PRESUPUESTO DE COSTOS DE LA ETAPA OPERATIVA PARA LA ALTERNATIVA I

(A PRECIOS DE MERCADO)
DESCRIPCION

UNIDAD

METRADO

COSTO
UNITARIO

COSTO TOTAL
(S/.)

Mantenimiento Anual
Limpieza General

M2

20,207.52

0.30

6,062.26

Mantenimiento de parques

Glb

1.00

1,500.00

1,500.00

Limpieza de alcantarillas

Und.

5.00

150.00

COSTO DE MANTENIMIENTO ANUAL

750.00
8,312.26

Gastos Generales (10%)

831.23

Imprevistos (2%)

16.62
TOTAL COSTO DE MANTENIEMIENTO ANUAL

9,160.11

Mantenimiento cada 05 Aos


Reposicin de Pintura

Glb

1.00

1,050.00

1,050.00

Resellado de Juntas Asflticas

ml

2,926.72

1.40

4,097.41

COSTO DE MANTENIMIENTO CADA 03 AOS

5,147.41

Gastos Generales (10%)

514.74

Imprevistos (2%)

10.29
TOTAL COSTO DE MANTENIEMIENTO CADA TRES AOS

5,672.44

Fuente: Poltica de mantanimiento. Consulta a especialistas

PRESUPUESTO DE COSTOS DE LA ETAPA OPERATIVA PARA LA ALTERNATIVA II


(A PRECIOS DE MERCADO)
DESCRIPCION

UNIDAD

METRADO

COSTO
UNITARIO

COSTO TOTAL
(S/.)

Mantenimiento Anual
Limpieza General

m2

20,207.52

0.30

6,062.26

Mantenimiento de parques

Glb

1.00

1,500.00

1,500.00

Limpieza de alcantarillas

Und.

5.00

150.00

COSTO DE MANTENIMIENTO ANUAL

750.00
8,312.26

Gastos Generales (10%)

831.23

Imprevistos (2%)

16.62
TOTAL COSTO DE MANTENIEMIENTO ANUAL

9,160.11

Mantenimiento cada 03 Aos


Sellado de Juntas de Adoquinado

ml

292.67

3.25

951.18

Cambio de Adoquines Fisurados

m2

292.67

24.50

7,170.42

COSTO DE MANTENIMIENTO ANUAL

8,121.60

Gastos Generales (10%)

812.16

Imprevistos (2%)

16.24
TOTAL COSTO DE MANTENIEMIENTO CADA TRES AOS

8,950.00

Mantenimiento cada 05 Aos


Resellado de Juntas y Adoquinado

m2

316.83

55.24

17,501.69

Cambio de Adoquines Fisurados

m2

1,950.18

24.50

47,779.41

Reposicin de Pintura

glb

1.00

924.00

924.00

COSTO DE MANTENIMIENTO ANUAL


Gastos Generales (10%)
Imprevistos (2%)

66,205.10
6,620.51
132.41

TOTAL COSTO DE MANTENIMIENTO CADA CINCO AOS


Fuente: Poltica de mantanimiento. Consulta a especialistas
GASTOS OPERATIVOS SIN PROYECTO A PRECIOS DE MERCADO

72,958.02

Limpieza general

m2

20,207.52

Prec.
Unit(s/.)
1.13

Bacheo con material de cantera

m2

2020.75

7.18

Gastos generales (10%)

GLB

3734.35

Imprevistos ( 2%)

GLB

746.87

Descripcin

Unid. Med. Cantidad

Total Costo en la etapa operativa (si.)

PRESUPUESTO DE COSTOS DE LA ETAPA OPERATIVA - MANTENIMIENTO


(A PRECIOS SOCIALES)
CON PROYECTO
SIN PROYECTO
a precios de
a precios
ALTERNATIVA 01
ALTERNATIVA 02
a precios de
mercado

ANUAL
C/ 3 AOS
C/ 5 AOS
C/ 5 AOS

a precios
sociales

a precios de
mercado

a precios sociales

9,160.11

6,870.08

9,160.11
8,950.00

6,870.08
6,712.50

5,672.44

4,254.33
72,958.02

54,718.52

mercado

sociales

41,824.72
41,824.72
41,824.72
41,824.72

31,368.54
31,368.54
31,368.54
31,368.54

Sub total
(s/.)
22834.50
14509.00
3734.35
746.87
41,824.72

CUADRO N 15
RESUMEN INVERSION ALTERNATIVA N 01: PAVIMENTOS
(A PRECIOS SOCIALES)
CUADRO RESUMEN
I.II.-

III.-

III.TOTAL

ESTUDIOS
EXPEDIENTE TECNICO (3%)
OBRAS CIVILES
Mano de Obra Calificada
Mano de Obra No Calificada
Materiales
Equipos y Herramientas
Mitigacin Ambiental
Mano de Obra Calificada
Mano de Obra no calificada
Equipo y Herramientas
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUB TOTAL
I.G.V. (19%)
TOTAL PRESUPUESTO
SUPERVISION
SUPERVISION (5%)
ALTERNATIVA N 01

PRECIOS DE
MERCADO
S/.

S/.
S/.
S/.
S/.
S/.
S/.
S/.

78,011.92
###
115,792.50
172,339.34
1,462,619.32
145,289.68
4,140.00
1,200.00
2,250.00
690.00
###
190,018.08
95,009.04
2,185,207.95
415,189.51
###

Factores
de
correccion
0.909
0.909
0.680
0.840
0.840
0.909
0.680
0.840

130,019.87
###

CUADRO N 16
RESUMEN INVERSION ALTERNATIVA N 02: PAVIMENTOS
(A PRECIOS SOCIALES)

CUADRO RESUMEN

I.II.-

III.-

ESTUDIOS
EXPEDIENTE TECNICO (3%)
OBRAS CIVILES
Mano de Obra Calificada
Mano de Obra No Calificada
Materiales
Equipos y Herramientas
Mitigacin Ambiental
Mano de Obra Calificada
Mano de Obra no calificada
Equipo y Herramientas
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUB TOTAL
I.G.V. (19%)

PRECIOS DE
MERCADO

S/.

S/.
S/.
S/.
S/.
S/.

89,819.79
###
221,022.33
207,034.26
1,640,823.30
114,771.94
4,140.00
1,200.00
2,250.00
690.00
###
218,779.18
109,389.59
2,515,960.60
478,032.51

Factores
de
correccion

0.909
0.909
0.680
0.840
0.840
0.909
0.680
0.840

TOTAL PRESUPUESTO
SUPERVISION
SUPERVISION (5%)
TOTAL ALTERNATIVA N 02

S/.

###

S/.

149,699.66
###

III.-

AVIMENTOS
PRECIOS
SOCIALES
70,919.93
1,573,630.17
105,255.38
117,190.75
1,229,091.87
122,092.17
3,200.74
1,090.91
1,530.00
579.83
1,576,830.91
157,683.09
78,841.55
1,813,355.54
344,537.55
2,157,893.10
107,894.65
2,336,707.68

AVIMENTOS

PRECIOS
SOCIALES

81,654.36
1,816,982.71
200,909.30
140,783.30
1,378,843.11
96,447.01
3,200.74
1,090.91
1,530.00
579.83
1,820,183.45
182,018.35
91,009.17
2,093,210.97
397,710.08

2,490,921.06
124,546.05
2,697,121.45

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Viernes, 01 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

6
4
4
2
3
4
4

2
2

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

20
15
15
10
8
15
15
98
27.68

22
15
12
10
5
18
15
97
27.4

18
16
18
20
18
15
14
119
33.62

2
1
1
0
0

4
1.13

0
0

27
7.63

0
0

68 19.21
52 14.69
51 14.41
42 11.86
37 10.45
54 15.25
50 14.12
354 100.00
100

0
0

55 16.87
45 13.80
40 12.27
40 12.27
44 13.50
49 15.03
53 16.26
326 100.00
100

2
1
2
5
1.41

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
12
10
10
12
15
16

15
12
10
8
10
15
18

93
28.53

88
26.99

17
17
18
20
18
14
16
120
36.81

4
3
1
2
3
2
3

1
0
0

2
0.61

0
0

18
5.52

1
1

1
2
5
1.53

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Sbado, 02 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

2
2
3
2
2
3
3

3
1
1

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
15
14
12
10
14
16

25
12
10
10
5
14
13

99
29.82

89
26.81

20
14
12
10
12
14
14

17
15
10
8
12
13
12

96
28.66

87
25.97

18
18
17
20
17
14
14
118
35.54

0
0

1
0.3

0
0

17
5.12

0
0

66 19.88
48 14.46
45 13.55
44 13.25
36 10.84
46 13.86
47 14.16
332 100.00
100

0
0

58 17.31
50 14.93
47 14.03
41 12.24
48 14.33
46 13.73
45 13.43
335 100.00
100

1
1
1
8
2.41

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
18
19
18
20
15
15
123
36.72

3
2
2
3
3
2
3

2
0
0

4
1.19

0
0

18
5.37

1
2
2
1
1
7
2.09

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Domingo, 03 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

2
1
2
2
2
3
2

2
1

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

12
7
7
5
5
6
6
48
29.09

5
4
3
1
3
2
3
21
12.73

15
12
10
12
8
8
10
75
45.45

1
1
0
0

2
1.21

0
0

14
8.48

0
0

36 21.82
25 15.15
22 13.33
21 12.73
19 11.52
20 12.12
22 13.33
165 100.00
100

0
0

29 20.14
23 15.97
21 14.58
17 11.81
19 13.19
17 11.81
18 12.50
144 100.00
100

1
1
5
3.03

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

11
6
4
4
5
4
3

3
2
2
1
2
2
2

14
12
12
11
10
9
9

37
25.69

14
9.72

77
53.47

1
1
2
1
2
1
1

1
0
0

2
1.39

0
0

9
6.25

1
1

3
5
3.47

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Lunes, 04 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

5
3
4
3
2
3
3

3
2
2
1

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

21
14
14
12
11
16
14
102
28.1

20
14
12
10
8
15
16
95
26.17

18
14
10
11
12
15
14

15
12
12
8
10
14
16

94
28.14

87
26.05

19
18
17
20
19
17
17
127
34.99

1
0
0

3
0.83

0
0

23
6.34

0
0

68 18.73
51 14.05
51 14.05
46 12.67
40 11.02
54 14.88
53 14.60
363 100.00
100

0
0

56
49
44
39
45
50
51
334
100

2
3
13
3.58

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
18
17
19
18
15
15
120
35.93

3
3
2
1
2
3
3

1
1

0
0

2
0.6

0
0

17
5.09

2
2
2
2
3
3
14
4.19

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

15.43
13.50
12.12
10.74
12.40
13.77
14.05
92.01

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Martes, 05 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

3
3
2
1
2
3
3

3
2
2
1
2
1
3

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
14
13
9
9
12
14

20
15
12
10
6
12
12

89
27.22

87
26.61

17
15
8
10
10
13
14

16
13
11
8
10
16
17

87
26.05

91
27.25

18
17
17
19
18
15
15
119
36.39

0
0

1
0.31

0
0

17
5.2

14
4.28

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

62 18.96
51 15.60
46 14.07
41 12.54
37 11.31
43 13.15
47 14.37
327 100.00
100

0
0

58 17.37
52 15.57
40 11.98
39 11.68
42 12.57
51 15.27
52 15.57
334 100.00
100

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
17
19
18
18
14
15
119
35.63

5
4
1
1
3
4
4

2
1
0
0

3
0.9

0
0

22
6.59

2
3
1
1
3
2
12
3.59

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Mircoles, 06 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

6
4
1
2
1
3
5

3
3
1

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
14
13
8
8
14
12

19
15
11
10
10
17
16

87
25.51

98
28.74

15
14
8
10
9
13
12

15
14
8
8
14
14
16

81
25.16

89
27.64

19
18
16
19
18
14
14
118
34.6

2
1

0
0

3
0.88

0
0

22
6.45

0
0

65 19.06
54 15.84
44 12.90
39 11.44
39 11.44
51 14.96
49 14.37
341 100.00
100

0
0

54 16.77
52 16.15
37 11.49
39 12.11
45 13.98
47 14.60
48 14.91
322 100.00
100

1
3
2
13
3.81

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

18
18
17
18
17
13
13
114
35.4

5
4
1
2
3
4
4

1
0
0

3
0.93

0
0

23
7.14

1
2
1
1
2
2
3
12
3.73

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO

Tramo:
Cdigo de Estacin:
Estacin:

Urpay - Huaraz
C01
Puente San Jernimo

Ubicacin:
Realizado por:
Fecha:

Huaraz - Huaraz
Jueves, 07 de Julio del 2011.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

5
4
5
2
1
4
4

3
2
2
1
1
3
2

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

22
19
15
12
12
18
14
112
30.03

20
13
12
10
10
16
17
98
26.27

21
18
12
12
11
11
13

15
10
12
8
10
12
14

19
18
17
18
18
16
15
121
32.44

0
0

3
0.8

0
0

25
6.7

14
3.75

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

69 18.50
58 15.55
51 13.67
43 11.53
43 11.53
57 15.28
52 13.94
373 100.00
100

0
0

63 19.09
50 15.15
44 13.33
40 12.12
44 13.33
43 13.03
46 13.94
330 100.00
100

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

98
29.7

81
24.55

19
17
18
17
17
16
15
119
36.06

5
3
1
2
2
2
1

0
0

2
0.61

0
0

16
4.85

3
2
1
1
2
2
3
14
4.24

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

RESUMEN DEL VOLUMEN DE TRAFICO VEHICULAR


10/10/2008

10/11/2008

10/12/2008

10/13/2008

10/14/2008

10/15/2008

10/16/2008

Sub Total por


Sentido

68
55
52
45
51
40
42
40
37
44
54
49
50
53
680

66
58
48
50
45
47
44
41
36
48
46
46
47
45
667

36
29
25
23
22
21
21
17
19
19
20
17
22
18
309

68
56
51
49
51
44
46
39
40
45
54
50
53
51
697

62
58
51
52
46
40
41
39
37
42
43
51
47
52
661

65
54
54
52
44
37
39
39
39
45
51
47
49
48
663

69
63
58
50
51
44
43
40
43
44
57
43
52
46
703

434
373
339
321
310
273
276
255
251
287
325
303
320
313
4380

Total
680
667
309
697
661
663
703

Automovil
191
195
85
196
176
168
210

Pick Up
185
176
35
182
178
187
179

Camin 2E
45
35
23
40
39
45
41

Camin 3E
10
15
10
27
26
25
28

626
100

174
27.88

160
25.62

38
6.12

20
3.22

SENTIDO

HORA
06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E

INDICE MEDIO DIARIO


Da
10/10/2008
10/11/2008
10/12/2008
10/13/2008
10/14/2008
10/15/2008
10/16/2008

IMD
%

Tipo de Trfico
Combi Rural
Bus 2E
239
6
241
5
152
4
247
5
238
4
232
6
240
5
227
36.28

5
0.80

976
80
84
5
34

1464
120
126
7.5
51

prom.
404
330
292
266
269
314
317

Municipalidad Provincial de
Huaraz

"PROYECTO CONSTRUCCIN DEL PUENTE ANTONIO RAYMONDI"

VARIACIN HORARIA
T
%
06 - 08
9.21
08 - 10
7.53
10 - 12
6.66
12 - 14
6.06
14 - 16
6.14
16 - 18
7.17
18 - 20
7.23

VARIACIN HORARIA
Vehculo
%
Automovil 27.88
Pick Up 25.62
Combi Rural 36.28
Bus 2E 0.80
Camion 2E 6.12
Camion 3E 3.22

VARIACIN HORARIA

CLASIFICACIN VEHICULAR

10.00
9.00

40.00

8.00

30.00

6.00

20.00

HORA

VEHCULO

Camion 3E

18 - 20

16 - 18

14 - 16

12 - 14

10 - 12

08 - 10

0.00

Camion 2E

1.00

0.00

Bus 2E

2.00

10.00

Combi Rural

3.00

Pick Up

IMD

4.00

Automovil

5.00

06 - 08

VARIACION(%)

7.00

tasa de Creciemineto vehicular:


Clase de vehculo
Automvil
Cmta. Pick Up
Cmta. Rural
mnibus
Camin
proyeccion vehicular (sin proyecto)
Tipo de vehiculo
Trfico Normal
Automovil
Pick Up
Combi Rural
Bus 2E
Camion 2E
Camion 3E
atraccion de transito

Tasa
Crecemiento
2.2
2.2
2.2
2.2
3.6

IMD Av. CONFRATERNIDAD INT. SUR


2008
626
174
160
227
5
38
20

2009
639
178
164
232
5
40
21

2010
654
182
167
237
5
41
22

2011
668
186
171
242
5
43
22

2012
683
190
175
248
5
44
23

2013
698
194
179
253
6
46
24

2014
713
199
183
259
6
47
25

2015
729
203
187
264
6
49
26

2016
745
208
191
270
6
51
27

2017
761
212
195
276
6
53
28

IMD Av. CONFRATERNIDAD INT. SUR


2010 2011 2012 2013 2014 2015
828
1081
1297
1557
1868
2242
231
301
362
434
521
625
212
277
332
399
479
574
300
392
471
565
678
813
7
9
10
12
15
18
51
66
79
95
114
137
27
35
42
50
60
72

2016
2690
750
689
976
21
165
87

2017
3229
900
827
1171
26
198
104

con proyecto

15% los 2 primeros aos y 20% a partir del 3er ao


Tipo de vehiculo
Trfico Normal
automovil
combi rural
micro
bus 2E
Camion 2E
Camion 3E

2008
626
174
160
227
5
38
20

2009
720
201
184
261
6
44
23

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"

Municipalidad distrital de
Independencia

VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Viernes, 02 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

10
8
10
12
10
10
14
74
78.72

TOTAL
%

2
2
2
2
2
1
2
13
13.83

1
0
0
0
0
1
0
2
2.13

0
0

14 14.89
10 10.64
13 13.83
16 17.02
12 12.77
13 13.83
16 17.02
94 100.00
100

0
0

18 17.65
15 14.71
13 12.75
16 15.69
12 11.76
13 12.75
15 14.71
102 100.00
100

1
2
1
0
0

0
0

0
0

5
5.32

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

13
13
10
12
10
10
13
81
79.41

3
2
2
2
2
1
2
14
13.73

1
1
2

1
2
1.96

1
0
0

0
0

0
0

5
4.9

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Sbado, 03 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

10
11
10
12
10
10
13

2
2

0
0

13 14.44
14 15.56
10 11.11
12 13.33
12 13.33
12 13.33
17 18.89
90 100.00
100

0
0

16 17.58
13 14.29
11 12.09
13 14.29
12 13.19
11 12.09
15 16.48
91 100.00
100

2
1
2

76
84.44

TOTAL

1
1

1
9
10

2
2.22

0
0

0
0

0
0

3
3.33

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

13
12
9
13
10
10
11

78
85.71

9
9.89

1
1

2
2
1
2

1
2
2.2

0
0

0
0

0
0

2
2.2

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
Municipalidad distrital de
Independencia
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Domingo, 04 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

14
13
10
12
10
10
13
82
83.67

TOTAL
%

2
2
1
2
1
1
2
11
11.22

0
0

19 19.39
15 15.31
11 11.22
15 15.31
11 11.22
11 11.22
16 16.33
98 100.00
100

0
0

18 17.82
15 14.85
12 11.88
15 14.85
13 12.87
11 10.89
17 16.83
101 100.00
100

1
4
4.08

0
0

0
0

0
0

1
1.02

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

14
13
11
13
11
10
14
86
85.15

2
2
1
1
2
1
2
11
10.89

1
2
1.98

0
0

0
0

0
0

2
1.98

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
lunes, 05 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

14
14
12
14
10
11
14

2
2
1
1
2
1

89
86.41

9
8.74

2
1.94

14
13
10
14
10
11
15

2
2
1

1
1
2

87
86.14

9
8.91

2
1.98

0
0

18 17.48
16 15.53
13 12.62
16 15.53
13 12.62
12 11.65
15 14.56
103 100.00
100

0
0

17
16
11
15
11
13
18
101
100

1
1
1
0
0

0
0

0
0

3
2.91

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

1
1

1
0
0

0
0

0
0

3
2.97

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

16.50
15.53
10.68
14.56
10.68
12.62
17.48
98.06

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Martes, 06 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

14
13
11
10
13
10
14

2
1
2
1

85
87.63

8
8.25

0
0

16 16.49
14 14.43
14 14.43
12 12.37
13 13.40
11 11.34
17 17.53
97 100.00
100

0
0

18 18.37
16 16.33
11 11.22
15 15.31
11 11.22
12 12.24
15 15.31
98 100.00
100

1
1
1

1
2
2.06

0
0

0
0

0
0

2
2.06

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

14
14
11
14
10
11
14
88
89.8

2
2

1
1
1
1
7
7.14

2
2.04

0
0

0
0

0
0

1
1.02

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Miercoles , 07 de febrero 2006

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

11
12
11
14
11
11
13

2
1

83
85.57

9
9.28

0
0

15 15.46
13 13.40
12 12.37
16 16.49
13 13.40
13 13.40
15 15.46
97 100.00
100

0
0

15 16.67
11 12.22
12 13.33
12 13.33
15 16.67
13 14.44
12 13.33
90 100.00
100

1
2
1
1
2

1
1
2
2.06

0
0

0
0

0
0

3
3.09

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

14
11
11
12
13
11
10

1
1
2

82
91.11

4
4.44

2
2.22

1
1

0
0

0
0

0
0

2
2.22

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO

Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario

Ubicacin
Sentido
Dia

Huaraz - Independencia
Jueves, 08 de Marzo del 2007.

Este - Oeste
CAMIONETAS
AUTO

HORA

PICK UP

Rural
combi

BUS
MICRO

2E

CAMION
3E

2E

3E

SEMI TRAYLER
4E

2S1/2S2

2S3

3S1/3S2

TRAYLER
3S3

2T2

2T3

3T2

3T3

TOTAL %

Diagrama de
vehculos

06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

12
11
10
15
11
11
15

2
2
1
2
1
1
1

1
1

85
85.86

10
10.1

3
3.03

13
13
10
10
11
10
12

2
1
2
1
1
1

8
3

6
5

79
70.54

8
7.14

2
1.79

0
0

16 16.16
14 14.14
11 11.11
17 17.17
12 12.12
12 12.12
17 17.17
99 100.00
100

0
0

24 21.43
17 15.18
12 10.71
18 16.07
17 15.18
11
9.82
13 11.61
112 100.00
100

1
0
0

0
0

0
0

1
1.01

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Oeste - Este
06 -

08 am

08

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

TOTAL
%

0
0

0
0

0
0

1
23
20.54

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Municipalidad distrital de
Independencia

MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"

RESUMEN DEL VOLUMEN DE TRAFICO VEHICULAR


3/2/2007

3/3/2007

3/4/2007

3/5/2007

3/6/2007

3/7/2007

3/8/2007

Sub Total por


Sentido

14
18
10
15
13
13
16
16
12
12
13
13
16
15
196

13
16
14
13
10
11
12
13
12
12
12
11
17
15
181

19
18
15
15
11
12
15
15
11
13
11
11
16
17
199

18
17
16
16
13
11
16
15
13
11
12
13
15
18
204

16
18
14
16
14
11
12
15
13
11
11
12
17
15
195

15
15
13
11
12
12
16
12
13
15
13
13
15
12
187

16
24
14
17
11
12
17
18
12
17
12
11
17
13
211

111
126
96
103
84
82
104
104
86
91
84
84
113
105
1373

automovil
155
154
168
176
173
165
164

Pick Up
27
18
22
18
15
13
18

Camion 2E
10
5
3
6
3
5
24

Camion 3E
0
0
0
0
0
0
0

165
84.12

19
9.54

8
4.08

0
0.00

SENTIDO

HORA
06 -

08 am

08 -

10 am

10 -

12 am

12 -

14 pm

14 -

16 pm

16 -

18 pm

18 -

20 pm

E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E

INDICE MEDIO DIARIO

196
100

4
2.26

Municipalidad distrital de
Independencia

0
0.00

MEJORAMIENTO DE LA AV. GRAN CHAVIN "

VARIACION HORARIA
T
%
06 - 08
8.63
08 - 10
7.25
10 - 12
6.05
12 - 14
7.57
14 - 16
6.45
16 - 18
6.12
18 - 20
7.94

VARIACION HORARIA
vehiculo
%
automovil
84.12
combi rural
9.54
micro
2.26
bus 2E
0.00
Camion 2E
4.08
Camion 3E
0.00

VARIACION HORARIA
Av. GRAN CHAVIN

CLASIFICACION VEHICULAR
Av. GRAN CHAVIN

90.00

9.00

80.00

8.00

70.00

7.00

60.00

6.00

50.00

5.00

40.00
30.00

3.00

20.00

2.00

10.00

1.00

0.00

HORA

18 - 20

16 - 18

14 - 16

12 - 14

10 - 12

08 - 10

0.00

combi rural

4.00

automovil

IMD

10.00

06 - 08

VARIACION(%)

1464
120
126
7.5
51

VEHICULO

Camion 3E

976
80
84
5
34

Camion 2E

IMD

Tipo de Trafico
combi rural
bus 2E
4
0
4
0
6
0
4
0
4
0
4
0
5
0

bus 2E

Total
196
181
199
204
195
187
211

micro

Dia
3/2/2007
3/3/2007
3/4/2007
3/5/2007
3/6/2007
3/7/2007
3/8/2007

prom.
119
100
83
104
89
84
109

tasa de Creciemineto vehicular:


Clase de vehculo
Tasa
Crecemiento .
Automvil
2.2
Cmta. Pick Up
2.2
Cmta. Rural
2.2
mnibus
2.2
Camin
3.6
proyeccion vehicular (sin proyecto)
Tipo de vehiculo
Trfico Normal
automovil
combi rural
micro
bus 2E
Camion 2E
Camion 3E
atraccion de transito

IMD Av. GRAN CHAVIN


2006
196
165
19
4
0
8
0

2007
200
169
19
5
0
8
0

2008
205
172
20
5
0
9
0

2009
209
176
20
5
0
9
0

2010
214
180
20
5
0
9
0

2011
219
184
21
5
0
10
0

2012
224
188
21
5
0
10
0

2013
228
192
22
5
0
10
0

2014
233
196
22
5
0
11
0

2015
239
201
23
5
0
11
0

IMD Av. GRAN CHAVIN


2009
2010 2011
2012
339
407
488
586
285
342
411
493
32
39
47
56
8
9
11
13
0
0
0
0
14
17
20
24
0
0
0
0

2013
703
591
67
16
0
29
0

2014
843
709
80
19
0
34
0

2015
1012
851
97
23
0
41
0

con proyecto

15% los 2 primeros aos y 20% a partir del 3er ao


Tipo de vehiculo
Trfico Normal
automovil
combi rural
micro
bus 2E
Camion 2E
Camion 3E

2006
196
165
19
4
0
8
0

2007
226
190
22
5
0
9
0

2008
259
218
25
6
0
11
0

INDICE MEDIO DIARIO


PROYECTO:

CONSTRUCCIN DE PAVIMENTO Y VEREDAS EN LA AV. CONFRATERNIDAD INTERNACIONAL SUR TRAMO: AV.


ATUSPARIA Y AV. C.I. ESTE

ESTACION:

E1

UBICACIN:

AV Gran Chavin con la interseccion del Jr. Las Margaritas.

SENTIDO:

E-O ---- O-E

FECHA:

02/03/2007 al 08/03/2007

( viernes, sbado, domingo, lunes, martes, miercoles y jueves,)

TRAFICO LIGERO
DIAS
7

AUTOS

PICK UP

BUS 2E

COMBI
RURAL

E-O Y O-E

626

160

TOTAL

626

160

TRAFICO PESADO
CAMIONES

TOTAL

2E

3E

227

38

20

626

227

38

20

626

COV ( $ )
SITUACION

SIN/ PROY

CON/ PROY

SIN/ PROY

CON/ PROY

TIPO

AFIRMADO

PAVIMENTO

SIN
AFIRMAR

AFIRMADO

ESTADO

MALO

BUENO

MALO

BUENO

0.55
0.46
0.87
0.90
1.12
1.55
1.76

0.27
0.28
0.60
0.52
0.78
0.65
0.89

0.43
0.38
0.84
0.81
1.04
1.49
1.71

0.24
0.26
0.5
0.58
0.76
0.63
0.87

AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E

FUENTE DE INFORMACION :MTC-OPP RESULTADO MODELO HDM-III

Tipo de Cambio =

3.2
COV (S/.)

Long. de Tramo (Km)

0.68

SITUACION

SIN/ PROY

CON/ PROY

SIN/ PROY

CON/ PROY

TIPO

AFIRMADO

PAVIMENTO

SIN
AFIRMAR

AFIRMADO

ESTADO

MALO

BUENO

REGULAR

BUENO

1.760
1.472
2.784
2.880
3.584
4.960
5.632

0.864
0.896
1.920
1.664
2.496
2.080
2.848

1.376
1.216
2.688
2.592
3.328
4.768
5.472

0.768
0.832
1.600
1.856
2.432
2.016
2.784

AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E

FUENTE DE INFORMACION :MTC-OPP RESULTADO MODELO HDM-III


TRAMOS

TRAMO 1

TRAMO 2

TOTAL

Long. de Tramo (Km)

0.68

0.68

IMD

*IMD1

*IMD2

626
160
5
227
0
38
20

0
0
0
0
0
0
0

AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E

626
160
5
227
0
38
20

1.38
1.22
2.59
2.69
4.77
5.47

0.77
0.83
1.86

0.43
0.38
0.81

0.24
0.26
0.58

1.6
2.02
2.78

0.84

0.50

1.49

0.63

1.71

0.87

COSTO DE OPERACIN VEHICULAR SIN PROYECTO


TRAFICO NORMAL
TRAMO 1

DIAS =

UNIDADES

COV unitario

365

L1 (Km) =

AUTOS

PICK UP

COMBI RURAL

1.76

1.47

2.78

0.68
OMNIBUS

*IMD1
CAMIONES
2E

3E

2.88

4.96

5.63

BUS 2E

TOTAL

0.00

2,009

1.00

2,010

277,592.19

59,586.16

159,422.98

3,554.32

47,746.33

29,192.79

577,094.78

2.00

2,011

283,239.61

60,676.15

162,858.83

3,554.32

48,970.60

29,192.79

588,492.29

3.00

2,012

289,321.44

62,129.47

166,294.67

3,554.32

50,194.86

29,192.79

600,687.55

4.00

2,013

295,403.27

63,219.46

169,730.51

3,554.32

51,419.13

30,582.93

613,909.61

5.00

2,014

301,485.10

64,672.78

173,166.35

4,265.18

51,419.13

30,582.93

625,591.46

6.00

2,015

308,001.35

66,126.10

176,602.19

4,265.18

52,643.39

31,973.06

639,611.27

7.00

2,016

314,517.60

67,216.09

180,725.19

4,265.18

53,867.66

31,973.06

652,564.78

8.00

2,017

321,033.85

68,669.41

184,161.03

4,265.18

55,091.92

33,363.19

666,584.59

9.00

2,018

327,550.10

70,122.73

188,284.04

4,265.18

56,316.19

33,363.19

679,901.43

10.00

2,019

334,500.76

71,576.05

191,719.88

4,265.18

57,540.45

34,753.33

694,355.66

COSTO DE OPERACIN VEHICULAR CON PROYECTO


TRAFICO TOTAL
TRAMO 1

DIAS =
UNIDADES

COV unitario

365

AUTOS
0.864

L1 (Km) =

PICK UP
0.896

0.68
OMNIBUS
COMBI RURAL
BUS 2E
1.920

1.664

*IMD1
CAMIONES
2E

TOTAL

3E
2.080

2.848

2,009

2,010

136,272.53

36,269.83

109,946.89

2,053.61

20,022.65

14,762.27

319,327.78

2,011

139,044.90

36,933.31

112,316.43

2,053.61

20,536.06

14,762.27

325,646.56

2,012

142,030.52

37,817.94

114,685.98

2,053.61

21,049.46

14,762.27

332,399.77

2,013

145,016.15

38,481.41

117,055.52

2,053.61

21,562.86

15,465.23

339,634.78

2,014

148,001.78

39,366.04

119,425.07

2,464.33

21,562.86

15,465.23

346,285.30

2,015

151,200.66

40,250.67

121,794.61

2,464.33

22,076.26

16,168.20

353,954.73

2,016

154,399.55

40,914.14

124,638.06

2,464.33

22,589.66

16,168.20

361,173.94

2,017

157,598.44

41,798.77

127,007.61

2,464.33

23,103.06

16,871.16

368,843.37

2,018

160,797.32

42,683.40

129,851.06

2,464.33

23,616.46

16,871.16

376,283.74

10

2,019

164,209.47

43,568.03

132,220.61

2,464.33

24,129.87

17,574.13

384,166.43

PRECIOS PRIVADOS
COV- SIN PROYECTO

PRECIOS SOCIALES - Fc= 0.74


COV- SIN PROYECTO

AO

COSTO DE
OPERACIN
VEHICULAR SIN
PROYECTO

AO

COSTO DE
OPERACIN
VEHICULAR SIN
PROYECTO

0
1
2
3
4
5
6
7
8
9
10

2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019

577,094.78
588,492.29
600,687.55
613,909.61
625,591.46
639,611.27
652,564.78
666,584.59
679,901.43
694,355.66

0
1
2
3
4
5
6
7
8
9
10

2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019

427,050.13
435,484.29
444,508.78
454,293.11
462,937.68
473,312.34
482,897.94
493,272.60
503,127.06
513,823.19

PRECIOS PRIVADOS
COV- CON PROYECTO

PRECIOS SOCIALES - Fc= 0.74


COV- CON PROYECTO

AO

COSTO DE
OPERACIN
VEHICULAR CON
PROYECTO

AO

COSTO DE
OPERACIN
VEHICULAR CON
PROYECTO

0
1
2
3
4
5
6
7
8
9
10

2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019

319,327.78
325,646.56
332,399.77
339,634.78
346,285.30
353,954.73
361,173.94
368,843.37
376,283.74
384,166.43

0
1
2
3
4
5
6
7
8
9
10

2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019

236,302.56
240,978.46
245,975.83
251,329.74
256,251.12
261,926.50
267,268.72
272,944.09
278,449.97
284,283.16

COSTOS PROYECTO ALTERNATIVO 01 - PRECIOS PRIVADOS

COSTOS PROYECTO ALTERNATIVO 01 - PRECIOS SOCIALES

COSTOS CON PROYECTO

COSTOS CON PROYECTO

MANTENIMIENTO

COSTOS SIN
PROYECTO

2,808,429.25

2,008

2,009

9,160.11

41,824.72

(32,664.61)

2,009

6,870.08

31,368.54

(24,498.45)

2,010

9,160.11

41,824.72

(32,664.61)

2,010

6,870.08

31,368.54

(24,498.45)

2,011

9,160.11

41,824.72

(32,664.61)

2,011

6,870.08

31,368.54

(24,498.45)

2,012

9,160.11

41,824.72

(32,664.61)

2,012

6,870.08

31,368.54

(24,498.45)

2,013

5,672.44

41,824.72

(36,152.28)

2,013

4,254.33

31,368.54

(27,114.21)

2,014

9,160.11

41,824.72

(32,664.61)

2,014

6,870.08

31,368.54

(24,498.45)

2,015

9,160.11

41,824.72

(32,664.61)

2,015

6,870.08

31,368.54

(24,498.45)

2,016

9,160.11

41,824.72

(32,664.61)

2,016

6,870.08

31,368.54

(24,498.45)

2,017

9,160.11

41,824.72

(32,664.61)

2,017

6,870.08

31,368.54

(24,498.45)

2,018

5,672.44

41,824.72

(36,152.28)

2,018

4,254.33

31,368.54

(27,114.21)

AO
2,008

INVERSION
2,808,429.25

COSTOS
INCREMENTALES

AO

COSTOS PROYECTO ALTERNATIVO 02- PRECIOS PRIVADOS


COSTOS CON PROYECTO
AO
2008

INVERSION

OPERACIN Y
MANTENIMIENTO

COSTOS SIN
PROYECTO

3,233,512.56

INVERSION

OPERACIN Y
MANTENIMIENTO

COSTOS SIN
PROYECTO

2,336,707.68

COSTOS
INCREMENTALES
2,336,707.68

COSTOS PROYECTO ALTERNATIVO 02- PRECIOS SOCIALES


COSTOS CON PROYECTO

COSTOS
INCREMENTALES

AO

INVERSION

OPERACIN Y
MANTENIMIENTO

COSTOS SIN
PROYECTO

2,697,121.45

COSTOS
INCREMENTALES

3,233,512.56

2008

2009

9,160.11

41,824.72

(32,664.61)

2009

6,870.08

31,368.54

2,697,121.45
(24,498.45)

2010

9,160.11

41,824.72

(32,664.61)

2010

6,870.08

31,368.54

(24,498.45)

2011

8,950.00

41,824.72

(32,874.72)

2011

6,712.50

31,368.54

(24,656.04)

2012

9,160.11

41,824.72

(32,664.61)

2012

6,870.08

31,368.54

(24,498.45)

2013

72,958.02

41,824.72

31,133.30

2013

54,718.52

31,368.54

23,349.98

2014

9,160.11

41,824.72

(32,664.61)

2014

6,870.08

31,368.54

(24,498.45)

2015

9,160.11

41,824.72

(32,664.61)

2015

6,870.08

31,368.54

(24,498.45)

2016

8,950.00

41,824.72

(32,874.72)

2016

6,712.50

31,368.54

(24,656.04)

2017

9,160.11

41,824.72

(32,664.61)

2017

6,870.08

31,368.54

(24,498.45)

2018

72,958.02

41,824.72

31,133.30

2018

54,718.52

31,368.54

23,349.98

PRECIOS PRIVADOS

PRECIOS SOCIALES

BENEFICIOS POR COSTO DE OPERACIN VEHICULAR

BENEFICIOS POR COSTO DE OPERACIN VEHICULAR

COV SIN PROYECTO

COV CON PROYECTO

BENEFICIOS
INCREMENTALES

COV SIN PROYECTO

COV CON PROYECTO

BENEFICIOS
INCREMENTALES

2009

577,094.78

319,327.78

257,767.00

2010

588,492.29

325,646.56

262,845.72

2009

427,050.13

236,302.56

190,747.58

2010

435,484.29

240,978.46

2011

600,687.55

332,399.77

194,505.84

268,287.78

2011

444,508.78

245,975.83

2012

613,909.61

198,532.96

339,634.78

274,274.83

2012

454,293.11

251,329.74

2013

202,963.37

625,591.46

346,285.30

279,306.16

2013

462,937.68

256,251.12

206,686.56

2014

639,611.27

353,954.73

285,656.54

2014

473,312.34

261,926.50

211,385.84

2015

652,564.78

361,173.94

291,390.84

2015

482,897.94

267,268.72

215,629.22

2016

666,584.59

368,843.37

297,741.22

2016

493,272.60

272,944.09

220,328.50

2017

679,901.43

376,283.74

303,617.69

2017

503,127.06

278,449.97

224,677.09

2018

694,355.66

384,166.43

310,189.23

2018

513,823.19

284,283.16

229,540.03

AO
2008

AO
2008

EVALUACION ECONOMICA ALTERANTIVA N01 - PRECIOS PRIVADOS

Costos + y Beneficios ###

Ao
0
1
2
3
4
5
6
7
8
9
10

2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018

Costos
Incrementales
2,808,429.25
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)

T.D. = 11%

Costos
Incrementales

2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018

FLUJO NETO
(2,808,429.25)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
346,341.51

VAN = -974,402.26
TIR = 2.17%
B/C = 0.63
2,612,761.74

Ao

Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23

2,808,429.25
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)

T.D. = 11%

1,638,359.48

Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23

2260237.2
-35000
-35000
-35000
-35000
-9000
-35000
-35000
-35000
-35000
(9,000.00)
S/. 1,834,026.99
###
###

2,078,700.61

FLUJO NETO
(2,808,429.25)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
346,341.51

1,217,050.80
(35,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(9,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(9,000.00)

VAN = -974,402.26
TIR = 2.17%
B/C = 0.63
2,612,761.74

1,638,359.48

1,035,514.21

EVALUACION ECONOMICA ALTERANTIVA N01 - PRECIOS SOCIALES

Costos + y Beneficios ###

Ao
0
1
2

2,008
2,009
2,010

Costos
Incrementales
2,336,707.68
(24,498.45)
(24,498.45)

Beneficios
Incrementales

190,747.58
194,505.84

FLUJO NETO
(2,336,707.68)
215,246.03
219,004.29

1785586.4
-33375
-33375

3
4
5
6
7
8
9

2,011
2,012
2,013
2,014
2,015
2,016
2,017

(24,498.45)
(24,498.45)
(27,114.21)
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)

10

2,018

(27,114.21)

T.D. 11%

Costos
Incrementales

2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

-33375
-33375
-6750
-33375
-33375
-33375
-33375

256,654.24

(6,750.00)

VAN -977,571.04
TIR 0.06%
B/C 0.55
2,189,957.05

Ao

198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03

2,336,707.68
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)
(27,114.21)
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)
(27,114.21)

T.D. 11%

1,212,386.01

Beneficios
Incrementales
190,747.58
194,505.84
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03

###
###

1,614,210.83

FLUJO NETO
(2,336,707.68)
215,246.03
219,004.29
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
256,654.24

961469.6
-33375
-33375
-33375
-33375
-6750
-33375
-33375
-33375
-33375
-6750

VAN -977,571.04
TIR 0.06%
B/C 0.55
2,189,957.05

1,212,386.01

790,094.03

Costos + y Beneficios -Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

10.00%

20.00%

30.00%

40.00%

50.00%

0
618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81

(3,089,272.18)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(3,370,115.10)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(3,650,958.03)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(3,931,800.95)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(4,212,643.88)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

769,948.82

346,341.51

346,341.51

346,341.51

346,341.51

346,341.51

(1,255,245.19)
0.43%
2.03

(1,536,088.11)
-1.10%
1.85

(1,816,931.04)
-2.45%
1.94

(2,097,773.96)
-3.67%

(2,378,616.89)
-4.77%

4,033,718.28
Inversion -

618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81
769,948.82

Inversion -

Inversion -

10.00%

20.00%

30.00%

(2,527,586.33)

(2,246,743.40)

(1,965,900.48)

290,431.61

290,431.61

290,431.61

295,510.33

295,510.33

295,510.33

300,952.39

300,952.39

300,952.39

306,939.44

306,939.44

306,939.44

315,458.44

315,458.44

315,458.44

318,321.15

318,321.15

318,321.15

324,055.45

324,055.45

324,055.45

330,405.83

330,405.83

330,405.83

336,282.30

336,282.30

336,282.30

346,341.51

346,341.51

346,341.51

(693,559.34)

(412,716.41)

(131,873.49)

4.18%

6.56%

9.43%

2.53

2.89

3.90

4,033,718.28

Costos + y Beneficios -Inversion +

457674.90
481077.88

Inversion +

Inversion +

Inversion +

Inversion +

10.00%

20.00%

30.00%

40.00%

50.00%

(2,570,378.45)
215,246.03
219,004.29

(2,804,049.22)
215,246.03
219,004.29

(3,037,719.99)
215,246.03
219,004.29

(3,271,390.76)
215,246.03
219,004.29

(3,505,061.53)
215,246.03
219,004.29

488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

569762.12

256,654.24

256,654.24

256,654.24

256,654.24

256,654.24

(1,211,241.80)
-1.59%
1.94

(1,444,912.57)
-3.04%
1.76

(1,678,583.34)
-4.34%
1.85

(1,912,254.11)
-5.50%

(2,145,924.88)
-6.55%

2,984,951.53

Inversion -

Inversion -

Inversion -

10.00%

20.00%

30.00%

(2,103,036.92)

(1,869,366.15)

(1,635,695.38)

457674.90

215,246.03

215,246.03

215,246.03

481077.88

219,004.29

219,004.29

219,004.29

488922.50

223,031.41

223,031.41

223,031.41

497378.24

227,461.83

227,461.83

227,461.83

511719.51
522590.52
538236.06
544943.83
556608.62

233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

569762.12

256,654.24

256,654.24

256,654.24

(743,900.27)
1.97%
2.43

(510,229.50)
4.22%
2.78

(276,558.73)
6.93%
3.78

2,984,951.53

Inversion +

Inversion +

Inversion +

60.00%

85.00%

89.21%

(4,493,486.80)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(5,195,594.12)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

(5,313,716.65)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30

346,341.51

346,341.51

346,341.51

(2,659,459.81)
-5.77%

(3,361,567.13)
-7.94%

(3,479,689.66)
-8.26%

Inversion +

Inversion +

Inversion +

60.00%

85.00%

89.21%

(3,738,732.29)
215,246.03
219,004.29

(4,322,909.21)
215,246.03
219,004.29

(4,421,191.14)
215,246.03
219,004.29

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55

256,654.24

256,654.24

256,654.24

(2,379,595.65)
-7.51%

(2,963,772.57)
-9.59%

(3,062,054.49)
-9.90%

EVALUACION ECONOMICA ALTERANTIVA N02 - PRECIOS PRIVADOS


Ao
0
1
2
3
4
5
6
7
8
9
10

2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015

Costos
Incrementales
3,233,512.56
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30

T.D. 11%

Ao
2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015

Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23

FLUJO NETO
(3,233,512.56)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93

2710886.1
-25000
-25000
-25000
-25000
6000
-25000
-25000
-25000
-25000
6000

0
618479.60
650105.24
660706.09
672132.76
691512.85
706203.41
727346.03
736410.58
752173.81
769948.82

VAN= -1,462,868.42
TIR= -1.15%
B/C= 0.53
3,101,227.90

1,638,359.48

Costos
Incrementales
3,233,512.56
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30

Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23

T.D. 11%

FLUJO NETO
(3,233,512.56)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93

2,592,970.01

4,033,718.28

1,459,707.90
(25,000.00)
(25,000.00)
(25,000.00)
(25,000.00)
6,000.00
(25,000.00)
(25,000.00)
(25,000.00)
(25,000.00)
6,000.00

618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81
769,948.82

1,341,791.81

4,033,718.28

VAN= -1,462,868.42
TIR= -1.15%
B/C= 0.53
3,101,227.90

1,638,359.48

EVALUACION ECONOMICA ALTERANTIVA N02 - PRECIOS SOCIALES


Ao

0
1
2

2,005
2,006
2,007

Costos
Incrementales
2,697,121.45
(24,498.45)
(24,498.45)

Beneficios
Incrementales
190,747.58
194,505.84

FLUJO NETO
(2,697,121.45)
215,246.03
219,004.29

2141600.50
-25875.00
-25875.00

0
457674.90
481077.88

3
4
5
6
7
8
9
10

2,008
2,009
2,010
2,011
2,012
2,013
2,014

(24,656.04)
(24,498.45)
23,349.98
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)

198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

2,015

23,349.98

229,540.03

206,190.05

T.D. 11%

Ao
2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015

-25875.00
-25875.00
4500.00
-25875.00
-25875.00
-25875.00
-25875.00
4500.00

488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62
569762.12

VAN= -1,385,521.94
TIR= -3.17%
B/C= 0.47

2,597,907.95

1,212,386.01

Costos
Incrementales
2,697,121.45
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)
23,349.98
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)
23,349.98

Beneficios
Incrementales
190,747.58
194,505.84
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03

T.D. 11%

2,017,940.31

2,984,951.53

FLUJO NETO
(2,697,121.45)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05

1153169.50
-25875.00
-25875.00
-25875.00
-25875.00
4500.00
-25875.00
-25875.00
-25875.00
-25875.00

0.00
457674.90
481077.88
488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62

4500.00

569762.12

VAN= -1,385,521.94
TIR= -3.17%
B/C= 0.47
2,597,907.95

1,212,386.01

1,029,509.31

2,984,951.53

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

85.00%

(3,556,863.81)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(3,880,215.07)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(4,203,566.33)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(4,526,917.58)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(4,850,268.84)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(5,173,620.09)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

(5,981,998.23)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30

279,055.93

279,055.93

279,055.93

279,055.93

279,055.93

279,055.93

279,055.93

(1,786,219.67)
-2.78%
1.63

(2,109,570.93)
-4.21%
1.48

(2,432,922.19)
-5.48%
1.56

(2,756,273.44)
-6.63%

(3,079,624.70)
-7.67%

(3,402,975.95)
-8.61%

(4,211,354.09)
-10.67%

Inversion -

Inversion -

Inversion -

10.00%

20.00%

30.00%

(2,910,161.30)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93

(2,586,810.05)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93

(2,263,458.79)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93

(1,139,517.16)
0.73%
2.01

(816,165.91)
2.94%
2.28

(492,814.65)
5.60%
3.01

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

Inversion +

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

85.00%

(2,966,833.59)
215,246.03
219,004.29

(3,236,545.74)
215,246.03
219,004.29

(3,506,257.88)
215,246.03
219,004.29

(3,775,970.02)
215,246.03
219,004.29

(4,045,682.17)
215,246.03
219,004.29

(4,315,394.31)
215,246.03
219,004.29

(4,989,674.68)
215,246.03
219,004.29

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

206,190.05

206,190.05

206,190.05

206,190.05

206,190.05

206,190.05

206,190.05

(1,655,234.08)
-4.72%
1.55

(1,924,946.23)
-6.09%
1.41

(2,194,658.37)
-7.30%
1.48

(2,464,370.52)
-8.40%

(2,734,082.66)
-9.40%

(3,003,794.80)
-10.30%

(3,678,075.17)
-12.28%

Inversion -

Inversion -

Inversion -

10.00%

20.00%

30.00%

(2,427,409.30)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

(2,157,697.16)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

(1,887,985.01)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55

206,190.05

206,190.05

206,190.05

(1,115,809.79)
-1.38%
1.92

(846,097.65)
0.71%
2.18

(576,385.50)
3.23%
2.90

Inversion +
110.00%

(6,790,376.37)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
(5,019,732.23)
-12.38%

Inversion +
110.00%

(5,663,955.04)
215,246.03
219,004.29

223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05
(4,352,355.53)
-13.93%

ESCENARIOS ANTE EL INCREMENTO O DISMINUCION DE LA INVERSION A PRECIOS P

ESCENARIOS A LA
VARIAC.EN LOS
COSTOS

+30%
+20%
+10%
0
-10%
-20%
-30%

PRECIOS PRIVADOS
ALTENATIVA N01

ALTENATIVA N02

VAN

TIR

B/C

VAN

-1,816,931
-1,536,088
-1,255,245
-974,402
-693,559
-412,716
-131,873

-2.45%
-1.10%
0.43%
2.17%
4.18%
6.56%
9.43%

1.94
1.85
2.03
0.63
2.53
2.89
3.90

-2,432,922
-2,109,571
-1,786,220
-1,462,868
-1,139,517
-816,166
-492,815

ESCENARIOS ANTE EL INCREMENTO O DISMINUCION DE LA INVERSION A PRECIOS S


ESCENARIOS A LA
VARIAC.EN LOS
COSTOS

+30%
+20%
+10%
0
-10%
-20%
-30%

PRECIOS SOCIALES
ALTENATIVA N01

ALTENATIVA N02

VAN

TIR

B/C

VAN

-1,678,583
-1,444,913
-1,211,242
-977,571
-743,900
-510,229
-276,559

-4.34%
-3.04%
-1.59%
0.06%
1.97%
4.22%
6.93%

1.85
1.76
1.94
0.55
2.43
2.78
3.78

-2,194,658
-1,924,946
-1,655,234
-1,385,522
-1,115,810
-846,098
-576,386

DESCRIPCION
Monto de Inversion- Precios Sociales
Valor Actual Neto (VAN)
Tasa Interna de Retorno (TIR)

PROYECTO
ALTERNATIVO 01
2,336,707.68
-977,571.04
0.06%

DE LA INVERSION A PRECIOS PRIVADOS

RIVADOS
ALTENATIVA N02

TIR

B/C

-5.48%
-4.21%
-2.78%
-1.15%
0.73%
2.94%
5.60%

1.56
1.48
1.63
0.53
2.01
2.28
3.01

DE LA INVERSION A PRECIOS SOCIALES

OCIALES
ALTENATIVA N02

TIR

B/C

-7.30%
-6.09%
-4.72%
-3.17%
-1.38%
0.71%
3.23%

1.48
1.41
1.55
0.47
1.92
2.18
2.90

PROYECTO
ALTERNATIVO 01

PROYECTO
ALTERNATIVO 02

2,336,707.68
-977,571.04
0.06%

2,697,121.45
-1,385,522
-3.17%

VARIACION DE COSTOS DEL PROYECTO ALTERNATIVO N01 FRENTE AL PROYECTO


PRECIOS SOCIALES
0.00%

Inversion +
10.00%

Inversion +
20.00%

VAN

(977,571.04)

(1,211,241.80)

(1,444,912.57)

TIR

0.06%

-1.59%

-3.04%

VAN

(1,385,521.94)

(1,385,521.94)

(1,385,521.94)

TIR

-3.17%

-3.17%

-3.17%

ALTERNATIVASINDICES

Proyecto
Alternativo 02

ANALISIS DE SENSIBILIDAD
(500,000)
(1,000,000)

VAN (S/.)

Proyecto
Alternativo 01

(1,500,000)

f(x) = -2336707.68x - 977571.04


f(x) = -1385521.94

(2,000,000)
(2,500,000)
(3,000,000)

(3,500,000)
Proyecto
Alternativo 01
0%

Linear Regression for


10%
20%
30%01
Proyecto
Alternativo

Proyecto Alternativo 02
40%
50%
60%

Linear Re
70%
Proyecto8

% Variacin Costo Proyecto Alternativo 01

IVO N01 FRENTE AL PROYECTO ALTERNATIVO N02


Inversion +
30.00%

Inversion +
Inversion + Inversion + Inversion + Inversion +
40.00%
50.00%
60.00%
85.00%
89.21%

(1,678,583.34)

(1,912,254.11) (2,145,924.88) (2,379,595.65) (2,963,772.57) (3,062,054.49)

-4.34%
(1,385,521.94)

-5.50%

-6.55%

-3.17%

-3.17%

DE SENSIBILIDAD

571.04

Proyecto Alternativo 02
40%
50%
60%

-9.59%

-9.90%

(1,385,521.94) (1,385,521.94) (1,385,521.94) (1,385,521.94) (1,385,521.94)

-3.17%

or
0%
o 01

-7.51%

Linear Regression for


70%
90%02
Proyecto80%
Alternativo

Costo Proyecto Alternativo 01

100%

-3.17%

-3.17%

-3.17%

UBICACIN

TRAMO

LONGUITUD DEL
TRAMO ( KM.)

Situacion
Actual

Grado de
Adec.

Recom.

INICIO

FINAL

TRAMO 1

Panamericana
Norte(km.310)

C.P.
Ampanu

10.00

Mejoramiento de la
via a nivel de
Terreno Natural Inadecuada
afirmado
compactado

TRAMO 2

C.P. Ampanu

El Molino

5.00

Terreno Natural Inadecuada

15.00

KM

TOTAL

Mejoramiento de la
via a nivel de
afirmado
compactado

OFERTA EN LA SITUACION SIN PROYECTO


TRAMO

UBICACIN

LONG. DEL
TRAMO ( KM.)

SUPERFICIE

C.P.
Ampanu

10.00

Terreno Natural

4- 6 mts

Malo

El Molino

5.00

Terreno Natural

4- 6 mts

Malo

INICIO

FINAL

TRAMO 1

Panamericana
Norte(km.310)

TRAMO 2

C.P. Ampanu

TOTAL

15.00

Ancho de
Estado
Via

KM

OFERTA EN LA SITUACION CON PROYECTO


TRAMO

UBICACIN

LONG. DEL
TRAMO ( KM.)

SUPERFICIE

C.P.
Ampanu

10.00

Afirmado
Compactado

Bueno

El Molino

5.00

Afirmado
Compactado

Bueno

INICIO

FINAL

TRAMO 1

Panamericana
Norte(km.310)

TRAMO 2

C.P. Ampanu
TOTAL

15.00

KM

Ancho de
Estado
Via

CRONOGRAMA DE ACTIVIDADES
Fase de
Inversion

Fase de Pre Inversion


Etapas

PERFIL

Meses

*
Ao 0
Elabora
cion de
Exp.
Tecnico
.
*
Ejecuci
on del
Proyect
o

Post Inversion

Ao 1 - 10
* Operacin
y
Mantenimien
to

CRONOGRAMA DE ACTIVIDADES
AO - 0
COMPONENTES
Mejoramiento de 2 km.
Tratamiento Superficial
Bicapa, corte y relleno
Mejoramiento de 10 km.
Tratamiento Supeficial
Bicapa,limpieza de
carpeta
Mejoramiento de 11 km.
Recapeo

MES 1 MES 2
X

MES 3
X

A DE ACTIVIDADES
AO - 0
MES 4 MES 5 MES 6

MES 7

CRONOGRAMA DE ACTIVIDADES
AO 0
ETAPAS

MESES
1-3

MESES
4-6

MESES
7-9

MESES
10-12

Operacin y
Mantenimiento de
Infrestructura

CRONOGRAMA DE ACTIVIDADES
AO 0
ETAPAS

MESES
1-3

MESES
4-6

Elab. De Perfil
Expediente Tecnico

X
X

Ejecucion de la Obra

MESES
7-9

MESES
10-12

Operacin y
Mantenimiento de
Infrestructura

DE ACTIVIDADES
AO 1 - 10
MESES
1-3

MESES
4-6

MESES
7-9

MESES
10-12

DE ACTIVIDADES
AO 1 - 10
MESES
1-3

MESES
4-6

MESES
7-9

MESES
10-12

POBLACION DEMANDANTE Y POBLACION DE REFERENCIA


Tasa de crecimiento
1.30% Ao 2,005
Ao 2,005
Pob. Referencia = 28,123
Ao 2,005
Pob. Demandante = 2,165
2,005

2,006

2,007

2,008

2,009

2,010

2,011

2,012

Pob. Referencia

28,123

28,489

28,859

29,234

29,614

29,999

30,389

30,784

Pob. Demandante

2,165

2,193

2,222

2,251

2,280

2,309

2,339

2,370

2,009
4
29,614

2,010
5
29,999

2,011
6
30,389

2,012
7
30,784

2,010
5
29,999
2,309

2,011
6
30,389
2,339

2,012
7
30,784
2,370

DETALLE

Tasa de crecimiento

1.30% Ao 2,005
Ao 2,005
= 28,123
Ao 2,005
Pob. Demandante = 2,165
Pob. Referencia

DETALLE
Pob. Referencia

2,005
0
28,123

2,006
1
28,489

2,007
2
28,859

2,008
3
29,234

POBLACION DEMANDANTE Y POBLACION DE REFERENCIA


Tasa de crecimiento
7.50% Ao 2,005
Ao 2,005
Pob. Referencia = 28,123
Ao 2,005
Pob. Demandante = 2,165

DETALLE
Pob. Referencia
Pob. Demandante

2,005
0
28,123
2,165

2,006
1
28,489
2,193

2,007
2
28,859
2,222

2,008
3
29,234
2,251

2,009
4
29,614
2,280

-9

2,013

2,014

2,015

10

31,184

31,590

32,000

2,401

2,432

2,463

2,013
8
31,184

2,014
9
31,590

2,015
10
32,000

0.08

2,013
8
31,184
2,401

2,014
9
31,590
2,432

2,015
10
32,000
2,463

MARCO LGICO
Estrategia de
Inversion

FIN

PROPOSITO

COMPONENTES

ACCIONES

Resumen de Objetivos

Desarrollo Socio Economico


del Distrito de Culebras

Indicadores Verificables

Medios

Supuestos /

Objetivamente ( IVO )

Verificacin ( MV )

Riesgos

1).- Mayor Ingreso Percapita.10%en 1 ao 1).- Encuesta sobre ingreso familiar 1).- Incremento del Salario Real
2).- Aumento del volumen de ventas en los 2).- Registros de Volumen de
2).-Se promocionan mercados
productos agricolas en20%
Comercio
3).- Aumento 10% Anual del flujo turistico en
3).- Se desarrolla economia de
3).- Registro de Turistas en la zona
la zona
soporte turistico

Eficiente Nivel de
Transitabilidad vehicular en
la carretera de acceos al Reduccion en 20% del tiempo de transporte Encuestas anuales realizados a
caserio el Molino desde el Publico y de carga en el primer ao
transportistas y publicos
cruce Panamericana Norte
Km 310

Se desarrolla en mantenimiento
rutinario y periodico

1).- Carretera Vecinal en


buen estado

Reduccion de los costos de transporte de


pasajeros y de carga en un 5%

Encuestas anuales realizados al


publico

Los Transportistas mejoran la


calidad del Servicio

2).- Superficie de rodadura


mejorada

Reduccion de los costos de transporte de


pasajeros y de carga en un 5%

Encuestas anuales realizados al


publico

Los Transportistas mejoran la


calidad del Servicio

3).- Presencia de Obras de


Arte y Drenaje

Reducccion en 5% de accidentes de transito 1).- Registro de Accidentes en las


vehicular
Unidades Policiales

3).- Mejoramiento de 15 Km. Costo de Expediente Tecnico:S/. 32,554


con material de cantera a
Costo Total de la Inversion S/.1'171,938.00 Factura por los servicios de
nivel de afirmado
Costo de Afirmado Afirmado Compactado
compactado
Compactado
S/. 841,924

2).- Presencia de Obras de


Arte y Drenaje

Costo de Obras de Arte y Drenaje


S/.243,204

Los Gobiernos Regulan las normas


de seguridad vial

4).- Financiamiento apropiado y


oportuno

Factura por los servicios de Obra de 3).- Financiamiento apropiado y


Arte y Drenaje
oportuno

MATRIZ DE MARCO LGICO DEL PROYECTO ALTERNATIVO SELECCIONADO


RESUMEN DE OBJETIVO
1.OBJETIVO DE DESARROLLO

INDICADORES
El costo de operacin de los Transportistas
se reduce en 35% respecto al ao 2008,
en el primer ao de operacin del proyecto

FIN

El ndice de desarrollo Urbano de la Av.


C.I. Sur aumenta faborablemente de la
siguiente forma:

Mejora en el desarrollo
socioeconmico en la Av.
Confraternidad Internacional
Sur

- 27% respecto al ao 2008 en el 2 ao


de operacin del proyecto
- 35% en el 3 ao de operacin del
proyecto
-

60% a partir del 5 ao

- Y un aumento constante de 7% a partir


del 6

PROPOSITO

2.OBJETIVO INMEDIATO
Generacin de una oferta vial peatonal en
adecuadas condiciones operativas
Adecuadas condiciones para el
transito vehicular en la Av.Av.
Confraternidad Internacional
Sur"

Incremento del Flujo vehicular en un 32%

3.RESULTADOS

Estado de la superficie de 11631.33 m2 de Pavimento Rgido


rodadura
en
buenas en
la
Av.
Confraternidad
condiciones
Internacional Sur.

COMPONENTES

Adecuada utilizacin
las reas verdes

de Mejoramiento de las reas verdes


en 21.60 m2. de la Av. C.I. Este

Adecuado
Sistema
de Cambio
total
del
sist.
De
Drenaje
alcantarillado
Adecuado infraestructura 2582.98 m2 de veredas en la Av.
para el trnsito peatonal. Confraternidad Internacional Sur.
Oportunos programas de Sealizacin
mantenimiento vial.
peridico

mantenimiento

4.ACTIVIDADES
INSUMOS
COSTOS

Insumos y logstica necesaria para


llevar las acciones

ACCIONES

Pavimentado con carpeta


de Concreto fc=210
La Municipalidad Provincial de
2
Kg/cm
Huaraz
participando
en
la
gestionamiento del financiamiento

Pisos
y pavimento con La junta vecinal organizada para
Concreto Fc.=175 Kg./cm2 realizar la gestin de la obra y
y emboquillado de piedra posteriormente en la sostenibilidad
con mezcla de concreto de la obra ejecutada
Fc.=175 Kg./cm2
Cambio de Redes de Agua
y Desage
Mejoramiento de las reas
verdes y seales de Trnsito

ONADO
MEDIOS DE VERIFICACIN SUPUESTOS

Encuesta a los transportistas

Informe de Evaluacin de
encuesta anual a los
moradores de la Av.
Confraternidad Internacional
Este y calles aledaas

Conteo del trafico vehicular


semestral

Evaluacin del Impacto


(expost del proyecto)

Las familias de la Av.


Confraternidad I. Sur,
apoyan en la concrecin
de la obra y su futura
sostenibilidad.

La
actitud
de
la
poblacin afectada es
positiva y hacen mejor
uso de la va
La va se mantiene
Operativa

Informes de supervisin
de obras
Informes de liquidacin
de obras

La construccin de
la
va
ser
de
Fotografas
acuerdo
a
las
consideraciones y a
plazos
Evaluacin del Impacto los
establecidos
en
el
(expost del proyecto)
expediente tcnico

Es posible contratar
Supervisin
de
obras al
personal
civiles por un monto de requerido para la
S/.130, 019.87
ejecucin de la obra
La
obra
de
Obras Civiles con un
pavimentacin es
costo
de:
S/.
supervisada
1'896,040.83 a Precios
adecuadamente
y
Privados
finaliza en funcin al
cronograma previsto
Mitigacin Ambiental con
un costo de S/.4 140.00 Existe disponibilidad
de
materiales
e
insumos requeridos
para la obra
Liquidacin de Obra con
un costo de S/.15,000.00

También podría gustarte