Documentos de Académico
Documentos de Profesional
Documentos de Cultura
3
4
51. What are the 2 major components taken into consideration with risk analysis?
6
7
8
92. Amount of testing to be performed is directly related to amount of risk involved. True
10or False?
11
12
13
14
153. What are the 4 methods for conducting risk analysis?
16
17
18
19
204. Name 3 primary testing risks.
21
22
23
24
255. Traditional system testing is just conducted at the end of development. True or
26False?
27
28
29
30
311. The probability the negative event will occur. The potential loss or impact associated with the
32 event.
332. True
343. Judgment and instinct; dollars estimate (cost of failure); identification and weighting of risk
375. False, may be conducted multiple times throughout the project for major components and