Está en la página 1de 2

S10

Pgina :

Precios y cantidades de recursos requeridos


Obra

0403001

Fecha

01/11/2011
040307

Lugar

CONSTRUCCIN DEL PAVIMENTADO DE LA AV. 8 DE DICIEMBRE Y CALLES TRANSVERSALES


DE LA URB. MANUEL PRADO, DISTRITO DE CHALA-CARAVELI-AREQUIPA
AREQUIPA - CARAVELI - CHALA

Cdigo

Recurso

Unidad

0147000022
0147000023
0147000032
0147010001
0147010002
0147010003
0147010004
0147010021
0147010023
0147010031
0147010098
0147030007
0201030004
0202000007
0202000008
0202010005
0202170001
0203020003
0204000000
0205000003
0205000017
0205000025
0205000033
0205000041
0205010004
0205010021
0213000006
0221000001
0229060005
0230260008
0230260011
0232000053
0232000054

OPERADOR DE EQUIPO LIVIANO


OPERADOR DE EQUIPO PESADO
TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
CAPATAZ "B"
CONTROLADOR OFICIAL
CAPATAZ "A"
LIMPIEZA FINAL DE OBRA
OPERARIO ESPECIALIZADO
ACEITE PARA MOTOR SAE-30
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA CALAMINA
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ARENA FINA
PIEDRA CHANCADA DE 1/2"
MATERIAL CLASIFICADO GRANULAR # 3
PIEDRA SELECCIONADA
PIEDRA GRANDE
MATERIAL GRANULAR CLASIFICADO
ARENA GRUESA
MATERIAL CLASIFICADO PARA SUBBASE 8"
ASFALTO RC-250
CEMENTO PORTLAND TIPO I (42.5 kg)
YESO DE 28 Kg
PINTURA ESMALTE EPOXICO BLANCO
PINTURA ESMALTE EPOXICO NEGRO
FLETE
ACCESO A CANTERAS,BOTADEROS,PLANTAS
DE PROCESO Y FUENTES DE AGUA
GASOLINA 84 OCTANOS
HORMIGON (PUESTO EN OBRA)
AGUA
TIZA
CARTEL DE OBRA INCL. TRANSPORTE
PRUEBA
CORDEL
PRUEBA PROCTOR MODIFICADO Y DENSIDAD
DE CAMPO
MADERA TORNILLO
ESTACA DE MADERA
MADERA TORNILLO INCLUYE CORTE PARA
ENCOFRADO
KEROSENE INDUSTRIAL
GRASA
DISOLVENTE THINER
PINTURA ESMALTE BLANCO
PINTURA ESMALTE
PLANCHA DE TECKNOPOR DE 1" X 4' X 8'
HERRAMIENTAS MANUALES
WINCHA DE 100 m
JALONES
MIRA TOPOGRAFICA
NIVEL TOPOGRAFICO
GUANTES DE CUERO
CASCO TIPO MINERO SIN PROTECTOR
CHALECOS
MASCARA CONTRA POLVO
MEZCLADORA DE CONCRETO DE 9 -11p3
CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 gl
CAMION VOLQUETE 6 X 4 330 HP 10 m3
MOTOBOMBA 10 HP 4"
CAMION VOLQUETE DE 10 m3
COMPRESORA NEUMATICA 250-330 PCM, 87 HP
COMPACTADOR VIBRATORIO TIPO PLANCHA 4
HP
RODILLO LISO VIBRATORIO
AUTOPROPULSADO 101-135HP 10-12 ton
RODILLO LISO VIBRATORIO
AUTOPROPULSADO 70-100 HP 7-9 ton

hh
hh
hh
hh
hh
hh
hh
hh
hh
hh
glb
hh
gal
kg
kg
kg
kg
kg
m3
m3
m3
m3
m3
m3
m3
m2
gal
bls
bls
gal
gal
glb
glb

118.3300
924.9500
101.3300
371.7000
1,070.2700
1,550.3300
14,054.7600
135.2700
161.8800
423.3400
1.0000
8.3300
0.9100
42.0200
167.8300
173.4200
4.5000
749.3600
7.1000
12.1500
819.5200
358.4900
85.1900
6.6500
525.3500
189.1600
22,623.9400
2,744.8000
2.1700
32.5000
3.2500
2.0000
1.0000

11.23
11.23
14.29
12.29
11.23
9.41
8.41
12.29
9.41
12.29
3,580.00
11.53
5.89
5.68
4.56
5.29
6.50
3.80
70.00
60.00
20.00
65.00
35.00
25.29
40.00
45.29
11.29
21.50
10.00
42.18
42.18
25,000.00
5,478.19

1,328.90
10,387.20
1,448.05
4,568.21
12,019.09
14,588.63
118,200.49
1,662.52
1,523.29
5,202.86
3,580.00
96.07
5.37
238.68
765.29
917.39
29.25
2,847.58
496.73
728.79
16,390.46
23,302.11
2,981.65
168.10
21,013.87
8,567.06
255,424.28
59,013.09
21.70
1,370.85
137.09
50,000.00
5,478.19

1,327.85
10,290.80
1,448.06
4,617.93
11,888.44
14,586.56
118,075.35
1,652.43
1,537.22
5,241.55
3,580.00
96.00
6.07
238.12
766.41
917.45
29.25
2,850.38
496.74
728.79
16,390.46
23,302.11
2,981.65
168.03
21,013.87
8,567.06
255,435.10
59,013.09
21.70
1,365.00
143.00
50,000.00
5,478.19

gal
m3
m3
bls
u
u
m
u

75.9400
379.6900
1,205.8500
1.3000
1.0000
25.0000
0.1400
25.0000

13.00
30.68
10.00
12.00
520.88
70.00
1.50
85.00

987.19
11,648.81
12,058.53
15.60
520.88
1,750.00
0.21
2,125.00

987.19
11,648.82
12,058.55
13.00
520.88
1,750.00
0.22
2,125.00

p2
u
p2

390.9200
11.3400
2,371.9400

6.50
5.50
4.50

2,540.98
62.37
10,673.73

2,540.98
62.38
10,673.73

gal
lb
gal
gal
gal
pl
%MO
u
he
he
hm
par
pza
pza
pza
hm
hm
hm
hm
hm
hm
hm

500.1200
0.6100
4.6800
0.0100
1.8000
173.7000

12.56
33.00
19.25
35.00
35.00
6.20

1.8200
24.0000
24.0000
24.0000
20.0000
20.0000
20.0000
20.0000
97.2000
148.0100
298.3900
4.2300
26.5100
33.3400
28.2700

60.00
6.00
6.00
12.00
9.00
38.15
35.00
7.50
22.35
137.74
145.08
14.80
145.00
92.73
23.18

6,281.46
20.05
90.09
0.28
63.00
1,076.94
6,600.15
109.37
144.00
144.00
288.00
180.00
763.00
700.00
150.00
2,172.42
20,386.37
43,290.94
62.59
3,843.63
3,091.72
655.21

6,334.81
21.26
91.00
0.28
63.00
1,076.94
6,600.15
109.37
144.00
144.00
288.00
180.00
763.00
700.00
150.00
2,171.81
20,423.90
43,305.34
62.69
3,841.81
3,111.84
655.38

hm

144.0100

88.04

12,679.05

12,673.30

hm

216.5000

97.04

21,008.77

21,101.11

0234000000
0238000000
0239050000
0239060020
0239130018
0239150006
0239160011
0239900004
0243040000
0244010001
0245010001
0253000000
0253010002
0253050007
0254110011
0254110014
0260000002
0337010001
0337020035
0337020045
0337020046
0337540016
0337600038
0337620007
0337620021
0337990052
0348010011
0348040003
0348040027
0348080000
0348110004
0349010002
0349030001
0349030007
0349030013

Cantidad

Precio S/.

Parcial S/. Presupuestado S/.

Fecha :

20/07/2011 10:47:34a.m.

S10

Pgina :

Precios y cantidades de recursos requeridos


Obra

0403001

Fecha

01/03/2011
040307

Lugar

CONSTRUCCIN DEL PAVIMENTADO DE LA AV. 8 DE DICIEMBRE Y CALLES TRANSVERSALES


DEL DISTRITO DE CHALA-CARAVELI-AREQUIPA
AREQUIPA - CARAVELI - CHALA

Cdigo

Recurso

Unidad

0349040008

CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25


yd3
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
TRACTOR DE ORUGAS DE 190-240 HP
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
BARREDORA MECANICA 10-20 HP 7 p
LONGITUD
VIBRADOR DE CONCRETO 3/4" - 2"
ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR
ELECTRICO 15 HP
MOTONIVELADORA DE 125 HP
MOTONIVELADORA DE 130-135 HP
MEZCLADORA DE CONCRETO TROMPO 8 HP 9
p3
CAMION IMPRIMIDOR 6 X 2 178 - 210 HP 1,800
gal
GRUPO ELECTROGENO 56 HP 37.5 KW
PLANTA DE ASFALTO DE 30/60 ton/h
TEODOLITO
NIVEL OPTICO
GUARDIANIA DE CAMPAMENTOS Y CANTERAS
MEDIDAS DE MITIGACION

hm

133.2900

195.29

26,030.95

26,011.96

hm
hm
hm
hm

7.2300
58.3200
46.2700
33.3400

195.29
220.00
195.29
92.49

1,411.87
12,829.98
9,035.17
3,083.72

1,410.08
12,819.92
9,015.83
3,111.84

hm
hm

97.2000
118.1200

15.26
63.82

1,483.27
7,538.27

1,482.30
7,520.60

hm
hm
hm

331.5200
144.0100
9.5300

152.00
152.34
19.26

50,390.55
21,939.18
183.49

50,506.06
21,890.28
183.48

hm

33.3400

187.59

6,254.46

6,223.67

hm
hm
hm
hm
glb
glb

118.1200
15.1800
77.3300
53.3300
1.0000
1.0000

12.02
78.22
15.50
12.50
3,500.00
3,500.00

1,419.77
1,187.08
1,198.66
666.67
3,500.00
3,500.00

1,415.64
1,189.01
1,198.68
666.67
3,500.00
3,500.00

0349040010
0349040034
0349040091
0349050003
0349070006
0349080010
0349090000
0349090003
0349100011
0349130004
0349150013
0349260002
0349880003
0349880016
0401100001
0402020001

Cantidad

Precio S/.

TOTAL

Parcial S/. Presupuestado S/.

S/.

1 174,916.00

S/.

1 174,916.00
1 174.916.00

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizand

Fecha :