CONSTRUCCION DE CUBIERTA Y GRADERIOS
TRANSPORTE DE MATERIALES
DESCRIPCION
IO TOTAL
ALAMBRE DE AMARRE
0.00
ANTICORROCIVO CROMADO 5
106.38
ANTICORROCIVO PLOMO
106.38
AR-2000
906.11
ARENA
13.59
Agua
0.00
Arena de ro
101.69
CEMENTO
7.89
CUMBREROS
234.05
Cemento
135.73
Clavos
0.00
ELECTRO SUELDA 6011
16.83
Encofrado recto
600.31
HIERRO
0.00
Herramienta menor
0.00
PERFIL U.G.L.
0.00
PIEDRA BOLA
31.77
PLACA DE ACERO 500X400X8MM
0.00
Pintura esmalte
0.00
Ripio
0.00
Ripio minado
169.47
Suelda
0.00
THINNER
70.14
TIRAFONDOS
0.00
UNID.
PRECIO TRANSP
CANTIDAD
LBS
0.00
210.47
GL
3.54
30.05
GL
3.54
30.05
M2
1.20
755.09
M3
4.37
3.11
m3
0.00
5.04
m3
4.37
23.27
SACO
0.38
20.76
7.75
30.20
kg
0.01
13,573.00
Kg
0.00
21.55
KG
0.04
420.77
m2
3.87
155.12
KG
0.00
3,613.09
hora
0.00
760.10
KG
0.00
6,010.98
M3
4.37
7.27
0.00
18.03
galn
0.00
4.35
m3
0.00
5.19
m3
4.37
38.78
kg
0.00
43.50
GL
3.89
18.03
KG
0.00
37.75
PREC
Tiras
0.00
Tubo HG de 2"
49.07
0.00
71.82
0.47
104.40
=======
========
TOTAL =
2,549.40