1
Spin Plan of 60S count cotton Yarn 2
Ring frame:
25000
Required ring frame = =52.08 ≈52for 24960 spindles.
480
100−5 95
No. of running spindles = 24960 × = 24960 × = 23712
100 100
Spindle speed × 60
× Efficiency × No . of running spindles
TPI ×36 ×840 ×Count
18000 ×60 90
= × ×23712=470.48 lbs
27 ×36 ×840 × 60 100
2
Spin Plan of 60S count cotton Yarn 3
Simplex section:
100+2.5
= 470.48 ×
100
= 482.24 lbs
1500 ×60 85
= ×
1.87× 36 ×840 ×3.5 100
= 0.39 lbs
482.24
No. of running spindles = =1247.65 ≈ 1248
0.39
100+stoppage time
No. of established spindles = 1248×
100
100+7
= 1248 ×
100
3
Spin Plan of 60S count cotton Yarn 4
= 1335.36 ≈ 1335
1335
No. of simplex machines = = 11.13 ≈ 11
120
Combing
Feed/Nip = 7 mm
Nips/ min= 250
Feed lap weight = 850 grains/yds
Feed Lap hank = 0.01
Delivery sliver weight =52 grains/yds
Delivery sliver hank = 0.16
Noil = 18%
No. of head/frame = 7
Efficiency = 90%.
Average stoppage time= 7%
100+simplex waste
Production of combing = Production of simplex ×
100
100+0.5 %
= 482.24×
100
= 484.65 lbs.
Production/hour =
4
Spin Plan of 60S count cotton Yarn 5
=87.55 lbs
484.65
Number of comber = = 5.53
87.55
100+7
Installed no. of comber = 5.53 × = 5.91≈ 6
100
100+waste
Production of lap former = production of comber ×
100
100+18
= 484.65 × = 571.89 lbs
100
grain
Delivery speed × laphank ∈ × 60
Production per hour = yds
× efficiency
7000
571.89
Number of super Lap former = = 0.89
643.26
100+stoppage time
Number of Installed super lap former = 0.89 ×
100
5
Spin Plan of 60S count cotton Yarn 6
100+7
= 0.89× =0.95 ≈ 1
100
Draw frame:
100+S . L . F waste
Production of draw frame = Super lap former production ×
100
100+2.5
= 571.89 ×
100
= 586.19 lbs
400 ×60 85
= × ×2
840 ×0.16 100
= 303.57
586.19
Running Draw frame = =1.93
303.57
6
Spin Plan of 60S count cotton Yarn 7
100+stoppage time
Install draw frame = 1.93 ×
100
100+10
= 1.93 ×
100
= 2.12 ≈ 2
Carding section:
100+0.75
= 586.19 ×
100
= 590.59 lbs
= 42.58 lbs
7
Spin Plan of 60S count cotton Yarn 8
590.59
= = 13.87
42.58
100+10
= 11.04 ×
100
= 15.26 ≈ 15
100+Carding wastage
Blow Room production = Carding production×
100
100+5
= 590.59 ×
100
= 620.12 lbs
π ×C . R . D× C . R . S ×60
Pro./hr./Scutcher of Blow room = × Efficiency
36 ×840 × Lap h ank
3.14 ×9.5 ×12 ×60 85
= × lbs
36 ×840 ×0.0016 100
8
Spin Plan of 60S count cotton Yarn 9
= 377.31 lbs
Blow Room production
Running Scutcher =
Pro ./hr ./Scutcher of Blow room
620.12
=
377.31
= 1.64
100+ Average ideal time
Installed Scutcher = 1.64 ×
100
100+12
= 1.64×
100
= 1.84 ≈ 2
No. of Blow room line = 2/2 = 1
Summary:
Number of required machines for 25000 spindles & 60 S Count Cotton yarn:
Carding machines = 15
Draw frame = 02
Comber = 06
Simplex = 11
Ring frame = 52
9
Spin Plan of 60S count cotton Yarn 10
10