TITLE

CIVIL STRUCTURE CALCULATION SHEET OF 2000 BBLs


TANK CAPACITY
DOCUMENT NO
FORMAT
REV
SHEET
F007-12-CAL-CS-001
A
1 of 10
CLIENT
PT. PERTAMINA EP UBEP LIRIK
PROJECT TITLE

PEMBANGUNAN SATU UNIT TANKI 2000 BBLs, SATU UNIT TANKI


5000 BBLs, SATU UNIT TANKI 10000 BBLs DI FIELD PERTAMINA
EP UBEP LIRIK

PT. PERTAMINA EP
UBEP LIRIK

CIVIL STRUCTURE CALCULATION SHEET OF


2000 BBLs TANK CAPACITY

PT. KLARAS PUSAKA INTERNASIONAL


PREPARED BY

PT. PERTAMINA EP UBEP LIRIK


CHECKED/REVIEWED BY
APPROVED BY

Issued For Review

20-Mar-11

NP

ERT

ARF

REV

DESCRIPTION REVISION

DATE

Prepare

Check

Approved

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

DOCUMENT CHANGES HISTORY


PAGES

REV. NO

DATE

REMARKS

REV
A

SHEET
1 of 10

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

REV
A

SHEET
1 of 10

DAFTAR ISI
1.0.

TUJUAN

..........................................................................................................................

2.0.

REFERENSI

3.0.

KRITERIA DESIGN

3.1.
3.2.
3.3.

Material .................................................................................................................................
Beban Rencana
.................................................................................................................................
.................................................................................................................................
Kombinasi Pembebanan .................................................................................................................................

4
5
5

4.0.

DETAIL PERHITUNGAN

.................................................................................................................................

4.1.
4.2.
4.3.
4.4.
4.5.
4.6.

Denah dan Potongan


.................................................................................................................................
Data Pembebanan
.................................................................................................................................
Foundation Outline
.................................................................................................................................
Ringkasan Pembebanan
.................................................................................................................................
Stability of Foundation
.................................................................................................................................
Perhitungan Ring Wall
.................................................................................................................................

5
6
6
7
7
9

..........................................................................................................................
..............................................................................................................

ATTACHMENT 1: TANK LOADING CALCULATION

4
4
4

10

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

1.0 TUJUAN
Dokumen ini bertujuan untuk memperlihatkan hasil perhitungan untuk Pondasi Tangki Air Kapasitas 5000 Bbl
pada proyek SPU Anggana UBEP Lirik
2.0 REFERENSI
Referensi yang digunakan antara lain:
: Petunjuk Perencanaan Beton Bertulang dan struktur Dinding
Bertulang untuk Rumah dan Gedung, 2002

1. SNI 03 1734
2. SNI 03 1727

: Pedoman Perencanaan Pembebanan untuk Rumah dan

3. SNI-03-1726-2002

: Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung

4. UBC 1997

: Uniform Buildiing Code 1997

5. ACI 318 02

: American Concrete Institute : Building Code Requiriments for Buildings

6. API650

: American Petroleum Institute : Welded Steel Tanks for Oil Storage

7. ASCE

: American Society of Civil Engineering : Minimum Design Loads for

Gedung, 2002

Building and Other Structures


8. ASTM A615

: American Society for Testing Materials Specification for Deformed

9. ASTM A36

: Standard Specification for Structure Steel. and Heat Treated Joints

10. AISC 9 th Edition

: American Institute of Steel Construction

and Plain Billet Steel Bars for Concrete Reinforcement

11. Soil test report yang dilakukan oleh Laboratorium Teknik Sipil Politeknik Negeri Samarinda

3.0 KRITERIA DESAIN


3.1 Material
Spesifikasi Material :
Baja
Beton
Tulangan Utama
Tulangan Sengkang
Anchor Bolt
Berat Jenis Beton

:
:
:
:
:

Berat Jenis Tanah


Berat Jenis Pasir (Sirtu)

ASTM A-36
K-300
BJTD40/ASTM 615
BJTD24/ASTM 615
ASTM 307

2400
280
4000
2400
20
2400

fy
f`c
fy
fy
ft
gbeton

=
=
=
=
=
=

kg/cm2
kg/cm2
kg/cm2
kg/cm2
kips
kg/m3

gtanah

= 1830

kg/m3

gpasir

= 1800

kg/m3

REV
A

SHEET
1 of 10

TITLE

- EP
UBEP Sangasanga & Tarakan

CIVIL STRUCTURE CALCULATION SHEET OF


2000 BBLs TANK CAPACITY
DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

REV
A

SHEET
1 of 10

3.2 Beban Rencana


Beban Rencana yang bekerja adalah:
: DL
- Beban Mati
: OL
- Beban Operation
: WL
- Beban Angin
: EL
- Beban Gempa
3.3 Kombinasi Pembebanan
Kombinasi untuk pembebanan mengacu pada LRFD
- 1.4 DL
- 1.2 DL + 1.6 OL
- 1.2 DL + 1.6 WL + 0.5 OL
- 1.2 DL 1.0 EL + 0.5 OL
- 0.9DL (1.6 WL atau 1.0 EL)
4.0 DETAIL PERHITUNGAN
4.1 DENAH dan POTONGAN
DATA :
H1
OD
D
d

=
=
=
=

t
b
Sx
Sy
Cx1
Cx2

=
=
=
=
=
=

(tinggi tanki)
(outer diameter tanki)
(inner diameter tanki)
(tinggi pondasi di atas
telapak)
0.30 m (tinggi pondasi telapak)
0.75 m (lebar pondasi)
outer diameter pondasi
tinggi pondasi
inner diameter pondasi
lebar pondasi telapak

Sx
Sy
Cx1
Cx2
Cx3

=
=
=

D + 2*0.5b
t+d
D - 2*0.5b

Cx1 - 2*0.6

6.00
8.40
8.39
8.00

m
m
m
m

=
=
=
=
=

9.14
8.30
7.64
2.00
6.44

m
m
m
m
m

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

REV
A

SHEET
1 of 10

4.2 Data Pembebanan


- Dead Load, Shell, Roof, & Ext.Structure Loads

: DL

762.43

kg/m

- Live Load

: LL

122.00

kg/m

- Uniform Load, Operating Condition

: WO

5,530.95

kg/m2

- Uniform Load, Hydrotest Load

: Wh

6,372.16

kg/m2

- Base Shear due to Wind

: WL

4,571.69

- Reaction due to Wind

: RW

71.17

kg/m

- Moment Due to Wind


- Base Shear due to Seismic Load
- Reaction due to Seismic Load

: MW
:V
: RS

13,715.07
928.40
11.75

kg.m
kg
kg/m

- Moment Due to Seismic Load

: MS

2,785.19

kg.m

4.3 Foundation Outline


- Lebar Ring Wall
- Tinggi Ring Wall
- Soil Cover
-

Footing Outer Dia


Footing Inner Dia

Areas & Moment of Inertia


- Area of Ring Foundation

b=
d+t =
d+t =

0.75
8.30
8.30

m
m
m

Sx =
Cx1 =

9.14
7.64

m
m

Sx
D
Cx1

AF = ( Sx2-Cx12 ) / 4
2

Area of Soil

Area Enclosed by Tank


AT = D2 / 4
W
= Section modulus of ring foundation
= 1/32 * p * (Sx3 - Cx13)

kg

AS = Cx1 / 4

19.78 m

197,778.97 cm

45.89 m

458,913.93 cm

55.34 m

553,385.55 cm

31.21 m

31,210,771.90 cm3

Loading at Bottom of Foundation


% Content Load transferred to Ring ( P1 )

17.07%

P1 = (AT - AS) / AT (%)

% Content Load transferred to Soil ( P2 )

82.93%

P2 = 100% - P1

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

FORMAT
A4

REV
A

SHEET
1 of 10

4.4 Ringkasan Pembebanan


Beban yang akan menjadi input dalam analysis
Vertical (kg)
Below Ring (NR)
Below Soil (NS)

Beban

Remarks

DL

Equip Erecting

20,105.63

WO

52,251.82

LL

3,217.20

W O + LL

55,469.02
1,876.72
309.88

OL
WL
EL

Wind Load
Seismic Load

Horisontal (kg)
H

253,823.18
169,222.91
-

Moment (kg.cm)
Mo
-

4,571.69
928.40

1,371,506.96
278,518.51

4.5 Stability of Foundation


Asumsi data tanah seperti dibawah ini
Titik CPT
Kedalaman
qc
qc @1.5m Satuan
1.40
3.20
Titik S-01
3.20
1.60
3.20
1.40
8.52
Titik S-02
10.65 kg/cm2
1.60
12.78
1.00
6.39
Titik S-03
5.59
3.00
3.20
6.48 kg/cm
Rata-rata qc
=
3
SF
=
Menurut Schmertmann (1978), untuk tanah lempung dengan pondasi persegi, daya dukung tanah yang diijinkan adalah sbb:
(5+0.34*qc)/SF
sall
=
= (5+0.34*6.48)/3
2.40
=
kg/cm
Maximum Soil Pressure Below Ring
dan
Maximum Soil Pressure Below Soil
Cek Soil Pressure

: PR = NR / AF + M/W

< Pallow : Allowable Soil Pressure

: PS = NS / AS

< Pallow : Allowable Soil Pressure


s (kg/cm2)
PR

PS

Allowable

Hasil
(PS dan PR < Allow)

0.142

0.000

2.40

PASS

0.545

0.88

2.40

PASS

0.070

0.340

0.277

2.40

PASS

0.256

0.009

0.265

0.277

2.40

PASS

1.2 DL - 1.0 EL + 0.5 OL

0.253

-0.009

0.244

0.277

2.40

PASS

0.9DL + 1.0 EL

0.093

0.009

0.102

0.000

2.40

PASS

0.9DL - 1.0 EL

-0.002

-0.009

-0.010

0.000

2.40

PASS

Kombinasi Beban

NR/AF

M/W

1.4 DL

0.142

0.000

1.2 DL + 1.6 OL

0.545

0.000

1.2 DL + 1.6 WL + 0.5 OL

0.269

1.2 DL + 1.0 EL + 0.5 OL

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

Cek Overturning
Resistant moment : Mr = N.Do / 2 (kg-cm)
Safety Factor
: Fo = Mr/Mo
Kombinasi Beban

FORMAT
A4

REV
A

SHEET
1 of 10

> Foallow : Minimum Safety Factor for Overturning

Mr (kg.cm)

Mo (kg.cm)

Fo = Mr/Mo

Foallow

Hasil
(Fo > Foallow)

1.4 DL

11,822,109.60

999.00

1.50

PASS

1.2 DL + 1.6 OL

47,408,419.56

999.00

1.50

PASS

1.2 DL + 1.6 WL + 0.5 OL

23,042,887.24

2,194,411.14

10.50

1.50

PASS

1.2 DL + 1.0 EL + 0.5 OL

21,911,880.25

278,518.51

78.67

1.50

PASS

1.2 DL - 1.0 EL + 0.5 OL

21,651,582.57

(278,518.51)

77.74

1.50

PASS

0.9DL + 1.0 EL

7,730,076.44

278,518.51

27.75

1.50

PASS

0.9DL - 1.0 EL

7,469,778.76

(278,518.51)

26.82

1.50

PASS

Fsallow

Hasil
(Fo > Foallow)

Cek Overturning
Resistant force
: Hr = 0.5 N (kN)
Safety Factor
: Fs = Hr / H
Kombinasi Beban

> Fsallow : Minimum Safety Factor for Sliding


Hr (kg.cm)

Ho (kg.cm)

Fs = Hr/Ho

1.4 DL

14,073.94

999.00

1.50

PASS

1.2 DL + 1.6 OL

56,438.59

999.00

1.50

PASS

1.2 DL + 1.6 WL + 0.5 OL

27,432.01

7,314.70

3.75

1.50

PASS

1.2 DL + 1.0 EL + 0.5 OL

26,085.57

928.40

28.10

1.50

PASS

1.2 DL - 1.0 EL + 0.5 OL

25,775.69

928.40

27.76

1.50

PASS

0.9DL + 1.0 EL

77,300.76

928.40

83.26

1.50

PASS

0.9DL - 1.0 EL

74,697.79

928.40

80.46

1.50

PASS

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER
F007-12-CAL-CS-001

4.6 Perhitungan Ring Wall

FORMAT
A4

REV
A

SHEET
1 of 10

C. L

PS

F
df

Di

Ka gsoil df

KaPS

Beban merata terfaktor yang bekerja pada Ring Wall adalah tegangan maximum yang terjadi
pada kombinasi beban 1.2DL + 1.6OL, sebesar
0.545
qu
=
kg/cm
5,446.97 kg/m2
=
Data Tanah :
1830
gsoil
=
kg/m3
11.2
=
deg
f
Ka
= tan2 (45-f/2)
= 0.674713173
Data Ring Wall:
Lebar Ring Wall: b
= 0.75 m
7.64 m
Inner Diameter: Di
= Cx1 =
Tinggi Ring Wall: df
= 8.30 m
Pembebanan
- Hoop Stress

Hoop Tension

= qu*Ka*df

30,503.70 kg/m

F2
F

= *gsoil*Ka*df2
= F1 + F2

=
=

42,530.11 kg/m
73,033.80 kg/m

= *F*Di

: F1

Penulangan Keliling (Circumferencial Reinforcement)


- Luas Tulangan untuk Hoop Tension
At
= T/fy
- As min / ACI-318-05-14.3.3
Asmin = 0.0025*b*df
Area of Steel Required =

6,978.38 mm2

15,562.50 mm2
mm2

15562.50

AREQ
Bar size (db)
Sectional area
Required No. of Bars

279,135.20 kg

12
113
138

mm2
mm2

Menurut ACI 318 Section 14.3.4, untuk tebal dinding pondasi lebih dari 250mm, harus mempunyai reinforcement dalam 2 (dua)
layer paralel dengan muka (face ) dari dinding.
Digunakan tulangan 69 - D12 Bars on each face
Penulangan Vertikal (Vertical Reinforcement)
- As min / ACI-318-05-14.3.2
Asmin = 0.0015*b
Bar size (db)
Sectional area
Required spacing of bars

Digunakan

1,125.00 mm2/m
mm2
mm2
mm
D12 @ 200 mm c/c (D22-200)
=

12
113
101

UBEP Sangasanga & Tarakan

TITLE
PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL
ATTACHMENT 1
DOCUMENT NUMBER
F007-12-CAL-CS-001

REV
A

FORMAT
A4

TANK LOADING CALCULATION

TOTAL
E & P INDONESIE
1 REFERENCE
MECHANICAL DESIGN

PT. WIFGASINDO DIN. INSTR. ENG.


PT. GUNANUSA UTAMA

- Mechanical Data Sheet No. : F007-12-CAL-ME-002-Mechanical Calculation Sheet of 5000 BBLs Tank Capacity
- Drawing No. : F007-12-DWG-ME-002
2

DEAD LOAD (D)

2.1 Plat Dinding


- Course 1, Plat 1524 x 6096 x
- Course 2, Plat 1524 x 6096 x
- Course 3, Plat 1524 x 6096 x
- Course 4, Plat 1524 x 6096 x
- Course 5, Plat 1524 x 6096 x
- Course 6, Plat 1380 x 6096 x
Total Berat Plat Dinding

Qty
6
6
6
6
6
6

pcs
pcs
pcs
pcs
pcs
pcs

Weight (kg/mm m2)


7.85
7.85
7.85
7.85
7.85
7.85

Total Weight (kg)


2,625.44
2,625.44
2,625.44
2,625.44
2,625.44
2,377.37
13,127.20

2.2 Plat Dasar


2
- No. 1-7 Plat 8.975m x 12mm Thk, A-36:
Total Berat Plat Dasar

Qty
7

pcs

Weight (kg/mm m2)


7.85

Total Weight (kg)


5,918.12
5,918.12

2.3 Plat Atap


- No. 1-9, Plat 1828 x 6096 x 6mm Thk, A-36:
Total Berat Plat Atap

Qty
9

pcs

Weight (kg/mm m2)


7.85

Total Weight (kg)


4,723.72
4,723.72

Qty
8.77
96.408
92.508
61.68
30.828
36.108
20.376
1
4
1
1
1
12
48
24
24

m
m
m
m
m
m
m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
set
set

Unit Weight
42.49
28.23
21.4
21.4
21.4
21.4
21.4
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85

6mm
6mm
6mm
6mm
6mm
8mm

Thk,
Thk,
Thk,
Thk,
Thk,
Thk,

A-36:
A-36:
A-36:
A-36:
A-36:
A-36:

2.4 Tiang Mast dan Rangka Atap


- Pipe 8", L=8.770m, Sch. 40, 1pcs
- Pipe 6", L=8.034m, Sch. 40, 12pcs
- Rafter1, L=7.709m, UNP 180x75x7mm, 12pcs
- Rafter2, L=5.140m, UNP 180x75x7mm, 12pcs
- Rafter3, L=2.569m, UNP 180x75x7mm, 12pcs
- Girder1, L=3.009m, UNP 180x75x7mm, 12pcs
- Girder2, L=0.849m, UNP 180x75x7mm, 24pcs
- Base Plat Center Colum 850 x 850 x 8mm Thk, A-36:
2
- Stiffener Plat Center Colum 0.09m x 8mm Thk, A-36:
2
- Base Plate Water Drench 0.890m x 8mm Thk, A-36:
- Neck Plate Water Drench 4350x300x8mm Thk, A-36:
2
- Stiffener Plat Center Drum 0.226m x8mm Thk, A-36:
- Base Plat Middle Colum 500 x 500 x 8mm Thk, A-36:
- Bracket Plat Middle Column 8mm Thk, A-36:
- Bracket & Plat Shell Middle Column 8mm Thk, A-36:
- Rafter Girder Support Plate & Bracket 8mm, A-36:
Total Berat Tiang Mast dan Rangka Atap

Page 10 of 12

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm

Total Weight (kg)


372.64
2,721.60
1,979.67
1,319.95
659.72
772.71
436.05
m2
45.37
m2
22.61
m2
55.89
m2
81.95
m2
14.19
m2
188.40
m2
94.20
m2
565.20
m2
565.20
9,895.35

SHEET
10 of 10

UBEP Sangasanga & Tarakan

TITLE
PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL
ATTACHMENT 1
DOCUMENT NUMBER
F007-12-CAL-CS-001

2.5 Nozzles
- N1 & N17, 3" Sch.40 Pipe:
- N1 & N17, 3" Flange:
- N3, N4, N9, N15, 4" Sch.40 Pipe:
- N3, N4, N9, N15, 4" Flange:
- N2, N5, N10, N11, N13 & N14, 6" Sch.40 Pipe:
- N2, N5, N10, N11, N13 & N14, 6" Flange:
- N7, N8, N12, N16, 8" Sch.40 Pipe:
- N7, N8, N12, N16, 8" Flange:
- N6, 10" Sch.40 Pipe:
- N6, 10" Flange:
- N18 - N21, 1" Sch.40 Pipe:
- N22, 2" Sch.40 Pipe:
- M1, M2, C1, 24" Sch.40 Pipe:
Total Berat Nozzles

Qty
0.4
1
1.6
4
2.4
6
1.6
4
0.4
1
1.6
0.4
1.2

2.6 Tangga & Handrail


- Round Bar 19 x 1700mm Length, ASTM A36:
- Bracing 60 x 60 x 6mm, ASTM A36:
- Pad Plate, 100 x 150 x 6mm, ASTM A36:
- Support, 762 x 300 x 10mm Thk, ASTM A36:
- Pipe 1-1/2", Sch. Std, CS
- Checquered Plate, 700 x 400 x 4.5mm, ASTM A36:
- Round Bar 19 x 1370mm Length, ASTM A36:
- CNP. 200 x 80 x 7.5mm, 1400mm Length, ASTM A36
- CNP. 200 x 80 x 7.5mm, 964mm Length, ASTM A36
- CNP. 200 x 80 x 7.5mm, 1200mm Length, ASTM A36
- CNP. 200 x 80 x 7.5mm, 762mm Length, ASTM A36
- Checker Plate, 762 x 1200 x 4.5mm, ASTM A36:
- L 60 x 60 x 6mm, 1070mm Length, ASTM A36:
- Pipe 1-1/2", Sch. Std, 6000mm Length, CS
- Pipe 1-1/4", Sch. Std, 6000mm Length, CS
- FB 75 x 6mm, 6000mm Length, ASTM A36
Total Berat Tangga & Handrail

Qty
30
0.995
1
1
11.661
30
5
3
2
2
2
1
35
9
9
9

Total WEIGHT
- Tolerancy
Dead Load (DL)
-

Inner Diameter Tank


Keliling Tank

Dead Load, DL
3

=
=

8.39 m
26.37 m

1,303.12 kg/m

LIVE LOAD (L)


- Uniform Roof Load
=
- Roof Load (Live Load)
=
- Roof Load (Live Load) =

122

ea
ea
ea

31,239.88
3,123.99
34,363.87

860

kg/m3
272,620.00 kg

2
1/4**ID2 m
2
55.34 m

Luas Area Tank

Uniform Load, Operating Condition, W O

=
=

Unit Weight
3.791
kg
5.42
kg/m
0.019625
kg
0.179451
kg
4.05
kg/m
0.502755556
kg
3.0551
kg
34.44
kg
23.7144
kg
29.52
kg
18.7452
kg
1.641856
kg
5.7994
kg
24.3
kg
20.34
kg
21.18
kg

=
=
=

=
=

Berat Fluida / Luas di bawah Tank

UNIFORM LOAD, HYDROSTATIC CONDITION


3
- Nominal Capacity :
795 m
(Data Sheet)
- Berat Fluida (Produced Water) =
1010 kg/m3 * 1600 m3
Uniform Load, Hydrostatic Condition, W h

kg/m2

4,926.40

12,354.86

Page 11 of 12

REV
SHEET
A
10 of 10
Total Weight (kg)
4.51
3.70
25.70
23.60
67.75
51.60
67.98
54.80
24.10
19.50
4.00
2.17
305.38
654.78

kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg/m
kg/m

kg/m2
(Data Sheet)
6,751.30 kg
256.02 kg/m

UNIFORM LOAD, OPERATING CONDITION


3
- Working Capacity :
317 m
(Data Sheet)
- SG Fluida
:
0.86
(Data Sheet)
SG Fluida / SG Water * 1000 kg/m3
- Berat Jenis Fluida :
- Berat Fluida (Produced Water) =
1010 kg/m3 * 1512 m3

ea
m
ea
ea
m
ea
ea
ea
ea
ea
ea
ea

10%

=
5

FORMAT
A4
Unit Weight
m
11.27
pcs
3.7
m
16.06
pcs
5.9
m
28.23
pcs
8.6
m
42.49
pcs
13.7
m
60.24
pcs
19.5
m
2.5
m
5.43
m
254.48

683,700.00 kg
kg/m2

Total Weight (kg)


113.73
5.39
0.02
0.18
47.23
15.08
15.28
103.32
47.43
59.04
37.49
1.64
202.98
218.70
183.06
190.62
1,241.19
Kg
Kg
Kg

TITLE
PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL
ATTACHMENT 1

UBEP Sangasanga & Tarakan

DOCUMENT NUMBER
F007-12-CAL-CS-001
6

WIND LOAD (WL)


- Wind Speed
- OD Shell Plate
- Tinggi Tanki, H
- Vertical Plane

126 km/hr
8.40
m
6.00
m
=
OD x H

REV
A

(Data Sheet)

2
50.40 m
=
Dari UBC 1997
Ce Cg qs Iw
Design Wind Pressure, P =
Ce
=
combined height, exposure and gust factor coefficient as given in Table 16-G (UBC 1997)
=
1.23 (Exposure C)
Cg
=
pressure coefficient for the structure or portion of structure under construction as given in Table 16-H (UBC 1997)
=
0.8 (winward wall)
qs
=
wind stagnation pressure at standard height of 10000 mm as forth in Table 16-F (UBC 1997)
2
=
0.79 kN/m
(16.4 psf)
Iw
=
importance factor as set forth in Table 16-K (UBC 1997)
=
1.15 (Essential facilities)
2
P
=
0.89 kN/m
(g = 9.8 m/s2)
Wind Load, W L
=
P x Av
=
44.80 kN
=
4,571.69 kg

Momen di dasar tangki akibat W L

MW =
W L x H/2
Reaction due to W L, Rw

Rw

=
=
=
Av

FORMAT
A4

13,715.07

W L/(0.87*D) x H/2
1,876.72 kg
71.17
kg/m

=
=
=

kg.m

(pembebanan di ringwall / keliling tanki)

SEISMIC LOAD (EL or V)


- Seismic Factor
: SUG II (Data Sheet)
0.15
- Seismic Zone Factor, Z =
(Table E-2 API-650 untuk Seismic Factor 2A)
- Maximum Seismic Load (design base shear): V
(UBC 1997 Section 1630.2.1)
V
=
2.5*Ca*I*W/R
Ca
I
R

0.18
1.25
4.5

=
=
=

W
Vmaks

=
=

(table 16-Q UBC 1997, untuk Sc dan Z=0.15)


(table 16-K UBC 1997, untuk Essential facilities)
(table 16-N UBC 1997, untuk Concrete shear walls)
34,363.87 kg

DL + W O
4,295.48 kg

Minimum Design Seismic Load (design base shear): V


V
=
0.11*Ca*I*W
850.51 kg
Vmin
=

(UBC 1997 Section 1630.2.1)

Design Seismic Load (design base shear): V


V
=
Cv*I*W/(R*T)

(UBC 1997 Section 1630.2.1)

Ct(hn)3/4

Ct
hn
T

=
=
=

0.0731
7.2
0.321

Cv

0.25

V
-

(UBC 1997 Section 1630.2.2 Method A)

(table 16-R UBC 1997, untuk Sc dan Z=0.15)

Momen di dasar tangki akibat V


MS =
V x H/2
=
Reaction due to V, Rw
Rs =
V/(1.07*D) x H/2
=
309.88 kg
=
11.75 kg/m

928.40 kg

(digunakan yang ini)

2,785.19

kg.m

(pembebanan di ringwall / keliling tanki)

Page 12 of 12