ABSTRACT

Tire building is the process of assembling all the components onto a tire building drum . This is
carries out in tyre building machine or TBM .The final product of the TBM process is called a
green tire, where green refers to the uncured state. Then the green tyre is moved to curing. In
between these two processes three additional operations are to be carried out on the green tyre.
They are lubing, awling and punching. In Apollo tyres, they were using three different machines
to carry out these operations earlier. Now they introduce a single machine to carry out these three
machines.LAP machine. That machine has got some problems, which makes the process
delayed. The delay at this stage will affect the following stages. So in order to avoid bottle neck
formation, the problems of the machine are to be removed by identifying the causes. This project
deals with, identifying the causes for the existing problems of the LAP machine and solve them
to stabilize the process.