Site Engineering Method SPP- 59

Specification for EVOLIUM A9130 BSC / MFS Evolution Site Preparation

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 1/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Contents

Contents
Preface ..................................................................................................3 1. Customer or Operator Services......................................................6 2. Alcatel Services ...............................................................................8 3. General specifications of product ................................................10 4. Site preparation and supply requirements for Customer or Operator..............................................................................................19 5. Installation and supply requirements for Alcatel ........................27 Appendix A: Installation help, rack layout and shelf positions. ....29 Appendix B: Installation help, site cabling cable tray with A9130 BSC/MFS Evolution cabinet, power supply, DDF 120 ohms, EAB, LMT.................................................................................30 Appendix C: Installation help, Site cabling raised floor with A9130 BSC/MFS Evolution, power supply, DDF 75 ohms, EAB, LMT......................................................................................................32 Abbreviations .....................................................................................34

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 2/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Preface

Preface

Purpose

The document defines the conditions regarding site preparation, for installing EVOLIUM A9130 BSC/MFS Evolution and activities to be handled by Customers and Alcatel services.

General description of product


The EVOLIUM A9130 BSC/MFS Evolution is the new platform based on a multi-shelf concept including in one rack: - BSC applications, - MFS applications, - BSC/MFS applications in rack-sharing solution. The EVOLIUM A9130 BSC/MFS Evolution supports all standard bands: GSM 850, E-GSM 900, GSM 1800 and GSM 1900, as well as several multiband combinations allowed by those standards. The EVOLIUM A9130 BSC/MFS Evolution has been designed in a modular way, permitting flexible extensions. Investment can therefore be optimised by purchasing and deploying the configuration, best suited to the network topology. The processing capacity is distributed throughout the BSC and/or MFS modules. In conjunction with the concept of distributed software it is possible to provide high availability, sufficient resources and high-traffic applications.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 3/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Preface

History
Date 06/12/04 Edition 01 Comments Released.

Audience
Alcatel Staff (Intermediate level) Installers Customer and Alcatel services

Assumed knowledge
You must have a basic understanding of the following: BSS Alcatel operations Site Engineering methods

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 4/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Preface

Document Structure
This section provides a summary of the contents of every chapter. Chapter 1 : Chapter 2 : Chapter 3 : Chapter 4 : Customer or Operator Services Alcatel Services General specifications of product Site preparation and supply requirements for Customer or Operator Installation and supply requirements for Alcatel

Chapter 5 :

Appendix A : Installation help, rack layout and shelf positions. Appendix B : Installation help, site cabling cable tray with A9130 BSC/MFS Evolution cabinet, power supply, DDF 120 ohms, EAB, LMT. Appendix B : Installation help, site cabling raised floor with A9130 BSC/MFS Evolution cabinet, power supply, DDF 75 ohms, EAB, LMT. Abbreviations : Acronyms encountered within the document.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 5/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 1: Customer or Operator Services

1. Customer or Operator Services


This chapter describes the services to be supplied by Customers or Operators. 1.1 - Services to be performed. 1.2 - Services not treated.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 6/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 1: Customer or Operator Services

1.1 - Services to be performed

The customer or operator is responsible for choosing the site and for all preparation work. The main services are as follows: Site Preparation of site. Power supply Earth PCM links. Lighting Circuit breaker Lightning protection (if necessary) Power distribution box : 48VDC or 60VDC Ground bar/plate Cable way runs from the infrastructure to each BSC and/or MFS. PCM network termination (NTL) upline (if necessary) PCM and alarm distributor (DDF) Of main supplies,

Qualification and checking

Main supplies

Installation

1.2 - Services not treated

All services not provided by Customer or Operator shall be treated as additional Alcatel services.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 7/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 2: Alcatel Services

2. Alcatel Services
This chapter describes the services to be supplied by Alcatel. 2.1 - Services to be performed

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 8/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 2: Alcatel Services

2.1 - Services to be performed


Supplying installation kits

Alcatel installs the rack . The main services are listed hereafter:

Basic installation kit. PCM cables from Alcatel equipment to DDF. Ethernet cables (for local OMC-R connection and/or for EAB connection). DC power and ground cables, External Alarm Box (delivered with BSC only). Earthquake kit, optional DDF, optional A9130 BSC/MFS Evolution installation. PCM & Ethernet cables installation. DC power and ground cables installation. External Alarm Box installation, (BSC configuration only) DDF installation, optional. Commissioning of EVOLIUM A9130 BSC/MFS Evolution. Acceptance of EVOLIUM A9130 BSC/MFS Evolution.

Installation

Commissioning

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 9/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3. General specifications of product


This chapter describes the general specifications of product about site preparation to install the product . 3.1 - Short description of product. 3.2 - Environmental specifications. 3.3 - Dimensions and weight specifications. 3.4 Power supply system connection. 3.5 Grounding system. 3.6 - Consumption specifications. 3.7 Cooling system. 3.8 - Lightning and overvoltage protection. 3.9 Installation indications. 3.10 - Clearance recommendations. 3.11 E1 interface specifications. 3.12 Network management interface specification. 3.13 External alarms specifications.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 10/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3.1 - Short description of product


The EVOLIUMTM A9130 BSC/MFS Evolution consists of a single 19 standard rack and is composed of: One or two ATCA shelves where is implemented BSC and/or MFS application. One or two LIU shelves (each shelf manage up to 256 physical E1 connections). Connection to the duplicated secondary power supply (-48VDC) through a PDU shelf. Connection to external links: E1 (120 ) interfaces and Ethernet cables in case of colocated OMC-R and/or connection of external equipement (EAB, CBC, ). Various configurations are indeed possible: BSC stand-alone configuration with one ATCA shelf and one LIU shelf. MFS stand alone configuration with one or two ATCA shelves and one LIU shelf. Rack sharing configurations with two ATCA shelves: two BSC shelves or one BSC + one MFS and 2 LIU shelves.

3.2 Environmental specifications


The environmental conditions define the climatic requirements (air temperature, humidity, etc.) that apply to the equipment in normal storage, transport and operation. They also specify requirements concerning contaminating products and electromagnetic considerations. Climatic requirements The EVOLIUM A9130 BSC/MFS Evolution is compliant with the following requirements: - For storage EN 300 019-1-1 class 1.1. Conditions are valid for the non-packed equipment (rack). Icing and frosting are not allowed. - For transportation EN 300 019-1-2 class 2.2. - For operation EN 300 019-1-3 class 3.1E. Heat and solar radiation are not allowed.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 11/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

Environmental conditions for EVOLIUM A9130 BSC/MFS Evolution (EN 300 019) Environmental parameter Low air temperature High air temperature low Low relative humidity High relative humidity Low absolute humidity High absolute humidity Low air pressure High air pressure Sand Dust (suspension) Dust (sedimentation) Stationary vibration, sinusoidal: - Peak-displacement amplitude - Peak-acceleration amplitude - Frequency range Non-stationary vibration including shock: - Shock-response spectrum type L, peak acceleration - Shock-response spectrum type II, peak acceleration Unit
C C % % g/m g/m kPa kPa mg/m mg/m mg/(mh)

Oper.-1-3 class 3.1E


-5 + 45 5 85 1 25 70 106 30 0.2 1.5

Transport -1-2 class 2.2


- 25 + 70 --95 --60 70 --100 --3

Stor.-1-1 class 1.1


-5 + 45 5 95 1 29 70 106 30 0.2 1.5

mm m/s Hz
2

0.3 1 2 to 9 9 to 200

3.5 10 2 to 9 15

1.5 5 2 to 9 9 to 200

9 to 200 200 to 500

m/s

40

---

40

m/s

---

100

---

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 12/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

Electromagnetic environment

EVOLIUM A9130 BSC/MFS Evolution compliant with EN 300 386 (2001) class B requirements.

Acoustic noise

EVOLIUM A9130 BSC/MFS Evolution compliant to ETS 300 753 Class 3.1: Acoustic noise emitted by Telecommunication equipment. Telecom equipment room attended.

Safety

EVOLIUM A9130 BSC/MFS Evolution compliant with: EN 60950-1 (2001): Safety of information technology equipment.

Waterproofness

EVOLIUM A9130 BSC/MFS Evolution compliant with: IEC 529 / EN 60529 / IP20: Degrees of protection provided by enclosures (IP class). DC Power supply: ETSI EN 300 132-2

Other conditions Green compliance

EVOLIUM A9130 BSC/MFS Evolution compliant with the new European directives for environment: WEEE: Wastes of Electrical and Electronic Equipment. RoHS: Restriction of Hazardous Substances. Ecodesign requirements: TR/70 ECMA technical report (guideline).

3.3 Dimensions and weight specifications


A9130 BSC/MFS Evolution cabinet Width (mm) Total height (mm) / useful height (U) Depth (mm) Empty rack weight (kg) Rack weight in minimum configuration (kg) - [1] Rack weight in maximum configuration (kg) - [2] Flow area including clearance (m)
[1] [2]

600 2000 / 40 600 110 212 284 1.56

Minimum configuration includes 1 ATCA shelf + 1 LIU shelf Maximum configuration includes 2 ATCA shelves + 2 LIU shelves

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 13/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3.4 - Power supply system connection


A9130 BSC/MFS Evolution is powered with DC nominal voltage: - 48 VDC or 60VDC, nominal voltage range: -38.4 VDC to 72 VDC. The A9130 BSC/MFS Evolution provides a power distribution unit (2U/19) located at the top of cabinet and which ensure power supply connection with the power plant. For reliability of the system, the PDU accepts two DC feeds (branch A and branch B) for power redundancy. The PDU is also equipped with DC power breakers in order to protect the shelves in the cabinet. Each shelf is protected by two DC power breakers, one breaker per branch (75A for ATCA shelf and 10A for LIU shelf) . These circuit breakers switch off automatically at over current flow detected. The cabinet is connected to DC power supply with 5 wires ( two black wires 0V, two blue wires -48V and one yellow/green cable).

3.5 Grounding system


All accessible surfaces that may become energized under a fault condition are connected to the chassis ground. The cabinet provides two bolts for connection of the mechanical ground, one at the top and one at the bottom. Each ATCA shelf provides an ESD wrist band at the front side.

3.6 Consumption specifications


Per rack, fully equipped. Maximum power consumption Consumption at min. voltage 38.4 VDC. Consumption at nominal voltage 48 VDC. Maximum power dissipation 2100 W (1050W per ATCA + LIU shelves) 55A 44A 2100W

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 14/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3.7 Cooling system


Dependent on configuration, the cabinet contains one or two ATCA shelves. Each shelf has an integrated cooling unit with four blowers. Airflow is drawn from the front of the unit and forced through the cards before being expelled to the back of cabinet. The cabinet is also equipped with complete perforated front and rear doors.

3.8 Lightning and overvoltage protection


The lightning protections on external interfaces are not implemented in the equipment. DC lightning protection: Not necessary. PCM lightning protection: if necessary, must be installed at the DDF by the customer. External alarms: External Alarm Box use an optocoupler for electrical isolation between the bus and the field.

3.9 Installation indications


The EVOLIUMTM A9130 BSC/MFS Evolution cabinet must be installed in a dry environmentally controlled building room specifically designed for switching systems and can be installed on a raised floor or a concrete-slabbed floor. An installation in rows is also possible. The cabinet has no side doors, access to interior is either from front or back side. The cabinet has detachable front and back doors. Power supply and signal cables may enter the cabinet through the top or the bottom. It is assumed that all cables enter the cabinet either through the top or all through the bottom. The rack has four anchor bolt holes at the bottom and must be fixed on the floor. The rack is delivered and packed horizontally or vertically with lifting lugs. In this case room entrances for equipment hoisting must be carefully studied. If the unit is installed in an enclosed space, such as a cabinet, a technical closure, etc., sufficient space must be allowed for circulation of the air.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 15/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3.10 - Clearance recommendations


Sufficient clearance must be allowed for handling, maintenance and inspection procedures and for equipment cooling purposes. In particular, there must be sufficient clearance at the front and at the rear to allow the handling (approximately: 1m). Side clearance is not required. At the top: 250 mm minimum.

3.11 E1 interface specifications


EVOLIUM A9130 BSC/MFS Evolution provides E1 interfaces via Line Interface Unit (LIU) shelf located at bottom of the cabinet. The E1 links carry either Abis interfaces or Atermux interfaces or Gb interfaces. One LIU shelf is housed in the cabinet for stand-alone application. For racksharing application, two LIU shelves are foreseen.

E1 interfaces: LIU shelf E1 boards E1 links 120 Ohms 1 or 2 per BSC/MFS cabinet. Up to 16 x E1 boards per shelf. 16 x E1 per board. Total = 256 E1

PCM lines are: - Multipair cable 34 pairs arranged as two insulated copper conductors, twisted per pair, with one SCSI 68 pins connector at both ends (not adjusted on site). On DDF side, these cables are connected to patch pannel interface. This module performs adaptation: From SCSI connector to insertion terminal blocks (for 120 network). The terminal blocks (8 pairs) accept wire diameter 0.32 to 0.8 mm. From SCSI connector to BALUN transformer (for 75 network).

Recommended maximum cables length between DDF and BSC/MFS cabinet: 20 m.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 16/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

Specification of 2 Mbit/s - 34 pairs PCM cable: Type of cable 34 pairs 28 AWG solid cable Conductor diameter = 0,32 mm (copper) Jacket diameter = 11, 3 mm Minimum bend radius = 66 mm Loss max. @ 1 MHz = 3.5 dB / 100 m Customer connection DDF side Inserting (120 ). BNC or 1.6/5.6 female (75 ).

Network impedance 120 or 75

3.12 Network management interface specifications


The EVOLIUM A9130 BSC/MFS Evolution permits O&M transport using a dedicated Ethernet port carrying an IP flow. The LMT is connected locally or remotely as the OMC-R. Maximum distance between BSC/MFS cabinet and external IP/Ethernet equipment: 20 meters. ATCA shelf SSW board
Port 3: OMC-R Port 5: EAB Port 8 : LMT

1 or 2 per cabinet (depends on configuration) 2 boards per shelf Physical interface: 10/100/1000Base TX Connector type: RJ45. Ethernet cable 30m UTP category 5 / 2 twisted pairs Connectors: RJ45 male

Cable type

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 17/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 3: General specifications of product

3.13 External alarm specifications


External alarms are available on A9130 BSC/MFS Evolution through an External Alarms Box (EAB). The EAB is connected via Ethernet link (without redundancy) to one Switch board of the BSC. The alarms are routed by the BSC to the OMC-R via the O&M link. The External Alarms Box provides 24 external alarm inputs which can be adapted to the individual requirements by the Customer. Typically, they are used for main power supply, rectifiers, batteries, air conditioning, intrusion etc. EAB is powered with DC nominal voltage: - 48 VDC Nominal voltage range: -36VDC to 72VDC. Max. consumption: 650mA.

Buscoupler connection: RJ45. The alarm level is defined as follows: - Voltage via power jumper contacts = DC 24V (-15% +20%) - Signal voltage (0) = DC 3V +5V - Signal voltage (1) = DC 15V 30 V - Input filter = 3ms - Current supply (typ) = 4.5 mA - Isolation = 500V system / supply. External Alarm Box dimensions (overall): - Height : 280 mm - Width: 380 mm - Depth: 180 mm Fixing points between axis are: 254mm x 354mm.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 18/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for the Customer or the Operator

4. Site preparation and supply requirements for Customer or Operator


This chapter describes the requirements of product about site preparation and supplies provided by Customer or Operator. 4.1 - Site safety requirements 4.2 - Main supplies provided by Customer 4.3 - Site infrastructure requirements 4.4 - Cable way requirements 4.5 - Computer requirements 4.6 - Power system requirements 4.7 - Leased line requirements 4.8 - DDF requirements 4.9 External alarm connection requirements 4.10 - Site information requirements

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 19/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

4.1 - Site safety requirements


Compliant with IEC 950 (EN60950) for equipment located only in restricted access locations. Compliant with IEC 60364 (NFC 15 100) Electrical installations of building. On the site, the current safety instructions must be strictly followed and hazardous points must be marked. The inspectors must make sure that signs are posted with the telephone number of emergency medical assistance in the event of electric shock. Displacement of equipment (transport, handling, or hoisting) must not endanger either personnel or equipment near-by. A smoke detector and a fire extinguisher system are recommended. A fire detection system is recommended for indoor sites. Failing this, a CO2 fire extinguisher must be present and clearly marked in the room where the equipment is to be installed.

4.2 - Main supplies provided by Customer or Operator


See chapter 1: Customer or Operator Services / Main supplies.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 20/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

4.3 - Site infrastructure requirements


Accessibility

The site shall be handed over with the leased lines in operation.

The client shall provide the site (in which the equipment is to be installed) with hoisting and handling devices to ease delivery of the equipment . If not, the costs incurred by the installer will be added to the installation costs and charged to the client. The entrances to the buildings must be large enough to transport the rack in an upright position. Access to the sites must be facilitated: - either by the presence of a local correspondent during delivery, assembly/wiring, and initial start-up of the equipment. - or by obtaining a set of duplicate keys to the sites prior to those operations. A set of furniture is provided, in sufficient quantity, as part of preparation of the room: at least 1 table and 2 chairs, (work space for the operating terminals). One or two phone lines are needed for the periods of installation and initial start-up of the equipments. The ceiling height must be greater than or equal to 2.5 m. The floor must be able to bear a load of 300 kg per cabinet.

Service facilities

Ceiling Floor

Each cabinet must be fixed to the floor or on raised floor with four anchor bolts. If earthquake option kit is required, it can be installed only with a raised floor exactly 34 cm high from the concrete ground. Distance constraints Various clearance spaces must be provided for maintenance and inspection operations and to allow equipment ventilation. The external ports of the equipment (power supply, lines, etc.) should be protected.

High voltage protector

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 21/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

Environment of the equipment

Cables are fed in through the top or the botom of the rack. The power cables from DC distribution box to the BSC/MFS cabinet should not exceed 40 meters. The PCM cables from DDF to BSC/MFS cabinet must not exceed 40m.

Lighting and wall The lighting in the room must have an intensity of 300 Lux at 1 m above the floor. No more than 500 Lux. sockets The external lamps on site should be of the electronic ballast type. 230V wall sockets must be provided in the room [one socket every 3 m; 2 poles (L, N) and ground; 16 A]. Sockets providing a 230 V emergency backup source must be provided for the operating equipment (LMT, )

4.4 - Cable way requirements


A cable way (cable tray or wire mesh) should be installed at a height of a least 250mm above top of rack to support the cables. A cable way (with width 508 mm) from the equipment to DDF and power distribution box should be provided. This cable way should be separated in two parts: power cables (width 108 mm) and other cables (width 400 mm). Two holes should be foreseen inside cable ways: for power cables: Hole (l:100 mm x d:40 mm) centred above each rack. for other cables (PCM cables, Ethernet cables): Hole centred above each rack (l:600 mm x d:60 mm). When using existing cable trays, various electrical systems (power, signals) should be kept apart. If no partitioning is possible, a new cable tray will be installed along the former at a 30 cm space to avoid interference. One wire braid (earth shielding) 16 mm per rack with side rack a lug diameter = 6mm should be provided. (length depending of height of cable way). A conduit (cable tray or plastic pipe) should be installed between the main cable tray and External Alarm Box. The conduit must reach the middle-bottom or the middle-top at maximum distance of 15 cm.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 22/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

4.5 - Computer requirements

Labtop LMT provided in option, but necessary during the installation and commissioning. The length of connecting cables between labtop equipment and racks on the sites shall not exceed 15 meters Clearance Length of cables from BSC/MFS to LMT terminal Side clearance (Only one side is necessary) Front clearance Rear clearance Dimension and weight Width (mm) Depth (mm) Height (mm) Maximum weight (kg) 100-240V, 50-60 Hz consumption Maximum power consumption (W) Fuse gauges, earth leakage protection 30 mA Gauge (A) 6 200 300 265 45 3 15 m 0,7 m 1m 0,2 m

4.6 - Power system requirements


Power supply system

The customer shall install all cables at the position of first rack.

The power plant should include standard backup batteries for emergency power.

The EVOLIUMTM A9130 BSC/MFS Evolution cabinet requires a nominal input voltage of 48VDC or 60VDC. The static input range should not exceed 38.4VDC to 72VDC. The EVOLIUMTM A9130 BSC/MFS Evolution cabinet must operate with two 48V(BAT A / BAT B) wires and two 0V (BATRET A / BATRET B) wires with redundancy between them. A power distributing box must be provided as part of the room preparations. It must include marked fuses for each output, and a grounding bus bar for the power cables. The box or power station must be marked.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 23/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

Power cable Lugs are necessary at cable end on equipment side. The power input terminals are M6 (thread stud) type connector. recommended Double sheathing. Multi-strand flexible copper core. Strand composition 0,41 mm max. class 5 (IEC 60 228). Cable type to be compliant with local legislation and standard for electrical installation in technical site. 5 cables (4x-48V/0V + Ground) are necessary: Signal -48 V DC, (BAT A / BAT B) 0V DC, (BATRET A / BATRET B) Frame Ground Distribution box Section 16 mm 25 mm 16 mm 25 mm 35 mm Length Up to 20m >20m to 40m Up to 20m >20m to 40m Up to 40 m Yellow/Green Black Color Blue

The distribution should be defined for using lugs of system 8 mm for BAT RET (0V), 8 mm for BAT A / BAT B (-48VDC), 8 mm for electrical earth. The customer provides breakers with the following gauges (with lightning protection if necessary): - The gauges should be calculated to operate with ETS300132-2 standard (-40,5VDC). - The breakers are only on BAT A and BAT B wires. - On first approach, the gauge is calculated like: I max. + 1/3 I max. (Imax at -40.5VDC)

Breakers recommendations

It is wished to put the gauge in agreement with the final configuration to avoid an interruption of service during an extension. Number of fuses per BSC/MFS cabinet Standard gauge for each cabinet fully equipped 2 (BAT A and BAT B) 80 A

Grounding distribution

A ground plate directly connected to the ground box of the building must be available in the room. The grounding system is composed of a metallic grounding network, formed of iron flooring .The grounds are respectively connected to grounding plate, and to the metallic ground of the power distributing box. The ground wire circuit resistance must be less than 3 Ohms.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 24/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

4.7 - Leased line requirements


The following shall also be handed over: a diagram of the distribution frame, identifying the lines, a wiring diagram, the technical and commercial references of each line, the lines connected to the line terminal blocks, the looped Tx/Rx lines on the cable side in the room, the quality tested lines of the local distribution frame to the remote distribution frame.

4.8 - DDF requirements


The Digital Distribution Frame should have terminal blocks for inserting PCM jumper cables / 120 (copper, Diameter = 0,5 mm). The DDF equipment must be remote of DDF customer at maximum 1m. The BSC/MFS equipment provides only 120 Ohms E1 interfaces. For unbalanced networks, adaptation to 75 Ohms is performed at DDF equipment level. The faceplates have a BNC or 1.6/5.6 female connectors type. The customer must indicate to Alcatel the type of connector used on terminal block (only for 75 network).

4.9 External alarm connection requirements


The External Alarm Box is supplied with: DC power cable (2x1mm); maximum length = 20m. Ground cable Y/G 1.5 mm; maximum length = 10m. Ethernet cable length between EAB and BSC/MFS cabinet: 30m No special pre-equipped alarm interface cable is necessary. System wire connection (cage clamp) alarm input: 0.08 mm to 2.5 mm. The External Alarm Box should be protected by an external circuit breaker: 6A

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 25/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 4: Site preparation and supply requirements for Customer or Operator

4.10 - Site information requirements

The customer shall produce an overall drawing for each unit site.

General site The drawing shall be submitted to Alcatel, after the initial site inspection, or in preliminary project documentation concerning the site supplied by the customer. information requirements The drawing shall indicate the position of the unit with its connections, relative to a reference point. The site data sheet must be completed based on data provided by the client or during site inspection. The site information procedure document should be completed by the customer or during a site inspection visit with Alcatel. The operator shall hand over to the constructor, with the preliminary study document or on the occasion of the site inspection: A drawing of the distribution frame locating the links with technical and commercial numbers of each link. The links with transmit/receive loops set up on the cable side at the unit.. Links qualified as far as the unit. The client shall draw up a layout map for each site. The map will indicate the location of: racks, power supplies, air-conditioning system, cable ways, collector rod system, grounding plate, digital distribution frame (positioning of the terminal blocks), furniture for the operating and maintenance tools.

PCM site information requirements

Layout

That plan is submitted to the manufacturer, either after an initial inspection of the site or in a preliminary project file for the site provided by the client.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 26/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 5: Installation and supply requirements for Alcatel

5. Installation and supply requirements for Alcatel


This chapter describes the requirements about installation and supplies provided by Alcatel. 5.1 - Installation 5.2 - Supplies

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 27/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Chapter 5: Installation and supply requirements for Alcatel

5.1 - Installation The main services are as follows:


Fitting of BSC/MFS Evolution system The services provided are:

- Preliminary preparation. - Rack installation. - Additionnal shelf (ATCA or LIU) installation. - Power supply cables installation. - PCM cables installation. - Ethernet cables installation - External Alarm box installation - Finishing installation. and are detailed in EVOLIUM A9130 BSC/MFS Evolution installation manual. BSC/MFS Evolution powering up and running in accordance with EVOLIUM A9130 BSC/MFS Evolution commissioning manual. Customer agrees that BSC/MFS Evolution has been installed, commissioned and are running in accordance with EVOLIUM A9130 BSC/MFS Evolution acceptance test document.

Commissioning of BSC/MFS Evolution system Acceptance of BSC/MFS Evolution system

5.2 - Supplies Alcatel provides:


Mandatory Optional Installation kits to install A9130 BSC/MFS Evolution . PCM cables. Ethernet cables. Digital Distribution Frame. Power and ground cables.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 28/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Appendix A: Installation help, rack layout and shelf positions.

Appendix A: Installation help, rack layout and shelf positions.

PDU

Stand-alone configurations

ATCA shelf 4

1 3

1 1

1 0

1 2

1 4

XP E M

XL IU

XL IU

X L IU

XL I U

XL I U

XL I U

X L IU

XL IU

XM UX

X MU X X L IU

X LI U X L I U

X L IU

XL I U

XL I U

XL IU X L I U XP E M

XP E M

XL IU

XL I U X L IU

XL I U

XL I U

XL IU

X L IU

XL I U XM UX

X MU X X L IU

X L IU X L IU

X L IU

XL I U

XL IU

XL I U X L IU

XP E M

X P EM

X P EM

-4 8/ 60 V DC

- 48 /60 V DC

-4 8/ 60 V DC

-48 /60 V DC

4A

4A

4A

4A

BSC or MFS (9GP)

MFS (21GP)

ATCA shelf 3

1 3

1 1

1 0

1 2

1 4

Rack-shared configuration

X P E M X LIU X P EM

X LIU

X LI U

X LI U

X LI U

X LI U

X LIU

X LIU X M U X

X M U X X LIU

X L IU X LI U

X LI U

X LI U

X LIU

X LIU X LIU X P E M

LIU shelf 2 LIU shelf 1

-48 /6 0 VD C

-48 /6 0 VD C

4A

4A

XP E M

XL IU

XL I U X L I U

XL I U

XL I U

XL IU

X L I U X L IU X MU X

XM UX XL IU

X L IU

X L IU

XL I U

XL IU

X L I U X L I U X L IU

XP E M

X P EM

- 48 /60 V DC

- 48 /60 V DC

4A

4A

X P E M X LIU X P EM

X LIU

X LIU

X LIU

X LIU

X LIU

X LI U

X LIU X M U X

X M U X X L IU

X LIU X LIU

X LIU

X LIU

X LI U

X LI U X LIU X PE M
XP E M XL IU XL I U X L IU XL I U XL I U XL IU X L IU XL I U XM UX X MU X X L IU X L IU X L IU X L IU XL I U XL IU XL I U X L IU XP E M

X P EM

-4 8/ 60 V DC

-48 /60 V DC

4A

4A

-4 8/60 V DC

-48 /60 VD C

4A

4A

BSC/MFS or 2 x BSC

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 29/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Appendix B: Installation help, site cabling cable tray with A9130 BSC/MFS Evolution cabinet, power supply, DDF 120 ohms, EAB, LMT, ground plate.

Appendix B: Installation help, site cabling cable tray with A9130 BSC/MFS Evolution cabinet, power supply, DDF 120 ohms, EAB, LMT.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 30/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Appendix B: Installation help, site cabling cable tray with A9130 BSC/MFS Evolution cabinet, power supply, DDF 120 ohms, EAB, LMT, ground plate.

Clearance

AC Box

External Alarm Box

Ground Plate

Power Supply cabinet

600 mm

A9130 BSC/MFS Evolution

600 mm

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Equipment DDF 120 ohms

Status Released

LMT

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

Ethernet cable length = 20 m


1 meter

1 meter

Date 06/12/04

Page 31/34

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Appendix C: Installation help: Site cabling raised floor with A9130 BSC/MFS Evolution, power supply, DDF 75 ohms, EAB, LMT, ground plate.

Appendix C: Installation help, Site cabling raised floor with A9130 BSC/MFS Evolution, power supply, DDF 75 ohms, EAB, LMT.

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 32/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution Appendix C: Installation help: Site cabling raised floor with A9130 BSC/MFS Evolution, power supply, DDF 75 ohms, EAB, LMT, ground plate.

Clearance

AC Box

External Alarm Box

Ground Plate

Power Supply cabinet

600 mm

A9130 BSC/MFS Evolution

600 mm

Equipment DDF 75 ohms

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

600 mm

Status Released

LMT
546 mm

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

Ethernet cable length = 20 m


1 meter

1 meter

Date 06/12/04

Page 33/34

SPP-59, EVOLIUMTM A9130 BSC/MFS Evolution

Abbreviations
Sigle ATCA BSC CBC DC DDF E1 EAB GP GSM IP LIU LMT MFS O&M OMC-R PCM PDU SGSN SG SSW Base Station Controller Cell Broadcast Center. Direct Current Digital Distribution Frame 2.048 Mbit/s External Alarm Box GPU board for MX project (ATCA) Global System for Mobile communication Internet Protocol Line Interface Unit. Local Maintenance Tool. Multi-BSS Fast packet Server. Operation & Maintenance Operation and Maintenance Center - Radio Pulse Code Modulation Power Distribution Unit Serving GPRS Support Node Signal Ground Subrack SWitch END OF DOCUMENT Description Advanced Telecom Computing Architecture

Alcatel

File A70476A1.doc V61

Reference 8BL 00704 0076 DRZZA

Edition 01

Status Released

Date 06/12/04

Page 34/34

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

También podría gustarte