REKAPITULASI

RENCANA ANGGARAN BIAYA ( RAB )


PROVINSI

JAWA TENGAH

KABUPATEN

TEGAL

KEGIATAN

PEMBANGUNAN RUMAH TYPE 36

PEKERJAAN

RENCANA PEMBANGUNAN PERUMAHAN

LOKASI

NO.

PEKERJAAN

JUMLAH HARGA ( RP.)

PEKERJAAN PERSIAPAN

900,000.00

II

PEKERJAAN PONDASI

3,280,151.00

III

PEKERJAAN BETON BERTULANG

8,080,100.00

IV

PEKERJAAN PASANGAN DAN PLASTERAN

PEKERJAAN LANTAI

VI

PEKERJAAN ATAP DAN PLAFOND

20,088,600.00

VII

PEKERJAAN KUSEN PINTU DAN JENDELA

10,280,000.00

VIII

PEKERJAAN PENGECATAN

17,292,865.00
3,181,760.00

6,410,300.00

IX

PEKERJAAN PENGUNCI DAN PENGANTUNG

202,000.00

PEKERJAAN INSTALASI LISTRIK

2,361,750.00

XI

PEKERJAAN SANITASI

6,920,000.00

JUMLAH

78,997,529.00

PEMBULATAN

78,997,500.00

Terbilang

Jutuh Puluh Delapan Juta Sembilah Ratus Sembilan puluh Tujuh Ribu Lima Ratus Rupiah

RENCANA ANGGARAN BIAYA ( RAB )

No.

Uraian Pekerjaan
2

Harga

Volume
Satuan
4

I.

PEKERJAAN PERSIAPAN

Pembersihan Lapangan

ls.

300,000.00

Pengukuran dan Pemasangan Bowplank

ls.

600,000.00
Sub Total

II.

Jumlah
5

300,000.00
600,000.00
900,000.00

PEKERJAAN PONDASI

Galian tanah pondasi menerus

11.864

25,000.00

Urugan kembali 1/4 galian

2.966

15,000.00

44,490.00

Urugan tanah bawah lantai

3.780

80,000.00

302,400.00

Urugan pasir bawah lantai

1.890

82,000.00

154,980.00

Urugan pasir bawah pondasi

1.402

82,000.00

114,923.00

Pekerjaan batu kosong

2.803

226,000.00

633,478.00

Pekerjaan beton pondasi batu kali

11.040

157,000.00

1,733,280.00

Sub Total
III.

296,600.00

3,280,151.00

PEKERJAAN BETON BERTULANG

Beton sloof

0.803

3,400,000.00

2,731,050.00

Beton kolom praktis

0.770

3,400,000.00

2,618,000.00

Beton reng balok

0.803

3,400,000.00
Sub Total

IV.

2,731,050.00
8,080,100.00

PEKERJAAN PASANGAN DAN PLASTERAN

Pasangan batu bata 1:2

4.215

67,000.00

282,405.00

Pasangan batu bata 1:4

168.250

60,000.00

10,095,000.00

Plasteran dinding 1:2

8.430

22,000.00

185,460.00

Plasteran dinding 1:4

336.500

20,000.00

6,730,000.00

Sub Total
V.

PEKERJAAN LANTAI

Lantai keramik 40 x 40

36.220

83,000.00

Lantai keramik 20 x 20

1.350

130,000.00
Sub Total

VI.

17,292,865.00

3,006,260.00
175,500.00
3,181,760.00

PEKERJAANATAP DAN PLAFOND

Rangka Baja Ringan

51.900

220,000.00

11,418,000.00

Atap multi roof

51.900

80,000.00

4,152,000.00

List plank GRC 200x10

17.040

m1

7,500.00

127,800.00

Plafond gypsum Rangka Hollow

36.590

120,000.00

4,390,800.00

Sub Total

20,088,600.00

VII. PEKERJAAN KOSEN PINTU JENDELA


1

Pintu Jendela PJ1

bh

2,200,000.00

2,200,000.00

Pintu Jendela PJ2

bh

1,800,000.00

1,800,000.00

Pintu P1

bh

1,200,000.00

3,600,000.00

Pintu Plastik

bh

200,000.00

200,000.00

Jendela J1

bh

1,500,000.00

1,500,000.00

Jendela J2

bh

900,000.00

900,000.00

Louvre toilet

bh

80,000.00
Sub Total

80,000.00
10,280,000.00

VIII. PEKERJAAN PENGECATAN


1

Cat Kosen / pintu, jendela, listplank, dll

2
3

Cat dinding tembok


Cat plafond

36.50
337
36.59

22,300.00

813,950.00

m
m

15,000.00
15,000.00

5,047,500.00
548,850.00

Sub Total
IX.

6,410,300.00

PEKERJAAN PENGUNCI DAN PENGANTUNG

Engsel pintu

bh

20,000.00

100,000.00

Engsel jendela

bh

15,000.00

75,000.00

Pacok jendela

bh

3,000.00

15,000.00

Grendel jendela

bh

3,000.00
Sub Total

12,000.00
202,000.00

X.

PEKERJAAN INSTALASI LISTRIK

Biaya penyambungan baru 4 amper

ls

2,000,000.00

2,000,000.00

Box zekering

bh

85,000.00

85,000.00

Saklar ganda setara broco

bh

25,500.00

51,000.00

Lampu philip 15 watt

bh

32,250.00
Sub Total

225,750.00
2,361,750.00

No.

Uraian Pekerjaan

Volume

XI.

Harga
Satuan

Jumlah

PEKERJAAN SANITASI

Pas instalasi air

ttk

150,000.00

900,000.00

Pas kran air

bh

30,000.00

90,000.00

Pas kran wastafel/Zink

bh

50,000.00

50,000.00

Pemasangan pipa pembuangan air bak

bh

15,000.00

15,000.00

Pas saringan kamar mandi

bh

20,000.00

20,000.00

6
7

Tempat sabun keramik


Pas kloset jongkok keramik

1
1

bh
bh

125,000.00
160,000.00

125,000.00
160,000.00

Pas pipa 3 inci + acsesoris

11

45,000.00

495,000.00

Pas pipa 4 inci + acsesoris

13

55,000.00

715,000.00

10

Zink

bh

850,000.00

850,000.00

11

Septictank

unit

3,500,000.00
Sub Total

3,500,000.00
6,920,000.00