PROGRAMACION DE OBRA

PROYECTO: MEJORAMIENTO DE LOS SERVICIOS CULTURALES DEL SALON DE USOS MULTIPLES EN EL SECTOR DE BARRIAL, DISTRITO DE YANATILE, CALCA CUSCO
TIEMPO DE EJECUCION
ITEM

DESCRIPCION

UND

METRADO

MES 1

TIEMPO DIAS

SEM 1
01.00.00

ESTRUCTURAS

01.01.00

OBRAS PROVISIONALES

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA 3.60 MX2.40 M

01.01.02

RESIDENCIA DE OBRA, ALMACN Y CASETA DE GUARDIANA

01.02.00

TRABAJOS PRELIMINARES

01.02.01
01.02.02

MES 2

SEM 2

SEM 3

33%
56.16

33%
56.17

UND

1.00

M2

60.00

MOVILIZACION Y DEMOVILIZACION DE EQUIPOS Y MAQUINARIAS

GLB

1.00

100%

FLETE TERRESTRE

GLB

1.00

100%

01.02.03

SEALIZACION TEMPORAL DE SEGURIDAD

GLB

1.00

1.00
100%
1.00

01.02.04

LIMPIEZA DE TERRENO MANUAL

M2

168.49

100%
168.49

01.02.05

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

M2

168.49

01.02.06

TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECUCION

M2

168.49

100%
168.49
33%
56.16

01.03.00
01.03.01

MOVIMIENTO DE TIERRAS
DEMOLICION DE CONSTRUCCION EXISTENTE

M2

47.67

100%

01.03.02

EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS DE 1.70 m DE PROFUNDIDAD

M3

31.42

01.03.03

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS CORRIDOS Y VIGAS DE CONEXIN

M3

11.34

16

01.03.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

16.87

16

01.03.05

NIVELACION Y COMPACTADO PARA FALSO PISO DE 4''

M2

143.16

01.03.06

ACARREO DE MATERIAL EXCEDENTE CON BUGUIE D 100 m

M3

68.57

01.03.07

ELIMINACION DE MATERIAL EXCEDENTE

M3

95.08

01.04.00

OBRAS DE CONCRETO SIMPLE

01.04.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO:HORMIGON + 30%PIEDRA

M3

9.96

01.04.02

SOLADO PARA ZAPATAS

M3

1.58

01.04.03

FALSO PISO DE 4" DE CONCRETO 1:10

M2

143.16

01.04.04

SOBRECIMIENTOS

01.04.04.01

CONCRETO 1:10+25% PM-PARA SOBRECIMIENTOS

M3

2.24

100%

01.04.04.02

ENCONFRADO Y DESENCONFRADO DE SOBRECIMIENTOS

M2

29.88

12

100%

SEM 4

SEM 5

SEM 6

MES 3

SEM 7

SEM 8

SEM 9

SEM 10

33%
26.07
33%

33%
26.07
33%

33%
26.07
33%

100%
1.00
100%
60.00

1.00

47.67
100%
31.42
100%
100%
16.87
100%
143.16
100%
68.57

70.00%
66.56

30%
28.52

100%
9.96
100%
1.58
100%
143.16

2.24

29.88
01.05.00
01.05.01
01.05.01.01

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO f'c= 210 kg/cm2

M3

7.39

01.05.01.02

ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60 PARA ZAPATAS

KG

220.21

15

01.05.02
01.05.02.01

VIGAS DE CONEXIN
CONCRETO f'c= 210 kg/cm2

M3

4.98

15

01.05.02.02

ENCOFRADO Y DESENCOFRADO DE VIGAS DE CONEXIN

M2

9.60

01.05.02.03

ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60

KG

631.18

100%
7.39
100%
220.21
100%
4.98

15

100%
9.60
100%

10

631.18
01.05.03
01.05.03.01

COLUMNAS
CONCRETO f'c= 210 kg/cm2

M3

7.94

10

01.05.03.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

M2

94.43

10

01.05.03.03

ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60

KG

1,420.01

10

01.05.04
01.05.04.01

VIGAS
CONCRETO f'c= 210 kg/cm2

M3

5.98

10

100%
5.98

01.05.04.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

M2

71.66

10

01.05.04.03

ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60

KG

948.53

10

100%
71.66
100%
948.53

01.06.00
01.06.01

COBERTURA
TIJERAL METALICO T-I

UND

6.00

100%
6.00

01.06.02

TIJERAL METALICO T-II

UND

2.00

01.06.03

COBERTURA DE PLANCHA DE TEJA ANDINA ENTERNIT

M2

218.95

01.06.04

CORREAS DE TUBO DE ACERO DE 50x25x2.5mm

218.38

100%
2.00
100%
218.95
100%
218.38

01.06.05

CUMBRERA SUPERIOR-PLANCHA

22.00

01.07.00
01.07.01

TRIBUNA DE CONCRETO CICLOPEO f'c=175 kg/cm2


EXCAVACION MANUAL

M3

26.51

01.07.02

NIVELACION Y COMPACTADO MANUAL

M2

94.45

01.07.03

SOLADO DE 4" MEZCLA 1:4 CEMENTO: HORMIGON

M2

94.45

01.07.04

ENCOFRADO Y DESENCOFRADO CADA 4m

M2

78.22

01.07.05

CONCRETO CICLOPEO f'c=175 kg/cm2 + 70% P.G.

M3

170.01

56.66

56.66

56.66

01.07.06

JUNTAS DE CONSTRUCCION CON TECKNOPORT e=1"

M2

19.60

12

33%

33%

33%

12

6.53
33%
26.07

6.53
33%
26.07

6.53
33%
26.07

M2

78.22

M2

172.47

01.07.07

CURADO DE CONCRETO

02.00.00
02.01.00

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA

02.01.00

MURO DE SOGA LADRILLO KING KONG CON CEMENTO-ARENA (Junta e= 1.5 cm)

02.02.00

REVOQUES Y ENLUCIDOS

02.02.01

TARRAJEO O RAYADO PRIMARIO CON MEZCLA CEMENTO ARENA 1:5

M2

33.28

02.02.02

TARRAJEO INTERIOR Y EXTERIOR CON MEZCLA CEMENTO ARENA 1:5

M2

309.22

02.02.03

TARRAJEO EN SOBRECIMIENTOS

M2

6.92

12

02.02.04

TARRAJEO EN COLUMNAS

M2

35.87

12

02.02.05

TARRAJEO EN VIGAS

M2

49.64

12

02.02.06

VESTIDURA DE DERRAMES EN VENTANAS, PUERTAS Y VANOS

116.20

12

02.02.07

BRUAS 1cm X 1cm ENTRE MUROS Y ESTRUCTURAS

139.80

12

02.03.00

CIELORRASOS

30%
2.38
50%
47.22

70%
5.56
50%
47.22

50%

50%

710.01

710.01

100%
22
100%
26.51
100%
94.45
100%
94.45

12

50%

50%

86.24

86.24

12

50%
16.64

12

50%
16.64
100%
309.22

100%
6.92
50%
17.94

50%
17.94
100%
49.64
100%
116.20
100%
139.80

SEM 11

SEM 12

TIEMPO DE EJECUCION
ITEM

DESCRIPCION

UND

METRADO

MES 1

TIEMPO DIAS

SEM 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

MES 3

SEM 7

SEM 8

SEM 9

SEM 10

02.03.01

FALSO CIELO CON BALDOSAS DE FIBRA MINERAL

M2

37.15

12

02.03.02

FALSO CIELO PANELES DE TRIPLAY CON ENLUCIDO DE YESO

M2

145.00

12

02.04.00
02.04.01
02.04.01.01

PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO INTERIOR DE 40 mm FC=175KG/CM2

M2

143.65

12

02.04.02
02.04.02.01

PISOS
PISO CERAMICO NACIONAL DE PRIMERA, ANTIDESLIZANTE DE 30 x 30 cm.

M2

13.97

12

100%
13.97

02.04.02.02

PISO CERAMICO CELIMA DE 40 X 40 CM, ANTIDESLIZANTE

M2

10.50

12

02.04.02.03

PISO DE MADERA MACHIHEMBRADA

M2

109.18

12

02.04.02.04

PISO DE CEMENTO PULIDO

M2

10.00

20

100%
10.50
50%
54.59
100%
10.00

02.04.03
02.04.03.01

SARDINELES
SARDINELES DE CONCRETO f'c= 140 kg/cm2, H=0.60

34.40

20

02.05.00
02.05.01
02.05.01.01

ZCALOS Y CONTRAZCALOS
ZCALOS
ZOCALO DE CERAMICO CELIMA DE 40 X 40 CM, ANTIDESLIZANTE

M2

34.24

20

100%

02.05.01.02

ZOCALO DE CEMENTO PULIDO H=0.60

M2

33.42

20

34.24
100%
33.42

02.05.02
02.05.02.01

CONTRAZCALOS
CONTRAZCALO DE CERMICA

12.40

20

100%
12.40

02.05.02.02

CONTRAZCALO DE CEMENTO PULIDO

11.87

20

02.05.02.03

CONTRAZOCALO DE MADERA MACHIHEMBRADA

52.35

20

100%
11.87
100%
52.35

02.06.00
02.06.01

CARPINTERIA DE MADERA
PUERTAS DE MADERA

M2

12.86

20

100%

02.06.02

TABLADILLO DE MADERA C/ESCALERA

UND

1.00

10

12.86
100%
1.00

02.07.00
02.07.01

CARPINTERIA METLICA
SEPARADOR Y PUERTAS DE TABLERO AGLOMERADO MELAMINA 18mm C/ESTRUCTURA DE ALUMINIO
DE 1 1/2'', EN SS.HH.

M2

11.34

10

100%
11.34

02.07.02

VENTANAS DE VIDRIO LAMINADO CON ACCESORIOS DE ALUMINIO

M2

37.77

10

100%

02.08.00
02.08.01
02.08.01.01

CERRAJERA
CERRADURAS
CERRADURA TIPO - A PUERTA EXTERIOR

UND

1.00

10

100%

02.08.01.02

CERRADURA TIPO - B PUERTA INTERIOR

UND

4.00

10

1.00
100%
4.00

02.09.00
02.09.02

VIDRIOS Y ESPEJOS
ESPEJOS

M2

0.75

10

02.10.00
02.10.01

PINTURAS
PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES C/IMPRIMANTE

M2

287.99

10

02.10.02

PINTURA LATEX EN COLUMNAS C/IMPRIMANTE

M2

32.69

10

02.10.03

PINTURA LATEX EN VIGAS C/IMPRIMANTE

M2

49.64

02.11.00
02.11.01

LIMPIEZA Y JARDINERIA
LIMPIEZA FINAL DE OBRA

GLB

1.00

02.11.02

TRABAJOS DE JARDINERIA

GLB

1.00

03.00.00
03.01.00
03.01.01

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
APARATOS SANITARIOS

03.01.01.01

INODORO DE LOSA CON TANQUE BAJO, COLOR BLANCO

UND

4.00

03.01.01.02

LAVATORIO DE LOSA VITRIFICADA C/GRIFERIA CROMADA

UND

2.00

03.01.01.03

URINARIO LOSA VITRIFICADA

UND

2.00

13

03.01.01.04

INSTALACION DE APARATOS SANITARIOS

UND

8.00

13

03.01.02
03.01.02.01

ACCESORIOS SANITARIOS
PAPELERA DE LOSA BLANCA 15 X 15 P/EMPOTRAR

UND

4.00

13

03.01.02.02

TACHO DE BASURA DE ALUMINIO

UND

4.00

13

03.01.02.03

COLOCACION DE ACCESORIOS SANITARIOS

UND

4.00

13

03.02.00
03.02.01
03.02.01.01

SISTEMA DE AGUA POTABLE


SALIDAS DE AGUA
SALIDA DE AGUA FRIA CON TUBERIA PVC SAP 1/2"

PTO

9.00

13

100%
9.00

03.02.02
03.02.02.01

RED DE DISTRIBUCION Y MONTAJE


RED DE DISTRIBUCION CON TUBERIA PVC 1/2"

19.64

13

100%

03.02.02.02

RED DE DISTRIBUCION CON TUBERIA PVC 3/4"

6.00

13

100%
6.00

03.02.03

ACCESORIOS SANITARIOS

03.02.03.01

TEE PVC SAP SP 3/4"

UND

1.00

100%

03.02.03.02

TEE PVC SAP SP 1/2"

UND

7.00

100%

03.02.03.03

CODO PVC SP 3/4" x 90

UND

1.00

100%

03.02.03.04

CODO PVC SP 1/2" x 90

UND

20.00

100%

03.02.04

VALVULAS

03.02.04.01

VALVULA COMPUERTA DE BRONCE DE 1/2"

03.03.00

SISTEMA DE DESAGE

03.03.01

SALIDAS DE DESAGE

03.03.01.01

SALIDA DE DESAGE PVC SAL DE 2"

PTO

5.00

100%

03.03.01.02

SALIDA DE DESAGE PVC SAL DE 4"

PTO

4.00

100%

03.03.01.03

SALIDA DE VENTILACION PVC DE 2"

PTO

4.00

100%

03.03.02

SISTEMAS DE REDES DE DESAGE

03.03.02.01

RED COLECTORA DE PVC SAL PARA DESAGE 2"

6.80

100%

03.03.02.02

RED COLECTORA DE PVC SAL PARA DESAGE 4"

16.66

100%

SEM 11

SEM 12

100%
37.15
100%
145.00

100%
143.65

50%
54.59

100%
34.40

37.77

100%
0.75
50%
144.00
100.00%
32.69

50%
144.00

100%
49.64
100%
1.00
100%
1.00

100%
4.00
100%
2.00
100%
2.00
100%
8.00
100%
4.00
100%
4.00
100%
4.00

19.64

1.00
7.00
1.00
20.00

UND

3.00

100%
3.00

5.00
4.00
4.00

6.80
16.66
03.03.02.03

RED COLECTORA DE PVC SAL PARA DESAGE 6"

5.42

100.00%

03.03.02.04

VENTILACION PVC DE 2''

18.80

100.00%

5.42
18.80
03.03.03

ACCESORIOS SANITARIOS

03.03.03.01

SUMIDERO CROMADO DE 2''

PZA

3.00

100%

03.03.03.02

REGISTRO ROSCADO DE BRONCE DE 4"

UND

4.00

100%

03.03.03.03

REGISTRO ROSCADO DE BRONCE DE 2"

UND

2.00

100%

03.03.03.04

YEE PVC SAL DE 2" X 2"

UND

5.00

100%

03.03.03.05

YEE PVC SAL DE 4" X 2"

UND

5.00

100%

03.03.03.06

YEE PVC SAL DE 4" X 4"

UND

7.00

100%

3.00
4.00
2.00
5.00
5.00

TIEMPO DE EJECUCION
ITEM

DESCRIPCION

UND

METRADO

MES 1

TIEMPO DIAS

SEM 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

MES 3

SEM 7

SEM 8

SEM 9

SEM 10

SEM 11

7.00
03.03.04

REDES COLECTORAS

03.03.04.01

TRAZO Y REPLANTEO PRELIMINAR

5.42

100%

03.03.04.02

EXCAV. ZANJAS P/REDES SANITARIAS (HASTA 1.0 m)

5.42

100.00%

03.03.04.03

REFINE Y NIVELACION DE ZANJAS

5.42

100%

03.03.04.04

CAMA DE ARENA (RED DE DESAGUE)

5.42

100%

03.03.04.05

RELLENO COMPACTADO CON MATERIAL PROPIO

5.42

100%

03.03.05

CAJAS DE INSPECCION

03.03.05.01

CAJA DE REGISTRO DE DESAGUE 12"x24"

UND

2.00

100%

03.03.06

VENTILACION

03.03.06.01

SOMBRERO DE VENTILACIN DE 2"

UND

4.00

100%

03.04.00

SISTEMA DE AGUAS PLUVIALES

03.04.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA 6"

21.52

100%

03.04.02

TUBERIA PVC SAL DE 3" PARA AGUAS PLUVIALES

3.20

100%

03.04.03

ACCESORIOS PVC SAL DE 3" PARA AGUAS PLUVIALES

GLB

1.00

100%

04.00.00

INSTALACIONES ELECTRICAS

04.01.00

TABLERO DE SISTRIBUCION

04.01.01

TABLEROS DE DISTRIBUCION CON CAJA METALICA CON20 POLOS

04.02.00

EQUIPOS PARA ALUMBRADOS INTERIOR

04.02.01

EQUIPOS PARA ALUMBRADOS INTERIOR

04.03.00

SALIDAS DE LUZ, INTERRUPTORES, TOMACORRIENTES Y CAJAS

04.03.01

SALIDA PARA CENTROS DE LUZ

PTO

16.00

100%

04.03.02

SALIDA PARA INTERRUPTOR DOBLE

PTO

4.00

100%

04.03.03

SALIDA PARA INTERRUPTOR SIMPLE

PTO

2.00

100%

04.03.04

SALIDA PARA INTERRUPTOR TRIPLE

PTO

2.00

100%

04.03.05

SALIDA PARA LUCES DE EMERGENCIA

PTO

2.00

100%

04.04.00

SISTEMA DE PUESTA A TIERRA

04.04.01

POZO PUESTA A TIERRA

UND

1.00

10

100%

5.42
5.42
5.42
5.42
5.42

2.00

4.00

21.52
3.20
1.00

UND

1.00

GLB

1.00

100%
1.00
100%
1.00

16.00
4.00
2.00
2.00
2.00

1.00

SEM 12

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES

SEM 1

SEMNAS

01
01.01
01.01.01

INFRAESTRUCTURA VEHICULAR
OBRAS PROVISIONALES
CARTEL DE OBRA

und

4.00

S/. 4,437.16

01.01.02

ALMACEN Y RESIDENCIA DE OBRA

UND

10.00

S/. 14,800.00

01.01.03

GALPONES EN CANTERA DE AGREGADOS

und

2.00

S/. 6,000.00

S/.

100%
S/. 4,437.16
25%
3,700.00
100%

S/.

01.01.04

CASETA DE ALMACEN Y GUARDIANIA

und

2.00

S/. 1,521.40

01.01.05

BAOS PORTATILES

und

4.00

S/. 1,690.68

01.01.06

CERCO PERIMETRICO DE ARPILLERA

150.00

S/. 4,578.00

01.01.07

CARTELES DE SEALIZACION Y SEGURIDAD DE OBRA

und

20.00

S/. 3,130.00

6,000.00
100%

S/.

1,521.40
50%

S/.

845.34
33%

S/.

1,526.00
25%

S/.

01.02
01.02.01

TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO

m2

14,664.57

S/. 25,369.71

25

782.50
4%

S/.

01.02.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

GLB

2.00

S/. 20,000.00

01.02.03

TRANSPORTE DE MATERIALES PARA LA OBRA

GLB

2.00

S/. 12,000.00

01.02.04

EQUIPO PERSONAL DE SEGURIDAD EN OBRA

und

140.00

S/. 41,300.00

1,014.79
25%

S/.

5,000.00
25%

S/.
S/.

01.03
01.03.01
01.03.01.01

MOVIMIENTO DE TIERRAS
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO EN TALUD

m3

10,884.52

S/. 63,456.75

3,000.00
25%
10,325.00

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

01.03.01.02

CORTE DE MATERIAL ROCOSO EN TALUD

m3

2,547.90

S/. 36,817.16

01.03.01.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

17,865.12

S/. 448,057.21

16

m3

23,129.18

S/. 118,421.40

16

01.03.03
01.03.03.01

MEJORAMIENTO DE SUB RASANTE


CORTE DE TERRENO PARA MEJORAMIENTO DE SUB RASANTE

01.03.03.02

ENROCADO (H=0.40m.)

m3

572.23

S/. 35,335.20

01.03.03.03

CAPA ANTICONTAMINANTE (e=10 cm.)

m2

2,861.15

S/. 36,050.49

01.03.03.04

EXTENDIDO Y COMPACTACION (MEJORAMIENTO DE SUB-RASANTE)

m2

29,126.12

S/. 138,640.33

01.03.03.05

RIEGO

m2

28,911.47

S/. 45,101.89

01.03.03.06

ELIMINACION DE MATERIAL EXCEDENTE

m3

30,761.80

S/. 771,505.94

17

m3

11,535.68

S/. 122,624.28

01.04
01.04.01
01.04.01.01

PAVIMENTOS
SUB BASE (E=0.30m.)
EXTRACCION Y PREPARACION DE MATERIAL DE SUB-BASE

01.04.01.02

CARGUIO Y TRANSPORTE DE MATERIAL DE SUB BASE (Dmax=10km)

m3

11,535.68

S/. 247,094.27

01.04.01.03

EXTENDIDO Y COMPACTACION DE SUB-BASE

m2

28,911.47

S/. 142,822.66

01.04.01.04

RIEGO

m2

28,911.47

S/. 45,101.89

m3

8,964.18

S/. 95,558.16

12

01.04.02
01.04.02.01

BASE (E=0.20 m.)


EXTRACCION Y PREPARACION DE MATERIAL DE BASE

01.04.02.02

CARGUIO Y TRANSPORTE DE MATERIAL DE BASE (Dmax=10km)

m3

8,964.18

S/. 179,014.67

01.04.02.03

SUMINISTRO E INSTALACION DE GEOMALLA BIAXIAL

m2

30,988.77

S/. 307,718.49

15

01.04.02.04

EXTENDIDO Y COMPACTACION DE BASE

m2

33,699.92

S/. 149,627.64

15

01.04.02.05

RIEGO

m2

33,699.92

S/. 52,571.88

15

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

01.04.03
01.04.03.01

CARPETA ASFALTICA e = 3"


LIMPIEZA CON AIRE COMPRIMIDO

m2

33,699.92

S/. 82,227.80

10

01.04.03.02

IMPRIMADO Y ARENADO

m2

33,699.92

S/. 291,167.31

10

01.04.03.03

SUMINISTRO Y COLOCADO DE GEOTEXTIL DE REPAVIMENTACION

m2

33,699.92

S/. 721,852.29

10

01.04.03.04

CALENTADO DE PLANTA DE ASFALTO SIN PRODUCCION

hm

236.00

S/. 19,293.00

10

01.04.03.05

MEZCLA ASFALTICA POR TON. DE PRODUCCION

ton

6,680.67

S/. 3,008,706.54

10

01.04.03.06

TRANSPORTE DE MEZCLA ASFALTICA EN CALIENTE

ton

6,680.67

S/. 76,159.64

10

01.04.03.07

COLOCADO DE MEZCLA ASFALTICA EN CALIENTE 3"

m2

33,699.92

S/. 196,807.53

10

m3

189.00

S/. 6,202.98

01.05
01.05.01
01.05.01.01

REPOSICION DE REDES AGUA POTABLE Y DESAGUE


REPOSICION DE DESAGUE
EXCAVACION MANUAL DE ZANJAS PARA REDES DE TUBERIA

01.05.01.02

CAMA DE APOYO PARA TUBERIAS (H=10cm)

m2

189.00

S/. 3,005.10

01.05.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

251.37

S/. 10,876.78

01.05.01.04

SUM INSTAL TUBERIA PVC SAL SEGUN NECESIDAD INC ACCESORIOS

315.00

S/. 16,354.80

01.05.01.05

NIVELACION DE BUZONES EN GENERAL

und

36.00

S/. 16,953.12

01.05.01.06

SUM. E INSTAlL. DE TAPA CON MARCO PARA BUZON

und

22.00

S/. 9,247.26

m3

66.00

S/. 2,166.12

01.05.02
01.05.02.02

REPOSICION DE AGUA
EXCAVACION MANUAL DE ZANJAS PARA REDES DE TUBERIA

01.05.02.01

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

87.78

S/. 3,798.24

01.05.02.03

SUM INSTAL TUBERIA PVC SAP SEGUN NECESIDAD INC ACCESORIOS

110.00

S/. 2,467.30

01.05.02.04

REPOSICION DE VALVULAS SEGUN NECESIDAD

und

8.00

S/. 731.44

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

Subpresupuesto
2
INFRAESTRUCTURA PEATONAL
02.01
VEREDAS
02.01.01
NIVELACION Y COMPACTADO MANUAL

m2

4,385.00

S/. 14,338.95

12

02.01.02

CONCRETO f'c = 175 Kg/cm2

m3

350.00

S/. 145,045.28

12

02.01.03

EMPEDRADO DE 6"

m2

4,385.00

S/. 101,468.90

12

02.01.04

ENCOFRADO Y DESENCOFRADO DE VEREDAS

m2

146.17

S/. 4,461.11

12

02.01.05

CURADO DE CONCRETO

m2

4,385.00

S/. 2,850.25

12

02.01.06

SELLADO DE JUNTAS, e=3/4", h=0.05 m. (Para veredas de concreto)

1,461.67

S/. 6,445.96

12

m2

805.00

S/. 70,501.90

12

m2

805.00

S/. 15,874.60

12

m2

540.00

S/. 934.20

12

02.01.07
02.01.08
Subpresupuesto
2.02
02.02.01

ACABADO DE VEREDAS CON ADOQUINES DE CONCRETO EN ZONA DE


BANCAS
SELLADO DE JUNTAS ENTRE ADOQUINES (C f'c=210 kg/cm2) (Para veredas
con acabado de adoquin de C)
SARDINELES DE CONCRETO
TRAZO, NIVELES Y REPLANTEO

02.02.02

EXCAVACION MANUAL

m3

162.00

S/. 5,316.84

12

02.02.03

CONCRETO f'c = 175 Kg/cm2

m3

243.00

S/. 100,473.21

12

02.02.04

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

1,440.00

S/. 45,201.60

12

02.02.05

SELLADO DE JUNTAS EN SARDINELES, e=3/4", h=0.15 m.

480.00

S/. 3,940.80

12

02.02.06

CURADO DE CONCRETO

m2

1,800.00

S/. 1,170.00

12

m3

834.20

S/. 27,378.44

20

03

SISTEMA DE EVACUACION DE AGUAS PLUVIALES

4
04.01
04.01.01

MUROS DE SOSTENIMIENTO
MUROS DE CONCRETO CICLOPEO
EXCAVACION MANUAL

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.01.02

NIVELACION Y COMPACTADO MANUAL

m2

304.23

S/. 596.29

20

04.01.03

SOLADO DE 4" MEZCLA 1:12 CEMENTO : HORMIGON

m2

299.47

S/. 7,914.99

20

04.01.04

ENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTO

m2

971.90

S/. 52,647.82

20

04.01.05

CONCRETO CICLOPEO F'c = 175 Kg/cm2 + 30% P.G.

m3

1,513.84

S/. 487,607.86

20

04.01.06

RELLENO COMPACTADO CON MATERIAL PROPIO (manual)

m3

589.47

S/. 20,307.24

20

04.01.07

COLOCACION DE TUBERIA DE PVC SAP 3" (Drenaje Transversal)

396.00

S/. 9,111.96

20

04.01.08

CURADO DE CONCRETO

m2

906.00

S/. 453.00

20

m3

380.22

S/. 12,478.82

10

04.02.00
04.02.01

MUROS DE CONCRETO ARMADO


EXCAVACION MANUAL

04.02.01

NIVELACION Y COMPACTADO MANUAL

m2

77.63

S/. 152.15

10

04.02.02

SOLADO DE 4" MEZCLA 1:12 CEMENTO : HORMIGON

m2

64.87

S/. 1,714.51

10

04.02.03

ENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTO (CA)

m2

609.80

S/. 38,704.01

10

04.02.04

CONCRETO f'c = 210 Kg/cm2

m3

169.16

S/. 73,445.89

10

04.02.05

RELLENO COMPACTADO CON MATERIAL PROPIO (muro)

m3

96.35

S/. 1,099.35

10

04.02.06

ACERO DE REFUERZO G-60

kg

8,042.04

S/. 58,063.53

10

04.02.07

CURADO DE CONCRETO

m2

396.12

S/. 198.06

10

04.02.08

ELIMINACION DE MATERIAL EXCEDENTE

m3

1,578.75

S/. 39,595.05

10

m2

709.11

S/. 1,226.76

m3

15.37

S/. 323.69

04.03
04.03.01
04.03.01.01
04.03.01.02

MURO PICCHU ALTO


TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
DEMOLICION DE MUROS DE CONTENCION DE CA

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.03.01.03

ACARREO DE MATERIALDE DEMOLICION D=40 M

m3

20.75

S/. 238.00

04.03.01.04

ELIMINACION DE DESMONTE PROVENIENTE DE LAS DEMOLICIONES

m3

20.75

S/. 520.41

04.03.01.05

CANALETA TEMPORAL EN CORONA DE MURO DE CONCRETO SIMPLE DE 12" m

96.65

S/. 7,931.10

m3

2,205.18

S/. 72,374.01

13

04.03.02
04.03.02.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL

04.03.02.02

NIVELACION Y COMPACTADO MANUAL

m2

515.76

S/. 1,010.89

13

04.03.02.03

ENTIBADO DE MADERA CON ROLLIZO DE 4"

m2

222.60

S/. 12,674.84

13

04.03.02.04

ACARREO DE MATERIALDE DEMOLICION D=40 M

m3

1,215.13

S/. 13,937.54

13

04.03.02.05

ELIMINACION DE DESMONTE PROVENIENTE DE LAS DEMOLICIONES

m3

1,215.13

S/. 30,475.46

13

04.03.02.06

RELLENO CON MATERIAL PROPIO C/EQUIPO LIVIANO

m3

1,541.35

S/. 66,694.21

13

04.03.02.07

EXTRACCION Y PREPARACION DE MATERIAL DE SUB-BASE

m3

1,541.35

S/. 16,384.55

13

04.03.02.08

CARGUIO Y TRANSPORTE DE MATERIAL DE SUB BASE (Dmax=10km)

m3

1,541.35

S/. 33,015.72

13

04.03.03
04.03.03.01

OBRAS DE CONCRETO SIMPLE


SOLADO DE 4" MEZCLA 1:12 CEMENTO : HORMIGON

m2

595.32

S/. 15,734.31

04.03.04
04.03.04.01

MURO GAVION TIPO 1


TRAZO, NIVELES Y REPLANTEO

m2

291.50

S/. 504.30

04.03.04.02

APROVISIONAMIENTO DE PIEDRA GRANDE Y MEDIANA ENTRE 6" A 8"

m3

2,159.75

S/. 190,187.59

04.03.04.03

ACARREO DE PIEDRAS PARA GAVIONES D=40 M

m3

2,159.75

S/. 26,824.10

04.03.04.04

APROVISIONAMIENTO DE CAJONES TIPO "A" (1.0X1.0X5.0)

und

217.00

S/. 114,458.82

04.03.04.05

APROVISIONAMIENTO DE CAJONES TIPO "B" (1.0X1.5X5.0)

und

143.00

S/. 81,861.78

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.03.04.06

ARMADO DE CAJONES TIPO "A" (1.0X1.0X5.0)

und

217.00

S/. 20,970.88

04.03.04.07

ARMADO DE CAJONES TIPO "B" (1.0X1.5X5.0)

und

143.00

S/. 23,030.15

04.03.04.08

PERFILADO DE TALUDES LATERALES

m2

424.00

S/. 2,811.12

04.03.04.09

SUMINISTRO Y COLOCACION DE GEOTEXTIL

m2

424.00

S/. 9,082.08

m2

390.00

S/. 674.70

04.03.05
04.03.05.01

MURO GAVION TIPO 2


TRAZO, NIVELES Y REPLANTEO

04.03.05.02

APROVISIONAMIENTO DE PIEDRA GRANDE Y MEDIANA ENTRE 6" A 8"

m3

1,616.75

S/. 142,371.01

04.03.05.03

ACARREO DE PIEDRAS PARA GAVIONES D=40 M

m3

1,616.75

S/. 20,080.04

04.03.05.04

APROVISIONAMIENTO DE CAJONES TIPO "A" (1.0X1.0X5.0)

und

134.00

S/. 70,679.64

04.03.05.05

APROVISIONAMIENTO DE CAJONES TIPO "B" (1.0X1.5X5.0)

und

122.00

S/. 69,840.12

04.03.05.06

ARMADO DE CAJONES TIPO "A" (1.0X1.0X5.0)

und

134.00

S/. 12,949.76

04.03.05.07

ARMADO DE CAJONES TIPO "B" (1.0X1.5X5.0)

und

122.00

S/. 19,648.10

04.03.05.08

PERFILADO DE TALUDES LATERALES

m2

501.75

S/. 3,326.60

04.03.05.09

SUMINISTRO Y COLOCACION DE GEOTEXTIL

m2

501.75

S/. 10,747.49

kg

478.03

S/. 3,451.38

04.03.06
04.03.06.01
04.03.06.01.01

MURO DE CONCRETO ARMADO


CIMENTACION
ACERO DE REFUERZO G-60

04.03.06.01.02

ENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTO (CA)

m2

9.57

S/. 607.41

04.03.06.01.03

CONCRETO f'c = 210 Kg/cm2

m3

6.70

S/. 2,909.01

04.03.06.02
04.03.06.02.01

MURO DE CONTENCION
ACERO DE REFUERZO G-60

kg

664.80

S/. 4,799.86

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.03.06.02.02

ENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTO (CA)

m2

80.64

S/. 5,118.22

04.03.06.02.03

CONCRETO f'c = 210 Kg/cm2

m3

11.09

S/. 4,815.06

04.03.06.02.04

CURADO DE CONCRETO

m2

40.32

S/. 20.16

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.04
04.04.01
04.04.01.01

MURO MERCADO TICA TICA


TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO

m2

900.00

S/. 1,557.00

04.04.02
04.04.02.01
04.04.02.01.01

MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION PLATAFORMA RETROEXCAVADORA

m3

5,062.50

S/. 95,276.25

04.04.02.01.02

REFINE DE FONDO DE ZANJA MANUAL_x000D_

m2

600.00

S/. 2,922.00

04.04.02.01.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

6,867.00

S/. 172,224.36

04.04.02.02
04.04.02.02.01

RELLENO DE SUELO REFORZADO


PREPARACION AFIRMADO TRACTOR D7

m3

4,788.00

S/. 21,929.04

04.04.02.02.02

ZARANDEO MATERIAL GRANULAR CARGADOR FRONTAL

m3

6,368.04

S/. 55,847.71

04.04.02.02.03

CARGUIO Y TRANSPORTE DE MATERIAL DE BASE (Dmax=10km)

m3

6,368.04

S/. 127,169.76

04.04.02.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO (muro-manual)

m3

6,368.04

S/. 109,148.21

04.04.02.02.05

RIEGO

m2

12,000.00

S/. 18,720.00

04.04.03

MURO DE CONTENCION CON SUELO REFORZADO

04.04.03.01

LABRADO DE PIEDRA

m3

198.00

S/. 23,605.56

10

04.04.03.02

ACARREO DE PIEDRA

m3

287.10

S/. 64,172.59

10

04.04.03.03

ENCOFRADO PARA ALINEADO DE MUROS TERRAMESH

m2

600.00

S/. 27,954.00

10

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

04.04.03.04

SUMINISTRO E INSTALACION DE ELEMENTOS TERRAMESH 1.0x1.0x3.0 (10x12 und

300.00

S/. 204,708.00

10

04.04.03.05

SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE POLIESTER Tu=150 m2

3,240.00

S/. 60,328.80

10

04.04.03.06

SUMINISTRO E INSTALACION DE GEOCOMPUESTO DE DRENAJE

m2

600.00

S/. 18,972.00

10

04.04.03.07

SUMINISTRO E INSTALACIN DE TUBERIA HDPE perforada de 8"

177.00

S/. 3,228.48

10

und

40.00

S/. 1,200.00

04.05
04.05.01

CONTROL DE CALIDAD
ELABORACION Y ROTURA DE BRIQUETAS DE C

04.05.02

DENSIDAD DE CAMPO

und

78.00

S/. 3,900.00

04.05.03

CALICATAS DE VERIFICACION PARA SUELOS

und

21.00

S/. 7,350.00

04.05.04

DISEO DE MEZCLAS DE C

und

5.00

S/. 1,250.00

04.05.05

ENSAYO MARSHALL PARA CALIDAD DE ASFALTO

und

3.00

S/. 750.00

mes

8.00

S/. 56,000.00

10

05
06
06.01

ACONDICIONAMIENTO URBANO
MITIGACION DE IMPACTOS
IMPLEMENTACION DE SEGURIDAD EN OBRA

06.02

RIEGO PERMANENTE EN OBRA

mes

8.00

S/. 67,353.60

10

06.03

MANEJO DE RESIDUOS SOLIDOS

GLB

1.00

S/. 20,000.00

10

06.04

SEALIZACION TEMPORAL PARA CIERRES DE VIA

mes

8.00

S/. 84,400.00

10

06.05
06.05.01

PLAN DE MANEJO AMBIENTAL


SUMINISTRO Y COLOCADO DE GEOMANTA PARA PROTECCION DE TALUD

m2

13,196.00

S/. 526,388.44

15

06.06

PLAN DE MONITOREO ARQUEOLOGICO

SEM 1

TIEMPO
ITEM

DESCRIPCION

UND

METRADO

COSTO

MESES
SEMNAS

06.06.01

mes

7.00

S/. 35,000.00

06.07
06.07.01

PLAN DE CONTINGENCIA
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD und

1.00

S/. 32,600.00

06.08
06.08.01

TRATAMIENTO DE AREAS VERDES


REVEGETACION EN TALUDES

m2

13,196.00

S/. 190,814.16

20

m2

330.00

S/. 16,443.90

20

1.00

S/. 3,973.55

14,667.57

S/. 2,933.51

1.00

S/. 15,000.00

06.08.02
06.09
06.09.01

MONITOREO E INTERVENCION ARQUEOLOGICA

PLANTONES EN TALUDES
PLAN DE CIERRE DE OBRA
DESMONTAJE DE INSTALACIONES PROVICIONALES

GLB

06.09.02

LIMPIEZA FINAL DE OBRA

m2

06.09.03

PREPARACION DE CEREMONIA PARA ENTREGA DE OBRA

GLB

S/. 12,175,288.87

SEM 1

S/. 38,152.19

MES 1

SEM 2

SEM 3

25%
S/.

MES 2

SEM 4

25%
3,700.00 S/.

SEM 5

SEM 6

SEM 7

SEM 8

25%
3,700.00 S/.

3,700.00

50%
S/.

845.34
33%

S/.

33%
1,526.00 S/.

1,526.00
25%
S/.

4%
S/.

4%
1,014.79 S/.

4%
1,014.79 S/.

782.50
4%

1,014.79 S/.

4%
1,014.79 S/.

4%
1,014.79 S/.

4%
1,014.79 S/.

1,014.79

25%
S/.

5,000.00
25%

S/.

3,000.00
25%

S/.

10,325.00

20%
S/.

20%
12,691.35 S/.

12,691.35

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8

6%
S/.
6%
S/.

6%
7,401.34 S/.

6%
7,401.34 S/.

6%
7,401.34 S/.

33%
S/.

6%
7,401.34 S/.

33%
11,778.40 S/.

13%
S/.

11,778.40 S/.

S/.

11,778.40
18,025.25
13%

17,330.04

S/.

13%
5,637.74

6%

S/.
6%

45,382.70 S/.

5,637.74

S/.
6%

45,382.70 S/.

45,382.70 S/.

17,517.75

S/.

35,299.18

S/.

35,299.18
14%

20,403.24

S/.

14%
S/.

17,517.75
14%

14%
S/.

45,382.70

14%

14%
S/.

5,637.74
6%

14%
S/.

17,330.04
13%

6%
45,382.70 S/.

7,401.34

50%
18,025.25 S/.

S/.

13%
S/.

6%
7,401.34 S/.

13%
17,330.04

28,003.58

33%

50%
S/.

6%
28,003.58 S/.

20,403.24
14%

6,443.13

S/.

6,443.13

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8

20%
S/.

1,240.60
20%

S/.

601.02
20%

S/.

2,175.36
20%

S/.

3,270.96
20%

S/.

3,390.62
20%

S/.

1,849.45
20%

S/.

433.22
20%

S/.

759.65
20%

S/.

493.46
20%

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8
S/.

8%
S/.

8%
1,194.91 S/.

8%
S/.

12,087.11 S/.
8,455.74 S/.

S/.

371.76 S/.

S/.

237.52 S/.

S/.

537.16 S/.

S/.

5,875.16 S/.

S/.

S/.

5%

3,766.80 S/.

S/.

3,766.80
8%

328.40 S/.
8%

S/.

5%

8,372.77
8%

8%

97.50

5%

8,372.77 S/.

S/.

328.40

443.07
8%

8%

8%
97.50 S/.

443.07 S/.

S/.

3,766.80

77.85
8%

8%
8,372.77

328.40 S/.

S/.

S/.

8%

8%

5%

443.07

3,766.80 S/.

8%
77.85 S/.

8%

8%

8%
S/.

8%

8%
8,372.77 S/.

1,322.88

S/.

8%

8%
S/.

1,322.88 S/.

77.85

443.07 S/.

5,875.16
8%

8%

8%

537.16
8%

8%

S/.

237.52
8%

8%

8%

371.76
8%

8%

77.85 S/.

8,455.74
8%

8%

8%

12,087.11
8%

8%

S/.

1,194.91
8%

8%
S/.

146.29

328.40
8%

97.50 S/.

5%

97.50

5%

MES 1

SEM 2

MES 2

SEM 3
S/.

SEM 4
1,368.92 S/.

5%
S/.

5%
29.81 S/.

5%
S/.

2,632.39 S/.

S/.

2,632.39 S/.

24,380.39 S/.

S/.

24,380.39 S/.

1,015.36 S/.
5%

S/.

1,015.36 S/.
5%

455.60 S/.
5%

455.60 S/.
5%

22.65 S/.

22.65 S/.
10%

S/.
S/.

S/.
S/.
S/.
S/.
S/.

100%
S/.

1,226.76
100%

5,806.35 S/.

19.81 S/.

5,806.35
10%

19.81 S/.
10%

3,959.51 S/.

109.94
10%

10%

10%
3,959.51 S/.

109.94 S/.

5,806.35 S/.

19.81 S/.

7,344.59
10%

10%

10%

10%

7,344.59 S/.

109.94 S/.

5,806.35 S/.

3,870.40
10%

10%

10%

10%

3,870.40 S/.

7,344.59 S/.

109.94 S/.
10%

171.45
10%

10%

10%

15.22
10%

171.45 S/.

3,870.40 S/.

7,344.59 S/.
10%

15.22 S/.

10%

10%

1,247.88
10%

10%
171.45 S/.

3,870.40 S/.
10%

10%

10%

10%

22.65

1,247.88 S/.

15.22 S/.

171.45 S/.
10%

S/.

10%

10%

455.60
5%

22.65 S/.

1,247.88 S/.

15.22 S/.
10%

455.60 S/.

22.65 S/.

10%

1,015.36
5%

5%

10%

10%

1,015.36 S/.

455.60 S/.

1,247.88 S/.

24,380.39
5%

5%

5%
22.65 S/.

S/.

24,380.39 S/.

1,015.36 S/.

455.60 S/.

2,632.39
5%

5%

5%

5%

2,632.39 S/.

24,380.39 S/.

1,015.36 S/.

395.75
5%

5%

5%

5%

395.75 S/.

2,632.39 S/.

24,380.39 S/.

29.81
5%

5%

5%

5%

29.81 S/.

395.75 S/.

2,632.39 S/.

1,368.92
5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 8
1,368.92 S/.

5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 7
1,368.92 S/.

5%

5%

5%

5%

S/.

29.81 S/.

395.75 S/.

SEM 6
1,368.92 S/.

5%

5%

5%
S/.

SEM 5
1,368.92 S/.

19.81
10%

3,959.51 S/.

3,959.51

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5
S/.

SEM 6

SEM 7

SEM 8

323.69
100%

S/.

238.00
100%

S/.

520.41
100%

S/.

7,931.10
8%
S/.

8%
5,567.23 S/.

8%
S/.

8%
77.76 S/.

8%
S/.

974.99 S/.
1,072.12 S/.

2,344.27 S/.

S/.

2,344.27 S/.
8%

5,130.32 S/.

2,344.27
8%

5,130.32 S/.

5,130.32
8%

1,260.35

S/.

8%
S/.

1,072.12
8%

8%
S/.

974.99
8%

8%

8%

77.76
8%

8%
1,072.12 S/.

S/.
|

77.76 S/.

974.99 S/.

8%

5,567.23
8%

8%

8%
S/.

8%
5,567.23 S/.

1,260.35
8%

2,539.67

S/.
20%
S/.

20%
3,146.86 S/.

13%
S/.

3,146.86
13%

63.04 S/.
13%

S/.

63.04
13%

23,773.45 S/.
13%

S/.

23,773.45
13%

3,353.01 S/.
13%

S/.

3,353.01
13%

14,307.35 S/.
13%

S/.

2,539.67

14,307.35
13%

10,232.72 S/.

10,232.72

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8

13%
S/.

13%
2,621.36 S/.

13%
S/.

2,878.77 S/.
13%

S/.

2,878.77
13%

351.39 S/.
13%

S/.

2,621.36
13%

351.39
13%

1,135.26 S/.

1,135.26

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8

100%
S/.

1,557.00

20%
S/.

20%
19,055.25 S/.

20%
S/.

20%
584.40 S/.

20%
S/.

20%
19,055.25 S/.
20%
584.40 S/.

20%
34,444.87 S/.

20%
19,055.25 S/.

19,055.25
20%

584.40 S/.
20%

34,444.87 S/.

584.40
20%

34,444.87 S/.

10%
S/.

34,444.87

10%
2,360.56 S/.

10%
S/.

2,360.56
10%

6,417.26 S/.
10%

6,417.26
10%

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7
S/.

SEM 8
2,795.40 S/.

10%
S/.

20,470.80 S/.
10%

S/.

20,470.80
10%

6,032.88 S/.
10%

S/.

6,032.88
10%

1,897.20 S/.
10%

S/.

2,795.40
10%

1,897.20
10%

322.85 S/.

322.85
11%

S/.

133.33
11%

S/.

433.33
11%

S/.

816.67
11%

S/.

138.89
11%

S/.

83.33

10%
S/.

5,600.00
10%

S/.

6,735.36
10%

S/.

2,000.00
10%

S/.

8,440.00

MES 1

SEM 2

MES 2

SEM 3

SEM 4

SEM 5

SEM 6

SEM 7

SEM 8
14%
S/.

5,000.00

PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD V

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13

25%
S/.
4%

S/.
4%

1,014.79 S/.

4%
1,014.79 S/.

4%
1,014.79 S/.

4%

5,000.00

S/.

3,000.00

S/.

3,000.00
25%

10,325.00

20%
S/.

5,000.00
25%

25%
S/.

4%
1,014.79 S/.

25%

25%
S/.

782.50

1,014.79 S/.

25%
S/.

SEM 15

25%
782.50

S/.

SEM 14

S/.

20%
12,691.35 S/.

20%
12,691.35 S/.

12,691.35

10,325.00

4%
1,014.79 S/.

1,014.79

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13

SEM 14

25%

25%

25%

S/.
6%
S/.

6%
28,003.58 S/.

6%
S/.

6%
28,003.58 S/.

6%
7,401.34 S/.

6%
28,003.58 S/.

6%
7,401.34 S/.

S/.

S/.

5,637.74

14%
17,517.75
35,299.18

S/.

20,403.24

8%
S/.

6,443.13

S/.

8%
7,963.18 S/.

35,299.18
14%

S/.

20,403.24
14%

6,443.13

S/.

8%

8%
7,963.18 S/.

20%
S/.

17,517.75

S/.

20,403.24

7,963.18 S/.

45,382.70

14%
35,299.18

S/.

6%
45,382.70 S/.

14%

14%

8%
7,963.18 S/.

45,382.70 S/.

17,517.75

S/.

5,637.74
6%

14%

14%
S/.

45,382.70 S/.

S/.

7,401.34

17,330.04

S/.
6%

14%

14%

6%
7,401.34 S/.

13%
5,637.74

S/.

28,003.58

13%

14%

14%
S/.

6%

S/.

6%
45,382.70 S/.

9,204.29
6%

28,003.58 S/.

7,401.34 S/.

17,330.04

S/.
6%

45,382.70 S/.

S/.

6%

13%

6%
45,382.70 S/.

28,003.58 S/.

7,401.34 S/.

25%
9,204.29 S/.

6%

13%
17,330.04

S/.

6%

6%

13%
6%

9,204.29 S/.

28,003.58 S/.

7,401.34 S/.

13%
S/.

9,204.29 S/.

SEM 15

6,443.13
8%

7,963.18 S/.
20%

35,802.93 S/.

20%
35,802.93 S/.

7%
S/.

35,802.93 S/.

20,514.57 S/.

35,802.93
7%

20,514.57 S/.
7%

9,975.18 S/.
7%

7,963.18
20%

7%

7%
S/.

8%
7,963.18 S/.

20,514.57
7%

9,975.18 S/.
7%

9,975.18
7%

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13
S/.

20%
S/.

1,240.60
20%

S/.

601.02
20%

S/.

2,175.36
20%

S/.

3,270.96
20%

S/.

3,390.62
20%

S/.

1,849.45
20%

S/.

433.22
20%

S/.

759.65
20%

S/.

493.46
20%

SEM 14
3,504.79 S/.

SEM 15
3,504.79 S/.

3,504.79

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12
S/.

8%
S/.
8%
12,087.11 S/.

S/.
S/.
S/.

8%
S/.
8%
S/.

443.07 S/.

S/.

8,372.77 S/.

3,766.80

328.40 S/.
8%

S/.

5%

5%

3,766.80 S/.

S/.

328.40 S/.

S/.

5%

3,766.80
8%

8%
97.50

8,372.77
8%

8%
328.40

97.50 S/.

8,372.77 S/.

S/.

8%

443.07
8%

8%

8%

77.85
8%

443.07 S/.

S/.

328.40
8%

97.50 S/.

5%

1,322.88

8%

8%
8,372.77

3,766.80 S/.

S/.

S/.

8%

8%

5%

443.07

5,875.16
8%

1,322.88 S/.

77.85 S/.
8%

8%

8%
S/.

8%
S/.

8%

8%

5,875.16 S/.

S/.

77.85

537.16
8%

8%

8%
77.85 S/.

537.16 S/.

S/.

1,322.88

237.52
8%

8%
5,875.16

1,322.88 S/.

237.52 S/.

S/.

8%

371.76
8%

8%
537.16

5,875.16 S/.
8%

371.76 S/.

S/.

8%

8,455.74
8%

8%
237.52

537.16 S/.
8%

8,455.74 S/.

S/.

8%

12,087.11
8%

8%
371.76

237.52 S/.
8%

12,087.11 S/.

S/.

8%

1,194.91
8%

8%
8,455.74

371.76 S/.

S/.

S/.

8%

8%

8%
1,194.91 S/.

8%
12,087.11

8,455.74 S/.

S/.

S/.

8%

8%

SEM 15

8%
1,194.91

8%

8%
S/.

SEM 14

8%
1,194.91 S/.

S/.

SEM 13
146.29

97.50

5%

5%

MES 3

SEM 9
S/.

SEM 10
1,368.92 S/.

5%
S/.

29.81 S/.

S/.

2,632.39 S/.

S/.

2,632.39 S/.

24,380.39 S/.

S/.

1,015.36 S/.
5%

S/.

1,015.36 S/.

455.60 S/.

S/.
10%

455.60 S/.

S/.

10%

15.22 S/.

S/.

15.22 S/.

171.45 S/.

171.45 S/.

3,870.40 S/.

S/.

3,870.40 S/.

7,344.59 S/.

S/.

7,344.59 S/.
10%

109.94 S/.
10%

S/.

109.94 S/.

5,806.35 S/.

S/.

5,806.35 S/.
10%

19.81 S/.
10%

19.81 S/.
10%

3,959.51 S/.

3,959.51 S/.

5,806.35 S/.

19.81 S/.

5,806.35
10%

19.81 S/.
10%

3,959.51 S/.

109.94
10%

10%

10%
3,959.51 S/.

109.94 S/.

5,806.35 S/.

19.81 S/.

7,344.59
10%

10%

10%

10%

7,344.59 S/.

109.94 S/.

5,806.35 S/.

3,870.40
10%

10%

10%

10%

3,870.40 S/.

7,344.59 S/.

109.94 S/.

171.45
10%

10%

10%

10%

171.45 S/.

3,870.40 S/.

7,344.59 S/.

15.22
10%

10%

10%

10%

10%

10%

3,870.40 S/.

1,247.88
10%

15.22 S/.

171.45 S/.
10%

10%

10%

10%

19.81
10%

3,959.51 S/.

455.60
5%

22.65 S/.

1,247.88 S/.

15.22 S/.

171.45 S/.

455.60 S/.

22.65 S/.

10%

1,015.36
5%

5%

10%

10%

10%

10%

10%

15.22 S/.

1,015.36 S/.

455.60 S/.

1,247.88 S/.
10%

10%

10%

10%

10%

24,380.39
5%

5%

5%
22.65 S/.

1,247.88 S/.
10%

10%

10%
S/.

10%

24,380.39 S/.

1,015.36 S/.

455.60 S/.

2,632.39
5%

5%

5%

5%
22.65 S/.

1,247.88 S/.
10%

10%

455.60 S/.

2,632.39 S/.

24,380.39 S/.

1,015.36 S/.

395.75
5%

5%

5%

5%

5%
22.65 S/.

1,247.88 S/.
10%

1,015.36 S/.

395.75 S/.

2,632.39 S/.

24,380.39 S/.

29.81
5%

5%

5%

5%

5%

5%
22.65 S/.

S/.

24,380.39 S/.

29.81 S/.

395.75 S/.

2,632.39 S/.

1,368.92
5%

5%

5%

5%

5%

5%

5%

2,632.39 S/.

24,380.39 S/.

29.81 S/.

395.75 S/.

SEM 15
1,368.92 S/.

5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 14
1,368.92 S/.

5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 13
1,368.92 S/.

5%

5%

5%

5%

S/.

29.81 S/.

395.75 S/.

SEM 12
1,368.92 S/.

5%

5%

5%
S/.

SEM 11
1,368.92 S/.

5%

5%

MES 4

3,959.51

22.65

MES 3

SEM 9

SEM 10

8%
S/.
8%
S/.

77.76 S/.

77.76 S/.

974.99 S/.

S/.

974.99 S/.

1,072.12 S/.
8%

S/.
S/.

974.99 S/.

1,072.12 S/.

2,344.27 S/.

1,072.12 S/.

2,344.27 S/.

5,130.32 S/.

2,344.27 S/.

5,130.32 S/.

5,130.32 S/.

8%
S/.

1,260.35

S/.
20%
S/.

20%

13%
S/.

63.04 S/.

S/.
S/.
S/.

10,232.72 S/.

2,539.67

14,307.35 S/.
10,232.72 S/.

3,353.01 S/.

14,307.35 S/.

3,353.01
13%

14,307.35 S/.
13%

10,232.72 S/.

23,773.45
13%

13%

13%
10,232.72 S/.

23,773.45 S/.

3,353.01 S/.

14,307.35 S/.

63.04
13%

13%

13%

13%

63.04 S/.

23,773.45 S/.

3,353.01 S/.

13%

13%

13%

13%

13%

63.04 S/.

23,773.45 S/.

3,353.01 S/.

14,307.35 S/.

S/.

13%

13%

13%

13%

13%

63.04 S/.

23,773.45 S/.

3,353.01 S/.

2,539.67

13%

13%

13%

13%

S/.

63.04 S/.

23,773.45 S/.

1,260.35
8%

3,146.86
13%

13%

13%

5,130.32 S/.
8%

S/.

14,307.35
13%

10,232.72 S/.

2,344.27
8%

20%
3,146.86 S/.

13%

13%

S/.

2,344.27 S/.

5,130.32 S/.

1,260.35

1,072.12
8%

8%

8%
2,539.67

3,146.86 S/.

5,130.32 S/.

S/.

1,072.12 S/.

2,344.27 S/.
8%

974.99
8%

8%

8%

8%

974.99 S/.

1,072.12 S/.

2,344.27 S/.

77.76
8%

8%

8%

8%

77.76 S/.

974.99 S/.

1,072.12 S/.

5,567.23
8%

8%

8%

8%

8%

77.76 S/.

974.99 S/.

8%
5,567.23 S/.

8%

8%

8%

8%

8%

77.76 S/.

SEM 15

8%
5,567.23 S/.

8%

8%

8%

8%

8%

77.76 S/.

SEM 14

8%
5,567.23 S/.

8%

8%

8%

SEM 13

8%
5,567.23 S/.

8%

8%

8%

SEM 12

8%
5,567.23 S/.

8%

8%
S/.

SEM 11

8%
5,567.23 S/.

MES 4

10,232.72

5,130.32

MES 3

SEM 9

SEM 10

SEM 11

SEM 12

SEM 13

SEM 14

13%

13%

13%

13%

13%

13%

S/.

2,621.36 S/.
13%

S/.

2,621.36 S/.
13%

2,878.77 S/.
13%

S/.

2,878.77 S/.

351.39 S/.

2,878.77 S/.

351.39 S/.

2,878.77 S/.

351.39 S/.

2,878.77
13%

351.39 S/.
13%

1,135.26 S/.

2,621.36

2,878.77 S/.

351.39 S/.

SEM 15

13%

13%

13%
1,135.26 S/.

2,621.36 S/.
13%

13%

13%
1,135.26 S/.

2,621.36 S/.
13%

13%

13%
1,135.26 S/.

2,621.36 S/.
13%

13%

13%
S/.

MES 4

351.39
13%

1,135.26 S/.

1,135.26
25%

S/.

25%
168.68 S/.

25%
S/.

35,592.75 S/.
25%

S/.

35,592.75
25%

5,020.01 S/.
25%

S/.

5,020.01
25%

17,669.91 S/.
25%

S/.

17,669.91
25%

17,460.03 S/.
25%

S/.

17,460.03
25%

3,237.44 S/.
25%

S/.

3,237.44
25%

4,912.03 S/.
25%

S/.

4,912.03
25%

831.65 S/.
25%

S/.

168.68
25%

831.65
25%

2,686.87 S/.

2,686.87

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13

SEM 14

SEM 15

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13

SEM 14

SEM 15

20%

20%

20%
S/.

19,055.25
20%

S/.

584.40
20%

S/.

34,444.87

S/.

4,385.81 S/.
20%

S/.

20%
11,169.54 S/.

20%
S/.

20%

20%

S/.

10%
2,360.56 S/.

10%
S/.

10%
6,417.26 S/.

10%

10%
2,360.56 S/.
10%
6,417.26 S/.

10%

10%
2,360.56 S/.
10%
6,417.26 S/.

10%

10%
2,360.56 S/.

20%

10%

10%

10%

3,744.00

10%
2,360.56 S/.

10%
6,417.26 S/.

10%

21,829.64
20%

3,744.00 S/.

2,360.56 S/.

6,417.26 S/.

25,433.95

21,829.64 S/.
20%

10%

11,169.54

25,433.95 S/.

S/.

S/.

4,385.81

2,360.56
10%

6,417.26 S/.
10%

6,417.26
10%

MES 3

SEM 9
S/.

SEM 10
2,795.40 S/.

10%
S/.

20,470.80 S/.

S/.

1,897.20 S/.

1,897.20 S/.

20,470.80 S/.

6,032.88 S/.

1,897.20 S/.
10%
322.85 S/.

20,470.80 S/.

6,032.88 S/.

6,032.88 S/.

1,897.20 S/.

6,032.88
10%

1,897.20 S/.
10%

322.85 S/.

20,470.80
10%

10%

10%
322.85 S/.

2,795.40
10%

10%

10%
1,897.20 S/.

SEM 15
2,795.40 S/.

10%

10%

10%

10%
322.85 S/.

20,470.80 S/.

6,032.88 S/.

SEM 14
2,795.40 S/.

10%

10%

10%

10%
322.85 S/.

20,470.80 S/.

6,032.88 S/.

SEM 13
2,795.40 S/.

10%

10%

10%

10%
S/.

20,470.80 S/.

6,032.88 S/.

SEM 12
2,795.40 S/.

10%

10%

10%
S/.

SEM 11
2,795.40 S/.

10%

10%

MES 4

1,897.20
10%

322.85 S/.

322.85

11%
S/.

133.33
11%

S/.

433.33
11%

S/.

816.67
11%

S/.

138.89
11%

S/.

83.33

10%
S/.

5,600.00
10%

S/.

6,735.36
10%

S/.

2,000.00
10%

S/.

8,440.00
7%
S/.

35,092.56

MES 3

SEM 9

SEM 10

MES 4

SEM 11

SEM 12

SEM 13

14%
S/.

5,000.00

SEM 14

SEM 15

PROGRAMACION DE OBRA

BILIDAD VEHICULAR - PEATONAL Y ACONDICIONAMIENTO URBANO EN LA VIA PRINCIPAL PUQUIN - ARCO


TIEMPO DE EJECUCIN : 270 DAS

TIEMPO DE E
MES 5

SEM 16

SEM 17

4%
S/.

SEM 18

4%
1,014.79 S/.

SEM 19

4%
1,014.79 S/.

MES 6

SEM 20

4%
1,014.79 S/.

SEM 21

4%
1,014.79 S/.

SEM 22

4%
1,014.79 S/.

4%
1,014.79 S/.

1,014.79

TIEMPO DE E
MES 5

SEM 16

SEM 17

6%
S/.

6%
28,003.58 S/.

6%
S/.

SEM 18

6%
7,401.34 S/.

45,382.70 S/.

6%
45,382.70 S/.

6%
45,382.70 S/.

45,382.70

14%
17,517.75

S/.

14%

17,517.75
14%

35,299.18

S/.

14%

35,299.18
14%

20,403.24

S/.

14%

20,403.24
14%

6,443.13
8%

S/.

5,637.74
6%

14%

S/.

28,003.58

17,330.04

S/.
6%

45,382.70 S/.

S/.

6%
28,003.58 S/.

7,401.34

S/.

5,637.74

S/.

6%
28,003.58 S/.

13%

6%

S/.

6%
28,003.58 S/.

SEM 22

6%

13%

S/.

SEM 21

13%
17,330.04

S/.

SEM 20

6%
28,003.58 S/.

7,401.34 S/.

13%
S/.

SEM 19

6%
28,003.58 S/.

MES 6

S/.
8%

7,963.18 S/.

6,443.13
8%

7,963.18 S/.

8%
7,963.18 S/.

8%
7,963.18 S/.

7,963.18

20%
S/.

35,802.93
7%

S/.

7%
20,514.57 S/.

7%
S/.

7%
9,975.18 S/.

7%

7%
20,514.57 S/.
7%
9,975.18 S/.

7%

7%
20,514.57 S/.
7%
9,975.18 S/.

7%

7%
20,514.57 S/.
7%
9,975.18 S/.

7%

7%
20,514.57 S/.
7%
9,975.18 S/.

7%

7%
20,514.57 S/.

20,514.57
7%

9,975.18 S/.
7%

9,975.18
7%

TIEMPO DE E
MES 5

SEM 16
S/.

SEM 17
3,504.79 S/.

SEM 18
3,504.79 S/.

10%
S/.
S/.

10%

29,116.73 S/.

10%
S/.

300,870.65 S/.

S/.

19,680.75 S/.

19,680.75 S/.

S/.

19,680.75 S/.

S/.

2,175.36

S/.

3,270.96

S/.

3,390.62

S/.

1,849.45

S/.

433.22

S/.

759.65

S/.

759.65
20%

493.46
20%

433.22
20%

20%
S/.

1,849.45
20%

20%
S/.

3,390.62
20%

20%
S/.

3,270.96
20%

20%
S/.

2,175.36
20%

20%
S/.

601.02
20%

20%
S/.

1,240.60
20%

601.02

S/.

493.46
20%

7,615.96
10%

19,680.75 S/.

S/.

20%
S/.

7,615.96 S/.
10%

20%

300,870.65
10%

20%
1,240.60

1,929.30
10%

300,870.65 S/.

7,615.96 S/.

20%
S/.

10%

10%

10%

72,185.23

1,929.30 S/.

300,870.65 S/.

7,615.96 S/.
10%

72,185.23 S/.

10%

10%

29,116.73
10%

10%

10%

8,222.78
10%

29,116.73 S/.

1,929.30 S/.

300,870.65 S/.

7,615.96 S/.
10%

S/.

10%

10%

10%

10%
72,185.23 S/.

1,929.30 S/.
10%

10%

29,116.73 S/.

SEM 22
3,504.79 S/.

8,222.78 S/.
10%

10%

10%

10%

10%

10%

72,185.23 S/.

SEM 21
3,504.79 S/.

8,222.78 S/.

29,116.73 S/.

1,929.30 S/.

S/.

10%

10%
72,185.23 S/.

SEM 20
3,504.79 S/.

8,222.78 S/.
10%

10%
S/.

SEM 19
3,504.79 S/.

8,222.78 S/.
10%

MES 6

19,680.75

3,504.79

TIEMPO DE E
MES 5

SEM 16
S/.

SEM 17

SEM 18

MES 6

SEM 19

SEM 20

146.29

S/.

8%
S/.
8%
12,087.11 S/.

8%
S/.
8%
S/.

8%
443.07 S/.

8%
S/.

443.07

8,372.77 S/.

S/.

3,766.80 S/.

S/.

3,766.80

328.40 S/.
8%

S/.

97.50 S/.

5%

5%

3,766.80 S/.

S/.

328.40 S/.

S/.

5%

3,766.80
8%

8%
97.50

8,372.77
8%

8%
328.40

443.07
8%

8,372.77 S/.

S/.

8%

77.85
8%

8%

8%

328.40
8%

97.50 S/.

5%

1,322.88

8%

443.07 S/.

S/.

5,875.16

S/.

77.85 S/.

8%

8%

8%

1,322.88

S/.

8,372.77

S/.
8%

8%

8%

8%

5,875.16

S/.

537.16
8%

8%
77.85

S/.

8%
1,322.88 S/.

237.52
8%

537.16

5,875.16 S/.

8%
77.85 S/.

S/.

8%

8%

371.76
8%

237.52

537.16 S/.

S/.

S/.

8%

8%

8,455.74
8%

371.76

237.52 S/.

S/.

S/.

8%

8%

12,087.11
8%

8,455.74

371.76 S/.

S/.

S/.

8%

8%

1,194.91
8%

12,087.11

8,455.74 S/.

S/.

S/.

8%

8%
S/.

8%
1,194.91

8%

8%
S/.

SEM 22

8%
1,194.91 S/.

S/.

SEM 21
146.29

97.50

5%

5%

5%

TIEMPO DE E
MES 5

SEM 16
S/.

SEM 17
1,368.92 S/.

5%
S/.

5%
29.81 S/.

5%
S/.

2,632.39 S/.

S/.

2,632.39 S/.

24,380.39 S/.

S/.

1,015.36 S/.
5%

S/.

1,015.36 S/.

455.60 S/.

1,015.36 S/.

455.60 S/.

455.60 S/.
5%

22.65 S/.

22.65 S/.

1,015.36 S/.

455.60 S/.

1,015.36
5%

455.60 S/.
5%

22.65 S/.

24,380.39
5%

5%

5%
22.65 S/.

24,380.39 S/.

1,015.36 S/.

455.60 S/.

2,632.39
5%

5%

5%

5%

2,632.39 S/.

24,380.39 S/.

1,015.36 S/.

395.75
5%

5%

5%

5%

395.75 S/.

2,632.39 S/.

24,380.39 S/.

29.81
5%

5%

5%

5%

5%

5%
22.65 S/.

24,380.39 S/.

29.81 S/.

395.75 S/.

2,632.39 S/.

1,368.92
5%

5%

5%

5%

5%

5%

5%

2,632.39 S/.

24,380.39 S/.

29.81 S/.

395.75 S/.

SEM 22
1,368.92 S/.

5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 21
1,368.92 S/.

5%

5%

5%

5%

5%

29.81 S/.

395.75 S/.

SEM 20
1,368.92 S/.

5%

5%

5%

5%

S/.

29.81 S/.

395.75 S/.

SEM 19
1,368.92 S/.

5%

5%

5%
S/.

SEM 18
1,368.92 S/.

MES 6

455.60
5%

22.65 S/.

22.65

TIEMPO DE E
MES 5

SEM 16

SEM 17

8%
S/.

8%
5,567.23 S/.

8%
S/.

77.76 S/.

77.76 S/.

974.99 S/.

S/.

974.99 S/.

1,072.12 S/.

S/.

1,072.12 S/.

2,344.27 S/.

S/.

2,344.27 S/.
5,130.32 S/.

5,130.32
8%

1,260.35

S/.

8%
S/.

2,344.27
8%

8%
S/.

1,072.12
8%

8%
5,130.32 S/.

974.99
8%

8%

8%

77.76
8%

8%

8%

5,567.23
8%

8%

8%

SEM 19

8%
5,567.23 S/.

8%

8%
S/.

SEM 18

1,260.35
8%

2,539.67

S/.

MES 6

2,539.67

SEM 20

SEM 21

SEM 22

TIEMPO DE E
MES 5

SEM 16

SEM 17

25%
S/.
25%
35,592.75 S/.

35,592.75
25%

5,020.01 S/.
25%

S/.

5,020.01
25%

17,669.91 S/.
25%

S/.

17,669.91
25%

17,460.03 S/.
25%

S/.

17,460.03
25%

3,237.44 S/.
25%

S/.

3,237.44
25%

4,912.03 S/.
25%

S/.

4,912.03
25%

831.65 S/.
25%

S/.

168.68
25%

25%
S/.

SEM 19

25%
168.68 S/.

S/.

SEM 18

831.65
25%

2,686.87 S/.

2,686.87

100%
S/.

3,451.38
100%

S/.

607.41
100%

S/.

2,909.01
100%

S/.

MES 6

4,799.86

SEM 20

SEM 21

SEM 22

TIEMPO DE E
MES 5

SEM 16

SEM 17

SEM 18

SEM 19

100%
S/.

5,118.22
100%
#REF!
100%

S/.

MES 6

20.16

SEM 20

SEM 21

SEM 22

TIEMPO DE E
MES 5

SEM 16

SEM 17

SEM 18

20%

20%

20%

S/.

4,385.81 S/.
20%

S/.

4,385.81 S/.
20%

11,169.54 S/.
20%

S/.
20%
S/.

10%
2,360.56
10%
S/.

6,417.26
10%

25,433.95
20%

21,829.64 S/.
20%

3,744.00 S/.

S/.

20%

20%

20%

11,169.54

25,433.95 S/.

21,829.64 S/.

S/.

20%

20%
25,433.95 S/.

SEM 19

4,385.81

11,169.54 S/.

21,829.64
20%

3,744.00 S/.

MES 6

3,744.00

SEM 20

SEM 21

SEM 22

TIEMPO DE E
MES 5

SEM 16
S/.

SEM 17

SEM 18

MES 6

SEM 19

SEM 20

SEM 21

SEM 22

2,795.40
10%

S/.

20,470.80
10%

S/.

6,032.88
10%

S/.

1,897.20
10%

S/.

322.85
11%

S/.

11%
133.33

S/.

11%
S/.

11%
433.33

#REF!

11%
S/.

11%
816.67

S/.

11%
S/.

138.89

S/.

83.33

S/.

5,600.00

S/.

6,735.36

S/.

2,000.00

S/.

8,440.00

S/.

2,000.00
10%

7%
S/.

6,735.36
10%

10%
S/.

5,600.00
10%

10%
S/.

83.33

10%

10%
S/.

138.89
11%

10%
S/.

816.67
11%

11%
S/.

133.33

7%
35,092.56 S/.

7%
35,092.56 S/.

7%
35,092.56 S/.

8,440.00
7%

35,092.56 S/.

7%
35,092.56 S/.

7%
35,092.56 S/.

35,092.56

TIEMPO DE E
MES 5

SEM 16

SEM 17

SEM 18

MES 6

SEM 19

SEM 20

14%
S/.

SEM 21

14%
5,000.00

S/.

5,000.00

SEM 22

IN - ARCO TICA TICA DE LA CIUDAD DEL CUSCO, PROVINCIA DE CUSCO - CUSCO

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

4%
S/.

SEM 25

4%
1,014.79 S/.

SEM 26

4%
1,014.79 S/.

1,014.79

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

7%
S/.

7%
20,514.57 S/.

7%
S/.

7%

7%

7%

20,514.57
7%

9,975.18 S/.
7%

SEM 28

7%
20,514.57 S/.

9,975.18 S/.
7%

SEM 27

7%
20,514.57 S/.

9,975.18 S/.
7%

SEM 26

7%
20,514.57 S/.

9,975.18 S/.
7%

SEM 25

9,975.18
7%

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23
S/.

SEM 24
3,504.79 S/.

SEM 25
3,504.79 S/.

10%
S/.

10%
8,222.78 S/.

10%
S/.

29,116.73 S/.

10%
S/.

300,870.65 S/.

S/.

7,615.96 S/.
10%

S/.

20%
S/.

1,240.60
20%

S/.

601.02
20%

S/.

2,175.36
20%

S/.

3,270.96
20%

S/.

3,390.62
20%

S/.

1,849.45
20%

S/.

433.22
20%

S/.

759.65
20%

S/.

493.46
20%

19,680.75 S/.

10%

10%
300,870.65 S/.

7,615.96 S/.

300,870.65
10%

7,615.96 S/.
10%

19,680.75 S/.

1,929.30
10%

10%

10%

72,185.23

1,929.30 S/.

300,870.65 S/.

7,615.96 S/.
10%

19,680.75 S/.

10%

10%

29,116.73
10%

72,185.23 S/.

1,929.30 S/.

300,870.65 S/.
10%

29,116.73 S/.

72,185.23 S/.

10%

8,222.78
10%

10%

10%

10%

10%

29,116.73 S/.

1,929.30 S/.

SEM 29

10%
8,222.78 S/.

10%

10%

10%

10%

10%

10%

72,185.23 S/.

SEM 28
3,504.79

8,222.78 S/.

29,116.73 S/.

1,929.30 S/.

S/.

10%

10%
72,185.23 S/.

SEM 27
3,504.79 S/.

8,222.78 S/.
10%

10%
S/.

SEM 26
3,504.79 S/.

7,615.96
10%

19,680.75 S/.

19,680.75

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24
S/.

SEM 25

SEM 26

8%
S/.

8%
1,194.91

S/.

8%
S/.

12,087.11

S/.

S/.

371.76

S/.

237.52 S/.

S/.

5,875.16

537.16 S/.

S/.
S/.

537.16
8%

5,875.16 S/.
8%

1,322.88

237.52
8%

8%

8%

371.76
8%

8%
537.16

S/.

371.76 S/.

S/.

8%

8,455.74
8%

8%
237.52

S/.

8,455.74 S/.

S/.

8%

12,087.11
8%

8%

8%
S/.

12,087.11 S/.

S/.

8%

1,194.91
8%

8%
8,455.74

SEM 28

8%
1,194.91 S/.

8%

8%
S/.

SEM 27

146.29

5,875.16
8%

1,322.88 S/.

1,322.88

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

SEM 29

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

11%
S/.

11%
133.33

S/.

11%

11%
#REF!

11%

11%
816.67

S/.

11%
S/.

138.89

S/.

83.33

S/.

5,600.00

S/.

6,735.36

S/.

2,000.00

S/.

8,440.00

S/.

7%

2,000.00
10%

7%
35,092.56 S/.

6,735.36
10%

10%
S/.

5,600.00
10%

10%
S/.

83.33

10%

10%
S/.

138.89
11%

10%
S/.

816.67
11%

11%
S/.

S/.

133.33

#REF!
S/.

SEM 29

7%
35,092.56 S/.

7%
35,092.56 S/.

7%
35,092.56 S/.

8,440.00
7%

35,092.56 S/.

7%
35,092.56 S/.

35,092.56

TIEMPO DE EJECICION
MES 6

MES 7

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28

14%
S/.

5%
S/.

5%

5%
S/.

5,000.00

9,540.71 S/.

S/.

5%
9,540.71 S/.

5%
822.20 S/.

SEM 29

14%

5%
9,540.71 S/.

5%
822.20 S/.

5%
9,540.71 S/.

5%
822.20 S/.

5%
9,540.71 S/.

5%
822.20 S/.

5,000.00

5%
9,540.71 S/.

5%
822.20 S/.

9,540.71
5%

822.20 S/.

822.20

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

11%
S/.

11%
133.33

S/.

11%

11%

#REF!

#REF!

11%

11%

S/.

816.67

S/.

11%
S/.

138.89

S/.

83.33

S/.

5,600.00

S/.

5,600.00
10%

6,735.36

S/.

2,000.00

S/.

8,440.00

S/.

10%
S/.

83.33

10%

10%
S/.

138.89
11%

10%
S/.

816.67
11%

11%
S/.

6,735.36
10%

10%
S/.

133.33

2,000.00
10%
8,440.00

MES 8

SEM 30

MES 9

SEM 31

SEM 32

SEM 33

SEM 34

SEM 35

SEM 36

14%
S/.

5%
S/.

5%
9,540.71 S/.

5%
S/.

5%
9,540.71 S/.

5%
822.20 S/.

5,000.00

5%
9,540.71 S/.

5%
822.20 S/.

5%
9,540.71 S/.

5%
822.20 S/.

5%
9,540.71 S/.

5%
822.20 S/.

5%
9,540.71 S/.

5%
822.20 S/.

9,540.71
5%

822.20 S/.

822.20

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

11%
S/.

133.33
11%
#REF!
11%

S/.

816.67
11%

S/.

138.89
11%

S/.

83.33

10%
S/.

5,600.00
10%

S/.

6,735.36
10%

S/.

2,000.00
10%

S/.

8,440.00

SEM 42

SEM 43

MES 10

SEM 37

SEM 38

MES 11

SEM 39

SEM 40

SEM 41

SEM 42

SEM 43

100%
S/.

5%
S/.

5%
9,540.71 S/.

5%
S/.

5%
822.20 S/.

13%
S/.

5%

13%

5%

13%

5%

13%

13%

822.20
13%

496.69 S/.
13%

366.69 S/.

13%
496.69 S/.

13%
366.69 S/.

25%
S/.

9,540.71
5%

822.20 S/.

496.69 S/.
13%

366.69 S/.

5%
9,540.71 S/.

822.20 S/.

496.69 S/.
13%

366.69 S/.

5%
9,540.71 S/.

822.20 S/.

496.69 S/.
13%

366.69 S/.

5%
9,540.71 S/.

822.20 S/.

496.69 S/.
13%

S/.

5%
9,540.71 S/.

32,600.00

366.69 S/.
25%

3,750.00 S/.

496.69
13%
366.69
25%

3,750.00 S/.

3,750.00

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

MES 11

SEM 44

10%
S/.

5,600.00
10%

S/.

6,735.36
10%

S/.

2,000.00
10%

S/.

8,440.00

MES 11

SEM 44

13%
S/.

496.69
13%

S/.

366.69
25%

S/.

3,750.00