Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ALEJANDRO
Fecha : 01/06/2007
EXPLOSION DE INSUMOS
Descripcin
Unidad
P.Unitario
Cantidad
Parcial
ABC
MATERIALES
HORMIGON ELABORADO H21 CANTO R
HIERRO REDONDO ESTRIADO 42/U50
ALAMBRE Ac.RECOCI.(NEGRO)(1.63
ALAMBRE Ac.RECOCI.(NEGRO)(4.06
CLAVO ACERO DULCE PUNTA PARIS(
MADERA PINO SALIGNA EN BRUTO
M3
TON
KILO
KILO
PAQ
M3
100.00
496.00
0.97
0.90
1.34
136.00
173.000
18.024
131.558
93.946
118.302
16.900
28,909.03
17,300.00
8,939.90
127.61
84.55
158.53
2,298.44
44.1%
26.4%
13.6%
0.2%
0.1%
0.2%
3.5%
EQUIPOS
MULTIFUNCION[56 HP]
GUINCHE A ENGRANAJES(8 HP)
VIBRADOR[2 HP]
CAMION VOLCADOR(6M3)120 HP
SIERRA CIRCULAR [1.8KW]
HORA
HORA
HORA
HORA
HORA
9.30
1.13
0.38
13.32
0.24
2.483
5.360
6.920
14.014
128.401
249.26
23.09
6.06
2.63
186.67
30.82
0.4%
0.0%
0.0%
0.0%
0.3%
0.0%
HORA
HORA
HORA
HORA
HORA
HORA
HORA
HORA
HORA
HORA
5.20
5.20
4.37
5.20
4.37
3.72
3.72
3.72
3.63
3.08
2632.320
749.749
103.965
16.497
4.556
2718.987
860.302
339.718
91.219
141.316
33,506.15
13,688.59
3,898.84
453.87
85.79
19.89
10,124.42
3,203.42
1,264.97
330.88
435.48
51.2%
20.9%
6.0%
0.7%
0.1%
0.0%
15.5%
4.9%
1.9%
0.5%
0.7%
SUBCONTRATOS
BOMBA HORMIGON TRASLADO
BOMBA HORMIGON SERVICIO
VEZ
M3
500.00
5.00
3.932
173.000
2,830.90
1,965.90
865.00
4.3%
3.0%
1.3%
65,495.34
100.0%
TOTAL
Base : SPI
Edificio Vivienda
Hoja Nro: 1