Está en la página 1de 7
‘TARIFAS ESTANDARES DE AVANCES LINEALES 2008 va fs foe ae [aes [SS] [SSS] ce se [rae | ot | eetmaet gat eet — at — tees nae ee aete il — al ieee a fet el at feces eee esr ate tt tag 2214 FS ae tee eer 2 i eee ess = ca i et eeceeeerees ea os Hee Ce i ease cea fa i Tt 3 fae rae pe a : Te eee = a ae = lal a ESTRUCTURA DE COSTOS GALERIA - CRUCERO PARAMETROS, No. DE TALADROS: 32 LONG, PERFORACION GPIES (1.53Mis) (6.02 pies) EFICIENCIA 1.41 MTJDISP. TIPO DE ROCA ‘SEMIDURA, No, DE CARTUCHOS/TALADRO- 6 TIPO DE EXPLOSIVO . SEMIGELATINA 65% 55% EMULNOR 3,000, 415% A PERFORACION Barras Conicas Barras Conicas-4'= 32 Tal x3'x $38.29 / 900 pies 11.64 Barras Conicas -6'= 32 Tal x 2.02' x $ 47-36 / 900 pies /1.41 Brocas Brocas 96 = 32 Tal x3°x $12.19 /200 pies / 1.41 Brocas-38 = 32 Tal x 2.02'x $ 12.89//200 pies /1.41, ‘Manguora de pertoracién 20 mts.($ 2.02 + $ 0.99) / 45,000 pies = $ 0.001 / pio 32 Tal x §.02'x $0.001 / 1.41 Aguzado Aguzadora: $2,950 x 1,30 (20 %) / 80,000 pies: 32 Tal x502'x $ 0.047 (1.41 0.047 J pie Piedra Esmeril: $12.10 /6,000 pies = $ 0.0021 pio 32 Tal x 5.02 x $ 0.002/1.41 Acalte Perforacion: M14 Galx $6.54 11.41 B. EXPLOSIVOS 1 Dinamita 718° x 7" x 65% 0.55x31 Tal x 6 Cart/Tal x $0.15CaM/1.41 Emulnor 3,000 045 x31 Tal x 6 CarVTal x $0.181Cavt.41 ‘carmex 0.90x31 Tal x 1 PraTal x SO.S4Pzalt.41 289 2at 415 295 535 022 1088 1068 1048 4. Minine! (0.40 x31 Tat x 1 PealTal x $0.89/Pzali 41 a wt 5, Mecha Rapida 6 MisDisp x $O.20MIS/At Siz. $s 36.22 MANO DE OBRA 4. OPERACION. : 01 Perf. X$6.48 x 1.8172/4.41 s 822 01 Avie. x$6.21 x 1.8172/ 1.41 S800 01 Pednx$.621 x 1.8172/ 4.41 3 8.00 2- SERVICIOS N12 Bod. X $6.21 x 1.8172/1.44 S068. 3. SUPERVISION. 4/12 Ing, Resid. x $ 626.86 (30) x 1.5800/ 1.41 s 4/12 Ing, Jefe de Gaia, x $ 522.38 (30) x 1.5800 / 1.41 s 42 Ing. Seg. x $ 626.86 (30) x 1.5800 / 1.41 s 4N2 Cap, x $ 298.50 (80) x 1.5800/ 1.41 $ s MISCELANEOS.- 4. IMPLEMENTOS DE SEGURIDAD Operaciin : 3x $054 / 141 ge 114 ‘Supervision :042x$0.39 / 1.41 3 oft ae ae 2. HERRAMIENTAS.. somr 1.4 s s GASTOS GENERALES 5 % s UTILIDAD 5 % $ SUB - TOTAL sim. = 3. MOVILIDAD.- $10,000 x 1.30 (30 %) / 6,000 Hrs.=$2.16 / Hr. AN2Mov, x $2.16 /Hra. x8 Hrs, /dia/ 1.44 @ +102 Petréteo: 42 Petréleo x1 Gal. /Hra. x 8 Hrs, /dia x $2.60/Gal/1.41 sig sae 4 Perf, x $3.98 / 1.44 1 Ayud. x$2.73/ 1.4% 1 Peon x$1.84/ 4.41 42 Bod. x $2.73 /1.41 BONIFICACION. SUPERVISION. 42 Ing. Resid. x $557.16 (80) /1.41 412 Ing. Jofe de Gdia. x § 373.13 (30) /1.41 4112 Ing. Seg. x $ 417.91 (30) 11.44 42 Cap. x $ 149.25 (80) 11.44 Operactin : 3 x $.0.18/ 1.41 Supervision: 5/12 x $0.18 /1.41 GOSTO TOTAL: | US Sim, 2.39 1.93 1.30 0.16 5.78 411 0.73 0.82 0.29 2.95 ESTRUCTURA DE COSTOS GALERIA- CRUCERO -6' x7 PARAMETROS.- No, DE TALADROS 25 LONG, PERFORACION SPIES (153M) (6.02pies) EFICIENCIA 1.41 MTUDISP. TIPO DE ROCA SEMIDURA No. DE CARTUCHOSITALADRO 6 TIPO DE EXPLOSIVO SEMIGELATINA 65% 55% EMULNOR 3,000 45% A- PERFORACION 1 Barras Conicas Barras Conicas -4'= 25 Talx3'x$ 28.29, 900 pies /1.41 Barras Conicas -6'= 25 Tal x2.02'x$ 47.26 / 900 pies 1.41 Brocas [Brocas-36 = 25 Talx3'x$ 12:19/200 pies 1.41 ‘Brocas 38 = 25 Talx2.07 x$ 12.69 /200 pies M141 ‘Manguera de pertoracion 20 mts.(§ 2.02 + $ 0.99) /45,000 pies = $0.001 / pie 28 Talx 5.02'x$ 0,001 1.41 Aguzado ‘Aguzadora: '§ 2,950 x 1.30 (30%) / £0,000 pies = $ 0.047 pie 25 Talx5.02' x $ 0.047 1.41 Piedra Esmeri: {$12.10 /6,000 pies = $ 0.002 / pie 25 Talx8.02'x$.0,002/1.41 Accite Perforacién: 14 Galx$ 654/141 B. EXPLOSIVOS 4 Dinamita 7/8" x 7" x 65% 0.55 x24 Tal x 6 CarvTal x $ O.15ICarvIAt Emulnor 3,000 045 x24 Tal x 6 CafiTal x $0,18/CaNt At annex 0.9024 Tal x 1 Pza/Tal x $ 0.5¥PzalI.41 2.26 1188 324 230 0.09 4.18 oar 115 15.27 342 827 ant 4. Mininel 040%24 Tal x 1 PzafTal x $0.89Pzalt.4t S481 5. Mecha Rapida 6 tsp x $O.20MM.At 3 3 77.88 MANO DE OBRA 4 OPERAGION OrPert.XS646 x 1.8172/1.41 $832 Of Ayte. x8 6.24 x 1.8172/1.41 S800 01 Peon x$621x 18172/141 S800 2- Servicios 2 Bod.X $6.21 x 1.6725) 1.41 Ss 06s 2. SUPERVISION. ‘12 ing. Resid. x $ 626.86 (30)x 1.5800/ 1.41 S195 2 ng, Jefe de Geka. x $522.38 (30) x 1.5800 1.41 .s i 112 ing, Seg. x$ 626.86 (30) x 1.5800 11.41 S195 4112 Gap. x $ 298.50 (30) x 1.5000/ 1.41 S092 Satz MISCELANEOS.- 1 IMPLEMENTOS DE SEGURIDAD Operacion «: 3x $0541 141 sud Supenison 042x039 / 141 Son S128 2+ HERRAMIENTAS somtstat $ s GASTOS GENERALES 5% $379 UTILIDAD 5% $379 SUB-TOTAL om = oases 3 MovILIDAD, {$10,000 x 1.30 (30 %) 6,000 Hrs =$2.16 / Ha AN2Moy. x $2.16/Hra.x8 Hrs. dia /1.41 S102 Petréleo: $N12Petéleo x t Gal. Hia.x 8 Hes. dia x$ 2.60 /Gal/1.41 51 7 S228 4 ASIGNACION.- 1 Perl. x$.338/ 1.41 S239 VAyud. x$2.73 1141 S$ 183 1 Pebn xS 1.84/1.41 Sia AN2 Bod.x $2.73/1.41 3019 S578 te SUPERVISION, it ng, Resid x $ 557.16 (80) 11.41 1112 ng, dete de Gala, x $ 373.13 80) 11.41 4112 ng, Seg, x$ 417.91 (30) 11.41 42Cap. x8 149.25 (20) 11.41 UTILES DE CAMPAMENTO COperacién :3x$ 0.18 /1.44 ‘Stpendsin: S112 x $0.18/ 1.41 COSTO TOTAL: US Sim. an 073 029 295 0.30 0.05 0.43 94.98

También podría gustarte