Está en la página 1de 156

DATOS GENERALES

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBER

Nombre de La Obra:

Entidad Contratante

MUNICIPALIDAD DISTRITAL DE LAREDO

Contratista

CONSORCIO AGUAS LAREDO

Modalidad de Ejecucin

A SUMA ALZADA

Identificacin

LP N 002-2013-CE/MDL

Representante Legal

SR. RICHARD ALEXANDER ABANTO VITERY

Alcalde Distrital

SR.JAVIER RODRIGUEZ

Ingeniero Residente

ING. MARCIA MARTOS HERNANDEZ

Ingeniero Supervisor

ING. JULIO FELIX VALERIANO MURGA

Ubicacin

LA LIBERTAD-TRUJILLO-LAREDO
Departamento: LA LIBERTAD

Provincia : TRUJILLO

Distrito : LAREDO

Region : LA LIBERTAD

Fecha Firma de Contrato

Monday, March 03, 2014

Fecha Entrega Terreno

Thursday, December 18, 2014

Fecha de Inicio

Saturday, December 20, 2014

Fecha de Termino

Friday, October 16, 2015

Valor Referencial

S/.

27,647,382.62

S/.

27,647,382.62

.
Monto Adjudicado
Factor de Relacin

1.00

Adelanto Directo

S/.

Adelanto por Materiales

S/.

5,529,476.52
-

1/156

S GENERALES

AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


AREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

TAL DE LAREDO

REDO

ER ABANTO VITERY

HERNANDEZ

IANO MURGA

LAREDO
TRUJILLO
LA LIBERTAD

, 2014

, 2014

2/156

CONSORCIO AGUAS LAREDO


OBRA:

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE


Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE
LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACIN DE OBRA N 02
MODALIDAD DE EJECUCIN:

A PRECIOS UNITARIOS
CONTRATISTA:

CONSORCIO AGUAS LAREDO


RESIDENTE DE OBRA:

ING. MARCIA MARTOS HERNANDEZ


SUPERVISOR DE OBRA:

ING. JULIO FELIX VALERIANO MURGA


LA LIBERTAD-TRUJILLO-LAREDO
ENERO DEL 2015

MUNICIPALIDAD DISTRITAL DE LAREDO

CONTENIDO DE DOCUMENTOS
1

Datos Generales

Informe del Residente De Obra

Valorizacin de Obra N 2 (Del 01/01/2015 AL 31/01/2015 )

Metrados Ejecutados.

Control de Avance de Obra

Pago a Cuenta al Contratista por Valorizacin N 02

Hoja de Cancelacin al Contratista.

Acta de adjudicacion de la buena Pro

Acta de Entrega de Terreno.

10

Contrato de Ejecucin de Obra

11

Carta Fianza

12

Panel Fotogrfico.

13

Control de almacen

14

Pruebas, ensayos y protocolos

15

Copias del Cuaderno de Obra.

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD


DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

MUNICIPALIDAD DISTRITAL DE LAREDO

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD


DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Datos Generales

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Informe del Residente De Obra

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Valorizacin de Obra N 2 (Del


01/01/2015 AL 31/01/2015 )

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Metrados Ejecutados.

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Control de Avance de Obra

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Pago a Cuenta al Contratista por


Valorizacin N 02

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Hoja de Cancelacin al Contratista.

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Acta de adjudicacion de la buena Pro

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Acta de Entrega de Terreno.

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Contrato de Ejecucin de Obra

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Carta Fianza

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Panel Fotogrfico.

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Control de almacen

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Pruebas, ensayos y protocolos

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA


LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Copias del Cuaderno de Obra.

RESIDENTE:ING. MARCIA MARTOS HERNANDEZ

VALORIZACION N02

( PERODO DEL 01/01/2015 AL 31/01/2015 )

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN


LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA
LIBERTAD"
SUPERVISOR DE OBRA

ING. JULIO FELIX VALERIANO MURGA


2.6

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

ENTIDAD CONTRATANTE :

MUNICIPALIDAD DISTRITAL DE LAREDO

CONTRATISTA

CONSORCIO AGUAS LAREDO

UBICACIN:
DEPARTAMENTO :

LA LIBERTAD

PROVINCIA

TRUJILLO

DISTRITO

LAREDO

ENERO 2015

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

UND

METRADO

VALORIZACION
N01

01 CAPTACION GALERIA FILTRANTE JESUS MARIA


01.01 OBRAS PROVISIONALES PARA TODA LA OBRA
01.01.01
CONSTRUCCION CAMPAMENTO PROVISIONAL PARA LA OBRA
01.01.02
CASETA DE GUARDIANIA Y ALMACEN
01.01.03
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M
01.01.04
MOVILIZACION DE MAQUINARIA Y HERRAMIENTAS PARA LA OBRA
01.02 OBRAS PRELIMINARES
01.02.01
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
01.02.02
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
01.03 MOVIMIENTO DE TIERRAS
01.03.01
BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"
01.03.02
SUMINISTRO E INSTALACION DE HIDRANTES (FILTRO DE GRAVA)
01.04 EXCAVACIONES DE ZANJAS
01.04.01
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=4.00M P/TUB. 200 MM.
01.05 REFINE Y NIVELACION DE ZANJAS
01.05.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.
01.06 CAMA DE APOYO
01.06.01
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.
01.07 RELLENO DE ZANJAS
01.07.01
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=4.0 M.
01.08 ELIMINACION DE MATERIAL EXCEDENTE
01.08.01
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 200 MM. HASTA R=5 KM.
01.09 ENTIBADOS Y/O TABLESTACADOS
01.09.01
ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.
01.10 SUMINISTRO E INSTALACION DE TUBERIAS
01.10.01
TUBERIA P.V.C. CLASE A-7.5 UF DE 160 MM
01.10.02
TUBERIA P.V.C. CLASE A-7.5 UF DE 200 MM
01.10.03
INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA Y DESINFECCION
01.10.04
INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA Y DESINFECCION
01.11 CAJAS PARA REBOSE
01.11.01
CAMARA DE REUNION PARA GALERIA FILTRANTE H=3.00M
01.11.02
CAMARA DE REUNION PARA GALERIA FILTRANTE H=4.00M
01.11.03
CAMARA DE REUNION PARA GALERIA FILTRANTE H=9.00M
02 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
02.01 OBRAS PRELIMINARES
02.01.01
LIMPIEZA Y DESBROCE DE TERRENO HASTA 0.20 M DE PROFUNDIDAD PARA LAGUNAS
02.01.02
TRAZO Y REPLANTEOS DEL PROYECTO DE OBRA
02.02 MOVIMIENTO DE TIERRAS
02.02.01
EXCAVACION MASIVA EN T. NATURAL PARA FORMACION DE LAGUNA INC. ACARREO Y SELECCION DE MAT
02.02.02
EXCAVACION MANUAL EN TERRENO NORMAL
02.02.03
RELLENO MASIVO P/FORMACION DE DIQUES Y FONDOS INC. CARGUIO Y TRANSPORTE
02.02.04
REFINE Y NIVELACION EN TERRENO NORMAL
02.02.05
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO
02.02.06
ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=5 KM)
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01
CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PII)
02.04 OBRAS DE CONCRETO ARMADO
02.04.01
CONCRETO f'c=210 kg/cm2 P/ZAPATAS (CEMENTO PII)
02.04.02
CONCRETO f'c=245 kg/cm2 P/ZAPATAS (CEMENTO PII)
02.04.03
ENCOFRADO Y DESENCOFRADO P/ZAPATAS RECTAS
02.04.04
ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS
02.04.05
CONCRETO f'c=210 kg/cm2 P/LOSAS DE FONDO - PISO
02.04.06
CONCRETO f'c=245 kg/cm2 P/LOSAS DE FONDO - PISO C-II
02.04.07
ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO
02.04.08
ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO
02.04.09
CONCRETO f'c=245 kg/cm2 P/MUROS REFORZADOS C-II
02.04.10
ENCOFRADO Y DESENCOFRADO P/MURO RECTOS
02.04.11
ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS
02.04.12
CONCRETO f'c=210 kg/cm2 P/COLUMNAS
02.04.13
CONCRETO f'c=245 kg/cm2 P/COLUMNAS
02.04.14
ENCOFRADO Y DESENCOFRADO P/COLUMNAS
02.04.15
ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS
02.04.16
CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES
02.04.17
ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES
02.04.18
ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES
02.04.19
CONCRETO f'c=245 kg/cm2 P/LOSAS MACIZAS
02.04.20
ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS
02.04.21
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS
02.04.22
CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS
02.04.23
ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS
02.04.24
ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS

m2
m2
m2
glb
m
m
hm
m3
m
m
m
m
m3
m
m
m
m
m
und
und
und
ha
ha
m3
m3
m3
m2
m3
m3
m3
m3
m3
m2
kg
m3
m3
m2
kg
m3
m2
kg
m3
m3
m2
kg
m3
m2
kg
m3
m2
kg
m3
m2
kg

90.00
300.00
25.92
1.00
1,945.00
1,945.00
480.00
243.00
1,945.00
1,945.00
1,945.00
1,945.00
260.04
703.00
1,242.00
703.00
1,242.00
703.00
15.00
20.00
1.00
2.60
2.60
112,246.23
23.60
3,510.22
38.80
19.00
125,051.70
1.20
4.60
9.76
45.28
263.35
39.50
29.82
128.90
1,889.10
22.25
294.53
1,851.31
1.10
4.55
59.00
720.69
1.10
1.10
191.00
1.66
4.74
171.58
2.80
42.00
151.00

90.00
250.00
25.92
0.45
1,945.00
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM
02.04.25
02.05
02.05.01
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.07
02.07.01
02.08
02.08.01
02.08.02
02.08.03
02.09
02.09.01
02.10
02.10.01
02.10.02
02.10.03
02.11
02.11.01
02.11.02
02.11.03
02.11.04
02.12
02.12.01
02.13
02.13.01
02.13.02
02.13.03
02.13.04
02.13.05
02.14
02.14.01
02.14.02
02.15
02.15.01
02.15.02
02.15.03
02.15.04
02.15.05
02.15.06
02.15.07
02.15.08
02.15.09
02.16
02.16.01
02.16.02
02.16.03
02.16.04
02.16.05
02.16.06
02.16.07
02.17
02.17.01
02.17.02
02.17.03
02.18
02.18.01
02.18.02
02.18.03
02.18.04
02.18.05
02.18.06
02.18.07
02.18.08
02.18.09
02.18.10
02.18.11
02.18.12

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION
LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM
REVOQUES Y ENLUCIDOS
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS
CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:4X1.5 CM
PISOS Y PAVIMENTOS
CONTRAPISO CON MORTERO 1:5 DE 40 MM.
PISO DE LOSETA CERAMICA BLANCO DE .20X.20 M C/BASE MOR 1:4X25MM
PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.
CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA C/MORT. 1:4 JUNTA 1.5 CM.
CARPINTERIA METALICA
VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA
PUERTA METALICA LAC 1/16" C/MARCO 2"X2"x1/4" Y REFUERZOS
PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC 3/16".
CERRAJERIA
CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2 GOLPES
CANDADO INCLUYENDO ALDABAS
PICAPORTE GALVANIZADO REDONDO DE 0.10M
MANIJA DE BRONCE
VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE
PINTURAS
PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)
PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
VARIOS
IMPERMEABILIZACION CON GEOMEMBRANA P.E.D.A DE 1.00 MM DE ESPESOR
TANQUE DE FIBRA DE VIDRIO V=1000 LT. I/ACCESORIOS E INSTALACION
APARATOS SANITARIOS Y ACCESORIOS
INODORO TANQUE BAJO BLANCO INC. ACCESORIOS
LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.
LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA
JABONERA DE LOSA COLOR BLANCO
TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR BLANCO
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO
GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE
INSTALACION DE APARATOS SANITARIOS
INSTALACION DE ACCESORIOS SANITARIOS
SISTEMA DE DESAGUE
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
SALIDAS DE PVC SAL PARA DESAGUE DE 2"
SALIDAS DE PVC SAL PARA DESAGUE DE 4"
RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"
TRAMPA P PVC DESAGUE SAL 4"
PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"
SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.
SISTEMA AGUA FRIA
SALIDA DE AGUA FRIA DE PVC DE 1/2"
RED DE PVC CLASE A-10 SP DE 1/2"
VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2"
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14 AWG
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 12
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")
TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")
TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")
TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")
CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2
CABLE ELECTRO TW AWG-MCM NO. 6-16.0 MM2
CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2
CABLE ELECTRICO NYY 1X6 MM2
CABLE ELECTRICO NYY 1X10 MM2

UND
und
m2
m2
m2
m2
m
m2
m2
m2
m2
m2
m2
m2
m2
und
und
und
und
p2
m2
m2
m2
m2
m2
m2
und
und
und
und
und
und
und
und
und
und
pto
pto
pto
m
und
und
und
pto
m
und
pto
pto
pto
m
m
m
m
m
m
m
m
m

METRADO
310.00
52.00
12.10
59.00
52.00
27.00
41.70
15.60
3.00
12.06
41.70
5.62
5.25
11.00
4.00
1.00
1.00
4.00
60.45
41.70
59.00
52.00
32.00
11.24
74,132.79
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
4.00
1.00
2.00
1.00
10.00
1.00
1.00
1.00
3.00
20.00
1.00
3.00
3.00
5.00
12.00
3.00
6.00
2.00
13.00
9.00
12.00
1,902.00
569.00

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

02.18.13
CABLE ELECTRICO NYY 1X16 MM2
02.18.14
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN ESPEFICICACIONES
02.18.15
ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR INC. EQUIPO Y PANTALLA
02.18.16
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE AHORRADOR DE 20 W. O SIMILAR
02.18.17
LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR
02.18.18
CAJA PORTAMEDIDOR TIPO LT
02.18.19
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<5 OHMIOS
02.18.20
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<20 OHMIOS
02.18.21
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) PARA RABLERO DE CONTROL
02.18.22
ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG, INC. CONEXIONADO Y ACCESORIOS
02.18.23
SUMINISTRO E INST. DE TRANSFORMADOR DE 25 KVA 10/0.23 KV
02.18.24
PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"
02.18.25
POSTE CONCRETO CENTRIF. 11/200/150/315
02.18.26
PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE FUNCIONAMIENTO
02.18.27
EXCAVACIONES DE ZANJAS
02.18.27.01
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 250 MM.
02.18.27.02
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 300 MM.
02.18.27.03
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.
02.18.27.04
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.
02.18.27.05
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM
02.18.27.06
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.
02.18.27.07
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=2.0 M.
02.18.27.08
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=2.0 M.
02.18.27.09
ELIMINACION DE MATERIAL EXCEDENTE
02.18.28
BUZONES Y CAMARAS
02.18.28.01
TANQUE SEPTICO DE CONCRETO ARMADO
02.18.28.02
POZO DE PERCOLACION
02.18.29
SUMINISTRO E INSTALACION DE TUBERIAS
02.18.29.01
TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 250 MM
02.18.29.02
TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 300 MM
02.18.29.03
INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 250 MM.
02.18.29.04
INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 300 MM.
02.18.29.05
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS TAPADA
02.18.29.06
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS TAPADA
02.18.30
PAVIMENTOS
02.18.30.01
CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)
02.18.30.02
VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5
02.18.30.03
SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM
02.18.31
CERCOS
02.18.31.01
CERCO PERIMETRICO CON POSTES DE CONCRETO Y ALAMBRE DE PUAS
03 LINEA DE CONDUCCION DE CAPTACION JESUS MARIA
03.01 OBRAS PRELIMINARES
03.01.01
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
03.01.02
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE OBRA)
03.01.03
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
03.01.04
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
03.01.05
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
03.02 EXCAVACIONES DE ZANJAS
03.02.01
EXCAVACION C/EQUIPO P/AGUA T. NATURAL P/TUB. 315 MM.
03.03 REFINE Y NIVELACION DE ZANJAS
03.03.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.
03.04 CAMA DE APOYO
03.04.01
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM
03.05 RELLENO DE ZANJAS
03.05.01
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM
03.06 ELIMINACION DE MATERIAL EXCEDENTE
03.06.01
ELIMINACION DE MATERIAL EXCEDENTE
03.07 SUMINISTRO E INSTALACION DE TUBERIAS
03.07.01
TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM.
03.07.02
INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA
03.07.03
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA
03.08 SUMINISTRO E INSTALACION DE ACCESORIOS
03.08.01
CODO PVC U.F. DE 45X315 MM.
03.08.02
CODO PVC U.F. DE 22.5X315 MM.
03.08.03
INSTALACION DE ACCESORIOS PVC U.F. 315 MM. INC. DADO DE ANCLAJE
03.09 SUMINISTRO E INSTALACION DE VALVULAS
03.09.01
VALVULA PURGA DE F. FDO. BRIDADA 8"
03.09.02
VALVULA DE AIRE DE 2" DOBLE EFECTO
03.10 CAMARAS PARA VALVULAS
03.10.01
CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ 4-24"
03.10.02
CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"

UND
m
und
und
und
und
und
und
und
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m3
und
und
m
m
m
m
m
m
m2
m2
m
m
und
und
m
m
m
m
m
m
m
m3
m
m
m
und
und
und
und
und
und
und

METRADO
21.00
1.00
2.00
1.00
23.00
1.00
1.00
2.00
1.00
1.00
1.00
23.00
23.00
1.00
74.00
43.00
74.00
43.00
74.00
43.00
74.00
43.00
29.25
1.00
1.00
74.00
43.00
74.00
43.00
74.00
43.00
150.00
30.00
25.00
690.00
30.00
50.00
13,149.00
13,149.00
13,149.00
13,149.00
13,149.00
13,149.00
13,149.00
2,780.00
13,149.00
13,149.00
13,149.00
7.00
124.00
131.00
3.00
11.00
11.00
3.00

VALORIZACION
N01
15.00
10.00
1,016.81
13,149.00
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

04 LINEA DE ADUCCION DE RESERVORIO APOYADO


04.01 OBRAS PRELIMINARES
04.01.01
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
04.01.02
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE OBRA)
04.01.03
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
04.01.04
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
04.01.05
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
04.02 EXCAVACIONES DE ZANJAS
04.02.01
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.
04.02.02
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.
04.03 REFINE Y NIVELACION DE ZANJAS
04.03.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.
04.03.02
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.
04.04 CAMA DE APOYO
04.04.01
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.
04.04.02
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM
04.05 RELLENO DE ZANJAS
04.05.01
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.
04.05.02
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.
04.06 ELIMINACION DE MATERIAL EXCEDENTE
04.06.01
ELIMINACION DE MATERIAL EXCEDENTE
04.07 SUMINISTRO E INSTALACION DE TUBERIAS
04.07.01
TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM
04.07.02
TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)
04.07.03
INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA
04.07.04
INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA
04.07.05
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA
04.07.06
PRUEBA HIDRAULICA+ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA
04.08 SUMINISTRO E INSTALACION DE ACCESORIOS
04.08.01
CODO HO DUCTIL DE 45 X 300 MM.
04.08.02
INSTALACION DE ACCESORIOS HO. DUCTIL EMBONE DE 300 - 350 MM
04.09 SUMINISTRO E INSTALACION DE VALVULAS
04.09.01
VALVULA PURGA DE F. FDO. BRIDADA 8"
04.09.02
VALVULA DE AIRE DE 2" DOBLE EFECTO
04.10 CAMARAS PARA VALVULAS
04.10.01
CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ 4-24"
04.10.02
CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"
05 REDES DE DISTRIBUCION PRIMARIA Y SECUNDARIA
05.01 OBRAS PRELIMINARES
05.01.01
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
05.01.02
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE OBRA)
05.01.03
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO
05.01.04
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
05.01.05
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)
05.01.06
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)
05.01.07
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
05.01.08
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
05.02 EXCAVACIONES DE ZANJAS
05.02.01
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 90-110 MM.
05.02.02
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 140-160 MM.
05.02.03
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 200 MM.
05.02.04
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 250 MM.
05.02.05
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.
05.03 REFINE Y NIVELACION DE ZANJAS
05.03.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 90-110 MM.
05.03.02
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 140-160 MM.
05.03.03
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.
05.03.04
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.
05.03.05
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.
05.04 CAMA DE APOYO
05.04.01
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 90-110 MM.
05.04.02
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 140-160 MM.
05.04.03
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.
05.04.04
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.
05.04.05
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM
05.05 RELLENO DE ZANJAS
05.05.01
RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 90-110 MM
05.05.02
RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 140-160 MM
05.05.03
RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 200 MM
05.05.04
RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 250 MM
05.05.05
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.

UND
und
und
m
m
m
m
m
m
m
m
m
m
m
m3
m
m
m
m
m
m
und
und
und
und
und
und
und
und
und
m
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

METRADO
20.00
10.00
4,042.00
4,042.00
4,042.00
3,542.00
500.00
500.00
3,542.00
500.00
3,542.00
3,542.00
500.00
540.41
3,542.00
500.00
3,542.00
500.00
3,542.00
500.00
123.00
123.00
10.00
10.00
10.00
10.00
40.00
30.00
20.00
28,038.22
30.00
10.00
28,038.22
28,038.22
22,213.55
4,136.34
1,391.85
246.45
50.04
22,213.55
4,136.34
1,391.85
246.45
50.04
22,213.55
4,136.34
1,291.85
246.45
50.04
22,213.55
4,136.34
1,391.85
246.45
50.04

VALORIZACION
N01
4,042.00
28,038.22
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

05.06 ELIMINACION DE MATERIAL EXCEDENTE


05.06.01
ELIMINACION DE MATERIAL EXCEDENTE
05.07 SUMINISTRO E INSTALACION DE TUBERIAS
05.07.01
TUBERIA P.V.C. CLASE A - 7.5 UF DE 90 MM.
05.07.02
TUBERIA P.V.C. CLASE A - 7.5 UF DE 110 MM.
05.07.03
TUBERIA P.V.C. CLASE A - 7.5 UF DE 160 MM.
05.07.04
TUBERIA P.V.C. CLASE A - 7.5 UF DE 200 MM.
05.07.05
TUBERIA P.V.C. CLASE A - 7.5 UF DE 250 MM.
05.07.06
TUBERIA P.V.C. CLASE A - 7.5 UF DE 315 MM.
05.07.07
INSTALACION TUBERIA PVC UF DE 90 MM. INC. PRUEBA HIDRAULICA
05.07.08
INSTALACION TUBERIA PVC UF DE 110 MM. INC. PRUEBA HIDRAULICA
05.07.09
INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA
05.07.10
INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA
05.07.11
INSTALACION TUBERIA PVC UF DE 250 MM. INC. PRUEBA HIDRAULICA
05.07.12
INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA
05.07.13
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 90 MM. ZANJAS TAPADA
05.07.14
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 110 MM. ZANJAS TAPADA
05.07.15
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 160 MM. ZANJAS TAPADA
05.07.16
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 200 MM. ZANJAS TAPADA
05.07.17
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 250 MM. ZANJAS TAPADA
05.07.18
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA
05.08 SUMINISTRO E INSTALACION DE ACCESORIOS
05.08.01
CRUZ DE PVC UF 110X110 MM
05.08.02
ACOPLE FLEXIBLE DE GRAN RANGO HD DN 80 MM
05.08.03
ACOPLE FLEXIBLE DE GRAN RANGO HD DN 100 MM
05.08.04
ACOPLE FLEXIBLE DE GRAN RANGO HD DN 150 MM
05.08.05
ACOPLE FLEXIBLE DE GRAN RANGO HD DN 200 MM
05.08.06
CODO PVC U.F. DE 45X110 MM.
05.08.07
CODO PVC U.F. DE 45X200 MM.
05.08.08
CODO PVC U.F. DE 90X110 MM.
05.08.09
REDUCCION PVC U.F. DE 200 MM A 110 MM
05.08.10
TEE PVC U.F. DE 110X110 MM.
05.08.11
TEE PVC U.F. DE 200X110 MM.
05.08.12
TEE PVC U.F. DE 200X200 MM.
05.08.13
INSTALACION DE ACCESORIOS PVC U.F. 90-160 MM. INC. DADO DE ANCLAJE
05.08.14
INSTALACION DE ACCESORIOS PVC U.F. 200-250 MM. INC. DADO DE ANCLAJE
05.09 SUMINISTRO E INSTALACION DE VALVULAS
05.09.01
VALVULA COMPUERTA DE FO. FDO. LUFLEX 90 mm
05.09.02
VALVULA COMPUERTA DE FO. FDO. LUFLEX 110 mm
05.09.03
VALVULA COMPUERTA DE FO. FDO. LUFLEX 160 mm
05.09.04
VALVULA COMPUERTA DE FO. FDO. LUFLEX 200 mm
05.09.05
GRIFO CONTRAINCENDIO TIPO POSTE 2 BOCAS LUFLEX
05.09.06
INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 90 MM
05.09.07
INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 110 MM
05.09.08
INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 160 MM
05.09.09
INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 200 MM
05.09.10
INSTALACION DE GRIFOS CONTRAINCENDIO LUFLEX TIPO POSTE 2 BOCAS
05.10 CAMARAS PARA VALVULAS
05.10.01
REGISTRO P/VALVULA DE COMPUERTA 90-160 MM.
05.10.02
REGISTRO P/VALVULA DE COMPUERTA 200-250 MM.
05.11 EMPALMES
05.11.01
EMPALME C/INSERCION DE TUBERIA A LINEAS DE AGUA 4"-6"
05.12 ROTURA Y REPOSICION DE PAVIMENTOS
05.12.01
BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO
05.12.02
CARPETA ASFALTICA EN FRIO E=5.00 CM.
05.12.03
ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.
05.12.04
ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION PAVIMENTACION PAVIMENTOS D=5 KM.
06 CONEXIONES DOMICILIARIAS AGUA POTABLE
06.01 CONEXIONES DOMICILIARIAS
06.01.01
CONEXION DOMICILIARIA AGUA 1/2" A TUB. DE 4" INC. PRUEBA HIDRAULICA
06.01.02
INSTALACION DE MEDIDORES DE 1/2".
06.01.03
INSTALACION DE MEDIDORES DE 1/2" (INC. RETIRO DE ACCESORIOS Y MEDIDOR MALOGRADO).
06.01.04
SUMINISTRO E INST. CAJA CONCRETO MARCO TAPA FGD. TN MED. 1/2"-3/4"
07 CONSTRUCCION RESERVORIO APOYADO RAP-01
07.01 OBRAS PRELIMINARES
07.01.01
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
07.01.02
TRAZOS Y REPLANTEOS FINALES DEL PROYECTO DE OBRA
07.02 MOVIMIENTO DE TIERRAS
07.02.01
EXCAVACIONES CORTES C/EQUIPO EN TERRENO NATURAL
07.02.02
REFINE Y NIVELACION EN TERRENO NORMAL
07.02.03
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO CON MAQUINARIA

UND
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
m2
m2
m2
m3
und
und
und
und
m
m
m3
m2
m3

METRADO
3,748.68
3,126.86
19,086.69
4,136.34
1,391.85
246.45
50.04
3,126.86
19,086.69
4,136.34
1,391.85
246.45
50.04
3,126.86
19,086.69
4,136.34
1,391.85
246.45
50.04
35.00
4.00
30.00
4.00
2.00
10.00
5.00
15.00
2.00
20.00
2.00
2.00
118.00
13.00
11.00
42.00
11.00
9.00
20.00
11.00
42.00
11.00
9.00
20.00
64.00
9.00
11.00
600.00
600.00
600.00
30.00
1,918.00
1,918.00
865.00
750.00
483.85
483.85
396.53
437.44
166.27

VALORIZACION
N01
483.85
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM
07.02.04
07.03
07.03.01
07.03.02
07.04
07.04.01
07.04.02
07.04.03
07.04.04
07.04.05
07.04.06
07.04.07
07.04.08
07.04.09
07.04.10
07.04.11
07.04.12
07.04.13
07.04.14
07.04.15
07.04.16
07.04.17
07.04.18
07.04.19
07.04.20
07.04.21
07.04.22
07.05
07.05.01
07.06
07.06.01
07.06.02
07.06.03
07.06.04
07.07
07.07.01
07.08
07.08.01
07.08.02
07.08.03
07.09
07.09.01
07.10
07.10.01
07.10.02
07.10.03
07.10.04
07.10.05
07.11
07.11.01
07.11.02
07.12
07.12.01
07.12.02
07.12.03
07.12.04
07.13
07.13.01
07.13.02
07.14
07.14.01
07.14.02
07.14.03
07.14.04
07.14.05
07.14.06
07.14.07
07.14.08
07.15
07.15.01
07.15.02

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION
ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=10 KM)
OBRAS DE CONCRETO SIMPLE
CONCRETO f'c=100 kg/cm2 P/SOLADOS Y/O SUB BASE
ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES
OBRAS DE CONCRETO ARMADO
CONCRETO f'c=280 kg/cm2 P/ZAPATAS
ENCOFRADO Y DESENCOFRADO P/ZAPATAS CIRCULARES
ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS
CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO
ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO
CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS
ENCOFRADO Y DESENCOFRADO P/MURO RECTOS
ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS
CONCRETO f'c=210 kg/cm2 P/COLUMNAS
ENCOFRADO Y DESENCOFRADO P/COLUMNAS
ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS
CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES
CONCRETO f'c=280 kg/cm2 P/VIGAS Y DINTELES
ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES
ENCOFRADO Y DESENCOFRADO P/VIGAS CIRCULARES
ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES
CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS
ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS
CONCRETO f'c=245 kg/cm2 P/CUPULA ESFERICA
ENCOFRADO Y DESENCOFRADO P/CUPULA ESFERICA
ACERO ESTRUCTURAL TRABAJADO P/CUPULA ESFERICA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM
TARRAJEO C/IMPERM. MUROS INTERIORMENTE M=1:3 E=1.5 CM
CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM
PISOS Y PAVIMENTOS
FALSO PISO DE 4" CONCRETO Fc=100 KG/CM2
PISO DE CONCRETO DE 2" ACABADO FROTACHADO
VEREDA DE CONCRETO Fc=140 KG/CM2 H=0.15M.
CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. C/CEZ 1:5 2.5 CM+FRAGUA C/MORT. 1:5 JUNTA 1.5 CM.
CARPINTERIA METALICA
VENTANA DE FIERRO C/PERFIL DE 1"+HOJA BAST. 3/4"
PUERTA METALICA LAC 1/16" C/MARCO 1 1/4"X1/8" Y REFUERZOS
ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"
TAPA METALICA DE INSPECCION STANDARD
VENTILACION C/TUBERIA DE ACERO S/DISEO DE 4"
CERRAJERIA
BISAGRA CAPUCHINA ALUMINIO DE 3"
CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 3 GOLPES
PINTURAS
PINTADO DE CIELO RASOS C/LATEX VINILICO (VINILATEX O SIMILAR)
PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR)
PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR)
PINTADO EXTERIOR C/LATEX VINILICO O SIMILAR DE RESERVORIO INCL. LOGOTIPO
VARIOS
PROVISION Y COLOCADO DE TECNOPORT DE 3/4"
PROVISION Y COLOCADO DE JUNTA WATER STOP DE PVC 6"
INSTALACIONES ELECTRICAS
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 14
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")
CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2
CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2
CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN ESPEFICICACIONES
POZO CONEXION A TIERRA EN SISTEMA C/ALUMBRADO Y TOMACORRIENTE.
PRUEBAS HIDRAULICAS DE OBRAS CIVILES
PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO
DESINFECCION DE RESERVORIO CON EMPLEO DE LINEA DE INGRESO

UND
m3
m3
m2
m3
m2
kg
m3
kg
m3
m2
kg
m3
m2
kg
m3
m3
m2
m2
kg
m3
m2
kg
m3
m2
kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
und
und
und
und
m2
m2
m2
m2
m2
m
pto
pto
m
m
m
m
und
und
m3
m3

METRADO
475.84
12.04
7.54
120.39
59.31
7,203.40
100.28
4,755.00
193.12
965.60
45,973.07
2.50
20.00
445.00
2.20
26.74
19.50
114.23
2,767.88
3.50
25.00
350.00
35.41
404.74
2,611.44
25.00
50.00
35.00
387.08
460.31
25.00
25.00
25.00
110.00
29.00
1.98
2.10
6.00
1.00
4.00
3.00
1.00
25.00
45.00
35.00
462.00
5.00
440.00
3.00
4.00
20.00
40.00
50.00
10.00
1.00
1.00
2,500.00
2,500.00

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

07.15.03
EVACUACION DEL AGUA DE PRUEBA C/EMPL. DE LINEA DE SALIDA
07.16 EXCAVACIONES DE ZANJAS
07.16.01
EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 400 MM.
07.16.02
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.
07.16.03
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.
07.16.04
RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 400 MM
07.16.05
ELIMINACION MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 400 MM HASTA R=5 KM
07.16.06
BUZON TIPO I TERRENO NORMAL HASTA 4.00 M. PROF.
07.17 SUMINISTRO E INSTALACION DE TUBERIAS
07.17.01
TUBERIA ACERO NEGRO SCH-40 DE 16" (400 MM.)
07.17.02
TUBERIA ACERO NEGRO SCH-40 DE 18" (450 MM.)
07.17.03
TUBERIA P.V.C. DESAGUE U.F. SERIES S-20 16" (400 MM.)
07.17.04
INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA HIDRAULICA
07.17.05
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS TAPADA
07.18 SUMINISTRO E INSTALACION DE ACCESORIOS
07.18.01
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 16" (400 MM)
07.18.02
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 18" (450 MM)
07.18.03
BRIDA ACERO PARA SOLDAR ROMPE-AGUA 16" (400MM)
07.18.04
BRIDA ACERO PARA SOLDAR ROMPE-AGUA 18" (450MM)
07.18.05
CODO FO. FDO. BRIDADO 16"X90 (400 MM)
07.18.06
CODO FO. FDO. BRIDADO 18"X90 (450 MM)
07.18.07
REDUCCION FO. FDO. BRIDADA DE 450 X 400 MM.
07.18.08
TEE FO. FDO. BRIDADA DE 400X400 MM
07.18.09
TEE FO. FDO. BRIDADA DE 450X450 MM
07.19 SUMINISTRO E INSTALACION DE VALVULAS
07.19.01
MEDIDOR DE CAUDAL TIPO TUBULAR BRIDADO 18"
07.19.02
VALVULA MARIPOSA F. FDO. BRIDADA DE 400 MM (16")
07.19.03
VALVULA MARIPOSA F. FDO. BRIDADA DE 450 MM (18")
07.19.04
VALVULA DE ALTITUD FO. FDO. DE 16" BB.
07.20 CAJAS PARA REBOSE
07.20.01
CAJA REBOSE-LIMPIA TERRENO ROCA
07.21 EQUIPOS
07.21.01
SUMINISTRO EQUIPO CLORINADOR INYECCION C/ACC., CILINDROS, BALANZA, MASCARA Y BOOSTER S/
07.22 MONTAJE DE INSTALACIONES HIDRAULICAS
07.22.01
MONTAJE DE INSTALACIONES HIDRAULICA DE RESERVORIO APOYODO
08 COLECTORES PRINCIPALES DESAGUE
08.01 OBRAS PRELIMINARES
08.01.01
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
08.01.02
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE OBRA)
08.01.03
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO
08.01.04
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
08.01.05
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)
08.01.06
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)
08.01.07
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
08.01.08
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
08.02 EXCAVACIONES DE ZANJAS
08.02.01
EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.00M P/TUB. 200 MM. C/O
08.02.02
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 250 MM.
08.02.03
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 300 MM.
08.02.04
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 350 MM.
08.02.05
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 400 MM.
08.03 REFINE Y NIVELACION DE ZANJAS
08.03.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.
08.03.02
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.
08.03.03
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 355 MM.
08.03.04
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.
08.03.05
REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.
08.04 CAMA DE APOYO
08.04.01
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.
08.04.02
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.
08.04.03
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM
08.04.04
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 355 MM.
08.04.05
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.
08.05 RELLENO DE ZANJAS
08.05.01
RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.0 M.
08.05.02
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=3.0 M.
08.05.03
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=3.0 M.
08.05.04
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 350 MM H=3.0 M.
08.05.05
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 400 MM H=3.0 M.
08.06 ELIMINACION DE MATERIAL EXCEDENTE
08.06.01
ELIMINACION DE MATERIAL EXCEDENTE

UND
m3
m
m
m
m
m
und
m
m
m
m
m
und
und
und
und
und
und
m
und
und
und
und
und
und
und
und
und
und
und
und
m
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3

METRADO
2,500.00
167.00
167.00
167.00
167.00
167.00
3.00
25.00
15.00
100.00
100.00
100.00
10.00
8.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
60.00
100.00
40.00
13,069.74
30.00
10.00
13,069.74
13,069.74
461.00
4,382.11
1,432.96
3,598.80
3,194.87
4,382.11
1,432.96
3,598.80
3,194.97
461.00
461.00
4,382.11
1,432.96
3,598.80
3,194.97
461.00
4,382.11
1,432.96
3,598.80
3,194.97
2,655.25

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

08.07 ENTIBADOS Y/O TABLESTACADOS


08.07.01
ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.
08.08 BUZONES Y CAMARAS
08.08.01
BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.
08.08.02
BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.
08.08.03
BUZON TIPO I TERRENO NORMAL HASTA 5.00 M. PROF.
08.08.04
BUZON TIPO I TERRENO NORMAL HASTA 6.00 M. PROF.
08.08.05
BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.
08.08.06
BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.
08.09 SUMINISTRO E INSTALACION DE TUBERIAS
08.09.01
TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 8" (200 MM)
08.09.02
TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 10" (250 MM)
08.09.03
TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 12" (315 MM)
08.09.04
TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 14" (355 MM)
08.09.05
TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 16" (400 MM)
08.09.06
INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA
08.09.07
INSTALACION TUBERIA PVC DESAGUE U.F. 10" (250 MM) INC. PRUEBA HIDRAULICA
08.09.08
INSTALACION TUBERIA PVC DESAGUE U.F. 12" (315 MM) INC. PRUEBA HIDRAULICA
08.09.09
INSTALACION TUBERIA PVC DESAGUE U.F. 14" (355 MM) INC. PRUEBA HIDRAULICA
08.09.10
INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA HIDRAULICA
08.09.11
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA
08.09.12
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS TAPADA
08.09.13
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS TAPADA
08.09.14
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 350 MM. ZANJAS TAPADA
08.09.15
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS TAPADA
09 REDES SECUNDARIAS DESAGUE
09.01 OBRAS PRELIMINARES
09.01.01
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
09.01.02
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE OBRA)
09.01.03
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO
09.01.04
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
09.01.05
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)
09.01.06
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)
09.01.07
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
09.01.08
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
09.02 EXCAVACIONES DE ZANJAS
09.02.01
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=1.50M P/TUB. 200 MM.
09.02.02
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.
09.02.03
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.50M P/TUB. 200 MM.
09.02.04
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 200 MM.
09.02.05
EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.50M P/TUB. 200 MM. C/O
09.02.06
EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=4.00M P/TUB. 200 MM. C/O
09.03 REFINE Y NIVELACION DE ZANJAS
09.03.01
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.
09.03.02
REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.
09.04 CAMA DE APOYO
09.04.01
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.
09.05 RELLENO DE ZANJAS
09.05.01
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=1.50 M.
09.05.02
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.
09.05.03
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.50 M.
09.05.04
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=3.00 M.
09.05.05
RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.5 M.
09.05.06
RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=4.0 M.
09.06 ELIMINACION DE MATERIAL EXCEDENTE
09.06.01
ELIMINACION DE MATERIAL EXCEDENTE
09.07 BUZONES Y CAMARAS
09.07.01
BUZON TIPO I TERRENO NORMAL HASTA 1.5 M. PROF.
09.07.02
BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.
09.07.03
BUZON TIPO I TERRENO NORMAL HASTA 2.5 M. PROF.
09.07.04
BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.
09.07.05
BUZON TIPO I ROCA SUELTA HASTA 3.50 M. PROF.
09.07.06
BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.
09.07.07
BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.
09.07.08
BUZON TIPO I ROCA SUELTA HASTA 6.00 M. PROF.
09.07.09
DEMOLICION DE BUZONES EXISTENTES (PROMEDIO)
09.08 SUMINISTRO E INSTALACION DE TUBERIAS
09.08.01
TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)
09.08.02
TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 6" (160 MM)
09.08.03
INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA
09.08.04
INSTALACION TUBERIA PVC DESAGUE U.F. 6" (160 MM) INC. PRUEBA HIDRAULICA

UND
m
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
und
m
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
und
und
und
und
und
und
und
und
und
m
m
m
m

METRADO
6,500.00
17.00
166.00
4.00
3.00
7.00
2.00
461.00
4,382.11
1,432.96
3,598.80
3,194.97
461.00
4,382.11
1,432.96
3,598.80
3,194.97
461.00
4,382.11
1,432.96
3,598.80
3,194.97
100.00
80.00
60.00
39,138.76
25.00
40.00
39,138.76
39,138.76
15,012.91
9,383.07
7,506.45
5,629.84
963.90
642.60
37,532.26
1,606.50
39,138.76
15,012.91
9,383.07
7,506.45
5,629.84
963.90
642.60
5,450.85
328.00
105.00
58.00
24.00
26.00
3.00
5.00
1.00
9.00
19,569.38
19,569.38
19,569.38
19,569.38

VALORIZACION
N01
39,138.76
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION

09.08.05
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA
09.08.06
PRUEBA HIDRAULICA + ESCORRENT. TUBERIAS 160 MM. ZANJAS TAPADA
09.09 EMPALMES
09.09.01
EMPALMES DE TUBERIAS DE 8"-10" A BUZON EXISTENTE EN SERVICIO
09.10 ROTURA Y REPOSICION DE PAVIMENTOS
09.10.01
BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO
09.10.02
CARPETA ASFALTICA EN FRIO E=5.00 CM.
09.10.03
ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.
09.10.04
ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION PAVIMENTACION PAVIMENTOS D=5 KM.
10 CONEXIONES DOMICILIARIAS DESAGUE
10.01 CONEXIONES DOMICILIARIAS
10.01.01
CONEXION DOMICIL. DESAGUE TUBO PVC U.F. S-25 6" T.N. 4.00-8.00M INC. PRUEBA HIDRAULICA
11 OTROS
11.01 DERIVACION DE AGUAS
11.01.01
TRANSBASE DE AGUA SERVIDAS
12 CAMARA DE BOMBEO DESAGUE CDP-01
12.01 OBRAS PRELIMINARES
12.01.01
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
12.01.02
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA
12.02 MOVIMIENTO DE TIERRAS
12.02.01
EXCAVACION MANUAL EN TERRENO NORMAL
12.02.02
EXCAVACION EN TERRENO SATURADO MANUAL
12.02.03
REFINE, NIVELACION Y COMPACTADO EN TERRENO NORMAL
12.02.04
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO
12.02.05
ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=10 KM)
12.02.06
BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01
CONCRETO F'c=140KG/CM2+30%P.G. P/CIMIENTO CORRIDO (CMTO PV)
12.03.02
CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PV)
12.03.03
ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES
12.03.04
CONCRETO F'c=140KG/CM2+25%P.G. P/SOBRECIMIENTO (CEMENTO PV)
12.03.05
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
12.03.06
CONCRETO f'c=280 kg/cm2 P/GRADAS Y/O PISO SIMPLE
12.03.07
ENCOFRADO Y DESENCOFRADO P/GRADAS Y/O PISOS
12.04 OBRAS DE CONCRETO ARMADO
12.04.01
CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO
12.04.02
ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO
12.04.03
CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS (CMTO. PV)
12.04.04
ENCOFRADO Y DESENCOFRADO P/MUROS CILINDRICOS DE CUBA
12.04.05
ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS
12.04.06
CONCRETO f'c=210 kg/cm2 P/COLUMNAS
12.04.07
ENCOFRADO Y DESENCOFRADO P/COLUMNAS
12.04.08
ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS
12.04.09
CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES
12.04.10
ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES
12.04.11
ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES
12.04.12
CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS
12.04.13
CONCRETO f'c=280 kg/cm2 P/LOSAS MACIZAS (CEMENTO PV)
12.04.14
ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS
12.04.15
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS
12.04.16
CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS
12.04.17
ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS
12.04.18
ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS
12.04.19
LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.
12.05 MUROS Y TABIQUES DE ALBAILERIA
12.05.01
MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM
12.06 REVOQUES Y ENLUCIDOS
12.06.01
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
12.06.02
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
12.06.03
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)
12.06.04
TARRAJEO DE SUPERFICIE DE COLUMNAS INDEPENDIENTES (EN INTERIOS)
12.06.05
TARRAJEO DE SUPERFICIE DE VIGAS PERALTADAS-INDEPENDIENTES (EN INTERIOS)
12.06.06
TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM
12.06.07
TARRAJEO C/IMPERM. DOS CAPAS MUROS INTERIORMENTE M=1:3 E=2.0 CM Y M=1:2 E=0.5 CM.
12.06.08
TARRAJEO C/IMPERM. CIELO RASO INT. M=1:3 E=1.5 CM
12.07 CIELO RASOS
12.07.01
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM
12.08 PISOS Y PAVIMENTOS
12.08.01
FALSO PISO DE 4" CONCRETO 1:8 (CEMENTO P-II)
12.08.02
CONTRAPISO CON MORTERO 1:5 DE 40 MM.
12.08.03
PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.

UND
m
m
und
m2
m2
m2
m3
und
m
m
m
m3
m3
m2
m3
m3
hm
m3
m3
m2
m3
m2
m3
m2
m3
kg
m3
m2
kg
m3
m2
kg
m3
m2
kg
m3
m3
m2
kg
m3
m2
kg
und
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

METRADO
19,569.38
19,569.38
18.00
180.00
180.00
180.00
9.00
3,599.00
25,997.13
1,225.00
1,225.00
134.22
442.60
45.96
51.24
632.74
168.00
17.58
0.40
0.53
2.80
25.00
10.59
2.79
9.80
2,627.91
110.29
604.18
7,581.80
5.93
74.27
826.80
6.83
60.18
617.50
8.72
7.27
98.38
1,204.34
4.55
52.00
273.00
434.00
152.18
14.40
160.00
148.17
15.51
12.63
33.55
282.64
26.71
96.25
52.00
12.00
12.00

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM
12.08.04
12.09
12.09.01
12.10
12.10.01
12.11
12.11.01
12.11.02
12.11.03
12.11.04
12.11.05
12.11.06
12.11.07
12.12
12.12.01
12.12.02
12.13
12.13.01
12.14
12.14.01
12.14.02
12.14.03
12.14.04
12.14.05
12.15
12.15.01
12.15.02
12.15.03
12.16
12.16.01
12.16.02
12.16.03
12.16.04
12.16.05
12.16.06
12.16.07
12.16.08
12.16.09
12.17
12.17.01
12.17.02
12.17.03
12.17.04
12.17.05
12.17.06
12.17.07
12.17.08
12.18
12.18.01
12.18.02
12.18.03
12.18.04
12.19
12.19.01
12.19.02
12.19.03
12.19.04
12.19.05
12.19.06
12.19.07
12.19.08
12.19.09
12.19.10
12.19.11
12.19.12
12.19.13
12.19.14
12.19.15
12.19.16
12.19.17
12.19.18

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION
PISO DE CONCRETO DE 2" ACABADO FROTACHADO
ZOCALOS
ZOCALO DE CERAMICO COLOR ENTERO 0.20X0.30 M
CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA C/MORT. 1:4 JUNTA 1.5 CM.
CARPINTERIA METALICA
VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA
PUERTA METALICA LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS
PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC 3/16".
ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"
MARCO Y TAPA PLANCHA LAC 1/4" C/MECAN. DE SEGUR. S/DISEO
TAPA METALICA DE INSPECCION STANDARD
REJILLA PARA ESTACION BOMBEO DESAGUE SEGUN DISEO
CERRAJERIA
CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2 GOLPES
CANDADO INCLUYENDO ALDABAS
VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE
PINTURAS
PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)
PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
VARIOS
SEMBRIO DE GRASS
ALAMO COSTEO
PROVISION Y COLOCADO DE JUNTA WATER STOP DE NEOPRENO 6"
APARATOS SANITARIOS Y ACCESORIOS
INODORO TANQUE BAJO BLANCO INC. ACCESORIOS
LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.
LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA
JABONERA DE LOSA COLOR BLANCO
TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR BLANCO
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO
GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE
INSTALACION DE APARATOS SANITARIOS
INSTALACION DE ACCESORIOS SANITARIOS
SISTEMA DE DESAGUE
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
SALIDAS DE PVC SAL PARA DESAGUE DE 2"
SALIDAS DE PVC SAL PARA DESAGUE DE 4"
RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"
RED DE DERIVACION PVC SAL PARA DESAGUE DE 6"
TRAMPA P PVC DESAGUE SAL 4"
PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"
SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.
SISTEMA AGUA FRIA
SALIDA DE AGUA FRIA DE PVC DE 1/2"
RED DE PVC CLASE A-10 SP DE 3/4"
RED DE PVC CLASE A-10 SP DE 1/2"
VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"
INSTALACIONES ELECTRICAS
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG
SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14 AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 12
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")
TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")
TUBERIA PVC-SAP ELECTRICA DE 35 mm (1 1/4")
TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")
TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")
TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1/2"
TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1 1/2"
INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1/2"-3/4"
INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1"-1 1/2"
INSTALAC. DE TUBERIA EMPOTRADA DE PVC 2"-3"
CABLE ELECTRO TW AWG-MCM NO. 14-2.5 MM2
CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2
CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2
CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2
CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2

UND
m2
m2
m2
m2
m2
m2
m
und
und
und
und
und
p2
m2
m2
m2
m2
m2
m2
und
m
und
und
und
und
und
und
und
und
und
pto
pto
pto
m
m
und
und
und
pto
m
m
und
pto
pto
pto
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

METRADO
52.00
14.40
99.88
6.33
12.68
18.00
10.00
2.00
1.00
1.00
5.00
1.00
52.00
91.88
148.17
159.66
22.83
6.33
300.00
20.00
118.40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
4.00
1.00
2.00
1.00
4.00
25.00
1.00
1.00
3.00
3.00
27.00
5.00
1.00
13.00
16.00
18.00
442.00
3.00
21.00
19.00
56.00
17.50
52.50
459.50
95.50
56.00
15.00
53.00
309.00
232.00
438.00

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM
12.19.19
12.19.20
12.19.21
12.19.22
12.19.23
12.19.24
12.19.25
12.19.26
12.19.27
12.19.28
12.19.29
12.19.30
12.19.31
12.19.32
12.19.33
12.19.34
12.19.35
12.19.36
12.19.37
12.19.38
12.19.39
12.19.40
12.19.41
12.19.42
12.19.43
12.19.44
12.19.45
12.19.46
12.19.47
12.19.48
12.19.49
12.19.50
12.19.51
12.20
12.20.01
12.20.02
12.20.03
12.20.04
12.20.05
12.21
12.21.01
12.21.02
12.21.03
12.21.04
12.22
12.22.01
12.22.02
12.22.03
12.22.04
12.22.05
12.22.06
12.22.07
12.22.08
12.22.09
12.22.10
12.22.11
12.22.12
12.22.13
12.22.14
12.22.15
12.22.16
12.22.17
12.22.18
12.22.19
12.22.20
12.22.21
12.22.22
12.22.23
12.22.24
12.22.25
12.22.26

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION
CABLE ELECTRO THW AWG-MCM NO. 10-6.0 MM2
CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2
CABLE ELECTRO THW AWG-MCM NO. 6-16.0 MM2
CABLE ELECTRICO SUBCAB 4X4.0 MM2
CABLE ELECTRICO SUBCAB 7X2.5 MM2
CABLE ELECTRO APANTALLADO 2X16 AWG
CABLE ELECTRICO NYY 1X6 MM2
CABLE ELECTRICO NYY 1X35 MM2
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN ESPEFICICACIONES
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 10 CIRCUITOS SEGUN ESPEFICICACIONES
TABLERO GENERAL "TG-1" SEGUN ESPECIFICACIONES
TABLERO GENERAL "TG-2" SEGUN ESPECIFICACIONES
SUMINISTRO DE TABLERO DE CONTROL (TC2) SEGUN ESPECIFICACIONES TECNICAS
TABLERO DE TRANSFERENCIA AUTOMATICA (TTA)
ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR INC. EQUIPO Y PANTALLA
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE AHORRADOR DE 20 W. O SIMILAR
LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR
CAJA DE FO GDO. 100X100X50 MM. INCL. TAPA
CAJA DE FO GDO. 150X150X75 MM. INCL. TAPA
CAJA DE FO GDO. 200X200X100 MM. INCL. TAPA
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<5 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<20 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) PARA TABLERO DE CONTROL
SUMINISTRO E INSTAL. DE ELECTRODOS PARA CONTROL DE NIVELES
SUMINISTRO DE TRANSMISOR ULTRASONICO DE NIVEL DE 4-20MM RANGO 0-10M H20
SUMINISTRO TRANSMISOR DE PRESION RANGO 0-50 MH20
SUMINISTRO DE DETECTOR DE INTRUSOS
ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG, INC. CONEXIONADO Y ACCESORIOS
SUMINISTRO E INST. DE TRANSFORMADOR DE 50 KVA 10/0.22 KV
PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"
POSTE CONCRETO CENTRIF. 11/400/180/345
CAJA DE INSPECCION H=1.20 M.
PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE FUNCIONAMIENTO
EXCAVACIONES DE ZANJAS
EXCAVACION DE ZANJAS PARA INSTALACION DE CABLES
REFINE Y NIVELACION DE ZANJAS P/INST. CABLES
CAMA DE ARENA E=0.10 M. ZANJA P/INST. DE CABLES
RELLENO ZANJA MAT. PROPIO COMPACT. C/EQ. P/INST. CABLES
ELIMINACION MATERIAL EXCEDENTE C/EQUIPO P/INST. DE CABLES HASTA R=5 KM
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA ACERO NEGRO SCH-40 DE 2" (50 MM.)
TUBERIA ACERO NEGRO SCH-40 DE 4" (100 MM.)
TUBERIA ACERO NEGRO SCH-40 DE 8" (200 MM.)
TUBERIA ACERO NEGRO SCH-40 DE 10" (250 MM.)
SUMINISTRO E INSTALACION DE ACCESORIOS
BRIDA CIEGA DE ACERO DE 10" (250MM)
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 2" (50 MM)
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 4" (100 MM)
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 8" (200 MM)
BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 10" (250 MM)
BRIDA ACERO PARA SOLDAR ROMPE-AGUA 2" (50MM)
BRIDA ACERO PARA SOLDAR ROMPE-AGUA 10" (250MM)
UNION DRESSER ACERO DE 2" (50 MM)
UNION DRESSER ACERO DE 8" (200 MM)
UNION DRESSER ACERO DE 10" (250 MM)
PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 2" (50 MM).
PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 4" (100 MM).
PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 8" (200 MM).
PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 10" (250 MM).
CODO FO. FDO. BRIDADO 2"X90 (50 MM)
CODO FO. FDO. BRIDADO 4"X90 (100 MM)
CODO FO. FDO. BRIDADO 8"X90 (200 MM)
CODO FO. FDO. BRIDADO 10"X90 (250 MM)
CODO FO. FDO. BRIDADO 8"X45 (200 MM)
CODO FO. FDO. BRIDADO 10"X45 (250 MM)
REDUCCION FO. FDO. BRIDADA DE 200X150 MM
REDUCCION FO. FDO. BRIDADA DE 250X150 MM
TEE FO. FDO. BRIDADA DE 100X50 MM
TEE FO. FDO. BRIDADA DE 100X100 MM
TEE FO. FDO. BRIDADA DE 250X100 MM
TRANSICION FO. FDO. CAMPANA-BRIDA DE 10" (250 MM)

UND
m
m
m
m
m
m
m
m
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und

METRADO
108.00
36.00
108.00
84.00
84.00
180.00
348.00
84.00
1.00
1.00
1.00
1.00
1.00
1.00
14.00
7.00
4.00
3.00
5.00
6.00
2.00
1.00
1.00
2.00
1.00
3.00
1.00
1.00
1.00
4.00
4.00
5.00
1.00
206.00
206.00
206.00
206.00
206.00
10.00
12.00
15.00
20.00
1.00
4.00
18.00
20.00
25.00
1.00
6.00
3.00
3.00
4.00
36.00
192.00
240.00
420.00
6.00
6.00
3.00
5.00
3.00
2.00
3.00
3.00
3.00
2.00
3.00
1.00

VALORIZACION
N01
-

METRADOS EJECUTADOS- VALORIZACION N02


OBRA

ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
VALOR REFERENCIAL
MONTO CONTRATADO
PERODO DE TRABAJO

:
:
:
:
:
:
:

ITEM
12.22.27
12.22.28
12.22.29
12.22.30
12.22.31
12.23
12.23.01
12.23.02
12.23.03
12.23.04
12.23.05
12.23.06
12.23.07
12.23.08
12.24
12.24.01
12.24.02
12.24.03
12.25
12.25.01
12.25.02
12.25.03
12.25.04
12.25.05
12.26
12.26.01
12.27
12.27.01

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD D


DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"
MUNICIPALIDAD DISTRITAL DE LAREDO
CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
( VR )
S/. 27,647,382.62
( MC )

DESCRIPCION
YEE FO. FDO. BRIDADA DE 10"X8"
EMPAQUETADURA JEBE ERNLONADO DE 2" (50 MM)
EMPAQUETADURA JEBE ERNLONADO DE 4" (100 MM)
EMPAQUETADURA JEBE ERNLONADO DE 8" (200 MM)
EMPAQUETADURA JEBE ERNLONADO DE 10" (250 MM)
SUMINISTRO E INSTALACION DE VALVULAS
MANOMETRO TIPO BOURDON RANGO 0-200PSI
MEDIDOR DE CAUDAL TIPO ELECTROMAGNETICO BRINDADO 10"
VALVULA AIRE DE F. FDO. 2" TRIPLE EFECTO
VALVULA ALIVIO C/PILOTO F. FDO. BRIDADA 4"
VALVULA COMPUERTA DE FO. FDO. BRIDADA 2" (50 MM)
VALVULA COMPUERTA DE FO. FDO. BRIDADA 8" (200 MM)
VALVULA COMPUERTA DE FO. FDO. BRIDADA 10" (250 MM)
VALVULA CHECK F. FDO. BRIDADA 8"
PAVIMENTOS
CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)
VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5
SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM
EQUIPOS
ELECTROBOMBA SUMERGIBLE SUMIDERO 6.0 LPS, ADT=6 M.
ELECTROBOMBA SUMERGIBLE PARA DESAGUE Q=28.8 LPS, ADT=24.7 M.
GRUPO ELECTROGENO 30KW - 460V
EXTRACTOR CENTRIFUGO DE 0.5 HP
TECLE MANUAL A CADENA 5TONX5.0 M. INC. VIGA METALICA
MONTAJE DE INSTALACIONES HIDRAULICAS
MONTAJE INST. HIDRAULICAS, PUESTA EN MARCHA DE EQUIPOS Y ELECTROBOMBAS EN ESTACION BOM
CERCOS
CERCO PERIMETRICO, MURO LADRILLO SOGA, COLUMNAS CADA 5 .

UND
und
und
und
und
und
und
und
und
und
und
und
und
und
m2
m2
m
und
und
und
und
und
und
m

METRADO
3.00
6.00
24.00
30.00
35.00
4.00
1.00
1.00
1.00
4.00
3.00
4.00
3.00
567.00
105.00
60.00
1.00
2.00
1.00
1.00
1.00
1.00
140.00

VALORIZACION
N01
-

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02

% AVANCE

0.00%
16.67%
0.00%
55.25%
0.00%
0.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
0.00%
50.00%
80.00%
92.27%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
103.72
492.45
18,389.23
284.72
-

% AVANCE
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.00%
11.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ADOS- VALORIZACION N02

TEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO


AREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

VALORIZACION
N02
-

% AVANCE
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

01
01.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

CAPTACION GALERIA FILTRANTE JESUS MARIA


OBRAS PROVISIONALES PARA TODA LA OBRA

01.01.01

CONSTRUCCION CAMPAMENTO PROVISIONAL PARA LA OBRA

m2

90.00 S/.

105.79 S/.

9,521.10

90.00

100.00%

S/.

9,521.10

0.00%

S/.

90.00 S/.

9,521.10

100.00%

01.01.02

CASETA DE GUARDIANIA Y ALMACEN

m2

300.00 S/.

69.57 S/.

20,871.00

250.00

83.33%

S/.

17,392.50

0.00%

S/.

250.00 S/.

17,392.50

83.33%

01.01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M

m2

25.92 S/.

126.61 S/.

3,281.73

25.92

100.00%

S/.

3,281.73

0.00%

S/.

25.92 S/.

3,281.73

100.00%

01.01.04

MOVILIZACION DE MAQUINARIA Y HERRAMIENTAS PARA LA OBRA

glb

1.00 S/.

9,849.47 S/.

9,849.47

0.45

44.75%

S/.

4,407.17

0.00%

S/.

0.45 S/.

4,407.17

44.75%

0.55

0.00%

S/.

0.00%

0.00%

S/.

1,945.00 S/.

01.02

OBRAS PRELIMINARES

S/.

S/.

01.02.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

1,945.00 S/.

0.58 S/.

1,128.10

01.02.02

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

1,945.00 S/.

1.04 S/.

2,022.80

01.03
01.03.01
01.03.02
01.04
01.04.01
01.05
01.05.01
01.06
01.06.01
01.07
01.07.01
01.08
01.08.01
01.09
01.09.01
01.10
01.10.01
01.10.02
01.10.03
01.10.04
01.11

MOVIMIENTO DE TIERRAS

BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"

hm

SUMINISTRO E INSTALACION DE HIDRANTES (FILTRO DE GRAVA)

m3

EXCAVACIONES DE ZANJAS
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=4.00M P/TUB. 200 MM.

REFINE Y NIVELACION DE ZANJAS


REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

RELLENO DE ZANJAS
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=4.0 M.
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 200 MM.
HASTA R=5 KM.
ENTIBADOS Y/O TABLESTACADOS
ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.

SUMINISTRO E INSTALACION DE TUBERIAS


TUBERIA P.V.C. CLASE A-7.5 UF DE 160 MM
TUBERIA P.V.C. CLASE A-7.5 UF DE 200 MM
INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA
Y DESINFECCION
INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA
Y DESINFECCION
CAJAS PARA REBOSE

0.00%

S/.

S/.

0.00%

1,945.00

0.00%

S/.

S/.

0.00%

0.00%

S/.

S/.

0.00%

480.00

243.00 S/.

112.14 S/.

27,250.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

243.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

S/.

S/.

S/.

703.00 S/.
-

S/.

260.04 S/.

S/.
S/.

1,945.00 S/.

m3

0.00%
0.00%

1,945.00 S/.

100.00%

0.00%

1,945.00 S/.

1,128.10

S/.

1.72 S/.
-

S/.

3.63 S/.
-

S/.

33.22 S/.
-

S/.

11.27 S/.
-

S/.

78.26 S/.

7,060.35
64,612.90
2,930.65
55,016.78

1,945.00
1,945.00
260.04
703.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00 S/.

53.46 S/.

37,582.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00

1,242.00 S/.

4.39 S/.

5,452.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,242.00

703.00 S/.

6.90 S/.

4,850.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

01.11.01

CAMARA DE REUNION PARA GALERIA FILTRANTE H=3.00M

und

15.00 S/.

01.11.02

CAMARA DE REUNION PARA GALERIA FILTRANTE H=4.00M

und

01.11.03

CAMARA DE REUNION PARA GALERIA FILTRANTE H=9.00M

und

S/.

1,945.00

S/.

3,345.40

1,945.00

42,849.00

99,856.30

34.50 S/.

S/.

51.34 S/.

1,242.00 S/.

S/.

S/.

S/.

1,128.10

31,224.00

S/.

S/.
S/.

65.05 S/.

S/.

0.00%
100.00%

480.00 S/.

1,945.00 S/.

CAMA DE APOYO

1,945.00

50.00

1,242.00

4,083.82 S/.

61,257.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

20.00 S/.

5,883.04 S/.

117,660.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

1.00 S/.

12,549.78 S/.

12,549.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00
-

02

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.01

OBRAS PRELIMINARES
LIMPIEZA Y DESBROCE DE TERRENO HASTA 0.20 M DE PROFUNDIDAD
PARA LAGUNAS
TRAZO Y REPLANTEOS DEL PROYECTO DE OBRA

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03

MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN T. NATURAL PARA FORMACION DE LAGUNA
INC. ACARREO Y SELECCION DE MATERIAL
EXCAVACION MANUAL EN TERRENO NORMAL
RELLENO MASIVO P/FORMACION DE DIQUES Y FONDOS INC.
CARGUIO Y TRANSPORTE
REFINE Y NIVELACION EN TERRENO NORMAL
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO
ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL
(R=5 KM)
OBRAS DE CONCRETO SIMPLE

ha
ha
m3

2.60 S/.

2,824.57 S/.

7,343.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.60

2.60 S/.

2,289.94 S/.

5,953.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

668,987.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

112,246.23 S/.

5.96 S/.

m3

23.60 S/.

29.48 S/.

695.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.60

m3

3,510.22 S/.

18.32 S/.

64,307.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,510.22

m2

38.80 S/.

3.66 S/.

142.01

0.00%

S/.

0.00%

S/.

S/.

0.00%

38.80

m3

19.00 S/.

73.95 S/.

1,405.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.00

m3

125,051.70 S/.

8.23 S/.

1,029,175.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

125,051.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

112,246.23

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.03.01
02.04

CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PII)

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

m3

OBRAS DE CONCRETO ARMADO

02.04.01

CONCRETO f'c=210 kg/cm2 P/ZAPATAS (CEMENTO PII)

m3

02.04.02

CONCRETO f'c=245 kg/cm2 P/ZAPATAS (CEMENTO PII)

02.04.03

ENCOFRADO Y DESENCOFRADO P/ZAPATAS RECTAS

02.04.04
02.04.05

METRADO

S/.

ACUMULADO

COSTO PARCIAL

CANTIDAD
1.20 S/.

ACTUAL

293.10 S/.
-

S/.

351.72
-

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.20
4.60

4.60 S/.

385.55 S/.

1,773.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

m3

9.76 S/.

451.34 S/.

4,405.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.76

m2

45.28 S/.

41.50 S/.

1,879.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.28

ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS

kg

263.35 S/.

4.76 S/.

1,253.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

263.35

CONCRETO f'c=210 kg/cm2 P/LOSAS DE FONDO - PISO

m3

39.50 S/.

308.68 S/.

12,192.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

39.50

02.04.06

CONCRETO f'c=245 kg/cm2 P/LOSAS DE FONDO - PISO C-II

m3

29.82 S/.

443.35 S/.

13,220.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

29.82

02.04.07

ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO

m2

128.90 S/.

42.14 S/.

5,431.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

128.90

02.04.08

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

1,889.10 S/.

4.76 S/.

8,992.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,889.10

02.04.09

CONCRETO f'c=245 kg/cm2 P/MUROS REFORZADOS C-II

m3

22.25 S/.

474.20 S/.

10,550.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

22.25

02.04.10

ENCOFRADO Y DESENCOFRADO P/MURO RECTOS

m2

294.53 S/.

57.56 S/.

16,953.15

0.00%

S/.

0.00%

S/.

S/.

0.00%

294.53

02.04.11

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

1,851.31 S/.

4.76 S/.

8,812.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,851.31

02.04.12

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

1.10 S/.

392.58 S/.

431.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.13

CONCRETO f'c=245 kg/cm2 P/COLUMNAS

m3

4.55 S/.

439.34 S/.

1,999.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.55

02.04.14

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

59.00 S/.

46.89 S/.

2,766.51

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

02.04.15

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

720.69 S/.

4.76 S/.

3,430.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

720.69

02.04.16

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

1.10 S/.

357.43 S/.

393.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.17

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

1.10 S/.

46.24 S/.

50.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.18

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

191.00 S/.

4.76 S/.

909.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

191.00

02.04.19

CONCRETO f'c=245 kg/cm2 P/LOSAS MACIZAS

m3

1.66 S/.

355.44 S/.

590.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.66

02.04.20

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

4.74 S/.

56.93 S/.

269.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.74

02.04.21

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

171.58 S/.

4.76 S/.

816.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

171.58

02.04.22

CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS

m3

2.80 S/.

313.94 S/.

879.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.80

02.04.23

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

m2

42.00 S/.

43.57 S/.

1,829.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

02.04.24

ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS

kg

151.00 S/.

4.76 S/.

718.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

151.00

02.04.25

LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.

und

310.00 S/.

2.78 S/.

861.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

310.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.05
02.05.01
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.07
02.07.01
02.08
02.08.01
02.08.02
02.08.03
02.09
02.09.01
02.10

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM

m2

REVOQUES Y ENLUCIDOS
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA
C/MORT. 1:4 JUNTA 1.5 CM.
CARPINTERIA METALICA

52.00 S/.
-

72.19 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.10

m2

59.00 S/.

21.73 S/.

1,282.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

m2

52.00 S/.

25.25 S/.

1,313.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

27.00 S/.

11.22 S/.

302.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

27.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2

41.70 S/.
-

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2

3.00 S/.

42.91 S/.

128.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

m2

12.06 S/.

53.97 S/.

650.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.06

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

41.70 S/.
-

S/.

S/.

S/.

24.02 S/.
-

S/.

41.70

246.64

1,178.03

15.81 S/.

m2

S/.

28.25 S/.

15.60 S/.

m2

S/.

52.00

S/.

3,753.88

S/.

214.17

S/.

S/.

17.70 S/.

12.10 S/.

PISOS Y PAVIMENTOS
CONTRAPISO CON MORTERO 1:5 DE 40 MM.
PISO DE LOSETA CERAMICA BLANCO DE .20X.20 M C/BASE MOR
1:4X25MM
PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.

S/.

m2

CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:4X1.5 CM

1,001.63
-

15.60

41.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.10.01

VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA

m2

5.62 S/.

174.59 S/.

981.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.62

02.10.02

PUERTA METALICA LAC 1/16" C/MARCO 2"X2"x1/4" Y REFUERZOS

m2

5.25 S/.

279.64 S/.

1,468.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.25

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.10.03
02.11
02.11.01
02.11.02

PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC
3/16".
CERRAJERIA
CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2
GOLPES
CANDADO INCLUYENDO ALDABAS

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

m2
-

METRADO

S/.

ACUMULADO

COSTO PARCIAL

CANTIDAD
11.00 S/.

ACTUAL

313.59 S/.
-

S/.

3,449.49
-

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00
-

und

4.00 S/.

90.67 S/.

362.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

und

1.00 S/.

15.00 S/.

15.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.11.03

PICAPORTE GALVANIZADO REDONDO DE 0.10M

und

1.00 S/.

5.50 S/.

5.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.11.04

MANIJA DE BRONCE

und

4.00 S/.

11.66 S/.

46.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.12
02.12.01
02.13
02.13.01
02.13.02
02.13.03
02.13.04
02.13.05
02.14
02.14.01
02.14.02
02.15

VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE

p2

PINTURAS
PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)
PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE
(SIMILAR)
PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2
ESMALTE)
VARIOS
IMPERMEABILIZACION CON GEOMEMBRANA P.E.D.A DE 1.00 MM DE
ESPESOR
TANQUE DE FIBRA DE VIDRIO V=1000 LT. I/ACCESORIOS E
INSTALACION
APARATOS SANITARIOS Y ACCESORIOS

S/.

60.45 S/.
-

3.66 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

41.70

m2

59.00 S/.

12.20 S/.

719.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

m2

52.00 S/.

12.04 S/.

626.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

m2

32.00 S/.

10.47 S/.

335.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

32.00

m2

11.24 S/.

13.42 S/.

150.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2
und
-

S/.

60.45

466.62

S/.

221.25

11.19 S/.

S/.

41.70 S/.

S/.

S/.

m2

74,132.79 S/.

13.40 S/.

993,379.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

74,132.79

1.00 S/.

933.33 S/.

933.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

02.15.01

INODORO TANQUE BAJO BLANCO INC. ACCESORIOS

und

1.00 S/.

203.55 S/.

203.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.02

LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.

und

1.00 S/.

294.87 S/.

294.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.03

LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA

und

1.00 S/.

71.00 S/.

71.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

9.80 S/.

9.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

12.90 S/.

12.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

10.70 S/.

10.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.04
02.15.05
02.15.06

JABONERA DE LOSA COLOR BLANCO


TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR
BLANCO
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO

02.15.07

GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE

und

1.00 S/.

3.40 S/.

3.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.08

INSTALACION DE APARATOS SANITARIOS

und

3.00 S/.

65.92 S/.

197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.15.09

INSTALACION DE ACCESORIOS SANITARIOS

und

4.00 S/.

11.43 S/.

45.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.16

SISTEMA DE DESAGUE

S/.

S/.

02.16.01

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

1.00 S/.

87.35 S/.

87.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.02

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

2.00 S/.

72.66 S/.

145.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

02.16.03

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

1.00 S/.

98.21 S/.

98.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.04

RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"

10.00 S/.

14.82 S/.

148.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

02.16.05

TRAMPA P PVC DESAGUE SAL 4"

und

1.00 S/.

32.10 S/.

32.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.06

PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"

und

1.00 S/.

77.92 S/.

77.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.07

SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.

und

1.00 S/.

142.14 S/.

142.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.17

SISTEMA AGUA FRIA

02.17.01

SALIDA DE AGUA FRIA DE PVC DE 1/2"

02.17.02

RED DE PVC CLASE A-10 SP DE 1/2"

02.17.03

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2"

02.18
02.18.01
02.18.02
02.18.03
02.18.04
02.18.05

INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14
AWG
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14
AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB.
SAP, ALAMBRE TW 12
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")
TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")

S/.

pto

3.00 S/.

m
und
-

S/.

78.15 S/.

234.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

20.00 S/.

2.55 S/.

51.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

1.00 S/.

22.78 S/.

22.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

pto

3.00 S/.

86.76 S/.

260.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

pto

3.00 S/.

86.79 S/.

260.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

pto

5.00 S/.

90.94 S/.

454.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.00 S/.

2.56 S/.

30.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

3.00 S/.

4.83 S/.

14.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

02.18.06

TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")

6.00 S/.

8.14 S/.

48.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.18.07

TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")

2.00 S/.

11.85 S/.

23.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

02.18.08

CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2

13.00 S/.

7.80 S/.

101.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

02.18.09

CABLE ELECTRO TW AWG-MCM NO. 6-16.0 MM2

9.00 S/.

15.38 S/.

138.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

02.18.10

CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2

12.00 S/.

16.85 S/.

202.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

02.18.11

CABLE ELECTRICO NYY 1X6 MM2

1,902.00 S/.

2.37 S/.

4,507.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,902.00

02.18.12

CABLE ELECTRICO NYY 1X10 MM2

569.00 S/.

3.47 S/.

1,974.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

569.00

21.00 S/.

5.39 S/.

113.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

21.00

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

2.00 S/.

138.66 S/.

277.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

76.66 S/.

76.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

23.00 S/.

404.67 S/.

9,307.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

und

1.00 S/.

147.46 S/.

147.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

867.14 S/.

867.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

2.00 S/.

882.81 S/.

1,765.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

862.81 S/.

862.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

3,968.36 S/.

3,968.36

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

16,574.38 S/.

16,574.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

23.00 S/.

99.56 S/.

2,289.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

und

23.00 S/.

926.75 S/.

21,315.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

und

1.00 S/.

2,420.72 S/.

2,420.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.18.13
02.18.14
02.18.15
02.18.16
02.18.17
02.18.18
02.18.19
02.18.20
02.18.21
02.18.22
02.18.23
02.18.24
02.18.25
02.18.26
02.18.27

CABLE ELECTRICO NYY 1X16 MM2


TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS
SEGUN ESPEFICICACIONES
ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR
INC. EQUIPO Y PANTALLA
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE
AHORRADOR DE 20 W. O SIMILAR
LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR
CAJA PORTAMEDIDOR TIPO LT
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
R<5 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
R<20 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
PARA RABLERO DE CONTROL
ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG,
INC. CONEXIONADO Y ACCESORIOS
SUMINISTRO E INST. DE TRANSFORMADOR DE 25 KVA 10/0.23 KV
PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"
POSTE CONCRETO CENTRIF. 11/200/150/315
PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE
FUNCIONAMIENTO
EXCAVACIONES DE ZANJAS

S/.

S/.

6.00

02.18.27.01

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 250 MM.

74.00 S/.

9.54 S/.

705.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.02

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 300 MM.

43.00 S/.

10.39 S/.

446.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

74.00 S/.

1.87 S/.

138.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

43.00 S/.

2.06 S/.

88.58

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.05

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

74.00 S/.

5.98 S/.

442.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.06

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

43.00 S/.

4.75 S/.

204.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.07

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=2.0 M.

74.00 S/.

25.24 S/.

1,867.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.08

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=2.0 M.

43.00 S/.

35.16 S/.

1,511.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.09

ELIMINACION DE MATERIAL EXCEDENTE

m3

29.25 S/.

12.23 S/.

357.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

29.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.18.28
02.18.28.01
02.18.28.02
02.18.29
02.18.29.01

BUZONES Y CAMARAS

TANQUE SEPTICO DE CONCRETO ARMADO

und

POZO DE PERCOLACION

und

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

S/.

1.00 S/.

3,604.53 S/.

3,604.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

1.00 S/.

2,142.27 S/.

2,142.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 250 MM

74.00 S/.

195.84 S/.

14,492.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.29.02

TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 300 MM

43.00 S/.

310.08 S/.

13,333.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.29.03

INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 250 MM.

74.00 S/.

7.55 S/.

558.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.29.04

INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 300 MM.


PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS
TAPADA
PAVIMENTOS

43.00 S/.

10.62 S/.

456.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

74.00 S/.

1.93 S/.

142.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

43.00 S/.

2.66 S/.

114.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.18.30.01

CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)

m2

150.00 S/.

10.22 S/.

1,533.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

150.00

02.18.30.02

VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5

m2

30.00 S/.

36.37 S/.

1,091.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

02.18.30.03

SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM

25.00 S/.

38.70 S/.

967.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

02.18.29.05
02.18.29.06
02.18.30

S/.

S/.

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.18.31
02.18.31.01
03
03.01
03.01.01
03.01.02
03.01.03

CERCOS
CERCO PERIMETRICO CON POSTES DE CONCRETO Y ALAMBRE DE
PUAS
LINEA DE CONDUCCION DE CAPTACION JESUS MARIA

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

METRADO
S/.

690.00 S/.

S/.

75.26 S/.
S/.

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO
(PROV. DURANTE OBRA)
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

S/.

51,929.40

03.06
03.06.01
03.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

690.00

15.00

50.00%

S/.

454.50

0.00%

S/.

15.00 S/.

454.50

50.00%

20.00%

S/.

150.00

0.00%

S/.

10.00 S/.

150.00

20.00%

40.00

13,149.00 S/.

0.86 S/.

11,308.14

1,016.81

7.73%

S/.

874.46

0.00%

S/.

1,016.81 S/.

874.46

7.73%

12,132.19

13,149.00

9,072.81

13,149.00 S/.

9,072.81

EXCAVACIONES DE ZANJAS

REFINE Y NIVELACION DE ZANJAS

S/.

S/.

S/.

13,149.00 S/.
-

m3

S/.

2,780.00 S/.

S/.

S/.

6.37 S/.
-

S/.

13.20 S/.
-

S/.

12.23 S/.

173,566.80
33,999.40

S/.

S/.

100.00%
0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00
13,149.00
13,149.00
13,149.00
13,149.00
2,780.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

03.07.02

INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA

13,149.00 S/.

8.77 S/.

115,316.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

03.07.03

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA

13,149.00 S/.

3.54 S/.

46,547.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.02
03.10

CODO PVC U.F. DE 45X315 MM.


CODO PVC U.F. DE 22.5X315 MM.
INSTALACION DE ACCESORIOS PVC U.F. 315 MM. INC. DADO DE
ANCLAJE
SUMINISTRO E INSTALACION DE VALVULAS

04.01.01
04.01.02
04.01.03

5,213.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

und

124.00 S/.

726.29 S/.

90,059.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

124.00

und

131.00 S/.

54.53 S/.

7,143.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

131.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

LINEA DE ADUCCION DE RESERVORIO APOYADO

04.01

744.78 S/.

VALVULA DE AIRE DE 2" DOBLE EFECTO

04

und
und

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO
(PROV. DURANTE OBRA)
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

7.00 S/.

und

03.10.02

03.10.01

S/.

S/.

S/.

3.00 S/.

1,306.36 S/.

3,919.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

11.00 S/.

888.26 S/.

9,770.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

1,548.59 S/.

17,034.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

3.00 S/.

1,743.73 S/.

5,231.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

606.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

und
und

20.00 S/.

30.30 S/.

10.00 S/.

15.00 S/.

150.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

4,042.00 S/.

0.86 S/.

3,476.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,042.00

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

4,042.00 S/.

0.69 S/.

2,788.98

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

4,042.00 S/.

1.04 S/.

4,203.68

04.02.02
04.03
04.03.01

EXCAVACIONES DE ZANJAS

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.

REFINE Y NIVELACION DE ZANJAS


REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

20.00

04.01.05
04.02.01

11.00 S/.

04.01.04
04.02

und

VALVULA PURGA DE F. FDO. BRIDADA 8"


CAMARAS PARA VALVULAS
CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ
4-24"
CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"

0.00%

S/.

S/.

83,759.13

S/.

1,933,560.45

30,242.70

0.00%

147.05 S/.

S/.

2.30 S/.

146,085.39

S/.

13,149.00 S/.

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

S/.

0.00%

03.08

11.11 S/.

100.00%

TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM.

03.07.01

SUMINISTRO E INSTALACION DE TUBERIAS

13,149.00 S/.

ELIMINACION DE MATERIAL EXCEDENTE

S/.

13,149.00 S/.

RELLENO DE ZANJAS

13,149.00 S/.

CAMA DE APOYO

ELIMINACION DE MATERIAL EXCEDENTE

0.00%

10.00

9,072.81

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM

15.00

13,674.96

03.05.01

S/.

750.00

1.04 S/.

03.05

METRADO

15.00 S/.
0.69 S/.

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

% AVANCE

50.00 S/.

13,149.00 S/.

03.04.01

VALORIZADO

S/.

und

13,149.00 S/.

03.04

METRADO

0.00%

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

VALORIZADO

909.00

03.03.01

% AVANCE

30.30 S/.

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

03.03

METRADO

S/.

30.00 S/.

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

EXCAVACION C/EQUIPO P/AGUA T. NATURAL P/TUB. 315 MM.

VALORIZADO

0.00%

und

03.01.05
03.02.01

% AVANCE
-

03.01.04
03.02

ACUMULADO

COSTO PARCIAL

CANTIDAD
-

ACTUAL

2,788.98

0.00%

S/.

4,042.00 S/.

0.00%

S/.

S/.

2,788.98
-

100.00%
0.00%

4,042.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

500.00 S/.

11.43 S/.

5,715.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00 S/.

S/.

1.72 S/.

S/.

38,253.60

S/.

S/.

0.00%

10.80 S/.

S/.

100.00%

3,542.00 S/.
-

S/.

4,042.00

860.00

500.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

04.03.02
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.06
04.06.01
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.07.05
04.07.06
04.08
04.08.01
04.08.02
04.09
04.09.01
04.09.02
04.10

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

RELLENO DE ZANJAS
m

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.

ELIMINACION DE MATERIAL EXCEDENTE

05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02

S/.

7,296.52
-

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

METRADO
3,542.00
-

500.00 S/.

3.63 S/.

1,815.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

3,542.00 S/.

5.98 S/.

21,181.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

3,542.00 S/.

18.79 S/.

66,554.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

500.00 S/.

14.03 S/.

7,015.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

12.23 S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00 S/.

32.78 S/.

16,390.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

3,542.00 S/.

5.32 S/.

18,843.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

500.00 S/.

3.56 S/.

1,780.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

3,542.00 S/.

3.01 S/.

10,661.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

500.00 S/.

1.98 S/.

990.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

INSTALACION DE ACCESORIOS HO. DUCTIL EMBONE DE 300 - 350 MM

und

SUMINISTRO E INSTALACION DE VALVULAS

VALVULA PURGA DE F. FDO. BRIDADA 8"

und

VALVULA DE AIRE DE 2" DOBLE EFECTO

und
und
und

OBRAS PRELIMINARES

S/.

540.41

0.00%

S/.

S/.

6,609.21

0.00%

S/.

S/.

403,646.32

und

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

2.06 S/.

113.96 S/.

CODO HO DUCTIL DE 45 X 300 MM.

SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA


CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO
(PROV. DURANTE OBRA)
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE
TRANSITO
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV.
DURANTE LA OBRA)
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV.
DURANTE LA OBRA)
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

ACUMULADO

3,542.00 S/.

TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)


INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA
HIDRAULICA
PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA
PRUEBA HIDRAULICA+ESCORRENT. TUBERIAS 200 MM. ZANJAS
TAPADA
SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

540.41 S/.
-

REDES DE DISTRIBUCION PRIMARIA Y SECUNDARIA

05.01.02

m3

TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM

05
05.01.01

SUMINISTRO E INSTALACION DE TUBERIAS

04.10.02
05.01

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.

METRADO

ACTUAL

COSTO PARCIAL

CANTIDAD
3,542.00 S/.

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

CAMARAS PARA VALVULAS


CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ
4-24"
CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"

04.10.01

CAMA DE APOYO

ELIMINACION DE MATERIAL EXCEDENTE

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

3,542.00

123.00 S/.

668.00 S/.

82,164.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

123.00

123.00 S/.

132.25 S/.

16,266.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

123.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

10.00 S/.

1,306.36 S/.

13,063.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

10.00 S/.

888.26 S/.

8,882.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

10.00 S/.

1,548.59 S/.

15,485.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

10.00 S/.

1,743.73 S/.

17,437.30

10.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

40.00 S/.

30.30 S/.

1,212.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

und

30.00 S/.

15.00 S/.

450.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

und

20.00 S/.

34.00 S/.

680.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

28,038.22 S/.

0.86 S/.

24,112.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

28,038.22

m
und

30.00 S/.

78.59 S/.

2,357.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

und

10.00 S/.

275.65 S/.

2,756.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

28,038.22 S/.

0.69 S/.

19,346.37

100.00%

S/.

0.00%

S/.

28,038.22 S/.

1.04 S/.

29,159.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

195,257.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.02.02

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 140-160 MM.

4,136.34 S/.

10.39 S/.

42,976.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.02.03

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 200 MM.

1,391.85 S/.

11.43 S/.

15,908.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.02.04

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 250 MM.

246.45 S/.

12.70 S/.

3,129.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.02.05

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.

50.04 S/.

10.80 S/.

540.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.03.02
05.03.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 90-110 MM.


REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 140-160
MM.
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

S/.

S/.

S/.

28,038.22

8.79 S/.

100.00%

22,213.55 S/.

S/.

19,346.37

REFINE Y NIVELACION DE ZANJAS

28,038.22 S/.

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 90-110 MM.

05.03.01

19,346.37

05.02.01

05.03

EXCAVACIONES DE ZANJAS

28,038.22

22,213.55 S/.

1.03 S/.

22,879.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

4,136.34 S/.

1.03 S/.

4,260.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

1,391.85 S/.

1.72 S/.

2,393.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

05.03.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

246.45 S/.

1.72 S/.

423.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.03.05

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

50.04 S/.

2.06 S/.

103.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.04

CAMA DE APOYO

S/.

S/.

05.04.01

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 90-110 MM.

22,213.55 S/.

3.64 S/.

80,857.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.04.02

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 140-160 MM.

4,136.34 S/.

3.63 S/.

15,014.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.04.03

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

1,291.85 S/.

3.63 S/.

4,689.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,291.85

05.04.04

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

246.45 S/.

4.75 S/.

1,170.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.04.05

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

50.04 S/.

5.98 S/.

299.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.05

RELLENO DE ZANJAS

S/.

S/.

05.05.01

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 90-110 MM

22,213.55 S/.

11.68 S/.

259,454.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.05.02

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 140-160 MM

4,136.34 S/.

13.13 S/.

54,310.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.05.03

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 200 MM

1,391.85 S/.

13.14 S/.

18,288.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.05.04

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 250 MM

246.45 S/.

13.19 S/.

3,250.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.05.05

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.

50.04 S/.

18.79 S/.

940.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.06
05.06.01
05.07

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

m3

S/.

3,748.68 S/.
-

12.23 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

42,150.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.02

TUBERIA P.V.C. CLASE A - 7.5 UF DE 110 MM.

19,086.69 S/.

15.92 S/.

303,860.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.03

TUBERIA P.V.C. CLASE A - 7.5 UF DE 160 MM.

4,136.34 S/.

34.48 S/.

142,621.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.04

TUBERIA P.V.C. CLASE A - 7.5 UF DE 200 MM.

1,391.85 S/.

55.18 S/.

76,802.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.05

TUBERIA P.V.C. CLASE A - 7.5 UF DE 250 MM.

246.45 S/.

101.22 S/.

24,945.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.06

TUBERIA P.V.C. CLASE A - 7.5 UF DE 315 MM.

50.04 S/.

113.66 S/.

5,687.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.07.07

INSTALACION TUBERIA PVC UF DE 90 MM. INC. PRUEBA HIDRAULICA

3,126.86 S/.

2.14 S/.

6,691.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.08

INSTALACION TUBERIA PVC UF DE 110 MM. INC. PRUEBA HIDRAULICA

19,086.69 S/.

2.98 S/.

56,878.34

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.09

INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA

4,136.34 S/.

4.39 S/.

18,158.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.10

INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA

1,391.85 S/.

6.90 S/.

9,603.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.11

INSTALACION TUBERIA PVC UF DE 250 MM. INC. PRUEBA HIDRAULICA

246.45 S/.

4.74 S/.

1,168.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.12

INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA

50.04 S/.

5.32 S/.

266.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.07.13

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 90 MM. ZANJAS TAPADA

3,126.86 S/.

1.49 S/.

4,659.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.14

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 110 MM. ZANJAS TAPADA

19,086.69 S/.

1.59 S/.

30,347.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.15

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 160 MM. ZANJAS TAPADA

4,136.34 S/.

1.84 S/.

7,610.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.16

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 200 MM. ZANJAS TAPADA

1,391.85 S/.

2.30 S/.

3,201.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.17

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 250 MM. ZANJAS TAPADA

246.45 S/.

2.46 S/.

606.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.18

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA

50.04 S/.

3.01 S/.

150.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,704.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.08.01

CRUZ DE PVC UF 110X110 MM

und

05.08.02

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 80 MM

05.08.03

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 100 MM

05.08.04
05.08.05

S/.

3,748.68

13.48 S/.

S/.

S/.

45,846.36

3,126.86 S/.

S/.

S/.

TUBERIA P.V.C. CLASE A - 7.5 UF DE 90 MM.

SUMINISTRO E INSTALACION DE ACCESORIOS

05.07.01

05.08

SUMINISTRO E INSTALACION DE TUBERIAS

35.00 S/.

162.98 S/.

35.00

und

4.00 S/.

62.93 S/.

251.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

und

30.00 S/.

87.87 S/.

2,636.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 150 MM

und

4.00 S/.

117.00 S/.

468.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 200 MM

und

2.00 S/.

169.20 S/.

338.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

05.08.06

CODO PVC U.F. DE 45X110 MM.

und

10.00 S/.

41.03 S/.

410.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

05.08.07

CODO PVC U.F. DE 45X200 MM.

und

5.00 S/.

132.08 S/.

660.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

05.08.08

CODO PVC U.F. DE 90X110 MM.

und

15.00 S/.

51.86 S/.

777.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

05.08.09

REDUCCION PVC U.F. DE 200 MM A 110 MM

und

2.00 S/.

89.70 S/.

179.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

05.08.10

TEE PVC U.F. DE 110X110 MM.

und

20.00 S/.

112.50 S/.

2,250.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.08.11

TEE PVC U.F. DE 200X110 MM.

und

2.00 S/.

627.00 S/.

1,254.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

2.00 S/.

728.39 S/.

1,456.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

118.00 S/.

47.24 S/.

5,574.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

118.00

13.00 S/.

62.19 S/.

808.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.08.12
05.08.13
05.08.14
05.09

TEE PVC U.F. DE 200X200 MM.


INSTALACION DE ACCESORIOS PVC U.F. 90-160 MM. INC. DADO DE
ANCLAJE
INSTALACION DE ACCESORIOS PVC U.F. 200-250 MM. INC. DADO DE
ANCLAJE
SUMINISTRO E INSTALACION DE VALVULAS

und
-

S/.

S/.

05.09.01

VALVULA COMPUERTA DE FO. FDO. LUFLEX 90 mm

und

11.00 S/.

335.45 S/.

3,689.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.02

VALVULA COMPUERTA DE FO. FDO. LUFLEX 110 mm

und

42.00 S/.

428.18 S/.

17,983.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

05.09.03

VALVULA COMPUERTA DE FO. FDO. LUFLEX 160 mm

und

11.00 S/.

755.45 S/.

8,309.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.04

VALVULA COMPUERTA DE FO. FDO. LUFLEX 200 mm

und

9.00 S/.

1,180.90 S/.

10,628.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

05.09.05

GRIFO CONTRAINCENDIO TIPO POSTE 2 BOCAS LUFLEX

und

20.00 S/.

772.00 S/.

15,440.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.09.06

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 90 MM

und

11.00 S/.

15.48 S/.

170.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.07

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 110 MM

und

42.00 S/.

17.70 S/.

743.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 160 MM

und

11.00 S/.

20.64 S/.

227.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

und

9.00 S/.

24.76 S/.

222.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

und

20.00 S/.

143.90 S/.

2,878.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.09.08
05.09.09
05.09.10
05.10
05.10.01
05.10.02
05.11
05.11.01
05.12
05.12.01
05.12.02
05.12.03
05.12.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
07
07.01

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 200 MM


INSTALACION DE GRIFOS CONTRAINCENDIO LUFLEX TIPO POSTE 2
BOCAS
CAMARAS PARA VALVULAS

REGISTRO P/VALVULA DE COMPUERTA 90-160 MM.

und

REGISTRO P/VALVULA DE COMPUERTA 200-250 MM.

und

EMPALMES
EMPALME C/INSERCION DE TUBERIA A LINEAS DE AGUA 4"-6"

und

ROTURA Y REPOSICION DE PAVIMENTOS

0.00%

S/.

0.00%

S/.

S/.

0.00%

64.00 S/.

157.78 S/.

10,097.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

64.00

9.00 S/.

222.42 S/.

2,001.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

11.00 S/.
S/.

S/.

89.90 S/.
-

S/.

988.90
-

11.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2

600.00 S/.

21.34 S/.

12,804.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

CARPETA ASFALTICA EN FRIO E=5.00 CM.

m2

600.00 S/.

45.31 S/.

27,186.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

m2

600.00 S/.

20.82 S/.

12,492.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

m3

30.00 S/.

11.27 S/.

338.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA AGUA 1/2" A TUB. DE 4" INC. PRUEBA
HIDRAULICA
INSTALACION DE MEDIDORES DE 1/2".
INSTALACION DE MEDIDORES DE 1/2" (INC. RETIRO DE ACCESORIOS
Y MEDIDOR MALOGRADO).
SUMINISTRO E INST. CAJA CONCRETO MARCO TAPA FGD. TN MED.
1/2"-3/4"
CONSTRUCCION RESERVORIO APOYADO RAP-01

S/.

BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO


ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.
ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION
PAVIMENTACION PAVIMENTOS D=5 KM.
CONEXIONES DOMICILIARIAS AGUA POTABLE

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

1,918.00 S/.

und
und
und

278.47 S/.

534,105.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,918.00

1,918.00 S/.

81.91 S/.

157,103.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,918.00

865.00 S/.

105.01 S/.

90,833.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

865.00

750.00 S/.

97.06 S/.

72,795.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

750.00

S/.

OBRAS PRELIMINARES

S/.

07.01.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

483.85 S/.

0.69 S/.

333.86

483.85

100.00%

S/.

333.86

0.00%

S/.

483.85 S/.

333.86

100.00%

07.01.02

TRAZOS Y REPLANTEOS FINALES DEL PROYECTO DE OBRA

483.85 S/.

2.34 S/.

1,132.21

483.85

100.00%

S/.

1,132.21

0.00%

S/.

483.85 S/.

1,132.21

100.00%

0.00%

S/.

0.00%

S/.

0.00%

07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.03

MOVIMIENTO DE TIERRAS
EXCAVACIONES CORTES C/EQUIPO EN TERRENO NATURAL
REFINE Y NIVELACION EN TERRENO NORMAL
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO CON
MAQUINARIA
ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL
(R=10 KM)
OBRAS DE CONCRETO SIMPLE

S/.

S/.

S/.

m3

396.53 S/.

14.00 S/.

5,551.42

396.53

100.00%

S/.

5,551.42

0.00%

S/.

396.53 S/.

5,551.42

100.00%

m2

437.44 S/.

3.66 S/.

1,601.03

437.44

100.00%

S/.

1,601.03

0.00%

S/.

437.44 S/.

1,601.03

100.00%

m3

166.27 S/.

8.23 S/.

1,368.40

166.27

100.00%

S/.

1,368.40

0.00%

S/.

166.27 S/.

1,368.40

100.00%

m3

475.84 S/.

11.05 S/.

5,258.03

475.84

100.00%

S/.

5,258.03

0.00%

S/.

475.84 S/.

5,258.03

100.00%

0.00%

S/.

0.00%

S/.

0.00%

S/.

S/.

S/.

07.03.01

CONCRETO f'c=100 kg/cm2 P/SOLADOS Y/O SUB BASE

m3

12.04 S/.

249.51 S/.

3,004.10

12.04

100.00%

S/.

3,004.10

0.00%

S/.

12.04 S/.

3,004.10

100.00%

07.03.02

ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES

m2

7.54 S/.

15.41 S/.

116.19

7.54

100.00%

S/.

116.19

0.00%

S/.

7.54 S/.

116.19

100.00%

0.00%

S/.

0.00%

S/.

0.00%

07.04

OBRAS DE CONCRETO ARMADO

S/.

S/.

S/.

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

07.04.01

CONCRETO f'c=280 kg/cm2 P/ZAPATAS

m3

120.39 S/.

409.90 S/.

49,347.86

120.39

100.00%

S/.

49,347.86

0.00%

S/.

120.39 S/.

49,347.86

100.00%

07.04.02

ENCOFRADO Y DESENCOFRADO P/ZAPATAS CIRCULARES

m2

59.31 S/.

62.44 S/.

3,703.32

59.31

100.00%

S/.

3,703.32

0.00%

S/.

59.31 S/.

3,703.32

100.00%

07.04.03

ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS

kg

7,203.40 S/.

4.76 S/.

34,288.18

7,203.40

100.00%

S/.

34,288.18

0.00%

S/.

7,203.40 S/.

34,288.18

100.00%

07.04.04

CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO

m3

100.28 S/.

428.76 S/.

42,996.05

100.28

100.00%

S/.

42,996.05

0.00%

S/.

100.28 S/.

42,996.05

100.00%

07.04.05

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

4,755.00 S/.

4.76 S/.

22,633.80

4,755.00

100.00%

S/.

22,633.80

0.00%

S/.

4,755.00 S/.

22,633.80

100.00%

07.04.06

CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS

m3

193.12 S/.

512.68 S/.

99,008.76

68.16

35.29%

S/.

34,944.27

103.72

53.71%

S/.

53,175.17

171.88 S/.

88,119.44

89.00%

21.24

07.04.07

ENCOFRADO Y DESENCOFRADO P/MURO RECTOS

m2

965.60 S/.

51.82 S/.

50,037.39

366.93

38.00%

S/.

19,014.31

492.45

51.00%

S/.

25,518.76

859.38 S/.

44,533.07

89.00%

106.22

07.04.08

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

45,973.07 S/.

4.76 S/.

218,831.81

27,583.07

60.00%

S/.

131,295.41

18,389.23

40.00%

S/.

87,532.73

45,972.30 S/.

218,828.14

100.00%

0.77

07.04.09

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

2.50 S/.

392.58 S/.

981.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.50

07.04.10

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

20.00 S/.

46.89 S/.

937.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

07.04.11

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

445.00 S/.

4.76 S/.

2,118.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

445.00

07.04.12

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

2.20 S/.

357.43 S/.

786.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.20

07.04.13

CONCRETO f'c=280 kg/cm2 P/VIGAS Y DINTELES

m3

26.74 S/.

421.99 S/.

11,284.01

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.74

07.04.14

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

19.50 S/.

46.24 S/.

901.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.50

07.04.15

ENCOFRADO Y DESENCOFRADO P/VIGAS CIRCULARES

m2

114.23 S/.

50.58 S/.

5,777.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

114.23

07.04.16

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

2,767.88 S/.

4.76 S/.

13,175.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,767.88

07.04.17

CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS

m3

3.50 S/.

340.24 S/.

1,190.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.50

07.04.18

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

25.00 S/.

56.93 S/.

1,423.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

07.04.19

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

350.00 S/.

4.76 S/.

1,666.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

350.00

07.04.20

CONCRETO f'c=245 kg/cm2 P/CUPULA ESFERICA

m3

35.41 S/.

455.35 S/.

16,123.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.41

07.04.21

ENCOFRADO Y DESENCOFRADO P/CUPULA ESFERICA

m2

404.74 S/.

75.51 S/.

30,561.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

404.74

ACERO ESTRUCTURAL TRABAJADO P/CUPULA ESFERICA

kg

2,611.44 S/.

4.76 S/.

12,430.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,611.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

07.04.22
07.05
07.05.01
07.06
07.06.01
07.06.02
07.06.03
07.06.04
07.07
07.07.01
07.08

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM
TARRAJEO C/IMPERM. MUROS INTERIORMENTE M=1:3 E=1.5 CM

m2
-

m2

VEREDA DE CONCRETO Fc=140 KG/CM2 H=0.15M.

S/.

25.00 S/.
-

PISO DE CONCRETO DE 2" ACABADO FROTACHADO

S/.

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.25 S/.

883.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00

18.80 S/.

7,277.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

387.08

22.78 S/.

10,485.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

460.31

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

22.41 S/.
-

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.01 S/.

475.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

59.28 S/.

6,520.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

110.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.
110.00 S/.
-

S/.

S/.

S/.

28.58 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.98

2.10 S/.

149.11 S/.

313.13

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.10

6.00 S/.

121.03 S/.

726.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

und

1.00 S/.

123.70 S/.

123.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

4.00 S/.

58.41 S/.

233.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

1.98 S/.

07.10.02

PUERTA METALICA LAC 1/16" C/MARCO 1 1/4"X1/8" Y REFUERZOS

m2

07.10.03

ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"

07.10.04

TAPA METALICA DE INSPECCION STANDARD

07.10.05

VENTILACION C/TUBERIA DE ACERO S/DISEO DE 4"


CERRAJERIA

und

S/.

3.00 S/.

S/.

5.83 S/.

29.00

286.13

m2

S/.

828.82

25.00

144.51 S/.

VENTANA DE FIERRO C/PERFIL DE 1"+HOJA BAST. 3/4"

25.00

m2

29.00 S/.

560.25

m2
-

50.00

736.00

29.44 S/.

07.10.01

BISAGRA CAPUCHINA ALUMINIO DE 3"

0.00%

25.00

25.00 S/.

m2

1,804.75

460.31 S/.

m2

1,086.50

35.00 S/.

07.08.03

07.11.01

S/.

387.08 S/.

07.08.02

07.11

m2

m2

07.10

72.19 S/.

m2

PISOS Y PAVIMENTOS

CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. C/CEZ 1:5 2.5 CM+FRAGUA
C/MORT. 1:5 JUNTA 1.5 CM.
CARPINTERIA METALICA

S/.

S/.

21.73 S/.

FALSO PISO DE 4" CONCRETO Fc=100 KG/CM2

07.09.01

50.00 S/.

07.08.01

07.09

S/.

25.00 S/.

m2

CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM

17.49

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

07.11.02
07.12
07.12.01
07.12.02
07.12.03
07.12.04
07.13
07.13.01
07.13.02
07.14
07.14.01
07.14.02
07.14.03

CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 3


GOLPES
PINTURAS
PINTADO DE CIELO RASOS C/LATEX VINILICO (VINILATEX O SIMILAR)
PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O
SIMILAR)
PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O
SIMILAR)
PINTADO EXTERIOR C/LATEX VINILICO O SIMILAR DE RESERVORIO
INCL. LOGOTIPO
VARIOS

und

METRADO

S/.

ACTUAL

ACUMULADO

COSTO PARCIAL

CANTIDAD
1.00 S/.

94.53 S/.
-

S/.

94.53
-

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

METRADO
1.00
-

m2

25.00 S/.

10.47 S/.

261.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

m2

45.00 S/.

9.74 S/.

438.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.00

m2

35.00 S/.

8.72 S/.

305.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00

m2

462.00 S/.

9.16 S/.

4,231.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

462.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

100.00%

PROVISION Y COLOCADO DE TECNOPORT DE 3/4"

m2

PROVISION Y COLOCADO DE JUNTA WATER STOP DE PVC 6"

INSTALACIONES ELECTRICAS
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14
AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB.
SAP, ALAMBRE TW 14
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

pto

S/.

S/.

5.00 S/.

5.38 S/.

26.90

440.00 S/.

18.99 S/.

8,355.60

S/.

S/.

155.28

35.29%

S/.

64.71%

S/.

0.00%

S/.

2,948.77
-

284.72
-

0.00%

S/.

5,406.83
-

440.00 S/.
-

S/.

8,355.60
-

0.00%

3.00

3.00 S/.

86.79 S/.

260.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

pto

4.00 S/.

63.52 S/.

254.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

20.00 S/.

2.56 S/.

51.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

07.14.04

CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2

40.00 S/.

2.08 S/.

83.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

07.14.05

CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2

50.00 S/.

2.77 S/.

138.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.00

10.00 S/.

3.14 S/.

31.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

675.98 S/.

675.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

07.14.06
07.14.07
07.14.08
07.15
07.15.01
07.15.02
07.15.03
07.16

CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2


TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS
SEGUN ESPEFICICACIONES
POZO CONEXION A TIERRA EN SISTEMA C/ALUMBRADO Y
TOMACORRIENTE.
PRUEBAS HIDRAULICAS DE OBRAS CIVILES
PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO
DESINFECCION DE RESERVORIO CON EMPLEO DE LINEA DE
INGRESO
EVACUACION DEL AGUA DE PRUEBA C/EMPL. DE LINEA DE SALIDA

S/.

S/.

m3

2,500.00 S/.

1.25 S/.

3,125.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00

m3

2,500.00 S/.

3.60 S/.

9,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00

m3

2,500.00 S/.

0.92 S/.

2,300.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

EXCAVACIONES DE ZANJAS

S/.

S/.

07.16.01

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 400 MM.

167.00 S/.

10.39 S/.

1,735.13

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00

07.16.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.

167.00 S/.

2.58 S/.

430.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00

07.16.03

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.

167.00 S/.

5.37 S/.

896.79

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00

167.00 S/.

38.13 S/.

6,367.71

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00

167.00 S/.

11.27 S/.

1,882.09

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00

3.00 S/.

2,961.19 S/.

8,883.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

07.16.04
07.16.05
07.16.06
07.17
07.17.01
07.17.02
07.17.03
07.17.04
07.17.05
07.18

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 400 MM


ELIMINACION MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 400 MM
HASTA R=5 KM
BUZON TIPO I TERRENO NORMAL HASTA 4.00 M. PROF.

und

SUMINISTRO E INSTALACION DE TUBERIAS

TUBERIA ACERO NEGRO SCH-40 DE 16" (400 MM.)

TUBERIA ACERO NEGRO SCH-40 DE 18" (450 MM.)


TUBERIA P.V.C. DESAGUE U.F. SERIES S-20 16" (400 MM.)
INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA
HIDRAULICA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS
TAPADA
SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

S/.

25.00 S/.

635.29 S/.

15,882.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00 S/.

860.52 S/.

12,907.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

100.00 S/.

148.98 S/.

14,898.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

100.00 S/.

4.19 S/.

419.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

100.00 S/.

4.84 S/.

484.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

25.00

07.18.01

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 16" (400 MM)

und

10.00 S/.

247.20 S/.

2,472.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

07.18.02

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 18" (450 MM)

und

8.00 S/.

266.40 S/.

2,131.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

8.00

07.18.03

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 16" (400MM)

und

1.00 S/.

247.20 S/.

247.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

07.18.04

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 18" (450MM)

und

1.00 S/.

266.40 S/.

266.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

07.18.05

CODO FO. FDO. BRIDADO 16"X90 (400 MM)

und

2.00 S/.

986.40 S/.

1,972.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

07.18.06

CODO FO. FDO. BRIDADO 18"X90 (450 MM)

und

2.00 S/.

1,310.40 S/.

2,620.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

07.18.07

REDUCCION FO. FDO. BRIDADA DE 450 X 400 MM.

1.00 S/.

966.30 S/.

966.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

07.18.08

TEE FO. FDO. BRIDADA DE 400X400 MM

und

1.00 S/.

1,547.40 S/.

1,547.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

07.18.09

TEE FO. FDO. BRIDADA DE 450X450 MM

und

1.00 S/.

1,964.70 S/.

1,964.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

07.19

SUMINISTRO E INSTALACION DE VALVULAS

METRADO
-

S/.

MEDIDOR DE CAUDAL TIPO TUBULAR BRIDADO 18"

und

1.00 S/.

07.19.02

VALVULA MARIPOSA F. FDO. BRIDADA DE 400 MM (16")

und

07.19.03

VALVULA MARIPOSA F. FDO. BRIDADA DE 450 MM (18")

und

07.19.04

VALVULA DE ALTITUD FO. FDO. DE 16" BB.

und

07.20.01
07.21
07.21.01
07.22
07.22.01
08
08.01
08.01.01
08.01.02
08.01.03
08.01.04
08.01.05
08.01.06
08.01.07
08.01.08
08.02

CAJAS PARA REBOSE


CAJA REBOSE-LIMPIA TERRENO ROCA
EQUIPOS
SUMINISTRO EQUIPO CLORINADOR INYECCION C/ACC., CILINDROS,
BALANZA, MASCARA Y BOOSTER S/ESPECIFICACIONES
MONTAJE DE INSTALACIONES HIDRAULICAS
MONTAJE DE INSTALACIONES HIDRAULICA DE RESERVORIO
APOYODO
COLECTORES PRINCIPALES DESAGUE

und
-

SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA


CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO
(PROV. DURANTE OBRA)
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE
TRANSITO
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV.
DURANTE LA OBRA)
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV.
DURANTE LA OBRA)
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA
TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

3.00 S/.

8,643.63 S/.

25,930.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

1.00 S/.

11,241.81 S/.

11,241.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

1.00 S/.

17,727.27 S/.

17,727.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

S/.

S/.

S/.

1.00 S/.

S/.

2,103.09 S/.
-

S/.

16,350.00 S/.
-

S/.

4,857.98 S/.
S/.
S/.

2,103.09
16,350.00
4,857.98
-

und

60.00 S/.

30.30 S/.

1,818.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

und

100.00 S/.

15.00 S/.

1,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

40.00 S/.

34.00 S/.

1,360.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

13,069.74 S/.

0.86 S/.

11,239.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74
30.00

und
m
und

30.00 S/.

78.59 S/.

2,357.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

10.00 S/.

275.65 S/.

2,756.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

13,069.74 S/.

0.69 S/.

9,018.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74

13,069.74 S/.

1.04 S/.

13,592.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

m
m
m

08.02.02
08.02.03

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 300 MM.

08.02.04
08.02.05
08.03

S/.

OBRAS PRELIMINARES

EXCAVACIONES DE ZANJAS
EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.00M P/TUB. 200
MM. C/O
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 250 MM.

08.02.01

18,500.00

1.00 S/.

und

ACUMULADO

18,500.00 S/.

1.00 S/.

und

ACTUAL

COSTO PARCIAL

CANTIDAD

07.19.01

07.20

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

S/.

S/.

461.00 S/.

22.86 S/.

10,538.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11 S/.

14.29 S/.

62,620.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

15.25 S/.

21,852.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 350 MM.

3,598.80 S/.

16.33 S/.

58,768.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 400 MM.

3,194.87 S/.

17.59 S/.

56,197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

REFINE Y NIVELACION DE ZANJAS

S/.

S/.

461.00

08.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

4,382.11 S/.

1.72 S/.

7,537.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.03.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

1,432.96 S/.

2.06 S/.

2,951.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.03.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 355 MM.

3,598.80 S/.

2.30 S/.

8,277.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.03.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.

3,194.97 S/.

2.58 S/.

8,243.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

08.03.05

REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.

461.00 S/.

1.59 S/.

732.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

08.04

CAMA DE APOYO

08.04.01

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

08.04.02

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

08.04.03

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

08.04.04
08.04.05
08.05

S/.

S/.

461.00 S/.

3.63 S/.

1,673.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11 S/.

4.75 S/.

20,815.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

5.98 S/.

8,569.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 355 MM.

3,598.80 S/.

5.51 S/.

19,829.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.

3,194.97 S/.

5.37 S/.

17,156.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

0.00%

S/.

0.00%

S/.

S/.

0.00%

RELLENO DE ZANJAS

08.05.01

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.0 M.

08.05.02

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=3.0 M.

08.05.03

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=3.0 M.

08.05.04
08.05.05

S/.

S/.

461.00

461.00 S/.

39.43 S/.

18,177.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

4,382.11 S/.

39.26 S/.

172,041.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

47.27 S/.

67,736.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 350 MM H=3.0 M.

3,598.80 S/.

46.06 S/.

165,760.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 400 MM H=3.0 M.

3,194.97 S/.

52.93 S/.

169,109.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

08.06
08.06.01
08.07
08.07.01
08.08

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

m3

ENTIBADOS Y/O TABLESTACADOS


ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

2,655.25 S/.
-

S/.

6,500.00 S/.
-

12.23 S/.
-

S/.

78.26 S/.

508,690.00

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

METRADO
2,655.25
6,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

29,643.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.00

08.08.02

BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.

und

166.00 S/.

2,203.69 S/.

365,812.54

0.00%

S/.

0.00%

S/.

S/.

0.00%

166.00

08.08.03

BUZON TIPO I TERRENO NORMAL HASTA 5.00 M. PROF.

und

4.00 S/.

3,494.49 S/.

13,977.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

08.08.04

BUZON TIPO I TERRENO NORMAL HASTA 6.00 M. PROF.

und

3.00 S/.

3,997.38 S/.

11,992.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

08.08.05

BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.

und

7.00 S/.

2,969.37 S/.

20,785.59

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

08.08.06

BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.

und

2.00 S/.

3,493.40 S/.

6,986.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

08.09.01

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 8" (200 MM)

08.09.02

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 10" (250 MM)

08.09.03

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 12" (315 MM)


TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 14" (355 MM)

08.09.04
08.09.05
08.09.06
08.09.07
08.09.08
08.09.09
08.09.10
08.09.11
08.09.12
08.09.13
08.09.14
08.09.15
09
09.01
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.02

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 16" (400 MM)


INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA
HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 10" (250 MM) INC. PRUEBA
HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 12" (315 MM) INC. PRUEBA
HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 14" (355 MM) INC. PRUEBA
HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA
HIDRAULICA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 350 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS
TAPADA
REDES SECUNDARIAS DESAGUE

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11 S/.

63.21 S/.

276,993.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

95.14 S/.

136,331.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

3,598.80 S/.

108.41 S/.

390,145.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

3,194.97 S/.

140.63 S/.

449,308.63

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

461.00 S/.

3.56 S/.

1,641.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

4,382.11 S/.

3.53 S/.

15,468.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

3.93 S/.

5,631.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

3,598.80 S/.

4.05 S/.

14,575.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

3,194.97 S/.

4.19 S/.

13,386.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

461.00 S/.

2.36 S/.

1,087.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

4,382.11 S/.

1.93 S/.

8,457.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

1,432.96 S/.

2.66 S/.

3,811.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

3,598.80 S/.

4.12 S/.

14,827.06

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

3,194.97 S/.

4.84 S/.

15,463.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

und

100.00 S/.

30.30 S/.

3,030.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

und

80.00 S/.

15.00 S/.

1,200.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

80.00

und

60.00 S/.

34.00 S/.

2,040.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

39,138.76 S/.

0.86 S/.

33,659.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

39,138.76

m
und

25.00 S/.

78.59 S/.

1,964.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

und

40.00 S/.

275.65 S/.

11,026.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

39,138.76 S/.

0.69 S/.

27,005.74

100.00%

S/.

0.00%

S/.

39,138.76 S/.

1.04 S/.

40,704.31

0.00%

S/.

0.00%

S/.

S/.

0.00%

EXCAVACIONES DE ZANJAS

S/.

27,005.74

100.00%

39,138.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

15,012.91

9,383.07 S/.

11.43 S/.

107,248.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

9,383.07

7,506.45 S/.

14.29 S/.

107,267.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,506.45

5,629.84 S/.

19.05 S/.

107,248.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,629.84

963.90 S/.

32.58 S/.

31,403.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

963.90

642.60 S/.

43.45 S/.

27,920.97

0.00%

S/.

0.00%

S/.

S/.

0.00%

642.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.

09.02.03

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.50M P/TUB. 200 MM.

09.02.04

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 200 MM.


EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.50M P/TUB. 200
MM. C/O
EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=4.00M P/TUB. 200
MM. C/O
REFINE Y NIVELACION DE ZANJAS

S/.

S/.

39,138.76 S/.

09.02.02

S/.

27,005.74

137,218.00

15,012.91 S/.

39,138.76

9.14 S/.

09.03

20,546.77

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=1.50M P/TUB. 200 MM.

09.02.06

44.57 S/.

09.02.01

09.02.05

S/.

461.00 S/.

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO
(PROV. DURANTE OBRA)
TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE
TRANSITO
CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV.
DURANTE LA OBRA)
PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV.
DURANTE LA OBRA)
TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

VALORIZADO

0.00%

1,743.73 S/.

S/.

S/.

32,473.71

% AVANCE
-

17.00 S/.

und

S/.

S/.

BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.

SUMINISTRO E INSTALACION DE TUBERIAS

08.08.01

08.09

BUZONES Y CAMARAS

METRADO
S/.

ACUMULADO

COSTO PARCIAL

CANTIDAD
-

ACTUAL

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

09.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

37,532.26 S/.

1.72 S/.

64,555.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

37,532.26

09.03.02

REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.

1,606.50 S/.

1.59 S/.

2,554.34

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,606.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

09.04
09.04.01
09.05

CAMA DE APOYO
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

S/.

39,138.76 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

208,379.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

15,012.91

09.05.02

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.

9,383.07 S/.

14.03 S/.

131,644.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

9,383.07

09.05.03

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.50 M.

7,506.45 S/.

25.24 S/.

189,462.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,506.45

09.05.04

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=3.00 M.

5,629.84 S/.

31.16 S/.

175,425.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,629.84

09.05.05

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.5 M.

963.90 S/.

45.85 S/.

44,194.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

963.90

09.05.06

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=4.0 M.

642.60 S/.

52.14 S/.

33,505.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

642.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

09.07

ELIMINACION DE MATERIAL EXCEDENTE

m3

5,450.85 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

518,889.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

328.00

09.07.02

BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.

und

105.00 S/.

1,743.73 S/.

183,091.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

105.00

09.07.03

BUZON TIPO I TERRENO NORMAL HASTA 2.5 M. PROF.

und

58.00 S/.

1,940.82 S/.

112,567.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

58.00

09.07.04

BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.

und

24.00 S/.

2,203.69 S/.

52,888.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

24.00

09.07.05

BUZON TIPO I ROCA SUELTA HASTA 3.50 M. PROF.

und

26.00 S/.

2,622.71 S/.

68,190.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.00

09.07.06

BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.

und

3.00 S/.

2,969.37 S/.

8,908.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

09.07.07

BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.

und

5.00 S/.

3,493.40 S/.

17,467.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

09.07.08

BUZON TIPO I ROCA SUELTA HASTA 6.00 M. PROF.

und

1.00 S/.

4,009.62 S/.

4,009.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

09.07.09

DEMOLICION DE BUZONES EXISTENTES (PROMEDIO)

und

9.00 S/.

412.66 S/.

3,713.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

09.08.02
09.08.03
09.08.04
09.08.05
09.08.06
09.09
09.09.01
09.10
09.10.01
09.10.02
09.10.03
09.10.04
10
10.01
10.01.01
11
11.01
11.01.01
12
12.01

TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)


TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 6" (160 MM)
INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA
HIDRAULICA
INSTALACION TUBERIA PVC DESAGUE U.F. 6" (160 MM) INC. PRUEBA
HIDRAULICA
PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS
TAPADA
PRUEBA HIDRAULICA + ESCORRENT. TUBERIAS 160 MM. ZANJAS
TAPADA
EMPALMES
EMPALMES DE TUBERIAS DE 8"-10" A BUZON EXISTENTE EN SERVICIO

S/.

S/.

S/.

5,450.85

1,581.98 S/.

66,663.90

328.00 S/.

S/.

12.23 S/.

und

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

BUZON TIPO I TERRENO NORMAL HASTA 1.5 M. PROF.

09.08.01

09.07.01

09.08

BUZONES Y CAMARAS

S/.

S/.

39,138.76

13.88 S/.

142,073.70

15,012.91 S/.

S/.

3.63 S/.

ELIMINACION DE MATERIAL EXCEDENTE

S/.

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=1.50 M.

09.06.01

09.05.01

09.06

RELLENO DE ZANJAS

19,569.38 S/.

32.78 S/.

641,484.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

19,569.38 S/.

21.77 S/.

426,025.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

19,569.38 S/.

3.56 S/.

69,666.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

19,569.38 S/.

3.56 S/.

69,666.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

19,569.38 S/.

2.36 S/.

46,183.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

19,569.38 S/.

2.36 S/.

46,183.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

ROTURA Y REPOSICION DE PAVIMENTOS

S/.

18.00 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,841.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

CARPETA ASFALTICA EN FRIO E=5.00 CM.

m2

180.00 S/.

45.31 S/.

8,155.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

m2

180.00 S/.

20.82 S/.

3,747.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

m3

9.00 S/.

11.27 S/.

101.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00
-

CAMARA DE BOMBEO DESAGUE CDP-01


OBRAS PRELIMINARES

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

S/.

18.00

21.34 S/.

TRANSBASE DE AGUA SERVIDAS

3,920.94

180.00 S/.

DERIVACION DE AGUAS

S/.

217.83 S/.

m2

CONEXIONES DOMICILIARIAS
CONEXION DOMICIL. DESAGUE TUBO PVC U.F. S-25 6" T.N. 4.00-8.00M
INC. PRUEBA HIDRAULICA
OTROS

S/.

BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO


ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.
ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION
PAVIMENTACION PAVIMENTOS D=5 KM.
CONEXIONES DOMICILIARIAS DESAGUE

3,599.00 S/.

398.89 S/.

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

25,997.13 S/.

7.31 S/.

1,435,605.11

190,039.02

3,599.00
25,997.13

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.01.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

1,225.00 S/.

0.69 S/.

845.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,225.00

12.01.02

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

1,225.00 S/.

1.04 S/.

1,274.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,225.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.02

MOVIMIENTO DE TIERRAS

S/.

S/.

12.02.01

EXCAVACION MANUAL EN TERRENO NORMAL

m3

134.22 S/.

29.48 S/.

3,956.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

134.22

12.02.02

EXCAVACION EN TERRENO SATURADO MANUAL

m3

442.60 S/.

85.26 S/.

37,736.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

442.60

12.02.03

REFINE, NIVELACION Y COMPACTADO EN TERRENO NORMAL

m2

45.96 S/.

3.25 S/.

149.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.96

m3

51.24 S/.

73.95 S/.

3,789.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

51.24

m3

632.74 S/.

10.99 S/.

6,953.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

632.74

168.00 S/.

65.05 S/.

10,928.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

168.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.02.04
12.02.05
12.02.06
12.03
12.03.01
12.03.02

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO


ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL
(R=10 KM)
BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"
OBRAS DE CONCRETO SIMPLE
CONCRETO F'c=140KG/CM2+30%P.G. P/CIMIENTO CORRIDO (CMTO
PV)
CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PV)

hm
-

S/.

S/.

m3

17.58 S/.

321.44 S/.

5,650.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.58

m3

0.40 S/.

273.67 S/.

109.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.40

ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES


CONCRETO F'c=140KG/CM2+25%P.G. P/SOBRECIMIENTO (CEMENTO

m2

0.53 S/.

15.41 S/.

8.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.53

m3

2.80 S/.

326.49 S/.

914.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.80

12.03.05

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

m2

25.00 S/.

28.30 S/.

707.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.03.06

CONCRETO f'c=280 kg/cm2 P/GRADAS Y/O PISO SIMPLE

m3

10.59 S/.

398.13 S/.

4,216.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.59

12.03.07

ENCOFRADO Y DESENCOFRADO P/GRADAS Y/O PISOS

m2

2.79 S/.

40.09 S/.

111.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.79

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.03.03
12.03.04

12.04

PV)

OBRAS DE CONCRETO ARMADO

12.04.01

CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO

12.04.02
12.04.03

S/.

m3

9.80 S/.

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS (CMTO. PV)

m3

12.04.04

ENCOFRADO Y DESENCOFRADO P/MUROS CILINDRICOS DE CUBA

12.04.05
12.04.06

S/.

428.76 S/.

4,201.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.80

2,627.91 S/.

4.76 S/.

12,508.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,627.91

110.29 S/.

512.68 S/.

56,543.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

110.29

m2

604.18 S/.

55.62 S/.

33,604.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

604.18

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

7,581.80 S/.

4.76 S/.

36,089.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,581.80

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

5.93 S/.

392.58 S/.

2,328.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.93

12.04.07

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

74.27 S/.

46.89 S/.

3,482.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.27

12.04.08

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

826.80 S/.

4.76 S/.

3,935.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

826.80

12.04.09

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

6.83 S/.

357.43 S/.

2,441.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.83

12.04.10

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

60.18 S/.

46.24 S/.

2,782.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.18

12.04.11

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

617.50 S/.

4.76 S/.

2,939.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

617.50

12.04.12

CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS

m3

8.72 S/.

340.24 S/.

2,966.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

8.72

12.04.13

CONCRETO f'c=280 kg/cm2 P/LOSAS MACIZAS (CEMENTO PV)

m3

7.27 S/.

482.23 S/.

3,505.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.27

12.04.14

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

98.38 S/.

56.93 S/.

5,600.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

98.38

12.04.15

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

1,204.34 S/.

4.76 S/.

5,732.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,204.34

12.04.16

CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS

m3

4.55 S/.

313.94 S/.

1,428.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.55

12.04.17

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

m2

52.00 S/.

43.57 S/.

2,265.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

12.04.18

ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS

kg

273.00 S/.

4.76 S/.

1,299.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

273.00

12.04.19

LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.

und

434.00 S/.

2.78 S/.

1,206.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

434.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.05
12.05.01
12.06
12.06.01
12.06.02
12.06.03
12.06.04
12.06.05

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM

m2

REVOQUES Y ENLUCIDOS
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL.
COLUMNAS EMPOT.)
TARRAJEO DE SUPERFICIE DE COLUMNAS INDEPENDIENTES (EN
INTERIOS)
TARRAJEO DE SUPERFICIE DE VIGAS PERALTADAS-INDEPENDIENTES
(EN INTERIOS)

S/.

152.18 S/.
-

S/.

S/.

72.19 S/.
-

S/.

10,985.87
-

152.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2

14.40 S/.

17.70 S/.

254.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

14.40

m2

160.00 S/.

21.73 S/.

3,476.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

160.00

m2

148.17 S/.

25.25 S/.

3,741.29

0.00%

S/.

0.00%

S/.

S/.

0.00%

148.17

m2

15.51 S/.

13.97 S/.

216.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.51

m2

12.63 S/.

18.87 S/.

238.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.63

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

12.06.06
12.06.07
12.06.08
12.07
12.07.01
12.08

TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM


TARRAJEO C/IMPERM. DOS CAPAS MUROS INTERIORMENTE M=1:3
E=2.0 CM Y M=1:2 E=0.5 CM.
TARRAJEO C/IMPERM. CIELO RASO INT. M=1:3 E=1.5 CM

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

m2

33.55 S/.

18.80 S/.

630.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

33.55

m2

282.64 S/.

38.78 S/.

10,960.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

282.64

26.71 S/.

20.43 S/.

545.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.71

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

m2

CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

m2

S/.

96.25 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,581.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

12.08.02

CONTRAPISO CON MORTERO 1:5 DE 40 MM.

m2

12.00 S/.

15.81 S/.

189.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.08.03

PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.

m2

12.00 S/.

53.97 S/.

647.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.08.04

PISO DE CONCRETO DE 2" ACABADO FROTACHADO

m2

52.00 S/.

19.01 S/.

988.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.10
12.10.01
12.11

ZOCALO DE CERAMICO COLOR ENTERO 0.20X0.30 M


CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA
C/MORT. 1:4 JUNTA 1.5 CM.
CARPINTERIA METALICA

m2

S/.

14.40 S/.
-

m2

S/.

99.88 S/.

S/.

24.02 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.33

m2

12.68 S/.

280.83 S/.

3,560.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.68

m2

18.00 S/.

313.59 S/.

5,644.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

12.11.04

PUERTA METALICA LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS


PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC
3/16".
ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"

10.00 S/.

121.03 S/.

1,210.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

12.11.05

MARCO Y TAPA PLANCHA LAC 1/4" C/MECAN. DE SEGUR. S/DISEO

und

2.00 S/.

359.19 S/.

718.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.11.06

TAPA METALICA DE INSPECCION STANDARD

und

1.00 S/.

123.70 S/.

123.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.11.07

REJILLA PARA ESTACION BOMBEO DESAGUE SEGUN DISEO

und

1.00 S/.

6,035.39 S/.

6,035.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.12.01
12.12.02
12.13
12.13.01
12.14
12.14.01
12.14.02
12.14.03
12.14.04
12.14.05
12.15

CERRAJERIA
CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2
GOLPES
CANDADO INCLUYENDO ALDABAS

und
und

VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE

p2

PINTURAS
PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)
PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)
PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE
(SIMILAR)
PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)
PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2
ESMALTE)
VARIOS

S/.

S/.

5.00 S/.

90.67 S/.

453.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

1.00 S/.

15.00 S/.

15.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

S/.

52.00 S/.
-

3.66 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

91.88

m2

148.17 S/.

12.20 S/.

1,807.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

148.17

m2

159.66 S/.

12.04 S/.

1,922.31

0.00%

S/.

0.00%

S/.

S/.

0.00%

159.66

m2

22.83 S/.

10.47 S/.

239.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

22.83

m2

6.33 S/.

13.42 S/.

84.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

SEMBRIO DE GRASS

m2

12.15.02

ALAMO COSTEO

12.15.03

PROVISION Y COLOCADO DE JUNTA WATER STOP DE NEOPRENO 6"

S/.

52.00

S/.

190.32
1,028.14

S/.

11.19 S/.

S/.

S/.

91.88 S/.

m2

12.15.01

12.16

99.88

12.12

S/.

2,399.12

14.40

1,105.15

12.11.03

755.14

174.59 S/.

12.11.02

S/.

52.44 S/.

6.33 S/.

VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA

S/.

m2

12.11.01

S/.

96.25

30.41 S/.

2,156.96

52.00 S/.

S/.

22.41 S/.

m2

ZOCALOS

S/.

FALSO PISO DE 4" CONCRETO 1:8 (CEMENTO P-II)

12.09.01

12.08.01

12.09

PISOS Y PAVIMENTOS

300.00 S/.

4.03 S/.

1,209.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

20.00 S/.

47.19 S/.

943.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

118.40 S/.

5.38 S/.

636.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

118.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.16.01

INODORO TANQUE BAJO BLANCO INC. ACCESORIOS

und

1.00 S/.

203.55 S/.

203.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.02

LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.

und

1.00 S/.

294.87 S/.

294.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.03

LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA

und

1.00 S/.

71.00 S/.

71.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

9.80 S/.

9.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

12.90 S/.

12.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

10.70 S/.

10.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

3.40 S/.

3.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.04
12.16.05
12.16.06
12.16.07

APARATOS SANITARIOS Y ACCESORIOS

JABONERA DE LOSA COLOR BLANCO


TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR
BLANCO
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO
GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE

S/.

S/.

300.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.16.08

INSTALACION DE APARATOS SANITARIOS

und

3.00 S/.

65.92 S/.

197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.16.09

INSTALACION DE ACCESORIOS SANITARIOS

und

4.00 S/.

11.43 S/.

45.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.17

SISTEMA DE DESAGUE

S/.

S/.

12.17.01

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

1.00 S/.

87.35 S/.

87.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.02

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

2.00 S/.

72.66 S/.

145.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.17.03

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

1.00 S/.

98.21 S/.

98.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.04

RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"

4.00 S/.

14.82 S/.

59.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.17.05

RED DE DERIVACION PVC SAL PARA DESAGUE DE 6"

25.00 S/.

23.18 S/.

579.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.17.06

TRAMPA P PVC DESAGUE SAL 4"

und

1.00 S/.

32.10 S/.

32.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.07

PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"

und

1.00 S/.

77.92 S/.

77.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.08

SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.

und

3.00 S/.

142.14 S/.

426.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.18

SISTEMA AGUA FRIA

S/.

S/.

12.18.01

SALIDA DE AGUA FRIA DE PVC DE 1/2"

pto

3.00 S/.

78.15 S/.

234.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.18.02

RED DE PVC CLASE A-10 SP DE 3/4"

27.00 S/.

1.15 S/.

31.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

27.00

12.18.03

RED DE PVC CLASE A-10 SP DE 1/2"

5.00 S/.

2.55 S/.

12.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.18.04

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"

und

1.00 S/.

39.95 S/.

39.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.19
12.19.01
12.19.02
12.19.03
12.19.04

INSTALACIONES ELECTRICAS
SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14
AWG
SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14
AWG
SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB.
SAP, ALAMBRE TW 12
TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")

S/.

S/.

pto

13.00 S/.

86.79 S/.

1,128.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

pto

16.00 S/.

86.76 S/.

1,388.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

16.00

pto

18.00 S/.

63.97 S/.

1,151.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

442.00 S/.

2.56 S/.

1,131.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

442.00

12.19.05

TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")

3.00 S/.

4.83 S/.

14.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.19.06

TUBERIA PVC-SAP ELECTRICA DE 35 mm (1 1/4")

21.00 S/.

4.12 S/.

86.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

21.00

12.19.07

TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")

19.00 S/.

8.14 S/.

154.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.00

12.19.08

TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")

56.00 S/.

11.85 S/.

663.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

56.00

12.19.09

TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1/2"

17.50 S/.

2.58 S/.

45.15

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.50

12.19.10

TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1 1/2"

52.50 S/.

15.97 S/.

838.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.50

12.19.11

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1/2"-3/4"

459.50 S/.

2.12 S/.

974.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

459.50

12.19.12

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1"-1 1/2"

95.50 S/.

2.32 S/.

221.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

95.50

12.19.13

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 2"-3"

56.00 S/.

2.55 S/.

142.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

56.00

12.19.14

CABLE ELECTRO TW AWG-MCM NO. 14-2.5 MM2

15.00 S/.

2.77 S/.

41.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

12.19.15

CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2

53.00 S/.

7.80 S/.

413.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

53.00

12.19.16

CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2

309.00 S/.

16.85 S/.

5,206.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

309.00

12.19.17

CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2

232.00 S/.

2.08 S/.

482.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

232.00

12.19.18

CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2

438.00 S/.

2.77 S/.

1,213.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

438.00

12.19.19

CABLE ELECTRO THW AWG-MCM NO. 10-6.0 MM2

108.00 S/.

2.12 S/.

228.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

108.00

12.19.20

CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2

36.00 S/.

3.14 S/.

113.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

36.00

12.19.21

CABLE ELECTRO THW AWG-MCM NO. 6-16.0 MM2

108.00 S/.

4.48 S/.

483.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

108.00

12.19.22

CABLE ELECTRICO SUBCAB 4X4.0 MM2

84.00 S/.

8.67 S/.

728.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

12.19.23

CABLE ELECTRICO SUBCAB 7X2.5 MM2

84.00 S/.

18.55 S/.

1,558.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

12.19.24

CABLE ELECTRO APANTALLADO 2X16 AWG

180.00 S/.

5.55 S/.

999.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

12.19.25

CABLE ELECTRICO NYY 1X6 MM2

348.00 S/.

2.37 S/.

824.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

348.00

84.00 S/.

10.80 S/.

907.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

799.69 S/.

799.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.26
12.19.27
12.19.28

CABLE ELECTRICO NYY 1X35 MM2


TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS
SEGUN ESPEFICICACIONES
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 10 CIRCUITOS
SEGUN ESPEFICICACIONES

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

12.19.29
12.19.30
12.19.31
12.19.32
12.19.33
12.19.34
12.19.35

TABLERO GENERAL "TG-1" SEGUN ESPECIFICACIONES


TABLERO GENERAL "TG-2" SEGUN ESPECIFICACIONES
SUMINISTRO DE TABLERO DE CONTROL (TC2) SEGUN
ESPECIFICACIONES TECNICAS
TABLERO DE TRANSFERENCIA AUTOMATICA (TTA)
ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR
INC. EQUIPO Y PANTALLA
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE
AHORRADOR DE 20 W. O SIMILAR
LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

und

1.00 S/.

38,247.69 S/.

38,247.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

15,247.69 S/.

15,247.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

20,000.00 S/.

20,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

18,158.05 S/.

18,158.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

14.00 S/.

138.79 S/.

1,943.06

0.00%

S/.

0.00%

S/.

S/.

0.00%

14.00

und

7.00 S/.

76.66 S/.

536.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

und

4.00 S/.

404.67 S/.

1,618.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.19.36

CAJA DE FO GDO. 100X100X50 MM. INCL. TAPA

und

3.00 S/.

14.18 S/.

42.54

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.19.37

CAJA DE FO GDO. 150X150X75 MM. INCL. TAPA

und

5.00 S/.

14.38 S/.

71.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

CAJA DE FO GDO. 200X200X100 MM. INCL. TAPA


POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
R<5 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
R<20 OHMIOS
POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES)
PARA TABLERO DE CONTROL
SUMINISTRO E INSTAL. DE ELECTRODOS PARA CONTROL DE NIVELES
SUMINISTRO DE TRANSMISOR ULTRASONICO DE NIVEL DE 4-20MM
RANGO 0-10M H20
SUMINISTRO TRANSMISOR DE PRESION RANGO 0-50 MH20

und

6.00 S/.

16.38 S/.

98.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

und

2.00 S/.

1,349.82 S/.

2,699.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

1,049.82 S/.

1,049.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

1,049.82 S/.

1,049.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

2.00 S/.

973.85 S/.

1,947.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

500.00 S/.

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

3.00 S/.

650.00 S/.

1,950.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

SUMINISTRO DE DETECTOR DE INTRUSOS


ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG,
INC. CONEXIONADO Y ACCESORIOS
SUMINISTRO E INST. DE TRANSFORMADOR DE 50 KVA 10/0.22 KV

und

1.00 S/.

5.00 S/.

5.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

3,968.36 S/.

3,968.36

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

16,574.38 S/.

16,574.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.38
12.19.39
12.19.40
12.19.41
12.19.42
12.19.43
12.19.44
12.19.45
12.19.46
12.19.47
12.19.48

PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"

und

4.00 S/.

99.56 S/.

398.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.19.49

POSTE CONCRETO CENTRIF. 11/400/180/345

und

4.00 S/.

1,746.75 S/.

6,987.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

und

5.00 S/.

715.48 S/.

3,577.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

und

1.00 S/.

5,228.41 S/.

5,228.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.19.50
12.19.51
12.20

CAJA DE INSPECCION H=1.20 M.


PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE
FUNCIONAMIENTO
EXCAVACIONES DE ZANJAS

S/.

S/.

12.20.01

EXCAVACION DE ZANJAS PARA INSTALACION DE CABLES

206.00 S/.

11.46 S/.

2,360.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.02

REFINE Y NIVELACION DE ZANJAS P/INST. CABLES

206.00 S/.

1.03 S/.

212.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.03

CAMA DE ARENA E=0.10 M. ZANJA P/INST. DE CABLES

206.00 S/.

4.02 S/.

828.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

206.00 S/.

10.52 S/.

2,167.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

206.00 S/.

11.27 S/.

2,321.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

202.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

12.20.04
12.20.05
12.21

RELLENO ZANJA MAT. PROPIO COMPACT. C/EQ. P/INST. CABLES


ELIMINACION MATERIAL EXCEDENTE C/EQUIPO P/INST. DE CABLES
HASTA R=5 KM
SUMINISTRO E INSTALACION DE TUBERIAS

S/.

S/.

12.21.01

TUBERIA ACERO NEGRO SCH-40 DE 2" (50 MM.)

10.00 S/.

12.21.02

TUBERIA ACERO NEGRO SCH-40 DE 4" (100 MM.)

12.00 S/.

45.45 S/.

545.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.21.03

TUBERIA ACERO NEGRO SCH-40 DE 8" (200 MM.)

15.00 S/.

101.00 S/.

1,515.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

12.21.04

TUBERIA ACERO NEGRO SCH-40 DE 10" (250 MM.)

20.00 S/.

319.16 S/.

6,383.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.22

SUMINISTRO E INSTALACION DE ACCESORIOS

12.22.01

BRIDA CIEGA DE ACERO DE 10" (250MM)

und

12.22.02

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 2" (50 MM)

12.22.03

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 4" (100 MM)

12.22.04
12.22.05

S/.

20.20 S/.

S/.

1.00 S/.

243.60 S/.

243.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

4.00 S/.

32.60 S/.

130.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

und

18.00 S/.

37.00 S/.

666.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 8" (200 MM)

und

20.00 S/.

84.00 S/.

1,680.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 10" (250 MM)

und

25.00 S/.

117.00 S/.

2,925.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.22.06

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 2" (50MM)

und

1.00 S/.

32.60 S/.

32.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.22.07

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 10" (250MM)

und

6.00 S/.

117.00 S/.

702.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.08

UNION DRESSER ACERO DE 2" (50 MM)

und

3.00 S/.

64.50 S/.

193.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.09

UNION DRESSER ACERO DE 8" (200 MM)

und

3.00 S/.

170.00 S/.

510.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.10

UNION DRESSER ACERO DE 10" (250 MM)

und

4.00 S/.

402.94 S/.

1,611.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.22.11

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 2" (50 MM).

und

36.00 S/.

2.00 S/.

72.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

36.00

12.22.12

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 4" (100 MM).

und

192.00 S/.

3.50 S/.

672.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

192.00

12.22.13

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 8" (200 MM).

und

240.00 S/.

5.50 S/.

1,320.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

240.00

12.22.14

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 10" (250 MM).

und

420.00 S/.

9.50 S/.

3,990.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

420.00

12.22.15

CODO FO. FDO. BRIDADO 2"X90 (50 MM)

und

6.00 S/.

52.80 S/.

316.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.16

CODO FO. FDO. BRIDADO 4"X90 (100 MM)

und

6.00 S/.

181.00 S/.

1,086.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.17

CODO FO. FDO. BRIDADO 8"X90 (200 MM)

und

3.00 S/.

282.00 S/.

846.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.18

CODO FO. FDO. BRIDADO 10"X90 (250 MM)

und

5.00 S/.

427.00 S/.

2,135.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.22.19

CODO FO. FDO. BRIDADO 8"X45 (200 MM)

und

3.00 S/.

282.00 S/.

846.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.20

CODO FO. FDO. BRIDADO 10"X45 (250 MM)

und

2.00 S/.

472.00 S/.

944.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.22.21

REDUCCION FO. FDO. BRIDADA DE 200X150 MM

und

3.00 S/.

229.00 S/.

687.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.22

REDUCCION FO. FDO. BRIDADA DE 250X150 MM

und

3.00 S/.

274.00 S/.

822.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.23

TEE FO. FDO. BRIDADA DE 100X50 MM

und

3.00 S/.

151.65 S/.

454.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.24

TEE FO. FDO. BRIDADA DE 100X100 MM

und

2.00 S/.

230.00 S/.

460.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.22.25

TEE FO. FDO. BRIDADA DE 250X100 MM

und

3.00 S/.

498.00 S/.

1,494.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.26

TRANSICION FO. FDO. CAMPANA-BRIDA DE 10" (250 MM)

und

1.00 S/.

583.07 S/.

583.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.22.27

YEE FO. FDO. BRIDADA DE 10"X8"

und

3.00 S/.

648.30 S/.

1,944.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.28

EMPAQUETADURA JEBE ERNLONADO DE 2" (50 MM)

und

6.00 S/.

3.53 S/.

21.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.29

EMPAQUETADURA JEBE ERNLONADO DE 4" (100 MM)

und

24.00 S/.

5.93 S/.

142.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

24.00

12.22.30

EMPAQUETADURA JEBE ERNLONADO DE 8" (200 MM)

und

30.00 S/.

8.92 S/.

267.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

12.22.31

EMPAQUETADURA JEBE ERNLONADO DE 10" (250 MM)

und

35.00 S/.

11.55 S/.

404.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.23

SUMINISTRO E INSTALACION DE VALVULAS

S/.

S/.

12.23.01

MANOMETRO TIPO BOURDON RANGO 0-200PSI

und

4.00 S/.

190.00 S/.

760.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.02

MEDIDOR DE CAUDAL TIPO ELECTROMAGNETICO BRINDADO 10"

und

1.00 S/.

14,425.00 S/.

14,425.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.03

VALVULA AIRE DE F. FDO. 2" TRIPLE EFECTO

und

1.00 S/.

772.72 S/.

772.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.04

VALVULA ALIVIO C/PILOTO F. FDO. BRIDADA 4"

und

1.00 S/.

3,345.45 S/.

3,345.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.05

VALVULA COMPUERTA DE FO. FDO. BRIDADA 2" (50 MM)

und

4.00 S/.

360.00 S/.

1,440.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.06

VALVULA COMPUERTA DE FO. FDO. BRIDADA 8" (200 MM)

und

3.00 S/.

1,306.36 S/.

3,919.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.23.07

VALVULA COMPUERTA DE FO. FDO. BRIDADA 10" (250 MM)

und

4.00 S/.

3,563.63 S/.

14,254.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.08

VALVULA CHECK F. FDO. BRIDADA 8"

und

3.00 S/.

3,237.81 S/.

9,713.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.24

PAVIMENTOS

S/.

S/.

12.24.01

CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)

m2

567.00 S/.

10.22 S/.

5,794.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

567.00

12.24.02

VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5

m2

105.00 S/.

36.37 S/.

3,818.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

105.00

12.24.03

SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM

60.00 S/.

38.70 S/.

2,322.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.25

EQUIPOS

12.25.01

S/.

S/.

ELECTROBOMBA SUMERGIBLE SUMIDERO 6.0 LPS, ADT=6 M.


ELECTROBOMBA SUMERGIBLE PARA DESAGUE Q=28.8 LPS, ADT=24.7

und

1.00 S/.

7,500.00 S/.

7,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

2.00 S/.

45,750.00 S/.

91,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.25.03

GRUPO ELECTROGENO 30KW - 460V

und

1.00 S/.

29,000.00 S/.

29,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.25.04

EXTRACTOR CENTRIFUGO DE 0.5 HP

und

1.00 S/.

7,500.00 S/.

7,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.25.05

TECLE MANUAL A CADENA 5TONX5.0 M. INC. VIGA METALICA

und

1.00 S/.

9,835.00 S/.

9,835.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.25.02

12.26
12.26.01
12.27
12.27.01

M.

MONTAJE DE INSTALACIONES HIDRAULICAS


MONTAJE INST. HIDRAULICAS, PUESTA EN MARCHA DE EQUIPOS Y
ELECTROBOMBAS EN ESTACION BOMBEO
CERCOS
CERCO PERIMETRICO, MURO LADRILLO SOGA, COLUMNAS CADA 5 .

und

S/.

1.00 S/.
-

COSTO DIRECTO

S/.

9,184.75 S/.

S/.

140.00 S/.

CD

S/.

9,184.75
-

348.92 S/.

48,848.80

S/.

20,373,895.56

S/.

% AVANCE
ANTERIOR

2.23%

454,960.69

S/.

% AVANCE
ACTUAL

0.84%

171,633.49

S/.

% AVANCE
ACUMULADO

140.00

626,594.17

3.08%

% SALDO
EJECUTAR

VALORIZACIN DE OBRA N 02-PROYECTO GENERAL


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE
TRUJILLO-LA LIBERTAD"

UBICACIN

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015.

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

METRADO

GASTOS GENERALES

GG

UTILIDAD

UU

1,018,694.78

SUB TOTAL

ST

23,429,979.89

IMPUESTO IGV
TOTAL PRESUPUESTO

% AVANCE

2,037,389.56

23,429,979.89

VALORIZADO

S/.
% AVANCE
ANTERIOR

2.23%

METRADO

% AVANCE

45,496.07

S/.

22,748.03

S/.

523,204.79

S/.

523,204.79

VALORIZADO

S/.
% AVANCE
ACTUAL

0.84%

METRADO

17,163.35

S/.

8,581.67

S/.

197,378.51

S/.

197,378.51

VALORIZADO

S/.
% AVANCE
ACUMULADO

S/.

31,329.71

S/.

720,583.31

S/.

720,583.31

4,217,396.38

S/.

94,176.86

S/.

35,528.13

S/.

129,705.00

P_T

27,647,376.27

S/.

617,381.65

S/.

232,906.64

S/.

850,288.31

27,647,376.27

S/.

617,381.65

S/.

232,906.64

S/.

850,288.31

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP:52774

% AVANCE

METRADO

3.08%

% SALDO
EJECUTAR

62,659.42

IGV%

MONTO CONTRACTUAL

ACUMULADO

COSTO PARCIAL

CANTIDAD

FACTOR DE RELACIN ( FR )

ACTUAL

SUPERVISOR DE OBRA

ING. JULIO FELIX VALERIANO M


CIP:78399

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

S/.
S/.
S/.
S/.

% AVANCE

3,478.50
5,442.30

S/.

S/.

S/.
S/.

2,022.80
-

0.00%
16.67%
0.00%
55.25%
0.00%
0.00%
100.00%
0.00%

S/.

31,224.00

100.00%

S/.

27,250.02

100.00%

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

99,856.30
3,345.40
7,060.35
64,612.90
2,930.65
55,016.78
-

0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%

S/.

42,849.00

100.00%

S/.

37,582.38

100.00%

S/.

5,452.38

100.00%

S/.

4,850.70

100.00%

S/.

0.00%

S/.

61,257.30

100.00%

S/.

117,660.80

100.00%

S/.

12,549.78

100.00%

S/.

S/.

0.00%
0.00%

S/.

7,343.88

100.00%

S/.

5,953.84

100.00%

S/.
S/.

0.00%

668,987.53

100.00%

S/.

695.73

100.00%

S/.

64,307.23

100.00%

S/.

142.01

100.00%

S/.

1,405.05

100.00%

S/.

1,029,175.49

100.00%

S/.

0.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.
S/.

% AVANCE

351.72
-

100.00%
0.00%

S/.

1,773.53

100.00%

S/.

4,405.08

100.00%

S/.

1,879.12

100.00%

S/.

1,253.55

100.00%

S/.

12,192.86

100.00%

S/.

13,220.70

100.00%

S/.

5,431.85

100.00%

S/.

8,992.12

100.00%

S/.

10,550.95

100.00%

S/.

16,953.15

100.00%

S/.

8,812.24

100.00%

S/.

431.84

100.00%

S/.

1,999.00

100.00%

S/.

2,766.51

100.00%

S/.

3,430.48

100.00%

S/.

393.17

100.00%

S/.

50.86

100.00%

S/.

909.16

100.00%

S/.

590.03

100.00%

S/.

269.85

100.00%

S/.

816.72

100.00%

S/.

879.03

100.00%

S/.

1,829.94

100.00%

S/.

718.76

100.00%

S/.

861.80

100.00%

S/.
S/.
S/.

3,753.88
-

0.00%
100.00%
0.00%

S/.

214.17

100.00%

S/.

1,282.07

100.00%

S/.

1,313.00

100.00%

S/.

302.94

100.00%

S/.
S/.
S/.

1,178.03
-

0.00%
100.00%
0.00%

S/.

246.64

100.00%

S/.

128.73

100.00%

S/.

650.88

100.00%

S/.
S/.
S/.

1,001.63
-

0.00%
100.00%
0.00%

S/.

981.20

100.00%

S/.

1,468.11

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.
S/.

% AVANCE

3,449.49
-

100.00%
0.00%

S/.

362.68

100.00%

S/.

15.00

100.00%

S/.

5.50

100.00%

S/.

46.64

100.00%

S/.
S/.
S/.

221.25
-

0.00%
100.00%
0.00%

S/.

466.62

100.00%

S/.

719.80

100.00%

S/.

626.08

100.00%

S/.

335.04

100.00%

S/.

150.84

100.00%

S/.

0.00%

S/.

993,379.39

100.00%

S/.

933.33

100.00%

S/.

0.00%

S/.

203.55

100.00%

S/.

294.87

100.00%

S/.

71.00

100.00%

S/.

9.80

100.00%

S/.

12.90

100.00%

S/.

10.70

100.00%

S/.

3.40

100.00%

S/.

197.76

100.00%

S/.

45.72

100.00%

S/.

0.00%

S/.

87.35

100.00%

S/.

145.32

100.00%

S/.

98.21

100.00%

S/.

148.20

100.00%

S/.

32.10

100.00%

S/.

77.92

100.00%

S/.

142.14

100.00%

S/.

0.00%

S/.

234.45

100.00%

S/.

51.00

100.00%

S/.

22.78

100.00%

S/.

0.00%

S/.

260.28

100.00%

S/.

260.37

100.00%

S/.

454.70

100.00%

S/.

30.72

100.00%

S/.

14.49

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

48.84

100.00%

S/.

23.70

100.00%

S/.

101.40

100.00%

S/.

138.42

100.00%

S/.

202.20

100.00%

S/.

4,507.74

100.00%

S/.

1,974.43

100.00%

S/.

113.19

100.00%

S/.

576.69

100.00%

S/.

277.32

100.00%

S/.

76.66

100.00%

S/.

9,307.41

100.00%

S/.

147.46

100.00%

S/.

867.14

100.00%

S/.

1,765.62

100.00%

S/.

862.81

100.00%

S/.

3,968.36

100.00%

S/.

16,574.38

100.00%

S/.

2,289.88

100.00%

S/.

21,315.25

100.00%

S/.

2,420.72

100.00%

S/.

0.00%

S/.

705.96

100.00%

S/.

446.77

100.00%

S/.

138.38

100.00%

S/.

88.58

100.00%

S/.

442.52

100.00%

S/.

204.25

100.00%

S/.

1,867.76

100.00%

S/.

1,511.88

100.00%

S/.

357.73

100.00%

S/.

0.00%

S/.

3,604.53

100.00%

S/.

2,142.27

100.00%

S/.

0.00%

S/.

14,492.16

100.00%

S/.

13,333.44

100.00%

S/.

558.70

100.00%

S/.

456.66

100.00%

S/.

142.82

100.00%

S/.

114.38

100.00%

S/.

0.00%

S/.

1,533.00

100.00%

S/.

1,091.10

100.00%

S/.

967.50

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.

% AVANCE
-

0.00%

S/.

51,929.40

100.00%

S/.

454.50

50.00%

S/.

600.00

80.00%

S/.

10,433.68

92.27%

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

13,674.96
146,085.39
30,242.70
83,759.13
173,566.80
33,999.40
-

0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%

S/.

1,933,560.45

100.00%

S/.

115,316.73

100.00%

S/.

46,547.46

100.00%

S/.

0.00%

S/.

5,213.46

100.00%

S/.

90,059.96

100.00%

S/.

7,143.43

100.00%

S/.

0.00%

S/.

3,919.08

100.00%

S/.

9,770.86

100.00%

S/.

0.00%

S/.

17,034.49

100.00%

S/.

5,231.19

100.00%

S/.

S/.

S/.

0.00%
0.00%

606.00

100.00%

S/.

150.00

100.00%

S/.

3,476.12

100.00%

S/.
S/.
S/.

4,203.68
-

0.00%
100.00%
0.00%

S/.

38,253.60

100.00%

S/.

5,715.00

100.00%

S/.
S/.

860.00

0.00%
100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.
S/.

% AVANCE

7,296.52
-

100.00%
0.00%

S/.

1,815.00

100.00%

S/.

21,181.16

100.00%

S/.

0.00%

S/.

66,554.18

100.00%

S/.

7,015.00

100.00%

S/.
S/.
S/.

6,609.21
-

0.00%
100.00%
0.00%

S/.

403,646.32

100.00%

S/.

16,390.00

100.00%

S/.

18,843.44

100.00%

S/.

1,780.00

100.00%

S/.

10,661.42

100.00%

S/.

990.00

100.00%

S/.

0.00%

S/.

82,164.00

100.00%

S/.

16,266.75

100.00%

S/.

0.00%

S/.

13,063.60

100.00%

S/.

8,882.60

100.00%

S/.

0.00%

S/.

15,485.90

100.00%

S/.

17,437.30

100.00%

S/.

S/.

0.00%
0.00%

S/.

1,212.00

100.00%

S/.

450.00

100.00%

S/.

680.00

100.00%

S/.

24,112.87

100.00%

S/.

2,357.70

100.00%

S/.

2,756.50

100.00%

S/.
S/.
S/.

29,159.75
-

0.00%
100.00%
0.00%

S/.

195,257.10

100.00%

S/.

42,976.57

100.00%

S/.

15,908.85

100.00%

S/.

3,129.92

100.00%

S/.

540.43

100.00%

S/.

0.00%

S/.

22,879.96

100.00%

S/.

4,260.43

100.00%

S/.

2,393.98

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

423.89

100.00%

S/.

103.08

100.00%

S/.

0.00%

S/.

80,857.32

100.00%

S/.

15,014.91

100.00%

S/.

4,689.42

100.00%

S/.

1,170.64

100.00%

S/.

299.24

100.00%

S/.

0.00%

S/.

259,454.26

100.00%

S/.

54,310.14

100.00%

S/.

18,288.91

100.00%

S/.

3,250.68

100.00%

S/.

940.25

100.00%

S/.
S/.
S/.

45,846.36
-

0.00%
100.00%
0.00%

S/.

42,150.07

100.00%

S/.

303,860.10

100.00%

S/.

142,621.00

100.00%

S/.

76,802.28

100.00%

S/.

24,945.67

100.00%

S/.

5,687.55

100.00%

S/.

6,691.48

100.00%

S/.

56,878.34

100.00%

S/.

18,158.53

100.00%

S/.

9,603.77

100.00%

S/.

1,168.17

100.00%

S/.

266.21

100.00%

S/.

4,659.02

100.00%

S/.

30,347.84

100.00%

S/.

7,610.87

100.00%

S/.

3,201.26

100.00%

S/.

606.27

100.00%

S/.

150.62

100.00%

S/.
S/.

0.00%

5,704.30

100.00%

S/.

251.72

100.00%

S/.

2,636.10

100.00%

S/.

468.00

100.00%

S/.

338.40

100.00%

S/.

410.30

100.00%

S/.

660.40

100.00%

S/.

777.90

100.00%

S/.

179.40

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

2,250.00

100.00%

S/.

1,254.00

100.00%

S/.

1,456.78

100.00%

S/.

5,574.32

100.00%

S/.

808.47

100.00%

S/.

0.00%

S/.

3,689.95

100.00%

S/.

17,983.56

100.00%

S/.

8,309.95

100.00%

S/.

10,628.10

100.00%

S/.

15,440.00

100.00%

S/.

170.28

100.00%

S/.

743.40

100.00%

S/.

227.04

100.00%

S/.

222.84

100.00%

S/.

2,878.00

100.00%

S/.

0.00%

S/.

10,097.92

100.00%

S/.

2,001.78

100.00%

S/.
S/.
S/.

988.90
-

0.00%
100.00%
0.00%

S/.

12,804.00

100.00%

S/.

27,186.00

100.00%

S/.

12,492.00

100.00%

S/.

338.10

100.00%

S/.

S/.

0.00%
0.00%

S/.

534,105.46

100.00%

S/.

157,103.38

100.00%

S/.

90,833.65

100.00%

S/.

72,795.00

100.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

10,889.32

11.00%
11.00%

S/.

5,504.32

S/.

3.67

S/.

981.45

100.00%

0.00%

S/.

937.80

100.00%

S/.

2,118.20

100.00%

S/.

786.35

100.00%

S/.

11,284.01

100.00%

S/.

901.68

100.00%

S/.

5,777.75

100.00%

S/.

13,175.11

100.00%

S/.

1,190.84

100.00%

S/.

1,423.25

100.00%

S/.

1,666.00

100.00%

S/.

16,123.94

100.00%

S/.

30,561.92

100.00%

S/.

12,430.45

100.00%

S/.
S/.
S/.
S/.

1,804.75
-

0.00%
100.00%
0.00%

1,086.50

100.00%

S/.

883.75

100.00%

S/.

7,277.10

100.00%

S/.

10,485.86

100.00%

S/.
S/.
S/.
S/.

560.25
-

0.00%
100.00%
0.00%

736.00

100.00%

S/.

475.25

100.00%

S/.

6,520.80

100.00%

S/.
S/.
S/.

828.82
-

0.00%
100.00%
0.00%

S/.

286.13

100.00%

S/.

313.13

100.00%

S/.

726.18

100.00%

S/.

123.70

100.00%

S/.

233.64

100.00%

S/.
S/.

17.49

0.00%
100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.
S/.

% AVANCE
94.53
-

100.00%
0.00%

S/.

261.75

100.00%

S/.

438.30

100.00%

S/.

305.20

100.00%

S/.

4,231.92

100.00%

S/.
S/.

26.90

S/.

S/.

0.00%
100.00%
0.00%
0.00%

S/.

260.37

100.00%

S/.

254.08

100.00%

S/.

51.20

100.00%

S/.

83.20

100.00%

S/.

138.50

100.00%

S/.

31.40

100.00%

S/.

576.69

100.00%

S/.

675.98

100.00%

S/.

0.00%

S/.

3,125.00

100.00%

S/.

9,000.00

100.00%

S/.

2,300.00

100.00%

S/.

0.00%

S/.

1,735.13

100.00%

S/.

430.86

100.00%

S/.

896.79

100.00%

S/.

6,367.71

100.00%

S/.

1,882.09

100.00%

S/.

8,883.57

100.00%

S/.

0.00%

S/.

15,882.25

100.00%

S/.

12,907.80

100.00%

S/.

14,898.00

100.00%

S/.

419.00

100.00%

S/.

484.00

100.00%

S/.

0.00%

S/.

2,472.00

100.00%

S/.

2,131.20

100.00%

S/.

247.20

100.00%

S/.

266.40

100.00%

S/.

1,972.80

100.00%

S/.

2,620.80

100.00%

S/.

966.30

100.00%

S/.

1,547.40

100.00%

S/.

1,964.70

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.

% AVANCE
-

0.00%

S/.

18,500.00

100.00%

S/.

25,930.89

100.00%

S/.

11,241.81

100.00%

S/.

17,727.27

100.00%

S/.
S/.
S/.
S/.
S/.

2,103.09
16,350.00
-

0.00%
100.00%
0.00%
100.00%
0.00%

S/.

4,857.98

100.00%

S/.

1,818.00

100.00%

S/.

1,500.00

100.00%

S/.

1,360.00

100.00%

S/.

11,239.98

100.00%

S/.

2,357.70

100.00%

S/.

2,756.50

100.00%

S/.

9,018.12

100.00%

S/.

13,592.53

100.00%

S/.

0.00%

S/.

10,538.46

100.00%

S/.

62,620.35

100.00%

S/.

21,852.64

100.00%

S/.

58,768.40

100.00%

S/.

56,197.76

100.00%

S/.

0.00%

S/.

7,537.23

100.00%

S/.

2,951.90

100.00%

S/.

8,277.24

100.00%

S/.

8,243.02

100.00%

S/.

732.99

100.00%

S/.

0.00%

S/.

1,673.43

100.00%

S/.

20,815.02

100.00%

S/.

8,569.10

100.00%

S/.

19,829.39

100.00%

S/.

17,156.99

100.00%

S/.

0.00%

S/.

18,177.23

100.00%

S/.

172,041.64

100.00%

S/.

67,736.02

100.00%

S/.

165,760.73

100.00%

S/.

169,109.76

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO
S/.
S/.
S/.
S/.
S/.

% AVANCE
-

32,473.71
508,690.00
-

0.00%
100.00%
0.00%
100.00%
0.00%

S/.

29,643.41

100.00%

S/.

365,812.54

100.00%

S/.

13,977.96

100.00%

S/.

11,992.14

100.00%

S/.

20,785.59

100.00%

S/.

6,986.80

100.00%

S/.

0.00%

S/.

20,546.77

100.00%

S/.

276,993.17

100.00%

S/.

136,331.81

100.00%

S/.

390,145.91

100.00%

S/.

449,308.63

100.00%

S/.

1,641.16

100.00%

S/.

15,468.85

100.00%

S/.

5,631.53

100.00%

S/.

14,575.14

100.00%

S/.

13,386.92

100.00%

S/.

1,087.96

100.00%

S/.

8,457.47

100.00%

S/.

3,811.67

100.00%

S/.

14,827.06

100.00%

S/.

15,463.65

100.00%

S/.

S/.

0.00%
0.00%

S/.

3,030.00

100.00%

S/.

1,200.00

100.00%

S/.

2,040.00

100.00%

S/.

33,659.33

100.00%

S/.

1,964.75

100.00%

S/.

11,026.00

100.00%

S/.
S/.
S/.

40,704.31
-

0.00%
100.00%
0.00%

S/.

137,218.00

100.00%

S/.

107,248.49

100.00%

S/.

107,267.17

100.00%

S/.

107,248.45

100.00%

S/.

31,403.86

100.00%

S/.

27,920.97

100.00%

S/.

0.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

64,555.49

100.00%

S/.

2,554.34

100.00%

S/.
S/.
S/.

142,073.70
-

0.00%
100.00%
0.00%

S/.

208,379.19

100.00%

S/.

131,644.47

100.00%

S/.

189,462.80

100.00%

S/.

175,425.81

100.00%

S/.

44,194.82

100.00%

S/.

33,505.16

100.00%

S/.
S/.
S/.

66,663.90
-

0.00%
100.00%
0.00%

S/.

518,889.44

100.00%

S/.

183,091.65

100.00%

S/.

112,567.56

100.00%

S/.

52,888.56

100.00%

S/.

68,190.46

100.00%

S/.

8,908.11

100.00%

S/.

17,467.00

100.00%

S/.

4,009.62

100.00%

S/.

3,713.94

100.00%

S/.

0.00%

S/.

641,484.28

100.00%

S/.

426,025.40

100.00%

S/.

69,666.99

100.00%

S/.

69,666.99

100.00%

S/.

46,183.74

100.00%

S/.

46,183.74

100.00%

S/.
S/.
S/.

3,920.94
-

0.00%
100.00%
0.00%

S/.

3,841.20

100.00%

S/.

8,155.80

100.00%

S/.

3,747.60

100.00%

S/.

101.43

100.00%

S/.

S/.

S/.

1,435,605.11

S/.

S/.

S/.

190,039.02

0.00%
0.00%
100.00%
0.00%
0.00%
100.00%

S/.

0.00%

S/.

0.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

845.25

100.00%

S/.

1,274.00

100.00%

S/.

0.00%

S/.

3,956.81

100.00%

S/.

37,736.08

100.00%

S/.

149.37

100.00%

S/.

3,789.20

100.00%

S/.

6,953.81

100.00%

S/.

10,928.40

100.00%

S/.

0.00%

S/.

5,650.92

100.00%

S/.

109.47

100.00%

S/.

8.17

100.00%

S/.

914.17

100.00%

S/.

707.50

100.00%

S/.

4,216.20

100.00%

S/.

111.85

100.00%

S/.

0.00%

S/.

4,201.85

100.00%

S/.

12,508.85

100.00%

S/.

56,543.48

100.00%

S/.

33,604.49

100.00%

S/.

36,089.37

100.00%

S/.

2,328.00

100.00%

S/.

3,482.52

100.00%

S/.

3,935.57

100.00%

S/.

2,441.25

100.00%

S/.

2,782.72

100.00%

S/.

2,939.30

100.00%

S/.

2,966.89

100.00%

S/.

3,505.81

100.00%

S/.

5,600.77

100.00%

S/.

5,732.66

100.00%

S/.

1,428.43

100.00%

S/.

2,265.64

100.00%

S/.

1,299.48

100.00%

S/.

1,206.52

100.00%

S/.
S/.
S/.

10,985.87
-

0.00%
100.00%
0.00%

S/.

254.88

100.00%

S/.

3,476.80

100.00%

S/.

3,741.29

100.00%

S/.

216.67

100.00%

S/.

238.33

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

630.74

100.00%

S/.

10,960.78

100.00%

S/.

545.69

100.00%

S/.
S/.
S/.

2,156.96
-

0.00%
100.00%
0.00%

S/.

1,581.32

100.00%

S/.

189.72

100.00%

S/.

647.64

100.00%

S/.

988.52

100.00%

S/.
S/.
S/.
S/.
S/.

755.14
2,399.12
-

0.00%
100.00%
0.00%
100.00%
0.00%

S/.

1,105.15

100.00%

S/.

3,560.92

100.00%

S/.

5,644.62

100.00%

S/.

1,210.30

100.00%

S/.

718.38

100.00%

S/.

123.70

100.00%

S/.

6,035.39

100.00%

S/.

0.00%

S/.

453.35

100.00%

S/.

15.00

100.00%

S/.
S/.
S/.

190.32
-

0.00%
100.00%
0.00%

S/.

1,028.14

100.00%

S/.

1,807.67

100.00%

S/.

1,922.31

100.00%

S/.

239.03

100.00%

S/.

84.95

100.00%

S/.

0.00%

S/.

1,209.00

100.00%

S/.

943.80

100.00%

S/.

636.99

100.00%

S/.

0.00%

S/.

203.55

100.00%

S/.

294.87

100.00%

S/.

71.00

100.00%

S/.

9.80

100.00%

S/.

12.90

100.00%

S/.

10.70

100.00%

S/.

3.40

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

197.76

100.00%

S/.

45.72

100.00%

S/.

0.00%

S/.

87.35

100.00%

S/.

145.32

100.00%

S/.

98.21

100.00%

S/.

59.28

100.00%

S/.

579.50

100.00%

S/.

32.10

100.00%

S/.

77.92

100.00%

S/.

426.42

100.00%

S/.

0.00%

S/.

234.45

100.00%

S/.

31.05

100.00%

S/.

12.75

100.00%

S/.

39.95

100.00%

S/.

0.00%

S/.

1,128.27

100.00%

S/.

1,388.16

100.00%

S/.

1,151.46

100.00%

S/.

1,131.52

100.00%

S/.

14.49

100.00%

S/.

86.52

100.00%

S/.

154.66

100.00%

S/.

663.60

100.00%

S/.

45.15

100.00%

S/.

838.43

100.00%

S/.

974.14

100.00%

S/.

221.56

100.00%

S/.

142.80

100.00%

S/.

41.55

100.00%

S/.

413.40

100.00%

S/.

5,206.65

100.00%

S/.

482.56

100.00%

S/.

1,213.26

100.00%

S/.

228.96

100.00%

S/.

113.04

100.00%

S/.

483.84

100.00%

S/.

728.28

100.00%

S/.

1,558.20

100.00%

S/.

999.00

100.00%

S/.

824.76

100.00%

S/.

907.20

100.00%

S/.

576.69

100.00%

S/.

799.69

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

38,247.69

100.00%

S/.

15,247.69

100.00%

S/.

20,000.00

100.00%

S/.

18,158.05

100.00%

S/.

1,943.06

100.00%

S/.

536.62

100.00%

S/.

1,618.68

100.00%

S/.

42.54

100.00%

S/.

71.90

100.00%

S/.

98.28

100.00%

S/.

2,699.64

100.00%

S/.

1,049.82

100.00%

S/.

1,049.82

100.00%

S/.

1,947.70

100.00%

S/.

500.00

100.00%

S/.

1,950.00

100.00%

S/.

5.00

100.00%

S/.

3,968.36

100.00%

S/.

16,574.38

100.00%

S/.

398.24

100.00%

S/.

6,987.00

100.00%

S/.

3,577.40

100.00%

S/.

5,228.41

100.00%

S/.

0.00%

S/.

2,360.76

100.00%

S/.

212.18

100.00%

S/.

828.12

100.00%

S/.

2,167.12

100.00%

S/.

2,321.62

100.00%

S/.
S/.

0.00%

202.00

100.00%

S/.

545.40

100.00%

S/.

1,515.00

100.00%

S/.

6,383.20

100.00%

S/.

0.00%

S/.

243.60

100.00%

S/.

130.40

100.00%

S/.

666.00

100.00%

S/.

1,680.00

100.00%

S/.

2,925.00

100.00%

S/.

32.60

100.00%

S/.

702.00

100.00%

S/.

193.50

100.00%

S/.

510.00

100.00%

S/.

1,611.76

100.00%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

72.00

100.00%

S/.

672.00

100.00%

S/.

1,320.00

100.00%

S/.

3,990.00

100.00%

S/.

316.80

100.00%

S/.

1,086.00

100.00%

S/.

846.00

100.00%

S/.

2,135.00

100.00%

S/.

846.00

100.00%

S/.

944.00

100.00%

S/.

687.00

100.00%

S/.

822.00

100.00%

S/.

454.95

100.00%

S/.

460.00

100.00%

S/.

1,494.00

100.00%

S/.

583.07

100.00%

S/.

1,944.90

100.00%

S/.

21.18

100.00%

S/.

142.32

100.00%

S/.

267.60

100.00%

S/.

404.25

100.00%

S/.

0.00%

S/.

760.00

100.00%

S/.

14,425.00

100.00%

S/.

772.72

100.00%

S/.

3,345.45

100.00%

S/.

1,440.00

100.00%

S/.

3,919.08

100.00%

S/.

14,254.52

100.00%

S/.

9,713.43

100.00%

S/.

0.00%

S/.

5,794.74

100.00%

S/.

3,818.85

100.00%

S/.

2,322.00

100.00%

S/.

0.00%

S/.

7,500.00

100.00%

S/.

91,500.00

100.00%

S/.

29,000.00

100.00%

S/.

7,500.00

100.00%

S/.

9,835.00

100.00%

S/.
S/.
S/.

9,184.75
-

S/.

48,848.80

S/.

19,747,301.39

0.00%
100.00%
0.00%
100.00%

96.92%

OBRA N 02-PROYECTO GENERAL


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

S/.

% AVANCE

1,974,730.14

S/.

987,365.07

S/.

22,709,396.59

S/.

22,709,396.59

S/.

4,087,691.39

S/.

26,797,087.98

S/.

26,797,087.98

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP:78399

96.92%

1. PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

01
01.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

CAPTACION GALERIA FILTRANTE JESUS MARIA


OBRAS PROVISIONALES PARA TODA LA OBRA

01.01.01

CONSTRUCCION CAMPAMENTO PROVISIONAL PARA LA OBRA

m2

90.00 S/.

105.79 S/.

9,521.10

90.00

100.00%

S/.

9,521.10

0.00%

S/.

90.00 S/.

9,521.10

100.00%

01.01.02

CASETA DE GUARDIANIA Y ALMACEN

m2

300.00 S/.

69.57 S/.

20,871.00

250.00

83.33%

S/.

17,392.50

0.00%

S/.

250.00 S/.

17,392.50

83.33%

01.01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M

m2

25.92 S/.

126.61 S/.

3,281.73

25.92

100.00%

S/.

3,281.73

0.00%

S/.

25.92 S/.

3,281.73

100.00%

01.01.04

MOVILIZACION DE MAQUINARIA Y HERRAMIENTAS PARA LA OBRA

glb

1.00 S/.

9,849.47 S/.

9,849.47

0.45

44.75%

S/.

4,407.17

0.00%

S/.

0.45 S/.

4,407.17

44.75%

0.55

1,945.00

100.00%

S/.

1,128.10

1,128.10

100.00%

01.02

OBRAS PRELIMINARES

S/.

50.00

01.02.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

1,945.00 S/.

0.58 S/.

1,128.10

0.00%

S/.

1,945.00 S/.

01.02.02

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

1,945.00 S/.

1.04 S/.

2,022.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,945.00

01.03

MOVIMIENTO DE TIERRAS

01.03.01

BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"

hm

480.00 S/.

65.05 S/.

31,224.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

480.00

01.03.02

SUMINISTRO E INSTALACION DE HIDRANTES (FILTRO DE GRAVA)

m3

243.00 S/.

112.14 S/.

27,250.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

243.00

1,945.00 S/.

51.34 S/.

99,856.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,945.00

1,945.00 S/.

1.72 S/.

3,345.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,945.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,945.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,945.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

260.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00

1,242.00

01.04
01.04.01
01.05
01.05.01
01.06
01.06.01
01.07
01.07.01
01.08
01.08.01
01.09
01.09.01
01.10

EXCAVACIONES DE ZANJAS
EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=4.00M P/TUB. 200 MM.
REFINE Y NIVELACION DE ZANJAS
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.
CAMA DE APOYO
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

S/.
m

1,945.00 S/.

RELLENO DE ZANJAS
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=4.0 M.

S/.
m

1,945.00 S/.

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 200 MM. HASTA R=5 KM.

33.22 S/.
S/.

m3

260.04 S/.

ENTIBADOS Y/O TABLESTACADOS


ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.

3.63 S/.

11.27 S/.
S/.

703.00 S/.

SUMINISTRO E INSTALACION DE TUBERIAS

78.26 S/.
S/.

7,060.35
64,612.90
2,930.65
55,016.78
-

01.10.01

TUBERIA P.V.C. CLASE A-7.5 UF DE 160 MM

1,242.00 S/.

34.50 S/.

42,849.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

01.10.02

TUBERIA P.V.C. CLASE A-7.5 UF DE 200 MM

703.00 S/.

53.46 S/.

37,582.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00

01.10.03

INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA Y DESINFECCION

1,242.00 S/.

4.39 S/.

5,452.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,242.00

INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA Y DESINFECCION

703.00 S/.

6.90 S/.

4,850.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

703.00

01.10.04
01.11

CAJAS PARA REBOSE

S/.

01.11.01

CAMARA DE REUNION PARA GALERIA FILTRANTE H=3.00M

und

15.00 S/.

4,083.82 S/.

61,257.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

01.11.02

CAMARA DE REUNION PARA GALERIA FILTRANTE H=4.00M

und

20.00 S/.

5,883.04 S/.

117,660.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

01.11.03

CAMARA DE REUNION PARA GALERIA FILTRANTE H=9.00M

und

1.00 S/.

12,549.78 S/.

12,549.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02
02.01

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

S/.

OBRAS PRELIMINARES

S/.

02.01.01

LIMPIEZA Y DESBROCE DE TERRENO HASTA 0.20 M DE PROFUNDIDAD PARA LAGUNAS

ha

2.60 S/.

2,824.57 S/.

7,343.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.60

02.01.02

TRAZO Y REPLANTEOS DEL PROYECTO DE OBRA

ha

2.60 S/.

2,289.94 S/.

5,953.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.60

112,246.23

02.02
02.02.01

MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN T. NATURAL PARA FORMACION DE LAGUNA INC. ACARREO Y
SELECCION DE MATERIAL

S/.

m3

112,246.23 S/.

5.96 S/.

668,987.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.02.02

EXCAVACION MANUAL EN TERRENO NORMAL

m3

23.60 S/.

29.48 S/.

695.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.60

02.02.03

RELLENO MASIVO P/FORMACION DE DIQUES Y FONDOS INC. CARGUIO Y TRANSPORTE

m3

3,510.22 S/.

18.32 S/.

64,307.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,510.22

02.02.04

REFINE Y NIVELACION EN TERRENO NORMAL

m2

38.80 S/.

3.66 S/.

142.01

0.00%

S/.

0.00%

S/.

S/.

0.00%

38.80

02.02.05

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO

m3

19.00 S/.

73.95 S/.

1,405.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.00

02.02.06

ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=5 KM)

m3

125,051.70 S/.

8.23 S/.

1,029,175.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

125,051.70

02.03

OBRAS DE CONCRETO SIMPLE

S/.

1. PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.03.01
02.04

CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PII)

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

m3

OBRAS DE CONCRETO ARMADO

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD
1.20 S/.

ACTUAL

293.10 S/.
S/.

351.72

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.20

4.60

02.04.01

CONCRETO f'c=210 kg/cm2 P/ZAPATAS (CEMENTO PII)

m3

4.60 S/.

385.55 S/.

1,773.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.04.02

CONCRETO f'c=245 kg/cm2 P/ZAPATAS (CEMENTO PII)

m3

9.76 S/.

451.34 S/.

4,405.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.76

02.04.03

ENCOFRADO Y DESENCOFRADO P/ZAPATAS RECTAS

m2

45.28 S/.

41.50 S/.

1,879.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.28

02.04.04

ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS

kg

263.35 S/.

4.76 S/.

1,253.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

263.35

02.04.05

CONCRETO f'c=210 kg/cm2 P/LOSAS DE FONDO - PISO

m3

39.50 S/.

308.68 S/.

12,192.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

39.50

02.04.06

CONCRETO f'c=245 kg/cm2 P/LOSAS DE FONDO - PISO C-II

m3

29.82 S/.

443.35 S/.

13,220.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

29.82

02.04.07

ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO

m2

128.90 S/.

42.14 S/.

5,431.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

128.90

02.04.08

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

1,889.10 S/.

4.76 S/.

8,992.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,889.10

02.04.09

CONCRETO f'c=245 kg/cm2 P/MUROS REFORZADOS C-II

m3

22.25 S/.

474.20 S/.

10,550.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

22.25

02.04.10

ENCOFRADO Y DESENCOFRADO P/MURO RECTOS

m2

294.53 S/.

57.56 S/.

16,953.15

0.00%

S/.

0.00%

S/.

S/.

0.00%

294.53

02.04.11

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

1,851.31 S/.

4.76 S/.

8,812.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,851.31

02.04.12

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

1.10 S/.

392.58 S/.

431.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.13

CONCRETO f'c=245 kg/cm2 P/COLUMNAS

m3

4.55 S/.

439.34 S/.

1,999.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.55

02.04.14

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

59.00 S/.

46.89 S/.

2,766.51

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

02.04.15

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

720.69 S/.

4.76 S/.

3,430.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

720.69

02.04.16

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

1.10 S/.

357.43 S/.

393.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.17

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

1.10 S/.

46.24 S/.

50.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.10

02.04.18

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

191.00 S/.

4.76 S/.

909.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

191.00

02.04.19

CONCRETO f'c=245 kg/cm2 P/LOSAS MACIZAS

m3

1.66 S/.

355.44 S/.

590.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.66

02.04.20

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

4.74 S/.

56.93 S/.

269.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.74

02.04.21

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

171.58 S/.

4.76 S/.

816.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

171.58

02.04.22

CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS

m3

2.80 S/.

313.94 S/.

879.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.80

02.04.23

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

m2

42.00 S/.

43.57 S/.

1,829.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

02.04.24

ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS

kg

151.00 S/.

4.76 S/.

718.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

151.00

02.04.25

LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.

und

310.00 S/.

2.78 S/.

861.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

310.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

02.05
02.05.01
02.06

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM

S/.
m2

52.00 S/.

REVOQUES Y ENLUCIDOS

72.19 S/.
S/.

3,753.88
-

02.06.01

TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5

m2

12.10 S/.

17.70 S/.

214.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.10

02.06.02

TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

59.00 S/.

21.73 S/.

1,282.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

02.06.03

TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

52.00 S/.

25.25 S/.

1,313.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

02.06.04

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

27.00 S/.

11.22 S/.

302.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

27.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

41.70

15.60

02.07
02.07.01
02.08

CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:4X1.5 CM

S/.
m2

41.70 S/.

PISOS Y PAVIMENTOS

28.25 S/.
S/.

1,178.03
-

02.08.01

CONTRAPISO CON MORTERO 1:5 DE 40 MM.

m2

15.60 S/.

15.81 S/.

246.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.08.02

PISO DE LOSETA CERAMICA BLANCO DE .20X.20 M C/BASE MOR 1:4X25MM

m2

3.00 S/.

42.91 S/.

128.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.08.03

PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.

m2

12.06 S/.

53.97 S/.

650.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.06

m2

41.70 S/.

24.02 S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

41.70

02.09
02.09.01
02.10

CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA C/MORT. 1:4 JUNTA 1.5 CM.

S/.

CARPINTERIA METALICA

S/.

1,001.63
-

02.10.01

VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA

m2

5.62 S/.

174.59 S/.

981.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.62

02.10.02

PUERTA METALICA LAC 1/16" C/MARCO 2"X2"x1/4" Y REFUERZOS

m2

5.25 S/.

279.64 S/.

1,468.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.25

1. PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.10.03
02.11

PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC 3/16".

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

m2

CERRAJERIA

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD
11.00 S/.

ACTUAL

313.59 S/.
S/.

3,449.49

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

02.11.01

CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2 GOLPES

und

4.00 S/.

90.67 S/.

362.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

02.11.02

CANDADO INCLUYENDO ALDABAS

und

1.00 S/.

15.00 S/.

15.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.11.03

PICAPORTE GALVANIZADO REDONDO DE 0.10M

und

1.00 S/.

5.50 S/.

5.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.11.04

MANIJA DE BRONCE

und

4.00 S/.

11.66 S/.

46.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.45

02.12
02.12.01
02.13

VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE

S/.
p2

60.45 S/.

PINTURAS

3.66 S/.
S/.

221.25
-

02.13.01

PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)

m2

41.70 S/.

11.19 S/.

466.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

41.70

02.13.02

PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)

m2

59.00 S/.

12.20 S/.

719.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

59.00

02.13.03

PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)

m2

52.00 S/.

12.04 S/.

626.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

02.13.04

PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)

m2

32.00 S/.

10.47 S/.

335.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

32.00

02.13.05

PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)

m2

11.24 S/.

13.42 S/.

150.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.24

02.14

VARIOS

S/.

02.14.01

IMPERMEABILIZACION CON GEOMEMBRANA P.E.D.A DE 1.00 MM DE ESPESOR

m2

74,132.79 S/.

13.40 S/.

993,379.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

74,132.79

02.14.02

TANQUE DE FIBRA DE VIDRIO V=1000 LT. I/ACCESORIOS E INSTALACION

und

1.00 S/.

933.33 S/.

933.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15

APARATOS SANITARIOS Y ACCESORIOS

S/.

02.15.01

INODORO TANQUE BAJO BLANCO INC. ACCESORIOS

und

1.00 S/.

203.55 S/.

203.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.02

LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.

und

1.00 S/.

294.87 S/.

294.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.03

LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA

und

1.00 S/.

71.00 S/.

71.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.04

JABONERA DE LOSA COLOR BLANCO

und

1.00 S/.

9.80 S/.

9.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.05

TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR BLANCO

und

1.00 S/.

12.90 S/.

12.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.06

PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO

und

1.00 S/.

10.70 S/.

10.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.07

GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE

und

1.00 S/.

3.40 S/.

3.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.15.08

INSTALACION DE APARATOS SANITARIOS

und

3.00 S/.

65.92 S/.

197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.15.09

INSTALACION DE ACCESORIOS SANITARIOS

und

4.00 S/.

11.43 S/.

45.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

02.16

SISTEMA DE DESAGUE

S/.

02.16.01

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

1.00 S/.

87.35 S/.

87.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.02

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

2.00 S/.

72.66 S/.

145.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

02.16.03

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

1.00 S/.

98.21 S/.

98.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.04

RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"

10.00 S/.

14.82 S/.

148.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

02.16.05

TRAMPA P PVC DESAGUE SAL 4"

und

1.00 S/.

32.10 S/.

32.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.06

PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"

und

1.00 S/.

77.92 S/.

77.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.16.07

SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.

und

1.00 S/.

142.14 S/.

142.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.17

SISTEMA AGUA FRIA

S/.

02.17.01

SALIDA DE AGUA FRIA DE PVC DE 1/2"

pto

3.00 S/.

78.15 S/.

234.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.17.02

RED DE PVC CLASE A-10 SP DE 1/2"

20.00 S/.

2.55 S/.

51.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

und

1.00 S/.

22.78 S/.

22.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.17.03
02.18

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2"


INSTALACIONES ELECTRICAS

S/.

02.18.01

SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14 AWG

pto

3.00 S/.

86.76 S/.

260.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.18.02

SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG

pto

3.00 S/.

86.79 S/.

260.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

02.18.03

SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 12

pto

5.00 S/.

90.94 S/.

454.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

02.18.04

TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")

12.00 S/.

2.56 S/.

30.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

02.18.05

TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")

3.00 S/.

4.83 S/.

14.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

1. PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

02.18.06

TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")

6.00 S/.

8.14 S/.

48.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

02.18.07

TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")

2.00 S/.

11.85 S/.

23.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

02.18.08

CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2

13.00 S/.

7.80 S/.

101.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

02.18.09

CABLE ELECTRO TW AWG-MCM NO. 6-16.0 MM2

9.00 S/.

15.38 S/.

138.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

02.18.10

CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2

12.00 S/.

16.85 S/.

202.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

02.18.11

CABLE ELECTRICO NYY 1X6 MM2

1,902.00 S/.

2.37 S/.

4,507.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,902.00

02.18.12

CABLE ELECTRICO NYY 1X10 MM2

569.00 S/.

3.47 S/.

1,974.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

569.00

02.18.13

CABLE ELECTRICO NYY 1X16 MM2

21.00 S/.

5.39 S/.

113.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

21.00

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

2.00 S/.

138.66 S/.

277.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

76.66 S/.

76.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.14
02.18.15
02.18.16

TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN


ESPEFICICACIONES
ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR INC. EQUIPO Y
PANTALLA
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE AHORRADOR DE 20
W. O SIMILAR

6.00

02.18.17

LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR

und

23.00 S/.

404.67 S/.

9,307.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

02.18.18

CAJA PORTAMEDIDOR TIPO LT

und

1.00 S/.

147.46 S/.

147.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.19

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<5 OHMIOS

und

1.00 S/.

867.14 S/.

867.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.20

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<20 OHMIOS

und

2.00 S/.

882.81 S/.

1,765.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

und

1.00 S/.

862.81 S/.

862.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

3,968.36 S/.

3,968.36

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.21
02.18.22

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) PARA RABLERO DE


CONTROL
ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG, INC.
CONEXIONADO Y ACCESORIOS

02.18.23

SUMINISTRO E INST. DE TRANSFORMADOR DE 25 KVA 10/0.23 KV

und

1.00 S/.

16,574.38 S/.

16,574.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.24

PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"

und

23.00 S/.

99.56 S/.

2,289.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

02.18.25

POSTE CONCRETO CENTRIF. 11/200/150/315

und

23.00 S/.

926.75 S/.

21,315.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

23.00

02.18.26

PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE FUNCIONAMIENTO

und

1.00 S/.

2,420.72 S/.

2,420.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.27

EXCAVACIONES DE ZANJAS

S/.

02.18.27.01

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 250 MM.

74.00 S/.

9.54 S/.

705.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.02

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 300 MM.

43.00 S/.

10.39 S/.

446.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

74.00 S/.

1.87 S/.

138.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

43.00 S/.

2.06 S/.

88.58

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.05

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

74.00 S/.

5.98 S/.

442.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.06

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

43.00 S/.

4.75 S/.

204.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.07

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=2.0 M.

74.00 S/.

25.24 S/.

1,867.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.27.08

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=2.0 M.

43.00 S/.

35.16 S/.

1,511.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.27.09

ELIMINACION DE MATERIAL EXCEDENTE

m3

29.25 S/.

12.23 S/.

357.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

29.25

02.18.28

BUZONES Y CAMARAS

S/.

02.18.28.01

TANQUE SEPTICO DE CONCRETO ARMADO

und

1.00 S/.

3,604.53 S/.

3,604.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.28.02

POZO DE PERCOLACION

und

1.00 S/.

2,142.27 S/.

2,142.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

02.18.29

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

02.18.29.01

TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 250 MM

74.00 S/.

195.84 S/.

14,492.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.29.02

TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 300 MM

43.00 S/.

310.08 S/.

13,333.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.29.03

INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 250 MM.

74.00 S/.

7.55 S/.

558.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.29.04

INSTALACION DE TUBERIA POLIETILENO ALTA DENSIDAD DE 300 MM.

43.00 S/.

10.62 S/.

456.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.29.05

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS TAPADA

74.00 S/.

1.93 S/.

142.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.00

02.18.29.06

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS TAPADA

43.00 S/.

2.66 S/.

114.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

43.00

02.18.30

PAVIMENTOS

S/.

02.18.30.01

CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)

m2

150.00 S/.

10.22 S/.

1,533.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

150.00

02.18.30.02

VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5

m2

30.00 S/.

36.37 S/.

1,091.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

02.18.30.03

SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM

25.00 S/.

38.70 S/.

967.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

1. PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

02.18.31
02.18.31.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

METRADO
S/.

CERCO PERIMETRICO CON POSTES DE CONCRETO Y ALAMBRE DE PUAS

690.00 S/.

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

51,929.40

S/.

3,679,779.80

S/.

35,730.61

S/.

S/.

35,730.61

GG

367,977.98

S/.

3,573.06

S/.

S/.

3,573.06

UU

183,988.99

S/.

1,786.53

S/.

S/.

1,786.53

ST

4,231,746.77

S/.

41,090.20

S/.

S/.

41,090.20

S/.

41,090.20

S/.

S/.

41,090.20

GASTOS GENERALES
UTILIDAD
SUB TOTAL
FACTOR DE RELACIN ( FR )

4,231,746.77
IGV%
P_T

MONTO CONTRACTUAL

VALORIZADO

S/.

CD

TOTAL PRESUPUESTO

% AVANCE

METRADO

75.26 S/.

COSTO DIRECTO

IMPUESTO IGV

SALDO

ACUMULADO

COSTO PARCIAL

CANTIDAD

CERCOS

ACTUAL

% AVANCE
ANTERIOR

0.00%

0.97%

S/.

% AVANCE ACTUAL

0.00%

0.00%

% AVANCE ACUMULADO

S/.

761,714.42

S/.

7,396.24

S/.

S/.

7,396.24

4,993,461.19

S/.

48,486.43

S/.

S/.

48,486.43

4,993,461.19

S/.

48,486.43

S/.

S/.

48,486.43

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP:52774

0.00%

0.97%

690.00

% SALDO
EJECUTAR

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MUR
CIP:63638

DE AGUAS RESIDUALES-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

S/.
S/.
S/.
S/.

S/.

% AVANCE

3,478.50
5,442.30

0.00%
16.67%
0.00%
55.25%

0.00%

S/.

2,022.80

100.00%

S/.

31,224.00

100.00%

S/.

27,250.02

100.00%

S/.

99,856.30

100.00%

S/.

3,345.40

100.00%

S/.

7,060.35

100.00%

S/.

64,612.90

100.00%

S/.

2,930.65

100.00%

S/.

55,016.78

100.00%

S/.

42,849.00

100.00%

S/.

37,582.38

100.00%

S/.

5,452.38

100.00%

S/.

4,850.70

100.00%

S/.

61,257.30

100.00%

S/.

117,660.80

100.00%

S/.

12,549.78

100.00%

S/.

7,343.88

100.00%

S/.

5,953.84

100.00%

S/.

668,987.53

100.00%

S/.

695.73

100.00%

S/.

64,307.23

100.00%

S/.

142.01

100.00%

S/.

1,405.05

100.00%

S/.

1,029,175.49

100.00%

DE AGUAS RESIDUALES-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

351.72

100.00%

S/.

1,773.53

100.00%

S/.

4,405.08

100.00%

S/.

1,879.12

100.00%

S/.

1,253.55

100.00%

S/.

12,192.86

100.00%

S/.

13,220.70

100.00%

S/.

5,431.85

100.00%

S/.

8,992.12

100.00%

S/.

10,550.95

100.00%

S/.

16,953.15

100.00%

S/.

8,812.24

100.00%

S/.

431.84

100.00%

S/.

1,999.00

100.00%

S/.

2,766.51

100.00%

S/.

3,430.48

100.00%

S/.

393.17

100.00%

S/.

50.86

100.00%

S/.

909.16

100.00%

S/.

590.03

100.00%

S/.

269.85

100.00%

S/.

816.72

100.00%

S/.

879.03

100.00%

S/.

1,829.94

100.00%

S/.

718.76

100.00%

S/.

861.80

100.00%

S/.

3,753.88

100.00%

S/.

214.17

100.00%

S/.

1,282.07

100.00%

S/.

1,313.00

100.00%

S/.

302.94

100.00%

S/.

1,178.03

100.00%

S/.

246.64

100.00%

S/.

128.73

100.00%

S/.

650.88

100.00%

S/.

1,001.63

100.00%

S/.

981.20

100.00%

S/.

1,468.11

100.00%

DE AGUAS RESIDUALES-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

3,449.49

100.00%

S/.

362.68

100.00%

S/.

15.00

100.00%

S/.

5.50

100.00%

S/.

46.64

100.00%

S/.

221.25

100.00%

S/.

466.62

100.00%

S/.

719.80

100.00%

S/.

626.08

100.00%

S/.

335.04

100.00%

S/.

150.84

100.00%

S/.

993,379.39

100.00%

S/.

933.33

100.00%

S/.

203.55

100.00%

S/.

294.87

100.00%

S/.

71.00

100.00%

S/.

9.80

100.00%

S/.

12.90

100.00%

S/.

10.70

100.00%

S/.

3.40

100.00%

S/.

197.76

100.00%

S/.

45.72

100.00%

S/.

87.35

100.00%

S/.

145.32

100.00%

S/.

98.21

100.00%

S/.

148.20

100.00%

S/.

32.10

100.00%

S/.

77.92

100.00%

S/.

142.14

100.00%

S/.

234.45

100.00%

S/.

51.00

100.00%

S/.

22.78

100.00%

S/.

260.28

100.00%

S/.

260.37

100.00%

S/.

454.70

100.00%

S/.

30.72

100.00%

S/.

14.49

100.00%

DE AGUAS RESIDUALES-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

48.84

100.00%

S/.

23.70

100.00%

S/.

101.40

100.00%

S/.

138.42

100.00%

S/.

202.20

100.00%

S/.

4,507.74

100.00%

S/.

1,974.43

100.00%

S/.

113.19

100.00%

S/.

576.69

100.00%

S/.

277.32

100.00%

S/.

76.66

100.00%

S/.

9,307.41

100.00%

S/.

147.46

100.00%

S/.

867.14

100.00%

S/.

1,765.62

100.00%

S/.

862.81

100.00%

S/.

3,968.36

100.00%

S/.

16,574.38

100.00%

S/.

2,289.88

100.00%

S/.

21,315.25

100.00%

S/.

2,420.72

100.00%

S/.

705.96

100.00%

S/.

446.77

100.00%

S/.

138.38

100.00%

S/.

88.58

100.00%

S/.

442.52

100.00%

S/.

204.25

100.00%

S/.

1,867.76

100.00%

S/.

1,511.88

100.00%

S/.

357.73

100.00%

S/.

3,604.53

100.00%

S/.

2,142.27

100.00%

S/.

14,492.16

100.00%

S/.

13,333.44

100.00%

S/.

558.70

100.00%

S/.

456.66

100.00%

S/.

142.82

100.00%

S/.

114.38

100.00%

S/.

1,533.00

100.00%

S/.

1,091.10

100.00%

S/.

967.50

100.00%

DE AGUAS RESIDUALES-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

S/.

51,929.40

S/.

3,644,049.20

S/.

364,404.92

S/.

182,202.46

S/.

4,190,656.58

S/.

4,190,656.58

S/.

754,318.18

S/.

4,944,974.76

S/.

4,944,974.76

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP:63638

% AVANCE

100.00%

99.03%

2. SISTEMA DE AGUA POTABLE-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

03
03.01
03.01.01
03.01.02

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

METRADO

SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA


CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE
OBRA)

15.00

50.00%

S/.

454.50

0.00%

S/.

15.00 S/.

454.50

50.00%

750.00

10.00

20.00%

S/.

150.00

0.00%

S/.

10.00 S/.

150.00

20.00%

40.00

11,308.14

1,016.81

7.73%

S/.

874.46

0.00%

S/.

1,016.81 S/.

874.46

7.73%

12,132.19

13,149.00

9,072.81

13,149.00 S/.

9,072.81

13,149.00 S/.

0.69 S/.

9,072.81

13,149.00 S/.

1.04 S/.

13,674.96

13,149.00 S/.

11.11 S/.

03.07

METRADO

909.00

03.06.01

% AVANCE

15.00 S/.

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

03.06

VALORIZADO

30.30 S/.

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

03.05.01

METRADO

50.00 S/.

03.01.05

03.05

VALORIZADO

30.00 S/.

03.01.04

03.04.01

% AVANCE

und

0.86 S/.

03.04

METRADO

und

13,149.00 S/.

03.03.01

VALORIZADO

OBRAS PRELIMINARES

03.03

% AVANCE

LINEA DE CONDUCCION DE CAPTACION JESUS MARIA

CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

03.02.01

SALDO

ACUMULADO

COSTO PARCIAL

CANTIDAD

03.01.03

03.02

ACTUAL

EXCAVACIONES DE ZANJAS
EXCAVACION C/EQUIPO P/AGUA T. NATURAL P/TUB. 315 MM.

S/.

REFINE Y NIVELACION DE ZANJAS


REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

S/.
m

13,149.00 S/.

CAMA DE APOYO
CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

S/.
m

13,149.00 S/.

RELLENO DE ZANJAS
RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM

6.37 S/.
S/.

13,149.00 S/.

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

2.30 S/.

13.20 S/.
S/.

m3

2,780.00 S/.

SUMINISTRO E INSTALACION DE TUBERIAS

12.23 S/.
S/.

100.00%

15.00

100.00%

S/.

0.00%

S/.

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,780.00

146,085.39
30,242.70
83,759.13
173,566.80
33,999.40
-

03.07.01

TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM.

13,149.00 S/.

147.05 S/.

1,933,560.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

03.07.02

INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA

13,149.00 S/.

8.77 S/.

115,316.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

03.07.03

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA

13,149.00 S/.

3.54 S/.

46,547.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,149.00

03.08

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

03.08.01

CODO PVC U.F. DE 45X315 MM.

und

7.00 S/.

744.78 S/.

5,213.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

03.08.02

CODO PVC U.F. DE 22.5X315 MM.

und

124.00 S/.

726.29 S/.

90,059.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

124.00

INSTALACION DE ACCESORIOS PVC U.F. 315 MM. INC. DADO DE ANCLAJE

und

131.00 S/.

54.53 S/.

7,143.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

131.00

03.08.03
03.09

SUMINISTRO E INSTALACION DE VALVULAS

S/.

03.09.01

VALVULA PURGA DE F. FDO. BRIDADA 8"

und

3.00 S/.

1,306.36 S/.

3,919.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

03.09.02

VALVULA DE AIRE DE 2" DOBLE EFECTO

und

11.00 S/.

888.26 S/.

9,770.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

03.10

CAMARAS PARA VALVULAS

S/.

03.10.01

CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ 4-24"

und

11.00 S/.

1,548.59 S/.

17,034.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

03.10.02

CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"

und

3.00 S/.

1,743.73 S/.

5,231.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

20.00

04
04.01
04.01.01
04.01.02

LINEA DE ADUCCION DE RESERVORIO APOYADO

S/.

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE
OBRA)

S/.

und

20.00 S/.

30.30 S/.

606.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

und

10.00 S/.

15.00 S/.

150.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,042.00

04.01.03

CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

4,042.00 S/.

0.86 S/.

3,476.12

04.01.04

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

4,042.00 S/.

0.69 S/.

2,788.98

04.01.05

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

4,042.00 S/.

1.04 S/.

4,203.68

04.02

EXCAVACIONES DE ZANJAS

S/.

4,042.00

100.00%

S/.

0.00%

S/.

4,042.00 S/.

0.00%

S/.

2,788.98
-

0.00%

S/.

S/.

2,788.98
-

100.00%
0.00%

4,042.00

04.02.01

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.

3,542.00 S/.

10.80 S/.

38,253.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

04.02.02

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.

500.00 S/.

11.43 S/.

5,715.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.03

REFINE Y NIVELACION DE ZANJAS

S/.

04.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

500.00 S/.

1.72 S/.

860.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.03.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

3,542.00 S/.

2.06 S/.

7,296.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

04.04

CAMA DE APOYO

S/.

2. SISTEMA DE AGUA POTABLE-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

04.04.01

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

500.00 S/.

3.63 S/.

1,815.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.04.02

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

3,542.00 S/.

5.98 S/.

21,181.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

04.05

RELLENO DE ZANJAS

S/.

04.05.01

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.

3,542.00 S/.

18.79 S/.

66,554.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

04.05.02

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.

500.00 S/.

14.03 S/.

7,015.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

540.41

3,542.00

04.06
04.06.01
04.07

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

S/.
m3

540.41 S/.

SUMINISTRO E INSTALACION DE TUBERIAS

12.23 S/.
S/.

6,609.21
-

04.07.01

TUBERIA P.V.C. CLASE A-7.5 UF DE 315 MM

3,542.00 S/.

113.96 S/.

403,646.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

04.07.02

TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)

500.00 S/.

32.78 S/.

16,390.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.07.03

INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA

3,542.00 S/.

5.32 S/.

18,843.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

04.07.04

INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA

500.00 S/.

3.56 S/.

1,780.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.07.05

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA

3,542.00 S/.

3.01 S/.

10,661.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,542.00

PRUEBA HIDRAULICA+ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA

500.00 S/.

1.98 S/.

990.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

500.00

04.07.06
04.08

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

04.08.01

CODO HO DUCTIL DE 45 X 300 MM.

und

123.00 S/.

668.00 S/.

82,164.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

123.00

04.08.02

INSTALACION DE ACCESORIOS HO. DUCTIL EMBONE DE 300 - 350 MM

und

123.00 S/.

132.25 S/.

16,266.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

123.00

04.09

SUMINISTRO E INSTALACION DE VALVULAS

S/.

04.09.01

VALVULA PURGA DE F. FDO. BRIDADA 8"

und

10.00 S/.

1,306.36 S/.

13,063.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

04.09.02

VALVULA DE AIRE DE 2" DOBLE EFECTO

und

10.00 S/.

888.26 S/.

8,882.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

04.10

CAMARAS PARA VALVULAS

S/.

04.10.01

CAMARA P/VALVULA AIRE D=1.50 M. TERRENO NORMAL E.D. P/MATRIZ 4-24"

und

10.00 S/.

1,548.59 S/.

15,485.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

04.10.02

CAMARA P/VALVULA PURGA TERRENO NORMAL P/MATRIZ 4-16"

und

10.00 S/.

1,743.73 S/.

17,437.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

05
05.01
05.01.01
05.01.02

REDES DE DISTRIBUCION PRIMARIA Y SECUNDARIA

S/.

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE
OBRA)

S/.

und

40.00 S/.

30.30 S/.

1,212.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

und

30.00 S/.

15.00 S/.

450.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

und

20.00 S/.

34.00 S/.

680.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

28,038.22 S/.

0.86 S/.

24,112.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

28,038.22

05.01.03

TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO

05.01.04

CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

05.01.05

PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

30.00 S/.

78.59 S/.

2,357.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

05.01.06

PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

10.00 S/.

275.65 S/.

2,756.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

05.01.07

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

28,038.22 S/.

0.69 S/.

19,346.37

100.00%

S/.

0.00%

S/.

05.01.08

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

28,038.22 S/.

1.04 S/.

29,159.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

28,038.22

05.02

EXCAVACIONES DE ZANJAS

S/.

28,038.22

19,346.37

28,038.22 S/.

19,346.37

100.00%

05.02.01

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 90-110 MM.

22,213.55 S/.

8.79 S/.

195,257.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.02.02

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 140-160 MM.

4,136.34 S/.

10.39 S/.

42,976.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.02.03

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 200 MM.

1,391.85 S/.

11.43 S/.

15,908.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.02.04

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 250 MM.

246.45 S/.

12.70 S/.

3,129.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.02.05

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 315 MM.

50.04 S/.

10.80 S/.

540.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.03

REFINE Y NIVELACION DE ZANJAS

S/.

05.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 90-110 MM.

22,213.55 S/.

1.03 S/.

22,879.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.03.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 140-160 MM.

4,136.34 S/.

1.03 S/.

4,260.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.03.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

1,391.85 S/.

1.72 S/.

2,393.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.03.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

246.45 S/.

1.72 S/.

423.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.03.05

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

50.04 S/.

2.06 S/.

103.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

2. SISTEMA DE AGUA POTABLE-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

05.04

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

CAMA DE APOYO

ACTUAL

S/.

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

05.04.01

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 90-110 MM.

22,213.55 S/.

3.64 S/.

80,857.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.04.02

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 140-160 MM.

4,136.34 S/.

3.63 S/.

15,014.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.04.03

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

1,291.85 S/.

3.63 S/.

4,689.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,291.85

05.04.04

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

246.45 S/.

4.75 S/.

1,170.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.04.05

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

50.04 S/.

5.98 S/.

299.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.05

RELLENO DE ZANJAS

S/.

05.05.01

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 90-110 MM

22,213.55 S/.

11.68 S/.

259,454.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

22,213.55

05.05.02

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 140-160 MM

4,136.34 S/.

13.13 S/.

54,310.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.05.03

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 200 MM

1,391.85 S/.

13.14 S/.

18,288.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.05.04

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 250 MM

246.45 S/.

13.19 S/.

3,250.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.05.05

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 315 MM H=4.0 M.

50.04 S/.

18.79 S/.

940.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,748.68

05.06
05.06.01
05.07

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

S/.
m3

3,748.68 S/.

SUMINISTRO E INSTALACION DE TUBERIAS

12.23 S/.
S/.

45,846.36
-

05.07.01

TUBERIA P.V.C. CLASE A - 7.5 UF DE 90 MM.

3,126.86 S/.

13.48 S/.

42,150.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.02

TUBERIA P.V.C. CLASE A - 7.5 UF DE 110 MM.

19,086.69 S/.

15.92 S/.

303,860.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.03

TUBERIA P.V.C. CLASE A - 7.5 UF DE 160 MM.

4,136.34 S/.

34.48 S/.

142,621.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.04

TUBERIA P.V.C. CLASE A - 7.5 UF DE 200 MM.

1,391.85 S/.

55.18 S/.

76,802.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.05

TUBERIA P.V.C. CLASE A - 7.5 UF DE 250 MM.

246.45 S/.

101.22 S/.

24,945.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.06

TUBERIA P.V.C. CLASE A - 7.5 UF DE 315 MM.

50.04 S/.

113.66 S/.

5,687.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.07.07

INSTALACION TUBERIA PVC UF DE 90 MM. INC. PRUEBA HIDRAULICA

3,126.86 S/.

2.14 S/.

6,691.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.08

INSTALACION TUBERIA PVC UF DE 110 MM. INC. PRUEBA HIDRAULICA

19,086.69 S/.

2.98 S/.

56,878.34

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.09

INSTALACION TUBERIA PVC UF DE 160 MM. INC. PRUEBA HIDRAULICA

4,136.34 S/.

4.39 S/.

18,158.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.10

INSTALACION TUBERIA PVC UF DE 200 MM. INC. PRUEBA HIDRAULICA

1,391.85 S/.

6.90 S/.

9,603.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.11

INSTALACION TUBERIA PVC UF DE 250 MM. INC. PRUEBA HIDRAULICA

246.45 S/.

4.74 S/.

1,168.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.12

INSTALACION TUBERIA PVC UF DE 315 MM. INC. PRUEBA HIDRAULICA

50.04 S/.

5.32 S/.

266.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

05.07.13

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 90 MM. ZANJAS TAPADA

3,126.86 S/.

1.49 S/.

4,659.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,126.86

05.07.14

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 110 MM. ZANJAS TAPADA

19,086.69 S/.

1.59 S/.

30,347.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,086.69

05.07.15

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 160 MM. ZANJAS TAPADA

4,136.34 S/.

1.84 S/.

7,610.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,136.34

05.07.16

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 200 MM. ZANJAS TAPADA

1,391.85 S/.

2.30 S/.

3,201.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,391.85

05.07.17

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 250 MM. ZANJAS TAPADA

246.45 S/.

2.46 S/.

606.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

246.45

05.07.18

PRUEBA HIDRAULICA +DESINFECC. TUBERIA 315 MM. ZANJAS TAPADA

50.04 S/.

3.01 S/.

150.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.04

35.00

05.08

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

05.08.01

CRUZ DE PVC UF 110X110 MM

und

35.00 S/.

162.98 S/.

5,704.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

05.08.02

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 80 MM

und

4.00 S/.

62.93 S/.

251.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

05.08.03

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 100 MM

und

30.00 S/.

87.87 S/.

2,636.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

05.08.04

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 150 MM

und

4.00 S/.

117.00 S/.

468.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

05.08.05

ACOPLE FLEXIBLE DE GRAN RANGO HD DN 200 MM

und

2.00 S/.

169.20 S/.

338.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

05.08.06

CODO PVC U.F. DE 45X110 MM.

und

10.00 S/.

41.03 S/.

410.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

05.08.07

CODO PVC U.F. DE 45X200 MM.

und

5.00 S/.

132.08 S/.

660.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

05.08.08

CODO PVC U.F. DE 90X110 MM.

und

15.00 S/.

51.86 S/.

777.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

05.08.09

REDUCCION PVC U.F. DE 200 MM A 110 MM

und

2.00 S/.

89.70 S/.

179.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

05.08.10

TEE PVC U.F. DE 110X110 MM.

und

20.00 S/.

112.50 S/.

2,250.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.08.11

TEE PVC U.F. DE 200X110 MM.

und

2.00 S/.

627.00 S/.

1,254.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

2. SISTEMA DE AGUA POTABLE-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

05.08.12

TEE PVC U.F. DE 200X200 MM.

und

2.00 S/.

728.39 S/.

1,456.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

05.08.13

INSTALACION DE ACCESORIOS PVC U.F. 90-160 MM. INC. DADO DE ANCLAJE

und

118.00 S/.

47.24 S/.

5,574.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

118.00

INSTALACION DE ACCESORIOS PVC U.F. 200-250 MM. INC. DADO DE ANCLAJE

und

13.00 S/.

62.19 S/.

808.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

05.08.14
05.09

SUMINISTRO E INSTALACION DE VALVULAS

S/.

05.09.01

VALVULA COMPUERTA DE FO. FDO. LUFLEX 90 mm

und

11.00 S/.

335.45 S/.

3,689.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.02

VALVULA COMPUERTA DE FO. FDO. LUFLEX 110 mm

und

42.00 S/.

428.18 S/.

17,983.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

05.09.03

VALVULA COMPUERTA DE FO. FDO. LUFLEX 160 mm

und

11.00 S/.

755.45 S/.

8,309.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.04

VALVULA COMPUERTA DE FO. FDO. LUFLEX 200 mm

und

9.00 S/.

1,180.90 S/.

10,628.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

05.09.05

GRIFO CONTRAINCENDIO TIPO POSTE 2 BOCAS LUFLEX

und

20.00 S/.

772.00 S/.

15,440.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.09.06

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 90 MM

und

11.00 S/.

15.48 S/.

170.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.07

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 110 MM

und

42.00 S/.

17.70 S/.

743.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

42.00

05.09.08

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 160 MM

und

11.00 S/.

20.64 S/.

227.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.09.09

INSTALACION VALVULAS COMPUERTA F. FDO. LUFLEX 200 MM

und

9.00 S/.

24.76 S/.

222.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

05.09.10

INSTALACION DE GRIFOS CONTRAINCENDIO LUFLEX TIPO POSTE 2 BOCAS

und

20.00 S/.

143.90 S/.

2,878.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

05.10

CAMARAS PARA VALVULAS

S/.

05.10.01

REGISTRO P/VALVULA DE COMPUERTA 90-160 MM.

und

64.00 S/.

157.78 S/.

10,097.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

64.00

05.10.02

REGISTRO P/VALVULA DE COMPUERTA 200-250 MM.

und

9.00 S/.

222.42 S/.

2,001.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

11.00

05.11
05.11.01
05.12

EMPALMES
EMPALME C/INSERCION DE TUBERIA A LINEAS DE AGUA 4"-6"

S/.
und

11.00 S/.

ROTURA Y REPOSICION DE PAVIMENTOS

89.90 S/.
S/.

988.90
-

05.12.01

BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO

m2

600.00 S/.

21.34 S/.

12,804.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

05.12.02

CARPETA ASFALTICA EN FRIO E=5.00 CM.

m2

600.00 S/.

45.31 S/.

27,186.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

05.12.03

ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.

m2

600.00 S/.

20.82 S/.

12,492.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

600.00

2. SISTEMA DE AGUA POTABLE-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

05.12.04

ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION PAVIMENTACION PAVIMENTOS


D=5 KM.

06

CONEXIONES DOMICILIARIAS AGUA POTABLE

06.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

METRADO

30.00 S/.

11.27 S/.
S/.

CONEXIONES DOMICILIARIAS

SALDO

ACUMULADO

COSTO PARCIAL

CANTIDAD

m3

ACTUAL

S/.

338.10

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

06.01.01

CONEXION DOMICILIARIA AGUA 1/2" A TUB. DE 4" INC. PRUEBA HIDRAULICA

und

1,918.00 S/.

278.47 S/.

534,105.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,918.00

06.01.02

INSTALACION DE MEDIDORES DE 1/2".

und

1,918.00 S/.

81.91 S/.

157,103.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,918.00

und

865.00 S/.

105.01 S/.

90,833.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

865.00

und

750.00 S/.

97.06 S/.

72,795.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

750.00

S/.

6,100,591.20

S/.

32,687.12

S/.

S/.

32,687.12
3,268.71

06.01.03
06.01.04

INSTALACION DE MEDIDORES DE 1/2" (INC. RETIRO DE ACCESORIOS Y MEDIDOR


MALOGRADO).
SUMINISTRO E INST. CAJA CONCRETO MARCO TAPA FGD. TN MED. 1/2"-3/4"

COSTO DIRECTO

CD

GASTOS GENERALES

GG

610,059.12

S/.

3,268.71

S/.

S/.

UTILIDAD

UU

305,029.56

S/.

1,634.36

S/.

S/.

1,634.36

SUB TOTAL

ST

7,015,679.88

S/.

37,590.19

S/.

S/.

37,590.19

S/.

37,590.19

S/.

S/.

37,590.19

FACTOR DE RELACIN ( FR )
IMPUESTO IGV
TOTAL PRESUPUESTO
MONTO CONTRACTUAL

7,015,679.88

% AVANCE
ANTERIOR

0.54%

% AVANCE ACTUAL

0.00%

% AVANCE ACUMULADO

IGV%

1,262,822.38

S/.

6,766.23

S/.

S/.

6,766.23

P_T

8,278,502.26

S/.

44,356.42

S/.

S/.

44,356.42

8,278,502.26

S/.

44,356.42

S/.

S/.

44,356.42

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP:52774

0.54%

% SALDO
EJECUTAR

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURG
CIP:63638

UA POTABLE-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

454.50

50.00%

S/.

600.00

80.00%

S/.

10,433.68

92.27%

S/.

0.00%

S/.

13,674.96

100.00%

S/.

146,085.39

100.00%

S/.

30,242.70

100.00%

S/.

83,759.13

100.00%

S/.

173,566.80

100.00%

S/.

33,999.40

100.00%

S/.

1,933,560.45

100.00%

S/.

115,316.73

100.00%

S/.

46,547.46

100.00%

S/.

5,213.46

100.00%

S/.

90,059.96

100.00%

S/.

7,143.43

100.00%

S/.

3,919.08

100.00%

S/.

9,770.86

100.00%

S/.

17,034.49

100.00%

S/.

5,231.19

100.00%

S/.

606.00

100.00%

S/.

150.00

100.00%

S/.

3,476.12

100.00%

S/.

0.00%

S/.

4,203.68

100.00%

S/.

38,253.60

100.00%

S/.

5,715.00

100.00%

S/.

860.00

100.00%

S/.

7,296.52

100.00%

UA POTABLE-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

1,815.00

100.00%

S/.

21,181.16

100.00%

S/.

66,554.18

100.00%

S/.

7,015.00

100.00%

S/.

6,609.21

100.00%

S/.

403,646.32

100.00%

S/.

16,390.00

100.00%

S/.

18,843.44

100.00%

S/.

1,780.00

100.00%

S/.

10,661.42

100.00%

S/.

990.00

100.00%

S/.

82,164.00

100.00%

S/.

16,266.75

100.00%

S/.

13,063.60

100.00%

S/.

8,882.60

100.00%

S/.

15,485.90

100.00%

S/.

17,437.30

100.00%

S/.

1,212.00

100.00%

S/.

450.00

100.00%

S/.

680.00

100.00%

S/.

24,112.87

100.00%

S/.

2,357.70

100.00%

S/.

2,756.50

100.00%

S/.

0.00%

S/.

29,159.75

100.00%

S/.

195,257.10

100.00%

S/.

42,976.57

100.00%

S/.

15,908.85

100.00%

S/.

3,129.92

100.00%

S/.

540.43

100.00%

S/.

22,879.96

100.00%

S/.

4,260.43

100.00%

S/.

2,393.98

100.00%

S/.

423.89

100.00%

S/.

103.08

100.00%

UA POTABLE-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

80,857.32

100.00%

S/.

15,014.91

100.00%

S/.

4,689.42

100.00%

S/.

1,170.64

100.00%

S/.

299.24

100.00%

S/.

259,454.26

100.00%

S/.

54,310.14

100.00%

S/.

18,288.91

100.00%

S/.

3,250.68

100.00%

S/.

940.25

100.00%

S/.

45,846.36

100.00%

S/.

42,150.07

100.00%

S/.

303,860.10

100.00%

S/.

142,621.00

100.00%

S/.

76,802.28

100.00%

S/.

24,945.67

100.00%

S/.

5,687.55

100.00%

S/.

6,691.48

100.00%

S/.

56,878.34

100.00%

S/.

18,158.53

100.00%

S/.

9,603.77

100.00%

S/.

1,168.17

100.00%

S/.

266.21

100.00%

S/.

4,659.02

100.00%

S/.

30,347.84

100.00%

S/.

7,610.87

100.00%

S/.

3,201.26

100.00%

S/.

606.27

100.00%

S/.

150.62

100.00%

S/.

5,704.30

100.00%

S/.

251.72

100.00%

S/.

2,636.10

100.00%

S/.

468.00

100.00%

S/.

338.40

100.00%

S/.

410.30

100.00%

S/.

660.40

100.00%

S/.

777.90

100.00%

S/.

179.40

100.00%

S/.

2,250.00

100.00%

S/.

1,254.00

100.00%

UA POTABLE-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

1,456.78

100.00%

S/.

5,574.32

100.00%

S/.

808.47

100.00%

S/.

3,689.95

100.00%

S/.

17,983.56

100.00%

S/.

8,309.95

100.00%

S/.

10,628.10

100.00%

S/.

15,440.00

100.00%

S/.

170.28

100.00%

S/.

743.40

100.00%

S/.

227.04

100.00%

S/.

222.84

100.00%

S/.

2,878.00

100.00%

S/.

10,097.92

100.00%

S/.

2,001.78

100.00%

S/.

988.90

100.00%

S/.

12,804.00

100.00%

S/.

27,186.00

100.00%

S/.

12,492.00

100.00%

UA POTABLE-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

338.10

100.00%

S/.

534,105.46

100.00%

S/.

157,103.38

100.00%

S/.

90,833.65

100.00%

S/.

72,795.00

100.00%

S/.

6,067,904.08

S/.

606,790.41

S/.

303,395.20

S/.

6,978,089.70

S/.

6,978,089.70

S/.

1,256,056.15

S/.

8,234,145.84

S/.

8,234,145.84

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP:63638

99.46%

3.RESERVORIO APOYADO RAP-01-VALORIZACION N 05


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD


UBICACIN
DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA
VALOR REFERENCIAL
MONTO CONTRATADO

:
:
:

ING. JULIO FELIX VALERIANO MURGA


27,647,382.62
( VR )
27,647,382.62
( MC )

VALORIZACIN DE LA OBRA N 02
PERIODO DE TRABAJO
FECHA DE PRESENTACIN

:
:

01/01/2015 AL 31/01/2015
4 DE FEBRERO DEL 2015

PRESUPUESTO
ITEM

METRADO

DESCRIPCION DE PARTIDAS

UND.
07
07.01

CANTIDAD

COSTO
UNITARIO

AVANCES
ANTERIOR (abril)

COSTO
PARCIAL

EJECUTADOS

ACTUAL (mayo)

METRADO % AVANCE VALORIZADO

%
AVANCE

METRADO

SALDO

ACUMULADO

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

VALORIZADO

% AVANCE

CONSTRUCCION RESERVORIO APOYADO RAP-01


OBRAS PRELIMINARES

07.01.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

483.85 S/.

0.69 S/.

333.86

483.85

100.00%

S/.

333.86

0.00%

S/.

483.85 S/.

333.86

100.00%

S/.

0.00%

07.01.02

TRAZOS Y REPLANTEOS FINALES DEL PROYECTO DE OBRA

483.85 S/.

2.34 S/.

1,132.21

483.85

100.00%

S/.

1,132.21

0.00%

S/.

483.85 S/.

1,132.21

100%

S/.

0.00%

07.02

MOVIMIENTO DE TIERRAS

S/.

07.02.01

EXCAVACIONES CORTES C/EQUIPO EN TERRENO NATURAL

m3

396.53 S/.

14.00 S/.

5,551.42

396.53

100.00%

S/.

5,551.42

0.00%

S/.

396.53 S/.

5,551.42

100.00%

S/.

0.00%

07.02.02

REFINE Y NIVELACION EN TERRENO NORMAL

m2

437.44 S/.

3.66 S/.

1,601.03

437.44

100.00%

S/.

1,601.03

0.00%

S/.

437.44 S/.

1,601.03

100.00%

S/.

0.00%

07.02.03

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO CON MAQUINARIA

m3

166.27 S/.

8.23 S/.

1,368.40

166.27

100.00%

S/.

1,368.40

0.00%

S/.

166.27 S/.

1,368.40

100.00%

S/.

0.00%

07.02.04

ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=10 KM)

m3

475.84 S/.

11.05 S/.

5,258.03

475.84

100.00%

S/.

5,258.03

0.00%

S/.

475.84 S/.

5,258.03

100.00%

S/.

0.00%

07.03

OBRAS DE CONCRETO SIMPLE

S/.

07.03.01

CONCRETO f'c=100 kg/cm2 P/SOLADOS Y/O SUB BASE

m3

12.04 S/.

249.51 S/.

3,004.10

12.04

100.00%

S/.

3,004.10

0.00%

S/.

12.04 S/.

3,004.10

100.00%

S/.

0.00%

07.03.02

ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES

m2

7.54 S/.

15.41 S/.

116.19

7.54

100.00%

S/.

116.19

0.00%

S/.

7.54 S/.

116.19

100.00%

S/.

0.00%

07.04

OBRAS DE CONCRETO ARMADO

S/.

07.04.01

CONCRETO f'c=280 kg/cm2 P/ZAPATAS

m3

120.39 S/.

409.90 S/.

49,347.86

120.39

100.00%

S/.

49,347.86

0.00%

S/.

120.39 S/.

49,347.86

100.00%

S/.

0.00%

07.04.02

ENCOFRADO Y DESENCOFRADO P/ZAPATAS CIRCULARES

m2

59.31 S/.

62.44 S/.

3,703.32

59.31

100.00%

S/.

3,703.32

0.00%

S/.

59.31 S/.

3,703.32

100.00%

S/.

0.00%

07.04.03

ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS

kg

7,203.40 S/.

4.76 S/.

34,288.18

7,203.40

100.00%

S/.

34,288.18

0.00%

S/.

7,203.40 S/.

34,288.18

100.00%

S/.

0.00%

07.04.04

CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO

m3

100.28 S/.

428.76 S/.

42,996.05

100.28

100.00%

S/.

42,996.05

0.00%

S/.

100.28 S/.

42,996.05

100.00%

S/.

0.00%

07.04.05

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

4,755.00 S/.

4.76 S/.

22,633.80

4,755.00

100.00%

S/.

22,633.80

0.00%

S/.

4,755.00 S/.

22,633.80

100.00%

S/.

07.04.06

CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS

m3

193.12 S/.

512.68 S/.

99,008.76

68.16

35.29%

S/.

34,944.27

103.72

53.71%

S/.

53,175.17

171.88 S/.

88,119.44

89.00%

21.24 S/.

10,889.32

11.00%

07.04.07

ENCOFRADO Y DESENCOFRADO P/MURO RECTOS

m2

965.60 S/.

51.82 S/.

50,037.39

366.93

38.00%

S/.

19,014.31

492.45

51.00%

S/.

25,518.76

859.38 S/.

44,533.07

89.00%

106.22 S/.

5,504.32

11.00%

07.04.08

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

45,973.07 S/.

4.76 S/.

218,831.81

27,583.07

60.00%

S/.

131,295.41

18,389.23

40.00%

S/.

87,532.73

45,972.30 S/.

218,828.14

100.00%

0.77 S/.

3.67

07.04.09

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

2.50 S/.

392.58 S/.

981.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.50 S/.

981.45

100.00%

07.04.10

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

20.00 S/.

46.89 S/.

937.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00 S/.

937.80

100.00%

07.04.11

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

445.00 S/.

4.76 S/.

2,118.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

445.00 S/.

2,118.20

100.00%

07.04.12

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

2.20 S/.

357.43 S/.

786.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.20 S/.

786.35

100.00%

07.04.13

CONCRETO f'c=280 kg/cm2 P/VIGAS Y DINTELES

m3

26.74 S/.

421.99 S/.

11,284.01

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.74 S/.

11,284.01

100.00%

07.04.14

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

19.50 S/.

46.24 S/.

901.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.50 S/.

901.68

100.00%

07.04.15

ENCOFRADO Y DESENCOFRADO P/VIGAS CIRCULARES

m2

114.23 S/.

50.58 S/.

5,777.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

114.23 S/.

5,777.75

100.00%

07.04.16

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

2,767.88 S/.

4.76 S/.

13,175.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,767.88 S/.

13,175.11

100.00%

07.04.17

CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS

m3

3.50 S/.

340.24 S/.

1,190.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.50 S/.

1,190.84

100.00%

07.04.18

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

25.00 S/.

56.93 S/.

1,423.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

1,423.25

100.00%

07.04.19

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

350.00 S/.

4.76 S/.

1,666.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

350.00 S/.

1,666.00

100.00%

07.04.20

CONCRETO f'c=245 kg/cm2 P/CUPULA ESFERICA

m3

35.41 S/.

455.35 S/.

16,123.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.41 S/.

16,123.94

100.00%

07.04.21

ENCOFRADO Y DESENCOFRADO P/CUPULA ESFERICA

m2

404.74 S/.

75.51 S/.

30,561.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

404.74 S/.

30,561.92

100.00%

07.04.22

ACERO ESTRUCTURAL TRABAJADO P/CUPULA ESFERICA

kg

2,611.44 S/.

4.76 S/.

12,430.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,611.44 S/.

12,430.45

100.00%

0.00%

0.00%

3.RESERVORIO APOYADO RAP-01-VALORIZACION N 05


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD


UBICACIN
DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA
VALOR REFERENCIAL
MONTO CONTRATADO

:
:
:

ING. JULIO FELIX VALERIANO MURGA


27,647,382.62
( VR )
27,647,382.62
( MC )

VALORIZACIN DE LA OBRA N 02
PERIODO DE TRABAJO
FECHA DE PRESENTACIN

:
:

01/01/2015 AL 31/01/2015
4 DE FEBRERO DEL 2015

PRESUPUESTO
ITEM

METRADO

DESCRIPCION DE PARTIDAS

UND.
07.05
07.05.01
07.06

CANTIDAD

COSTO
UNITARIO

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM

AVANCES

COSTO
PARCIAL
S/.

m2

25.00 S/.

REVOQUES Y ENLUCIDOS

ANTERIOR (abril)

72.19 S/.
S/.

EJECUTADOS

ACTUAL (mayo)

METRADO % AVANCE VALORIZADO

%
AVANCE

METRADO

SALDO

ACUMULADO

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

VALORIZADO

% AVANCE

1,804.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

1,804.75

100.00%

07.06.01

TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

50.00 S/.

21.73 S/.

1,086.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.00 S/.

1,086.50

100.00%

07.06.02

TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

35.00 S/.

25.25 S/.

883.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00 S/.

883.75

100.00%

07.06.03

TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM

m2

387.08 S/.

18.80 S/.

7,277.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

387.08 S/.

7,277.10

100.00%

07.06.04

TARRAJEO C/IMPERM. MUROS INTERIORMENTE M=1:3 E=1.5 CM

m2

460.31 S/.

22.78 S/.

10,485.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

460.31 S/.

10,485.86

100.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

560.25

100.00%

07.07
07.07.01
07.08

CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM

S/.
m2

25.00 S/.

PISOS Y PAVIMENTOS

22.41 S/.
S/.

560.25
-

07.08.01

FALSO PISO DE 4" CONCRETO Fc=100 KG/CM2

m2

25.00 S/.

29.44 S/.

736.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

736.00

100.00%

07.08.02

PISO DE CONCRETO DE 2" ACABADO FROTACHADO

m2

25.00 S/.

19.01 S/.

475.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

475.25

100.00%

07.08.03

VEREDA DE CONCRETO Fc=140 KG/CM2 H=0.15M.

m2

110.00 S/.

59.28 S/.

6,520.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

110.00 S/.

6,520.80

100.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

29.00 S/.

828.82

100.00%

07.09
07.09.01
07.10

CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. C/CEZ 1:5 2.5 CM+FRAGUA C/MORT. 1:5 JUNTA 1.5
CM.

S/.
m2

29.00 S/.

CARPINTERIA METALICA

28.58 S/.
S/.

828.82
-

07.10.01

VENTANA DE FIERRO C/PERFIL DE 1"+HOJA BAST. 3/4"

m2

1.98 S/.

144.51 S/.

286.13

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.98 S/.

286.13

100.00%

07.10.02

PUERTA METALICA LAC 1/16" C/MARCO 1 1/4"X1/8" Y REFUERZOS

m2

2.10 S/.

149.11 S/.

313.13

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.10 S/.

313.13

100.00%

07.10.03

ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"

6.00 S/.

121.03 S/.

726.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00 S/.

726.18

100.00%

07.10.04

TAPA METALICA DE INSPECCION STANDARD

und

1.00 S/.

123.70 S/.

123.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

123.70

100.00%

07.10.05

VENTILACION C/TUBERIA DE ACERO S/DISEO DE 4"

und

4.00 S/.

58.41 S/.

233.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00 S/.

233.64

100.00%

07.11

CERRAJERIA

S/.

07.11.01

BISAGRA CAPUCHINA ALUMINIO DE 3"

und

3.00 S/.

5.83 S/.

17.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00 S/.

17.49

100.00%

07.11.02

CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 3 GOLPES

und

1.00 S/.

94.53 S/.

94.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

94.53

100.00%

07.12

PINTURAS

S/.

07.12.01

PINTADO DE CIELO RASOS C/LATEX VINILICO (VINILATEX O SIMILAR)

m2

25.00 S/.

10.47 S/.

261.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

261.75

100.00%

07.12.02

PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR)

m2

45.00 S/.

9.74 S/.

438.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.00 S/.

438.30

100.00%

07.12.03

PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR)

m2

35.00 S/.

8.72 S/.

305.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00 S/.

305.20

100.00%

07.12.04

PINTADO EXTERIOR C/LATEX VINILICO O SIMILAR DE RESERVORIO INCL. LOGOTIPO

m2

462.00 S/.

9.16 S/.

4,231.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

462.00 S/.

4,231.92

100.00%

S/.

0.00%

5.00 S/.

26.90

100.00%

07.13

VARIOS

S/.

07.13.01

PROVISION Y COLOCADO DE TECNOPORT DE 3/4"

m2

5.00 S/.

5.38 S/.

26.90

07.13.02

PROVISION Y COLOCADO DE JUNTA WATER STOP DE PVC 6"

440.00 S/.

18.99 S/.

8,355.60

07.14

INSTALACIONES ELECTRICAS

S/.

155.28

0.00%

S/.

35.29%

S/.

2,948.77

284.72

0.00%

S/.

64.71%

S/.

5,406.83

440.00 S/.

8,355.60

100.00%

S/.

0.00%

07.14.01

SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG

pto

3.00 S/.

86.79 S/.

260.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00 S/.

260.37

100.00%

07.14.02

SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 14

pto

4.00 S/.

63.52 S/.

254.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00 S/.

254.08

100.00%

07.14.03

TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")

20.00 S/.

2.56 S/.

51.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00 S/.

51.20

100.00%

07.14.04

CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2

40.00 S/.

2.08 S/.

83.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00 S/.

83.20

100.00%

07.14.05

CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2

50.00 S/.

2.77 S/.

138.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

50.00 S/.

138.50

100.00%

07.14.06

CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2

10.00 S/.

3.14 S/.

31.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00 S/.

31.40

100.00%

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

576.69

100.00%

und

1.00 S/.

675.98 S/.

675.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

675.98

100.00%

07.14.07
07.14.08
07.15

TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN


ESPEFICICACIONES
POZO CONEXION A TIERRA EN SISTEMA C/ALUMBRADO Y TOMACORRIENTE.
PRUEBAS HIDRAULICAS DE OBRAS CIVILES

S/.

07.15.01

PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO

m3

2,500.00 S/.

1.25 S/.

3,125.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00 S/.

3,125.00

100.00%

07.15.02

DESINFECCION DE RESERVORIO CON EMPLEO DE LINEA DE INGRESO

m3

2,500.00 S/.

3.60 S/.

9,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00 S/.

9,000.00

100.00%

07.15.03

EVACUACION DEL AGUA DE PRUEBA C/EMPL. DE LINEA DE SALIDA

m3

2,500.00 S/.

0.92 S/.

2,300.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,500.00 S/.

2,300.00

100.00%

3.RESERVORIO APOYADO RAP-01-VALORIZACION N 05


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD


UBICACIN
DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALORIZACIN DE LA OBRA N 02

VALOR REFERENCIAL
MONTO CONTRATADO

:
:

:
:

01/01/2015 AL 31/01/2015
4 DE FEBRERO DEL 2015

27,647,382.62
27,647,382.62

( VR )
( MC )

PERIODO DE TRABAJO
FECHA DE PRESENTACIN

PRESUPUESTO
ITEM

METRADO

DESCRIPCION DE PARTIDAS

UND.
07.16

CANTIDAD

COSTO
UNITARIO

EXCAVACIONES DE ZANJAS

AVANCES
ANTERIOR (abril)

COSTO
PARCIAL
S/.

EJECUTADOS

ACTUAL (mayo)

METRADO % AVANCE VALORIZADO

%
AVANCE

METRADO

SALDO

ACUMULADO

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

VALORIZADO

% AVANCE

07.16.01

EXCAVACION C/EQUIPO P/AGUA T. NORMAL P/TUB. 400 MM.

167.00 S/.

10.39 S/.

1,735.13

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00 S/.

1,735.13

100.00%

07.16.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.

167.00 S/.

2.58 S/.

430.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00 S/.

430.86

100.00%

07.16.03

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.

167.00 S/.

5.37 S/.

896.79

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00 S/.

896.79

100.00%

07.16.04

RELLENO ZANJA MAT. SELEC. COMPACT. C/EQUIPO P/TUB 400 MM

167.00 S/.

38.13 S/.

6,367.71

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00 S/.

6,367.71

100.00%

07.16.05

ELIMINACION MATERIAL EXCEDENTE C/EQUIPO T.N. TUB. 400 MM HASTA R=5 KM

167.00 S/.

11.27 S/.

1,882.09

0.00%

S/.

0.00%

S/.

S/.

0.00%

167.00 S/.

1,882.09

100.00%

07.16.06

BUZON TIPO I TERRENO NORMAL HASTA 4.00 M. PROF.

3.00 S/.

2,961.19 S/.

8,883.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00 S/.

8,883.57

100.00%

07.17

und

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

07.17.01

TUBERIA ACERO NEGRO SCH-40 DE 16" (400 MM.)

25.00 S/.

635.29 S/.

15,882.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00 S/.

15,882.25

100.00%

07.17.02

TUBERIA ACERO NEGRO SCH-40 DE 18" (450 MM.)

15.00 S/.

860.52 S/.

12,907.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00 S/.

12,907.80

100.00%

07.17.03

TUBERIA P.V.C. DESAGUE U.F. SERIES S-20 16" (400 MM.)

100.00 S/.

148.98 S/.

14,898.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00 S/.

14,898.00

100.00%

07.17.04

INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA HIDRAULICA

100.00 S/.

4.19 S/.

419.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00 S/.

419.00

100.00%

07.17.05

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS TAPADA

100.00 S/.

4.84 S/.

484.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00 S/.

484.00

100.00%

07.18

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

07.18.01

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 16" (400 MM)

und

10.00 S/.

247.20 S/.

2,472.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00 S/.

2,472.00

100.00%

07.18.02

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 18" (450 MM)

und

8.00 S/.

266.40 S/.

2,131.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

8.00 S/.

2,131.20

100.00%

07.18.03

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 16" (400MM)

und

1.00 S/.

247.20 S/.

247.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

247.20

100.00%

07.18.04

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 18" (450MM)

und

1.00 S/.

266.40 S/.

266.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

266.40

100.00%

07.18.05

CODO FO. FDO. BRIDADO 16"X90 (400 MM)

und

2.00 S/.

986.40 S/.

1,972.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00 S/.

1,972.80

100.00%

07.18.06

CODO FO. FDO. BRIDADO 18"X90 (450 MM)

und

2.00 S/.

1,310.40 S/.

2,620.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00 S/.

2,620.80

100.00%

07.18.07

REDUCCION FO. FDO. BRIDADA DE 450 X 400 MM.

1.00 S/.

966.30 S/.

966.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

966.30

100.00%

07.18.08

TEE FO. FDO. BRIDADA DE 400X400 MM

und

1.00 S/.

1,547.40 S/.

1,547.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

1,547.40

100.00%

07.18.09

TEE FO. FDO. BRIDADA DE 450X450 MM

und

1.00 S/.

1,964.70 S/.

1,964.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

1,964.70

100.00%

07.19

SUMINISTRO E INSTALACION DE VALVULAS

S/.

07.19.01

MEDIDOR DE CAUDAL TIPO TUBULAR BRIDADO 18"

und

1.00 S/.

18,500.00 S/.

18,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

18,500.00

100.00%

07.19.02

VALVULA MARIPOSA F. FDO. BRIDADA DE 400 MM (16")

und

3.00 S/.

8,643.63 S/.

25,930.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00 S/.

25,930.89

100.00%

07.19.03

VALVULA MARIPOSA F. FDO. BRIDADA DE 450 MM (18")

und

1.00 S/.

11,241.81 S/.

11,241.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

11,241.81

100.00%

07.19.04

VALVULA DE ALTITUD FO. FDO. DE 16" BB.

und

1.00 S/.

17,727.27 S/.

17,727.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

17,727.27

100.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

2,103.09

100.00%

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00 S/.

16,350.00

100.00%

0.00%

0.00%

0.00%

100.00%

07.20
07.20.01
07.21
07.21.01
07.22
07.22.01

CAJAS PARA REBOSE


CAJA REBOSE-LIMPIA TERRENO ROCA

S/.
und

1.00 S/.

2,103.09 S/.

EQUIPOS
SUMINISTRO EQUIPO CLORINADOR INYECCION C/ACC., CILINDROS, BALANZA,
MASCARA Y BOOSTER S/ESPECIFICACIONES

S/.
und

1.00 S/.

16,350.00 S/.

MONTAJE DE INSTALACIONES HIDRAULICAS


MONTAJE DE INSTALACIONES HIDRAULICA DE RESERVORIO APOYODO

S/.
und

1.00 S/.

4,857.98 S/.

COSTO DIRECTO

CD

GASTOS GENERALES
UTILIDAD
SUB TOTAL

IMPUESTO IGV

2,103.09
16,350.00
4,857.98

S/.

1.00 S/.

4,857.98

531,170.70

S/.

345,657.47

S/.

53,117.07

S/.

34,565.75

S/.

26,558.54

S/.

17,282.87

S/.

610,846.31

S/.

397,506.09

359,537.22

S/.

171,633.49

S/.

GG

87,682.83

S/.

35,953.72

S/.

17,163.35

UU

43,841.41

S/.

17,976.86

S/.

8,581.67

ST

1,008,352.40

S/.

413,467.80

S/.

197,378.51

1,008,352.40

MONTO CONTRACTUAL

S/.

S/.

IGV%

TOTAL PRESUPUESTO

S/.

876,828.17

FACTOR DE RELACIN ( FR )

S/.

P_T

% AVANCE
ANTERIOR

41.00%

% AVANCE
ACTUAL

19.57%

% AVANCE
ACUMULADO

60.58%

% SALDO
EJECUTAR

S/.

413,467.80

S/.

197,378.51

S/.

610,846.31

S/.

397,506.09

181,503.43

S/.

74,424.20

S/.

35,528.13

S/.

109,952.34

S/.

71,551.10

1,189,855.83

S/.

487,892.00

S/.

232,906.64

S/.

720,798.65

S/.

469,057.19

1,189,855.83

S/.

487,892.00

S/.

232,906.64

S/.

720,798.65

S/.

469,057.19

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

ING. MARCIA MARTOS HERNANDEZ

ING. JULIO FELIX VALERIANO MURGA

CIP:52774

CIP:63638

39.42%

4.SISTEMA DE ALCANTARILLADO-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 al 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

08
08.01
08.01.01
08.01.02

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

SALD

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

COLECTORES PRINCIPALES DESAGUE


OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE
OBRA)

und

60.00 S/.

30.30 S/.

1,818.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

und

100.00 S/.

15.00 S/.

1,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

40.00 S/.

34.00 S/.

1,360.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

13,069.74 S/.

0.86 S/.

11,239.98

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74
30.00

08.01.03

TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO

08.01.04

CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

08.01.05

PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

30.00 S/.

78.59 S/.

2,357.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

08.01.06

PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

10.00 S/.

275.65 S/.

2,756.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

08.01.07

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

13,069.74 S/.

0.69 S/.

9,018.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

13,069.74 S/.

1.04 S/.

13,592.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

13,069.74

08.01.08
08.02

und
m

EXCAVACIONES DE ZANJAS

S/.

08.02.01

EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.00M P/TUB. 200 MM. C/O

461.00 S/.

22.86 S/.

10,538.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.02.02

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 250 MM.

4,382.11 S/.

14.29 S/.

62,620.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.02.03

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 300 MM.

1,432.96 S/.

15.25 S/.

21,852.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.02.04

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 350 MM.

3,598.80 S/.

16.33 S/.

58,768.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.02.05

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 400 MM.

3,194.87 S/.

17.59 S/.

56,197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.87

08.03

REFINE Y NIVELACION DE ZANJAS

S/.

08.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 250 MM.

4,382.11 S/.

1.72 S/.

7,537.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.03.02

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 315 MM.

1,432.96 S/.

2.06 S/.

2,951.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.03.03

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 355 MM.

3,598.80 S/.

2.30 S/.

8,277.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.03.04

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 400 MM.

3,194.97 S/.

2.58 S/.

8,243.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

08.03.05

REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.

461.00 S/.

1.59 S/.

732.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.04

CAMA DE APOYO

S/.

08.04.01

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

461.00 S/.

3.63 S/.

1,673.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.04.02

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 25O MM.

4,382.11 S/.

4.75 S/.

20,815.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.04.03

CAMA DE GRAVA E=0.10 M ZANJA P/TUB. 315MM

1,432.96 S/.

5.98 S/.

8,569.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.04.04

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 355 MM.

3,598.80 S/.

5.51 S/.

19,829.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.04.05

CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 40O MM.

3,194.97 S/.

5.37 S/.

17,156.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

08.05

RELLENO DE ZANJAS

S/.

08.05.01

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.0 M.

461.00 S/.

39.43 S/.

18,177.23

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.05.02

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 250 MM H=3.0 M.

4,382.11 S/.

39.26 S/.

172,041.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.05.03

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 300 MM H=3.0 M.

1,432.96 S/.

47.27 S/.

67,736.02

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.05.04

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 350 MM H=3.0 M.

3,598.80 S/.

46.06 S/.

165,760.73

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.05.05

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 400 MM H=3.0 M.

3,194.97 S/.

52.93 S/.

169,109.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,655.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

6,500.00

08.06
08.06.01
08.07
08.07.01
08.08

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

S/.
m3

2,655.25 S/.

ENTIBADOS Y/O TABLESTACADOS


ENTIBADO CORRIDO DE ZANJAS HASTA 3.00 PROF.

12.23 S/.
S/.

6,500.00 S/.

BUZONES Y CAMARAS

78.26 S/.
S/.

32,473.71
508,690.00
-

08.08.01

BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.

und

17.00 S/.

1,743.73 S/.

29,643.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.00

08.08.02

BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.

und

166.00 S/.

2,203.69 S/.

365,812.54

0.00%

S/.

0.00%

S/.

S/.

0.00%

166.00

08.08.03

BUZON TIPO I TERRENO NORMAL HASTA 5.00 M. PROF.

und

4.00 S/.

3,494.49 S/.

13,977.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

08.08.04

BUZON TIPO I TERRENO NORMAL HASTA 6.00 M. PROF.

und

3.00 S/.

3,997.38 S/.

11,992.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

08.08.05

BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.

und

7.00 S/.

2,969.37 S/.

20,785.59

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

08.08.06

BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.

und

2.00 S/.

3,493.40 S/.

6,986.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

4.SISTEMA DE ALCANTARILLADO-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 al 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

08.09

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

SALD

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

SUMINISTRO E INSTALACION DE TUBERIAS

ACTUAL

S/.

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

08.09.01

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 8" (200 MM)

461.00 S/.

44.57 S/.

20,546.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.09.02

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 10" (250 MM)

4,382.11 S/.

63.21 S/.

276,993.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.09.03

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 12" (315 MM)

1,432.96 S/.

95.14 S/.

136,331.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.09.04

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 14" (355 MM)

3,598.80 S/.

108.41 S/.

390,145.91

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.09.05

TUBERIA P.V.C. DESAGUE U.F. SERIE S-20 16" (400 MM)

3,194.97 S/.

140.63 S/.

449,308.63

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

08.09.06

INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA

461.00 S/.

3.56 S/.

1,641.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.09.07

INSTALACION TUBERIA PVC DESAGUE U.F. 10" (250 MM) INC. PRUEBA HIDRAULICA

4,382.11 S/.

3.53 S/.

15,468.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.09.08

INSTALACION TUBERIA PVC DESAGUE U.F. 12" (315 MM) INC. PRUEBA HIDRAULICA

1,432.96 S/.

3.93 S/.

5,631.53

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.09.09

INSTALACION TUBERIA PVC DESAGUE U.F. 14" (355 MM) INC. PRUEBA HIDRAULICA

3,598.80 S/.

4.05 S/.

14,575.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.09.10

INSTALACION TUBERIA PVC DESAGUE U.F. 16" (400 MM) INC. PRUEBA HIDRAULICA

3,194.97 S/.

4.19 S/.

13,386.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

08.09.11

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA

461.00 S/.

2.36 S/.

1,087.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

461.00

08.09.12

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 250 MM. ZANJAS TAPADA

4,382.11 S/.

1.93 S/.

8,457.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

4,382.11

08.09.13

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 300 MM. ZANJAS TAPADA

1,432.96 S/.

2.66 S/.

3,811.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,432.96

08.09.14

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 350 MM. ZANJAS TAPADA

3,598.80 S/.

4.12 S/.

14,827.06

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,598.80

08.09.15

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 400 MM. ZANJAS TAPADA

3,194.97 S/.

4.84 S/.

15,463.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,194.97

09
09.01
09.01.01
09.01.02

REDES SECUNDARIAS DESAGUE

S/.

OBRAS PRELIMINARES
SEALIZACION, DEVIO DE TRANSITO Y PROTECCION DE OBRA
CONO FIBRA DE VIDRIO FOSFORECENTE S/D PARA DEVIO TRANSITO (PROV. DURANTE
OBRA)

S/.

und

100.00 S/.

30.30 S/.

3,030.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

100.00

und

80.00 S/.

15.00 S/.

1,200.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

80.00

und

60.00 S/.

34.00 S/.

2,040.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

39,138.76 S/.

0.86 S/.

33,659.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

39,138.76

09.01.03

TRANQUERA DE MADERA 1.20X1.10 M. PROVISIONAL PARA DESVIO DE TRANSITO

09.01.04

CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC. POSTES

09.01.05

PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

25.00 S/.

78.59 S/.

1,964.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

09.01.06

PUENTE DE MADERA PARA PASE VEHICULAR S/ZANJA S/D (PROV. DURANTE LA OBRA)

und

40.00 S/.

275.65 S/.

11,026.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

40.00

09.01.07

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

39,138.76 S/.

0.69 S/.

27,005.74

100.00%

S/.

0.00%

S/.

09.01.08

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

39,138.76 S/.

1.04 S/.

40,704.31

0.00%

S/.

0.00%

S/.

S/.

0.00%

39,138.76

09.02

EXCAVACIONES DE ZANJAS

S/.

39,138.76

27,005.74

39,138.76 S/.

27,005.74

100.00%

09.02.01

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=1.50M P/TUB. 200 MM.

15,012.91 S/.

9.14 S/.

137,218.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

15,012.91

09.02.02

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.00M P/TUB. 200 MM.

9,383.07 S/.

11.43 S/.

107,248.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

9,383.07

09.02.03

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=2.50M P/TUB. 200 MM.

7,506.45 S/.

14.29 S/.

107,267.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,506.45

09.02.04

EXCAV. ZANJAS C/EQ. P/ALCAN. T. NATURAL H=3.00M P/TUB. 200 MM.

5,629.84 S/.

19.05 S/.

107,248.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,629.84

09.02.05

EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=3.50M P/TUB. 200 MM. C/O

963.90 S/.

32.58 S/.

31,403.86

0.00%

S/.

0.00%

S/.

S/.

0.00%

963.90

09.02.06

EXCAV. ZANJAS C/EQ. P/ALCAN. R. SUELTA TIPO I H=4.00M P/TUB. 200 MM. C/O

642.60 S/.

43.45 S/.

27,920.97

0.00%

S/.

0.00%

S/.

S/.

0.00%

642.60

09.03

REFINE Y NIVELACION DE ZANJAS

S/.

09.03.01

REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB 200 MM.

37,532.26 S/.

1.72 S/.

64,555.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

37,532.26

09.03.02

REFINE Y NIVELACION FONDO DE ZANJA TRS P/TUB 200 MM.

1,606.50 S/.

1.59 S/.

2,554.34

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,606.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

39,138.76

09.04
09.04.01
09.05

CAMA DE APOYO
CAMA DE ARENA E=0.10 M. ZANJA P/TUB. 20O MM.

S/.
m

39,138.76 S/.

RELLENO DE ZANJAS

3.63 S/.
S/.

142,073.70
-

09.05.01

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=1.50 M.

15,012.91 S/.

13.88 S/.

208,379.19

0.00%

S/.

0.00%

S/.

S/.

0.00%

15,012.91

09.05.02

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.0 M.

9,383.07 S/.

14.03 S/.

131,644.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

9,383.07

09.05.03

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=2.50 M.

7,506.45 S/.

25.24 S/.

189,462.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,506.45

09.05.04

RELLENO ZANJA COMPACT. C/EQ. TN P/TUB 200 MM H=3.00 M.

5,629.84 S/.

31.16 S/.

175,425.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,629.84

09.05.05

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=3.5 M.

963.90 S/.

45.85 S/.

44,194.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

963.90

09.05.06

RELLENO ZANJA COMPACT. C/EQ. TSR P/TUB 200 MM H=4.0 M.

642.60 S/.

52.14 S/.

33,505.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

642.60

4.SISTEMA DE ALCANTARILLADO-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 al 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

09.06
09.06.01
09.07

METRADO
S/.

m3

5,450.85 S/.

BUZONES Y CAMARAS

ACTUAL

SALD

ACUMULADO

COSTO PARCIAL

CANTIDAD

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

12.23 S/.
S/.

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

66,663.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

5,450.85

09.07.01

BUZON TIPO I TERRENO NORMAL HASTA 1.5 M. PROF.

und

328.00 S/.

1,581.98 S/.

518,889.44

0.00%

S/.

0.00%

S/.

S/.

0.00%

328.00

09.07.02

BUZON TIPO I TERRENO NORMAL HASTA 2.00 M. PROF.

und

105.00 S/.

1,743.73 S/.

183,091.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

105.00

09.07.03

BUZON TIPO I TERRENO NORMAL HASTA 2.5 M. PROF.

und

58.00 S/.

1,940.82 S/.

112,567.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

58.00

09.07.04

BUZON TIPO I TERRENO NORMAL HASTA 3.00 M. PROF.

und

24.00 S/.

2,203.69 S/.

52,888.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

24.00

09.07.05

BUZON TIPO I ROCA SUELTA HASTA 3.50 M. PROF.

und

26.00 S/.

2,622.71 S/.

68,190.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.00

09.07.06

BUZON TIPO I ROCA SUELTA HASTA 4.00 M. PROF.

und

3.00 S/.

2,969.37 S/.

8,908.11

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

09.07.07

BUZON TIPO I ROCA SUELTA HASTA 5.00 M. PROF.

und

5.00 S/.

3,493.40 S/.

17,467.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

09.07.08

BUZON TIPO I ROCA SUELTA HASTA 6.00 M. PROF.

und

1.00 S/.

4,009.62 S/.

4,009.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

09.07.09

DEMOLICION DE BUZONES EXISTENTES (PROMEDIO)

und

9.00 S/.

412.66 S/.

3,713.94

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.00

09.08

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

09.08.01

TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 8" (200 MM)

19,569.38 S/.

32.78 S/.

641,484.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

09.08.02

TUBERIA P.V.C. DESAGUE U.F. SERIE S-25 6" (160 MM)

19,569.38 S/.

21.77 S/.

426,025.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

09.08.03

INSTALACION TUBERIA PVC DESAGUE U.F. 8" (200 MM) INC. PRUEBA HIDRAULICA

19,569.38 S/.

3.56 S/.

69,666.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

09.08.04

INSTALACION TUBERIA PVC DESAGUE U.F. 6" (160 MM) INC. PRUEBA HIDRAULICA

19,569.38 S/.

3.56 S/.

69,666.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

09.08.05

PRUEBA HIDRAULICA +ESCORRENT. TUBERIAS 200 MM. ZANJAS TAPADA

19,569.38 S/.

2.36 S/.

46,183.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

09.08.06

PRUEBA HIDRAULICA + ESCORRENT. TUBERIAS 160 MM. ZANJAS TAPADA

19,569.38 S/.

2.36 S/.

46,183.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

19,569.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

09.09
09.09.01
09.10

EMPALMES
EMPALMES DE TUBERIAS DE 8"-10" A BUZON EXISTENTE EN SERVICIO

S/.
und

18.00 S/.

ROTURA Y REPOSICION DE PAVIMENTOS

217.83 S/.
S/.

3,920.94
-

09.10.01

BASE AFIRMADA P/PISTA E=0.20 M. CON EQUIPO

m2

180.00 S/.

21.34 S/.

3,841.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

09.10.02

CARPETA ASFALTICA EN FRIO E=5.00 CM.

m2

180.00 S/.

45.31 S/.

8,155.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

09.10.03

ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO DE DISCO E=5.00 CM.

m2

180.00 S/.

20.82 S/.

3,747.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

4.SISTEMA DE ALCANTARILLADO-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 al 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO 2015

VALORIZACIN DE LA OBRA N 02

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

09.10.04

ELIMINACION DE DESMONTE PROVENIENTE DEMOLICION PAVIMENTACION PAVIMENTOS


D=5 KM.

10

CONEXIONES DOMICILIARIAS DESAGUE

10.01

CONEXION DOMICIL. DESAGUE TUBO PVC U.F. S-25 6" T.N. 4.00-8.00M INC. PRUEBA
HIDRAULICA

11

OTROS

11.01
11.01.01

m3

METRADO

9.00 S/.

11.27 S/.
S/.
S/.

und

3,599.00 S/.

398.89 S/.
S/.

DERIVACION DE AGUAS

S/.

TRANSBASE DE AGUA SERVIDAS

25,997.13 S/.

ACTUAL

SALD

ACUMULADO

COSTO PARCIAL

CANTIDAD

CONEXIONES DOMICILIARIAS

10.01.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

101.43

% AVANCE
-

1,435,605.11

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

S/.

0.00%

S/.

S/.

0.00%

9.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3,599.00

0.00%

0.00%

25,997.13

7.31 S/.

190,039.02

S/.

S/.

8,912,017.31

0.00%

S/.

S/.

27,005.74

S/.

S/.

S/.

27,005.74
2,700.57

COSTO DIRECTO

CD

GASTOS GENERALES

GG

891,201.73

S/.

2,700.57

S/.

S/.

UTILIDAD

UU

445,600.87

S/.

1,350.29

S/.

S/.

1,350.29

SUB TOTAL

ST

10,248,819.91

S/.

31,056.61

S/.

S/.

31,056.60

S/.

31,056.61

S/.

S/.

31,056.60

FACTOR DE RELACIN ( FR )
IMPUESTO IGV
TOTAL PRESUPUESTO
MONTO CONTRACTUAL

10,248,819.91

% AVANCE
ANTERIOR

METRADO

0.00%

0.30%

% AVANCE ACTUAL

0.00%

% AVANCE ACUMULADO

IGV%

1,844,787.58

S/.

5,590.19

S/.

S/.

5,590.19

P_T

12,093,607.49

S/.

36,646.80

S/.

S/.

36,646.79

12,093,607.49

S/.

36,646.80

S/.

S/.

36,646.79

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP:52774

0.30%

% SALDO
EJECUTAR

SUPERVISOR DE OBRA

ING. JULIO FELIX VALERIANO MUR


CIP:63638

NTARILLADO-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

1,818.00

100.00%

S/.

1,500.00

100.00%

S/.

1,360.00

100.00%

S/.

11,239.98

100.00%

S/.

2,357.70

100.00%

S/.

2,756.50

100.00%

S/.

9,018.12

100.00%

S/.

13,592.53

100.00%

S/.

10,538.46

100.00%

S/.

62,620.35

100.00%

S/.

21,852.64

100.00%

S/.

58,768.40

100.00%

S/.

56,197.76

100.00%

S/.

7,537.23

100.00%

S/.

2,951.90

100.00%

S/.

8,277.24

100.00%

S/.

8,243.02

100.00%

S/.

732.99

100.00%

S/.

1,673.43

100.00%

S/.

20,815.02

100.00%

S/.

8,569.10

100.00%

S/.

19,829.39

100.00%

S/.

17,156.99

100.00%

S/.

18,177.23

100.00%

S/.

172,041.64

100.00%

S/.

67,736.02

100.00%

S/.

165,760.73

100.00%

S/.

169,109.76

100.00%

S/.

32,473.71

100.00%

S/.

508,690.00

100.00%

S/.

29,643.41

100.00%

S/.

365,812.54

100.00%

S/.

13,977.96

100.00%

S/.

11,992.14

100.00%

S/.

20,785.59

100.00%

S/.

6,986.80

100.00%

NTARILLADO-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

20,546.77

100.00%

S/.

276,993.17

100.00%

S/.

136,331.81

100.00%

S/.

390,145.91

100.00%

S/.

449,308.63

100.00%

S/.

1,641.16

100.00%

S/.

15,468.85

100.00%

S/.

5,631.53

100.00%

S/.

14,575.14

100.00%

S/.

13,386.92

100.00%

S/.

1,087.96

100.00%

S/.

8,457.47

100.00%

S/.

3,811.67

100.00%

S/.

14,827.06

100.00%

S/.

15,463.65

100.00%

S/.

3,030.00

100.00%

S/.

1,200.00

100.00%

S/.

2,040.00

100.00%

S/.

33,659.33

100.00%

S/.

1,964.75

100.00%

S/.

11,026.00

100.00%

S/.

0.00%

S/.

40,704.31

100.00%

S/.

137,218.00

100.00%

S/.

107,248.49

100.00%

S/.

107,267.17

100.00%

S/.

107,248.45

100.00%

S/.

31,403.86

100.00%

S/.

27,920.97

100.00%

S/.

64,555.49

100.00%

S/.

2,554.34

100.00%

S/.

142,073.70

100.00%

S/.

208,379.19

100.00%

S/.

131,644.47

100.00%

S/.

189,462.80

100.00%

S/.

175,425.81

100.00%

S/.

44,194.82

100.00%

S/.

33,505.16

100.00%

NTARILLADO-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

66,663.90

100.00%

S/.

518,889.44

100.00%

S/.

183,091.65

100.00%

S/.

112,567.56

100.00%

S/.

52,888.56

100.00%

S/.

68,190.46

100.00%

S/.

8,908.11

100.00%

S/.

17,467.00

100.00%

S/.

4,009.62

100.00%

S/.

3,713.94

100.00%

S/.

641,484.28

100.00%

S/.

426,025.40

100.00%

S/.

69,666.99

100.00%

S/.

69,666.99

100.00%

S/.

46,183.74

100.00%

S/.

46,183.74

100.00%

S/.

3,920.94

100.00%

S/.

3,841.20

100.00%

S/.

8,155.80

100.00%

S/.

3,747.60

100.00%

NTARILLADO-VALORIZACION N02
LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

101.43

100.00%

S/.

1,435,605.11

100.00%

100.00%

S/.

190,039.02

S/.

8,885,011.57

S/.

888,501.16

S/.

444,250.58

S/.

10,217,763.31

S/.

10,217,763.31

S/.

1,839,197.39

S/.

12,056,960.70

S/.

12,056,960.70

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP:63638

99.70%

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

12
12.01

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

CAMARA DE BOMBEO DESAGUE CDP-01


OBRAS PRELIMINARES

S/.

12.01.01

TRAZO Y REPLANTEO INICALES DEL PROYECTO DE OBRA

1,225.00 S/.

0.69 S/.

845.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,225.00

12.01.02

TRAZO Y REPLANTEO FINALES DEL PROYECTO DE OBRA

1,225.00 S/.

1.04 S/.

1,274.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,225.00

12.02

MOVIMIENTO DE TIERRAS

S/.

12.02.01

EXCAVACION MANUAL EN TERRENO NORMAL

m3

134.22 S/.

29.48 S/.

3,956.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

134.22

12.02.02

EXCAVACION EN TERRENO SATURADO MANUAL

m3

442.60 S/.

85.26 S/.

37,736.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

442.60

12.02.03

REFINE, NIVELACION Y COMPACTADO EN TERRENO NORMAL

m2

45.96 S/.

3.25 S/.

149.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

45.96

12.02.04

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO

m3

51.24 S/.

73.95 S/.

3,789.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

51.24

12.02.05

ELIMINACION DESMONTE, CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R=10 KM)

m3

632.74 S/.

10.99 S/.

6,953.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

632.74

BOMBEO DE AGUA EN TERRENO SATURADO C/MOTOBOMBA MANG. 4"

hm

168.00 S/.

65.05 S/.

10,928.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

168.00

12.02.06
12.03

OBRAS DE CONCRETO SIMPLE

S/.

12.03.01

CONCRETO F'c=140KG/CM2+30%P.G. P/CIMIENTO CORRIDO (CMTO PV)

m3

17.58 S/.

321.44 S/.

5,650.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.58

12.03.02

CONCRETO F'c=100KG/CM2 P/SOLADOS Y/O SUB BASE (CEMENTO PV)

m3

0.40 S/.

273.67 S/.

109.47

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.40

12.03.03

ENCOFRADO Y DESENCOFRADO P/SOLADOS Y/O SUB BASES

m2

0.53 S/.

15.41 S/.

8.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

0.53

12.03.04

CONCRETO F'c=140KG/CM2+25%P.G. P/SOBRECIMIENTO (CEMENTO PV)

m3

2.80 S/.

326.49 S/.

914.17

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.80

12.03.05

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

m2

25.00 S/.

28.30 S/.

707.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.03.06

CONCRETO f'c=280 kg/cm2 P/GRADAS Y/O PISO SIMPLE

m3

10.59 S/.

398.13 S/.

4,216.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.59

12.03.07

ENCOFRADO Y DESENCOFRADO P/GRADAS Y/O PISOS

m2

2.79 S/.

40.09 S/.

111.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.79

12.04

OBRAS DE CONCRETO ARMADO

S/.

12.04.01

CONCRETO f'c=280 kg/cm2 P/LOSAS DE FONDO-PISO

m3

9.80 S/.

428.76 S/.

4,201.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

9.80

12.04.02

ACERO ESTRUCTURAL TRABAJADO P/LOSAS DE FONDO

kg

2,627.91 S/.

4.76 S/.

12,508.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

2,627.91

12.04.03

CONCRETO f'c=280 kg/cm2 P/MUROS REFORZADOS (CMTO. PV)

m3

110.29 S/.

512.68 S/.

56,543.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

110.29

12.04.04

ENCOFRADO Y DESENCOFRADO P/MUROS CILINDRICOS DE CUBA

m2

604.18 S/.

55.62 S/.

33,604.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

604.18

12.04.05

ACERO ESTRUCTURAL TRABAJADO P/MUROS REFORZADOS

kg

7,581.80 S/.

4.76 S/.

36,089.37

0.00%

S/.

0.00%

S/.

S/.

0.00%

7,581.80

12.04.06

CONCRETO f'c=210 kg/cm2 P/COLUMNAS

m3

5.93 S/.

392.58 S/.

2,328.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.93

12.04.07

ENCOFRADO Y DESENCOFRADO P/COLUMNAS

m2

74.27 S/.

46.89 S/.

3,482.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

74.27

12.04.08

ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS

kg

826.80 S/.

4.76 S/.

3,935.57

0.00%

S/.

0.00%

S/.

S/.

0.00%

826.80

12.04.09

CONCRETO f'c=210 kg/cm2 P/VIGAS Y DINTELES

m3

6.83 S/.

357.43 S/.

2,441.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.83

12.04.10

ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES

m2

60.18 S/.

46.24 S/.

2,782.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.18

12.04.11

ACERO ESTRUCTURAL TRABAJADO P/VIGAS Y DINTELES

kg

617.50 S/.

4.76 S/.

2,939.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

617.50

12.04.12

CONCRETO f'c=210 kg/cm2 P/LOSAS MACIZAS

m3

8.72 S/.

340.24 S/.

2,966.89

0.00%

S/.

0.00%

S/.

S/.

0.00%

8.72

12.04.13

CONCRETO f'c=280 kg/cm2 P/LOSAS MACIZAS (CEMENTO PV)

m3

7.27 S/.

482.23 S/.

3,505.81

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.27

12.04.14

ENCOFRADO Y DESENCOFRADO P/LOSAS MACIZAS

m2

98.38 S/.

56.93 S/.

5,600.77

0.00%

S/.

0.00%

S/.

S/.

0.00%

98.38

12.04.15

ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACIZAS

kg

1,204.34 S/.

4.76 S/.

5,732.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

1,204.34

12.04.16

CONCRETO f'c=210 kg/cm2 P/LOSAS ALIGERADAS

m3

4.55 S/.

313.94 S/.

1,428.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.55

12.04.17

ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS

m2

52.00 S/.

43.57 S/.

2,265.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

12.04.18

ACERO ESTRUCTURAL TRABAJADO P/LOSAS ALIGERADAS

kg

273.00 S/.

4.76 S/.

1,299.48

0.00%

S/.

0.00%

S/.

S/.

0.00%

273.00

12.04.19

LADRILLOS DE ARCILLA PARA TECHO 15X30X30 CM.

und

434.00 S/.

2.78 S/.

1,206.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

434.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

152.18

12.05
12.05.01
12.06

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE LADRILLO K.K. ARC. DE CABEZA MEZCL. 1:4 1:5 CM

S/.
m2

152.18 S/.

REVOQUES Y ENLUCIDOS

72.19 S/.
S/.

10,985.87
-

12.06.01

TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5

m2

14.40 S/.

17.70 S/.

254.88

0.00%

S/.

0.00%

S/.

S/.

0.00%

14.40

12.06.02

TARRAJEO MUROS INT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

160.00 S/.

21.73 S/.

3,476.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

160.00

12.06.03

TARRAJEO MUROS EXT. FROTACHADO C/MORT. 1:5X1.5 CM (INCL. COLUMNAS EMPOT.)

m2

148.17 S/.

25.25 S/.

3,741.29

0.00%

S/.

0.00%

S/.

S/.

0.00%

148.17

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.06.04

TARRAJEO DE SUPERFICIE DE COLUMNAS INDEPENDIENTES (EN INTERIOS)

m2

15.51 S/.

13.97 S/.

216.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.51

12.06.05

TARRAJEO DE SUPERFICIE DE VIGAS PERALTADAS-INDEPENDIENTES (EN INTERIOS)

m2

12.63 S/.

18.87 S/.

238.33

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.63

12.06.06

TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3 E=1.5 CM

m2

33.55 S/.

18.80 S/.

630.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

33.55

m2

282.64 S/.

38.78 S/.

10,960.78

0.00%

S/.

0.00%

S/.

S/.

0.00%

282.64

m2

26.71 S/.

20.43 S/.

545.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

26.71

0.00%

S/.

0.00%

S/.

S/.

0.00%

96.25

12.06.07
12.06.08
12.07
12.07.01
12.08

TARRAJEO C/IMPERM. DOS CAPAS MUROS INTERIORMENTE M=1:3 E=2.0 CM Y M=1:2


E=0.5 CM.
TARRAJEO C/IMPERM. CIELO RASO INT. M=1:3 E=1.5 CM
CIELO RASOS
CIELO RASOS INCL. VIGAS EMPOT. C/MORTERO 1:5X1.5 CM

S/.
m2

96.25 S/.

PISOS Y PAVIMENTOS

22.41 S/.
S/.

2,156.96
-

12.08.01

FALSO PISO DE 4" CONCRETO 1:8 (CEMENTO P-II)

m2

52.00 S/.

30.41 S/.

1,581.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

12.08.02

CONTRAPISO CON MORTERO 1:5 DE 40 MM.

m2

12.00 S/.

15.81 S/.

189.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.08.03

PISO DE LOSETA CERAMICA BLANCO DE 20X20 CM.

m2

12.00 S/.

53.97 S/.

647.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.08.04

PISO DE CONCRETO DE 2" ACABADO FROTACHADO

m2

52.00 S/.

19.01 S/.

988.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

14.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

99.88

12.09
12.09.01
12.10
12.10.01
12.11

ZOCALOS
ZOCALO DE CERAMICO COLOR ENTERO 0.20X0.30 M

S/.
m2

14.40 S/.

CUBIERTAS
CUBIERTA LAD. PASTELERO ASENT. CON BARRO 3CM+FRAGUA C/MORT. 1:4 JUNTA 1.5 CM.

52.44 S/.
S/.

m2

99.88 S/.

CARPINTERIA METALICA

24.02 S/.
S/.

755.14
2,399.12
-

12.11.01

VENTANA DE FIERRO C/PERFIL DE 1"FIJA+REF. DE 1" CON MALLA

m2

6.33 S/.

174.59 S/.

1,105.15

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.33

12.11.02

PUERTA METALICA LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS

m2

12.68 S/.

280.83 S/.

3,560.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.68

12.11.03

PUERTA C/MARCO DE TUB. FO. GDO. DE 2" Y 4" CON PLANCHA LAC 3/16".

m2

18.00 S/.

313.59 S/.

5,644.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

12.11.04

ESCALERA TUB. FO. GDO. C/PARANTES DE 2" C/PELD. 3/4"

10.00 S/.

121.03 S/.

1,210.30

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

12.11.05

MARCO Y TAPA PLANCHA LAC 1/4" C/MECAN. DE SEGUR. S/DISEO

und

2.00 S/.

359.19 S/.

718.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.11.06

TAPA METALICA DE INSPECCION STANDARD

und

1.00 S/.

123.70 S/.

123.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.11.07

REJILLA PARA ESTACION BOMBEO DESAGUE SEGUN DISEO

und

1.00 S/.

6,035.39 S/.

6,035.39

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.12

CERRAJERIA

S/.

12.12.01

CERRADURA PUERTA PRINCIPAL DE SOBREPONER LLAVE EXT. 2 GOLPES

und

5.00 S/.

90.67 S/.

453.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.12.02

CANDADO INCLUYENDO ALDABAS

und

1.00 S/.

15.00 S/.

15.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.00

12.13
12.13.01
12.14

VIDRIOS Y CRISTALES
SUMINISTRO Y COLOCACION DE VIDRIO SEMIDOBLE

S/.
p2

52.00 S/.

PINTURAS

3.66 S/.
S/.

190.32
-

12.14.01

PINTADO DE CIELO RASOS C/TEKNO MATE O SUPERMATE (SIMILAR)

m2

91.88 S/.

11.19 S/.

1,028.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

91.88

12.14.02

PINTADO DE MURO INTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)

m2

148.17 S/.

12.20 S/.

1,807.67

0.00%

S/.

0.00%

S/.

S/.

0.00%

148.17

12.14.03

PINTADO DE MURO EXTERIOR C/TEKNOMATE O SUPERMATE (SIMILAR)

m2

159.66 S/.

12.04 S/.

1,922.31

0.00%

S/.

0.00%

S/.

S/.

0.00%

159.66

12.14.04

PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)

m2

22.83 S/.

10.47 S/.

239.03

0.00%

S/.

0.00%

S/.

S/.

0.00%

22.83

12.14.05

PINTADO DE VENTANAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE)

m2

6.33 S/.

13.42 S/.

84.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.33

300.00

12.15

VARIOS

S/.

12.15.01

SEMBRIO DE GRASS

m2

300.00 S/.

4.03 S/.

1,209.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.15.02

ALAMO COSTEO

und

20.00 S/.

47.19 S/.

943.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

12.15.03

PROVISION Y COLOCADO DE JUNTA WATER STOP DE NEOPRENO 6"

118.40 S/.

5.38 S/.

636.99

0.00%

S/.

0.00%

S/.

S/.

0.00%

118.40

12.16

APARATOS SANITARIOS Y ACCESORIOS

S/.

12.16.01

INODORO TANQUE BAJO BLANCO INC. ACCESORIOS

und

1.00 S/.

203.55 S/.

203.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.02

LAVATORIO BLANCO 20X17" DE PARED C/GRIFERIA CROM.

und

1.00 S/.

294.87 S/.

294.87

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.03

LLAVE DE DUCHA STANDARD CROMADA INCLUY SALIDA

und

1.00 S/.

71.00 S/.

71.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.04

JABONERA DE LOSA COLOR BLANCO

und

1.00 S/.

9.80 S/.

9.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.05

TOALLERA C/SOPORTES DE LOSA Y BARRA PLASTICA, COLOR BLANCO

und

1.00 S/.

12.90 S/.

12.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.16.06

PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO

und

1.00 S/.

10.70 S/.

10.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.07

GANCHO DE LOSA, COLOR BLANCO TIPO DOBLE

und

1.00 S/.

3.40 S/.

3.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.16.08

INSTALACION DE APARATOS SANITARIOS

und

3.00 S/.

65.92 S/.

197.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.16.09

INSTALACION DE ACCESORIOS SANITARIOS

und

4.00 S/.

11.43 S/.

45.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.17

SISTEMA DE DESAGUE

S/.

12.17.01

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

1.00 S/.

87.35 S/.

87.35

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.02

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

2.00 S/.

72.66 S/.

145.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.17.03

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

1.00 S/.

98.21 S/.

98.21

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.04

RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"

4.00 S/.

14.82 S/.

59.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.17.05

RED DE DERIVACION PVC SAL PARA DESAGUE DE 6"

25.00 S/.

23.18 S/.

579.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.17.06

TRAMPA P PVC DESAGUE SAL 4"

und

1.00 S/.

32.10 S/.

32.10

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.07

PROVISION Y COLOCACION DE SUMIDERO DE BRONCE 4"

und

1.00 S/.

77.92 S/.

77.92

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.17.08

SUMINISTRO E INST. DE CAJA Y TAPA CONCRETO DE 0.30X0.60 M.

und

3.00 S/.

142.14 S/.

426.42

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.18

SISTEMA AGUA FRIA

S/.

12.18.01

SALIDA DE AGUA FRIA DE PVC DE 1/2"

pto

3.00 S/.

78.15 S/.

234.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.18.02

RED DE PVC CLASE A-10 SP DE 3/4"

27.00 S/.

1.15 S/.

31.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

27.00

12.18.03

RED DE PVC CLASE A-10 SP DE 1/2"

5.00 S/.

2.55 S/.

12.75

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.18.04

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"

und

1.00 S/.

39.95 S/.

39.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19

INSTALACIONES ELECTRICAS

S/.

12.19.01

SALIDAD PARA ALUMBRADO DE TECHO. C/TUB. SAP. ALMABRE TW 14 AWG

pto

13.00 S/.

86.79 S/.

1,128.27

0.00%

S/.

0.00%

S/.

S/.

0.00%

13.00

12.19.02

SALIDA PARA ALUMBRADO DE PARED, C/TUB. SAP, ALMABRE TW 14 AWG

pto

16.00 S/.

86.76 S/.

1,388.16

0.00%

S/.

0.00%

S/.

S/.

0.00%

16.00

12.19.03

SALIDAD TOMACORRIENTE DOBLE CON PUESTA A TIERRA, C/TUB. SAP, ALAMBRE TW 12

pto

18.00 S/.

63.97 S/.

1,151.46

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

12.19.04

TUBERIA PVC-SAP ELECTRICA DE 20 mm(3/4")

442.00 S/.

2.56 S/.

1,131.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

442.00

12.19.05

TUBERIA PVC-SAP ELECTRICA DE 25 mm(1")

3.00 S/.

4.83 S/.

14.49

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.19.06

TUBERIA PVC-SAP ELECTRICA DE 35 mm (1 1/4")

21.00 S/.

4.12 S/.

86.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

21.00

12.19.07

TUBERIA PVC-SAP ELECTRICA DE 40 mm (1 1/2")

19.00 S/.

8.14 S/.

154.66

0.00%

S/.

0.00%

S/.

S/.

0.00%

19.00

12.19.08

TUBERIA PVC-SAP ELECTRICA DE 50 mm (2")

56.00 S/.

11.85 S/.

663.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

56.00

12.19.09

TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1/2"

17.50 S/.

2.58 S/.

45.15

0.00%

S/.

0.00%

S/.

S/.

0.00%

17.50

12.19.10

TUBERIA FLEXIBLE CONDUIT CON FORRO DE PVC DE 1 1/2"

52.50 S/.

15.97 S/.

838.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

52.50

12.19.11

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1/2"-3/4"

459.50 S/.

2.12 S/.

974.14

0.00%

S/.

0.00%

S/.

S/.

0.00%

459.50

12.19.12

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 1"-1 1/2"

95.50 S/.

2.32 S/.

221.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

95.50

12.19.13

INSTALAC. DE TUBERIA EMPOTRADA DE PVC 2"-3"

56.00 S/.

2.55 S/.

142.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

56.00

12.19.14

CABLE ELECTRO TW AWG-MCM NO. 14-2.5 MM2

15.00 S/.

2.77 S/.

41.55

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

12.19.15

CABLE ELECTRO TW AWG-MCM NO. 8-10.0 MM2

53.00 S/.

7.80 S/.

413.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

53.00

12.19.16

CABLE ELECTRO TW AWG-MCM NO. 4-25.0 MM2

309.00 S/.

16.85 S/.

5,206.65

0.00%

S/.

0.00%

S/.

S/.

0.00%

309.00

12.19.17

CABLE ELECTRO THW AWG-MCM NO. 14-2.5 MM2

232.00 S/.

2.08 S/.

482.56

0.00%

S/.

0.00%

S/.

S/.

0.00%

232.00

12.19.18

CABLE ELECTRO THW AWG-MCM NO. 12-4.0 MM2

438.00 S/.

2.77 S/.

1,213.26

0.00%

S/.

0.00%

S/.

S/.

0.00%

438.00

12.19.19

CABLE ELECTRO THW AWG-MCM NO. 10-6.0 MM2

108.00 S/.

2.12 S/.

228.96

0.00%

S/.

0.00%

S/.

S/.

0.00%

108.00

12.19.20

CABLE ELECTRO THW AWG-MCM NO. 8-10.0 MM2

36.00 S/.

3.14 S/.

113.04

0.00%

S/.

0.00%

S/.

S/.

0.00%

36.00

12.19.21

CABLE ELECTRO THW AWG-MCM NO. 6-16.0 MM2

108.00 S/.

4.48 S/.

483.84

0.00%

S/.

0.00%

S/.

S/.

0.00%

108.00

12.19.22

CABLE ELECTRICO SUBCAB 4X4.0 MM2

84.00 S/.

8.67 S/.

728.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

12.19.23

CABLE ELECTRICO SUBCAB 7X2.5 MM2

84.00 S/.

18.55 S/.

1,558.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

12.19.24

CABLE ELECTRO APANTALLADO 2X16 AWG

180.00 S/.

5.55 S/.

999.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

180.00

12.19.25

CABLE ELECTRICO NYY 1X6 MM2

348.00 S/.

2.37 S/.

824.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

348.00

12.19.26

CABLE ELECTRICO NYY 1X35 MM2

84.00 S/.

10.80 S/.

907.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

84.00

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

COSTO UNITARIO
UND.

12.19.27
12.19.28

TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 6 CIRCUITOS SEGUN


ESPEFICICACIONES
TABLERO ELECTRICO GABINETE METAL P/DISTR. DE 10 CIRCUITOS SEGUN
ESPEFICICACIONES

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

und

1.00 S/.

576.69 S/.

576.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

799.69 S/.

799.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.29

TABLERO GENERAL "TG-1" SEGUN ESPECIFICACIONES

und

1.00 S/.

38,247.69 S/.

38,247.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.30

TABLERO GENERAL "TG-2" SEGUN ESPECIFICACIONES

und

1.00 S/.

15,247.69 S/.

15,247.69

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.31

SUMINISTRO DE TABLERO DE CONTROL (TC2) SEGUN ESPECIFICACIONES TECNICAS

und

1.00 S/.

20,000.00 S/.

20,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.32

TABLERO DE TRANSFERENCIA AUTOMATICA (TTA)

und

1.00 S/.

18,158.05 S/.

18,158.05

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

14.00 S/.

138.79 S/.

1,943.06

0.00%

S/.

0.00%

S/.

S/.

0.00%

14.00

12.19.33
12.19.34

ARTEFACTO REJILLA METALICA RAS-M 2X40 W. JOSFEL O SIMILAR INC. EQUIPO Y


PANTALLA
ARTEFACTO TIPO BRAQUETA CITECIL AHORRO LUZ FLOURESCENTE AHORRADOR DE 20
W. O SIMILAR

und

7.00 S/.

76.66 S/.

536.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

7.00

12.19.35

LUMINARIA TIPO BSH-83S C/LAMPARA V.S. 250 W. O SIMILAR

und

4.00 S/.

404.67 S/.

1,618.68

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.19.36

CAJA DE FO GDO. 100X100X50 MM. INCL. TAPA

und

3.00 S/.

14.18 S/.

42.54

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.19.37

CAJA DE FO GDO. 150X150X75 MM. INCL. TAPA

und

5.00 S/.

14.38 S/.

71.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.19.38

CAJA DE FO GDO. 200X200X100 MM. INCL. TAPA

und

6.00 S/.

16.38 S/.

98.28

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.19.39

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<5 OHMIOS

und

2.00 S/.

1,349.82 S/.

2,699.64

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.19.40

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) R<20 OHMIOS

und

1.00 S/.

1,049.82 S/.

1,049.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

1,049.82 S/.

1,049.82

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.41

POZO CONEXION A TIERRA COMPLETO (VARILLA CU. CONECTORES) PARA TABLERO DE


CONTROL

12.19.42

SUMINISTRO E INSTAL. DE ELECTRODOS PARA CONTROL DE NIVELES

und

2.00 S/.

973.85 S/.

1,947.70

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.19.43

SUMINISTRO DE TRANSMISOR ULTRASONICO DE NIVEL DE 4-20MM RANGO 0-10M H20

und

1.00 S/.

500.00 S/.

500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.44

SUMINISTRO TRANSMISOR DE PRESION RANGO 0-50 MH20

und

3.00 S/.

650.00 S/.

1,950.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.19.45

SUMINISTRO DE DETECTOR DE INTRUSOS

und

1.00 S/.

5.00 S/.

5.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

und

1.00 S/.

3,968.36 S/.

3,968.36

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.46

ESTRUCTURA SUBESTACION AEREA MONOPOSTE CAC 12 M. 400 KG, INC.


CONEXIONADO Y ACCESORIOS

12.19.47

SUMINISTRO E INST. DE TRANSFORMADOR DE 50 KVA 10/0.22 KV

und

1.00 S/.

16,574.38 S/.

16,574.38

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.19.48

PASTORAL DE ACERO GO. PS/1.5/1.9/1.5"

und

4.00 S/.

99.56 S/.

398.24

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.19.49

POSTE CONCRETO CENTRIF. 11/400/180/345

und

4.00 S/.

1,746.75 S/.

6,987.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.19.50

CAJA DE INSPECCION H=1.20 M.

und

5.00 S/.

715.48 S/.

3,577.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.19.51

PRUEBAS DE AISLAMIENTO, CONTINUIDAD Y PUESTA DE FUNCIONAMIENTO

und

1.00 S/.

5,228.41 S/.

5,228.41

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.20

EXCAVACIONES DE ZANJAS

S/.

12.20.01

EXCAVACION DE ZANJAS PARA INSTALACION DE CABLES

206.00 S/.

11.46 S/.

2,360.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.02

REFINE Y NIVELACION DE ZANJAS P/INST. CABLES

206.00 S/.

1.03 S/.

212.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.03

CAMA DE ARENA E=0.10 M. ZANJA P/INST. DE CABLES

206.00 S/.

4.02 S/.

828.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.04

RELLENO ZANJA MAT. PROPIO COMPACT. C/EQ. P/INST. CABLES

206.00 S/.

10.52 S/.

2,167.12

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.20.05

ELIMINACION MATERIAL EXCEDENTE C/EQUIPO P/INST. DE CABLES HASTA R=5 KM

206.00 S/.

11.27 S/.

2,321.62

0.00%

S/.

0.00%

S/.

S/.

0.00%

206.00

12.21

SUMINISTRO E INSTALACION DE TUBERIAS

S/.

12.21.01

TUBERIA ACERO NEGRO SCH-40 DE 2" (50 MM.)

10.00 S/.

20.20 S/.

202.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

10.00

12.21.02

TUBERIA ACERO NEGRO SCH-40 DE 4" (100 MM.)

12.00 S/.

45.45 S/.

545.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.00

12.21.03

TUBERIA ACERO NEGRO SCH-40 DE 8" (200 MM.)

15.00 S/.

101.00 S/.

1,515.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

15.00

12.21.04

TUBERIA ACERO NEGRO SCH-40 DE 10" (250 MM.)

20.00 S/.

319.16 S/.

6,383.20

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

1.00

12.22

SUMINISTRO E INSTALACION DE ACCESORIOS

S/.

12.22.01

BRIDA CIEGA DE ACERO DE 10" (250MM)

und

1.00 S/.

243.60 S/.

243.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.22.02

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 2" (50 MM)

und

4.00 S/.

32.60 S/.

130.40

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.22.03

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 4" (100 MM)

und

18.00 S/.

37.00 S/.

666.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

18.00

12.22.04

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 8" (200 MM)

und

20.00 S/.

84.00 S/.

1,680.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

20.00

12.22.05

BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 10" (250 MM)

und

25.00 S/.

117.00 S/.

2,925.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

25.00

12.22.06

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 2" (50MM)

und

1.00 S/.

32.60 S/.

32.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.22.07

BRIDA ACERO PARA SOLDAR ROMPE-AGUA 10" (250MM)

und

6.00 S/.

117.00 S/.

702.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.08

UNION DRESSER ACERO DE 2" (50 MM)

und

3.00 S/.

64.50 S/.

193.50

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.22.09

UNION DRESSER ACERO DE 8" (200 MM)

und

3.00 S/.

170.00 S/.

510.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

12.22.10

UNION DRESSER ACERO DE 10" (250 MM)

und

4.00 S/.

402.94 S/.

1,611.76

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.22.11

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 2" (50 MM).

und

36.00 S/.

2.00 S/.

72.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

36.00

12.22.12

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 4" (100 MM).

und

192.00 S/.

3.50 S/.

672.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

192.00

12.22.13

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 8" (200 MM).

und

240.00 S/.

5.50 S/.

1,320.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

240.00

12.22.14

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 10" (250 MM).

und

420.00 S/.

9.50 S/.

3,990.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

420.00

12.22.15

CODO FO. FDO. BRIDADO 2"X90 (50 MM)

und

6.00 S/.

52.80 S/.

316.80

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.16

CODO FO. FDO. BRIDADO 4"X90 (100 MM)

und

6.00 S/.

181.00 S/.

1,086.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.17

CODO FO. FDO. BRIDADO 8"X90 (200 MM)

und

3.00 S/.

282.00 S/.

846.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.18

CODO FO. FDO. BRIDADO 10"X90 (250 MM)

und

5.00 S/.

427.00 S/.

2,135.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

5.00

12.22.19

CODO FO. FDO. BRIDADO 8"X45 (200 MM)

und

3.00 S/.

282.00 S/.

846.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.20

CODO FO. FDO. BRIDADO 10"X45 (250 MM)

und

2.00 S/.

472.00 S/.

944.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.22.21

REDUCCION FO. FDO. BRIDADA DE 200X150 MM

und

3.00 S/.

229.00 S/.

687.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.22

REDUCCION FO. FDO. BRIDADA DE 250X150 MM

und

3.00 S/.

274.00 S/.

822.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.23

TEE FO. FDO. BRIDADA DE 100X50 MM

und

3.00 S/.

151.65 S/.

454.95

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.24

TEE FO. FDO. BRIDADA DE 100X100 MM

und

2.00 S/.

230.00 S/.

460.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.22.25

TEE FO. FDO. BRIDADA DE 250X100 MM

und

3.00 S/.

498.00 S/.

1,494.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.26

TRANSICION FO. FDO. CAMPANA-BRIDA DE 10" (250 MM)

und

1.00 S/.

583.07 S/.

583.07

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.22.27

YEE FO. FDO. BRIDADA DE 10"X8"

und

3.00 S/.

648.30 S/.

1,944.90

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.22.28

EMPAQUETADURA JEBE ERNLONADO DE 2" (50 MM)

und

6.00 S/.

3.53 S/.

21.18

0.00%

S/.

0.00%

S/.

S/.

0.00%

6.00

12.22.29

EMPAQUETADURA JEBE ERNLONADO DE 4" (100 MM)

und

24.00 S/.

5.93 S/.

142.32

0.00%

S/.

0.00%

S/.

S/.

0.00%

24.00

12.22.30

EMPAQUETADURA JEBE ERNLONADO DE 8" (200 MM)

und

30.00 S/.

8.92 S/.

267.60

0.00%

S/.

0.00%

S/.

S/.

0.00%

30.00

12.22.31

EMPAQUETADURA JEBE ERNLONADO DE 10" (250 MM)

und

35.00 S/.

11.55 S/.

404.25

0.00%

S/.

0.00%

S/.

S/.

0.00%

35.00

12.23

SUMINISTRO E INSTALACION DE VALVULAS

S/.

3.00

12.23.01

MANOMETRO TIPO BOURDON RANGO 0-200PSI

und

4.00 S/.

190.00 S/.

760.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.02

MEDIDOR DE CAUDAL TIPO ELECTROMAGNETICO BRINDADO 10"

und

1.00 S/.

14,425.00 S/.

14,425.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.03

VALVULA AIRE DE F. FDO. 2" TRIPLE EFECTO

und

1.00 S/.

772.72 S/.

772.72

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.04

VALVULA ALIVIO C/PILOTO F. FDO. BRIDADA 4"

und

1.00 S/.

3,345.45 S/.

3,345.45

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.23.05

VALVULA COMPUERTA DE FO. FDO. BRIDADA 2" (50 MM)

und

4.00 S/.

360.00 S/.

1,440.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.06

VALVULA COMPUERTA DE FO. FDO. BRIDADA 8" (200 MM)

und

3.00 S/.

1,306.36 S/.

3,919.08

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.23.07

VALVULA COMPUERTA DE FO. FDO. BRIDADA 10" (250 MM)

und

4.00 S/.

3,563.63 S/.

14,254.52

0.00%

S/.

0.00%

S/.

S/.

0.00%

4.00

12.23.08

VALVULA CHECK F. FDO. BRIDADA 8"

und

3.00 S/.

3,237.81 S/.

9,713.43

0.00%

S/.

0.00%

S/.

S/.

0.00%

3.00

12.24

PAVIMENTOS

S/.

12.24.01

CARPETA DE ENRRIPIADO COMPACTADO E=0.10 M. (A PULSO)

m2

567.00 S/.

10.22 S/.

5,794.74

0.00%

S/.

0.00%

S/.

S/.

0.00%

567.00

12.24.02

VEREDA RIGIDA-CONCRETO Fc=140 KG/CM2 DE E=10CM, PASTA 1:5

m2

105.00 S/.

36.37 S/.

3,818.85

0.00%

S/.

0.00%

S/.

S/.

0.00%

105.00

12.24.03

SARDINEL DE CONCRETO SIMPLE Fc=140 KG/CM2 DE 15X30 CM

60.00 S/.

38.70 S/.

2,322.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

60.00

12.25

EQUIPOS

S/.

5.CAMARA DE BOMBEO DE DESAGUE CDP-01-VALORIZACION N02


OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA
UBICACIN
DE TRUJILLO-LA LIBERTAD"

LA LIBERTAD-TRUJILLO-LAREDO

ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

FECHA DE INICIO DE OBRA

12/20/2014

CONTRATISTA

CONSORCIO AGUAS LAREDO

PLAZO DE EJECUCIN ( D.C. )

300.00 dias cal

RESIDENTE DE OBRA

ING. MARCIA MARTOS HERNANDEZ

FECHA DE TERMINO DE OBRA

10/16/2015

SUPERVISOR DE LA OBRA

ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL

27,647,382.62

( VR )

PERIODO DE TRABAJO

01/01/2015 AL 31/01/2015

MONTO CONTRATADO

27,647,382.62

( MC )

FECHA DE PRESENTACIN

4 DE FEBRERO DEL 2015

VALORIZACIN DE LA OBRA N 01

PRESUPUESTO
ITEM

AVAN C E S E J E C U T AD O S
ANTERIOR

METRADO

DESCRIPCION DE PARTIDAS

COSTO UNITARIO
UND.

ACTUAL

SALDO

ACUMULADO

COSTO PARCIAL
METRADO

CANTIDAD

% AVANCE

VALORIZADO

METRADO

% AVANCE

VALORIZADO

METRADO

VALORIZADO

% AVANCE

METRADO

12.25.01

ELECTROBOMBA SUMERGIBLE SUMIDERO 6.0 LPS, ADT=6 M.

und

1.00 S/.

7,500.00 S/.

7,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.25.02

ELECTROBOMBA SUMERGIBLE PARA DESAGUE Q=28.8 LPS, ADT=24.7 M.

und

2.00 S/.

45,750.00 S/.

91,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

2.00

12.25.03

GRUPO ELECTROGENO 30KW - 460V

und

1.00 S/.

29,000.00 S/.

29,000.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.25.04

EXTRACTOR CENTRIFUGO DE 0.5 HP

und

1.00 S/.

7,500.00 S/.

7,500.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

12.25.05

TECLE MANUAL A CADENA 5TONX5.0 M. INC. VIGA METALICA

und

1.00 S/.

9,835.00 S/.

9,835.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

S/.

0.00%

S/.

S/.

0.00%

1.00

0.00%

0.00%

0.00%

140.00

12.26
12.26.01
12.27
12.27.01

MONTAJE DE INSTALACIONES HIDRAULICAS


MONTAJE INST. HIDRAULICAS, PUESTA EN MARCHA DE EQUIPOS Y ELECTROBOMBAS
EN ESTACION BOMBEO

S/.
und

1.00 S/.

9,184.75 S/.

CERCOS

S/.

CERCO PERIMETRICO, MURO LADRILLO SOGA, COLUMNAS CADA 5 .

140.00 S/.

48,848.80

S/.

S/.

S/.

804,679.08

S/.

S/.

S/.

GG

80,467.91

S/.

S/.

S/.

UU

40,233.95

S/.

S/.

S/.

ST

925,380.94

S/.

S/.

S/.

S/.

GASTOS GENERALES
UTILIDAD
SUB TOTAL
FACTOR DE RELACIN ( FR )

925,380.94
IGV%
P_T

MONTO CONTRACTUAL

S/.

CD

TOTAL PRESUPUESTO

9,184.75

348.92 S/.

COSTO DIRECTO

IMPUESTO IGV

% AVANCE
ANTERIOR

0.00%

S/.

% AVANCE ACTUAL

0.00%

S/.

% AVANCE ACUMULADO

166,568.57

S/.

S/.

S/.

1,091,949.51

S/.

S/.

S/.

1,091,949.51

S/.

S/.

S/.

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP:52774

0.00%

% SALDO
EJECUTAR

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURG
CIP:63638

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

845.25

100.00%

S/.

1,274.00

100.00%

S/.

3,956.81

100.00%

S/.

37,736.08

100.00%

S/.

149.37

100.00%

S/.

3,789.20

100.00%

S/.

6,953.81

100.00%

S/.

10,928.40

100.00%

S/.

5,650.92

100.00%

S/.

109.47

100.00%

S/.

8.17

100.00%

S/.

914.17

100.00%

S/.

707.50

100.00%

S/.

4,216.20

100.00%

S/.

111.85

100.00%

S/.

4,201.85

100.00%

S/.

12,508.85

100.00%

S/.

56,543.48

100.00%

S/.

33,604.49

100.00%

S/.

36,089.37

100.00%

S/.

2,328.00

100.00%

S/.

3,482.52

100.00%

S/.

3,935.57

100.00%

S/.

2,441.25

100.00%

S/.

2,782.72

100.00%

S/.

2,939.30

100.00%

S/.

2,966.89

100.00%

S/.

3,505.81

100.00%

S/.

5,600.77

100.00%

S/.

5,732.66

100.00%

S/.

1,428.43

100.00%

S/.

2,265.64

100.00%

S/.

1,299.48

100.00%

S/.

1,206.52

100.00%

S/.

10,985.87

100.00%

S/.

254.88

100.00%

S/.

3,476.80

100.00%

S/.

3,741.29

100.00%

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

216.67

100.00%

S/.

238.33

100.00%

S/.

630.74

100.00%

S/.

10,960.78

100.00%

S/.

545.69

100.00%

S/.

2,156.96

100.00%

S/.

1,581.32

100.00%

S/.

189.72

100.00%

S/.

647.64

100.00%

S/.

988.52

100.00%

S/.

755.14

100.00%

S/.

2,399.12

100.00%

S/.

1,105.15

100.00%

S/.

3,560.92

100.00%

S/.

5,644.62

100.00%

S/.

1,210.30

100.00%

S/.

718.38

100.00%

S/.

123.70

100.00%

S/.

6,035.39

100.00%

S/.

453.35

100.00%

S/.

15.00

100.00%

S/.

190.32

100.00%

S/.

1,028.14

100.00%

S/.

1,807.67

100.00%

S/.

1,922.31

100.00%

S/.

239.03

100.00%

S/.

84.95

100.00%

S/.

1,209.00

100.00%

S/.

943.80

100.00%

S/.

636.99

100.00%

S/.

203.55

100.00%

S/.

294.87

100.00%

S/.

71.00

100.00%

S/.

9.80

100.00%

S/.

12.90

100.00%

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

10.70

100.00%

S/.

3.40

100.00%

S/.

197.76

100.00%

S/.

45.72

100.00%

S/.

87.35

100.00%

S/.

145.32

100.00%

S/.

98.21

100.00%

S/.

59.28

100.00%

S/.

579.50

100.00%

S/.

32.10

100.00%

S/.

77.92

100.00%

S/.

426.42

100.00%

S/.

234.45

100.00%

S/.

31.05

100.00%

S/.

12.75

100.00%

S/.

39.95

100.00%

S/.

1,128.27

100.00%

S/.

1,388.16

100.00%

S/.

1,151.46

100.00%

S/.

1,131.52

100.00%

S/.

14.49

100.00%

S/.

86.52

100.00%

S/.

154.66

100.00%

S/.

663.60

100.00%

S/.

45.15

100.00%

S/.

838.43

100.00%

S/.

974.14

100.00%

S/.

221.56

100.00%

S/.

142.80

100.00%

S/.

41.55

100.00%

S/.

413.40

100.00%

S/.

5,206.65

100.00%

S/.

482.56

100.00%

S/.

1,213.26

100.00%

S/.

228.96

100.00%

S/.

113.04

100.00%

S/.

483.84

100.00%

S/.

728.28

100.00%

S/.

1,558.20

100.00%

S/.

999.00

100.00%

S/.

824.76

100.00%

S/.

907.20

100.00%

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

576.69

100.00%

S/.

799.69

100.00%

S/.

38,247.69

100.00%

S/.

15,247.69

100.00%

S/.

20,000.00

100.00%

S/.

18,158.05

100.00%

S/.

1,943.06

100.00%

S/.

536.62

100.00%

S/.

1,618.68

100.00%

S/.

42.54

100.00%

S/.

71.90

100.00%

S/.

98.28

100.00%

S/.

2,699.64

100.00%

S/.

1,049.82

100.00%

S/.

1,049.82

100.00%

S/.

1,947.70

100.00%

S/.

500.00

100.00%

S/.

1,950.00

100.00%

S/.

5.00

100.00%

S/.

3,968.36

100.00%

S/.

16,574.38

100.00%

S/.

398.24

100.00%

S/.

6,987.00

100.00%

S/.

3,577.40

100.00%

S/.

5,228.41

100.00%

S/.

2,360.76

100.00%

S/.

212.18

100.00%

S/.

828.12

100.00%

S/.

2,167.12

100.00%

S/.

2,321.62

100.00%

S/.

202.00

100.00%

S/.

545.40

100.00%

S/.

1,515.00

100.00%

S/.

6,383.20

100.00%

S/.

243.60

100.00%

S/.

130.40

100.00%

S/.

666.00

100.00%

S/.

1,680.00

100.00%

S/.

2,925.00

100.00%

S/.

32.60

100.00%

S/.

702.00

100.00%

S/.

193.50

100.00%

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

510.00

100.00%

S/.

1,611.76

100.00%

S/.

72.00

100.00%

S/.

672.00

100.00%

S/.

1,320.00

100.00%

S/.

3,990.00

100.00%

S/.

316.80

100.00%

S/.

1,086.00

100.00%

S/.

846.00

100.00%

S/.

2,135.00

100.00%

S/.

846.00

100.00%

S/.

944.00

100.00%

S/.

687.00

100.00%

S/.

822.00

100.00%

S/.

454.95

100.00%

S/.

460.00

100.00%

S/.

1,494.00

100.00%

S/.

583.07

100.00%

S/.

1,944.90

100.00%

S/.

21.18

100.00%

S/.

142.32

100.00%

S/.

267.60

100.00%

S/.

404.25

100.00%

S/.

760.00

100.00%

S/.

14,425.00

100.00%

S/.

772.72

100.00%

S/.

3,345.45

100.00%

S/.

1,440.00

100.00%

S/.

3,919.08

100.00%

S/.

14,254.52

100.00%

S/.

9,713.43

100.00%

S/.

5,794.74

100.00%

S/.

3,818.85

100.00%

S/.

2,322.00

100.00%

E DESAGUE CDP-01-VALORIZACION N02


LA LIBERTAD-TRUJILLO-LAREDO

SALDO

VALORIZADO

% AVANCE

S/.

7,500.00

100.00%

S/.

91,500.00

100.00%

S/.

29,000.00

100.00%

S/.

7,500.00

100.00%

S/.

9,835.00

100.00%

S/.

9,184.75

100.00%

100.00%

S/.

48,848.80

S/.

804,679.08

S/.

80,467.91

S/.

40,233.95

S/.

925,380.94

S/.

925,380.94

S/.

166,568.57

S/.

1,091,949.51

S/.

1,091,949.51

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP:63638

100.00%

RESUMEN DE VALORIZACIN DE OBRA N 2


"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA
LIBERTAD"

OBRA
UBICACIN
ENTIDAD CONTRATANTE
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
PRESUPUESTO TOTAL
MODALIDAD
FECHA DE INICIO
PLAZO DE EJECUCION
FECHA DE TERMINO
PERIODO DE TRABAJO

:
:
:
:
:
:
:
:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE LAREDO


CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA
S/. 27,647,382.62
A SUMA ALZADA
12/20/2014
300.00 d.c
16/10/2015
20/12/2014 AL 31/12/2014

VALORIZACIN DE OBRA N 01
MONTO DEL
CONTRATO

ESPECIALIDAD

ACUMULADO
MES ANTERIOR

MES ACTUAL

MONTO

S
%

S/.

20,373,895.56

S/.

454,960.69 S/.

171,633.49 S/.

626,594.17

3.08%

MONTO
S/.

19,747,301.39

AVANCE PROGRAMA
%
96.92%

MONTO
S/.

118,168.62

"MEJORAMIENTO Y AMPLIACION DEL


SISTEMA DE AGUA POTABLE Y
SANEAMIENTO EN LA LOCALIDAD DE
LAREDO,DISTRITO DE LAREDO-PROVINCIA
DE TRUJILLO-LA LIBERTAD"

COSTO DIRECTO

S/.

20,373,895.56

S/.

454,960.69 S/.

171,633.49 S/.

626,594.17

S/.

19,747,301.39

S/.

100,105.60

GASTOS GENERALES

10.00%

S/.

2,037,389.56

S/.

45,496.07 S/.

17,163.35 S/.

62,659.42

S/.

1,974,730.14

S/.

10,010.56

UTILIDAD
SUB TOTAL

5.00%

S/.
S/.

1,018,694.78
23,429,979.89

S/.
S/.

22,748.03 S/.
523,204.79 S/.

8,581.67 S/.
197,378.51 S/.

31,329.71
720,583.30

S/.
S/.

987,365.07
22,709,396.60

S/.
S/.

5,005.28
115,121.44

S/.

23,429,979.89

S/.

523,204.79 S/.

197,378.51 S/.

720,583.30

S/.

22,709,396.60

S/.

115,121.44

S/.

4,217,396.38

S/.

94,176.86 S/.

35,528.13 S/.

129,704.99

S/.

4,087,691.39

S/.

20,721.86

S/.

27,647,376.27

S/.

617,381.65 S/.

232,906.64 S/.

850,288.29

S/.

26,797,087.99

S/.

135,843.30

FACTOR DE RELACIN
IGV
TOTAL

1.00
18.00%

Pgina 127

3.08%

96.92%

ALORIZACIN DE OBRA N 2

ACIN DE OBRA N 01
AVANCE PROGRAMADO
%
3.08%

3.08%

Pgina 128

CALCULO DE LOS COEFICIENTES DE REAJUSTE


#REF!

OBRA

PROPIETARIO

#REF!

CONTRATISTA

#REF!

REPRESENTANTE LEGAL

#REF!

INSPECTOR DE OBRA

#REF!

RESIDENTE DE OBRA

#REF!

UBICACIN

#REF!

AREA GEOGRAFICA

N 01 ( Segn INEI )

PRESUPUESTO REFERENCIAL

#REF!

MONTO CONTRATADO

REDES SECUNDARIAS, INCLUYE CONEXIONES DOMICIL

Formula Polinmica:

K = 0.213*(PCr /PCo) + 0.226*(Dlr / Dlo) + 0.121*( Fer/Feo) + 0.284 (Jr/Jo) + 0.156*(GGr/GGo)

BASE
MONOMIO

SIMBOLO

I.U.

DESCRIPCION

PC

62

POSTES DE CONCRETO

Dl

30

CABLES Y CONDUCTORES DE ALUMINIO

Coef. Inc.

0.213

INDICE DE PRECIOS DE

Dec-08

Jul-09

Iro

Ir1

100.000%

404.09

387.77

66.500%

338.98

338.98

0.226
Dl

30

CONEXIONES DOMICILIARIAS

33.500%

385.50

378.60

FE

11

LUMINARIAS, LAMPARAS Y ACCESORIOS

9.000%

279.68

279.68

FE

11

ACCESORIOS PARA CABLES AUTOPORTANTES

10.500%

279.68

279.68

FE

RETENIDAS Y ANCLAJES

18.600%

650.49

464.23

0.120
FE

ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS

6.600%

650.49

464.23

FE

CABLES Y CONDUCTORES DE COBRE

52.800%

665.71

612.72

FE

PUESTA A TIERRA

2.500%

665.71

612.72

47

MONTAJE ELECTROMECANICO

85.100%

396.82

413.41

14.900%

428.68

419.22

100.000%

346.60

347.34

Incidencia
Especfica

0.284
J

32

TRANSPORTE

GG

39

GASTOS GENERALES Y UTILIDADES

0.200

COEFICIENTE DE REAJUSTE ( K ) :

Para: Valorizacin de JULIO 2009

COEFICIENTE DE REAJUSTE ( K ) :
Se anexa al presente Informe.

INSPECTOR DE
#REF!

RESIDENTE DE OBRA

129/156

#REF!

130/156

EAJUSTE

#REF!

NCLUYE CONEXIONES DOMICILIARIAS

INDICE DE PRECIOS DEL MES


K

0.204

0.225

0.104

0.293

0.200

1.00000

1.00000

INSPECTOR DE OBRA
#REF!

131/156

132/156

CALCULO DE LOS COEFICIENTES DE REAJUSTE


#REF!

OBRA

PROPIETARIO

#REF!

CONTRATISTA

#REF!

REPRESENTANTE LEGAL

#REF!

INSPECTOR DE OBRA

#REF!

RESIDENTE DE OBRA

#REF!

UBICACIN

#REF!

AREA GEOGRAFICA

N 01 ( Segn INEI )

PRESUPUESTO REFERENCIAL

#REF!

MONTO CONTRATADO
LINEA DE REDES PRIMARIAS

Formula Polinmica:

K = 0.26*(FEr / FEo) + 0.128*(AEr / AEo) + 0.221*(ENr / ENo) + 0.252*(Jr / Jo) + 0.16*(GGr / GGo)

BASE
MONOMIO

SIMBOLO

I.U.

DESCRIPCION

Coef. Inc.

Jul-09

Iro

Ir1

62

POSTES DE CONCRETO

9.000%

404.09

387.77

FE

43

CRUCETAS DE MADERA

10.500%

539.42

558.77

FE

FERRETERIA PARA POSTES Y CRUCETAS

18.600%

650.49

464.23

0.260
FE

ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS

6.600%

650.49

464.23

FE

CONDUCTOR DE COBRE Y ACCESORIOS

52.800%

665.71

612.72

FE

MATERIAL PARA PUESTA A TIERRA

2.500%

665.71

612.72

AE

11

EQUIPO DE PROTECCION

20.450%

279.68

279.68

AE

11

AISLADORES Y ACCESORIOS

21.560%

279.68

279.68

0.128
AE

19

CABLES DE ENERGIA

9.280%

589.88

560.09

AE

30

CONDUCTORES DE AAAC Y ACCESORIOS

48.730%

385.50

378.60

EN

48

TRANSFORMADORES DE DISTRIBUCION Y TABLEROS

100.000%

345.06

338.21

47

MAQUINARIA Y EQUIPO IMPORTADO

75.960%

396.82

413.41

24.040%

428.68

419.22

100.000%

346.60

347.34

INDICE DE PRECIOS DEL ME

Dec-08

FE

Incidencia
Especfica

0.201

0.252
J

32

HERRAMIENTAS MANUAL

GG

39

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.160

COEFICIENTE DE REAJUSTE ( K ) :

Para: Valorizacin de JULIO 2009

COEFICIENTE DE REAJUSTE ( K ) :
Se anexa al presente Informe.

RESIDENTE DE OBRA

INSPECTOR DE OBRA

###

#REF!

133/156

EAJUSTE

#REF!

(GGr / GGo)

INDICE DE PRECIOS DEL MES


K

0.229

0.126

0.197

0.252

0.160

1.00000

1.00000

INSPECTOR DE OBRA
#REF!

134/156

CALCULO DE LOS REINTEGROS


JULIO DEL 2009 - V01
OBRA

#REF!

PROPIETARIO

#REF!

CONTRATISTA

#REF!

REPRESENTANTE LEGAL

#REF!

INSPECTOR DE OBRA

#REF!

RESIDENTE DE OBRA

#REF!

UBICACIN

#REF!

AREA GEOGRAFICA

N 01 ( Segn INEI )

PRESUPUESTO REFERENCIAL

MONTO CONTRATADO

#REF!
#REF!

( CON I.G.V. )

#REF!

( SIN I.G.V. )

AVANCE PROGRAMADO

AVANCE REAL

MES

"A"

MENSUAL

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

VALORIZACION N

MES

ACUMUL

"B"

MENSUAL

ACUMULADO

#REF!

COEFICIENTE

REINTEGRO PROGRAMADO

DE REAJUSTE

MENSUAL

ACUMULADO

Kmensual

C=A *(K - 1)

#REF!

1.00000

#REF!

ACUMULADO

S/.

197,378.51

#REF!

S/.

197,378.51

REINTEGRO REAL

REINTEGRO RECONOCID

MENSUAL
ACUMULADO

ACUMULADO

MENSUAL

C=B*(K - 1)
#REF!

S/.

S/.

S/.

#REF!
Nota: Reint. Real acumul. < Reint. Program.

REINTEGRO DE LA VALORIZACION DEL MES

TOTAL DE REINTEGRO A RECONOCER

INSPECTOR DE OBRA
#REF!

RESIDENTE DE OBRA
#REF!

LOS REINTEGROS
DEL 2009 - V01

REINTEGRO RECONOCIDO

ACUMULADO

S/.

S/. 0.00
S/. 0.00

INSPECTOR DE OBRA
#REF!

CALCULO DE LOS REINTEGROS


DIC DEL 2011 - V01
OBRA

#REF!

PROPIETARIO

#REF!

CONTRATISTA

#REF!

REPRESENTANTE LEGAL

#REF!

INSPECTOR DE OBRA

#REF!

RESIDENTE DE OBRA

#REF!

UBICACIN

#REF!

AREA GEOGRAFICA

N 01 ( Segn INEI )

PRESUPUESTO REFERENCIAL

MONTO CONTRATADO

#REF!
#REF!

( CON I.G.V. )

#REF!

( SIN I.G.V. )

AVANCE PROGRAMADO

AVANCE REAL

MES

"A"

DEL MES

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

VALORIZACION N

MES

ACUMUL

"B"

QUINCENAL

ACUMULADO

#REF!

COEFICIENTE

REINTEGRO PROGRAMADO

DE REAJUSTE

MENSUAL

ACUMULADO

Kmensual

C=A *(K - 1)

#REF!

1.00000

#REF!

ACUMULADO

S/.

197,378.51

#REF!

S/.

197,378.51

REINTEGRO REAL

REINTEGRO RECONOCIDO

MENSUAL
ACUMULADO

ACUMULADO

MENSUAL

C=B*(K - 1)
#REF!

S/.

S/.

S/.

#REF!
Nota: Reint. Real acumul. < Reint. Program.

REINTEGRO DE LA VALORIZACION DEL MES

TOTAL DE REINTEGRO A RECONOCER

INSPECTOR DE OBRA
#REF!

RESIDENTE DE OBRA
#REF!

E LOS REINTEGROS

C DEL 2011 - V01

REINTEGRO RECONOCIDO

ACUMULADO

S/.

S/. 0.00
S/. 0.00

INSPECTOR DE OBRA
#REF!

CONTROL DE AMORTIZACION DE ADELANTO DIRECTO


AL 31 DE ENERO DEL 2015
Obra

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

Cliente

MUNICIPALIDAD DISTRIAL DE LAREDO

Ubicacin

:Departamento LA LIBERTAD Provincia TRUJILLO Distrito LAREDO

Contratista

CONSORCIO AGUAS LAREDO

Supervisin

ING. JULIO FELIX VALERIANO MURGA CIP N 63638

Residente:

ING. MARCIA MARTOS HERNANDEZ CIP N 52774

DATOS GENERALES

AMORTIZACION DEL ADELANTO PARA MATERIALES


VALORIZACION
AMORTIZACION

DEL ADELANTO

MONTO CONTRATADO (Inc/IGV)

S/.

27,647,382.62

MONTO CONTRATADO (Sin/IGV)

S/.

23,429,985.27

MES

MONTO

MES

ACUMUL.

SALDO

ADELANTO OTORGADO (Inc/IGV)

S/.

5,529,476.52

Dec-14

232,906.64

46,581.33

46,581.33

4,639,415.72

ADELANTO OTORGADO (Sin/IGV)

S/.

4,685,997.05

Jan-15

0.00

0.00

46,581.33

4,639,415.72

20.00%
20.00%

TOTAL PORCENTAJE ADELANTOS OTORGADOS

ENTREGA DEL ADELANTO S/, (Sin / IGV)

Feb-15

0.00

0.00

46,581.33

4,639,415.72

Mar-15

0.00

0.00

46,581.33

4,639,415.72

Apr-15

0.00

0.00

46,581.33

4,639,415.72

May-15

0.00

0.00

46,581.33

CARTA FIANZA

MONTO (S/.)

FOGAPI - TRUJILLO

5,529,476.52

N039-502-2014-CRACSL

5,529,476.52

4,639,415.72

OBSERVACIONES :

FECHA PAGO

PARCIAL

ACUMULADO

Jun-15

0.00

0.00

46,581.33

4,639,415.72

Carta Fianza

19-Dec-14

4,685,997.05

4,685,997.05

Jul-15

0.00

0.00

46,581.33

4,639,415.72

Aug-15

0.00

0.00

46,581.33

4,639,415.72

Sep-15

0.00

0.00

46,581.33

4,639,415.72

LOS MONTOS EN EL CUADRO DE AMORTIZACION


NO INCLUYEN EL IGV

5,529,476.52
S/. 27,647,382.62

VIGENCIA

20/09/2015

PAGO A CUENTA AL CONTRATISTA POR VALORIZACION V02


"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DI
DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

OBRA

PROPIETARIO
CONTRATISTA

: MUNICIPALIDAD DISTRITAL DE LAREDO


: CONSORCIO AGUAS LAREDO

REPRESENTANTE LEGAL
RESIDENTE DE OBRA

: SR. RICHARD ALEXANDER ABANTO VITERY


: ING. MARCIA MARTOS HERNANDEZ

SUPERVISOR DE OBRA
UBICACIN

: ING. JULIO FELIX VALERIANO MURGA


: LA LIBERTAD-TRUJILLO-LAREDO

AREA GEOGRAFICA
: N 01 (Segn INEI)
PRESUPUESTO REFERENCIAL: S/. 27,647,382.62

MONTO CONTRATADO

S/. 27,647,382.62

VALORIZACION N 02
DEL 01/01/2015 AL 31/01/2015
CONCEPTO
Valorizacin
Valorizacin N 01 : V01
Reajustes e Intereses: R
Intereses
Reajuste por Valorizacin V01
Deduccin de Reajustes: D
Deduccin del Reajuste que No corresponde por Adelanto Directo
Deduccin del Reajuste que No corresponde por Pago a cuenta Materiales N 01

PARCIAL

SUBTOTAL
S/. 197,378.51

S/. 197,378.51
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00

VALORIZACION BRUTA: VB = V01 + R - D =

S/. 197,378.51

IMPUESTO GENERAL A LAS VENTAS: 0.18 * VB =

S/. 35,528.13

VALORIZACION BRUTA TOTAL: VBT = VB +0.18 VB=

S/. 232,906.64

Amortizacin de Adelantos: A=
Amortizacin por Adelanto Directo
Amortizacin por Pago a Cuenta Materiales N 01

S/. 46,581.33
S/. 46,581.33
S/. 0.00

VALORIZACION NETA: VN = VBT - A =

S/. 186,325.31

MONTO A CANCELAR: INCLUIDO I.G.V. =

S/. 186,325.31

Son:

CIENTO TRES MIL NOVESCIENTOS CINCUENTA Y CUATRO CON 16/100 Nuevos Soles.

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP: 52774

SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MUR
CIP.63638

V02

A LOCALIDAD DE LAREDO,DISTRITO

SUBTOTAL
S/. 197,378.51
S/. 0.00

S/. 0.00

S/. 197,378.51
S/. 35,528.13
S/. 232,906.64
S/. 46,581.33

S/. 186,325.31

S/. 186,325.31

SUPERVISOR DE OBRA
ULIO FELIX VALERIANO MURGA
CIP.63638

HOJA DE CANCELACIN AL CONTRATISTA


01/01/2015 AL 31/01/2015

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDOTRUJILLO-LA LIBERTAD"

OBRA

ENTIDAD CONTRATANTE
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISOR DE OBRA

:
:
:
:

MUNICIPALIDAD DISTRITAL DE LAREDO


CONSORCIO AGUAS LAREDO
ING. MARCIA MARTOS HERNANDEZ
ING. JULIO FELIX VALERIANO MURGA

VALOR REFERENCIAL
MONTO CONTRATADO
FACTOR DE RELACION
UBICACIN
PLAZO DE EJECUCION

:
:
:
:
:

S/. 27,647,382.62
S/. 27,647,382.62
1.00
LA LIBERTAD-TRUJILLO-LAREDO
300 DIAS CALENDARIOS

DESCRIPCION
VALORIZACION BRUTA : (VB)
TOTAL VALORIZACIN BRUTA ( VB ):
REINTEGRO POR POLINOMICA "K"
I.G.V. ( 18% * VN )

18.00%

MONTO VB INCL IGV.

DESCUENTOS: (D)
AMORTIZACION DE ADELANTOS
ADELANTO DIRECTO
ADELANTO POR MATERIALES

20.00%
40.00%

VALORIZACION NETA: ( VN = VB INCL. IGV - D )

MONTO VALORIZACION N01


RETENCION POR FIEL CUMPLIMIENTO
EN VALORIZACION N 01

5%

MONTO TOTAL A CANCELAR

SON:
SON: CIENTO TRES MIL NOVESCIENTOS CINCUENTA Y CUATRO CON 16/100 NUEVOS SOLES

RESIDENTE DE OBRA
ING. MARCIA MARTOS HERNANDEZ
CIP: 52774

142/156

CONTRATISTA

15

EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE


TAD"

VALORIZACION DE OBRA N2
01/01/2015 AL 31/01/2015

S/.
S/.

S/.

S/.
S/.

46,581.33
-

S/.

S/.

S/.

S/.

RO CON 16/100 NUEVOS SOLES

V B SUPERVISOR DE OBRA
ING. JULIO FELIX VALERIANO MURGA
CIP.63638

143/156

CALCULO DE LOS "K" DE REAJUSTE DEFINITIVOS


001 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
K = 0.126*(Jr / Jo) + 0.072*(CMAr / CMAo) + 0.232*(Tr / To) + 0.413*(Mr / Mo) + 0.154*(Ir / Io)

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDOPROVINCIA DE TRUJILLO-LA LIBERTAD"

OBRA:

CONTRATISTA:

CONSORCIO AGUAS LAREDO


VALORIZACION N01

MONOMIO

SIMBOLO

INDICE
UNIFIC.

ELEMENTO REPRESENTATIVO

47

MANO DE OBRA INC. LEYES SOCIALES

FACTOR
0.126

PORC.

INDICE BASE

INDICE

Jan-14

Dec-13

Dec-13

100.00

471.44

497.55

0.133

20.83

359.18

358.63

0.015

55.56

455.86

455.19

0.000

23.61

352.30

378.29

0.000

ACERO DE CONSTRUCCION CORRUGADO

21

CEMENTO PORTLAND TIPO I

43

MADERA NACIONAL PARA ENCOF. Y CARPINT.

72

TUBERIA DE PVC PARA AGUA

0.232

100.00

512.73

513.64

0.232

48

MAQUINARIA Y EQUIPO NACIONAL

0.413

100.00

436.72

469.58

0.444

39

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.154

100.00

457.84

460.44

0.155

0.072

1.00

0.979

REINTEGROS TOTAL POR REAJUSTES


ENTIDAD

MUNICIPALIDAD DISTRITAL DE LAREDO

CONTRATISTA

CONSORCIO AGUAS LAREDO

OBRA

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO


EN LA LOCALIDAD DE LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA
LIBERTAD"

FORMULAS

VALORIZACION

001 UNICA

TOTAL
VALORIZACIONES

REINTEGRO
AUTORIZADO

MES

Dec-13

32,130.96

823,870.88

32,130.96

Jan-14

27,256.48

592,532.24

27,256.48

Feb-14

16,921.46

360,031.16

16,921.46

Mar-14

26,410.21

574,134.92

26,410.21

Apr-14

5,216.11

113,393.75

5,216.11

May-14

18,762.24

399,196.60

18,762.24

Jun-14

16,920.54

376,012.00

16,920.54

Jul-14

17,842.87

241,119.81

17,842.87

Aug-14

4,795.42

60,701.49

4,795.42

10

Sep-14

6,767.71

80,567.95

6,767.71

11

Oct-14

12,654.89

143,805.53

12,654.89

12

Nov-14

40,949.97

449,999.71

40,949.97

TOTAL DE REINTEGRO

S/. 226,628.86

REINTEGROS POR REAJUSTES


ENTIDAD

MUNICIPALIDAD DISTRITAL DE CURGOS

CONTRATISTA

CONSORCIO ESPERANZA

OBRA

"REHABILITACION,MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE LAS LOCALIDADES:


EL CALVARIO,HUANGASPARATE, CASA BLANCA, RICON DE PAMPA GRANDE Y CURGOS, DISTRITO DE CURGOS - SANCHEZ
CARRION - LA LIBERTAD"

FORMULA

:001 UNICA

PRESUPUESTO CONTRATADO

S/.3,637,058.27

VALORIZACION

AVANCE REAL
MENSUAL

ACUMULADO

COEFICIENTE

REINTEGRO REAL

DE REAJUSTE

MENSUAL

(C =B * (K - 1) )

ACUMULADO

DEDUCIONES
ADELANTO

ADELANTO

DIRECTO

MATERIALES

REINTEGRO
AUTORIZADO

MES

Dec-13

823,870.88

823,870.88

1.039

32,130.96

32,130.96

0.00

0.00

S/.

32,130.96

Jan-14

592,532.24

1,416,403.12

1.046

27,256.48

59,387.44

0.00

0.00

S/.

27,256.48

Feb-14

360,031.16

1,776,434.28

1.047

16,921.46

76,308.90

0.00

0.00

S/.

16,921.46

Mar-14

574,134.92

2,350,569.20

1.046

26,410.21

102,719.11

0.00

0.00

S/.

26,410.21

Apr-14

113,393.75

2,463,962.96

1.046

5,216.11

107,935.22

0.00

0.00

S/.

5,216.11

May-14

399,196.60

2,863,159.55

1.047

18,762.24

126,697.46

0.00

0.00

S/.

18,762.24

Jun-14

376,012.00

3,239,171.56

1.045

16,920.54

143,618.00

0.00

0.00

S/.

16,920.54

Jul-14

241,119.81

3,480,291.36

1.074

17,842.87

161,460.87

0.00

0.00

S/.

17,842.87

Aug-14

60,701.49

3,540,992.85

1.079

4,795.42

166,256.29

0.00

0.00

S/.

4,795.42

10

Sep-14

80,567.95

3,621,560.80

1.084

6,767.71

173,024.00

0.00

0.00

S/.

6,767.71

11

Oct-14

143,805.53

3,765,366.33

1.088

12,654.89

185,678.89

0.00

0.00

S/.

12,654.89

12

Nov-14

449,999.71

4,215,366.04

1.091

40,949.97

226,628.86

0.00

0.00

S/.

40,949.97

TOTAL

S/.

226,628.86

PO RC E NTAG E DE AVANC E %

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE


LAREDO,DISTRITO DE LAREDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

GRAFICO DE AVANCE FISICO - FINANCIERO PROGRAMADO Vs EJECUTADO


100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%

EJECUTADO

30.00%
20.00%
10.00%
0.00%

0.47%

31/12/2014

31/01/2015

28/02/2015

31/03/2015

30/04/2015

31/05/2015

30/06/2015

31/07/2015

31/08/2015

30/09/2015

MONTOS VALORIZADOS REPROGRAMADO PROGRAMADOS


MONTOS (Con/ IGV)
MES

MONTOS VALORIZADOS EJECUTADOS

PORCENTAJES

MONTOS (Con/ IGV)

PARCIAL

ACUMUL.

PARCIAL

ACUMUL.

S/.

S/.

MES

PORCENTAJES

PARCIAL

ACUMUL.

PARCIAL

S/.

S/.

31/12/2014

135,843.30

135,843.30

0.49%

0.49%

31/12/2014

31/01/2015

1,015,378.68

1,151,221.98

3.67%

4.16%

31/01/2015

28/02/2015

4,008,105.41

5,159,327.4

14.50%

18.66%

28/02/2015

31/03/2015

4,879,412.84

10,038,740.23

17.65%

36.31%

31/03/2015

30/04/2015

4,210,131.66

14,248,871.89

15.23%

51.54%

30/04/2015

31/05/2015

3,700,467.41

17,949,339.30

13.38%

64.92%

31/05/2015

30/06/2015

4,132,353.33

22,081,692.63

14.95%

79.87%

30/06/2015

31/07/2015

2,116,045.43

24,197,738.06

7.65%

87.52%

31/07/2015

31/08/2015

1,704,919.22

25,902,657.28

6.17%

93.69%

31/08/2015

30/09/2015

922,667.03

26,825,324.29

3.34%

97.03%

30/09/2015

16/10/2015

822,058.34

27,647,382.62

2.97%

100.00%

16/10/2015

27,647,382.62

27,647,382.62

100.00%

100.00%

TOTAL

TOTAL

232,906.64

232,906.64

232,906.64

0.47%

232,906.64

0.47%

MA DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE


EDO-PROVINCIA DE TRUJILLO-LA LIBERTAD"

CO - FINANCIERO PROGRAMADO Vs EJECUTADO

015

EJECUTADO

31/05/2015

30/06/2015

31/07/2015

31/08/2015

30/09/2015

MONTOS VALORIZADOS EJECUTADOS


PORCENTAJES
ACUMUL.
%
0.47%

0.47%