INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


HV Cable Testing On the Drums

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00024

Equipment Taq #:

Equipment Tag Description:

Taq Equipment Type:

No
1

Description of Item
Cables are not damaged and suitable for installation.

2
3

Insulation and Continuity checks performed on cable drum prior to pulling the
cable off the drum.
Identification correct.

Check all results recorded in attached form. IQ347-300-EL-CHL-00025.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction