Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Executive Summary
This is a international collaborative project. Teachers continued to communicate and have brainstorming. We used Mind Map to think how we play a role and what we product according to the procedure. At last we accomplished our goal to complete all materials we wanted through collaborative study in a short time.
Motivation & Purpose To propose a international project to those who have sought a interesting project between Korea and Peru. Process of PDP
Picture
Picture
Major Concept & Practice 1. Brainstorming on the Project and Drawing Mind Map 2. Website Construction with Web 2.0 Spirit 3. Project Synopsis 4. Teaching Plan 5. Team Project Proposal 6. Brochure Plan/Story Board 7. PPT Plan/ Story Board 8. UCC Continuity 9. Sample Materials(Brochure, UCC, Presentation) 10.Evaluation Sheet (Team/ Peer Evaluation)
Expected Effects 1. Students will understand cross-culture through this project. 2. They can experience collaborative study and it will enhance their ability and enlarge their thinking.
PBL? : student-centered instructional strategy in which students collaboratively solve problems and reflect on their experiences. Merit of PBL Thinking Power Self Driving Power Collaborative Power Collection of information, analysis and presentation power
To propose a international project to those who have sought a interesting project between Korea and Peru. To revive the mysterious Incas through the project to find the hidden code of history. To recognize similarities and differences between Incas culture on the design, architecture and pattern and so on. It gives interesting and edutainment to students. To have pride in their fathers and cultures, and also understand the cross-culture with respect.
Teaching Plan
Lesson Contents Team Building and Project Synopsis 1 Team Project Proposal 2 Mind Map 3 Brochure 4 5~7 8 9 Making Materials(UCC, Presentation) Presentation Evaluation
Who : Peruvian and Korean student s Place : class room, web Term : 2011. 4 ~ 6 (Term depends on the teachers situation.) Role : Deciding leader
Share team goal and role Web surfing and finding meaningful materials Discussion, UCC and Newspaper Prepare final material Presentation(mid, final) Evaluation
SWOT Analysis
(Strength) (Opportunity)
(Weakness)
(Threat)
Solving problem through communication Collaborative Study Participating in various activities Thinking outside the box Trying new idea
Evaluation
Content
Mind Map
UCC
News paper
Presenta tion
Core evaluati on
grade (100)
10
20
20
20
20
10
Go Go Together~
Reference
http://Incasforever.com http://en.wikipedia.org/wiki/Problem-based_learning