Fecha Thursday, September 15, 2011 Friday, September 16, 2011 Saturday, September 17, 2011 Sunday, September

18, 2011 Monday, September 19, 2011 Tuesday, September 20, 2011 Wednesday, September 21, 2011 Thursday, September 22, 2011 Friday, September 23, 2011 Saturday, September 24, 2011 Sunday, September 25, 2011 Monday, September 26, 2011 Tuesday, September 27, 2011 Wednesday, September 28, 2011 Thursday, September 29, 2011 Friday, September 30, 2011 Saturday, October 01, 2011

MAANA TARDE Entrada Salida Parcial Entrada Salida CC PLAZA 8.00 8.50 0.50 15.00 20.00 CC PLAZA 8.00 8.50 0.50 15.00 19.00 CC PLAZA 8.00 12.00 4.00 0.00 CC PLAZA 0.00 15.00 19.00 CC PLAZA 0.00 15.50 19.50 PORTUGAL 0.00 15.00 19.00 PORTUGAL 0.00 15.00 19.00 PORTUGAL 0.00 14.50 18.50 PORTUGAL 8.00 12.00 4.00 0.00 PORTUGAL 0.00 15.00 19.50 PORTUGAL 0.00 15.00 19.00 SANTA LUZMILA 0.00 15.00 18.50 PORTUGAL 0.00 15.00 19.50 PORTUGAL 0.00 15.00 20.00 PORTUGAL 8.00 14.00 6.00 PROYECTO

TARDE Parcial 5.00 4.00 0.00 0.00 4.00 4.00 4.00 4.00 4.00 0.00 0.00 4.50 4.00 3.50 4.50 5.00 0.00

TOTAL 5.50 4.50 4.00 0.00 4.00 4.00 4.00 4.00 4.00 4.00 0.00 4.50 4.00 3.50 4.50 5.00 6.00 65.50

ITEM 1 2 3 4 5

DETALLE HORAS RESPONSABLETERMINADO Dibujo de calzaduras 5 Arq. Pedro P SI Metrado de calzaduras Arq. Pedro P SI 4 Plano de demolicin 4 Arq. Pedro P SI Metrado de demolicin Arq. Pedro P SI 5 Metrado de arquitectura 4 Arq. Pedro P no 22.00 DETALLE HORAS RESPONSABLETERMINADO Plano de estructuras Portugal 4 Ing. Maikol F SI Plano de vigas 4 Ing. Maikol F SI Plano de columnas 4 Ing. Maikol F SI Plano de cimentacion 5 Ing. Maikol F SI Plano de sobre cimientos Maikol F SI 4 Ing. Plano de zapatas 5 Ing. Maikol F SI Plano de vigas de conexin Maikol F SI 4.5 Ing. Tanque cisterna 5 Ing. Maikol F SI Metrado de acero en planosMaikol F no 6 Ing. de cimentacin 41.50

ITEM 1 2 3 4 5 6 7 8 9

ITEM

DETALLE HORAS RESPONSABLETERMINADO 1 Plan de seguridad 3 Ing. Maikol F SI 3.00

ENTREGADO OBS. SI SI SI SI no CC PLAZA PORTUGAL SANTA LUZMILA 22.00 41.50 3.00

ENTREGADO SI SI SI SI SI SI SI SI no

OBS. NINGUNA Ing. Raul Canal Ing. Raul Canal Ing. Raul Canal Ing. Raul Canal Ing. Raul Canal Ing. Raul Canal NINGUNA Por modific.

ENTREGADO OBS. SI

CC PLAZA

PORTUGAL SANTA LUZMILA