OPERATING MANAGEMENT RUNNING MAINTENANCE REPLACEMENT OF SYSTEMS RECENTLY REFURBISHED BUILDINGS RECENT LOW ENERGY BUILDING
RAMEAUX
Les Rameaux, Alle des Monts Dors 63370 LEMPDES. France. 70 dwellings. 3 low-rise horizontal blocks (3 stories) + 1 low-rise block (4 stories). Year of construction: 1970.
OPTIMIZATION SUGGESTION
List of interventions planned and proposed as options by the energy supplier in the contract in order to improve the energy performance. Profit-sharing clause on the energy supply and contractual clauses securizing the price of the energy (gas).
JABURKOVE
J.Jaburkov 1,3,5, 736 01 HAVIROV. Czech Republic. 36 apartments. Building national type T02B, 4 overground floors. Year of construction 1962
OPTIMIZATION SUGGESTION
Web portal use and impact improved thanks to direct communication with the tenants on new supports and focusing particular targets: certificates in the entrance, visualization tools, personal advising for the most energyconsuming tenants by the staff of the SHO, competition and pedagogic approach of the information.
HERNING
H2-College, 7400 Herning. Denmark. 66 dwelling for students. Year of construction: 2009.
College buildings. Target group = students (which mean frequent transfers, some period of vacancy in the dwellings and other characteristics regarding the use of the building and its energy equipment). H2 College is a pioneers work: the first passive house building for Danish SHOs. Located for maximum sunlight. Pre-fabricated elements. Double flow Ventilation system, heavily insulated, low energy windows and geothermal heat-system. Production of hot water and electricity from own Hydrogen Plant.
OPTIMIZATION SUGGESTION
Energy data shows an unacceptable huge difference between highest and lowest consumption among Tenants. In order to change/improve this situation Tenant information is planned to be distributed October 2012. The Information will provide some general guidelines for living in a passive house as well as more technical information of the equipment in the dwelling. At the moment it is not possible to separate the energy consumption in what is used for the ventilation system (incl. fan coils) and what is used for personal equipment - computers, Hi Fi, tv etc .
MLADI
Mladi 25 736 01 HAVIROV. Czech Republic. 66 appartments. Panel apartment building. National typology: OP1.11 Year of construction: 1983
OPTIMIZATION SUGGESTION
Check of the heating system scheme. Detect imperfections and errors in the scheme. Propose the correct positioning and dimensions of heating circuit elements, especially the pressure regulators: circulation pump overloaded causing excessive energy consumption for its activity. New positioning for a capillary pipe in the scheme between circulation pump, manual valve, and the differential pressure regulator in to reduce the over-consumption of the circulation pump.
RIESI
VIa Riesi 5, 10043 Orbassano. Italy. 1 Apartment Block, 51 dwellings, traditional construction Year of construction: 1995.
A new heating system based on three condensing boilers (Brand: Baltur - Model: Supergenio MC115, power: 115 kW each) and a smart metering system with adapter were installed in a quite recent building (1995). Tenants still complain about thermal discomfort, higher costs than before and too many differences of consumption rates among apartments. A better periodic control and cleaning of the boilers, boilers fume, exchanger, pumps and valves control has been planned in order to find solutions for this problem.
OPTIMIZATION SUGGESTION
Regulation of the temperature settings and calibration of the heating curves (slop and level, from 0.8 point to 2) once a month. The effects of these optimizatons and adjustments regarding the comfort and the bills of the tenants will be analyzed to find the good settings.
REVOLUCIJE
Trg revolucije 16 1420 TRBOVLJE. Slovenia. 14 storey. Building with walls and facade bricks, flat roof. 52 dwellings. Year of construction: 1970.
Hydraulic balancing of the heating system. Connecting valves were built-in on return flow line. Balancing valves Danfoss ASV-PV (adjustable differential pressure regulators) and Danfoss ASV-I (adjustable shutter valves and metering valves) were installed. In all appartments radiator valves were switched for new Danfoss thermostatic valves with additional fine regulation. At the end complete system was balanced and regulated with newly installed valves.
OPTIMIZATION SUGGESTION
Special context: SPEKTER doesnt own the heating station and, as a consequence, limited actions are possible on the system. Regulation of the system and thermal insulation of some district heating station parts will be discussed with the company managing the district heating. Tenants awareness on how to use thermostatic valves and ventilation with lower temperature of the system will be a preferred lever to optimize the ESM if direct intervention on the system is not possible.
AIGUILLADE
44, rue du Colombier 63000 CLERMONT-FERRAND. France. 1 long low-rise block. 7 stories for 196 dwellings. Year of construction: 1965
OPTIMIZATION SUGGESTION
Modification of the requested heat flow after a refurbishment of the building in order to maximize the economic efficiency reducing the standing charge linked to the access of the district heating system. This optimization solution improves the efficiency of a renewable-based model that is part of the legal obligations for Auvergne Habitat and optimize its general environmental strategy regarding energy.
10
HEINHEIMER
Heinheimer Strae 57-61 D-64289, Darmstadt. Germany. 30 dwellings. Simple family house from the 50s with 5 storeys. Year of construction: 1957.
OPTIMIZATION SUGGESTION
Radiators were not replaced and were sized according to the old supply temperature. Hydraulic balancing will ensured that each radiator gets the same amount of heat.
11
PASSONI
Via Passoni 14 10146 Turin. Italy. 1 Prefab building, 4 floors each, 12 dwellings. Year of construction: 1978
12
BERGSON
Place Bergson 63000 CLERMONT-FERRAND. (63). France. . 142 dwellings. 3 low-rise horizontal blocks (9 stories + 4 stories+ 9 stories). Year of construction: 1967
OPTIMIZATION SUGGESTION
The mechanical ventilation system (based on static pressure and on hourly settings) is adjusted with different settings on its different parts (fan, ducts, extractors) in order to see the impacts on flow rates, hygrometry and electric consumption of the ventilation system.
13
DESTINNOVE
E.Destinnov 1a,1b,1c 736 01 HAVIROV. Czech Republic. National type: OP1.11 Number of apartments: 68 Prefabricated building Overground floors: 8 Year of construction: 1960
OPTIMIZATION SUGGESTION
Thermovision with diagnosis on the weak points of the insulation. Intervention on the repetitive errors without having to enter into the appartments: reinforcement of the joints related to the windows frame.
MATHILDEN
Mathildenstrae 36-40 64285 DARMSTADT. Germany. 19 dwellings. 4 storey apartment building from the 50s, simple design. Year of construction: 1955
Global refurbishment wit the following measures: Insulation of cellar ceiling, faade and roof New Windows with heat protection glazing New heating system with a central boiler in the cellar and decentral heat exchanger in the dwellings Installation of an Ventilation system with supply air through the window frame and a central system in the cellar.
15
PICCO
Via Picco 53-55-62-64 10078 VENERIA REALE. Italy. 4 traditional buildings, 4 floors each, 28 dwellings. Year of construction: 1966
External shell insulation and windows substitution: In the framework of retrofitting actions, an insulated coat of 80mm was applied to an existing building dated 1960s. Existing single glazing were substituted with high performance double glazing. At the same time, the heating system was improved by the installation of new boilers and solar panels (for DHW).
OPTIMIZATION SUGGESTION
No technical intervention can be implemented on the ventilation system. Direct intervention toward the tenants in order to keep the ESM efficient and avoid condensation. Identification of the most performing behavior, education toward tenants and monitoring of the implementation of best practices by the tenants.
16
LYSTRUP
Centervej 30-56 8520 LYSTRUP. Denmark. 1 story building. 14 dwellings. Year of construction: 1984
OPTIMIZATION SUGGESTION
Separation between the heating recovering system and the underfloor heating system adding a control valve for the heating coil of the ventilation system in order to make its control independent (to save energy at the beginning and at the end of the heating season).
17
FAKIN
Trg Franca Fakina 2a. 1420 TRBOVLJE. Slovenia. 8 storey building with 31 appartments made of concrete walls. Year of construction: 1990
OPTIMIZATION SUGGESTION
Thermography and potential elimination of small thermal bridges coupled with direct intervention toward tenants (to be precised).
18
MARSLET
Kildevang, Langballevej 9A-9H 8320 MRSLET. Denmark. 8 New houses; New constructions. Year of construction: 2011
OPTIMIZATION SUGGESTION
Replacement of one comfort valve of the heat exchanger for the Domestic Hot Water. The comfort valve was soliciting permanently the heating system and consuming energy.
19
SAVINJSKA
Savinjska cesta 9b, 1420 TRBOVLJE. Slovenia. 5 storey building with 13 appartments made of reinforced concrete Year of construction: 2006.
OPTIMIZATION SUGGESTION
to be determined
20
OPTIMIZING
21
OPT