Está en la página 1de 4

RESUME

G NAGENDRA
Mob: 9052453555
Godina579@gmail.com
CAREER OBJECTIVE

To work in a firm with a professional work driven environment


where I can utilize and apply my knowledge, skills which
would enable me as a fresh graduate to grow while fulfilling
organizational goals.
PROJECT DETAILS

Project
Emp ID
Vendor Name
DOJ
Location

: RELIANCE INDUSTRIES LTD


: H2164
: AAPT Outsourcing Solutions pvt ltd.
: 19-07-2013
: Cuddapah

Professional Profile:

Start of OSP work execution as per received permission.


Having good knowledge of different trenching methodology such as Open Trenching,
Micro/Slot Trenching, HDD (Horizontal Directional Drilling).
To keep supervision of works- starting from Trenching, Laying, Back-filling, DIT,
Blowing, Splicing (coupling),Testing (using OTDR),Termination in FMS of the
OFC(Optical Fiber Cable) .
Splicing (coupling) of the OFC using splicing machine
By Termination of the OFC in the Tower equipment room using splicing machine.
And To preparation of ABD of completed link.
Taking record of all measurements in specified measurement sheets.
To track of daily progress report (DPR) in the specified format and
Detailed route survey as per planned route.
Preparing SLD and submitting application to concerned authority
Coordination and commissioning of new sites & Core nodes for entire cluster.
Link through from ONE POINT TO ANOTHER END POINT.
Presently handling 4G OFC Fiber for entire complete kadapa.

Coordinating and supporting my implementation engineers in maintaining quality at new


nodes and site works done in time to meet project rollouts
Splicing (coupling) of the OFC using splicing machine
Route Surveys for new nodes with the help of GPS(global positioning) with 3 point
location and OPTICAL POWER METER.

Fiber Cable

and Structural cable with help of OPM Meter for Termination and

straighting.
Quality Assurance & Testing of Optical Fiber Network.
Quality Assurance of D. I. T & O. F. C Blowing.
Survey, Planning & Execution of O. F. C Network (Fiber Cluster).
Quality Assurance of O.F.C splicing & termination at FMS .
Follow up with vendors to get work execution with Maintain Quality as per
Specifications.
Follow Up with the Vendors to execute the Work within the Time line.
Start of OSP work execution as per received permission
Preparing SLD and submitting to concerned authority, Resolving the OWNER ISSUES
also.
AREAL work of installation of poles and Cable Pulling with Padestals.
By Termination of the OFC in the Tower equipment room using splicing machine.
To track of daily progress report (DPR) in the specified format and
Liaison with local Authorities for ROW like PWD, MCD,NHAI and GHMC.
Having good knowledge of different trenching methodology such as Open Trenching,
Micro/Slot Trenching, HDD (Horizontal Directional Drilling).

BASIC ACADEMIC CREDENTIALS

Qualificatio
n
B.Tech (Civil
Engineering)
Intermediate

Board/University

Year

Percentage

ACHARAYA COLL OF ENG

2013

65%

ISC
Nagarjuna junior college

2009

64%

High School

ICSE
Z .P .H IGH(Boys) school

2007

62%

EXPERIENTIAL LEARNING (SUMMER INTERNSHIP PROGRAM)

Project Title
STAAD.PRO

Duration

Design Of Over Head Tank Using

one Months (21th Jan13 to 21th Feb13)

PROJECT TITLE

Design Of Over Head Tank Using STAAD.PRO

I.T PROFICIENCY

STADD PRO vi8(Civil)

Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Point

INTERPERSONAL SKILL
Ability to rapidly build relationship and set up trust.
Confident and Determined
Ability to cope up with different situations.
PERSONAL DETAILS
Fathers Name

G.MANOHRA

Permanent Address

D.NO: 6/120

Godina Vari (St)


Chennur (m)
Kadapa(dst)
Date of Birth
Language Known

:
:

05-06-1992

English & Telugu

Marital Status

Single

Nationality/Religion

Indian / Hindu

Interest & Hobbies

Palying chess, Listen songs and Reading

novel(Telugu)

DECLARATION
I do hereby declare that the above information is true to the best of my knowledge.
Place:
Date:
NAGENDRA.G

También podría gustarte