvt. Ltd. have been providing quality services since 1978 in the areas of Geotechnical Engineering and Environmental Services. The company provides Phase-I and Phase-II Environmental site assessments. Our laboratory is certified by AASTHO Accreditation Program. Costs On the basis of our understanding of the work, We estimate the total cost of the two projects to be Rs. 5 Crores approximately the breakup of which is as follows: Table of Cost Estimates
Mass Grading units Field Inspection 1320 Hrs. Labour Vehicle Expense 132 Days Lab Testing 4 Tests Engineering/Project 84 Hrs Management Rates Rs.** ** ** ** Total Cost Rs.********* ******* ******* *******

Total

Rs. 5000,000

Parker Associates Pvt. Ltd.

05 October 2012

Page 4

Authorization With a staff of over 200 personnel, including registered professional engineers, resident engineers, construction inspectors and laboratory technicians, we are convinced that Parker Associates are capable of providing services of this magnitude. If you would like our firm to provide the services as outlined in this proposal, please sign this letter and return it to us along with a certified check in the amount of Rs. 50,000 by October 20, 2012.Please call me if you have any queries regarding the terms of this proposal or our approach. Sincerely, Ravi K. Kumar Vice President Enclosures

Accepted for AGI Corporations By______________________ Date__________________