Documentos de Académico
Documentos de Profesional
Documentos de Cultura
IMD
IMD
(A PRECIOS DE MERCADO)
DESCRIPCION
UNIDAD
METRADO
COSTO
UNITARIO
COSTO TOTAL
(S/.)
Mantenimiento Anual
Limpieza General
M2
20,207.52
0.30
6,062.26
Mantenimiento de parques
Glb
1.00
1,500.00
1,500.00
Limpieza de alcantarillas
Und.
5.00
150.00
750.00
8,312.26
831.23
Imprevistos (2%)
16.62
TOTAL COSTO DE MANTENIEMIENTO ANUAL
9,160.11
Glb
1.00
1,050.00
1,050.00
ml
2,926.72
1.40
4,097.41
5,147.41
514.74
Imprevistos (2%)
10.29
TOTAL COSTO DE MANTENIEMIENTO CADA TRES AOS
5,672.44
UNIDAD
METRADO
COSTO
UNITARIO
COSTO TOTAL
(S/.)
Mantenimiento Anual
Limpieza General
m2
20,207.52
0.30
6,062.26
Mantenimiento de parques
Glb
1.00
1,500.00
1,500.00
Limpieza de alcantarillas
Und.
5.00
150.00
750.00
8,312.26
831.23
Imprevistos (2%)
16.62
TOTAL COSTO DE MANTENIEMIENTO ANUAL
9,160.11
ml
292.67
3.25
951.18
m2
292.67
24.50
7,170.42
8,121.60
812.16
Imprevistos (2%)
16.24
TOTAL COSTO DE MANTENIEMIENTO CADA TRES AOS
8,950.00
m2
316.83
55.24
17,501.69
m2
1,950.18
24.50
47,779.41
Reposicin de Pintura
glb
1.00
924.00
924.00
66,205.10
6,620.51
132.41
72,958.02
Limpieza general
m2
20,207.52
Prec.
Unit(s/.)
1.13
m2
2020.75
7.18
GLB
3734.35
Imprevistos ( 2%)
GLB
746.87
Descripcin
ANUAL
C/ 3 AOS
C/ 5 AOS
C/ 5 AOS
a precios
sociales
a precios de
mercado
a precios sociales
9,160.11
6,870.08
9,160.11
8,950.00
6,870.08
6,712.50
5,672.44
4,254.33
72,958.02
54,718.52
mercado
sociales
41,824.72
41,824.72
41,824.72
41,824.72
31,368.54
31,368.54
31,368.54
31,368.54
Sub total
(s/.)
22834.50
14509.00
3734.35
746.87
41,824.72
CUADRO N 15
RESUMEN INVERSION ALTERNATIVA N 01: PAVIMENTOS
(A PRECIOS SOCIALES)
CUADRO RESUMEN
I.II.-
III.-
III.TOTAL
ESTUDIOS
EXPEDIENTE TECNICO (3%)
OBRAS CIVILES
Mano de Obra Calificada
Mano de Obra No Calificada
Materiales
Equipos y Herramientas
Mitigacin Ambiental
Mano de Obra Calificada
Mano de Obra no calificada
Equipo y Herramientas
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUB TOTAL
I.G.V. (19%)
TOTAL PRESUPUESTO
SUPERVISION
SUPERVISION (5%)
ALTERNATIVA N 01
PRECIOS DE
MERCADO
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
78,011.92
###
115,792.50
172,339.34
1,462,619.32
145,289.68
4,140.00
1,200.00
2,250.00
690.00
###
190,018.08
95,009.04
2,185,207.95
415,189.51
###
Factores
de
correccion
0.909
0.909
0.680
0.840
0.840
0.909
0.680
0.840
130,019.87
###
CUADRO N 16
RESUMEN INVERSION ALTERNATIVA N 02: PAVIMENTOS
(A PRECIOS SOCIALES)
CUADRO RESUMEN
I.II.-
III.-
ESTUDIOS
EXPEDIENTE TECNICO (3%)
OBRAS CIVILES
Mano de Obra Calificada
Mano de Obra No Calificada
Materiales
Equipos y Herramientas
Mitigacin Ambiental
Mano de Obra Calificada
Mano de Obra no calificada
Equipo y Herramientas
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUB TOTAL
I.G.V. (19%)
PRECIOS DE
MERCADO
S/.
S/.
S/.
S/.
S/.
S/.
89,819.79
###
221,022.33
207,034.26
1,640,823.30
114,771.94
4,140.00
1,200.00
2,250.00
690.00
###
218,779.18
109,389.59
2,515,960.60
478,032.51
Factores
de
correccion
0.909
0.909
0.680
0.840
0.840
0.909
0.680
0.840
TOTAL PRESUPUESTO
SUPERVISION
SUPERVISION (5%)
TOTAL ALTERNATIVA N 02
S/.
###
S/.
149,699.66
###
III.-
AVIMENTOS
PRECIOS
SOCIALES
70,919.93
1,573,630.17
105,255.38
117,190.75
1,229,091.87
122,092.17
3,200.74
1,090.91
1,530.00
579.83
1,576,830.91
157,683.09
78,841.55
1,813,355.54
344,537.55
2,157,893.10
107,894.65
2,336,707.68
AVIMENTOS
PRECIOS
SOCIALES
81,654.36
1,816,982.71
200,909.30
140,783.30
1,378,843.11
96,447.01
3,200.74
1,090.91
1,530.00
579.83
1,820,183.45
182,018.35
91,009.17
2,093,210.97
397,710.08
2,490,921.06
124,546.05
2,697,121.45
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Viernes, 01 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
6
4
4
2
3
4
4
2
2
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
20
15
15
10
8
15
15
98
27.68
22
15
12
10
5
18
15
97
27.4
18
16
18
20
18
15
14
119
33.62
2
1
1
0
0
4
1.13
0
0
27
7.63
0
0
68 19.21
52 14.69
51 14.41
42 11.86
37 10.45
54 15.25
50 14.12
354 100.00
100
0
0
55 16.87
45 13.80
40 12.27
40 12.27
44 13.50
49 15.03
53 16.26
326 100.00
100
2
1
2
5
1.41
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
12
10
10
12
15
16
15
12
10
8
10
15
18
93
28.53
88
26.99
17
17
18
20
18
14
16
120
36.81
4
3
1
2
3
2
3
1
0
0
2
0.61
0
0
18
5.52
1
1
1
2
5
1.53
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Sbado, 02 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
2
2
3
2
2
3
3
3
1
1
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
15
14
12
10
14
16
25
12
10
10
5
14
13
99
29.82
89
26.81
20
14
12
10
12
14
14
17
15
10
8
12
13
12
96
28.66
87
25.97
18
18
17
20
17
14
14
118
35.54
0
0
1
0.3
0
0
17
5.12
0
0
66 19.88
48 14.46
45 13.55
44 13.25
36 10.84
46 13.86
47 14.16
332 100.00
100
0
0
58 17.31
50 14.93
47 14.03
41 12.24
48 14.33
46 13.73
45 13.43
335 100.00
100
1
1
1
8
2.41
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
18
19
18
20
15
15
123
36.72
3
2
2
3
3
2
3
2
0
0
4
1.19
0
0
18
5.37
1
2
2
1
1
7
2.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Domingo, 03 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
2
1
2
2
2
3
2
2
1
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
12
7
7
5
5
6
6
48
29.09
5
4
3
1
3
2
3
21
12.73
15
12
10
12
8
8
10
75
45.45
1
1
0
0
2
1.21
0
0
14
8.48
0
0
36 21.82
25 15.15
22 13.33
21 12.73
19 11.52
20 12.12
22 13.33
165 100.00
100
0
0
29 20.14
23 15.97
21 14.58
17 11.81
19 13.19
17 11.81
18 12.50
144 100.00
100
1
1
5
3.03
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
11
6
4
4
5
4
3
3
2
2
1
2
2
2
14
12
12
11
10
9
9
37
25.69
14
9.72
77
53.47
1
1
2
1
2
1
1
1
0
0
2
1.39
0
0
9
6.25
1
1
3
5
3.47
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Lunes, 04 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
5
3
4
3
2
3
3
3
2
2
1
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
21
14
14
12
11
16
14
102
28.1
20
14
12
10
8
15
16
95
26.17
18
14
10
11
12
15
14
15
12
12
8
10
14
16
94
28.14
87
26.05
19
18
17
20
19
17
17
127
34.99
1
0
0
3
0.83
0
0
23
6.34
0
0
68 18.73
51 14.05
51 14.05
46 12.67
40 11.02
54 14.88
53 14.60
363 100.00
100
0
0
56
49
44
39
45
50
51
334
100
2
3
13
3.58
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
18
17
19
18
15
15
120
35.93
3
3
2
1
2
3
3
1
1
0
0
2
0.6
0
0
17
5.09
2
2
2
2
3
3
14
4.19
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15.43
13.50
12.12
10.74
12.40
13.77
14.05
92.01
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Martes, 05 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
3
3
2
1
2
3
3
3
2
2
1
2
1
3
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
14
13
9
9
12
14
20
15
12
10
6
12
12
89
27.22
87
26.61
17
15
8
10
10
13
14
16
13
11
8
10
16
17
87
26.05
91
27.25
18
17
17
19
18
15
15
119
36.39
0
0
1
0.31
0
0
17
5.2
14
4.28
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
62 18.96
51 15.60
46 14.07
41 12.54
37 11.31
43 13.15
47 14.37
327 100.00
100
0
0
58 17.37
52 15.57
40 11.98
39 11.68
42 12.57
51 15.27
52 15.57
334 100.00
100
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
17
19
18
18
14
15
119
35.63
5
4
1
1
3
4
4
2
1
0
0
3
0.9
0
0
22
6.59
2
3
1
1
3
2
12
3.59
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Mircoles, 06 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
6
4
1
2
1
3
5
3
3
1
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
14
13
8
8
14
12
19
15
11
10
10
17
16
87
25.51
98
28.74
15
14
8
10
9
13
12
15
14
8
8
14
14
16
81
25.16
89
27.64
19
18
16
19
18
14
14
118
34.6
2
1
0
0
3
0.88
0
0
22
6.45
0
0
65 19.06
54 15.84
44 12.90
39 11.44
39 11.44
51 14.96
49 14.37
341 100.00
100
0
0
54 16.77
52 16.15
37 11.49
39 12.11
45 13.98
47 14.60
48 14.91
322 100.00
100
1
3
2
13
3.81
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
18
18
17
18
17
13
13
114
35.4
5
4
1
2
3
4
4
1
0
0
3
0.93
0
0
23
7.14
1
2
1
1
2
2
3
12
3.73
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
FICHA TCNICA DE RECOPILACN DE DATOS PARA EL CLCULO DE VOLUMEN DE TRFICO PROMEDIO DIARIO
Tramo:
Cdigo de Estacin:
Estacin:
Urpay - Huaraz
C01
Puente San Jernimo
Ubicacin:
Realizado por:
Fecha:
Huaraz - Huaraz
Jueves, 07 de Julio del 2011.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
5
4
5
2
1
4
4
3
2
2
1
1
3
2
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
22
19
15
12
12
18
14
112
30.03
20
13
12
10
10
16
17
98
26.27
21
18
12
12
11
11
13
15
10
12
8
10
12
14
19
18
17
18
18
16
15
121
32.44
0
0
3
0.8
0
0
25
6.7
14
3.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
69 18.50
58 15.55
51 13.67
43 11.53
43 11.53
57 15.28
52 13.94
373 100.00
100
0
0
63 19.09
50 15.15
44 13.33
40 12.12
44 13.33
43 13.03
46 13.94
330 100.00
100
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
98
29.7
81
24.55
19
17
18
17
17
16
15
119
36.06
5
3
1
2
2
2
1
0
0
2
0.61
0
0
16
4.85
3
2
1
1
2
2
3
14
4.24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad Provincial de
Huaraz
10/11/2008
10/12/2008
10/13/2008
10/14/2008
10/15/2008
10/16/2008
68
55
52
45
51
40
42
40
37
44
54
49
50
53
680
66
58
48
50
45
47
44
41
36
48
46
46
47
45
667
36
29
25
23
22
21
21
17
19
19
20
17
22
18
309
68
56
51
49
51
44
46
39
40
45
54
50
53
51
697
62
58
51
52
46
40
41
39
37
42
43
51
47
52
661
65
54
54
52
44
37
39
39
39
45
51
47
49
48
663
69
63
58
50
51
44
43
40
43
44
57
43
52
46
703
434
373
339
321
310
273
276
255
251
287
325
303
320
313
4380
Total
680
667
309
697
661
663
703
Automovil
191
195
85
196
176
168
210
Pick Up
185
176
35
182
178
187
179
Camin 2E
45
35
23
40
39
45
41
Camin 3E
10
15
10
27
26
25
28
626
100
174
27.88
160
25.62
38
6.12
20
3.22
SENTIDO
HORA
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
IMD
%
Tipo de Trfico
Combi Rural
Bus 2E
239
6
241
5
152
4
247
5
238
4
232
6
240
5
227
36.28
5
0.80
976
80
84
5
34
1464
120
126
7.5
51
prom.
404
330
292
266
269
314
317
Municipalidad Provincial de
Huaraz
VARIACIN HORARIA
T
%
06 - 08
9.21
08 - 10
7.53
10 - 12
6.66
12 - 14
6.06
14 - 16
6.14
16 - 18
7.17
18 - 20
7.23
VARIACIN HORARIA
Vehculo
%
Automovil 27.88
Pick Up 25.62
Combi Rural 36.28
Bus 2E 0.80
Camion 2E 6.12
Camion 3E 3.22
VARIACIN HORARIA
CLASIFICACIN VEHICULAR
10.00
9.00
40.00
8.00
30.00
6.00
20.00
HORA
VEHCULO
Camion 3E
18 - 20
16 - 18
14 - 16
12 - 14
10 - 12
08 - 10
0.00
Camion 2E
1.00
0.00
Bus 2E
2.00
10.00
Combi Rural
3.00
Pick Up
IMD
4.00
Automovil
5.00
06 - 08
VARIACION(%)
7.00
Tasa
Crecemiento
2.2
2.2
2.2
2.2
3.6
2009
639
178
164
232
5
40
21
2010
654
182
167
237
5
41
22
2011
668
186
171
242
5
43
22
2012
683
190
175
248
5
44
23
2013
698
194
179
253
6
46
24
2014
713
199
183
259
6
47
25
2015
729
203
187
264
6
49
26
2016
745
208
191
270
6
51
27
2017
761
212
195
276
6
53
28
2016
2690
750
689
976
21
165
87
2017
3229
900
827
1171
26
198
104
con proyecto
2008
626
174
160
227
5
38
20
2009
720
201
184
261
6
44
23
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
Municipalidad distrital de
Independencia
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Viernes, 02 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
10
8
10
12
10
10
14
74
78.72
TOTAL
%
2
2
2
2
2
1
2
13
13.83
1
0
0
0
0
1
0
2
2.13
0
0
14 14.89
10 10.64
13 13.83
16 17.02
12 12.77
13 13.83
16 17.02
94 100.00
100
0
0
18 17.65
15 14.71
13 12.75
16 15.69
12 11.76
13 12.75
15 14.71
102 100.00
100
1
2
1
0
0
0
0
0
0
5
5.32
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
13
13
10
12
10
10
13
81
79.41
3
2
2
2
2
1
2
14
13.73
1
1
2
1
2
1.96
1
0
0
0
0
0
0
5
4.9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Sbado, 03 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
10
11
10
12
10
10
13
2
2
0
0
13 14.44
14 15.56
10 11.11
12 13.33
12 13.33
12 13.33
17 18.89
90 100.00
100
0
0
16 17.58
13 14.29
11 12.09
13 14.29
12 13.19
11 12.09
15 16.48
91 100.00
100
2
1
2
76
84.44
TOTAL
1
1
1
9
10
2
2.22
0
0
0
0
0
0
3
3.33
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
13
12
9
13
10
10
11
78
85.71
9
9.89
1
1
2
2
1
2
1
2
2.2
0
0
0
0
0
0
2
2.2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
Municipalidad distrital de
Independencia
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Domingo, 04 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
14
13
10
12
10
10
13
82
83.67
TOTAL
%
2
2
1
2
1
1
2
11
11.22
0
0
19 19.39
15 15.31
11 11.22
15 15.31
11 11.22
11 11.22
16 16.33
98 100.00
100
0
0
18 17.82
15 14.85
12 11.88
15 14.85
13 12.87
11 10.89
17 16.83
101 100.00
100
1
4
4.08
0
0
0
0
0
0
1
1.02
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
14
13
11
13
11
10
14
86
85.15
2
2
1
1
2
1
2
11
10.89
1
2
1.98
0
0
0
0
0
0
2
1.98
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
lunes, 05 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
14
14
12
14
10
11
14
2
2
1
1
2
1
89
86.41
9
8.74
2
1.94
14
13
10
14
10
11
15
2
2
1
1
1
2
87
86.14
9
8.91
2
1.98
0
0
18 17.48
16 15.53
13 12.62
16 15.53
13 12.62
12 11.65
15 14.56
103 100.00
100
0
0
17
16
11
15
11
13
18
101
100
1
1
1
0
0
0
0
0
0
3
2.91
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
1
1
1
0
0
0
0
0
0
3
2.97
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16.50
15.53
10.68
14.56
10.68
12.62
17.48
98.06
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Martes, 06 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
14
13
11
10
13
10
14
2
1
2
1
85
87.63
8
8.25
0
0
16 16.49
14 14.43
14 14.43
12 12.37
13 13.40
11 11.34
17 17.53
97 100.00
100
0
0
18 18.37
16 16.33
11 11.22
15 15.31
11 11.22
12 12.24
15 15.31
98 100.00
100
1
1
1
1
2
2.06
0
0
0
0
0
0
2
2.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
14
14
11
14
10
11
14
88
89.8
2
2
1
1
1
1
7
7.14
2
2.04
0
0
0
0
0
0
1
1.02
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Miercoles , 07 de febrero 2006
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
11
12
11
14
11
11
13
2
1
83
85.57
9
9.28
0
0
15 15.46
13 13.40
12 12.37
16 16.49
13 13.40
13 13.40
15 15.46
97 100.00
100
0
0
15 16.67
11 12.22
12 13.33
12 13.33
15 16.67
13 14.44
12 13.33
90 100.00
100
1
2
1
1
2
1
1
2
2.06
0
0
0
0
0
0
3
3.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
14
11
11
12
13
11
10
1
1
2
82
91.11
4
4.44
2
2.22
1
1
0
0
0
0
0
0
2
2.22
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
VOLUMEN DE TRAFIFICO PROMEDIO DIARIO
Tramo
Av. GRAN CHAVIN
Codigo de Estacion
C01
Estacion
Salida a la Av. Centenario
Ubicacin
Sentido
Dia
Huaraz - Independencia
Jueves, 08 de Marzo del 2007.
Este - Oeste
CAMIONETAS
AUTO
HORA
PICK UP
Rural
combi
BUS
MICRO
2E
CAMION
3E
2E
3E
SEMI TRAYLER
4E
2S1/2S2
2S3
3S1/3S2
TRAYLER
3S3
2T2
2T3
3T2
3T3
TOTAL %
Diagrama de
vehculos
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
12
11
10
15
11
11
15
2
2
1
2
1
1
1
1
1
85
85.86
10
10.1
3
3.03
13
13
10
10
11
10
12
2
1
2
1
1
1
8
3
6
5
79
70.54
8
7.14
2
1.79
0
0
16 16.16
14 14.14
11 11.11
17 17.17
12 12.12
12 12.12
17 17.17
99 100.00
100
0
0
24 21.43
17 15.18
12 10.71
18 16.07
17 15.18
11
9.82
13 11.61
112 100.00
100
1
0
0
0
0
0
0
1
1.01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Oeste - Este
06 -
08 am
08
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
TOTAL
%
0
0
0
0
0
0
1
23
20.54
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Municipalidad distrital de
Independencia
MEJORAMIENTO DE LA AV. GRAN CHAVIN Y ULTIMA CUADRA DEL JR. AUGUSTO B. LEGUIA"
3/3/2007
3/4/2007
3/5/2007
3/6/2007
3/7/2007
3/8/2007
14
18
10
15
13
13
16
16
12
12
13
13
16
15
196
13
16
14
13
10
11
12
13
12
12
12
11
17
15
181
19
18
15
15
11
12
15
15
11
13
11
11
16
17
199
18
17
16
16
13
11
16
15
13
11
12
13
15
18
204
16
18
14
16
14
11
12
15
13
11
11
12
17
15
195
15
15
13
11
12
12
16
12
13
15
13
13
15
12
187
16
24
14
17
11
12
17
18
12
17
12
11
17
13
211
111
126
96
103
84
82
104
104
86
91
84
84
113
105
1373
automovil
155
154
168
176
173
165
164
Pick Up
27
18
22
18
15
13
18
Camion 2E
10
5
3
6
3
5
24
Camion 3E
0
0
0
0
0
0
0
165
84.12
19
9.54
8
4.08
0
0.00
SENTIDO
HORA
06 -
08 am
08 -
10 am
10 -
12 am
12 -
14 pm
14 -
16 pm
16 -
18 pm
18 -
20 pm
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
E- O
O-E
196
100
4
2.26
Municipalidad distrital de
Independencia
0
0.00
VARIACION HORARIA
T
%
06 - 08
8.63
08 - 10
7.25
10 - 12
6.05
12 - 14
7.57
14 - 16
6.45
16 - 18
6.12
18 - 20
7.94
VARIACION HORARIA
vehiculo
%
automovil
84.12
combi rural
9.54
micro
2.26
bus 2E
0.00
Camion 2E
4.08
Camion 3E
0.00
VARIACION HORARIA
Av. GRAN CHAVIN
CLASIFICACION VEHICULAR
Av. GRAN CHAVIN
90.00
9.00
80.00
8.00
70.00
7.00
60.00
6.00
50.00
5.00
40.00
30.00
3.00
20.00
2.00
10.00
1.00
0.00
HORA
18 - 20
16 - 18
14 - 16
12 - 14
10 - 12
08 - 10
0.00
combi rural
4.00
automovil
IMD
10.00
06 - 08
VARIACION(%)
1464
120
126
7.5
51
VEHICULO
Camion 3E
976
80
84
5
34
Camion 2E
IMD
Tipo de Trafico
combi rural
bus 2E
4
0
4
0
6
0
4
0
4
0
4
0
5
0
bus 2E
Total
196
181
199
204
195
187
211
micro
Dia
3/2/2007
3/3/2007
3/4/2007
3/5/2007
3/6/2007
3/7/2007
3/8/2007
prom.
119
100
83
104
89
84
109
2007
200
169
19
5
0
8
0
2008
205
172
20
5
0
9
0
2009
209
176
20
5
0
9
0
2010
214
180
20
5
0
9
0
2011
219
184
21
5
0
10
0
2012
224
188
21
5
0
10
0
2013
228
192
22
5
0
10
0
2014
233
196
22
5
0
11
0
2015
239
201
23
5
0
11
0
2013
703
591
67
16
0
29
0
2014
843
709
80
19
0
34
0
2015
1012
851
97
23
0
41
0
con proyecto
2006
196
165
19
4
0
8
0
2007
226
190
22
5
0
9
0
2008
259
218
25
6
0
11
0
ESTACION:
E1
UBICACIN:
SENTIDO:
FECHA:
02/03/2007 al 08/03/2007
TRAFICO LIGERO
DIAS
7
AUTOS
PICK UP
BUS 2E
COMBI
RURAL
E-O Y O-E
626
160
TOTAL
626
160
TRAFICO PESADO
CAMIONES
TOTAL
2E
3E
227
38
20
626
227
38
20
626
COV ( $ )
SITUACION
SIN/ PROY
CON/ PROY
SIN/ PROY
CON/ PROY
TIPO
AFIRMADO
PAVIMENTO
SIN
AFIRMAR
AFIRMADO
ESTADO
MALO
BUENO
MALO
BUENO
0.55
0.46
0.87
0.90
1.12
1.55
1.76
0.27
0.28
0.60
0.52
0.78
0.65
0.89
0.43
0.38
0.84
0.81
1.04
1.49
1.71
0.24
0.26
0.5
0.58
0.76
0.63
0.87
AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E
Tipo de Cambio =
3.2
COV (S/.)
0.68
SITUACION
SIN/ PROY
CON/ PROY
SIN/ PROY
CON/ PROY
TIPO
AFIRMADO
PAVIMENTO
SIN
AFIRMAR
AFIRMADO
ESTADO
MALO
BUENO
REGULAR
BUENO
1.760
1.472
2.784
2.880
3.584
4.960
5.632
0.864
0.896
1.920
1.664
2.496
2.080
2.848
1.376
1.216
2.688
2.592
3.328
4.768
5.472
0.768
0.832
1.600
1.856
2.432
2.016
2.784
AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E
TRAMO 1
TRAMO 2
TOTAL
0.68
0.68
IMD
*IMD1
*IMD2
626
160
5
227
0
38
20
0
0
0
0
0
0
0
AUTOS
PICK UP
BUS 2E
COMBI RURAL
BUS GRANDE
CAMION 2E
CAMION 3E
626
160
5
227
0
38
20
1.38
1.22
2.59
2.69
4.77
5.47
0.77
0.83
1.86
0.43
0.38
0.81
0.24
0.26
0.58
1.6
2.02
2.78
0.84
0.50
1.49
0.63
1.71
0.87
DIAS =
UNIDADES
COV unitario
365
L1 (Km) =
AUTOS
PICK UP
COMBI RURAL
1.76
1.47
2.78
0.68
OMNIBUS
*IMD1
CAMIONES
2E
3E
2.88
4.96
5.63
BUS 2E
TOTAL
0.00
2,009
1.00
2,010
277,592.19
59,586.16
159,422.98
3,554.32
47,746.33
29,192.79
577,094.78
2.00
2,011
283,239.61
60,676.15
162,858.83
3,554.32
48,970.60
29,192.79
588,492.29
3.00
2,012
289,321.44
62,129.47
166,294.67
3,554.32
50,194.86
29,192.79
600,687.55
4.00
2,013
295,403.27
63,219.46
169,730.51
3,554.32
51,419.13
30,582.93
613,909.61
5.00
2,014
301,485.10
64,672.78
173,166.35
4,265.18
51,419.13
30,582.93
625,591.46
6.00
2,015
308,001.35
66,126.10
176,602.19
4,265.18
52,643.39
31,973.06
639,611.27
7.00
2,016
314,517.60
67,216.09
180,725.19
4,265.18
53,867.66
31,973.06
652,564.78
8.00
2,017
321,033.85
68,669.41
184,161.03
4,265.18
55,091.92
33,363.19
666,584.59
9.00
2,018
327,550.10
70,122.73
188,284.04
4,265.18
56,316.19
33,363.19
679,901.43
10.00
2,019
334,500.76
71,576.05
191,719.88
4,265.18
57,540.45
34,753.33
694,355.66
DIAS =
UNIDADES
COV unitario
365
AUTOS
0.864
L1 (Km) =
PICK UP
0.896
0.68
OMNIBUS
COMBI RURAL
BUS 2E
1.920
1.664
*IMD1
CAMIONES
2E
TOTAL
3E
2.080
2.848
2,009
2,010
136,272.53
36,269.83
109,946.89
2,053.61
20,022.65
14,762.27
319,327.78
2,011
139,044.90
36,933.31
112,316.43
2,053.61
20,536.06
14,762.27
325,646.56
2,012
142,030.52
37,817.94
114,685.98
2,053.61
21,049.46
14,762.27
332,399.77
2,013
145,016.15
38,481.41
117,055.52
2,053.61
21,562.86
15,465.23
339,634.78
2,014
148,001.78
39,366.04
119,425.07
2,464.33
21,562.86
15,465.23
346,285.30
2,015
151,200.66
40,250.67
121,794.61
2,464.33
22,076.26
16,168.20
353,954.73
2,016
154,399.55
40,914.14
124,638.06
2,464.33
22,589.66
16,168.20
361,173.94
2,017
157,598.44
41,798.77
127,007.61
2,464.33
23,103.06
16,871.16
368,843.37
2,018
160,797.32
42,683.40
129,851.06
2,464.33
23,616.46
16,871.16
376,283.74
10
2,019
164,209.47
43,568.03
132,220.61
2,464.33
24,129.87
17,574.13
384,166.43
PRECIOS PRIVADOS
COV- SIN PROYECTO
AO
COSTO DE
OPERACIN
VEHICULAR SIN
PROYECTO
AO
COSTO DE
OPERACIN
VEHICULAR SIN
PROYECTO
0
1
2
3
4
5
6
7
8
9
10
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
577,094.78
588,492.29
600,687.55
613,909.61
625,591.46
639,611.27
652,564.78
666,584.59
679,901.43
694,355.66
0
1
2
3
4
5
6
7
8
9
10
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
427,050.13
435,484.29
444,508.78
454,293.11
462,937.68
473,312.34
482,897.94
493,272.60
503,127.06
513,823.19
PRECIOS PRIVADOS
COV- CON PROYECTO
AO
COSTO DE
OPERACIN
VEHICULAR CON
PROYECTO
AO
COSTO DE
OPERACIN
VEHICULAR CON
PROYECTO
0
1
2
3
4
5
6
7
8
9
10
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
319,327.78
325,646.56
332,399.77
339,634.78
346,285.30
353,954.73
361,173.94
368,843.37
376,283.74
384,166.43
0
1
2
3
4
5
6
7
8
9
10
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
236,302.56
240,978.46
245,975.83
251,329.74
256,251.12
261,926.50
267,268.72
272,944.09
278,449.97
284,283.16
MANTENIMIENTO
COSTOS SIN
PROYECTO
2,808,429.25
2,008
2,009
9,160.11
41,824.72
(32,664.61)
2,009
6,870.08
31,368.54
(24,498.45)
2,010
9,160.11
41,824.72
(32,664.61)
2,010
6,870.08
31,368.54
(24,498.45)
2,011
9,160.11
41,824.72
(32,664.61)
2,011
6,870.08
31,368.54
(24,498.45)
2,012
9,160.11
41,824.72
(32,664.61)
2,012
6,870.08
31,368.54
(24,498.45)
2,013
5,672.44
41,824.72
(36,152.28)
2,013
4,254.33
31,368.54
(27,114.21)
2,014
9,160.11
41,824.72
(32,664.61)
2,014
6,870.08
31,368.54
(24,498.45)
2,015
9,160.11
41,824.72
(32,664.61)
2,015
6,870.08
31,368.54
(24,498.45)
2,016
9,160.11
41,824.72
(32,664.61)
2,016
6,870.08
31,368.54
(24,498.45)
2,017
9,160.11
41,824.72
(32,664.61)
2,017
6,870.08
31,368.54
(24,498.45)
2,018
5,672.44
41,824.72
(36,152.28)
2,018
4,254.33
31,368.54
(27,114.21)
AO
2,008
INVERSION
2,808,429.25
COSTOS
INCREMENTALES
AO
INVERSION
OPERACIN Y
MANTENIMIENTO
COSTOS SIN
PROYECTO
3,233,512.56
INVERSION
OPERACIN Y
MANTENIMIENTO
COSTOS SIN
PROYECTO
2,336,707.68
COSTOS
INCREMENTALES
2,336,707.68
COSTOS
INCREMENTALES
AO
INVERSION
OPERACIN Y
MANTENIMIENTO
COSTOS SIN
PROYECTO
2,697,121.45
COSTOS
INCREMENTALES
3,233,512.56
2008
2009
9,160.11
41,824.72
(32,664.61)
2009
6,870.08
31,368.54
2,697,121.45
(24,498.45)
2010
9,160.11
41,824.72
(32,664.61)
2010
6,870.08
31,368.54
(24,498.45)
2011
8,950.00
41,824.72
(32,874.72)
2011
6,712.50
31,368.54
(24,656.04)
2012
9,160.11
41,824.72
(32,664.61)
2012
6,870.08
31,368.54
(24,498.45)
2013
72,958.02
41,824.72
31,133.30
2013
54,718.52
31,368.54
23,349.98
2014
9,160.11
41,824.72
(32,664.61)
2014
6,870.08
31,368.54
(24,498.45)
2015
9,160.11
41,824.72
(32,664.61)
2015
6,870.08
31,368.54
(24,498.45)
2016
8,950.00
41,824.72
(32,874.72)
2016
6,712.50
31,368.54
(24,656.04)
2017
9,160.11
41,824.72
(32,664.61)
2017
6,870.08
31,368.54
(24,498.45)
2018
72,958.02
41,824.72
31,133.30
2018
54,718.52
31,368.54
23,349.98
PRECIOS PRIVADOS
PRECIOS SOCIALES
BENEFICIOS
INCREMENTALES
BENEFICIOS
INCREMENTALES
2009
577,094.78
319,327.78
257,767.00
2010
588,492.29
325,646.56
262,845.72
2009
427,050.13
236,302.56
190,747.58
2010
435,484.29
240,978.46
2011
600,687.55
332,399.77
194,505.84
268,287.78
2011
444,508.78
245,975.83
2012
613,909.61
198,532.96
339,634.78
274,274.83
2012
454,293.11
251,329.74
2013
202,963.37
625,591.46
346,285.30
279,306.16
2013
462,937.68
256,251.12
206,686.56
2014
639,611.27
353,954.73
285,656.54
2014
473,312.34
261,926.50
211,385.84
2015
652,564.78
361,173.94
291,390.84
2015
482,897.94
267,268.72
215,629.22
2016
666,584.59
368,843.37
297,741.22
2016
493,272.60
272,944.09
220,328.50
2017
679,901.43
376,283.74
303,617.69
2017
503,127.06
278,449.97
224,677.09
2018
694,355.66
384,166.43
310,189.23
2018
513,823.19
284,283.16
229,540.03
AO
2008
AO
2008
Ao
0
1
2
3
4
5
6
7
8
9
10
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
Costos
Incrementales
2,808,429.25
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
T.D. = 11%
Costos
Incrementales
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
FLUJO NETO
(2,808,429.25)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
346,341.51
VAN = -974,402.26
TIR = 2.17%
B/C = 0.63
2,612,761.74
Ao
Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23
2,808,429.25
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
(32,664.61)
(32,664.61)
(32,664.61)
(32,664.61)
(36,152.28)
T.D. = 11%
1,638,359.48
Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23
2260237.2
-35000
-35000
-35000
-35000
-9000
-35000
-35000
-35000
-35000
(9,000.00)
S/. 1,834,026.99
###
###
2,078,700.61
FLUJO NETO
(2,808,429.25)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
346,341.51
1,217,050.80
(35,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(9,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(35,000.00)
(9,000.00)
VAN = -974,402.26
TIR = 2.17%
B/C = 0.63
2,612,761.74
1,638,359.48
1,035,514.21
Ao
0
1
2
2,008
2,009
2,010
Costos
Incrementales
2,336,707.68
(24,498.45)
(24,498.45)
Beneficios
Incrementales
190,747.58
194,505.84
FLUJO NETO
(2,336,707.68)
215,246.03
219,004.29
1785586.4
-33375
-33375
3
4
5
6
7
8
9
2,011
2,012
2,013
2,014
2,015
2,016
2,017
(24,498.45)
(24,498.45)
(27,114.21)
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)
10
2,018
(27,114.21)
T.D. 11%
Costos
Incrementales
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
-33375
-33375
-6750
-33375
-33375
-33375
-33375
256,654.24
(6,750.00)
VAN -977,571.04
TIR 0.06%
B/C 0.55
2,189,957.05
Ao
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03
2,336,707.68
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)
(27,114.21)
(24,498.45)
(24,498.45)
(24,498.45)
(24,498.45)
(27,114.21)
T.D. 11%
1,212,386.01
Beneficios
Incrementales
190,747.58
194,505.84
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03
###
###
1,614,210.83
FLUJO NETO
(2,336,707.68)
215,246.03
219,004.29
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
256,654.24
961469.6
-33375
-33375
-33375
-33375
-6750
-33375
-33375
-33375
-33375
-6750
VAN -977,571.04
TIR 0.06%
B/C 0.55
2,189,957.05
1,212,386.01
790,094.03
Inversion +
Inversion +
Inversion +
Inversion +
10.00%
20.00%
30.00%
40.00%
50.00%
0
618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81
(3,089,272.18)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(3,370,115.10)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(3,650,958.03)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(3,931,800.95)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(4,212,643.88)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
769,948.82
346,341.51
346,341.51
346,341.51
346,341.51
346,341.51
(1,255,245.19)
0.43%
2.03
(1,536,088.11)
-1.10%
1.85
(1,816,931.04)
-2.45%
1.94
(2,097,773.96)
-3.67%
(2,378,616.89)
-4.77%
4,033,718.28
Inversion -
618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81
769,948.82
Inversion -
Inversion -
10.00%
20.00%
30.00%
(2,527,586.33)
(2,246,743.40)
(1,965,900.48)
290,431.61
290,431.61
290,431.61
295,510.33
295,510.33
295,510.33
300,952.39
300,952.39
300,952.39
306,939.44
306,939.44
306,939.44
315,458.44
315,458.44
315,458.44
318,321.15
318,321.15
318,321.15
324,055.45
324,055.45
324,055.45
330,405.83
330,405.83
330,405.83
336,282.30
336,282.30
336,282.30
346,341.51
346,341.51
346,341.51
(693,559.34)
(412,716.41)
(131,873.49)
4.18%
6.56%
9.43%
2.53
2.89
3.90
4,033,718.28
457674.90
481077.88
Inversion +
Inversion +
Inversion +
Inversion +
10.00%
20.00%
30.00%
40.00%
50.00%
(2,570,378.45)
215,246.03
219,004.29
(2,804,049.22)
215,246.03
219,004.29
(3,037,719.99)
215,246.03
219,004.29
(3,271,390.76)
215,246.03
219,004.29
(3,505,061.53)
215,246.03
219,004.29
488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
569762.12
256,654.24
256,654.24
256,654.24
256,654.24
256,654.24
(1,211,241.80)
-1.59%
1.94
(1,444,912.57)
-3.04%
1.76
(1,678,583.34)
-4.34%
1.85
(1,912,254.11)
-5.50%
(2,145,924.88)
-6.55%
2,984,951.53
Inversion -
Inversion -
Inversion -
10.00%
20.00%
30.00%
(2,103,036.92)
(1,869,366.15)
(1,635,695.38)
457674.90
215,246.03
215,246.03
215,246.03
481077.88
219,004.29
219,004.29
219,004.29
488922.50
223,031.41
223,031.41
223,031.41
497378.24
227,461.83
227,461.83
227,461.83
511719.51
522590.52
538236.06
544943.83
556608.62
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
569762.12
256,654.24
256,654.24
256,654.24
(743,900.27)
1.97%
2.43
(510,229.50)
4.22%
2.78
(276,558.73)
6.93%
3.78
2,984,951.53
Inversion +
Inversion +
Inversion +
60.00%
85.00%
89.21%
(4,493,486.80)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(5,195,594.12)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
(5,313,716.65)
290,431.61
295,510.33
300,952.39
306,939.44
315,458.44
318,321.15
324,055.45
330,405.83
336,282.30
346,341.51
346,341.51
346,341.51
(2,659,459.81)
-5.77%
(3,361,567.13)
-7.94%
(3,479,689.66)
-8.26%
Inversion +
Inversion +
Inversion +
60.00%
85.00%
89.21%
(3,738,732.29)
215,246.03
219,004.29
(4,322,909.21)
215,246.03
219,004.29
(4,421,191.14)
215,246.03
219,004.29
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
223,031.41
227,461.83
233,800.77
235,884.30
240,127.68
244,826.96
249,175.55
256,654.24
256,654.24
256,654.24
(2,379,595.65)
-7.51%
(2,963,772.57)
-9.59%
(3,062,054.49)
-9.90%
2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
Costos
Incrementales
3,233,512.56
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
T.D. 11%
Ao
2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23
FLUJO NETO
(3,233,512.56)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
2710886.1
-25000
-25000
-25000
-25000
6000
-25000
-25000
-25000
-25000
6000
0
618479.60
650105.24
660706.09
672132.76
691512.85
706203.41
727346.03
736410.58
752173.81
769948.82
VAN= -1,462,868.42
TIR= -1.15%
B/C= 0.53
3,101,227.90
1,638,359.48
Costos
Incrementales
3,233,512.56
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
(32,664.61)
(32,664.61)
(32,874.72)
(32,664.61)
31,133.30
Beneficios
Incrementales
257,767.00
262,845.72
268,287.78
274,274.83
279,306.16
285,656.54
291,390.84
297,741.22
303,617.69
310,189.23
T.D. 11%
FLUJO NETO
(3,233,512.56)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
2,592,970.01
4,033,718.28
1,459,707.90
(25,000.00)
(25,000.00)
(25,000.00)
(25,000.00)
6,000.00
(25,000.00)
(25,000.00)
(25,000.00)
(25,000.00)
6,000.00
618,479.60
650,105.24
660,706.09
672,132.76
691,512.85
706,203.41
727,346.03
736,410.58
752,173.81
769,948.82
1,341,791.81
4,033,718.28
VAN= -1,462,868.42
TIR= -1.15%
B/C= 0.53
3,101,227.90
1,638,359.48
0
1
2
2,005
2,006
2,007
Costos
Incrementales
2,697,121.45
(24,498.45)
(24,498.45)
Beneficios
Incrementales
190,747.58
194,505.84
FLUJO NETO
(2,697,121.45)
215,246.03
219,004.29
2141600.50
-25875.00
-25875.00
0
457674.90
481077.88
3
4
5
6
7
8
9
10
2,008
2,009
2,010
2,011
2,012
2,013
2,014
(24,656.04)
(24,498.45)
23,349.98
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
2,015
23,349.98
229,540.03
206,190.05
T.D. 11%
Ao
2,005
2,006
2,007
2,008
2,009
2,010
2,011
2,012
2,013
2,014
2,015
-25875.00
-25875.00
4500.00
-25875.00
-25875.00
-25875.00
-25875.00
4500.00
488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62
569762.12
VAN= -1,385,521.94
TIR= -3.17%
B/C= 0.47
2,597,907.95
1,212,386.01
Costos
Incrementales
2,697,121.45
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)
23,349.98
(24,498.45)
(24,498.45)
(24,656.04)
(24,498.45)
23,349.98
Beneficios
Incrementales
190,747.58
194,505.84
198,532.96
202,963.37
206,686.56
211,385.84
215,629.22
220,328.50
224,677.09
229,540.03
T.D. 11%
2,017,940.31
2,984,951.53
FLUJO NETO
(2,697,121.45)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05
1153169.50
-25875.00
-25875.00
-25875.00
-25875.00
4500.00
-25875.00
-25875.00
-25875.00
-25875.00
0.00
457674.90
481077.88
488922.50
497378.24
511719.51
522590.52
538236.06
544943.83
556608.62
4500.00
569762.12
VAN= -1,385,521.94
TIR= -3.17%
B/C= 0.47
2,597,907.95
1,212,386.01
1,029,509.31
2,984,951.53
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
85.00%
(3,556,863.81)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(3,880,215.07)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(4,203,566.33)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(4,526,917.58)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(4,850,268.84)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(5,173,620.09)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
(5,981,998.23)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
279,055.93
279,055.93
279,055.93
279,055.93
279,055.93
279,055.93
(1,786,219.67)
-2.78%
1.63
(2,109,570.93)
-4.21%
1.48
(2,432,922.19)
-5.48%
1.56
(2,756,273.44)
-6.63%
(3,079,624.70)
-7.67%
(3,402,975.95)
-8.61%
(4,211,354.09)
-10.67%
Inversion -
Inversion -
Inversion -
10.00%
20.00%
30.00%
(2,910,161.30)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
(2,586,810.05)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
(2,263,458.79)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
(1,139,517.16)
0.73%
2.01
(816,165.91)
2.94%
2.28
(492,814.65)
5.60%
3.01
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
Inversion +
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
85.00%
(2,966,833.59)
215,246.03
219,004.29
(3,236,545.74)
215,246.03
219,004.29
(3,506,257.88)
215,246.03
219,004.29
(3,775,970.02)
215,246.03
219,004.29
(4,045,682.17)
215,246.03
219,004.29
(4,315,394.31)
215,246.03
219,004.29
(4,989,674.68)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05
206,190.05
206,190.05
206,190.05
206,190.05
206,190.05
206,190.05
(1,655,234.08)
-4.72%
1.55
(1,924,946.23)
-6.09%
1.41
(2,194,658.37)
-7.30%
1.48
(2,464,370.52)
-8.40%
(2,734,082.66)
-9.40%
(3,003,794.80)
-10.30%
(3,678,075.17)
-12.28%
Inversion -
Inversion -
Inversion -
10.00%
20.00%
30.00%
(2,427,409.30)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
(2,157,697.16)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
(1,887,985.01)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05
206,190.05
206,190.05
(1,115,809.79)
-1.38%
1.92
(846,097.65)
0.71%
2.18
(576,385.50)
3.23%
2.90
Inversion +
110.00%
(6,790,376.37)
290,431.61
295,510.33
301,162.50
306,939.44
248,172.86
318,321.15
324,055.45
330,615.94
336,282.30
279,055.93
(5,019,732.23)
-12.38%
Inversion +
110.00%
(5,663,955.04)
215,246.03
219,004.29
223,188.99
227,461.83
183,336.58
235,884.30
240,127.68
244,984.54
249,175.55
206,190.05
(4,352,355.53)
-13.93%
ESCENARIOS A LA
VARIAC.EN LOS
COSTOS
+30%
+20%
+10%
0
-10%
-20%
-30%
PRECIOS PRIVADOS
ALTENATIVA N01
ALTENATIVA N02
VAN
TIR
B/C
VAN
-1,816,931
-1,536,088
-1,255,245
-974,402
-693,559
-412,716
-131,873
-2.45%
-1.10%
0.43%
2.17%
4.18%
6.56%
9.43%
1.94
1.85
2.03
0.63
2.53
2.89
3.90
-2,432,922
-2,109,571
-1,786,220
-1,462,868
-1,139,517
-816,166
-492,815
+30%
+20%
+10%
0
-10%
-20%
-30%
PRECIOS SOCIALES
ALTENATIVA N01
ALTENATIVA N02
VAN
TIR
B/C
VAN
-1,678,583
-1,444,913
-1,211,242
-977,571
-743,900
-510,229
-276,559
-4.34%
-3.04%
-1.59%
0.06%
1.97%
4.22%
6.93%
1.85
1.76
1.94
0.55
2.43
2.78
3.78
-2,194,658
-1,924,946
-1,655,234
-1,385,522
-1,115,810
-846,098
-576,386
DESCRIPCION
Monto de Inversion- Precios Sociales
Valor Actual Neto (VAN)
Tasa Interna de Retorno (TIR)
PROYECTO
ALTERNATIVO 01
2,336,707.68
-977,571.04
0.06%
RIVADOS
ALTENATIVA N02
TIR
B/C
-5.48%
-4.21%
-2.78%
-1.15%
0.73%
2.94%
5.60%
1.56
1.48
1.63
0.53
2.01
2.28
3.01
OCIALES
ALTENATIVA N02
TIR
B/C
-7.30%
-6.09%
-4.72%
-3.17%
-1.38%
0.71%
3.23%
1.48
1.41
1.55
0.47
1.92
2.18
2.90
PROYECTO
ALTERNATIVO 01
PROYECTO
ALTERNATIVO 02
2,336,707.68
-977,571.04
0.06%
2,697,121.45
-1,385,522
-3.17%
Inversion +
10.00%
Inversion +
20.00%
VAN
(977,571.04)
(1,211,241.80)
(1,444,912.57)
TIR
0.06%
-1.59%
-3.04%
VAN
(1,385,521.94)
(1,385,521.94)
(1,385,521.94)
TIR
-3.17%
-3.17%
-3.17%
ALTERNATIVASINDICES
Proyecto
Alternativo 02
ANALISIS DE SENSIBILIDAD
(500,000)
(1,000,000)
VAN (S/.)
Proyecto
Alternativo 01
(1,500,000)
(2,000,000)
(2,500,000)
(3,000,000)
(3,500,000)
Proyecto
Alternativo 01
0%
Proyecto Alternativo 02
40%
50%
60%
Linear Re
70%
Proyecto8
Inversion +
Inversion + Inversion + Inversion + Inversion +
40.00%
50.00%
60.00%
85.00%
89.21%
(1,678,583.34)
-4.34%
(1,385,521.94)
-5.50%
-6.55%
-3.17%
-3.17%
DE SENSIBILIDAD
571.04
Proyecto Alternativo 02
40%
50%
60%
-9.59%
-9.90%
-3.17%
or
0%
o 01
-7.51%
100%
-3.17%
-3.17%
-3.17%
UBICACIN
TRAMO
LONGUITUD DEL
TRAMO ( KM.)
Situacion
Actual
Grado de
Adec.
Recom.
INICIO
FINAL
TRAMO 1
Panamericana
Norte(km.310)
C.P.
Ampanu
10.00
Mejoramiento de la
via a nivel de
Terreno Natural Inadecuada
afirmado
compactado
TRAMO 2
C.P. Ampanu
El Molino
5.00
15.00
KM
TOTAL
Mejoramiento de la
via a nivel de
afirmado
compactado
UBICACIN
LONG. DEL
TRAMO ( KM.)
SUPERFICIE
C.P.
Ampanu
10.00
Terreno Natural
4- 6 mts
Malo
El Molino
5.00
Terreno Natural
4- 6 mts
Malo
INICIO
FINAL
TRAMO 1
Panamericana
Norte(km.310)
TRAMO 2
C.P. Ampanu
TOTAL
15.00
Ancho de
Estado
Via
KM
UBICACIN
LONG. DEL
TRAMO ( KM.)
SUPERFICIE
C.P.
Ampanu
10.00
Afirmado
Compactado
Bueno
El Molino
5.00
Afirmado
Compactado
Bueno
INICIO
FINAL
TRAMO 1
Panamericana
Norte(km.310)
TRAMO 2
C.P. Ampanu
TOTAL
15.00
KM
Ancho de
Estado
Via
CRONOGRAMA DE ACTIVIDADES
Fase de
Inversion
PERFIL
Meses
*
Ao 0
Elabora
cion de
Exp.
Tecnico
.
*
Ejecuci
on del
Proyect
o
Post Inversion
Ao 1 - 10
* Operacin
y
Mantenimien
to
CRONOGRAMA DE ACTIVIDADES
AO - 0
COMPONENTES
Mejoramiento de 2 km.
Tratamiento Superficial
Bicapa, corte y relleno
Mejoramiento de 10 km.
Tratamiento Supeficial
Bicapa,limpieza de
carpeta
Mejoramiento de 11 km.
Recapeo
MES 1 MES 2
X
MES 3
X
A DE ACTIVIDADES
AO - 0
MES 4 MES 5 MES 6
MES 7
CRONOGRAMA DE ACTIVIDADES
AO 0
ETAPAS
MESES
1-3
MESES
4-6
MESES
7-9
MESES
10-12
Operacin y
Mantenimiento de
Infrestructura
CRONOGRAMA DE ACTIVIDADES
AO 0
ETAPAS
MESES
1-3
MESES
4-6
Elab. De Perfil
Expediente Tecnico
X
X
Ejecucion de la Obra
MESES
7-9
MESES
10-12
Operacin y
Mantenimiento de
Infrestructura
DE ACTIVIDADES
AO 1 - 10
MESES
1-3
MESES
4-6
MESES
7-9
MESES
10-12
DE ACTIVIDADES
AO 1 - 10
MESES
1-3
MESES
4-6
MESES
7-9
MESES
10-12
2,006
2,007
2,008
2,009
2,010
2,011
2,012
Pob. Referencia
28,123
28,489
28,859
29,234
29,614
29,999
30,389
30,784
Pob. Demandante
2,165
2,193
2,222
2,251
2,280
2,309
2,339
2,370
2,009
4
29,614
2,010
5
29,999
2,011
6
30,389
2,012
7
30,784
2,010
5
29,999
2,309
2,011
6
30,389
2,339
2,012
7
30,784
2,370
DETALLE
Tasa de crecimiento
1.30% Ao 2,005
Ao 2,005
= 28,123
Ao 2,005
Pob. Demandante = 2,165
Pob. Referencia
DETALLE
Pob. Referencia
2,005
0
28,123
2,006
1
28,489
2,007
2
28,859
2,008
3
29,234
DETALLE
Pob. Referencia
Pob. Demandante
2,005
0
28,123
2,165
2,006
1
28,489
2,193
2,007
2
28,859
2,222
2,008
3
29,234
2,251
2,009
4
29,614
2,280
-9
2,013
2,014
2,015
10
31,184
31,590
32,000
2,401
2,432
2,463
2,013
8
31,184
2,014
9
31,590
2,015
10
32,000
0.08
2,013
8
31,184
2,401
2,014
9
31,590
2,432
2,015
10
32,000
2,463
MARCO LGICO
Estrategia de
Inversion
FIN
PROPOSITO
COMPONENTES
ACCIONES
Resumen de Objetivos
Indicadores Verificables
Medios
Supuestos /
Objetivamente ( IVO )
Verificacin ( MV )
Riesgos
1).- Mayor Ingreso Percapita.10%en 1 ao 1).- Encuesta sobre ingreso familiar 1).- Incremento del Salario Real
2).- Aumento del volumen de ventas en los 2).- Registros de Volumen de
2).-Se promocionan mercados
productos agricolas en20%
Comercio
3).- Aumento 10% Anual del flujo turistico en
3).- Se desarrolla economia de
3).- Registro de Turistas en la zona
la zona
soporte turistico
Eficiente Nivel de
Transitabilidad vehicular en
la carretera de acceos al Reduccion en 20% del tiempo de transporte Encuestas anuales realizados a
caserio el Molino desde el Publico y de carga en el primer ao
transportistas y publicos
cruce Panamericana Norte
Km 310
Se desarrolla en mantenimiento
rutinario y periodico
INDICADORES
El costo de operacin de los Transportistas
se reduce en 35% respecto al ao 2008,
en el primer ao de operacin del proyecto
FIN
Mejora en el desarrollo
socioeconmico en la Av.
Confraternidad Internacional
Sur
PROPOSITO
2.OBJETIVO INMEDIATO
Generacin de una oferta vial peatonal en
adecuadas condiciones operativas
Adecuadas condiciones para el
transito vehicular en la Av.Av.
Confraternidad Internacional
Sur"
3.RESULTADOS
COMPONENTES
Adecuada utilizacin
las reas verdes
Adecuado
Sistema
de Cambio
total
del
sist.
De
Drenaje
alcantarillado
Adecuado infraestructura 2582.98 m2 de veredas en la Av.
para el trnsito peatonal. Confraternidad Internacional Sur.
Oportunos programas de Sealizacin
mantenimiento vial.
peridico
mantenimiento
4.ACTIVIDADES
INSUMOS
COSTOS
ACCIONES
Pisos
y pavimento con La junta vecinal organizada para
Concreto Fc.=175 Kg./cm2 realizar la gestin de la obra y
y emboquillado de piedra posteriormente en la sostenibilidad
con mezcla de concreto de la obra ejecutada
Fc.=175 Kg./cm2
Cambio de Redes de Agua
y Desage
Mejoramiento de las reas
verdes y seales de Trnsito
ONADO
MEDIOS DE VERIFICACIN SUPUESTOS
Informe de Evaluacin de
encuesta anual a los
moradores de la Av.
Confraternidad Internacional
Este y calles aledaas
La
actitud
de
la
poblacin afectada es
positiva y hacen mejor
uso de la va
La va se mantiene
Operativa
Informes de supervisin
de obras
Informes de liquidacin
de obras
La construccin de
la
va
ser
de
Fotografas
acuerdo
a
las
consideraciones y a
plazos
Evaluacin del Impacto los
establecidos
en
el
(expost del proyecto)
expediente tcnico
Es posible contratar
Supervisin
de
obras al
personal
civiles por un monto de requerido para la
S/.130, 019.87
ejecucin de la obra
La
obra
de
Obras Civiles con un
pavimentacin es
costo
de:
S/.
supervisada
1'896,040.83 a Precios
adecuadamente
y
Privados
finaliza en funcin al
cronograma previsto
Mitigacin Ambiental con
un costo de S/.4 140.00 Existe disponibilidad
de
materiales
e
insumos requeridos
para la obra
Liquidacin de Obra con
un costo de S/.15,000.00