Submitted By: Prince Leonard R. Vergara Submitted To: Mrs. Marilou C. Estrada
ACCOMPLISHMENTS - Briefing regarding on the training at Team Energy. - Power Point Presentation on General Rules of Safety and Health. - Orientation on Security. - Power Point Presentation on Power Plant Fundamentals. - Appointment on designated Department. - Briefing regarding on the rules and safety on the job training. - Assist on routine maintenance on the SRA cooling system. -Lecture on work order general procedures. -PTW -RAC -SFT - PTW ROMP - Tour and discussion on the main operating systems at the main plant. - Desiccant Replacement. - Tour and discussion on the main operating systems at the main plant. - Inspection and cleaning at the Cooling Tower. - Tour and introduce the different types of valves that are commonly used at the Power Plant. - Discussion on different types of pumps at the limestone preparation area. - Sketch the shafting of agitator at the FGD. - Tour and overview on the process at the FGD area. - Dismantling and overhauling of Hydraulic Jack. - Ash collector 1A patching of Belzona at Equalizing Pipe. - Assist on schedule routine maintenance of fly ash collector 2 Alpha. - Inspection on upper and lower dump valve. - Assist on rectifying ash leak at the collector 2 Alpha Discharge Valve. - Check and repair suspected bend Pug Mill rotor shafting. - Change of packing seal at the Absorber tank agitator. - Close inspection port at the fly ash collector 2 Alpha. - Assist on clearing fly ash Electrostatic Hopper 20.
May 4, 2012
- Assist on replacing the packing seal of Unit 2 SBLO 208, 222 and 220. - Readjust and retighten packing of Unit 2 SBLO 202, 215, 230, 226. - Conducted monthly routine of Unit1 SSC 1 WK 120420-0388. - Replace the packing and calibrated the blowing steam pressure at Unit 2 SBLO 216, 214 and 210. - Semiannual routine maintenance at Unit 1 Boiler Feed pump. - Assist on rectifying the leak at Phosphate Dosing pump suction line. - Assist on rectifying and checking the oil leak at the casing of Unit 1 (C) Mill Main Speed Reducer. - Assist on disconnecting By pass hose to tank reservoir. - Connect Hydraulic Hose to HPP going to crusher. - Short discussion about Alignment. - Assist on rectifying the pump low discharge of Unit 1 and 2 Ammonia Injection Pump-007. - Assist on checking and correcting the HP and IP pressure stop valve. - Assist on rectifying the leak on HP heater. - Assist on putting packing seal in the classifier - Install membrane on skid J at the Reverse Osmosis Plant. - Assist on pulling out t Ball mill Recirculation Pump A at the limestone preparation area due to unusual sound. - Dismantle the Ball mill Recirculation Pump A for Troubleshooting.
May 7, 2012
- Assemble the Ball mill Recirculation Pump A. - Assist on repacking and rectifying the packing seal at the limestone preparation area.
May 8, 2012
May 9, 2012
- Assist on finishing the assembly of Scrubber Dump Sump Pump. - Assist on the removal and installation of membrane at skid J at the Reverse Osmosis Plant.
(Scrubber Dump Sump Pump) May 10, 2012 May 11, 2012 May 12, 2012 - Assist on aligning the Waste Water Belt Press. - Assist on replacing the Drive end Bearing at Skid D. - Assist on adjusting the Mechanical Seal on the drive end at the Skid D. - Assist in the installation of Scrubber Dump Sump Pump. - Assist on rectifying the piping at the Waste Water Treatment Plant. - Assist on pulling out the Discharge Pump A at Skid J. (On Progress)
(Discharge Pump A)
- Assist on removal of Discharge Pump A at Skid J. - Dismantle the Screen Spray Wash Pump for troubleshooting.
(Screen Spray Wash Pump) May 15, 2012 - Assist on the installation of new Discharge Pump A on Skid J. - Assist on rectifying the leak at the Hyrdocyclone Piping. -Assist on the assembly of Screen Spray Wash Pump.
(Assembly of Screen Spray Wash Pump) May 17, 2012 May 18, 2012 May 19, 2012 - Assist on the installation of Screen Spray Wash Pump. - Assist on rectifying the problem at the Backwash pump Delta. - Assist on dismantling the gearbox. - Assist on the installation of rectified flange adaptor and new valve at the Backwash Pump Delta.