Safety Instructions
Please take note of the warning and caution icons, presented in this manual, as follows:
Existence of dangerous electrical voltage. This operation should only be performed by qualified personnel.
Attention
Kindly give special attention or take precautions whilst performing this operation. The procedure as described in the manual must be followed.
Deliverables
1. 2. 3.
PLSI Cables & Lugs, necessary for connecting PLSI with Bus Hand Gloves
Contents
About PLSI Precautions & Safety Practices Tools & Accessories Setup Schematic Pre-Installation Issues Installation Post Installation Issues Changing the Firing Angle Configuring Interval for Transmission Absence Acknowledging the Fault Ensuring Signal Strength Viewing Failure Information Annexure 1: Check List
5 7 7 8 9 9 13 13 14 15 15 16 17
Important
Whilst every effort has been made in preparing the product documentation, the possibility of error always exists. We undertake to correct such errors wherever possible, and request feedback from users in this regard.
BGX501-139-R01
About PLSI
About PLSI
PLSI, an acronym for Power Line Signal Injector is installed as an integral part of the distribution metering system having dual supply sources i.e. Mains and Auxiliary. Such system demands a separate tariff to be applied for Main and Auxiliary supply. This requires recognising current source of supply by the meters for applying the corresponding tariff. PLSI, when installed on the secondary side of a distribution transformer, injects the desired signals into the downstream supply using the supply frequency itself. This signal is detected by the intelligent inbuilt receiver at the meter end. If the signal is available, mains tariff is applied otherwise DG tariff is applied. As the absence of signals is observed as DG Supply, it is necessary to implement this system in such a manner that failure of PLSI is immediately detected and notified. A Failure Detection Unit (FDU) is built in the PLSI which turns ON a hooter on detecting PLSI failure.
Entity
The distortion of the voltage waveform travels along the power line and is available at all consumer terminals in the system. This method of creating a distortion in voltage waveform near the zero cross over enables the propagation of the distortion along distribution wires to all power recipients. The term "transmission" has been used in this document to describe this propagation. A pair of consecutive sinusoidal cycles is used to describe a signal as "zero" or "one". For a "zero" signal, the first cycle has no distortion in the zero-cross over point and a distortion in the second cycle. For a "one" signal, the first cycle has a distortion in the zero-cross over point and no distortion in the second cycle. The baud rate for signal transmission is therefore 25 bauds (bits per second) for a 50Hz system. The baud rate for an American system, where the power frequency is 60Hz, would be 30 bauds. A zero signal is as follows:
This signal is detected by in-built receiver module of the Liberty meter to verify the source of supply from distribution transformer. It is interesting to note that these signals (voltage distortions) are not transmitted to wires belonging to any other transformer. That is because the impedance of the transformer and upstream (source) impedance do not cause a short circuit current to flow in other transformers so as to observe a noticeable distortion in voltage waveforms. Other Document to Refer Liberty User Manual (Dual Supply Meter) Liberty Installation Guide (Dual Supply Meter)
BGX501-139-R01
1. This product is designed for LT/LV applications only and should not be used elsewhere. 2. To minimize the risk of electrical shock, avoid any loose or exposed electrical connections near the installation. Use sleeves, and if necessary, you can also use any fast-drying insulation coating to cover such exposed electrical wire. Such coatings are easily available in varnish or aerosol form. 3. Disconnect the supply during the installation. Use insulated hand-gloves while working. 4. Always use proper tools & tackles and avoid using damaged tools. Usage of damaged tools is a major cause of all types of installation related accidents. Additionally, it can cause an irreversible damage to the PLSI and other devices. 5. To prevent any potential damage, always install the PLSI at a height considered to be safe. 6. Always refer to installation & associated documentations and follow the instruction and the practices described.
Safety First
Following tools & tackles are required for installation: 1. 2. 3. 4. 5. 6. 7. Hexagonal Bolt Tightener for M8 Size Bolts Tabular Bolt Torque Screw Driver Cross head Magnetic Screw Driver Cable/Wire Cutting Knife Pliers Hand-gloves Multi-meter
Entity
Setup Schematic
The following figure describes the schematic for the PLSI Installation:
PLSI
MCCB
BGX501-139-R01
Pre-Installation Issues
Pre-Installation Issues
Before you proceed with PLSI Installation, you must consider the following: Selection of Mounting Location PLSI must be installed near the Distribution Transformer (DT) on the secondary side. PLSI should be placed on a concrete platform. The dimensions of the PLSI are 120 cm X 66 cm X 37 cm (Height X Width X Depth). A concrete platform 2-4 feet above the ground level is most suitable for placing the PLSI unit. A height convenient for user operations should be selected. Hooters must be mounted at a height of 6 ft. or above, to prevent it from any malicious activity. Ratings and Cable Selection The current ratings for the hooter should not exceed 2A. The supply voltage should be 230V AC. Use 1.1 kV super flexible cables (supplied with the PLSI) to connect PLSI with DT. If the length of the supplied cable is insufficient, never use a joint to expand the cable length. Use a complete length of another cable instead. The size of the cable should be selected according to the DT rating. Recommended sizes are tabularised as follows: DT Ratings
In kVA
Sr. 1 2 3 4 5 6 7 8 9 10
Conductor Area
In sq mm
Current Capacity
In amp
100 200 250 315 400 500 630 750 800 1000
6 6 6 6 10 10 10 16 16 25
18 30 34 38 40 46 50 68 71 90
Installation
The step-by-step procedure for installing the PLSI system is described here. 1. Make sure that you have all necessary tools in hand. By visual inspection, check any loose and exposed electrical connection near the installation. If any loose and exposed electrical connections are seen, make necessary arrangement to correct them. Unpack the PLSI. Due to the size & weight of PLSI, it is necessary to visually inspect and confirm that it is not damaged during transportation, loading & unloading. Open the front door of the PLSI. Now open the internal door of PLSI. Check for the healthy conditions of all mounted parts such as thyristors, inductors, MCCB etc. Make sure that all parts are tightly connected. Tighten any loose screw or bolt, if any. Perform for continuity test as prescribed in the Annexure. Make sure that all inductors are connected at 60T tapping position.
9
2. Attention You must fill up the form prescribed in the Annexure at the time of installation
Entity
3.
First prepare the location for mounting the PLSI unit i.e. concrete platform or some place above the ground level. Now affix the base-frame (provided by SML) on this platform. If necessary, make use of grouting. Prepare a channel for cable passage. Lay down the connecting cables along the channel. Five cables are provided one for each phase and two for neutral. This ensures that high neutral current is distributed. Close the internal door & front door of PLSI and Mount the PLSI on the base-frame. Make sure that conductors are terminated using the lugs. If you are not using the supplied cables, you should terminate the cable using appropriate size lugs. Use colour coded sleeves. Make sure that MCCB is off. Insert each connecting cable into the PLSI panel using gland. Loosen the Rin, Yin and Bin terminals of the MCCB. Connect each of connecting cables to respective terminal (supplied cables are color coded). Now connect the two neutral cables to neutral terminal (one to each terminal) as shown in the picture. Two neutral cables help in distributing the high return current flowing through neutral at the time of transmission.
4. 5.
7.
Inductors
Thyrsitors
Rin, Yin, Bin Terminals Attention It is necessary to earth the PLSI from both the sides 8. 9.
Earth the PLSI panel using the earth terminals provided on each side of the panel. Now, you can connect the hooter as shown in the picture. Hooter rating should be 2A. Dont use a hooter exceeding this rating. Please note this connection is for hooter activation only. Power Supply to the hooter should be provided separately. Initially, switch off the power supply of the hooter.
10
BGX501-139-R01
Installation
10. Isolate the bus Now connect the Bus bar. Before sure again that
bar from the distribution transformer. PLSI unit with the mains supply from the making connection with the bus bar, make MCCB is switched off.
11. Resume the supply. Once the PLSI unit is connected to the power supply, all three indicators should be glowing. In case any of the indicators is not glowing, recheck the connections. Check the phase voltage (P-N). 12. Switch on the MCCB and test the MCCB using the trip test button. This must be healthy. Switch the MCCB again. 13. Make sure that fans available on both sides are working. 14. Once the PLSI is powered up, the default display cycle is shown on the Signal Injector Unit. This cycle is repeated at a regular interval.
Mains On
Attention Default firing angle should be set at 18 degree. If this is not the case, you must change the firing angle to 18 degree as described in section Changing the Firing Angle
Attention Firing is off by default. If this is not the case, you must stop the firing at the time of installation by entering code 00000-32423-0
Current firing angle is 18 degree. FIR OFF indicates that firing is inactive. This implies that signals are not being transmitted. FIR ON is indicated when signal transmission is active. By default, the firing is off.
15. Similarly, the default display cycle is also shown on Fault Detection Units. This cycle is also repeated at a regular interval.
Test Display
45 BULS indicates that signal strength is 45 BULS. Now press key 1 VOLTAGE indicates that value of voltage on the connected phase follows
Entity
11
Time is 12:45
Date is 02-10-2005
16. Check the displays of each individual phase for Signal Injector Units as well as Fault Detection Units. 17. Now, you can start transmitting signals. This requires you entering 00000-52425-9 when default display cycle is being shown on the Signal Injector Unit. Follow the procedure as shown below.
Press *
Press key 0
Press key 9
Press key # ACCEPTED indicates that your code has been accepted successfully and transmission has been started. You can verify this with default display cycle. In case some error occurs ERROR is shown on the display.
You must perform this operation on all the three Signal Injector Units one by one. Please note that you can stop the transmission by entering the code 00000-32423-0 in the same manner.
12
BGX501-139-R01
18. Once the transmission is started, you should verify this with the Fault Detection Unit. Check for the signal strength as follows.
Press *
Enter 0000-51423-9 and press key # ACCEPTED indicate that operation is successful SIGNAL indicates the signal strength follows 45 BULS indicates that signal strength is 45 BULS. Now press key 1. Display should indicate OK status
Attention You may notices some noise produced at the time of transmission
19. Now, power up the supply of hooter. As the transmission is started, the hooter should not make a noise. To check the healthy condition of hooter, stop transmission of a Signal Injector Unit by entering the code 00000-324239. The Fault Detection Unit of the corresponding phase should detect the failure (with in pre-configured interval) and turn on relay of the Hooter circuit followed by the hooter activation. After two minutes, relay is turns off automatically. The Fault Detection Unit turns On the relay repetitively at 30 minutes interval, unless it is acknowledged as described in the next section. 20. Once you have checked all three phases, PLSI is ready for operation. Now restart the transmission again. Close the internal door. If you wish to modify the firing angle and other default configuration, follow the instructions as described in the section Post Installation Issues. 21. Make sure that you fill up the form prescribed in the Annexure 1.
Once you have installed, you can perform following operations with the Signal Injector Unit and Fault Detection Unit.
Entity
13
Press *
AGNLE CFG confirm the firing angle configuration mode Current firing angle is 24 degree. Press key 4 to increase the firing angle in steps of 3 degree Current angle is 27. Press key 6 to decrease the firing angle in steps of 3 degree
Current angle is 24.Press key 6 again to decrease the firing angle in steps of 3 degree Current angle is 21. Press key # to confirm the angle being displayed on the screen. Signal Injector Unit switch to normal mode.
When you increase the firing angle, check current in the connecting cable of respective phase. This should not exceed 50 ampere.
This interval is user defined and can be configured by entering 00000-00XXX-7 where XXX is the period in minutes. Follow the instructions as below:
Press *, when the default display cycle is being displayed Enter 00000-00XXX-7 and press key #. For example, enter 00000-00005-7 for configuring 5 minute ACCEPTED indicate that operation is successful
14
BGX501-139-R01
Press *, when the default display cycle is being displayed Enter 00000-51423-9 and press key # ACCEPTED indicate that operation is successful
If the sufficient signal strength (20 Buls or above) is not available at the tail end of the distribution line, it is necessary to increase the strength of transmitted signal. There are two different ways to increase the signal strength:
Entity
15
By increasing the firing angle at the transmission end. The maximum permissible limit is 27 degree. By reducing the inductor turns. You should use this method only if is not possible by increasing the firing angle. When increasing the signal strength, ensure current in the connecting cable of corresponding phase doesnt exceed 50 ampere. Use digital clamp millimeter for this.
When using inductor turns for increasing the signal strength, you should reduce the firing angle first and then reduce the number of inductor turns. You can increase the firing angle again, if required.
OK indicates that transmission is OK. FAIL is shown if transmission failure is detected. Wait for 2 seconds
16
BGX501-139-R01
Entity
17
PLSI Copyright @ Secure Meters Ltd. 2006-2007 This manual is a copyright with all rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the copyright owner; the same is proprietary and copyright must be affixed to any permitted copies as were affixed to the original. Secure Meters Ltd. reserves the right to periodically change information. The results generated by PLSI are not subject to copyright, and there is no restriction placed on their use by the original purchaser. No warranties are expressed or implied with respect to the product described, its quality, performance, or suitability for any purpose. In no circumstance will the copyright holder or his agents be liable for direct, indirect, incidental or consequential damages resulting from the use of this manual. No statements contained in this package shall affect the statutory rights of consumers.