Documentos de Académico
Documentos de Profesional
Documentos de Cultura
30 MMSCFD
200~500 PSIG
60~100
Deg F
32 Inch
200 PSIG
100 Deg F
9.56 Inch ( ID )
0.49868 Ft 2
2
0.046328 M
Vessel Area
Dens X V2=kg/M3
214.73
560
51.43802 Ft/Sec
15.64052 M/Sec
35.4 SM3
1 Sq FT=
0.092903 M3
15.67831 M/Sec
Maximum
Minimum
41666.67 Qs
PsQs/ZsTs = PQ/ZT
49.98693
Q=
Ps*Qs*Z*T / Zs*Ts*P
Q=
Q=
14.73*41666.67Qs*Z*T / Zs*520*P
Q=
Q=
Ps=
14.73 PSIA
Qs=
49.98693 MMSCFD
Z=
48.4556 DEG F
Zs=
Q=
Ps=
Qs=
0.977799
0.999974
0.9155
T=
CUFT / HR
508.4556 DEG R
T=
0.9984
Ts=
Zs=
60 DEG F
P=
608.93 PSIG
Qf=
44106.59657 CUFT/HR
520 DEG R
d=
Ts=
623.66 PSIA
P=
3
1248.96 M /HR
1.0586 MMCFD
0.785714286 d2 (FT2)
Area A=
Z=
Qf=
Area A=
0.492126 FT
d=
FOR A= 0.2M2
d=
VELOCITY=
VELOCITY=
5.905512
Qf/3600*A
FT/SEC
VELOCITY=
64.38486307 FT/SEC
VELOCITY=
Q= 55 FT/SEC =
d=
5.905512
Q= 55 FT/SEC =
Ps=
14.73 PSIA
Qs=
49.98693 MMSCFD
Z=
0.9155
T=
48.4556 DEG F
Zs=
508.4556 DEG R
0.9984
Ts=
60 DEG F
P=
520 DEG R
608.93 PSIG
623.66 PSIA
2
0.832121036 P*d *Zs/Z*T
Qs=
ASSUME Zs =0.999
ASSUME Z =0.95
T= 75 deg F=
N-Pipe Dia.
( inch )
4
6
8
10
12
14
20
24
2
Mean Pressure
MMSCFD
0.999
0.95
535 RANKINE
PSIG
PSIG
PSIG
PSIG
300
400
500
40
100
200
1.4323
3.2226
5.7290
8.9516
11.8385
15.7156
32.3152
47.3539
0.3581
3.0024
6.7554
12.0097
18.7651
24.8169
32.9445
67.7421
99.2675
0.7506
5.6194
12.6436
22.4775
35.1210
46.4476
61.6594
126.7869
185.7903
1.4048
8.2363
10.8533
18.5317 24.4198
32.9452 43.4130
51.4769 67.8328
68.0783 89.7089
90.3742 119.0890
185.8318 244.8766
272.3130 358.8358
2.0591
2.7133
CUFT / HR
CUFT / sec
Qs=
38
13.4702
30.3080
53.8808
84.1888
111.3396
147.8039
303.9214
445.3585
3.3676
0.785714286
GAS VELOCITY
Z=
0.9155
T=
70
Zs=
0.9984
P=
200.00
d=
10
L=
180
51.67780031
5.1
530
214.73
ft / sec
Hrs
MKS SYSTEM
MMSCFD
CF/HR
CF/HR
Qs*106 /24
41666.67 Qs
Qs= MMSCM/D
CM/HR
CM/HR
Ps*Qs*Z*T / Zs*Ts*P
1.0156*41666.67*Qs*Z*T / Zs*288.5556*P
146.64996 Qs*Z*T / Zs*P
CU M / HR
1.0156 bars
1.415472 MMCMD
1.415472
0.977773434
0.9155
9.142 DEG C
282.142 DEG K
0.9984
15.5556 DEG C
288.5556 DEG K
41.9844 barsG
43 bars A
3
1248.9248 M /HR
0.7857143 d2 (M2)
0.15 M
Qf/3600*A M/SEC
19.623959 M/SEC
55*3600*24*d2*22/(7*4*144*1000000) MMCFD
3.28084
10.76391
0.215278
56.91162
17.35
0.0235714 d2
MMCFD
PsQs/ZsTs = PQ/ZT
Qs= P*Q*Zs*Ts / Z*T*Ps
Qs= 520*P*.025929d2*Zs/Z*T*14.73
Qs=
2
0.832121036 P*d *Zs/Z*T
MMSCFD
Qs= 0.915333139*623.66*5.905512*5.905512*.9984/.9155*508.4556
38.819 MMSCFD
Qs=
PSIG
PSIG
600
600
16.0871
36.1961
64.3486
100.5447
132.9703
176.5187
362.9662
531.8813
4.0218
16.0871
36.1961
64.3486
100.5447
132.9703
176.5187
362.9662
531.8813
4.0218
FT/SEC
M/SEC
Pipe Dia.
Design
Up Stream
Temperature Pressure
Deg F
PSIG
Velocity
Inch(Schl 80),OD/ID
Ft/Sec
10(9.56)
54.14
12(11.37)
38.3
110
150
800
14(12.5)
31.7
16(14.31)
24.2
20(17.94)
15.4
Pipe Velicity 0f 10" Line Pipe shall be acceptable.But Need to comply
Header Dia = 1.5 ( A1 + A2),A1=45.6 A2=26.1
1.5(45.6+26.1)=107.55,
For OD12 ",ID 11.37" Sch 80 = Header Area 101.5
For OD 14", ID 12.5" Sch 80 =Header Area
122.8
Flow
MMSCFD
75
Flow
MMSCFD
75
75
Flow
MMSCFD
35
Flow
MMSCFD
Velocity
Ft/Sec
101.7
58.11
36.9
Velocity
Ft/Sec
61.9
39.3
56.83
36.1
35
35
Pipe Dia.
Design
Up Stream Velocity
Temperature Pressure
Inch(Schl 80),OD/ID
Deg F
PSIG
8(7.62)
150
400
10(9.56)
8(7.62)
100
400
10(9.56)
Ft/Sec
53.3
33.5
48.9
31.1
Flow
MMSCFD
35
Flow
MMSCFD
35
35
Flow
MMSCFD
30
Flow
MMSCFD
30
30
Flow
MMSCFD
15
Flow
MMSCFD
15
15
Velocity
Ft/Sec
47.5
27.1
17.3
Velocity
Ft/Sec
53.3
33.5
48.9
31.1
Velocity
Ft/Sec
47.5
27.1
17.3
Velocity
Ft/Sec
88.19
56.0
80
51.0
Velocity
Ft/Sec
52.7
30.1
Velocity
Ft/Sec
77.2
44.0
70.5
40.5
Standard/Flowrat
e
3
Pressure
Normal Flowrate
3
Temperature
Presssure
Flowrate
1
Inlet/Outlet
No.
Line ReFerence
V1
P1
T1
P2
I/Stream,600psi
O/Stream, 400psi
Compressor Stations
3a
3b
I/Stream,300psi
O/Stream, 200psi
Simjkhon Refinery
4a
4b
I/Stream,300psi
O/Stream,125psi
T1
Kelvin
9
V2
12
m
2
m
2
14
VL
mm
15
16
mm
17
18
Actual Inside
diameter of Pipe
used
Actual thickness
Schedule of Pipe
Acutal Outside
Diameter of Pipe
Used
13
Actual NPS Diameter
of pipe Used
Minimum diameter
of the required,
Dmin
11
10
Limited Velocity
Actual Flowrate
Actual
Temperature
P1*V1/T1 =
P2*V2/T2
Actual Flowrate
V2 =
(P1*V1/T1)*(T2/P2)
Result
mm