May 22, 2012

ON THE JOB TRAINING DAILY REPORT


(SAINT LOUIS UNIVERSITY)

Submitted By: Prince Leonard R. Vergara Submitted To: Mrs. Marilou C. Estrada

DATE April 10, 2012

April 11, 2012

April 12, 2012

April 13, 2012

April 16, 2012

April 17, 2012

April 18, 2012

April 19, 2012 April 20, 2012 April 21, 2012

ACCOMPLISHMENTS - Briefing regarding on the training at Team Energy. - Power Point Presentation on General Rules of Safety and Health. - Orientation on Security. - Power Point Presentation on Power Plant Fundamentals. - Appointment on designated Department. - Briefing regarding on the rules and safety on the job training. - Assist on routine maintenance on the SRA cooling system. -Lecture on work order general procedures. -PTW -RAC -SFT - PTW ROMP - Tour and discussion on the main operating systems at the main plant. - Desiccant Replacement. - Tour and discussion on the main operating systems at the main plant. - Inspection and cleaning at the Cooling Tower. - Tour and introduce the different types of valves that are commonly used at the Power Plant. - Discussion on different types of pumps at the limestone preparation area. - Sketch the shafting of agitator at the FGD. - Tour and overview on the process at the FGD area. - Dismantling and overhauling of Hydraulic Jack. - Ash collector 1A patching of Belzona at Equalizing Pipe. - Assist on schedule routine maintenance of fly ash collector 2 Alpha. - Inspection on upper and lower dump valve. - Assist on rectifying ash leak at the collector 2 Alpha Discharge Valve. - Check and repair suspected bend Pug Mill rotor shafting. - Change of packing seal at the Absorber tank agitator. - Close inspection port at the fly ash collector 2 Alpha. - Assist on clearing fly ash Electrostatic Hopper 20.

April 23, 2012

April 24, 2012

April 25, 2012

April 26, 2012

April 27, 2012 April 28, 2012

April 30, 2012 May 2, 2012 May 3, 2012

May 4, 2012

- Assist on replacing the packing seal of Unit 2 SBLO 208, 222 and 220. - Readjust and retighten packing of Unit 2 SBLO 202, 215, 230, 226. - Conducted monthly routine of Unit1 SSC 1 WK 120420-0388. - Replace the packing and calibrated the blowing steam pressure at Unit 2 SBLO 216, 214 and 210. - Semiannual routine maintenance at Unit 1 Boiler Feed pump. - Assist on rectifying the leak at Phosphate Dosing pump suction line. - Assist on rectifying and checking the oil leak at the casing of Unit 1 (C) Mill Main Speed Reducer. - Assist on disconnecting By pass hose to tank reservoir. - Connect Hydraulic Hose to HPP going to crusher. - Short discussion about Alignment. - Assist on rectifying the pump low discharge of Unit 1 and 2 Ammonia Injection Pump-007. - Assist on checking and correcting the HP and IP pressure stop valve. - Assist on rectifying the leak on HP heater. - Assist on putting packing seal in the classifier - Install membrane on skid J at the Reverse Osmosis Plant. - Assist on pulling out t Ball mill Recirculation Pump A at the limestone preparation area due to unusual sound. - Dismantle the Ball mill Recirculation Pump A for Troubleshooting.

May 7, 2012

- Assemble the Ball mill Recirculation Pump A. - Assist on repacking and rectifying the packing seal at the limestone preparation area.

(Assembly of the Ball Mill Recirculation Pump Alpha)

May 8, 2012

- Assist on Assembly of the Scrubber Dump Sump Pump. (in progress)

(Rectified Scrubber Dump Sump Pump)

May 9, 2012

- Assist on finishing the assembly of Scrubber Dump Sump Pump. - Assist on the removal and installation of membrane at skid J at the Reverse Osmosis Plant.

(Scrubber Dump Sump Pump) May 10, 2012 May 11, 2012 May 12, 2012 - Assist on aligning the Waste Water Belt Press. - Assist on replacing the Drive end Bearing at Skid D. - Assist on adjusting the Mechanical Seal on the drive end at the Skid D. - Assist in the installation of Scrubber Dump Sump Pump. - Assist on rectifying the piping at the Waste Water Treatment Plant. - Assist on pulling out the Discharge Pump A at Skid J. (On Progress)

May 13, 2012

(Discharge Pump A)

May 14, 2012

- Assist on removal of Discharge Pump A at Skid J. - Dismantle the Screen Spray Wash Pump for troubleshooting.

(Screen Spray Wash Pump) May 15, 2012 - Assist on the installation of new Discharge Pump A on Skid J. - Assist on rectifying the leak at the Hyrdocyclone Piping. -Assist on the assembly of Screen Spray Wash Pump.

May 16, 2012

(Assembly of Screen Spray Wash Pump) May 17, 2012 May 18, 2012 May 19, 2012 - Assist on the installation of Screen Spray Wash Pump. - Assist on rectifying the problem at the Backwash pump Delta. - Assist on dismantling the gearbox. - Assist on the installation of rectified flange adaptor and new valve at the Backwash Pump Delta.