DAFTAR HARGA SATUAN UPAH KABUPATEN PASER

BIDANG KE CIPTA KARYAAN


TAHUN ANGARAN 2012

NO

1
1
2
3
4
5
6
7
8
9
10
11
12

Uraian

2
Buruh Terampil/Pekerja
Tukang Kayu
Tukang Batu
Tukang Besi
Tukang Cat
Kepala Tukang
Mandor
Pembantu Supir
Mekanik
Pembantu Mekanik
Operator
Pembantu Operator

Upah
(Rp)
12

55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
80,000.00
90,000.00
50,000.00
75,000.00
50,000.00
80,000.00
50,000.00

Ket
13
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja

DAFTAR HARGA SATUAN MATERIAL KONSTRUKSI KABUPATEN PASER


BIDANG KE CIPTA KARYAAN
TAHUN ANGARAN 2012

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Semen
1
2

Semen Tonasa
Semen Tonasa

1 zak

1 zak

50
40

kg
kg

Zak

66,000

60,000

6,000

Zak

58,300

53,000

5,300

61,000

6,100

54,000

5,400

Semen Gresik

1 zak

50

kg

Zak

67,100

Semen Gresik

1 zak

40

kg

Zak

59,400

Semen PC

kg

1,342

Semen Warna

kg

11,000

10,000

1,000

Semen Putih

kg

2,860

2,600

260

Roll

3,300,000

3,000,000

300,000

Dos

143,000

130,000

13,000

Dos

154,000

140,000

14,000

Dos

220,000

200,000

20,000

Kg

23,100

21,000

2,100

m'

25,300

23,000

2,300

m'

17,325

15,750

1,575

Roll

89,100

81,000

8,100

Kawat
1

Kawat Wiremesh

Ukuran

mm

Kawat Las

Ukuran

2.6

mm

RB

26 @

Kawat Las

Ukuran

3.2

mm

RB

26 @

Kawat Las

Ukuran

mm

RB

26 @

Kawat Bendrat

Kawat Nyamuk

Kawat Kasa

Kawat Duri

Lebar
Lebar

50 m

Besi Beton Polos ( Full )

kg

12,534

Batang

28,600

26,000

2,600

mm

Batang

41,800

38,000

3,800

mm

Batang

63,800

58,000

5,800

Batang

90,200

82,000

8,200

mm

Batang

182,600

166,000

16,600

mm

Batang

248,600

226,000

22,600

Besi beton polos U-22


Besi Beton

Besi Beton

Ukuran

Besi Beton

Ukuran

Besi Beton

Ukuran

Besi Beton

Ukuran

Besi Beton

Ukuran

90 cm

Besi Beton

Ukuran

90 cm

2.25

6
8

mm

10
12
14
16

mm

Besi Beton

Ukuran

18

mm

Batang

306,900

279,000

27,900

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Besi Beton Ulir


1

kg

16,688

mm

Batang

102,795

93,450

9,345

mm

Batang

113,190

102,900

10,290

mm

Batang

173,250

157,500

15,750

mm

Batang

259,875

236,250

23,625

Besi beton Ulir U-32

Besi Beton Ulir

Ukuran

Besi Beton Ulir

Ukuran

Besi Beton Ulir

Ukuran

Besi Beton Ulir

Ukuran

10
16
19
22

Baut Mur
1

Klam U

Klam Plat

Baut Dan Mur

4
5

Baut dan Mur


Baut dan Mur

5
5

cm
cm

10 mm

12 mm

16 mm

3 mm

3 mm
20 cm
25 cm
25 cm

x
x

40 cm
40 cm

Buah

10,450

9,500

950

Buah

11,000

10,000

1,000

Pasang

3,300

3,000

300

Pasang

4,400

4,000

400

Pasang

4,950

4,500

450

Kg

27,500

25,000

2,500

Paku
1

Paku Triplek

Paku Payung

Kg

27,500

25,000

2,500

Paku Ulir

Kg

27,500

25,000

2,500

Kg

27,500

25,000

2,500

Paku Sumbat

Paku Sekrup

1 1/4

"

Kotak

7,700

7,000

700

Paku Sekrup

1 1/2

"

Kotak

11,000

10,000

1,000

Paku Sekrup

"

Kotak

22,000

20,000

2,000

Kotak

16,500

15,000

1,500

Kg

27,500

25,000

2,500

Kg

27,500

25,000

2,500

Paku Sekrup

2 1/2

"

Paku Seng

"

10

Paku Seng

1 3/4

"

besar
kecil

11

Paku Ulin

"

Kg

22,000

20,000

2,000

12

Paku Ulin

1 1/2

"

Kg

22,000

20,000

2,000

Kg

22,000

20,000

2,000

13

Paku Ulin

"

14

Paku Ulin

"

Kg

22,000

20,000

2,000

15

Paku Ulin

"

Kg

22,000

20,000

2,000

Kg

22,000

20,000

2,000

16

Paku Ulin

"

17

Paku Biasa

"

Kg

16,500

15,000

1,500

18

Paku Biasa

"

Kg

16,500

15,000

1,500

Kg

16,500

15,000

1,500

19

Paku Biasa

3 1/2

"

Ket.

20

Paku Biasa

"

Kg

16,500

15,000

1,500

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Peralatan cat
1

Ampelas

Lembar

3,850

3,500

350

Kuas Roll

Buah

27,500

25,000

2,500

Kuas

"

Buah

6,050

5,500

550

Kuas

2,5

"

Buah

8,800

8,000

800

Kuas

"

Buah

10,450

9,500

950

Kuas

3,5

"

Buah

13,750

12,500

1,250

Kuas

"

Buah

17,050

15,500

1,550

Kuas

4,5

"

Buah

17,050

15,500

1,550

Kuas

"

Buah

25,300

23,000

2,300

Buah

24,750

22,500

2,250

10

Kuas
Cat dasar

"

Cat Meni Kayu

Kg

Kaleng

25,850

23,500

2,350

Cat dasar tembok

Kg

Kaleng

16,500

15,000

1,500

Kaleng

138,600

126,000

12,600

Cat Meni Besi

Kg

Wall Filler Decor DWF - 200

Kg

Kaleng

104,500

95,000

9,500

Minyak cat

kg

Kaleng

16,500

15,000

1,500

Water proofing

Kaleng

27,500

25,000

2,500

Plamir

Kg

25,300

23,000

2,300

Residu

Kg

127,050

115,500

11,550

Kg

Minyak Begisting

ltr

9,900

9,000

900

10

Dempul
Cat Tembok

Kg

23,100

21,000

2,100

Cat Tembok biasa

Kaleng

77,000

70,000

7,000

165,000

16,500
4,500

Cat tembok mutu A ( setara jotun )

Cat Kilap

Pelitur Kayu

Kg

2.5

kg

Kaleng

135,000

Kg

Kaleng

49,500

45,000
47,000

Liter

Kaleng

51,700

mm

Lembar

51,700

47,000

4,700

Lembar

55,000

50,000

5,000

55,000

5,500

4,700

Multipleks
1
2

Triplek
Triplek

3.6

mm

Triplek

mm

Lembar

60,500

Triplek

mm

Lembar

100,100

91,000

9,100

Lembar

167,200

152,000

15,200

Triplek

mm

Ket.

Triplek

12

mm

Lembar

202,400

184,000

18,400

No

Nama Barang

Triplek

Melamine

Ukuran / Tipe

18

Teakwood

Satuan

mm

mm

1200

Harga

Harga Dasar

Galian C

Benefit 10 %

Lembar

316,800

288,000

28,800

Lembar

77,000

70,000

7,000

Lembar

69,300

63,000

6,300

Lembar

57,750

52,500

5,250

Lembar

59,950

54,500

5,450

bh

7,700

7,000

700

7,500

750

Kalsi Board
1
2

Kalsi Board

Ukuran

Kalsi Board

2400

Ukuran

1200

2400

Ukuran

10

20

Cm

3.5 mm
4.5 mm

Keramik
1 Plint Keramik 10 x 20
2 Plint Keramik 10 x 30

Ukuran

10

20

Cm

bh

8,250

3 Keramik

Warna

Ukuran

10

20

Cm

Kotak

69,300

63,000

6,300

4 Keramik

Warna

Ukuran

20

20

Cm

Kotak

61,600

56,000

5,600

56,000

5,600

7 Keramik

Warna

Ukuran

20

25

Cm

Kotak

61,600

8 Keramik

Warna

Ukuran

25

40

Cm

Kotak

64,900

59,000

5,900

Kotak

60,500

55,000

5,500

40,000

4,000

9 Keramik

Warna

Ukuran

30

30

Cm

10 Keramik

Polos

Ukuran

20

20

Cm

Kotak

44,000

11 Keramik

Polos

Ukuran

30

30

Cm

Kotak

49,500

45,000

4,500

73,000

7,300

12 Keramik

Warna

Ukuran

40

40

Cm

Kotak

80,300

14 Keramik

Warna

Ukuran

60

60

Cm

Kotak

93,500
-

85,000
-

8,500
-

Bahan Penutup Atap


Genteng Metal
1

Atap Metal

Multi Roof / Multi Colour

Ukuran

0.4 mm

Lembar

79,750

72,500

7,250

Atap Metal

Mega Colour/ spyro roof

Ukuran

0.3 mm

Lembar

46,200

42,000

4,200

m'

28,600

26,000

2,600

23,000

2,300

Atap Metal

Nok U

Ukuran

Atap Metal

Nok Pinggir L

Ukuran

m'

25,300

Atap Metal

Nok C

Ukuran

m'

30,800

28,000

2,800

Talang
1

Talang PVC

92,400

84,000

8,400

Corong Talang

18,700

17,000

1,700

Belokan Talang
Tutup Talang

18,700

17,000

7,700

7,000

1,700
700

31,900

29,000

2,900

3
4

Asbes Gelombang
1

Asbes Gelombang Plat

Lembar

Ket.

Bubungan Asbes gelombang

Buah

30,800

28,000

2,800

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Galian C

Harga Dasar

Benefit 10 %

Atap Seng
1

Seng Gelombang Besar BJLS 30

Lembar

46,200

42,000

4,200

42,000

4,200

Seng Gelombang Kecil BJLS 30

Lembar

46,200

Seng Gelombang Besar BJLS 20

Lembar

42,900

39,000

3,900

Seng Gelombang Kecil BJLS 20

Lembar

42,900

39,000

3,900

20,000

2,000

Seng Plat BJLS 20

Lebar

50

m'

22,000

Seng Plat BJLS 20

Lebar

40

m'

15,950

14,500

1,450

Seng Plat BJLS 20

Lebar

30

m'

13,750

12,500

1,250

17,500

1,750

Seng Plat BJLS 30

Lebar

50

m'

19,250

Seng Plat BJLS 30

Lebar

40

m'

17,050

15,500

1,550

m'

11,550

10,500

1,050

Pasang

30,800

28,000

2,800

Pasang

22,000

20,000

2,000

Pasang

6,600

6,000

600

Buah

9,900

9,000

900

Buah

108,900

99,000

9,900

20 cm

Buah

14,300

13,000

1,300

4 "

Buah

17,600

16,000

1,600

Set

143,000

130,000

13,000

100,000

10,000

10

Seng Plat BJLS 30

Lebar

30

Penggantung & Pengunci


1
2

Engsel Standart Mutu A


Engsel Standart Mutu A

Engsel Kupu-kupu

Grendel

3 "
4 "

Grendel Tanam

Hak Angin Kuningan

Handle

4 "

Kunci Pintu Besar Standart 2 x Slag

Kunci Pintu Kecil Standart 2 x Slag

Set

110,000

10

Kunci Alpha 8000

Set

77,000

70,000

7,000

Buah

258,500

235,000

23,500

120,000

12,000
17,500

Perlengkapan Sanitasi
Bak Mandi
1

Bak Mandi Viber

Ukuran

80

60

60 cm

Closet
1

Closet Jongkok Keramik

Buah

132,000

Closet Jongkok Porselin

Buah

192,500

175,000

Urinoir

Set

880,000

800,000

80,000

Closet Duduk Standart Mutu A

Set

2,200,000

2,000,000

200,000

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Kran Air
1

Kran Washtafel Steinliss

Buah

97,900

89,000

8,900

160,000

16,000

Kran Bebek Steinliss

Buah

176,000

Kran Shower Stainliss

Buah

97,900

89,000

8,900

Bak Cuci Piring Almun. lobang 1

Buah

286,000

260,000

26,000

440,000

44,000

Bak Cuci Piring Almun. lobang 2

Buah

484,000

Kran Air Stainliss

Ukuran

3/4 "

Buah

39,600

36,000

3,600

Kran Air Stainliss

Ukuran

1/2 "

Buah

38,500

35,000

3,500

24,000

2,400

Kran Air galvaniss

Ukuran

3/4 "

Buah

26,400

Kran Air galvaniss

Ukuran

1/2 "

Buah

22,000

20,000

2,000

Buah

8,800

8,000

800

21,000

2,100

10

Floor Drain Plastik

11

Floor Drain galvanis

Buah

23,100

12

Floor Drain Stainliss

Buah

34,100

31,000

3,100

Tandon Air
1

Tandon Air

5,000 Ltr

Buah

6,490,000

5,900,000

590,000

Tandon Air

3,000 Ltr

Buah

4,180,000

3,800,000

380,000

Buah

3,080,000

2,800,000

280,000

1,300,000

130,000

Tandon Air

2,000 Ltr

Tandon Air

1,200 Ltr

Buah

1,430,000

Tandon Air

1,000 Ltr

Buah

924,000

840,000

84,000

Buah

1,023,000

930,000

93,000

Liter

39.60

36

Buah

286,000

260,000

26,000

260,000

26,000

Tandon Air

Air PDAM

450 Ltr

Wastafel
1

Wastafel

Type LW 650 J/LW 650 FJ

Wastafel

Type LW 501 J

Buah

286,000

Wastafel

Type L 34

Buah

192,500

175,000

17,500

Buah

192,500

175,000

17,500

Batang

20,900

19,000

1,900

Batang

25,300

23,000

2,300

29,000

2,900

Wastafel

Type L 529 V1

Pipa PVC Type AW


1
2

Pipa PVC
Pipa PVC

1/2''
3/4"

Panjang
Panjang

4
4

m
m

Pipa PVC

1"

Panjang

Batang

31,900

Pipa PVC

1 1/4"

Panjang

Batang

51,700

47,000

4,700

Batang

57,750

52,500

5,250

Pipa PVC

1 1/2"

Panjang

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Pipa PVC

2"

Panjang

Batang

Pipa PVC

2 1/2"

Panjang

Batang

Harga

74,800

Harga Dasar

Galian C

Benefit 10 %

68,000

6,800

97,900

89,000

8,900

120,000

12,000

Pipa PVC

3"

Panjang

Batang

132,000

Pipa PVC

4"

Panjang

Batang

213,400

194,000

19,400

10

Pipa PVC

5"

Panjang

Batang

275,000

250,000

25,000

510,000

51,000

11

Pipa PVC

6"

Panjang

Batang

561,000

Panjang

m'

Batang

121,000

110,000

11,000

118,000

11,800

Pipa Galvanis
1

Pipa Galvanis

1/2"

Pipa Galvanis

Pipa Galvanis

1"

Pipa Galvanis

3/4"

1 1/2"

Panjang

m'

Batang

129,800

Panjang

m'

Batang

154,000

140,000

14,000

Batang

269,500

245,000

24,500

195,000

19,500

Panjang

m'

Pipa Galvanis

2"

Panjang

m'

Batang

214,500

Pipa Galvanis

3"

Panjang

m'

Batang

616,000

560,000

56,000

Batang

836,000

760,000

76,000

Tube

11,000

10,000

1,000

7,000

700

Pipa Galvanis

4"

Panjang

m'

Lem
1

Lem PVC

Lem PVC

Buah

7,700

Isolatif TBA
Alat Pertukangan

Buah

4,950

4,500

450

Benang Nylon

Rol

4,950

4,500

450

Bethel

Buah

20,900

19,000

1,900

58,000

5,800

Cangkul

Buah

63,800

Cangkul (lengkap)

Buah

88,000

80,000

8,000

Ember Cor

Buah

11,550

10,500

1,050

52,500

5,250

Gergaji Kayu

Buah

57,750

Hammer Konde

Buah

88,000

80,000

8,000

Hammer Cabut

Buah

55,000

50,000

5,000

Kg
Buah

27,500

25,000

2,500

418,000

380,000

38,000

9
10

Kain Majun
Kereta Dorong

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Bola Lampu
1

Lampu pijar 5 watt Phillip

Buah

4,950

4,500

450

5,500

550

Lampu pijar 10 watt Phillip

Buah

6,050

Lampu pijar 15 watt Phillip

Buah

6,050

5,500

550

Lampu pijar 25 watt Phillip

Buah

7,150

6,500

650

6,500

650

7,500

750

Lampu pijar 40 watt Phillip

Buah

7,150

Lampu pijar 60 watt Phillip

Buah

8,250

Lampu pijar 100 watt Phillip

Buah

8,250

7,500

750

31,500

3,150

Lampu EL 8 watt Mutu Klas - A Phillip

Buah

34,650

Lampu EL 18 watt Mutu Klas - A Phillip

Buah

38,500

35,000

3,500

Buah

40,700

37,000

3,700

105,000

10,500

10

Lampu EL 20 watt Mutu Klas - A Phillip

11

Lampu TL ( trafo ) 20 watt Phillip

Buah

115,500

12

Lampu TL ( trafo ) 40 watt Phillip

Buah

150,150

136,500

13,650

Buah

207,900

189,000

18,900

262,500

26,250

13

Lampu TL ( trafo ) 2x20 watt Phillip

14

Lampu TL ( trafo ) 2x40 watt Phillip

Buah

288,750

15

Box MCB 2 Group

Buah

17,600

16,000

1,600

Buah

34,650

31,500

3,150

68,250

6,825

16

Box MCB 4 Group

17

Box MCB 8 Group

Buah

75,075

18

Saklar Tunggal Standart mutu A

Buah

14,300

13,000

1,300

Buah

17,600

16,000

1,600

13,000

1,300

19

Saklar Ganda Standart mutu A

20

Stop Kontak Standart Mutu A

Buah

14,300

21

Piting lampu tanam ( besar ) Mutu A

Buah

85,800

78,000

7,800

Buah

57,750

52,500

5,250

21,000

2,100

22

Piting lampu tanam ( kecil ) Mutu A

23

Breaker / MCB 2 Amp

Buah

23,100

24

Breaker / MCB 4 Amp

Buah

23,100

21,000

2,100

Buah

28,875

26,250

2,625

31,500

3,150

25

Breaker / MCB 6 Amp

26

Breaker / MCB 12 Amp

Buah

34,650

27

Kabel NGA 2,5 Amp Eterna

Rol

288,750

262,500

26,250

28

Kabel NGA 2,5 Amp Surya

Rol

173,250

157,500

15,750

29

Stop Kontak

Buah

23,100

21,000

2,100

AC

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

30

Stop Kontak

Cabang empat

Buah

17,325

15,750

1,575

31

Stop Kontak

Tembok

Buah

28,875

26,250

2,625

13,000

1,300

32

Stop kontak

Brocco

Buah

14,300

33

Saklar

Ganda

Buah

17,600

16,000

1,600

34

Saklar

Tunggal

Buah

13,750

12,500

1,250

11,500

1,150

35

Beugel

1 1/2 x 18 x 18 cm

Buah

12,650

36

Beugel

10"

Buah

11,550

10,500

1,050

37

Elbou PVC

1 1/2"

Buah

4,950

4,500

450

2,500

250

38

Elbou PVC

5/8"

Buah

2,750

39

Isolasi

S chot 23

Buah

80,300

73,000

7,300

40

isolasi

Unibel

Buah

8,250

7,500

750

11,000

1,100

41

Isolasi

Unibel Besar

Buah

12,100

42

Kelam Kabel

Nomer. 10,12,14

Buah

7,700

7,000

700

Buah

632,500

575,000

57,500

340,000

34,000

43

Handel

01 63A

44

OHM Saklar Germany

25A

Buah

374,000

45

Pole Braker

3"

Buah

11,550

10,500

1,050

Buah

23,100

21,000

2,100

21,000

2,100

46

Braker

MCB 2 AMP

47

Braker

MCB 4 AMP

Buah

23,100

48

Braker

MCB 6 AMP

Buah

28,875

26,250

2,625

Buah

34,650

31,500

3,150

52,500

5,250

49

Braker

MCB 12 AMP

50

Braker

MCB 20 A

Buah

57,750

51

Braker

MCB 25 A

Buah

69,300

63,000

6,300

Rol

462,000

420,000

42,000

105,000

10,500

52

Kabel

NYA 4 mm

53

Kabel

NYFGBY 4 x 16 mm

Rol

115,500

54

Kabel

NYFGBY 4 x 10 mm

Rol

86,625

78,750

7,875

Rol

167,475

152,250

15,225

68,250

6,825

55

Kabel

NYFGBY 4 x 25 mm

56

Kabel

NYFGBY 4 x 6 mm

Rol

75,075

57

Kabel

NYM 2 x 2,5 mm

Rol

866,250

787,500

78,750

58

Kabel

NYM 3 x 2,5 mm

Rol

1,155,000

1,050,000

105,000

1,575,000

157,500

2,100,000

210,000

59

Kabel

NYM 3 x 4 mm

Rol

1,732,500

60

Kabel

NYM 4 x 4 mm

Rol

2,310,000

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

61

Kabel

NYMHY 2 x 0,75 mm

Rol

462,000

420,000

42,000

62

Kabel

NYMHY 3 x 2,5 mm

Rol

1,443,750

1,312,500

131,250

1,942,500

194,250

4,935,000

493,500

63

Kabel

NYY 3 x 4 mm

Rol

2,136,750

64

Kabel

NYY 4 x 10 mm

Rol

5,428,500

65

Kabel

NYY 4x 16 mm

Rol

80,850

73,500

7,350

Rol

3,349,500

3,045,000

304,500

66

Kabel

NYY 4 x 6 mm

67

Bola Lampu

Hologen 1000 Watt

Buah

286,000

260,000

26,000

68

Bola Lampu

Hologen 500 Watt

Buah

148,500

135,000

13,500

40,000

4,000

69

Bola Lampu

HPIT 400Watt

Buah

44,000

70

Bola Lampu

HPL 125 Watt

Buah

56,100

51,000

5,100

Buah

69,300

63,000

6,300

47,000

4,700

71

Bola Lampu

mercury 250 watt

72

Bola Lampu

ML 160 Watt

Buah

51,700

73
74
75

Bola Lampu
Sekring Otomatis
Sekring Otomatis
Bahan Pelapis Dinding

ML 250 Watt
16 a
20 a

Buah
Buah
Buah

66,000
23,100
23,100

60,000
21,000
21,000

6,000
2,100
2,100

m2
m2
m2

75,900
86,900
97,900

69,000
79,000
89,000

6,900
7,900
8,900

10 - 15 cm
5 - 7 cm
3 - 5 cm

m3
m3
m3
m3

204,800
285,000
340,000
367,500

180,000
250,000
300,000
325,000

6,800
10,000
10,000
10,000

18,000
25,000
30,000
32,500

2 - 3 cm

m3

395,000

350,000

10,000

35,000

422,500

375,000

505,000
395,000
186,000
151,000
105,000
94,000
100,600
16,500

450,000
350,000
160,000
130,000
90,000
80,000
86,000
15,000

10,000
10,000
10,000
10,000
8,000
6,000
6,000
6,000

37,500
45,000
35,000
16,000
13,000
9,000
8,000
8,600
1,500

1
2
3

Kaca
Kaca Bening
Kaca Bening
Kaca Rayband
BAHAN CETAKAN/CAMPURAN BETON

1
2
3
4

Batu gunung Belah


Batu Pecah
Batu Pecah
Batu Pecah

Batu Pecah

6
7
8
9
10
11
12
13
14

Batu Pecah
Batu Pecah
Batu Abu Filler/Kapur
Kerikil
Sirtu
Pasir Untuk Beton
Pasir Urug
Pasir Pasangan
Ijuk

3
5
5

mm
mm
mm

1 - 2 cm
0.5 - 1.0 cm (Chipping)

m
m3
m3
m3
m3
m3
m3
m3
kg

Ket.

15

Tanah Urug

m3

38,550

32,500

2,800

3,250

No

Nama Barang

CETAKAN BETON
1 Batu Bata
2 Glass block
3 Loster
4 Bataco
5 Paving Block Abu-abu Kecil
6 Paving Block Abu-abu Besar
7 Buis Beton Bulat Bertulang
8 Buis Beton Bulat Bertulang
9 Buis Beton Bulat Bertulang
10 Buis Beton Bulat Bertulang
11 Buis Beton Bulat Tidak Bertulang
12 Buis Beton Bulat Tidak Bertulang
13 Buis Beton Bulat Tidak Bertulang
14 Buis Beton Bulat Tidak Bertulang
Kayu Ulin

Ukuran / Tipe

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

10
20
10
10
Tbl
Tbl

x
10
x
20
x
20
x
20
6 cm
6 cm
80
x
60
x
40
x
30
x
80
x
60
x
40
x
30
x

x
x
x

P
P
P
P
P
P
P
P

50
50
100
100
50
50
100
100

Satuan

20 cm
cm
20 cm
40 cm

cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x

Tbl
Tbl
Tbl
Tbl
Tbl
Tbl
Tbl
Tbl

10
10
10
10
10
10
10
10

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

Harga

Harga Dasar

1,000
26,400
6,050
7,700
9,350
3,300
412,500
313,500
198,000
187,000
165,000
126,500
159,500
137,500

900
24,000
5,500
7,000
8,500
3,000
375,000
285,000
180,000
170,000
150,000
115,000
145,000
125,000

Galian C

Benefit 10 %

10

90
2,400
550
700
850
300
37,500
28,500
18,000
17,000
15,000
11,500
14,500
12,500

1
2
3
4
5
6
7
8
9
10
11

Kayu Ulin
Kayu Ulin
Kayu Ulin
Kayu Ulin
Kayu Ulin
Kayu Ulin
Kayu Ulin
Papan Ulin
Papan Ulin
Kayu Ulin
Kayu Ulin
Kayu Meranti

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

20
15
12
10
5
5
5
2.5
2
5
7

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x
x
x
x

20
15
12
10
10
7
5
20
10
20
14

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x
x
x
x

4
4
4
4
4
4
4
4
4
4
4

m
m
m
m
m
m
m
m
m
m
m

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

4,950,000
4,950,000
4,950,000
4,950,000
5,500,000
5,500,000
5,720,000
6,600,000
5,500,000
5,500,000
5,500,000

4,500,000
4,500,000
4,500,000
4,500,000
5,000,000
5,000,000
5,200,000
6,000,000
5,000,000
5,000,000
5,000,000

450,000
450,000
450,000
450,000
500,000
500,000
520,000
600,000
500,000
500,000
500,000

1
2
3
4
5
6
7
8
9

Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Papan Meranti
Papan Meranti

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

2
5
5
5
5
6
10
2.5
2

cm
cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x
x

3
3
5
7
10
12
10
20
4

cm
cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x
x

4
4
4
4
4
4
4
4
4

m
m
m
m
m
m
m
m
m

m3
m3
m3
m3
m3
m3
m3
m3
m3

2,695,000
2,695,000
2,640,000
2,640,000
2,640,000
2,640,000
2,640,000
2,750,000
2,695,000

2,450,000
2,450,000
2,400,000
2,400,000
2,400,000
2,400,000
2,400,000
2,500,000
2,450,000

245,000
245,000
240,000
240,000
240,000
240,000
240,000
250,000
245,000

Ket.

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Kayu Bengkirai
1
2
3
4
5
6
7
8

Kayu Bengkirai
Kayu Bengkirai
Kayu Bengkirai
Kayu Bengkirai
Kayu Bengkirai
Kayu Bengkirai
Papan bengkirai
Papan bengkirai
Kayu Kawi

1 Kayu Kawi
2 Kayu Kawi
3 Kayu Kawi
4 Kayu Kawi
5 Papan Kawi
6 Papan Kawi
7 Kayu Campuran ( Bekisting)
8 Formite/penjaga jarak bekisting/spacer
9 Kayu .Galam
BAHAN MEBEL/MOULDING
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Papan Moulding (Meranti)


Papan Ruiter (Meranti)
Kusen Kayu Bengkirai
Kusen Kayu Ulin
Jalusi Kayu
Jalusi Dinding Layar 5 Segi
List Profille Sudut 3/5 kayu
Lumber zering moulding
Daun Pintu Panil kayu ulin
Daun Pintu Panil kayu ulin
Daun Pintu Panil kayu ulin 2 Daun
Daun Pintu Panil kayu bengkirai
Daun Pintu Panil kayu bengkirai
Daun Pintu Panil kayu Bangkirai 2 Daun
Daun jendela bengkirai
Daun jendela bengkirai
Daun jendela ulin
Daun jendela ulin

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

3
5
5
5
7
10
2.5
2

cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x

5
5
7
10
14
10
20
20

cm
cm
cm
cm
cm
cm
cm
cm

x
x
x
x
x
x
x
x

4
4
4
4
4
4
4
4

m
m
m
m
m
m
m
m

m3
m3
m3
m3
m3
m3
m3
m3

3,520,000
3,520,000
3,520,000
3,520,000
3,520,000
3,520,000
3,850,000
3,850,000

3,200,000
3,200,000
3,200,000
3,200,000
3,200,000
3,200,000
3,500,000
3,500,000

320,000
320,000
320,000
320,000
320,000
320,000
350,000
350,000

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

5
5
5
10
2.5
2

cm
cm
cm
cm
cm
cm

x
x
x
x
x
x

5
7
10
10
20
20

cm
cm
cm
cm
cm
cm

x
x
x
x
x
x

4
4
4
4
4
4

m
m
m
m
m
m

m3
m3
m3
m3
m3
m3
m3
bh
Batang

3,465,000
3,465,000
3,465,000
3,025,000
3,465,000
3,465,000
2,200,000
27,500
27,500

3,150,000
3,150,000
3,150,000
2,750,000
3,150,000
3,150,000
2,000,000
25,000
25,000

315,000
315,000
315,000
275,000
315,000
315,000
200,000
2,500
2,500

m3
bh
m'
m'
m'
Buah
Batang
m3
Buah
Buah
Pasang
Buah
Buah
Pasang
Buah
Buah
Buah
Buah

2,750,000
44,000
63,800
74,800
11,550
396,000
16,500
3,025,000
770,000
825,000
1,595,000
660,000
693,000
1,375,000
302,500
302,500
346,500
346,500

2,500,000
40,000
58,000
68,000
10,500
360,000
15,000
2,750,000
700,000
750,000
1,450,000
600,000
630,000
1,250,000
275,000
275,000
315,000
315,000

250,000
4,000
5,800
6,800
1,050
36,000
1,500
275,000
70,000
75,000
145,000
60,000
63,000
125,000
27,500
27,500
31,500
31,500

10 - 12 panjang 4 m
Ukuran
Ukuran

15
15

x
x

18
18

x
x

400 cm
400 cm

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

1
4
4
4
4
4
4
110
110
110
110

x
x
x
x
x
x
x
x
x
x
x

8
75
90
60
75
90
60
77
55
77
55

x
x
x
x
x
x
x

400
210
210
210
210
210
210
+
+
+
+

cm
cm
cm
cm

cm
cm
cm
cm
cm
cm
cm
Kaca
Kaca
Kaca
Kaca

Ket.

No

Nama Barang

Ukuran / Tipe

SEWA ALAT
1 CONCRETE MIXER 0.3-0.6 M3 ( Molen )
2 DUMP TRUCK
3 GENERATOR SET
4 CONCRETE VIBRATOR
5 WATER PUMP 70-100 mm
6 WATER TANKER 3000-4500 L.
7 PILE DRIVER + HAMMER
8 Alat Pancang Manual

Keterangan :
# Harga diatas merupakan harga rata - rata tertinggi pada ibukota kabupaten / pusat kecamatan
# Harga sudah termasuk :
a. keuntungan(benefit) 10%
b. Restribusi tambang Galian C

Satuan

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

Harga

25,000.00
340,000.00
530,000.00
25,000.00
33,000.00
310,000.00
495,000.00
25,000.00

Harga Dasar

Galian C

Benefit 10 %

Ket.

ANALISA HARGA SATUAN


BIDANG KECIPTA KARYAAN
NO.
A.
A.1

A.2

B.
B.1

B.2

B.3

B.4

B.5

B.6

B.7

B.8

B.9

B.10

B.11

NAMA PEKERJAAN
Pekerjaan Persiapan
1 m2 Pembersihan lapangan dan peralatan
0.1000 or Pekerja
0.0050 or Mandor
1 m' Pengukuran dan pemasangan bouwplank
0.0120 m3 Kayu meranti 5/7 cm
0.0200 kg Paku biasa 2 s/d 5 inchi
0.0070 m3 Papan kayu meranti 2.5/20 cm
0.1000 or Tukang kayu
0.1000 or Pekerja
0.0100 or Kepala tukang
0.0050 or Mandor
Pekerjaan Bongkaran
1 m3 Membongkar pasangan batu kali
0.4000 or Pekerja
4.0000 or Tukang batu
1 m3 Pembongkaran pasangan dinding bata
6.6670 or Pekerja
0.3330 or Mandor
1 m3 Pembongkaran beton bertulang
6.6670 or Pekerja
0.3330 or Mandor
10 m2 Mengupas plesteran lama
1.2500 or Pekerja
0.1250 or Mandor

10 m2 Membongkar lantai tegel/keramik untuk dipakai kembali


2.0000 or Pekerja
0.1000 or Mandor

1 m2 Menurunkan atap sirap/genteng


yang tidak dipakai kembali
0.0542 or Pekerja
0.0027 or Mandor
10 m2 Menurunkan atap sirap/genteng
yang dipakai kembali
2.0000 or Pekerja
0.1000 or Mandor

1 m3 Membongkar kayu balok loteng,


kuda-kuda,gelagar jembatan,rangka rumah dll
(kayu bongkaran dipakai lagi)
6.0000 or Tukang kayu
4.0000 or Pekerja
0.6000 or Kepala tukang
0.2000 or Mandor
1 m3 Membongkar kayu balok loteng,
kuda-kuda,gelagar jembatan,rangka rumah dll
(kayu bongkaran tidak dipakai lagi)
1.0000 or Pekerja
0.2000 or Mandor
10 m2 Membongkar atap seng
0.5000 or Pekerja
1.0000 or Mandor

10 m2 Menurunkan rangka atap dari kayu


(kayu bongkaran dipakai lagi)
0.6000 or Tukang kayu
2.0000 or Pekerja
0.0600 or Kepala tukang
0.1000 or Mandor

HARGA SATUAN
( Rp )

55,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

5,500.00
450.00
5,950.00

JUMLAH HARGA
( Rp )

5,500.00
450.00
5,950.00

2,640,000.00
16,500.00
2,750,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

7,500.00
5,500.00
800.00
450.00
14,250.00

55,000.00
75,000.00
Jumlah

22,000.00
300,000.00
322,000.00

22,000.00
300,000.00
322,000.00

55,000.00
90,000.00
Jumlah

366,685.00
29,970.00
396,655.00

366,685.00
29,970.00
396,655.00

55,000.00
90,000.00
Jumlah

366,685.00
29,970.00
396,655.00

366,685.00
29,970.00
396,655.00

55,000.00
68,750.00
90,000.00
11,250.00
Jumlah
80,000.00
Untuk 1 m2 pekerjaan bongkaran

68,750.00
11,250.00
80,000.00
8,000.00

55,000.00
110,000.00
90,000.00
9,000.00
Jumlah
119,000.00
Untuk 1 m2 pekerjaan bongkaran

110,000.00
9,000.00
119,000.00
11,900.00

55,000.00
90,000.00
Jumlah

31,680.00
330.00
19,250.00

51,260.00

31,680.00
330.00
19,250.00
7,500.00
5,500.00
800.00
450.00
65,510.00

2,981.00
243.00
3,224.00

2,981.00
243.00
3,224.00

55,000.00
110,000.00
90,000.00
9,000.00
Jumlah
119,000.00
Untuk 1 m2 pekerjaan bongkaran

110,000.00
9,000.00
119,000.00
11,900.00

75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

450,000.00
220,000.00
48,000.00
18,000.00
736,000.00

450,000.00
220,000.00
48,000.00
18,000.00
736,000.00

55,000.00
90,000.00
Jumlah

55,000.00
18,000.00
73,000.00

55,000.00
18,000.00
73,000.00

55,000.00
27,500.00
90,000.00
90,000.00
Jumlah
117,500.00
Untuk 1 m2 pekerjaan bongkaran

27,500.00
90,000.00
117,500.00
11,750.00

75,000.00
45,000.00
55,000.00
110,000.00
80,000.00
4,800.00
90,000.00
9,000.00
Jumlah
168,800.00
Untuk 1 m2 pekerjaan bongkaran

45,000.00
110,000.00
4,800.00
9,000.00
168,800.00
16,880.00

NO.

NAMA PEKERJAAN

B.12

1 m2 Menurunkan rangka atap dari kayu


(kayu bongkaran tidak dipakai lagi)
2.0000 or Pekerja
0.1000 or Mandor

C.
C.1

C.2

C.3

C.4

C.5

C.6

C.7

C.8

C.9

C.10

C.11

C.12

C.13

C.14

C.15

Pekerjaan Tanah
1 m3 Galian tanah biasa sedalam 1 m'
0.7500 or Pekerja
0.0250 or Mandor
1 m3 Galian tanah biasa sedalam 2 m'
0.9000 or Pekerja
0.0450 or Mandor
1 m3 Galian tanah biasa sedalam 3 m'
1.0500 or Pekerja
0.0670 or Mandor
1 m3 Menggali tanah keras sedalam 1 m'
1.0000 or Pekerja
0.0320 or Mandor
1 m3 Menggali tanah yang banyak batu bundar
0.8571 or Pekerja
0.0429 or Mandor
1 m3 Menggali tanah lumpur
0.7895 or Pekerja
0.0395 or Mandor
1 m3 Menggali tanah lumpur sedalam 1 m'
1.2000 or Pekerja
0.0450 or Mandor
1 m3 Menggali tanah cadas sedalam 1 m'
1.5000 or Pekerja
0.0600 or Mandor
1 m3 Membuang tanah sejauh 15 m'
0.3300 or Pekerja
0.0100 or Mandor
1 m3 Urugan tanah kembali
1/3 m3 Pekerjaan Galian Tanah (C.1)
1 m3 Urugan tanah pilihan
1.2000 m3 Tanah urug
0.3000 or Pekerja
0.0150 or Mandor
1 m3 Urugan pasir
1.2000 m3 Pasir urug
0.3000 or Pekerja
0.0100 or Mandor
1 m3 Memadatkan tanah per-20 cm
0.5000 or Pekerja
0.0500 or Mandor
1 m2 Memasang lapisan ijuk tebal 10 cm untuk bidang resapan
6.0000 kg Ijuk
0.1500 or Pekerja
0.0150 or Mandor
1 m2 Memasang sirtu padat untuk peninggian lantai bangunan
1.2000 m3 Sirtu
0.2500 or Pekerja
0.0250 or Mandor

HARGA SATUAN
( Rp )

UPAH
( Rp )

BAHAN
( Rp )

55,000.00
110,000.00
90,000.00
9,000.00
Jumlah
119,000.00
Untuk 1 m2 pekerjaan bongkaran

JUMLAH HARGA
( Rp )

110,000.00
9,000.00
119,000.00
11,900.00

55,000.00
90,000.00
Jumlah

41,250.00
2,250.00
43,500.00

41,250.00
2,250.00
43,500.00

55,000.00
90,000.00
Jumlah

49,500.00
4,050.00
53,550.00

49,500.00
4,050.00
53,550.00

55,000.00
90,000.00
Jumlah

57,750.00
6,030.00
63,780.00

57,750.00
6,030.00
63,780.00

55,000.00
90,000.00
Jumlah

55,000.00
2,880.00
57,880.00

55,000.00
2,880.00
57,880.00

55,000.00
90,000.00
Jumlah

47,140.50
3,861.00
51,001.50

47,140.50
3,861.00
51,001.50

55,000.00
90,000.00
Jumlah

43,422.50
3,555.00
46,977.50

43,422.50
3,555.00
46,977.50

55,000.00
90,000.00
Jumlah

66,000.00
4,050.00
70,050.00

66,000.00
4,050.00
70,050.00

55,000.00
90,000.00
Jumlah

82,500.00
5,400.00
87,900.00

82,500.00
5,400.00
87,900.00

55,000.00
90,000.00
Jumlah

18,150.00
900.00
19,050.00

18,150.00
900.00
19,050.00

43,500.00
Jumlah

14,500.00
14,500.00

14,500.00
14,500.00

38,550.00
55,000.00
90,000.00
Jumlah

16,500.00
1,350.00
17,850.00

94,000.00
55,000.00
90,000.00
Jumlah

16,500.00
900.00
17,400.00

55,000.00
90,000.00
Jumlah

27,500.00
4,500.00
32,000.00

16,500.00
55,000.00
90,000.00
Jumlah

8,250.00
1,350.00
9,600.00

151,000.00
55,000.00
90,000.00
Jumlah

13,750.00
2,250.00
16,000.00

46,260.00

46,260.00
112,800.00

112,800.00

46,260.00
16,500.00
1,350.00
64,110.00
112,800.00
16,500.00
900.00
130,200.00
27,500.00
4,500.00
32,000.00

99,000.00

99,000.00
181,200.00

181,200.00

99,000.00
8,250.00
1,350.00
108,600.00
181,200.00
13,750.00
2,250.00
197,200.00

NO.
D
D.1

D.2

D.3

D.4

D.5

D.6

D.7

D.8

D.9

D.10

D.11

E
E.1

E.2

E.3

NAMA PEKERJAAN
Pekerjaan Tiang Pancang
Memancang tiang per m` - 20/20, tanah lunak
(dihitung bagian yang masuk tanah)
0.1250 or Tukang kayu
0.2917 or Pekerja
0.0125 or Kepala tukang kayu
0.0007 or Mandor
1.0000 ls Sewa alat Pancang
1 m1 Tanah biasa - 20/20
1.2500
Upah (D.1)
1 m1 Tanah keras - 20/20
1.5000
Upah (D.1)
1 m1 Tanah keras - 10/10
1.0000
Upah (D.1)
1 m1 Tanah pasir - 20/20
2.0000
Upah (D.1)
1 m1 Tanah pasir - 10/10
2.6667
Upah (D.1)
1 bh membuat cincin kepala tiang pancang &
dilancipkan balok kayu ulin ukuran 20/20 cm
0.2250 or Tukang kayu
0.0750 or Pekerja
0.0225 or Kepala tukang kayu
0.0038 or Mandor
1 bh Membuat cincin kepala tiang pancang &
dilancipkan balok kayu ulin 10/10 cm
0.5000
Upah (D.7)
Membuat cincin kepala tiang pancang &
dilancipkan kayu galam dia 12 - 20 cm
0.5000
Upah (D.7)
1 bh Membuat sunduk pada pancang kayu 5/7-50 cm
0.0019 m3 Kayu ulin
0.0600 or Tukang kayu
0.0600 or Pekerja
0.0060 or Kepala tukang kayu
0.0030 or Mandor
1 psg Membuat pen dan lobang pada
tiap kepala kayu (tiap-tiap pasang)
0.2000
Tukang kayu
0.0200
Kepala tukang kayu
Pekerjaan Pondasi
1 m3 Memasang batu kosong / Aanstamping
1.2000 m3 Batu belah ( 15 s/d 20) cm
0.4320 m3 Pasir urug
0.3900 or Tukang batu
0.7800 or Pekerja
0.0390 or Kepala tukang
0.0390 or Mandor
1 m3 Memasang pondasi batu belah campuran 1 : 3
1.2000 m3 Batu belah ( 15 s/d 20) cm
0.4850 m3 Pasir pasang
202.0000 kg Semen Pc 50 kg
0.7500 or Tukang batu
1.5000 or Pekerja
0.0750 or Kepala tukang
0.0750 or Mandor
1 m3 Memasang pondasi batu belah campuran 1 : 4
1.2000 m3 Batu belah ( 15 s/d 20) cm
0.5200 m3 Pasir pasang
163.0000 kg Semen Pc 50 kg
0.7500 or Tukang batu
1.5000 or Pekerja
0.0750 or Kepala tukang
0.0750 or Mandor

HARGA SATUAN
( Rp )

UPAH
( Rp )

BAHAN
( Rp )

JUMLAH HARGA
( Rp )

75,000.00
55,000.00
80,000.00
90,000.00
25,000.00
Jumlah

9,375.00
16,043.50
1,000.00
63.00

51,481.50
Jumlah

64,351.88
64,351.88

64,351.88
64,351.88

51,481.50
Jumlah

77,222.25
77,222.25

77,222.25
77,222.25

51,481.50
Jumlah

51,481.50
51,481.50

51,481.50
51,481.50

51,481.50
Jumlah

102,963.00
102,963.00

102,963.00
102,963.00

51,481.50
Jumlah

137,285.72
137,285.72

137,285.72
137,285.72

75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

16,875.00
4,125.00
1,800.00
342.00
23,142.00

16,875.00
4,125.00
1,800.00
342.00
23,142.00

23,142.00
Jumlah

11,571.00
11,571.00

11,571.00
11,571.00

11,571.00
Jumlah

5,785.50
5,785.50

5,785.50
5,785.50

5,500,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

4,500.00
3,300.00
480.00
270.00
8,550.00

75,000.00
80,000.00
Jumlah

15,000.00
1,600.00
16,600.00

204,800.00
94,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
204,800.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
204,800.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

26,481.50

25,000.00
25,000.00

10,450.00

10,450.00

286,368.00
245,760.00
48,791.00
271,084.00

56,250.00
82,500.00
6,000.00
6,750.00
151,500.00

565,635.00
245,760.00
52,312.00
218,746.00

56,250.00
82,500.00
6,000.00
6,750.00
151,500.00

10,450.00
4,500.00
3,300.00
480.00
270.00
19,000.00

15,000.00
1,600.00
16,600.00

245,760.00
40,608.00
29,250.00
42,900.00
3,120.00
3,510.00
78,780.00

9,375.00
16,043.50
1,000.00
63.00
25,000.00
51,481.50

516,818.00

245,760.00
40,608.00
29,250.00
42,900.00
3,120.00
3,510.00
365,148.00
245,760.00
48,791.00
271,084.00
56,250.00
82,500.00
6,000.00
6,750.00
717,135.00
245,760.00
52,312.00
218,746.00
56,250.00
82,500.00
6,000.00
6,750.00
668,318.00

NO.
E.4

F
F.1

F.2

F.3

G.
G.1

G.2

G.3

NAMA PEKERJAAN
1 m3 Rangka bawah dari kayu ulin
(tongkat, sunduk)
1.1000 m3 Kayu ulin
9.0000 or Tukang kayu
9.0000 or Pekerja
0.9000 or Kepala tukang
0.4500 or Mandor
1.0000 ls Alat bantu (Bor listrik, dll)
Pekerjaan Rangka Kayu
1 m3 Mengerjakan sloof dan lenger
1.1000 m3 Kayu ulin
5.2238 kg Paku ulin
10.0000 or Tukang kayu
6.0000 or Pekerja
1.0000 or Kepala tukang
0.3000 or Mandor
1.0000 ls Alat bantu (Bor listrik, dll)
1 m3 Mengerjakan kolom praktis (meranti)
1.1000 m3 Kayu meranti
2.6493 kg Paku kayu
12.0000 or Tukang kayu
5.7143 or Pekerja
2.5000 or Kepala tukang
0.4688 or Mandor
1.0000 ls Alat bantu (mesin ketam, dll)
1 m3 Mengerjakan rangka rumah kayu ulin
1.1000 m3 Kayu ulin
2.6493 kg Paku ulin
25.0000 or Tukang kayu
9.3750 or Pekerja
2.5000 or Kepala tukang
0.4688 or Mandor
1.0000 ls Mesin ketam
Pekerjaan Struktur
1 m2 Memasang bekisting untuk pondasi
0.0400 m3 Papan kayu klas III
0.3000 kg Paku 5 s/d 10 cm
0.1000 ltr Minyak bekisting
0.2600 or Tukang kayu
0.5200 or Pekerja
0.0260 or Kepala tukang
0.0260 or Mandor

1 m2 Memasang bekisting untuk sloof


0.0450 m3 Papan kayu klas III
0.3000 kg Paku 5 s/d 10 cm
0.1000 ltr Minyak bekisting
0.2600 or Tukang kayu
0.5200 or Pekerja
0.0260 or Kepala tukang
0.0260 or Mandor

1 m2 Memasang bekisting untuk kolom


0.0400 m3 Papan kayu klas III
0.4000 kg Paku 5 cm s/d 12 cm
0.2000 ltr Minyak bekisting
0.0150 m3 Balok kayu klas II
0.3500 lbr Plywood tebal 9 mm
2.0000 btg Dolken kayu galam, (8 - 10) cm,
panjang 4m'
0.3300 or Tukang kayu
0.6600 or Pekerja
0.0330 or Kepala tukang
0.0330 or Mandor

HARGA SATUAN
( Rp )

4,950,000.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

4,950,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
25,000.00
Jumlah
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
30,000.00
Jumlah
4,950,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
30,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

5,445,000.00
675,000.00
495,000.00
72,000.00
40,500.00
1,282,500.00

20,000.00
5,465,000.00

5,445,000.00
114,923.60
750,000.00
330,000.00
80,000.00
27,000.00
1,187,000.00

25,000.00
5,584,923.60
2,904,000.00
43,713.45

900,000.00
314,286.50
200,000.00
42,192.00
1,456,478.50

30,000.00
2,977,713.45
5,445,000.00
58,284.60

1,875,000.00
515,625.00
200,000.00
42,192.00
2,632,817.00

30,000.00
5,533,284.60

2,200,000.00
16,500.00
9,900.00
75,000.00
19,500.00
55,000.00
28,600.00
80,000.00
2,080.00
90,000.00
2,340.00
Jumlah
50,180.00
Untuk bekisting 2 x pakai

88,000.00
4,950.00
990.00

2,200,000.00
16,500.00
9,900.00
75,000.00
19,500.00
55,000.00
28,600.00
80,000.00
2,080.00
90,000.00
2,340.00
Jumlah
50,180.00
Untuk bekisting 2 x pakai

99,000.00
4,950.00
990.00

2,200,000.00
16,500.00
9,900.00
2,640,000.00
167,200.00
27,500.00
75,000.00
24,750.00
55,000.00
36,300.00
80,000.00
2,640.00
90,000.00
2,970.00
Jumlah
63,690.00
Untuk bekisting 2 x pakai

93,940.00

104,940.00

88,000.00
6,600.00
1,980.00
39,600.00
58,520.00
55,000.00

249,700.00

JUMLAH HARGA
( Rp )

5,445,000.00
675,000.00
495,000.00
72,000.00
40,500.00
20,000.00
6,747,500.00

5,445,000.00
114,923.60
750,000.00
330,000.00
80,000.00
27,000.00
25,000.00
6,771,923.60
2,904,000.00
43,713.45
900,000.00
314,286.50
200,000.00
42,192.00
30,000.00
4,434,191.95
5,445,000.00
58,284.60
1,875,000.00
515,625.00
200,000.00
42,192.00
30,000.00
8,166,101.60

88,000.00
4,950.00
990.00
19,500.00
28,600.00
2,080.00
2,340.00
146,460.00
73,230.00

99,000.00
4,950.00
990.00
19,500.00
28,600.00
2,080.00
2,340.00
157,460.00
78,730.00
88,000.00
6,600.00
1,980.00
39,600.00
58,520.00
55,000.00
24,750.00
36,300.00
2,640.00
2,970.00
316,360.00
158,180.00

NO.
G.4

G.5

G.6

G.7

G.8

NAMA PEKERJAAN
1 m2 Memasang bekisting untuk balok
0.0400 m3 Papan kayu klas III
0.4000 kg Paku 5 cm s/d 12 cm
0.2000 ltr Minyak bekisting
0.0180 m3 Balok kayu klas II
0.3500 lbr Plywood tebal 9 mm
2.0000 btg Dolken kayu galam, (8 - 10) cm,
panjang 4m'
0.3300 or Tukang kayu
0.6600 or Pekerja
0.0330 or Kepala tukang
0.0330 or Mandor

1 m2 Memasang bekisting untuk plat lantai


0.0400 m3 Papan kayu klas III
0.4000 kg Paku 5 cm s/d 12 cm
0.2000 ltr Minyak bekisting
0.0150 m3 Balok kayu klas II
0.3500 lbr Plywood tebal 9 mm
6.0000 btg Dolken kayu galam, (8 - 10) cm,
panjang 4m'
0.3300 or Tukang kayu
0.6600 or Pekerja
0.0330 or Kepala tukang
0.0330 or Mandor

1 m2 Memasang bekisting untuk dinding


0.0300 m3 Papan kayu klas III
0.4000 kg Paku 5 cm s/d 12 cm
0.2000 ltr Minyak bekisting
0.0200 m3 Balok kayu klas II
0.3500 lbr Plywood tebal 9 mm
3.0000 btg Dolken kayu galam, (8 - 10) cm,
panjang 4m'
4.0000 bh Formite/penjaga jarak bekisting/
spacer
0.3300 or Tukang kayu
0.6600 or Pekerja
0.0330 or Kepala tukang
0.0330 or Mandor

1 m2 Memasang bekisting untuk tangga


0.0300 m3 Papan kayu klas III
0.4000 kg Paku 5 cm s/d 12 cm
0.1500 ltr Minyak bekisting
0.0150 m3 Balok kayu klas II
0.3500 lbr Plywood tebal 9 mm
2.0000 btg Dolken kayu galam, (8 - 10) cm,
panjang 4m'
0.3300 or Tukang kayu
0.6600 or Pekerja
0.0330 or Kepala tukang
0.0330 or Mandor

1 m2 Memasang jembatan untuk pengecoran beton


0.0264 m3 Papan kayu klas III
0.6000 kg Paku 5 cm s/d 12 cm
0.5000 btg Dolken kayu galam (kasau),
(8 - 10) cm, panjang 4m'
0.0500 or Tukang kayu
0.1500 or Pekerja
0.0050 or Kepala tukang
0.0080 or Mandor

HARGA SATUAN
( Rp )

UPAH
( Rp )

2,200,000.00
16,500.00
9,900.00
2,640,000.00
167,200.00
27,500.00

BAHAN
( Rp )

88,000.00
6,600.00
1,980.00
47,520.00
58,520.00
55,000.00

75,000.00
24,750.00
55,000.00
36,300.00
80,000.00
2,640.00
90,000.00
2,970.00
Jumlah
63,690.00
Untuk bekisting 2 x pakai
2,200,000.00
16,500.00
9,900.00
2,640,000.00
167,200.00
27,500.00

257,620.00

88,000.00
6,600.00
1,980.00
39,600.00
58,520.00
165,000.00

75,000.00
24,750.00
55,000.00
36,300.00
80,000.00
2,640.00
90,000.00
2,970.00
Jumlah
63,690.00
Untuk bekisting 2 x pakai

359,700.00

JUMLAH HARGA
( Rp )

88,000.00
6,600.00
1,980.00
47,520.00
58,520.00
55,000.00
24,750.00
36,300.00
2,640.00
2,970.00
324,280.00
162,140.00
88,000.00
6,600.00
1,980.00
39,600.00
58,520.00
165,000.00
24,750.00
36,300.00
2,640.00
2,970.00
426,360.00
213,180.00

2,200,000.00
16,500.00
9,900.00
2,640,000.00
167,200.00
27,500.00

66,000.00
6,600.00
1,980.00
52,800.00
58,520.00
82,500.00

66,000.00
6,600.00
1,980.00
52,800.00
58,520.00
82,500.00

27,500.00

110,000.00

110,000.00

75,000.00
24,750.00
55,000.00
36,300.00
80,000.00
2,640.00
90,000.00
2,970.00
Jumlah
63,690.00
Untuk bekisting 2 x pakai
2,200,000.00
16,500.00
9,900.00
2,640,000.00
167,200.00
27,500.00

66,000.00
6,600.00
1,485.00
39,600.00
58,520.00
55,000.00

75,000.00
24,750.00
55,000.00
36,300.00
80,000.00
2,640.00
90,000.00
2,970.00
Jumlah
63,690.00
Untuk bekisting 2 x pakai
2,200,000.00
16,500.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

378,400.00

3,750.00
8,250.00
400.00
720.00
13,120.00

227,205.00

24,750.00
36,300.00
2,640.00
2,970.00
445,060.00
222,530.00
66,000.00
6,600.00
1,485.00
39,600.00
58,520.00
55,000.00
24,750.00
36,300.00
2,640.00
2,970.00
293,865.00
146,932.50

58,080.00
9,900.00
13,750.00

58,080.00
9,900.00
13,750.00

81,730.00

3,750.00
8,250.00
400.00
720.00
94,850.00

NO.
G.9

G.10

G.11

G.12

G.13

G.14

H.
H.1

H.2

NAMA PEKERJAAN
1 m3 Pek. Beton campuran 1 : 2 : 3
0.8100 m3 Koral
0.5400 m3 Pasir beton
336.0000 kg Semen Pc 50 kg
350.0000 ltr Air bersih
0.3500 or Tukang batu
2.0000 or Pekerja
0.0350 or Kepala tukang
0.1000 or Mandor
1.0000 ls alat bantu pengecoran
1 m3 Pek. Beton campuran 1 : 3 : 5
0.8700 m3 Koral
0.5200 m3 Pasir beton
218.0000 kg Semen Pc 50 kg
350.0000 ltr Air bersih
0.2500 or Tukang batu
1.6500 or Pekerja
0.0250 or Kepala tukang
0.0800 or Mandor
1.0000 ls alat bantu pengecoran
1 m3 Pekerjaan beton mutu K-225, f'c = 19.3 Mpa, slump 12
(2) cm, w/c = 0.58
0.7756 m3 Batu pecah 2-3 cm
0.5983 m3 Pasir beton
371.0000 kg Semen Pc 50 kg
215.0000 ltr Air bersih
0.2750 or Tukang batu
1.6500 or Pekerja
0.0280 or Kepala tukang
0.0830 or Mandor
1.0000 ls alat bantu pengecoran
10 kg Pekerjaan pembesian dengan besi polos
10.5000 kg Besi beton polos
0.1500 kg kawat beton
0.0700 or Tukang besi
0.0700 or Pekerja
0.0070 or Kepala tukang
0.0040 or Mandor

10 kg Pekerjaan pembesian dengan besi ulir


10.5000 kg Besi beton ulir
0.1500 kg kawat beton
0.0700 or Tukang besi
0.0700 or Pekerja
0.0070 or Kepala tukang
0.0040 or Mandor

Peralatan tambahan untuk 1 m3


Beton mutu K-225, K-275, K-350
1.9640 jam Cone mixer (molen)
jam Water tanker
1.9600 jam Cone vibrator
1.0000 ls Alat bantu tukang batu
Pekerjaan Dinding
1 m2 Pasangan batu bata 1 : 2, tebal 1 bata
100.0000 bh Batu bata
0.0800 m3 Pasir pasang
43.5000 kg Semen Pc 50 kg
0.2000 or Tukang batu
0.6000 or Pekerja
0.0200 or Kepala tukang
0.0300 or Mandor
1 m2 Pasangan batu bata 1 : 2, tebal 1/2 bata
50.0000 bh Batu bata
0.0380 m3 Pasir pasang
18.9500 kg Semen Pc 50 kg
0.1000 or Tukang batu
0.3000 or Pekerja
0.0100 or Kepala tukang
0.0150 or Mandor

HARGA SATUAN
( Rp )

186,000.00
105,000.00
1,342.00
39.60
75,000.00
55,000.00
80,000.00
90,000.00
100,600.00
Jumlah
186,000.00
105,000.00
1,342.00
39.60
75,000.00
55,000.00
80,000.00
90,000.00
100,600.00
Jumlah

395,000.00
105,000.00
1,342.00
39.60
75,000.00
55,000.00
80,000.00
90,000.00
100,600.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

150,660.00
56,700.00
450,912.00
13,860.00
26,250.00
110,000.00
2,800.00
9,000.00
148,050.00

100,600.00
772,732.00
161,820.00
54,600.00
292,556.00
13,860.00

18,750.00
90,750.00
2,000.00
7,200.00
118,700.00

100,600.00
522,836.00

306,344.44
62,820.00
497,882.00
8,514.00
20,625.00
90,750.00
2,240.00
7,470.00
121,085.00

100,600.00
875,560.44

12,533.69
23,100.00
75,000.00
5,250.00
55,000.00
3,850.00
80,000.00
560.00
90,000.00
360.00
Jumlah
10,020.00
Untuk 1 kg pembesian besi polos

131,603.77
3,465.00

16,687.50
23,100.00
75,000.00
5,250.00
55,000.00
3,850.00
80,000.00
560.00
90,000.00
360.00
Jumlah
10,020.00
Untuk 1 kg pembesian besi ulir

175,218.75
3,465.00

135,068.77

178,683.75

JUMLAH HARGA
( Rp )

150,660.00
56,700.00
450,912.00
13,860.00
26,250.00
110,000.00
2,800.00
9,000.00
100,600.00
920,782.00
161,820.00
54,600.00
292,556.00
13,860.00
18,750.00
90,750.00
2,000.00
7,200.00
100,600.00
742,136.00

306,344.44
62,820.00
497,882.00
8,514.00
20,625.00
90,750.00
2,240.00
7,470.00
100,600.00
1,097,245.44
131,603.77
3,465.00
5,250.00
3,850.00
560.00
360.00
145,088.77
14,508.88
175,218.75
3,465.00
5,250.00
3,850.00
560.00
360.00
188,703.75
18,870.38

25,000.00

49,100.00

49,100.00

25,000.00
2,500.00
Jumlah

49,000.00
2,500.00
100,600.00

49,000.00
2,500.00
100,600.00

1,000.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
1,000.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

100,000.00
8,048.00
58,377.00
15,000.00
33,000.00
1,600.00
2,700.00
52,300.00

166,425.00
50,000.00
3,822.80
25,430.90

7,500.00
16,500.00
800.00
1,350.00
26,150.00

79,253.70

100,000.00
8,048.00
58,377.00
15,000.00
33,000.00
1,600.00
2,700.00
218,725.00
50,000.00
3,822.80
25,430.90
7,500.00
16,500.00
800.00
1,350.00
105,403.70

NO.
H.3

H.4

H.5

H.6

H.7

H.8

H.9

H.10

H.11

NAMA PEKERJAAN
1 m2 Pasangan batu bata 1 : 4, tebal 1 bata
100.0000 bh Batu bata
0.0930 m3 Pasir pasang
26.5500 kg Semen Pc 50 kg
0.2000 or Tukang batu
0.6000 or Pekerja
0.0200 or Kepala tukang
0.0300 or Mandor
1 m2 Pasangan batu bata 1 : 4, tebal 1/2 bata
50.0000 bh Batu bata
0.0430 m3 Pasir pasang
11.5000 kg Semen Pc 50 kg
0.1000 or Tukang batu
0.3000 or Pekerja
0.0100 or Kepala tukang
0.0150 or Mandor
1 m2 Memasang plesteran 1 : 2, tebal 15 mm
0.0200 m3 Pasir pasang
10.2240 kg Semen Pc 50 kg
0.1500 or Tukang batu
0.3000 or Pekerja
0.0150 or Kepala tukang
0.0150 or Mandor
1 m2 Memasang plesteran 1 : 4, tebal 15 mm
0.0240 m3 Pasir pasang
6.2400 kg Semen Pc 50 kg
0.1500 or Tukang batu
0.3000 or Pekerja
0.0150 or Kepala tukang
0.0150 or Mandor
1 m2 Memasang plesteran 1 : 2, tebal 20 mm
0.0270 m3 Pasir pasang
13.6320 kg Semen Pc 50 kg
0.2000 or Tukang batu
0.4000 or Pekerja
0.0200 or Kepala tukang
0.0220 or Mandor
1 m2 Memasang plesteran 1 : 4, tebal 20 mm
0.0320 m3 Pasir pasang
8.3200 kg Semen Pc 50 kg
0.2000 or Tukang batu
0.4000 or Pekerja
0.0200 or Kepala tukang
0.0220 or Mandor
1 m2 Memasang acian dinding
3.2500 kg Semen Pc 50 kg
0.1000 or Tukang batu
0.2000 or Pekerja
0.0100 or Kepala tukang
0.0100 or Mandor
1 m' Pekerjaan nat tali air 1 : 3
0.0086 m3 Pasir pasang
0.0770 zak Semen Pc 50 kg
0.0600 or Tukang batu
0.1600 or Pekerja
0.0060 or Kepala tukang
0.0250 or Mandor
1 m2 Dinding keramik 20 x 20
26.5000 bh Keramik 20 x 20
0.0180 m3 Pasir pasang
9.3000 kg Semen Pc 50 kg
1.9400 kg Semen warna
0.4500 or Tukang batu
0.9000 or Pekerja
0.0450 or Kepala tukang
0.0450 or Mandor

HARGA SATUAN
( Rp )

1,000.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
1,000.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

100,000.00
9,355.80
35,630.10
15,000.00
33,000.00
1,600.00
2,700.00
52,300.00

7,500.00
16,500.00
800.00
1,350.00
26,150.00

69,758.80
2,012.00
13,720.61

11,250.00
16,500.00
1,200.00
1,350.00
30,300.00

15,732.61
2,414.40
8,374.08

11,250.00
16,500.00
1,200.00
1,350.00
30,300.00

10,788.48
2,716.20
18,294.14

15,000.00
22,000.00
1,600.00
1,980.00
40,580.00

15,000.00
22,000.00
1,600.00
1,980.00
40,580.00

1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

7,500.00
11,000.00
800.00
900.00
20,200.00

2,464.00
100,600.00
1,342.00
2,860.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

144,985.90
50,000.00
4,325.80
15,433.00

100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

100,600.00
67,100.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

BAHAN
( Rp )

21,010.34
3,219.20
11,165.44

14,384.64
4,361.50

4,361.50
865.16
5,166.70

4,500.00
8,800.00
480.00
2,250.00
16,030.00

5,166.70
65,296.00
1,810.80
12,480.60
5,548.40

33,750.00
49,500.00
3,600.00
4,050.00
90,900.00

85,135.80

JUMLAH HARGA
( Rp )

100,000.00
9,355.80
35,630.10
15,000.00
33,000.00
1,600.00
2,700.00
197,285.90
50,000.00
4,325.80
15,433.00
7,500.00
16,500.00
800.00
1,350.00
95,908.80
2,012.00
13,720.61
11,250.00
16,500.00
1,200.00
1,350.00
46,032.61
2,414.40
8,374.08
11,250.00
16,500.00
1,200.00
1,350.00
41,088.48
2,716.20
18,294.14
15,000.00
22,000.00
1,600.00
1,980.00
61,590.34
3,219.20
11,165.44
15,000.00
22,000.00
1,600.00
1,980.00
54,964.64
4,361.50
7,500.00
11,000.00
800.00
900.00
24,561.50
865.16
5,166.70
4,500.00
8,800.00
480.00
2,250.00
21,196.70
65,296.00
1,810.80
12,480.60
5,548.40
33,750.00
49,500.00
3,600.00
4,050.00
176,035.80

NO.

NAMA PEKERJAAN

H.12

1 m2 Dinding keramik 30 x 30
1.0000 dos Keramik 30 x 30
0.0171 m3 Pasir pasang
0.1416 zak Semen Pc 50 kg
0.0140 kg Semen warna
0.6000 or Tukang batu
0.9000 or Pekerja
0.0600 or Kepala tukang
0.0450 or Mandor

H.13

H.14

H.15

H.16

H.17

H.18

H.19

1 m2 Dinding keramik 20 x 25
1.0000 dos Keramik 20 x 25
0.0171 m3 Pasir pasang
0.1416 zak Semen Pc 50 kg
0.0140 kg Semen warna
0.6000 or Tukang batu
0.9000 or Pekerja
0.0600 or Kepala tukang
0.0450 or Mandor
1 m' Plint keramik 10 x 20
5.0000 bh Plint keramik 10 x 20
0.0017 m3 Pasir pasang
0.0200 zak Semen Pc 50 kg
0.0058 kg Semen warna
0.1000 or Tukang batu
0.0500 or Pekerja
0.0100 or Kepala tukang
0.0025 or Mandor
.
1 m' Plint keramik 10 x 30
3.5000 bh Plint keramik 10 x 30
0.0016 m3 Pasir pasang
0.0200 zak Semen Pc 50 kg
0.0058 kg Semen warna
0.1000 or Tukang batu
0.0500 or Pekerja
0.0100 or Kepala tukang
0.0025 or Mandor
1 m2 Dinding skat
Double Plywood 3.6 mm + rangka
0.7639 lbr Plywood 3,6 mm
0.0161 m3 Kayu meranti
0.0494 kg Paku kayu
0.1765 or Tukang kayu
0.0880 or Pekerja
0.0177 or Kepala tukang
0.0044 or Mandor
.
1 m2 Dinding sekat/partisi (tdk termasuk finishing)
Double gypsum 12 mm + rangka kayu
0.7639 lbr Board gypsum 12 mm
0.0161 m3 Kayu meranti
0.0494 kg Paku
0.4286 or Tukang kayu
0.2143 or Pekerja
0.0429 or Kepala tukang
0.0107 or Mandor
1 m2 Dinding sekat/partisi (tdk termasuk finishing)
Double Calsiboard 4 mm + rangka kayu
0.7639 lbr Calsiboard 4 mm
0.0161 m3 Kayu meranti
0.0494 kg Paku
0.4286 or Tukang kayu
0.2143 or Pekerja
0.0429 or Kepala tukang
0.0107 or Mandor
1 m2 Dinding susun sirih papan meranti
0.0281 m3 Papan kayu meranti
0.0676 kg Paku
0.4000 or Tukang kayu
0.2000 or Pekerja
0.0400 or Kepala tukang
0.0100 or mandor

HARGA SATUAN
( Rp )

60,500.00
100,600.00
67,100.00
2,860.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
61,600.00
100,600.00
67,100.00
2,860.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
7,700.00
100,600.00
67,100.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
8,250.00
100,600.00
67,100.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

55,000.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

202,400.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

59,950.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
2,695,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

60,500.00
1,720.26
9,501.36
40.04
45,000.00
49,500.00
4,800.00
4,050.00
103,350.00

71,761.66
61,600.00
1,720.26
9,501.36
40.04

45,000.00
49,500.00
4,800.00
4,050.00
103,350.00

72,861.66
38,500.00
171.02
1,342.00
63.80

7,500.00
2,750.00
800.00
225.00
11,275.00

40,076.82
28,875.00
160.96
1,342.00
63.80

7,500.00
2,750.00
800.00
225.00
11,275.00

30,441.76

42,014.50
42,504.00
815.10
13,237.50
4,840.00
1,416.00
396.00
19,889.50

85,333.60

154,613.36
42,504.00
815.10
32,145.00
11,786.50
3,432.00
963.00
48,326.50

197,932.46

45,795.81
42,504.00
815.10
32,145.00
11,786.50
3,432.00
963.00
48,326.50

89,114.91
75,729.50
1,115.40

30,000.00
11,000.00
3,200.00
900.00
45,100.00

76,844.90

JUMLAH HARGA
( Rp )

60,500.00
1,720.26
9,501.36
40.04
45,000.00
49,500.00
4,800.00
4,050.00
175,111.66
61,600.00
1,720.26
9,501.36
40.04
45,000.00
49,500.00
4,800.00
4,050.00
176,211.66
38,500.00
171.02
1,342.00
63.80
7,500.00
2,750.00
800.00
225.00
51,351.82
28,875.00
160.96
1,342.00
63.80
7,500.00
2,750.00
800.00
225.00
41,716.76

42,014.50
42,504.00
815.10
13,237.50
4,840.00
1,416.00
396.00
105,223.10

154,613.36
42,504.00
815.10
32,145.00
11,786.50
3,432.00
963.00
246,258.96

45,795.81
42,504.00
815.10
32,145.00
11,786.50
3,432.00
963.00
137,441.41
75,729.50
1,115.40
30,000.00
11,000.00
3,200.00
900.00
121,944.90

NO.
H.20

H.21

H.22

H.23

H.24

H.25

H.26

I.
I.1

NAMA PEKERJAAN
1 m2 Dinding susun sirih papan meranti dilapisi
calsiboard 4 mm + rangka
0.0281 m3 Papan kayu meranti
0.3820 lbr Calsiboard 4 mm
0.0161 m3 Kayu meranti
0.2372 kg Paku
0.4206 or Tukang kayu
0.2143 or Pekeja
0.0428 or kepala tukang
0.0107 or Mandor
1 m2 Dinding
Plywood 3.6 mm + rangka
0.3820 bh Plywood 3.6 mm
0.0161 m3 Kayu meranti
0.0494 kg Paku kayu
0.1500 or Tukang kayu
0.0750 or Pekerja
0.0150 or Kepala tukang
0.0038 or Mandor
1 m2 Dinding skat double multiplek 9 mm
dan rangka
0.7639 bh Multiplek 9 mm
0.0161 m3 Kayu meranti
0.0494 kg Paku kayu
0.1765 or Tukang kayu
0.0880 or Pekerja
0.0177 or Kepala tukang
0.0044 or Mandor
1 m2 Glass block 20 x 20
25.0000 bh Glass block 20 x 20
0.0230 m3 Pasir pasang
0.1390 kg Semen Pc 50 kg
2.0000 or Tukang batu
1.0000 or Pekerja
0.2000 or Kepala tukang
0.0500 or Mandor
1 m2 Dinding roster 20 x 20
25.0000 bh Roster beton 20 x 20
0.0230 m3 Pasir pasang
0.1390 kg Semen Pc 50 kg
1.2000 or Tukang batu
0.7200 or Pekerja
0.1200 or Kepala tukang
0.0360 or Mandor
1 m2 Dinding papan ulin diketam dgn alur lidah
0.0234 m3 Papan kayu ulin
0.1126 kg Paku ulin
0.6000 or Tukang kayu
0.3000 or Pekerja
0.0600 or Kepala tukang
0.0150 or Mandor
1.0000 ls Alat bantu (ketam listrik)
1 m2 Dinding papan meranti diketam dgn alur lidah
0.0234 m3 Papan kayu meranti
0.0100 m3 kayu meranti
0.1126 kg Paku kayu
0.6000 or Tukang kayu
0.3000 or Pekerja
0.0600 or Kepala tukang
0.0150 or Mandor
1.0000 ls Alat bantu (ketam listrik)
Pekerjaan Lantai
1 m2 Lantai keramik 20 x 20
26.5000 bh Keramik 20 x 20
0.0450 m3 Pasir pasang
10.4000 kg Semen Pc 50 kg
1.6200 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor

HARGA SATUAN
( Rp )

2,695,000.00
59,950.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

55,000.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

167,200.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
26,400.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
6,050.00
100,600.00
1,342.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
5,500,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
3,000.00
Jumlah
2,695,000.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
3,000.00
Jumlah

2,464.00
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

75,729.50
22,900.90
42,504.00
3,913.80
31,545.00
11,786.50
3,424.00
963.00
47,718.50

145,048.20

21,010.00
42,504.00
815.10
11,250.00
4,125.00
1,200.00
342.00
16,917.00

64,329.10

127,724.08
42,504.00
815.10
13,237.50
4,840.00
1,416.00
396.00
19,889.50

171,043.18
660,000.00
2,313.80
186.54

150,000.00
55,000.00
16,000.00
4,500.00
225,500.00

662,500.34
151,250.00
2,313.80
186.54

90,000.00
39,600.00
9,600.00
3,240.00
142,440.00

153,750.34
128,700.00
2,477.20

45,000.00
16,500.00
4,800.00
1,350.00
67,650.00

3,000.00
134,177.20
63,063.00
26,400.00
1,857.90

45,000.00
16,500.00
4,800.00
1,350.00
67,650.00

3,000.00
94,320.90

65,296.00
4,527.00
13,956.80
17,820.00
26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

101,599.80

JUMLAH HARGA
( Rp )

75,729.50
22,900.90
42,504.00
3,913.80
31,545.00
11,786.50
3,424.00
963.00
192,766.70

21,010.00
42,504.00
815.10
11,250.00
4,125.00
1,200.00
342.00
81,246.10

127,724.08
42,504.00
815.10
13,237.50
4,840.00
1,416.00
396.00
190,932.68
660,000.00
2,313.80
186.54
150,000.00
55,000.00
16,000.00
4,500.00
888,000.34
151,250.00
2,313.80
186.54
90,000.00
39,600.00
9,600.00
3,240.00
296,190.34
128,700.00
2,477.20
45,000.00
16,500.00
4,800.00
1,350.00
3,000.00
201,827.20
63,063.00
26,400.00
1,857.90
45,000.00
16,500.00
4,800.00
1,350.00
3,000.00
161,970.90

65,296.00
4,527.00
13,956.80
17,820.00
26,250.00
38,500.00
2,800.00
3,150.00
172,299.80

NO.

NAMA PEKERJAAN

I.2

1 m2 Lantai keramik 30 x 30
11.8700 bh Keramik 30 x 30
0.0450 m3 Pasir pasang
10.0000 kg Semen Pc 50 kg
1.5000 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor

I.3

I.4

I.5

I.6

I.7

L.8

L.9

1 m2 Lantai keramik 40 x 40
6.2500 bh Keramik 40 x 40
0.0450 m3 Pasir pasang
10.0000 kg Semen Pc 50 kg
1.5000 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor
1 m2 Lantai keramik 60 x 60
2.7780 bh Keramik 60 x 60
0.0450 m3 Pasir pasang
10.0000 kg Semen Pc 50 kg
1.5000 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor
1 m2 Lantai keramik anti slip 20 x 20
26.5000 bh Keramik anti slip 20 x 20
0.0450 m3 Pasir pasang
10.4000 kg Semen Pc 50 kg
1.6200 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor
1 m2 Lantai keramik anti slip 30 x 30
11.8700 bh Keramik 30 x 30
0.0450 m3 Pasir pasang
10.0000 kg Semen Pc 50 kg
1.5000 kg Semen warna
0.3500 or Tukang batu
0.7000 or Pekerja
0.0350 or Kepala tukang
0.0350 or Mandor
1 m2 Lantai keramik anti slip 40 x 40
1.0000 dos Keramik 40 x 40
0.0190 m3 Pasir pasang
0.1920 zak Semen Pc 50 kg
0.0140 kg Semen warna
0.2500 or Tukang batu
0.5000 or Pekerja
0.0250 or Kepala tukang
0.0250 or Mandor
1 m2 Lantai Papan Ulin diketam tanpa celah
0.0234 m3 Papan kayu ulin
0.1609 kg Paku ulin
0.6000 or Tukang kayu
0.3000 or Pekerja
0.0600 or Kepala tukang
0.0150 or Mandor
1.0000 ls Alat bantu (ketam listrik)
1 m2 Lantai jembatan titian ulin dengan celah
0.0234 m3 Papan ulin
0.1609 kg Paku ulin
0.3750 or Tukang kayu
0.0375 or Kepala tukang
0.0125 or Mandor
0.1250 or Pekerja
1.0000 ls Alat bantu (ketam listrik)

HARGA SATUAN
( Rp )

5,500.00
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
13,383.33
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
23,375.00
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
2,464.00
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
5,500.00
100,600.00
1,342.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
80,300.00
100,600.00
67,100.00
11,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
5,500,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
3,000.00
Jumlah
5,500,000.00
22,000.00
75,000.00
80,000.00
90,000.00
55,000.00
3,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

65,285.00
4,527.00
13,420.00
16,500.00
26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

99,732.00
83,645.83
4,527.00
13,420.00
16,500.00

26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

118,092.83
64,935.75
4,527.00
13,420.00
16,500.00

26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

99,382.75
65,296.00
4,527.00
13,956.80
17,820.00

26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

101,599.80
65,285.00
4,527.00
13,420.00
16,500.00

26,250.00
38,500.00
2,800.00
3,150.00
70,700.00

99,732.00
80,300.00
1,911.40
12,883.20
154.00

18,750.00
27,500.00
2,000.00
2,250.00
50,500.00

95,248.60
128,700.00
3,539.80

45,000.00
16,500.00
4,800.00
1,350.00
67,650.00

3,000.00
135,239.80
128,700.00
3,539.80

28,125.00
3,000.00
1,125.00
6,875.00
39,125.00

3,000.00
135,239.80

JUMLAH HARGA
( Rp )

65,285.00
4,527.00
13,420.00
16,500.00
26,250.00
38,500.00
2,800.00
3,150.00
170,432.00
83,645.83
4,527.00
13,420.00
16,500.00
26,250.00
38,500.00
2,800.00
3,150.00
188,792.83
64,935.75
4,527.00
13,420.00
16,500.00
26,250.00
38,500.00
2,800.00
3,150.00
170,082.75
65,296.00
4,527.00
13,956.80
17,820.00
26,250.00
38,500.00
2,800.00
3,150.00
172,299.80
65,285.00
4,527.00
13,420.00
16,500.00
26,250.00
38,500.00
2,800.00
3,150.00
170,432.00
80,300.00
1,911.40
12,883.20
154.00
18,750.00
27,500.00
2,000.00
2,250.00
145,748.60
128,700.00
3,539.80
45,000.00
16,500.00
4,800.00
1,350.00
3,000.00
202,889.80
128,700.00
3,539.80
28,125.00
3,000.00
1,125.00
6,875.00
3,000.00
174,364.80

NO.
J.
J.1

J.2

J.3

J.4

J.5

j.6

J.7

J.8

J.9

NAMA PEKERJAAN
Pekerjaan Plapond
1 m2 Memasang langit-langit tripleks (120 x 240) cm,
tebal 3.6 mm
0.3750 lbr Plywood 3.6 mm
0.0300 kg Paku plywood
0.1000 or Tukang kayu
0.1000 or Pekerja
0.0100 or Kepala tukang
0.0050 or Mandor
1 m2 Memasang langit-langit tripleks (120 x 240) cm,
tebal 4 mm
0.3750 lbr Plywood 4 mm
0.0300 kg Paku plywood
0.1000 or Tukang kayu
0.1000 or Pekerja
0.0100 or Kepala tukang
0.0050 or Mandor
1 m2 Memasang langit-langit tripleks (120 x 240) cm,
tebal 6 mm
0.3750 lbr Plywood 6 mm
0.0300 kg Paku plywood
0.1000 or Tukang kayu
0.1000 or Pekerja
0.0100 or Kepala tukang
0.0050 or Mandor
1 m2 Memasang langit-langit calsiboard (120 x 240) cm,
tebal 4.5 mm
0.3750 lbr Calsiboard 4.5 mm
0.0300 kg Paku plywood
0.1000 or Tukang kayu
0.1000 or Pekerja
0.0100 or Kepala tukang
0.0050 or Mandor
1 m2 Memasang langit-langit lambreziring kayu tebal 9 mm
0.0150 m3 Papan kayu lumbriziring tebal 9 mm
0.0100 kg Paku kayu
0.8000 or Tukang kayu
0.8000 or Pekerja
0.0800 or Kepala tukang
0.0400 or Mandor
1 m' Memasang list langit-langit kayu profil
1.0500 m' List kayu profil
0.0100 kg Paku kayu
0.0500 or Tukang kayu
0.0500 or Pekerja
0.0050 or Kepala tukang
0.0030 or Mandor
1 m2 Plapond calsiboard 3,5 mm + rangka
0.3819 lbr Calsiboard 3,6 mm
0.0201 m3 Kayu meranti
0.1000 kg Paku
0.5000 or Tukang kayu
0.2500 or Pekerja
0.0500 or Kepala tukang
0.0125 or Mandor
1 m1 Kusen pintu, jendela, ventilasi kayu ulin
(pekerjaan memasang kusen jadi)
1.0000 m1 Kusen kayu ulin
0.0750 or Tukang kayu
0.1500 or Pekerja
0.0075 or Kepala tukang
0.0075 or Mandor
1 m2 Memasang rangka langit-langit (60 x 60) cm,
kayu klas II atau III
0.0163 m3 Kayu balok 5/7 cm
0.2500 kg Paku kayu 7 s/d 10 cm
0.3000 or Tukang kayu
0.2000 or Pekerja
0.0300 or Kepala tukang
0.0100 or Mandor

HARGA SATUAN
( Rp )

55,000.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

60,500.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

100,100.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

59,950.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
3,025,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
4,125.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

20,625.00
825.00
7,500.00
5,500.00
800.00
450.00
14,250.00

21,450.00

22,687.50
825.00
7,500.00
5,500.00
800.00
450.00
14,250.00

23,512.50

37,537.50
825.00
7,500.00
5,500.00
800.00
450.00
14,250.00

38,362.50

22,481.25
825.00
7,500.00
5,500.00
800.00
450.00
14,250.00

23,306.25
45,375.00
165.00

60,000.00
44,000.00
6,400.00
3,600.00
114,000.00

45,540.00
4,331.25
165.00

3,750.00
2,750.00
400.00
270.00
7,170.00

57,750.00
2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

37,500.00
13,750.00
4,000.00
1,125.00
56,375.00

74,800.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

5,625.00
8,250.00
600.00
675.00
15,150.00

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

BAHAN
( Rp )

4,496.25
22,054.73
53,064.00
1,650.00

76,768.73

74,800.00

74,800.00

43,032.00
4,125.00
22,500.00
11,000.00
2,400.00
900.00
36,800.00

47,157.00

JUMLAH HARGA
( Rp )

20,625.00
825.00
7,500.00
5,500.00
800.00
450.00
35,700.00

22,687.50
825.00
7,500.00
5,500.00
800.00
450.00
37,762.50

37,537.50
825.00
7,500.00
5,500.00
800.00
450.00
52,612.50

22,481.25
825.00
7,500.00
5,500.00
800.00
450.00
37,556.25
45,375.00
165.00
60,000.00
44,000.00
6,400.00
3,600.00
159,540.00
4,331.25
165.00
3,750.00
2,750.00
400.00
270.00
11,666.25
22,054.73
53,064.00
1,650.00
37,500.00
13,750.00
4,000.00
1,125.00
133,143.73

74,800.00
5,625.00
8,250.00
600.00
675.00
89,950.00

43,032.00
4,125.00
22,500.00
11,000.00
2,400.00
900.00
83,957.00

NO.
J.10

K.
K.1

K.2

K.3

K.4

K.5

K.6

K.7

NAMA PEKERJAAN
1 m2 Memasang rangka langit-langit (50 x 100) cm,
kayu klas II atau III
0.0154 m3 Kayu balok 5/7 cm
0.2000 kg Paku kayu 7 s/d 10 cm
0.3000 or Tukang kayu
0.1500 or Pekerja
0.0300 or Kepala tukang
0.0750 or Mandor
Pekerjaan Kusen
1 m3 Membuat dan memasang kusen pintu dan jendela,
kayu klas I
1.1000 m3 Balok kayu klas I
1.2500 kg Paku 10 cm
1.0000 kg Lem kayu
21.0000 or Tukang kayu
7.0000 or Pekerja
2.1000 or Kepala tukang
0.3500 or Mandor
1 m3 Membuat dan memasang kusen pintu dan jendela,
kayu klas II atau III
1.2000 m3 Balok kayu klas II atau III
1.2500 kg Paku 10 cm
1.0000 kg Lem kayu
18.0000 or Tukang kayu
6.0000 or Pekerja
1.8000 or Kepala tukang
0.3000 or Mandor
1 m2 Membuat dan memasang daun pintu panel,
kayu klas I
0.0400 m3 Papan kayu klas I
0.5000 kg Lem kayu
3.0000 or Tukang kayu
1.0000 or Pekerja
0.3000 or Kepala tukang
0.0500 or Mandor
1 m2 Membuat dan memasang daun pintu panel,
kayu klas II
0.0400 m3 Papan kayu klas II
0.5000 kg Lem kayu
3.0000 or Tukang kayu
1.0000 or Pekerja
0.3000 or Kepala tukang
0.0500 or Mandor
1 m2 Membuat dan memasang pintu dan jendela kaca,
kayu klas I
0.0240 m3 Papan kayu klas I
0.3000 kg Lem kayu
2.4000 or Tukang kayu
0.8000 or Pekerja
0.2400 or Kepala tukang
0.0400 or Mandor
1 m2 Membuat dan memasang pintu dan jendela kaca,
kayu klas II
0.0240 m3 Papan kayu klas II
0.3000 kg Lem kayu
2.4000 or Tukang kayu
0.8000 or Pekerja
0.2400 or Kepala tukang
0.0400 or Mandor
1 m2 Membuat dan memasang pintu dan jendela jalusi,
kayu klas I
0.0640 m3 Papan kayu klas I
0.5000 kg Lem kayu
3.0000 or Tukang kayu
1.0000 or Pekerja
0.3000 or Kepala tukang
0.0500 or Mandor

HARGA SATUAN
( Rp )

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

5,500,000.00
22,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

3,520,000.00
22,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

6,600,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

3,850,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

6,600,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

3,850,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

6,600,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

40,656.00
3,300.00
22,500.00
8,250.00
2,400.00
6,750.00
39,900.00

43,956.00

6,050,000.00
27,500.00
20,250.00
1,575,000.00
385,000.00
168,000.00
31,500.00
2,159,500.00

6,097,750.00

4,224,000.00
27,500.00
20,250.00
1,350,000.00
330,000.00
144,000.00
27,000.00
1,851,000.00

4,271,750.00

264,000.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
308,500.00

274,125.00

154,000.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
308,500.00

164,125.00

158,400.00
6,075.00
180,000.00
44,000.00
19,200.00
3,600.00
246,800.00

164,475.00

92,400.00
6,075.00
180,000.00
44,000.00
19,200.00
3,600.00
246,800.00

98,475.00

422,400.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
308,500.00

432,525.00

JUMLAH HARGA
( Rp )

40,656.00
3,300.00
22,500.00
8,250.00
2,400.00
6,750.00
83,856.00

6,050,000.00
27,500.00
20,250.00
1,575,000.00
385,000.00
168,000.00
31,500.00
8,257,250.00

4,224,000.00
27,500.00
20,250.00
1,350,000.00
330,000.00
144,000.00
27,000.00
6,122,750.00

264,000.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
582,625.00

154,000.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
472,625.00

158,400.00
6,075.00
180,000.00
44,000.00
19,200.00
3,600.00
411,275.00

92,400.00
6,075.00
180,000.00
44,000.00
19,200.00
3,600.00
345,275.00

422,400.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
741,025.00

NO.
K.8

K.9

K.10

L.
L.1

L.2

L.3

L.4

L.5

NAMA PEKERJAAN
1 m2 Membuat dan memasang pintu dan jendela jalusi,
kayu klas II
0.0640 m3 Papan kayu klas II
0.5000 kg Lem kayu
3.0000 or Tukang kayu
1.0000 or Pekerja
0.3000 or Kepala tukang
0.0500 or Mandor
1 m2 Memasang jalusi kusen, kayu klas I
0.0600 m3 Papan kayu klas I
0.1500 kg Paku 1 s/d 2.5 cm
2.0000 or Tukang kayu
0.6700 or Pekerja
0.2000 or Kepala tukang
0.3350 or Mandor
1 m2 Memasang jalusi kusen, kayu klas II
0.0600 m3 Papan kayu klas II
0.1500 kg Paku 1 s/d 2.5 cm
2.0000 or Tukang kayu
0.6700 or Pekerja
0.2000 or Kepala tukang
0.3350 or Mandor
Pekerjaan Atap
1 m3 Kuda-kuda bentang lebih dari 7 meter
(atap pelana tdk byk jurai/atap sekolah dasar)
1.1000 m3 Kayu meranti
3.0000 kg Paku kayu
17.3611 or Tukang kayu
11.0480 or Pekerja
1.7361 or Kepala tukang
0.5524 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)
1 m3 Kuda-kuda bentang lebih dari 7 meter
(atap perisai/byk jurai/atap rumah agak rumit)
1.2000 m3 Kayu meranti
3.6000 kg Paku kayu
20.8330 or Tukang kayu
13.2576 or Pekerja
2.0833 or Kepala tukang
0.6629 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)
1 m3 Kuda-kuda bentang lebih dari 7 meter
(atap bentuk sulit dgn bentuk arsitektur rumit)
1.3000 m3 Kayu meranti
3.9000 kg Paku kayu
22.5694 or Tukang kayu
14.3624 or Pekerja
2.2569 or Kepala tukang
0.7181 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)
1 m3 Kuda-kuda bentang kurang dari 7 meter
(atap pelana tdk byk jurai/atap sekolah dasar)
1.1000 m3 Kayu meranti
3.0000 kg Paku kayu
6.9444 or Tukang kayu
13.8889 or Pekerja
0.6944 or Kepala tukang
0.6944 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)
1 m3 Kuda-kuda bentang kurang dari 7 meter
(atap perisai/byk jurai/atap rumah agak rumit)
1.2000 m3 Kayu meranti
3.6000 kg Paku kayu
16.6667 or Tukang kayu
8.3330 or Pekerja
1.6667 or Kepala tukang
0.4167 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)

HARGA SATUAN
( Rp )

3,850,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
6,600,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
3,850,000.00
20,250.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

246,400.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
308,500.00

256,525.00
396,000.00
3,037.50

150,000.00
36,850.00
16,000.00
30,150.00
233,000.00

399,037.50
231,000.00
3,037.50

150,000.00
36,850.00
16,000.00
30,150.00
233,000.00

234,037.50

2,904,000.00
49,500.00
1,302,082.50
607,640.00
138,888.00
49,716.00
2,098,326.50

20,000.00
2,973,500.00

3,168,000.00
59,400.00
1,562,475.00
729,168.00
166,664.00
59,661.00
2,517,968.00

20,000.00
3,247,400.00

3,432,000.00
64,350.00
1,692,705.00
789,932.00
180,552.00
64,629.00
2,727,818.00

20,000.00
3,516,350.00

2,904,000.00
49,500.00
520,830.00
763,889.50
55,552.00
62,496.00
1,402,767.50

20,000.00
2,973,500.00

3,168,000.00
59,400.00
1,250,002.50
458,315.00
133,336.00
37,503.00
1,879,156.50

20,000.00
3,247,400.00

JUMLAH HARGA
( Rp )

246,400.00
10,125.00
225,000.00
55,000.00
24,000.00
4,500.00
565,025.00
396,000.00
3,037.50
150,000.00
36,850.00
16,000.00
30,150.00
632,037.50
231,000.00
3,037.50
150,000.00
36,850.00
16,000.00
30,150.00
467,037.50

2,904,000.00
49,500.00
1,302,082.50
607,640.00
138,888.00
49,716.00
20,000.00
5,071,826.50

3,168,000.00
59,400.00
1,562,475.00
729,168.00
166,664.00
59,661.00
20,000.00
5,765,368.00

3,432,000.00
64,350.00
1,692,705.00
789,932.00
180,552.00
64,629.00
20,000.00
6,244,168.00

2,904,000.00
49,500.00
520,830.00
763,889.50
55,552.00
62,496.00
20,000.00
4,376,267.50

3,168,000.00
59,400.00
1,250,002.50
458,315.00
133,336.00
37,503.00
20,000.00
5,126,556.50

NO.
L.6

L.7

L.8

L.9

L.10

L.11

L.12

L.13

NAMA PEKERJAAN
1 m3 Kuda-kuda bentang kurang dari 7 meter
(atap bentuk sulit dgn bentuk arsitektur rumit)
1.3000 m3 Kayu meranti
3.9000 kg Paku kayu
18.0556 or Tukang kayu
9.0277 or Pekerja
1.8056 or Kepala tukang
0.4514 or Mandor
1.0000 ls Alat bantu (bor listrik, dll)
1 m1 Kuda-kuda diketam halus, konsul kayu bengkirai
1.0000 m1 Kayu bengkirai
3.0000 kg Paku
0.0511 or Tukang kayu
0.0682 or Pekerja
0.0051 or Kepala tukang
0.0034 or Mandor
1.1000 m3 Pek. Gergajian
1 m3 Gording, kayu klas II
1.1000 m3 Balok kayu klas II
15.0000 kg Besi strip tebal 5 mm
3.0000 kg Paku 12 cm
7.2000 or Tukang kayu
2.4000 or Pekerja
0.7200 or Kepala tukang
0.1200 or Mandor
1 m2 Kasau + reng (untuk atap sirap, genteng)
(atap pelana tdk byk jurai/atap sekolah dasar)
0.0123 m3 Kayu meranti
0.0523 kg Paku kayu
0.0900 or Tukang kayu
0.0600 or Pekerja
0.0090 or Kepala tukang
0.0030 or Mandor
0.4000 m2 Upah menggergaji
1 m2 Kasau + reng (untuk atap sirap, genteng)
(atap perisai/byk jurai/atap rumah agak rumit)
0.0146 m3 Kayu meranti
0.0567 kg Paku kayu
0.1170 or Tukang kayu
0.0780 or Pekerja
0.0117 or Kepala tukang
0.0039 or Mandor
1 m2 Kasau + reng (untuk atap sirap, genteng)
(atap bentuk sulit dgn bentuk arsitektur rumit)
0.0157 m3 Kayu meranti
0.0610 kg Paku kayu
0.1260 or Tukang kayu
0.0840 or Pekerja
0.0126 or Kepala tukang
0.0042 or Mandor
Atap seng gelombang BJLS 20
(atap pelana/perisai sederhana/atap sekolahan)
0.8929 lbr Seng BJLS 20
0.0482 kg Paku seng
0.0750 or Tukang kayu
0.0375 or Pekerja
0.0075 or Kepala tukang
0.0018 or Mandor
Atap seng gelombang BJLS 20
(atap perisai yang banyak jurai)
1.1688 lbr Seng BJLS 20
0.0540 kg Paku seng
0.0975 or Tukang kayu
0.0488 or Pekerja
0.0098 or Kepala tukang
0.0023 or Mandor

HARGA SATUAN
( Rp )

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
20,000.00
Jumlah
3,520,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
5,000.00
Jumlah
2,640,000.00
12,533.69
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
2,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

2,640,000.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

42,900.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

42,900.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

3,432,000.00
64,350.00
1,354,170.00
496,523.50
144,448.00
40,626.00
2,035,767.50

20,000.00
3,516,350.00
3,520,000.00
49,500.00

3,832.50
3,751.00
408.00
306.00
8,297.50

5,500.00
3,575,000.00
2,904,000.00
188,005.39
49,500.00

540,000.00
132,000.00
57,600.00
10,800.00
740,400.00

3,141,505.39

32,472.00
862.95
6,750.00
3,300.00
720.00
270.00
800.00
11,840.00

33,334.95

38,544.00
935.55
8,775.00
4,290.00
936.00
351.00
14,352.00

39,479.55

41,448.00
1,006.50
9,450.00
4,620.00
1,008.00
378.00
15,456.00

42,454.50

38,305.41
1,325.50
5,625.00
2,062.50
600.00
162.00
8,449.50

39,630.91

50,141.52
1,485.00
7,312.50
2,684.00
784.00
207.00
10,987.50

51,626.52

JUMLAH HARGA
( Rp )

3,432,000.00
64,350.00
1,354,170.00
496,523.50
144,448.00
40,626.00
20,000.00
5,552,117.50
3,520,000.00
49,500.00
3,832.50
3,751.00
408.00
306.00
5,500.00
3,583,297.50
2,904,000.00
188,005.39
49,500.00
540,000.00
132,000.00
57,600.00
10,800.00
3,881,905.39

32,472.00
862.95
6,750.00
3,300.00
720.00
270.00
800.00
45,174.95

38,544.00
935.55
8,775.00
4,290.00
936.00
351.00
53,831.55

41,448.00
1,006.50
9,450.00
4,620.00
1,008.00
378.00
57,910.50

38,305.41
1,325.50
5,625.00
2,062.50
600.00
162.00
48,080.41

50,141.52
1,485.00
7,312.50
2,684.00
784.00
207.00
62,614.02

NO.
L.15

L.16

L.17

L.18

L.19

L.20

L.21

L.23

L.24

NAMA PEKERJAAN
1 m' Bubungan seng datar/ Jurai dalam
1.0000 m' Seng plat BJLS 20
0.0500 kg Paku seng
0.0088 m3 Papan kayu meranti
0.0750 or Tukang besi
0.0750 or Pekerja
0.0075 or Kepala tukang
0.0038 or Mandor
1 m2 Atap genteng metal mutu klas I
(atap pelana/perisai sederhana/atap sekolahan)
1.3000 lbr Genteng metal 0.4mm
0.0300 kg Paku genteng
0.0536 or Tukang kayu
0.0321 or Pekerja
0.0054 or Kepala tukang
0.0016 or Mandor
1 m2 Atap genteng metal mutu klas I
(atap perisai yang banyak jurai)
1.3000 lbr Genteng metal 0.4mm
0.0300 kg Paku genteng
0.0577 or Tukang kayu
0.0346 or Pekerja
0.0058 or Kepala tukang
0.0017 or Mandor
1 m2 Atap genteng metal mutu klas II
(atap pelana/perisai sederhana/atap sekolahan)
1.3000 lbr Genteng metal 0.3 mm
0.0300 kg Paku genteng
0.0536 or Tukang kayu
0.0321 or Pekerja
0.0054 or Kepala tukang
0.0016 or Mandor
1 m2 Atap genteng metal mutu klas II
(atap perisai yang banyak jurai)
1.3000 lbr Genteng metal
0.0300 kg Paku genteng
0.0577 or Tukang kayu
0.0346 or Pekerja
0.0058 or Kepala tukang
0.1700 or Mandor
1 m' Nok genteng metal model U panjang 110 cm
1.0000 bh Nok model U
0.0750 kg Paku genteng
0.0375 or Tukang kayu
0.0375 or Pekerja
0.0038 or Kepala tukang
0.0019 or Mandor
1 M1 Nok genteng metal model C panjang 40 cm
3.0000 bh Nok model C
0.0750 kg Paku genteng
0.0375 or Tukang kayu
0.0375 or Pekerja
0.0038 or Kepala tukang
0.0019 or Mandor
1 m' Nok samping genteng metal 110 cm
1.0000 bh Nok samping genteng metal
0.0750 kg Paku genteng
0.0375 or Tukang kayu
0.0375 or Pekerja
0.0038 or Kepala tukang
0.0019 or Mandor
1 m' List plank 3/20 cm, kayu klas I
0.0108 m3 Papan kayu klas I
0.1000 kg Paku 5 s/d 7 cm
0.2000 or Tukang kayu
0.1000 or Pekerja
0.0200 or Kepala tukang
0.0050 or Mandor

HARGA SATUAN
( Rp )
15,950.00
27,500.00
2,695,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

79,750.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

79,750.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

46,200.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

46,200.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
28,600.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
30,800.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
25,300.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
5,500,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )
15,950.00
1,375.00
23,716.00

5,625.00
4,125.00
600.00
342.00
10,692.00

41,041.00

103,675.00
825.00
4,020.00
1,765.50
432.00
144.00
6,361.50

104,500.00

103,675.00
825.00
4,327.50
1,903.00
464.00
153.00
6,847.50

104,500.00

60,060.00
825.00
4,020.00
1,765.50
432.00
144.00
6,361.50

60,885.00

60,060.00
825.00
4,327.50
1,903.00
464.00
15,300.00
21,994.50

60,885.00
28,600.00
2,062.50

2,812.50
2,062.50
304.00
171.00
5,350.00

30,662.50
92,400.00
2,062.50

2,812.50
2,062.50
304.00
171.00
5,350.00

94,462.50
25,300.00
2,062.50

2,812.50
2,062.50
304.00
171.00
5,350.00

27,362.50
59,400.00
2,200.00

15,000.00
5,500.00
1,600.00
450.00
22,550.00

61,600.00

JUMLAH HARGA
( Rp )
15,950.00
1,375.00
23,716.00
5,625.00
4,125.00
600.00
342.00
51,733.00

103,675.00
825.00
4,020.00
1,765.50
432.00
144.00
110,861.50

103,675.00
825.00
4,327.50
1,903.00
464.00
153.00
111,347.50

60,060.00
825.00
4,020.00
1,765.50
432.00
144.00
67,246.50

60,060.00
825.00
4,327.50
1,903.00
464.00
15,300.00
82,879.50
28,600.00
2,062.50
2,812.50
2,062.50
304.00
171.00
36,012.50
92,400.00
2,062.50
2,812.50
2,062.50
304.00
171.00
99,812.50
25,300.00
2,062.50
2,812.50
2,062.50
304.00
171.00
32,712.50
59,400.00
2,200.00
15,000.00
5,500.00
1,600.00
450.00
84,150.00

NO.
L.25

L.26

L.27

M.
M.1

M.2

M.3

M.4

M.5

M.6

NAMA PEKERJAAN
1 m' List plank 3/20 cm, kayu klas I I
0.0108 m3 Papan kayu klas II
0.1000 kg Paku 5 s/d 7 cm
0.2000 or Tukang kayu
0.1000 or Pekerja
0.0200 or Kepala tukang
0.0050 or Mandor
1 m1 Les penutup teras papan ulin 2/20
0.0044 m3 Papan kayu ulin
0.0250 kg Paku
0.0750 or Tukang kayu
0.0750 or Pekerja
0.0075 or Kepala tukang
0.0038 or Mandor
1.0000 ls Pemakaian ketam, bor, dll
1 m1 Les penutup papan ulin 3/20
0.0060 m3 Papan kayu ulin
0.0250 kg Paku
0.0750 or Tukang kayu
0.0750 or Pekerja
0.0075 or Kepala tukang
0.0038 or Mandor
1.0000 ls Pemakaian ketam, bor, dll
Pekerjaan Cat-catan
1 m2 Mengikis/mengerok cat tembok cara manual
0.0500 bh Kapek
0.1500 or Pekerja
0.0080 or Mandor
1 m2 Mencuci bidang permukaan tembok lama dengan sabun
0.0500 kg Sabun
0.0800 or Pekerja
0.0040 or Mandor
1 m2 Lapis plamir pada tembok
0.1000 kg Plamir tembok
0.0500 bh Kapek
0.5000 lbr Ampelas
0.0300 or Tukang cat
0.0200 or Pekerja
0.0030 or Kepala tukang
0.0010 or Mandor
1 m2 Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat tembok biasa (penutup 2x )
0.0630 or Tukang cat
0.0200 or Pekerja
0.0063 or Kepala tukang
0.0025 or Mandor
1 m2 Mengecat dinding / plapond (anti jamur/klas A)
0.4250 kg Cat tembok (klas A)
0.0750 kg Tukang cat
0.1500 lbr Pekerja
0.0075 or Kepala tukang
0.0075 or Mandor
1 m2 Mengecat bidang kayu baru (1 lapis plamir, 1 lapis cat
dasar, 2 lapis cat penutup)
0.2000 kg Cat meni
0.1500 kg Plamir
0.1700 kg Cat dasar
0.2600 kg Cat kilap penutup 2x
0.0900 or Tukang cat
0.0700 or Pekerja
0.0060 or Kepala tukang
0.0025 or Mandor

HARGA SATUAN
( Rp )

3,465,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
5,500,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
500.00
Jumlah

UPAH
( Rp )

37,422.00
2,200.00
15,000.00
5,500.00
1,600.00
450.00
22,550.00

5,625.00
4,125.00
600.00
342.00
10,692.00

10,692.00

20,000.00
55,000.00
90,000.00
Jumlah

8,250.00
720.00
8,970.00

15,000.00
55,000.00
90,000.00
Jumlah

4,400.00
360.00
4,760.00

25,300.00
16,500.00
15,400.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
54,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

25,850.00
25,300.00
16,500.00
49,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

39,622.00
24,200.00
550.00

5,500,000.00
22,000.00
75,000.00
55,000.00
80,000.00
90,000.00
500.00
Jumlah

25,300.00
20,000.00
3,850.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

BAHAN
( Rp )

500.00
25,250.00
33,000.00
550.00

5,625.00
4,125.00
600.00
342.00
500.00
34,050.00

1,000.00

1,000.00
750.00

750.00
2,530.00
1,000.00
1,925.00

2,250.00
1,100.00
240.00
90.00
3,680.00

5,455.00

2,530.00
1,650.00
4,004.00
4,725.00
1,100.00
504.00
225.00
6,554.00

8,184.00
22,950.00
5,625.00
8,250.00

600.00
675.00
1,275.00

36,825.00

5,170.00
3,795.00
2,805.00
12,870.00
6,750.00
3,850.00
480.00
225.00
11,305.00

24,640.00

JUMLAH HARGA
( Rp )

37,422.00
2,200.00
15,000.00
5,500.00
1,600.00
450.00
62,172.00
24,200.00
550.00
5,625.00
4,125.00
600.00
342.00
500.00
35,942.00
33,000.00
550.00
5,625.00
4,125.00
600.00
342.00
500.00
44,742.00

1,000.00
8,250.00
720.00
9,970.00
750.00
4,400.00
360.00
5,510.00
2,530.00
1,000.00
1,925.00
2,250.00
1,100.00
240.00
90.00
9,135.00

2,530.00
1,650.00
4,004.00
4,725.00
1,100.00
504.00
225.00
14,738.00
22,950.00
5,625.00
8,250.00
600.00
675.00
38,100.00

5,170.00
3,795.00
2,805.00
12,870.00
6,750.00
3,850.00
480.00
225.00
35,945.00

NO.
M.7

M.8

M.9

M.10

M.11

M.12

N.
N.1

N.2

NAMA PEKERJAAN
1 m2 Pengecatan bidang tembok lama 2 lapis dengan kuas
0.2400 kg Cat tembok (klas A)
0.0150 bh Kuas
0.0500 or Tukang cat
0.0600 or Pekerja
0.0050 or Kepala tukang
0.0030 or Mandor
1 m2 Pengecatan bidang tembok lama 2 lapis dengan roll
0.4700 kg Cat tembok (klas A)
0.0100 bh Roll
0.0300 or Tukang cat
0.0400 or Pekerja
0.0030 or Kepala tukang
0.0020 or Mandor
1 m2 Pengecatan langit-langit 2 lapis dengan cat tembok,
menggunakan kuas termasuk plamur
0.1000 kg Plamir
0.2400 kg Cat tembok biasa
0.5000 lbr Ampelas
0.0150 bh Kuas
0.0500 bh Kapek
0.0600 or Tukang cat
0.0800 or Pekerja
0.0060 or Kepala tukang
0.0040 or Mandor
1 M2 Mengecat dasar / meni
0.0840 kg Cat meni
0.0440 ltr Minyak cat
0.0600 or Tukang cat
0.0300 or Pekerja
0.0060 or Kepala tukang
0.0015 or Mandor
1 m2 Pengecatan langit-langit 2 lapis dengan cat tembok,
menggunakan roll termasuk plamur
0.1000 kg Plamir
0.4700 kg Cat tembok biasa
0.5000 lbr Ampelas
0.0100 bh Roll
0.0500 bh Kapek
0.0400 or Tukang cat
0.0600 or Pekerja
0.0040 or Kepala tukang
0.0030 or Mandor
1 m2 Pasang waterproofing
0.4250 kg Waterproofing
0.0750 or Tukang cat
0.1500 or Pekerja
0.0075 or Kepala tukang
0.0075 or Mandor
Pekerjaan Pipa dan Saniter
1 m1 Memasang pipa PVC AW 1/2 inchi
1.2000 m Pipa PVC AW 1/2 inchi
35% Harga pipa ls Perlengkapan
0.0600 or Tukang pipa
0.0360 or Pekerja
0.0060 or Kepala tukang
0.0018 or Mandor
1 m1 Memasang pipa PVC AW 3/4 inchi
1.2000 m Pipa PVC AW 3/4 inchi
35% Harga pipa ls Perlengkapan
0.0600 or Tukang pipa
0.0360 or Pekerja
0.0060 or Kepala tukang
0.0018 or Mandor

HARGA SATUAN
( Rp )

54,000.00
17,050.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
54,000.00
27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

25,300.00
15,400.00
3,850.00
17,050.00
20,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
25,850.00
16,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

UPAH
( Rp )

12,960.00
255.75
3,750.00
3,300.00
400.00
270.00
7,720.00

2,250.00
2,200.00
240.00
180.00
4,870.00

25,655.00

2,530.00
3,696.00
1,925.00
255.75
1,000.00
4,500.00
4,400.00
480.00
360.00
9,740.00

9,406.75
2,171.40
726.00

4,500.00
1,650.00
480.00
135.00
6,765.00

3,000.00
3,300.00
320.00
270.00
6,890.00

27,500.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

5,625.00
8,250.00
600.00
675.00
15,150.00

6,325.00
2,213.75
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

13,215.75
25,380.00
275.00

25,300.00
15,400.00
3,850.00
27,500.00
20,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

5,225.00
1,828.75
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah

BAHAN
( Rp )

2,897.40

2,530.00
7,238.00
1,925.00
275.00
1,000.00

12,968.00
11,687.50

11,687.50

6,270.00
1,828.75
4,500.00
1,980.00
480.00
162.00
7,122.00

8,098.75
7,590.00
2,213.75

4,500.00
1,980.00
480.00
162.00
7,122.00

9,803.75

JUMLAH HARGA
( Rp )

12,960.00
255.75
3,750.00
3,300.00
400.00
270.00
20,935.75
25,380.00
275.00
2,250.00
2,200.00
240.00
180.00
30,525.00

2,530.00
3,696.00
1,925.00
255.75
1,000.00
4,500.00
4,400.00
480.00
360.00
19,146.75
2,171.40
726.00
4,500.00
1,650.00
480.00
135.00
9,662.40

2,530.00
7,238.00
1,925.00
275.00
1,000.00
3,000.00
3,300.00
320.00
270.00
19,858.00
11,687.50
5,625.00
8,250.00
600.00
675.00
26,837.50

6,270.00
1,828.75
4,500.00
1,980.00
480.00
162.00
15,220.75
7,590.00
2,213.75
4,500.00
1,980.00
480.00
162.00
16,925.75

NO.
N.3

N.4

N.5

N.6

N.7

N.8

N.9

N.10

N.11

NAMA PEKERJAAN
1 m1 Memasang pipa PVC AW 1 inchi
1.2000 m Pipa PVC AW 1 inchi
35% Harga pipa ls Perlengkapan
0.0600 or Tukang pipa
0.0360 or Pekerja
0.0600 or Kepala tukang
0.0018 or Mandor
1 m1 Memasang pipa PVC AW 2 inchi
1.2000 m Pipa PVC AW 2 inchi
35% Harga pipa ls Perlengkapan
0.0900 or Tukang pipa
0.0540 or Pekerja
0.0090 or Kepala tukang
0.0027 or Mandor
1 m1 Memasang pipa PVC AW 4 inchi
1.2000 m Pipa PVC AW 4inchi
35% Harga pipa ls Perlengkapan
0.1350 or Tukang pipa
0.0810 or Pekerja
0.0135 or Kepala tukang
0.0041 or Mandor
1 bh Memasang closed jongkok porselin
1.0000 bh Closed jongkok porselin
6.0000 kg Semen Pc 50 kg
0.0100 m3 Pasir pasang
1.5000 or Tukang batu
1.0000 or Pekerja
0.1500 or Kepala tukang
0.1600 or Mandor
1 bh Memasang closed jongkok teraso
1.0000 bh Closed jongkok teraso
0.0100 m3 Batu bata
6.0000 kg Semen Pc 50 kg
0.0100 m3 Pasir pasang
1.5000 or Tukang batu
1.0000 or Pekerja
0.3000 or Kepala tukang
0.1100 or Mandor
1 bh Memasang closed duduk/monoblock
1.0000 bh Closed duduk/monoblock
6% Harga Closed ls Perlengkapan
1.1000 or Tukang batu
3.3000 or Pekerja
0.0010 or Kepala tukang
0.1600 or Mandor
1 bh Memasang urinoir
1.0000 bh
30% Harga Urinoir ls
6.0000 kg
0.0100 m3
1.0000 or
1.0000 or
0.1000 or
0.1000 or

Urinoir
Perlengkapan
Semen Pc 50 kg
Pasir pasang
Tukang batu
Pekerja
Kepala tukang
Mandor

1 bh Memasang wastafel keramik


1.0000 bh Wastafel keramik
12% Harga Westafel ls Perlengkapan
6.0000 kg Semen Pc 50 kg
0.0100 m3 Pasir pasang
1.4500 or Tukang batu
1.2000 or Pekerja
0.1500 or Kepala tukang
0.1000 or Mandor
1 bh Memasang bak cuci piring stainless steel (1 lobang)
1.0000 bh Bak cuci stainless steel (1 lobang)
1.0000 set Water drain+accessories
0.3000 or Tukang batu
0.0300 or Kepala tukang

HARGA SATUAN
( Rp )

7,975.00
2,791.25
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
18,700.00
6,545.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
53,350.00
18,672.50
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
192,500.00
1,342.00
100,600.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
132,000.00
500,000.00
1,342.00
100,600.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
2,200,000.00
132,000.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
880,000.00
264,000.00
1,342.00
100,600.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
286,000.00
34,320.00
1,342.00
100,600.00
75,000.00
55,000.00
80,000.00
90,000.00
Jumlah
286,000.00
34,100.00
75,000.00
80,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

9,570.00
2,791.25
4,500.00
1,980.00
4,800.00
162.00
11,442.00

12,361.25
22,440.00
6,545.00

6,750.00
2,970.00
720.00
243.00
10,683.00

28,985.00
64,020.00
18,672.50

10,125.00
4,455.00
1,080.00
369.00
16,029.00

82,692.50
192,500.00
8,052.00
1,006.00

112,500.00
55,000.00
12,000.00
14,400.00
193,900.00

201,558.00
132,000.00
5,000.00
8,052.00
1,006.00

112,500.00
55,000.00
24,000.00
9,900.00
201,400.00

146,058.00
2,200,000.00
132,000.00

82,500.00
181,500.00
80.00
14,400.00
278,480.00

2,332,000.00
880,000.00
264,000.00
8,052.00
1,006.00

75,000.00
55,000.00
8,000.00
9,000.00
147,000.00

1,153,058.00
286,000.00
34,320.00
8,052.00
1,006.00

108,750.00
66,000.00
12,000.00
9,000.00
195,750.00

329,378.00
286,000.00
34,100.00

22,500.00
2,400.00
24,900.00

320,100.00

JUMLAH HARGA
( Rp )

9,570.00
2,791.25
4,500.00
1,980.00
4,800.00
162.00
23,803.25
22,440.00
6,545.00
6,750.00
2,970.00
720.00
243.00
39,668.00
64,020.00
18,672.50
10,125.00
4,455.00
1,080.00
369.00
98,721.50
192,500.00
8,052.00
1,006.00
112,500.00
55,000.00
12,000.00
14,400.00
395,458.00
132,000.00
5,000.00
8,052.00
1,006.00
112,500.00
55,000.00
24,000.00
9,900.00
347,458.00
2,200,000.00
132,000.00
82,500.00
181,500.00
80.00
14,400.00
2,610,480.00
880,000.00
264,000.00
8,052.00
1,006.00
75,000.00
55,000.00
8,000.00
9,000.00
1,300,058.00
286,000.00
34,320.00
8,052.00
1,006.00
108,750.00
66,000.00
12,000.00
9,000.00
525,128.00
286,000.00
34,100.00
22,500.00
2,400.00
345,000.00

NO.
N.12

N.13

N.14

N.15

N.16

N.17

N.18

NAMA PEKERJAAN
1 bh Memasang bak cuci piring stainless steel (2 lobang)
1.0000 bh Bak cuci stainless steel (2 lobang)
1.0000 set Water drain+accessories
0.3000 or Tukang batu
0.0300 or Kepala tukang
1 bh Memasang kran air 1/2 inchi (stainless steel)
1.0000 bh Kran air 1/2 inchi (stainless steel)
0.0250 rol Seal tape
0.1000 or Tukang pipa
0.0100 or Kepala tukang
1 bh Memasang kran air 3/4 inchi (stainless steel)
1.0000 bh Kran air 3/4 inchi (stainless steel)
0.0250 rol Seal tape
0.1000 or Tukang pipa
0.0100 or Kepala tukang
1 bh Memasang kran air 1/2 inchi (galvanis)
1.0000 bh Kran air 1/2 inchi (galvanis)
0.0250 rol Seal tape
0.1000 or Tukang pipa
0.0100 or Kepala tukang
1 bh Memasang kran air 3/4 inchi (galvanis)
1.0000 bh Kran air 3/4 inchi (galvanis)
0.0250 rol Seal tape
0.1000 or Tukang pipa
0.0100 or Kepala tukang
1 bh Memasang floor drain (plastik)
1.0000 bh Floor drain (plastik)
0.1000 or Tukang pipa
0.0100 or Kepala tukang
1 bh Memasang floor drain (stailess steel)
1.0000 bh Floor drain (stainless steel)
0.1000 or Tukang pipa
0.0100 or Kepala tukang

HARGA SATUAN
( Rp )

484,000.00
34,100.00
75,000.00
80,000.00
Jumlah
38,500.00
4,950.00
75,000.00
80,000.00
Jumlah
39,600.00
4,950.00
75,000.00
80,000.00
Jumlah
22,000.00
4,950.00
75,000.00
80,000.00
Jumlah

UPAH
( Rp )

BAHAN
( Rp )

484,000.00
34,100.00
22,500.00
2,400.00
24,900.00

518,100.00
38,500.00
4,950.00

7,500.00
800.00
8,300.00

43,450.00
39,600.00
4,950.00

7,500.00
800.00
8,300.00

44,550.00
22,000.00
4,950.00

7,500.00
800.00
8,300.00

26,400.00
4,950.00
75,000.00
80,000.00
Jumlah

7,500.00
800.00
8,300.00

8,800.00
75,000.00
80,000.00
Jumlah

7,500.00
800.00
8,300.00

34,100.00
75,000.00
80,000.00
Jumlah

7,500.00
800.00
8,300.00

26,950.00
26,400.00
4,950.00

31,350.00
8,800.00

8,800.00
34,100.00

34,100.00

JUMLAH HARGA
( Rp )

484,000.00
34,100.00
22,500.00
2,400.00
543,000.00
38,500.00
4,950.00
7,500.00
800.00
51,750.00
39,600.00
4,950.00
7,500.00
800.00
52,850.00
22,000.00
4,950.00
7,500.00
800.00
35,250.00
26,400.00
4,950.00
7,500.00
800.00
39,650.00
8,800.00
7,500.00
800.00
17,100.00
34,100.00
7,500.00
800.00
42,400.00