Está en la página 1de 14

CODIGO

INSUMO

0202010005

CLAVOS PARA MADERA C/C 3"

Und.
kg

Cantidad
22.1728

0202010007

CLAVOS PARA MADERA C/C 4"

kg

10.3296

0202010008

ACERO CORRUGADO 3/8"

ML

21.0000

0202040010

ALAMBRE NEGRO N 8

kg

21.6152

0202970043

ACERO DE REF. FY=4200 G 60 1/2"

kg

33.0978

0202980001

SOLDADURA AWS E6011 x 1/8"

kg

9.0000

0205000003

PIEDRA CHANCADA DE 1/2"

m3

15.7786

0205000010

PIEDRA MEDIANA DE 4"

m3

5.6626

0205000011

PIEDRA MEDIANA 6"

m3

19.2255

0205000025

PIEDRA GRANDE

m3

5.8950

0205000026

MATERIAL CLASIFICADO PARA DRENAJE

m3

1.8000

0205000027

TIERRA AGRICOLA

m3

27.4635

0205000028

GRASS TIPO STRONG O SIMILAR

m2

183.0900

0205000029

PLANTAS

und

29.2944

0205010004

ARENA GRUESA

m3

11.6039

0213000006

ASFALTO RC-250

gln

0.5070

0221000000

CEMENTO PORTLAND TIPO IP (42.50 Kg)

BOL

162.8192

0229030004

YESO

BOL

2.1384

0229200011

THINNER ACRILICO

2.5200

0232010001

CARTEL DE OBRA PREFABRICADO TIPO GIGANTOGRAFIA


und

1.0000

0234020001

KEROSENE

gln

0.0900

0239050000

AGUA

m3

7.5988

0243000031

LEA

QQ

0.1200

0243000032

BASTIDOR DE MADERA CORRIENTE

und

1.0000

0243110012

MADERA AGUANO 1 1/2" X 8" X 10'

p2

528.0300

0243110013

MADERA AGUANO 2" X 3" X 10'

p2

81.3652

0243110014

MADERA AGUANO 1 1/2" X 2" X 10'

p2

216.3712

0243110015

MADERA AGUANO 2" X 2" X 10'

p2

84.4088

0243510062

ESTACA DE MADERA CORRIENTE 2" x 2" x 1'

p2

2.8512

0243600031

ROLLIZO DE EUCALIPTO DE 6"

PGM

27.0000

0243600032

ROLLIZO DE EUCALIPTO DE 6" x 10'

PGM

201.3990

0253100003

PETROLEO

gln

17.3922

0254010054

PINTURA ZINCROMATICA ANTICORROSIVA

gln

2.5200

0256010001

TUBO FG 2 1/2" x 1/8" x 6.40ml.

ML

72.0000

0256010002

CODO FG 2 1/2" x 2 1/2"

und

20.0010

0272130014

TUBO PVC SAP 2"

ML

7.5600

Material

Und

Cantidad

Und

Cantidad

Und

Cantidad

CLAVOS PARA MADERA C/C 3"

kg

230.140

tn

0.230

CLAVOS PARA MADERA C/C 4"

kg

168.202

tn

0.168

ALAMBRA NEGRO N16

kg

2,100.550

tn

2.101

ALAMBRA NEGRO N8

kg

333.536

tn

0.334

PERNOS HEXAGONALES DE 3/4" x 8" INC. TUER

und

12.000

tn

0.012

FIERRO CO. FY=4200 KG/CM2 (GRADO 60)

kg

11,027.888

tn

11.028

TIERRA NEGRA PARA JARDINES

m3

19.040

tn

0.019

TUBERIA PVC UF 250MM x 6,00M S-25

und

8.620

tn

0.009

ASFALTO LIQUIDO RC-250

gln

61.600

tn

0.062

GRASS

kg

19.040

tn

0.019

PEGAMENTO P/TUBO CPBV 250ML.

pza

2.500

tn

0.003

SERVICIO DE ROTURA DE BRIQUETA

pza

10.000

tn

0.010

SOLDADURA CELLOCORD P 3/16"

kg

34.400

tn

0.034

SOLDADURA SUPERSITO DE 1/8

kg

24.400

tn

0.024

HOJA DE SIERRA

und

45.506

tn

0.046

LEA

QQ

2.316

tn

0.002

ESTACA DE MADERA

und

3.279

tn

0.003

PETROLEO

gln

20.012

tn

0.020

AREA TECHADA

CEMENTO PORTLAND TIPO I (42.5KG)


MADERA NACIONAL P/ENCOFRADO-CARP

kg

14,123.029

tn

14.123

BOL

2,755.360

bol

2,755.360

p2

6,837.488

P3

569.791

m3

16.135

pza

2.000

P3

0.167

m3

0.005

1.250

m3

1.250

PIEDRA CHANCADA DE 3/4"

205.583

m3

205.583

ARENA GRUESA

162.456

m3

162.456

HORMIGON

30.523

m3

30.523

MADERA ROLLIZO DE 4" x 6.00M.

Minimo Area Techada


Minimo Area Techada
AREA EN CANCHA
ARENA DE MINA

Mnimo Area en Cancha


Mnimo Area en Cancha

Area (m)
0.115
0.084
1.050
0.167
0.006
5.514
0.010
0.004
0.031
0.010
0.001
0.005
0.017
0.012
0.023
0.001
0.002
0.010
7.062
71.639
24.203
0.007
109.972

m2

36.657

m2

2.500
0.417
411.166
68.528
324.912
54.152
61.046
10.174
133.271

m2

44.424

m2

181010002 BONIFICACION POR TRABAJOS BAJO AGUA

%MO

147010001 CAPATAZ

hh

2,972.41

14.83

6,849.15
44,080.87

147010020 CONTROLADOR

hh

559.9971

11.01

6,165.57

147010008 CORTADOR

hh

1,520.00

14.83

22,541.60

182010001 CURADO

%IN

198010048 MANO DE OBRA

est

2.7

800

2,160.00

147010003 OFICIAL

hh

8,104.19

11.01

89,227.14

147010002 OPERARIO

hh

14,557.58

12.36

179,931.67

147010004 PEON

hh

47,103.08

9.95

468,675.61

147000029 SOLDADOR

hh

2,130.00

14.83

31,587.90

147000045 TECNICO

hh

305

16.1

4,910.50

147000038 TECNICO (C.CALIDAD)

hh

760

16.1

12,236.00

147000037 TECNICO CALDERERO

hh

760

14.83

11,270.80

147010034 TOPOGRAFO

hh

188.2603

14.83

2,791.90

882,428.71
MATERIALES
202970003 ACERO CORRUGADO GRADO 60 ASTM A615

kg

123,560.26

3.54

437,403.31

202500001 ACERO ESTRUCTURAL A-36

kg

21,748.15

3.7

80,468.16

202500011 ACERO ESTRUCTURAL GRADO 50

ton

199.4998

3,968.27

791,669.07

229510003 ACETILENO

m3

943.3958

43.15

40,707.53

229010035 ADITIVO PLASTIFICANTE

kg

1,880.52

7.5

14,103.87

202040010 ALAMBRE NEGRO N8

kg

1,045.26

4.33

4,525.98

202040009 ALAMBRE NEGRO N 16

kg

3,759.90

4.33

16,280.37

243570052 ANDAMIO DE MADERA

p2

7,197.00

21,591.00

251020057 ANGULO DE FIERRO 1"x1"x3/16"

10.5582

9.1

204000007 ARENA

m3

608

25.5

15,504.00

213010013 ASFALTO RC-250

gln

27.216

7.5

204.12

230020097 BARRENO DE 7/8" x 5 PIES

und

211.6131

396.25

83,851.69

230020006 CABLE DE ACERO DE 1"

152.5

26.4

4,026.00

298010043 CAPACITACION AMBIENTAL A LA POBLACION LOCAL

und

1,500.00

1,500.00

298010042 CAPACITACION AMBIENTAL A LOS TRABAJADORES

und

1,500.00

1,500.00

221000002 CEMENTO PORTLAND TIPO I (42.5KG)

BOL

15,982.63

30.08

480,757.57

202010061 CLAVOS

kg

1,113.20

4.33

4,820.15

234000004 COMBUSTIBLE, LUBRIC. Y FILTROS

%IN

234000005 COMBUSTIBLE, LUBRIC. Y FILTROS

%EQ

254830003 DILUYENTE

gln

89.2385

67.83

6,053.05

228000022 DINAMITA

kg

3,180.46

9.45

30,055.32

229510052 DISCO DE DESBASTE 1/4" x 7"

pza

380

14.9

5,662.00

254830004 DISOLVENTE

gln

12.5483

30.86

387.24

230320005 FIBRA DE VIDRIO DE 4 MM. ACABADO

m2

3.6399

158.81

578.05

298010032 FLETE TERRESTRE

%PU

227020011 FULMINANTE

und

13,228.95

0.55

7,275.92

227000007 GUIA

13,228.95

0.55

7,275.92

253100004 KEROSENE

gln

7.4975

12.1

96.08

0
134,930.67

248,163.62

90.72

230200005 LACA DESMOLDEADORA

gln

240.8143

56.22

13,538.58

203110005 LAMINA REFLECTIVA A.I. BLANCA

p2

5.92

22.51

133.26

203110006 LAMINA REFLECTIVA A.I.AMARILLA

p2

16

22.51

360.16

203110004 LAMINA REFLECTIVA G.I. VERDE

p2

24

12.52

300.48

243570051 MADERA

p2

28,581.96

1.88

53,734.09

298010054 MATERIALES

est

4.5

800

3,600.00

229510062 NEOPRENO VULCANIZADO CON PLANCHAS DE ACERO

und

2,495.72

19,965.76

229510001 OXIGENO

m3

2,846.18

16.15

45,965.74

202510015 PERNOS

kg

373.7255

4.62

1,726.61

202510017 PERNOS 1/4" x 3"

pza

202510018 PERNOS 3/4" x 18"

pza

16

7.59

202510016 PERNOS 3/8" x 8"

pza

202140005 PERNOS DE ANCLAJE

und

16

50

800

202140006 PERNOS TUERCAS Y ARANDELAS A-325

und

1,900.00

13.8

26,220.00

253100003 PETROLEO

gln

215.369

13.74

2,959.17

254210001 PINTURA ANTICORROSIVA

gln

0.1001

51.96

254210002 PINTURA ANTICORROSIVA EPOXICA

gln

212.8

220

46,816.00

254210004 PINTURA ANTICORROSIVA ZINC INORGANICO

gln

162.287

356

57,774.17

254110091 PINTURA DE TRAFICO

gln

55.4306

58.76

3,257.10

254110090 PINTURA ESMALTE

gln

0.7001

51.96

36.38

254020045 PINTURA ESMALTE BLANCO

gln

0.0477

51.96

2.48

254020044 PINTURA ESMALTE NEGRO

gln

0.0477

51.96

2.48

254020042 PINTURA ESMALTE SINTETICO

gln

46.1876

64.27

2,968.48

Unidad

Cantidad

Precio S/.

254220022 PINTURA POLYURETHANE BICOMPONENTE

gln

189.6994

251020056 PLATINA DE FIERRO 1"x1/8"

5.2403

3.87

251020059 PLATINA DE FIERRO 2.5"x3/8"

1.7997

22.47

251020058 PLATINA DE FIERRO 3"x3"X1/4"

0.6

23.6

230990030 POLIESTIRENO EXPANDIDO 1"

pln

48.25

12

230990029 SELLANTE DE POLIURETANO

cja

24.125

270

230990008 SOLDADURA

kg

20,828.02

11.75

254110094 TINTA XER0GRAFICA NEGRA

gln

0.012

1,180.00

248800012 TORRE METALICA

GLB

152.4999

150

245010002 TRIPLAY DE 19 MM.

pln

301.0262

136.41

245010005 TRIPLAY DE 6 MM.

pln

4.032

28

272240017 TUB. PVC 3/4"

956.0686

3.5

265010026 TUBERIA DE ACERO A-36 D= 4"

kg

735

7.67

265010021 TUBERIA DE FIERRO NEGRO 3"

277.2602

55.1

265010022 TUBERIA DE FIERRO NEGRO 4"

251.4485

79.64

272240020 TUBO PVC SAP 6"

132.0148

60.15

221000001 YESO

BOL

139.595

10

Cdigo

Recurso

40
121.44
40

5.2

263.7

EQUIPOS

398010049 ALQUILER

mes

337970001 BANCO DE TRABAJO

%IN

2,500.00

348120002 CAMION CISTERNA 4x2 (AGUA) 2,000 GAL.

hm

347.4739

120.96

349040010 CARGADOR S/LLANTAS 125-155 HP 3 YD3.

hm

750.3049

170.3

384010001 CEPILLADORA ELECTRICA

hm

0.572

7.25

349030003 COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP

hm

1,395.45

22.09

349010092 COMPRESORA NEUMATICA 175 PCM, 76 HP

hm

438.2539

50.46

349010094 COMPRESORA NEUMATICA 250-330 PCM, 87 HP

hm

149.9167

72.17

349010093 COMPRESORA NEUMATICA 335-375 PCM, 93 HP

hm

289.9889

92.84

349010004 COMPRESORA NEUMATICA 600-690 PCM, 196 HP

hm

495.3165

157.91

349180013 ELECTROBOMBA SUMERGIBLE 10"

hm

799.8095

28

349180012 ELECTROBOMBA SUMERGIBLE 6"

hm

1,599.53

20

348070020 EQUIPO DE OXICORTE

hm

2,087.88

10

348210057 EQUIPO DE PINTAR AIRLESS

hm

403.7686

15.3

348970015 ESTACION TOTAL

hm

186.1267

18.75

349180002 FAJA TRANSPORT 18"x50' M.E. 3KW 150 TON/H

hm

278.2686

14.57

348830001 GATAS DE 50 TN.

hm

2,130.00

15

349180015 GRUA 15 TON + 2 BALDES DE 1 M3

hm

399.7677

182.85

349180010 GRUA HIDRAULICA AUTOP. 127HP 18TON-9M.

hm

610

182.85

349150002 GRUPO ELECTROGENO 140 HP 90 KW

hm

677.3215

19.58

349150004 GRUPO ELECTROGENO 230 HP 150 KW

hm

399.747

46.3

337010001 HERRAMIENTAS MANUALES

%MO

337010002 HERRAMIENTAS MANUALES

est

1.8

800

349060006 MARTILLO NEUMATICO DE 29 Kg.

hm

2,539.44

9.74

348010005 MEZCLADORA DE CONCRETO DE 11 P3

hm

797.813

24.6

349070051 MONTACARGA 80 HP 5 TON

hm

760

87.99

348080006 MOTOBOMBA 34 HP 8"

hm

26.8779

8.11

349090000 MOTONIVELADORA DE 125 HP

hm

221.2845

129.51

349070050 MOTOSOLDADORA DE 250 AMP.

hm

2,089.23

59.42

348970016 NIVEL DE INGENIERIA

hm

179.6589

7.77

349040036 RETROEXCAVADOR S/ORUG 80-110 HP

hm

473.0455

158.1

349030013 RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.

hm

154.5707

76.43

348840001 RODILLOS

hm

610

15

385010001 SIERRA CIRCULAR

hm

0.5837

7.5

348970005 TECLE DE 5 TON.

hm

2,130.00

15

348600002 TIRFOR DE 5 TON.

hm

610

12

348210058 TOLVA PARA ARENADO

hm

120.186

8.6

349040037 TRACTOR DE ORUGAS DE 140-160 HP

hm

862.7298

176.41

349070003 VIBRADOR DE CONCRETO 4 HP 1.50"

hm

797.2765

6.49

348110004 VOLQUETE DE 10 M3

hm

2,549.66

192.5

348110005 VOLQUETE DE 4 M3

hm

1.28

120

348010081 WINCHE ELECTRICO 3.6 HP DE DOS BALDES

hm

608.7325

6.8

349080010 ZARANDA VIBRATORIA 4"x6"x14" M.E. 15 HP

hm

278.3068

33.81

Total

S/.

Parcial S/.

50,023.73
20.28
40.44
14.16
579
6,513.75
244,729.24
14.16
22,874.99
41,062.98
112.9
3,346.24
5,637.45
15,277.04
20,025.36
7,940.69
1,395.95
3,139,457.35

22,500.00
0
42,030.44
127,776.92
4.15
30,825.42
22,114.29
10,819.49
26,922.57
78,215.43
22,394.67
31,990.66
20,878.80
6,177.66
3,489.88
4,054.37
31,950.00
73,097.52
111,538.50
13,261.95
18,508.29
44,898.67
1,440.00
24,734.13
19,626.20
66,872.40
217.98
28,658.56
124,141.97
1,395.95
74,788.49
11,813.84
9,150.00
4.38
31,950.00
7,320.00
1,033.60
152,194.16
5,174.32
490,809.28
153.6
4,139.38
9,409.55
1,808,477.47

5,830,363.53

También podría gustarte