SUMMARY OUTPUT

Regression Statistics
Multiple R
0.81122086
R Square
0.658079283
Adjusted R Square
0.646288914
Standard Error
0.636739019
Observations
31
ANOVA
df
Regression
Residual
Total

1
29
30

SS
22.62943601
11.75766077
34.38709677

MS
22.62943601
0.405436578

Coefficients
Standard Error
t Stat
-0.064091498
0.388488349 -0.164976627
0.389080708
0.052079199 7.470942625

Intercept
X Variable 1

RESIDUAL OUTPUT
Observation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Predicted Y
3.82671558
2.659473457
1.103150626
3.048554165
1.881312041
2.659473457
3.437634873
3.437634873
1.103150626
3.437634873
2.270392749
2.270392749
3.437634873
3.82671558
3.437634873
3.048554165
2.659473457
1.881312041
3.437634873
3.437634873
2.270392749
1.881312041

Residuals
1.17328442
-0.659473457
-0.103150626
-1.048554165
0.118687959
0.340526543
0.562365127
-0.437634873
-0.103150626
-0.437634873
0.729607251
0.729607251
0.562365127
-0.82671558
0.562365127
-0.048554165
0.340526543
0.118687959
0.562365127
-0.437634873
0.729607251
0.118687959

F
Significance F
55.8149837
3.11002E-08

P-value
0.870107011
3.11002E-08

Lower 95%
-0.858639373
0.282566788

23
24
25
26
27
28
29
30
31

3.437634873
2.659473457
1.881312041
3.048554165
3.048554165
1.103150626
1.103150626
3.82671558
3.437634873

0.562365127
-0.659473457
-0.881312041
0.951445835
-1.048554165
-0.103150626
-0.103150626
-0.82671558
-0.437634873

X Variable 1 Line Fit Plot


6.00
Y

4.00
2.00
0.00
0

6
X Variable 1

Upper 95% Lower 95.0% Upper 95.0%


0.730456378 -0.858639373 0.730456378
0.495594628 0.282566788 0.495594628

10

ne Fit Plot

Y
Predicted Y
10

12

N Parches
10
7
3
8
5
7
9
9
3
9
6
6
9
10
9
8
7
5
9
9
6
5
9
7
5
8
8
3
3
10
9

Tiempo
5.00
2.00
1.00
2.00
2.00
3.00
4.00
3.00
1.00
3.00
3.00
3.00
4.00
3.00
4.00
3.00
3.00
2.00
4.00
3.00
3.00
2.00
4.00
2.00
1.00
4.00
2.00
1.00
1.00
3.00
3.00

6.00

5.00
y = 0.3891x - 0.0641
R = 0.6581
4.00

3.00

2.00

1.00

0.00
0

Series1
Linear (Series1)
Linear (Series1)

10

12

Actividad
A
B
C
D
E
F
G
H

Descripcin
Trabajos de obra civil
Adecuar parte elctrica
Adecuar salas de equipos
Instalar planta de poder
Instalar banco de bateras
Montar sistema de climatizacin
Instalar equipos de central
Inspeccin y pruebas

Precede
Inicio
A
A
B, C
B, C
D, E
F
G

to
1.0
1.0
2.0
3.0
2.0
2.0
4.0
0.8

tm
2.0
1.5
3.0
5.0
4.0
3.0
6.0
1.0

Objetivo terminar en 21 semanas


z

Probabilidad de terminar en 21 semana

1.09972766
Prob. De acabar en 19 sem

tp
3.0
3.0
5.0
7.0
5.0
5.0
8.0
1.3

te
2.00
1.67
3.17
5.00
3.83
3.17
6.00
1.02

ES
0.00
2.00
2.00
5.17
5.17
10.17
13.34
16.34

EF
2.00
3.67
5.17
10.17
9.00
13.34
16.34
17.36

0.5294985

obabilidad de terminar en 21 semanas

0.3621
0.1379
13.79

70.19%

LS
0
3.5
2
5.17
6.34
10.17
13.34
16.34

LF
2
5.17
5.17
10.17
10.17
13.34
16.34
17.36

H
0.00
1.50
0.00
0.00
1.17
0.00
0.00
0.00

Desv. Std.
0.33
0.33
0.50
0.67
0.50
0.50
0.67
0.08
VAR
DES
Te Proy

Varianza
0.11
0.25
0.44
0.25
0.44
0.01
1.51
1.22757666
20.35 Duraciones Ruta Crtica

%
IC1
IC2
IC3

Linf
Lsup
68% 19.1224233 21.5775767
95% 17.8948467 22.8051533
99%
16.66727
24.03273