Process For SCFT

Vodafone 3G NSN Gujarat


Project_Version1
Step 1 – Physical Audit
• Start Physical audit for Site before Carry out SCFT.
• Need to fill Physical audit form at Site. ( Please collect Form in Hard Copy from
Coordinator )
• Draw Terrace Layout on reverse of the page.
• Take Photos as given below.
1. Building Photo
2. Antenna FINAL Tilt Photos of all sectors
3. Terrace layout photo which drawn on reverse of Hard Copy Page
4. Sector Clutter Photo
Hard Copy of Physical Audit

Teleysia Network Pvt Ltd ___________________________ Vodafone 3G Gujarat

3G Site ID City
Address
Latitude / longitude Plan___________________________Actual___________________ AMSL
Tower Hgt / Building Hgt
BTS Type
Tower type & Height
Sector Sec-1 Sec-2 Sec-3
Planned Observed Final Planned Observed Final Planned Observed Final
GSM Radiation Height
Azimuth
M Tilt
E Tilt
Total Tilt
WCDMA Antenna Type
Antenna Mount Type
Feeder Cable installed (Y/N)
Feeder Cable Length (in m)
No Of ports of Antenna
Remarks:

Engineer Name Varified By

Date Date

Signature Signature
Step 2 – SCFT
Stationary Test

• 3G-3G Voice call ( 3 calls each with 30 sec duration )


• 3G-3G Video Call ( 3 calls each with 30 sec duration )
• 3G-3G SMS ( 3 SMS )
• PS Data Download ( FTP DL PS ) and take snap shot ( 1)
• PS Data Upload ( FTP UP PS ) and take snap shot ( 2 )
• HS Data Download ( FTP DL HS ) and take Snap shot ( 3 )
• HS Data upload ( FTP UL HS ) and take snap shot ( 4 )
• Web Browsing ( HTTP ) in PS and take snap shot ( 5 )
• Web Browsing ( HTTP ) in HS and take snap shot ( 6 )
• Ping to FTP Server 10.11.208.138 3 times and note down average latency in
msec and take snap shot ( 7 )

Repeat above procedure in all sectors


We have made Command sequence for Voice Video and SMS please use that during SCFT
Also install Net per sec to see data speed
PS, HS and Ping needs to be done by Command Prompt
FTP server – 10.11.208.138
Username – vijay
Password – v1jay!@#
During performing Voice Video and SMS please note down below mentioned parameter.

Stationary test will be carried out at 80-100 m distance from site in main lobe.

SECTOR 1 SECTOR 2 SECTOR 3


Pilot
RxLev (Stationary)
BLER (Stationary)
Ms Tx Pwr (Stationary)
EcNo (Stationary)
RSCP (Stationary)
AMR Codec Rates
Maximum active set
ADJS, ADJG, ADJW Neighbour List
Default Parameters
PS Data Download ( FTP DL PS ) and take snap shot ( 1)
PS Data Upload ( FTP UP PS ) and take snap shot ( 2 )
HS Data Download ( FTP DL HS ) and take Snap shot ( 3 )
HS Data upload ( FTP UL HS ) and take snap shot ( 4 )
Web Browsing ( HTTP ) in PS and take snap shot ( 5 )

OPEN 3 to 4 Browser and Surf Net


Web Browsing ( HTTP ) in HS and take snap shot ( 6 )

OPEN 3 to 4 Browser and Surf Net


Take Snap shot of Ping to FTP Server 3 times and attached ( 7 )
Movable Test
Check Softer Handover in Clockwise and Anticlockwise and take snap shot at every instant
of Handover

For example if you are in 1st sector and handover is happened to same site or neighbour site
Take a snap shot of that event and rename as Sec1 3G-3G Soft Handover.

We need to check handover in all sectors and taking snap shot as shown in next slide.

We also need to check 3g-2g Handover ( IRAT Handover ) in all sectors and take snap shot
For the same as shown in next to next slide.
Sec 1 3G-3G Soft Handover
Sec 1 3G-2G IRAT Handover
When you are performing IRAT Handover after successful handover to 2G take snap shot
and disconnect voice and data call.

During the return to site cell reselection is possible from 2G to 3G without locking the cell

Please check because the same parameter we need to note down in report

Sector 1 Sector 2 Sector 3

Reselection to 3G after 2G CS

Reselection to 3G after 2G PS

Now SCFT will complete and ensure to rename all the log files appropriate and
Submit the report and log files to coordinator