Building construction project management

Building construction project management


Table of Contents
1.0 Introduction. 4
1.2 Project sub-divisions. 4
1.1 Analysis of business objectives. 5
1.3 Project Methodology: 6
1.4 Feasibility: 7
2. Managing and controls project. 8
2.1 Management and Adminsistration. 8
2.2 Roles and responsibilities Of Project manager : 9
2.3 Project plan: 9
Critical path: 10
3. Project management: 10
4 Be able to organize and manage a project. 12
4.2 Identification of risks and issues that impedes a projoct. 13

4.3 Design control systems to detect and manage issues arising in the course of projects. 15
5. Be able to review, evaluate and closeout a project. 16
5.1 Identify issues and risk likely to be encountered in the final stages of a project. 16
5.2 Assess the necessary project task to be completed in the final stages of a project. 16
Conclusion. 17
REFERNCES: 18

1.0 Introduction
The project management is an application of knowledge, skills, tools and techniques. The various
processes are included in the project management like initiation, planning, executing, monitoring and
controlling and closing. The project objectives are developed by the project manager. Sunrise is a
building construction company that carries out bulky scale projects and provides quality
management service. The construction sector is one of the growing sectors around the world and
contains huge employment of labors. The varieties of resources are needed for the development of a
successful project. The project manager plays a vital role to deliver quality project(Duncan,1996).
The efficient team is selected by the project manager because an effective team work can fulfill the
demand of the company. The project undergoes numerous life phases like initiation, planning,
design, construction and closeout. The framework is developed by the project manager that
implemented by the workers. Depending upon the project budget the project is designed and
scheduled. In the project life cycle the scope refinement is become essential. The programs should
be scheduled properly because a definite beginning and end is required otherwise the company can
suffer huge loss due to the delay. A strategic planning is conducted to improve the quality of service
as well as to meet the growing demand and regulatory requirements(Randolph and Posner,1988).
The strong management control systems are configured in the sunrise construction company that
helps to meet that targeted goal of the company. The best possible resources and employees are
engaged in the sunrise construction company which results in delivering quality service to the
required customer. The prince 2 project methodology is selected to ensure the effectiveness of the
sunrise construction company.

1.2 Project sub-divisions


The project management tools are adapts to serve better quality service to the customers. The
construction project will focus on development of a new building.
The project management process involves following operational sub divisions-

1.1 Analysis of business objectives

Project initiation:

The construction business is one of the growing business sector and the customer demands are
increasing day by day. The sunrise construction company provides quality service to the customer so
the business reputation is very high. The huge investment is required for the construction business.
In this building construction project the sunrise construction company providing good quality
equipments that will fulfill the customer needs.
The alternative cost benefit analysis is done to find the best net gain to the society. The society
benefit is the key of alternative cost benefit analysis. The fair distribution is required to facilitate the
benefit to the overall community. The overall social benefit can be achieved if the collective benefits
are much higher than the losses. The transfer of payments is undertaken by the government as
income taxes from the construction sector. The potential cost and potential benefit is calculated by
the methodological techniques (Abdou,2002). The project cost includesaccounting costs, capital
charge and the operation and management cost. The cost of construction and development is
estimated around $ 12,876, including the equipments of water supply. The time required 1 to 2years
to complete whole framework. The cost analysis helps to determine the applicable externalities.

Cost analysis Summary

1.3 Project Methodology:


In this construction project the PRINCE 2 project methodology is taken under considerations. This
proposed methodology is applied in the sunrise construction company to enhance the performance
of overall business. The PRINCE 2 is one of the common methods which are applied by sunrise
Construction Company (Akintove et al. 2008). It offers several advantages that are very effective
than the traditional methodologies that are used in the past.

1.4 Feasibility:
Risk management:

The identification of risks is essential to establish any kind of business. It is important to give
attention regarding the risk factors because it can hamper the business. The decision making
process is involve with the risk management. The business opportunities are also identified by the
risk management. The risk management is a function of project management that is carried out by
the project manager(Deeprose ,2002). The management factor plays a vital role in overall project.
The various risk management components are represented below-

The effect of globalization is another factor that highly affects on construction project. The advanced
technologies are vividly used during the construction period. Depending upon the culture and country
globalization enhance the competition in the market. The globalization of the economy is also affects
the construction business because the foreign direct investment is easily available for the investors. It
also offers new opportunities that sometimes help the construction company. The global governance
helps to increase the business worldwide. The climate change is another factor that affects the
construction business.

2. Managing and controls project


2.1 Management and Adminsistration
The PRINCE project methodology is one of the helpful tools which help the construction company.
The following components influence the success of business.

Documentation- The project documents like the contract papers are verified by the project
manager. The framework is developed that implemented by the employees. The scoping of
the documents is essential because the approval is made after the documentation. The
contract of the total work is represented to the government. The permission of government
will not give if the proper documentation is not done (Field and Keller, 2007).

Technique- The standard project technique is applied in the construction company because
the standard tool helps to provide a quality work. The Critical path analysis and risk
management is done to maintain the quality work. The project methodology undergoes
various techniques that create a landmark of building construction.

Sequence- The various stages are present in a building construction. The practical
framework is done that helps to manage the various stages of the work. The total work is
divided into different stages that help in working.

Overview- The documentation and techniques are fitted together in this stage. The
techniques and documentation must be properly fit in the given task otherwise the framework
will not be implemented properly.

PRINCE 2 is applied in UK and Europe and it is one of the best techniques that are implemented in
the building construction. The methodology is divided into several parts and they are as follows

Starting up the project- It is one of the most important components that influence the total
business case. The starting of the project includes verities of tasks that should be
implemented properly because the starting framework determines the overall project work.

Directing the project- The efficient decisions are taken by the manager regarding the
project. The decision should be practical because the work is conducted under the guidance
of the project manager. The guidelines are developed by the manager and the workers are
maintaining the guidelines throughout the project.

Initiating the project- The main framework of the whole project is identified in this stage.
The project initiation documents are created for the task. The total project of building
construction is conducted in this phase

Planning- The plans related to the projects are developed in this stage and the total lifecycle
of the project activity is selected in this stage. The standard planning helps to make a
consistent approach towards the project.

Controlling- The day by day operation is controlled by the manager because it ensures the
quality. The predicted work is properly executed through the controlling over the employees.

Monitoring- The feedback report is given to the project board about the working status. The
necessary action is conducted by the project manager to maintain the quality of the service.

Closing- The finite project time is selected because the needs of the customer must be filled
by the company.

Thus, PRINCE 2 methodology helps the company to meet the targeted goal.

2.2 Roles and responsibilities Of Project


manager :
The project is mainly guided by the project manager without the manager the project will be not
executed properly. The stakeholders are also played very critical role in this stage of working and the
supports are also given by the employees that result in success of the project. The risk management

helps to know the threats of the project .The planning is developed by the manager and it is a key
issue in the overall project(Field and Keller, 2007)..

2.3 Project plan:


The sponsorship and accountability is under the project planning that is very important in this stage.
The accounts are regularly checked by the manager. An efficient accountant is available in this
construction company and he manages the accounts section very well. The working schedule is
developed by the manager and the employees maintain the schedule until the project is over.

Critical path:
The critical path analysis helps to predict that the project will complete in time or not. It is very
essential because a single day delay will results in huge loss of the company. The total activities are
enlisted with the help of software by the project manager. After that a diagram is developed that
contains all the relationship and activities together.

3. Project management:
Quality management
The quality management provides reduced cost to the company. The targeted goal is achieved by
the quality management. The various tolls are utilized by the company to ensure quality
management.
Quality Planning
The identification of quality standards are done to make an efficient plan. The proper execution is
done to fulfill the customers needs. The quality planning is requires for the construction business
because if the planning is not done then the correct path will be dislocated.
Execute Quality Assurance
The plan should be apply after the development of the framework. The quality assurance also
provides the better quality service because it is verified before going to the customer. The market
reputation is maintained due to this particular stage of work.
Execute Quality Control

The quality management is needed to monitor for positive consequences to determine whether the
work is producing predicted quality or not. It increases the quality values of the company. The
customers needs are fulfilled because they get what exactly they want. So all the provided
requirements are fulfilled by the company and quality control helps to maintain the consistency of the
quality service.
Reducing cost and achieves client satisfaction
The extra costs are reduced due to the quality management so the quality work is easily delivered to
the respective clients at minimum cost. The expectations of the customers are fulfilled by the
company.
Managing accountability:
The success of the project is achieved by the standard management accountability that reduces the
extra cost. The resources are properly delivered by the company that results in standard
accountability.
Procedures for managing proposals
The reason of change must be known to the company. The success is come from the proper
framework done by the manager. The management planning is conducted by the efficient
employees. The cost management strategy and managing financial strategy must be completed by
the company to make the project success. The risk management must be identified properly. The
project undergoes several stages; each and every stage is executed by the workers. All the project
requirements are fulfilled by the standard framework done by the manager. The change is essential
for the company to deliver quality service to the required customers.

4 Be able to organize and manage a


project
For the monitoring and controlling of all the various aspects pertaining to project management Prince
2 methodology is followed which is a very standard practice followed across UK and Europe. It is
also followed by all the government commissioned projects of UK.
The basic structure is shown in the figure below:

The Project Inception: This happens only once during the course of the project and the business and
alternatives pertaining to the feasibility of the project is evaluated.

Initiation of Project: At this stage a formal plan is made regarding how the project will be managed
.PID (Project Initiation document) will form the contract and also act as a guideline for the project.
Planning: The project deliverables needs to be chalked out clearly throughout the duration of the
entire lifecycle of the project so that the delays and mismanagement can be successfully averted.
Controlling: By controlling it means to design various documentation and operational plans which
helps to eradicate the mistakes that occur on site. Various tolls like CPM, WBS Gantt charts are used
to keep a strict control over the planned project schedule.
Monitoring: A constant feedback on all the processes from the controlling activities and acting on the
changes with necessary authorization of action and reporting to the project board (Ahmed et
al.2003).
Closing: A project cannot go on for an indefinite period and this construction project has a strict
deadline within which all the activities related to the same needs to be completed so that project
does not suffered from the clauses of penalty due to delay which the client generally puts in during
the contractual part at the beginning of the project (Duncan, 1996).

4.2 Identification of risks and issues that


impedes a projoct
Risks encountered in Cost Management

Risks encountered in Time

Risks encountered in Quality

Management

Management

Rigidity of project schedule

Very Tight project schedule

Stretched project schedule


incurring losses.

Design variations at site


leading to cost increase and
time delay (Chen et al, 2004)

Time for the


implementation of
variations

Unavailability of the expert


skilled workers
and engineers.

Client variations and sudden


requirements

Construction materials
price hike

Incidence of dispute between


various regulatory bodies in
government and environment.

Operational Systems which


are often Time
consuming (Berkeley et al,
2005)

Lack of proper planning

Expert competency of
consultant

Long approval procedures in

Poor quality due to time

expectations gap of quality

the management(Berkeley et
al, 2005)

Rejection of completed
works from the clients and
reworking on the same

Cost estimation which is


found to be Incomplete or
inaccurate.

constraints

Time Variations of the


consultancy programs

Lack of proper coordination


between the team
participants(Chen et al,
2004)

4.3 Design control systems to detect and


manage issues arising in the course of
projects
This may be done with the help of a Work Breakdown structure together with a Gantt chart and
critical path evaluation which already has been illustrated before.

5. Be able to review, evaluate and


closeout a project
5.1 Identify issues and risk likely to be
encountered in the final stages of a
project
Risk is a part of the project management, which help to identify and take preventive measures to
overcome the issue, and challenges, which may occur during the time of the project. There are some
key risk issue are measure during the implementation of the final stage or step of the project which
should be taken care of in order to get the project completed within the given timeline. When the
administration office as well as the entire business, which being restructured and relocated from one
place to another place create a business risk(Duncan and Gorsha,2005). These activities may create

a series of risk for the entire business, as the new area where the business relocated might not be
suitable for the smooth business operation. The risk factors are as follows,

Probability to decrease the level of expert consultant

Decrease in the overall opportunity

Decrease in the co-ordination among the team member

Inefficient monitoring system may lead to the failure of successive decision

Affected by the environmental negative concern

Safety risk

5.2 Assess the necessary project task to


be completed in the final stages of a
project
Decision taken by the managing director is one of the complex issues, which considered one of the
major challenges by the management as the level of sensitivity is high which related to the customer.
The entire analysis help to identify that the overall decision regarding relocation of the office may be
best for the business operation. The risk are the part and parcel which can be solve without proper
monitoring on the level of complexity occur due to the movement of the business office. Increase in
the 10% revenue might cause risk of losing potential customer as the customer are very focused on
the level of revenue increase in their respective product. However, the company focuses on
decreasing the overall cost of the business operation but relocation of the office might increase the
cost, which is more than the benefit incurred by the company for the given period. However, in the
long run it will prove to be beneficial for the company overall revenue generation. Client will be
decrease, which will lead to the decrease in the current earning capacity of the company. Generating
a bill of the entire work done for the given respective service to the core client must do accurately
and properly. The team should focused on the primary work on which they are targeted or should
focus on some new project which are required to allocated(Heerkens ,2002).

Conclusion
Project management is one of the most complex part for several organization and play a major role
in the overall success of the organization in long run especially in case of sensitive issue. In the

given case, it can conclude that the overall relocation of the business may be successful depending
on the overall outcome of the risk factor of the project, which covered in the given paper. Planning
accordingly will help to generate a greater level of success rate of the project. There are some
different alternative plan which are being covered in the given paper in order to overall the uncertain
event in the given project management. The entire IT system should be enhanced for the better
business operation which will help to decrease the overall cost of the business(Lock ,2007).

REFERNCES:
Abdou, O.A., (2002), Managing Risks, Journal of Architectural Engineering,2(1), 3-10.
Ahmed, S.M., Ahmad, R. and Saram, D.D., (2003), Risk Management Trends in the Engnand: a
Comparison of Contractors and Owners Perceptions,Engineering, Construction and Architectural
Management, 6(3), 225-234.
Akintoye, A.S. and MacLeod, M.J.,( 2008), Risk Analysis and Management,International Journal of
Project Management, 15(1), 31-38.
Baker, W. and Reid, H., (2005),Identifying and Managing Risk, Frenchs Forest, N.S.W.:Pearson
Education.
Berkeley, D., Humphreys, P.C. and Thomas, R.D., 2005,
Management,Construction Management and Economics, 9(1), 3-17.

Project

Risk

Action

Bernhard
S.,
(2000),
ObjektorientierteReferenzmodellefr
das
Prozessund
Projektcontrolling.Grundlagen Konstruktionen Anwendungsmglichkeiten. ISBN 978-3-82447162-1. p.131.
Chen, H., Hao, G., Poon, S.W. and Ng, F.F., (2004), Cost Risk Management in West RailProject of
London, 2004 AACE International Transactions.
Deeprose, D,( 2002), Project management. Oxford, U.K.: Capstone Pub
Duncan, G L and Gorsha, R(2005), A Project management: A major factor in project success IEEE
Transactions on Power Apparatus and System 102 (11) (1983) 3701-3705
Duncan, W. R. (1996), Project Management Institute (PMI), A Guide to the Project
Field, M. and Keller, L.(2007), Project management. London: International Thomson Business Press.
Heerkens, G.,( 2002), Project management. New York: McGraw-Hill.Institute of Systems Science
(2001), Certified Information Technology Project Management, Singapore: NUS

Lackman, M (1998), Controlling the project development cycle, tools for successful project
management J System Management 16-28
Lock, D, (2007). Project management. Aldershot, England: Gower.Management Body of
Knowledge, North Carolina: PMI Publishing, Sylva
Morris, P W G and Hugh, G H (1986), Preconditions of Success and Failure in Major Projects
Templeton College, the Oxford Centre for Management Studies, Kinnington Oxford, Technical paper
No. 3
Randolph, W A and Posner, B Z (1988), What every manager needs to know about project
management Sloan Management Review Summer .
Schwalbe, K (2000), Information Technology Project Management, Cambridge, MA

Related Assignment Samples

August 20, 2015

Traditional SDLC Model Assignment-93552-51425

August 20, 2015

Database Backup Disaster Planning and The Importance of Integration-93553-

September 2, 2015

THE CRITERIA FOR RECRUITING A TOP BUILDING ESTIMATOR-97367

September 1, 2015

Strategic Marketing Management-95418

December 3, 2015

Internal Control Structure for Application Controls-116032

June 27, 2015

December 3, 2015

November 16, 2015

August 20, 2015

September 18, 2015

August 20, 2015

December 1, 2015

Object Oriented Analysis & Design-116763

September 9, 2015

BM5207 Market Research Deferred/Retake Quantitative Assignment-91324

51425

Case Study: The Probuild Constructions Story-70153


Microwave Engineering Assignment-114235
MATLab Program-113812

Paraphrasing Discussion Board-93565-51425


English Assignment-102230

English Legal System Law Coursework-94283

Ascience Inner Rich Shampoo-IMC plan-1012351

September 15, 2015

December 2, 2015

September 14, 2015

November 6, 2015

Wellness and Wellbeing-112544

September 9, 2015

McDonalds BUSINESS ENVIRONMENTAL ANALYSIS-92022

September 3, 2015

October 30, 2015

Procedural Programming Assignment-115664


Preparation of Business Plan-93518

RESEARCH PROPOSAL: IMPLEMENTATION OF CLOUD BASED ERP IN


RETAIL BUSINESS SECTOR OF UK-95574
Foreign Direct Investment (FDI) in New Zealand by Uniqlo-109886

También podría gustarte