Está en la página 1de 2

Project:

ETAP

S.E.P. CENTRAL AZUCARERO TRUJ.

Location:

6.0.0

MOTATAN

Page:

Date:

07-11-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Study Case: SM

Filename:

CENTRAL_MOTATAN

SHORT- CIRCUIT REPORT


Fault at bus:
Nominal kV

BARRA TRANSF 1600 kVA


=

0.480

Voltage c Factor

3-Phase Fault

Contribution
From Bus
ID

= 1.05 (User-Defined)

To Bus
ID

%V
From Bus

kA
Symm. rms

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault
% Voltage at From Bus
Va
Vb
Vc

kA Symm. rms
Ia
3I0

BARRA TRANSF
1600 kVA

Total

0.00

30.064

0.00

105.06

91.52

31.104

31.104

Barra Oficinas

0.00

0.000

54.16

62.17

101.43

0.000

0.000

60.06

19.697

87.70

93.17

74.09

25.178

Mtr45

BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA
Taller Ind.

100.00

0.465

100.00

100.00

100.00

Mtr46

Taller Ind.

100.00

0.242

100.00

100.00

Mtr47

Taller Ind.

100.00

0.163

100.00

100.00

Mtr39

Panel 9.

100.00

0.465

100.00

Mtr40

Panel 9.

100.00

0.483

100.00

Mtr41

Panel 9.

100.00

0.507

Mtr33

Panel 7B.

100.00

0.465

Mtr34

Panel 7B.

100.00

Mtr35

Panel 7B.

Mtr27

Panel 7A.

Mtr28
Mtr29

R1

% Impedance on 100 MVA base


X1
R0

X0

9.20E+001

3.89E+002

5.24E+001

3.72E+002

31.104 *

7.26E+001

6.06E+002

5.24E+001

3.72E+002

0.283

0.000

9.15E+003

2.42E+004

100.00

0.129

0.000

2.12E+004

4.50E+004

100.00

0.086

0.000

3.45E+004

6.52E+004

100.00

100.00

0.283

0.000

9.15E+003

2.42E+004

100.00

100.00

0.257

0.000

1.06E+004

2.25E+004

100.00

100.00

100.00

0.268

0.000

1.18E+004

2.06E+004

100.00

100.00

100.00

0.283

0.000

9.15E+003

2.42E+004

0.146

100.00

100.00

100.00

0.077

0.000

3.85E+004

7.27E+004

100.00

0.085

100.00

100.00

100.00

0.045

0.000

7.08E+004

1.23E+005

100.00

0.930

100.00

100.00

100.00

0.567

0.000

4.57E+003

1.21E+004

Panel 7A.

100.00

0.966

100.00

100.00

100.00

0.515

0.000

5.30E+003

1.13E+004

Panel 7A.

100.00

0.634

100.00

100.00

100.00

0.335

0.000

9.44E+003

1.64E+004

Mtr55

Panel 7A.

100.00

0.077

100.00

100.00

100.00

0.040

0.000

8.47E+004

1.32E+005

Mtr21

Panel 5.

100.00

0.930

100.00

100.00

100.00

0.567

0.000

4.57E+003

1.21E+004

Mtr22

Panel 5.

100.00

0.966

100.00

100.00

100.00

0.515

0.000

5.30E+003

1.13E+004

Mtr23

Panel 5.

100.00

0.634

100.00

100.00

100.00

0.335

0.000

9.44E+003

1.64E+004

Mtr15

Panel 4.

100.00

1.449

100.00

100.00

100.00

0.772

0.000

3.53E+003

7.51E+003

Mtr16

Panel 4.

100.00

1.141

100.00

100.00

100.00

0.604

0.000

5.24E+003

9.14E+003

BARRA TRANSF
2500 kVA
GENERADOR
PRINCIPAL

BARRA TRAFOS

71.48

0.167

104.08

83.57

84.56

0.389

0.000

1.39E+003

2.02E+002

BARRA TRAFOS

97.56

0.540

97.56

97.56

97.56

0.210

0.000

6.36E+000

3.05E+002

Inyeccion

BARRA TRANSF
2500 kVA
BARRA TRANSF
2500 kVA
BARRA TRANSF
2500 kVA
Panel 8B.

100.00

0.660

100.00

100.00

100.00

0.039

0.000

1.08E+003

5.09E+003

100.00

0.414

100.00

100.00

100.00

0.024

0.000

2.02E+003

8.05E+003

100.00

0.414

100.00

100.00

100.00

0.024

0.000

2.02E+003

8.05E+003

100.00

0.039

100.00

100.00

100.00

0.005

0.000

5.34E+004

6.90E+004

BARRA TRAFOS

Picadora
Rechazo
Mtr13

Project:

ETAP

S.E.P. CENTRAL AZUCARERO TRUJ.

Location:

6.0.0

MOTATAN

Page:

Date:

07-11-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Study Case: SM

Filename:

CENTRAL_MOTATAN

(Cont.)

Fault at bus:
Nominal kV

BARRA TRANSF 1600 kVA


=

0.480

Voltage c Factor

3-Phase Fault

Contribution
From Bus
ID

= 1.05 (User-Defined)

To Bus
ID

%V
From Bus

kA
Symm. rms

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault
% Voltage at From Bus
Va
Vb
Vc

kA Symm. rms
Ia
3I0

R1

% Impedance on 100 MVA base


X1
R0

Mtr12

Panel 8A.

100.00

0.414

100.00

100.00

100.00

0.037

0.000

3.53E+003

7.51E+003

Mtr51

Panel 6,

100.00

0.398

100.00

100.00

100.00

0.022

0.000

3.05E+003

8.06E+003

Mtr52

Panel 6,

100.00

0.345

100.00

100.00

100.00

0.031

0.000

4.24E+003

9.01E+003

Mtr53

Panel 6,

100.00

0.290

100.00

100.00

100.00

0.029

0.000

5.90E+003

1.03E+004

Mtr10

Panel 2.

100.00

0.627

100.00

100.00

100.00

0.053

0.000

2.17E+003

5.02E+003

Motore 1 Panel 3..

Panel 3.

100.00

0.336

100.00

100.00

100.00

0.019

0.000

3.81E+003

9.47E+003

Mtr7

Panel 3.

100.00

0.365

100.00

100.00

100.00

0.033

0.000

4.00E+003

8.50E+003

Mtr9

Panel 3.

100.00

0.419

100.00

100.00

100.00

0.040

0.000

3.83E+003

7.24E+003

Panel 4.

BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA
BARRA TRANSF
1600 kVA

0.00

2.588

0.00

105.06

91.52

1.375

0.000

0.00

2.525

0.00

105.06

91.52

1.415

0.000

0.00

2.601

0.00

105.06

91.52

1.455

0.000

0.00

0.694

0.00

105.06

91.52

0.405

0.000

0.00

1.452

0.00

105.06

91.52

0.808

0.000

0.00

0.868

0.00

105.06

91.52

0.498

0.000

71.48

0.452

104.08

83.57

84.56

0.041

0.000

Panel 8A.

BARRA TRANSF
2500 kVA

71.48

0.414

104.08

83.57

84.56

0.037

0.000

Panel 8B.

71.48

0.039

104.08

83.57

84.56

0.005

0.000

Panel 3.

BARRA TRANSF
2500 kVA
BARRA TRANSF
2500 kVA
BARRA TRANSF
2500 kVA

71.48

1.119

104.08

83.57

84.56

0.074

0.000

71.48

0.627

104.08

83.57

84.56

0.053

0.000

71.48

1.030

104.08

83.57

84.56

0.063

0.000

Panel 5.
Panel 7A.
Panel 7B.
Panel 9.
Taller Ind.

Panel 2.
Panel 6,

Initial Symmetrical Current (kA, rms)


Peak Current (kA), Method C
Breaking Current (kA, rms, symm)
Steady State Current (kA, rms)

:
:
:
:

3-Phase
30.064
63.127
10.610

L-G
31.104
65.313
31.104
31.104

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

L-L
26.452
55.543
26.452
26.452

L-L-G
32.537
68.321
32.537
32.537

X0