PERFORACION EN FRENTES:

BP 343

MINA

BIENAVENTURADA

LABOR

BP 343

EQUIPO DE LIMPIEZA

SCOOP MOD.
WAGNER

EQUIPO DE PERFORACION

JACK LEG

1.67 m

5.48'

33

03

LONG. DE PERFORACION
NIVEL

SECCION

MATERIAL

DENSIDAD DE
MATERIAL (TM/m3)
TIPO DE ROCA

4280

8' X 8' (2.4 m x 2.4


m)

DESMONTE

EFECTIVA

N DE TALADROS
(PERFORADOS)

N DE TALADROS (ALIVIOS)

DENSIDAD DEL EXPLOSIVO


2.7

(Kg/m3)

900

RMR 50-60

PIES PERFORADOS TOTALES

192.28'

ANLISIS DE TIEMPOS DE PERFORACIN


TIEMPO DE PERFORACION CON BARRENO DE 4'

DE

TIEMPO

TIEMPO

TIEMPO

TAL.

Nro

EMBOQUILLADO PERFORACIN BARRIDO

TIEMPO
DE CAMBIO

T.T.

DE

DE PEFORACIN

seg.

seg.

BARRENO seg

TALADRO seg seg

6.00

166.00

11.00

10.00

183.00

4.00

150.00

6.00

14.00

160.00

5.00

160.00

15.00

10.00

180.00

6.00

175.00

7.00

11.00

188.00

7.00

158.00

10.00

13.00

175.00

4.00

177.00

11.00

9.00

192.00

8.00

168.00

9.00

11.00

185.00

5.00

149.00

11.00

8.00

165.00

8.00

180.00

9.00

12.00

197.00

10

6.00

162.00

11.00

15.00

179.00

11

9.00

161.00

12.00

11.00

182.00

12

7.00

190.00

11.00

14.00

208.00

13

6.00

178.00

13.00

16.00

197.00

14

8.00

170.00

18.00

15.00

196.00

15

9.00

156.00

16.00

17.00

181.00

16

7.00

136.00

8.00

12.00

151.00

17

9.00

131.00

9.00

15.00

149.00

18

6.00

130.00

9.00

13.00

145.00

19

5.00

128.00

6.00

12.00

139.00

20

7.00

124.00

5.00

12.00

136.00

21

6.00

155.00

7.00

13.00

168.00

22

8.00

140.00

9.00

10.00

157.00

23

9.00

173.00

13.00

9.00

195.00

24

8.00

184.00

14.00

8.00

206.00

25

6.00

152.00

7.00

9.00

165.00

26

7.00

164.00

10.00

7.00

181.00

27

5.00

165.00

10.00

9.00

180.00

28

9.00

137.00

7.00

10.00

153.00

29

8.00

188.00

9.00

9.00

205.00

30

7.00

165.00

11.00

8.00

183.00

31

6.00

162.00

10.00

21.00

178.00

32

8.00

165.00

9.00

11.00

182.00

33

5.00

141.00

8.00

12.00

154.00

34

6.00

147.00

11.00

14.00

164.00

35

8.00

155.00

9.00

16.00

172.00

36

7.00

148.00

12.00

10.00

167.00

TOTAL

245.00

5690.00

363.00

426.00

6298.00

PROM (seg) 245.00

5690.00

363.00

426.00

6298.00

94.83

6.05

7.10

104.97

PROM
(min)

4.08

TIEMPO DE PERFORACION CON BARRENO DE 6'


TIEMPO
Nro DE TAL.

TIEMPO

EMBOQUILLADO PERFORACIN
seg.

seg.

5.00

82.00

4.00

TIEMPO BARRIDO
DE BARRENO seg.

T.

T.DE LONG. DE

PERFORACIN TALADRO
seg.

m.

9.00

96.00

1.68

75.00

9.00

88.00

1.70

6.00

68.00

8.00

82.00

1.69

4.00

70.00

9.00

83.00

1.70

3.00

80.00

9.00

92.00

1.64

7.00

69.00

10.00

86.00

1.66

5.00

78.00

8.00

91.00

1.70

6.00

76.00

8.00

90.00

1.69

4.00

95.00

10.00

109.00

1.68

10

6.00

87.00

9.00

102.00

1.70

11

5.00

97.00

11.00

113.00

1.66

12

6.00

87.00

11.00

104.00

1.69

13

4.00

85.00

12.00

101.00

1.69

14

7.00

92.00

10.00

109.00

1.65

15

5.00

135.00

9.00

149.00

1.64

16

6.00

97.00

9.00

112.00

1.65

17

7.00

91.00

11.00

109.00

1.68

18

5.00

89.00

8.00

102.00

1.66

19

6.00

93.00

11.00

110.00

1.67

20

4.00

86.00

9.00

99.00

1.63

21

5.00

94.00

11.00

110.00

1.65

22

6.00

102.00

12.00

120.00

1.65

23

7.00

92.00

15.00

114.00

1.66

24

5.00

131.00

13.00

149.00

1.64

25

7.00

91.00

10.00

108.00

1.64

26

5.00

89.00

9.00

103.00

1.62

27

6.00

102.00

13.00

121.00

1.60

28

7.00

93.00

12.00

112.00

1.70

29

4.00

86.00

10.00

100.00

1.69

30

6.00

105.00

12.00

123.00

1.70

31

5.00

111.00

14.00

130.00

1.68

32

6.00

84.00

15.00

105.00

1.66

33

4.00

95.00

12.00

111.00

1.65

34

6.00

83.00

16.00

105.00

1.63

35

7.00

77.00

15.00

99.00

1.67

36

8.00

89.00

10.00

107.00

1.68

TOTAL

199.00

3256.00

389.00

3844.00

59.98

PROM
(seg)
PROM
(min)

199.00

3256.00

389.00

3844.00

3.32

54.26

6.48

64.06