Está en la página 1de 4

PROCESS COMBUSTION CORPORATION 5460 HORNING ROAD PITTSBURGH, PA 15236-2822 Phone: 412-655-0955 Fax: 412-650-5569 Web Site: www.pcc-sterling.

com

THERMAL OXIDIZER INQUIRY SHEET


DATE: CONTACT: TITLE: PHONE #: FAX #: ( 01152 ) 55- 55649819 Ext. 109 ( ) PCC REF #: YOUR REF #: Paola Duque Vega COMPANY: ADDRESS: VIGEN January 31st, 2012

E-MAIL:polita.duque@gmail.com PROCESS DESCRIPTION: X CONTINUOUS

Thermal Oxidizer BATCH

TYPE OF ODOR, FUME, VAPOR, GAS: Normal flow rate: 4 445 scfm Max/Min flow rate: 6 944 scfm Inlet Temperature: 89.6 F No. of streams: lb/hr lb/hr scfm scfm Particulate: Are inorganics present? Yes Moisture: Pressure: 17 kg/cm2 grains/scf wt % psig vol % inches w.c.

Approx. LHV: Btu/scf XYes No

XNo Is chlorine or suflur present?

Material of construction required: Composition: wt% vol % - dry

TYPE OF LIQUID: Flow rate: 1.7gph Viscosity: lb/hr ssu gph cs Heating value: Solids: Pressure: 12-17psig Btu/lb ppm psig wt % inches w.c. Yes No

Inlet Temperature: 89.6F Material of construction required: Composition: wt%

Are inorganics present?

vol %

Over

1. Type of auxiliary fuel:

X Natural Gas

Propane

#2 Oil

#6 Oil

Other

Fuel heating value: Fuel pressure: 2. Type of insurance: psig IRI

Btu/lb

Btu/ft

Oil temperature: X Yes

F No

Is gas pressure regulator required? FM Other X Rack mount Ship loose

3. Type of NEMA panel: Yes 4. Electrical power: 5. Is stack required? Yes No

Electrical area classification: Stack height: X Yes feet

6. Is thermal heat recovery required? Saturated Steam

No (Please check appropriate selection) Hot Water Hot air F F Vertical down position Vertical up position X Themal fluid

Superheated Steam

Flow requirement: 1420 ton/h Pressure: psig

Temperature:

Boiler feedwater temperature: Inside XOutside 99 % lbs/yr lbs/yr Yes CO Particulates X No % psig psig lbs/yr Horizontal

7. Thermal oxidizer will be installed:

8. Destruction efficiency required? 9. Emission limit relative to: NOx SOx

UHC lbs/yr

lbs/yr

10. Is a scrubber or quench system required? Percent SO2 removal: %

Percent Cl2 removal: Yes Yes X No X No

Percent HCl removal:

11. Is atomizing steam available? 12. Is compressed air available? 13. Site elevation:

Feet (ASL)

Seismic Zone: Yes

14. Additional equipment required? Liquid Seal Pot Detonation Flame Arrestors Yes Yes No Waste Gas Blower Yes No No

Waste Gas Eductor Liquid Knock-out Pot Ladders & Platform

Yes Yes

No No

Skid Mounting EPA Test Ports

Yes Yes Yes

No No No

PROCESS COMBUSTION CORPORATION

También podría gustarte