PAINTING & DECORATING SOR 1 SCHEDULE OF RATES PAINTING & DECORATING S/N Acrylic Emulsion Paint 1 Brush or wash

down and apply 1 coat of approved acrylic emulsion paint (with 20% water dilution) on concrete or plastered surfaces. Brush or wash down and apply 1 priming coat (with 20% water dilution) and 1 upper coat (without water dilution) of approved acrylic synthetic emulsion paint on concrete or plastered surfaces. Brush or wash down and apply 1 priming coat (with 20% water dilution) and 2 upper coats (without water dilution) of approved acrylic synthetic emulsion paint on concrete or plastered surfaces. Algae Resistant Emulsion Paint 4 Brush or wash down and apply 1 priming coat (with thinning of up to 10% by volume) and 2 subsequent coats (without thinning) of approved water based Algae Resistant Emulsion Paint on all exterior surfaces of the external walls and in accordance with manufacturer's instructions. Synthetic Emulsion Paint 5 Brush or wash down and apply by spraying with an appropriate portable airless spraying equipment, 1 primer coat (with 20% water dilution) and 1 upper coat (without water dilution) of approved acrylic synthetic emulsion paint on concrete or plastered surfaces including providing tapes or other means to cover up door frames, windows frames or other surfaces from being tainted with the paint. Prepare and apply 2 coats of approved synthetic enamel paint to pipes: 6 7 8 Not exceeding 75mm diameter. Exceeding 75mm but not exceeding 150mm diameter. Exceeding 150mm but not exceeding 300mm diameter. Solvent Based Paint 9 Brush or wash down, prepare and apply 1 coat of sealer, 1 undercoat, and 1 finishing coat of solvent based paint on m2 4.20 m m m 0.85 1.50 3.10 m2 2.20 m2 4.20 m2 1.40 DESCRIPTION UNIT RATE ($)

m2

2.30

m2

3.00

CD13/SOR-Building, Sanitary & Plumbing/Painting & Decoration/(1)/[2009 Edition]

PAINTING & DECORATING SOR 2 SCHEDULE OF RATES PAINTING & DECORATING S/N DESCRIPTION concrete or wall surfaces. 10 Brush or wash down, prepare and apply 1 undercoat and 1 finishing coat of solvent based paint for external wall surfaces. Water Based Sealer 11 Brush or wash down, prepare and apply 1 coat of water based sealer on concrete or plastered surfaces. Synthetic Enamel Paint 12 Prepare and apply 1 undercoat and 1 finishing coat of approved synthetic enamel paint on steel and ironwork. Prepare and apply 1 undercoat and 1 finishing coat of approved synthetic enamel paint on grilles or railing etc (rate inclusive of painting on both faces). Prepare and apply 2 coats of approved synthetic enamel paint on casement windows (rate inclusive of painting on both faces). Prepare and apply 2 coats of approved synthetic enamel paint to mild steel door frame not exceeding 300mm girth. Lead and Chromate-free Primer 16 Brush with steel wire brush to remove all rust, prepare and apply 1 coat of approved lead and chromate-free primer on steel and ironwork. Brush with steel wire brush to remove all rust, prepare and apply 1 coat of approved lead and chromate-free primer to pipes not exceeding 75mm diameter. Brush with steel wire brush to remove all rust, prepare and apply 1 coat of approved lead and chromate-free primer to pipes exceeding 75mm diameter but not exceeding 150mm diameter. Brush with steel wire brush to remove all rust, prepare and apply 1 coat of approved lead and chromate-free primer to pipes exceeding 150mm diameter but not exceeding 300mm diameter. Brush with steel wire brush to remove all rust, prepare and apply 2 coats of approved lead and chromate-free primer to pipes exceeding 75mm diameter but not exceeding 150mm diameter. m2 2.40 m2 m2 3.00 m2 1.00 m2 3.10 UNIT RATE ($)

13

3.80

14

m2

2.85

15

1.00

17

0.60

18

1.15

19

2.30

20

2.00

CD13/SOR-Building, Sanitary & Plumbing/Painting & Decoration/(2)/[2009 Edition]

PAINTING & DECORATING SOR 3 SCHEDULE OF RATES PAINTING & DECORATING S/N DESCRIPTION Polyvinyl butyral Etching Primer 21 Prepare and apply 1 coat of polyvinyl butyral etching primer on steel and ironwork. Prepare and apply 1 coat of polyvinyl butyral etching primer to pipes not exceeding 75mm diameter. Prepare and apply 1 coat of polyvinyl butyral etching primer to pipes exceeding 75mm diameter but not exceeding 150mm diameter. Prepare and apply 1 coat of polyvinyl butyral etching primer to pipes exceeding 150mm but not exceeding 300mm diameter. Zinc Chromate Primer 25 Prepare and apply 1 coat of zinc chromate primer to pipes not exceeding 75mm diameter. Prepare and apply 1 coat of zinc chromate primer to pipes not exceeding 75mm diameter but not exceeding 150mm diameter. Prepare and apply 1 coat of zinc chromate primer to pipes exceeding 150mm but not exceeding 300mm diameter Bituminous Paint 28 Prepare and apply 2 coats of bituminous paint to pipes not exceeding 75mm diameter. Prepare and apply 2 coats of bituminous paint to pipes exceeding 75mm but not exceeding 150mm diameter. Prepare and apply 2 coats of bituminous paint to pipes exceeding 150mm diameter but not exceeding 300mm diameter. Wood Preservative 31 Stop, knot with spirit knotting varnish, prime with 1 coat wood primer and paint 2 coats of approved synthetic enamel paint on woodwork. Prepare and apply 2 coats of wood stain/wood dye and 3 coats of clear varnish/lacquer in matt or gloss finish to door surfaces. m2 5.10 m 0.90 m 0.70 m2 1.80 UNIT RATE ($)

22

0.50

23

0.90

24

1.90

26

1.20

27

2.00

29

1.80

30

3.60

32

m2

8.40

CD13/SOR-Building, Sanitary & Plumbing/Painting & Decoration/(3)/[2009 Edition]

PAINTING & DECORATING SOR 4 SCHEDULE OF RATES PAINTING & DECORATING S/N 33 34 35 DESCRIPTION Prepare and apply 2 coats of wood preservative on woodwork. Prepare and apply 2 coats of approved stain on woodwork. Prepare and apply 2 coats of polyurethane varnish on woodwork. Others 36 Prepare and apply 1 coat (up to 5% water dilution) and subsequent coat (without water dilution) of approved pesticide paint to surface of walls, ceilings, columns etc including preparing surfaces. Prepare and apply approved 2 pack system polyurethane paint including sand papering. Prepare and apply 2 coat of approved ready-to-use, air-drying elastomeric wall emulsion paint with waterproofing and repairing fine crack properties in compliance with SS500:2002 (complete with 4 years joint warranty). Prepare and apply 2 coat of approved ready-to-use, air-drying elastomeric wall emulsion paint with waterproofing and repairing fine crack properties in compliance with SS500:2002 (complete with 6 years joint warranty). m2 2.40 UNIT m2 m2 m2 RATE ($) 2.00 4.10 5.20

37

m2 m2

4.55

38

7.60

39

m2

8.80

CD13/SOR-Building, Sanitary & Plumbing/Painting & Decoration/(4)/[2009 Edition]