Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ARES Phase I - Advanced Power Generation Product Waukesha Engine APG1000TM Enginator
Waukesha Engine introduces APG1000TM engine & Enginator to serve the growing power generation needs throughout the world.
Introduction
ARES Phase I Project Goal:
Release a highly-competitive 1-MWe gas power-generation product for world-wide sale
Market Drivers:
Power generation focused product High efficiency Low emissions Lower total $/kWe No reduction in reliability
50 hz: 41%
50 hz Prime Power (Europe) 29% 50 hz Prime Power (World) 60 hz Peak Shave (US) 60 hz Prime Power (US)
13%
5% 12%
60 hz: 29%
24%
Performance
Frequency Speed KWe* HPb Mech Eff(%)* Elect. Eff(%)* BMEP PSI(Bar)
Jay Plastics
Commercialization Summary
The Waukesha Engine ARES program has successfully attained its ARES phase I goals:
42% brake thermal efficiency at 1.0 g/bhp-hr NOx emissions (before after-treatment) and offering electrical generating sets at a competitive price.
The advantage of ARES technology in the APG1000 when compared to its predecessor VGF P48GLD:
power output increased by more than 20% and efficiency improved by 13%, with decreased exhaust emissions, while maintaining its maintenance and reliability.