Presupuesto
Presupuesto
Cliente
Lugar
1006009
Item
Descripcin
01
OBRAS PROVISIONALES
Und.
Parcial S/.
143,664.42
01.01
01.02
01.03
01.04
02
Precio S/.
Metrado
1.00
1,066.72
1,066.72
m2
240.00
68.43
16,423.20
glb
1.00
54,024.50
54,024.50
TRANSPORTE DE MATERIALES
glb
1.00
72,150.00
72,150.00
85,884.32
TRABAJOS PRELIMINARES
02.01
m2
74,113.17
0.98
02.02
km
16.47
804.70
03
12/05/2016
72,630.91
13,253.41
1,040,293.30
MOVIMIENTO DE TIERRAS
03.01
m3
14,822.63
4.71
69,814.59
03.02
m3
97,198.07
4.51
438,363.30
03.03
m3
17,766.40
9.81
174,288.38
m3
17,766.40
5.41
96,116.22
03.04
03.05
m3
1,780.60
15.86
28,240.32
03.06
m3
1,780.60
6.66
11,858.80
03.07
m3
7,328.23
10.98
80,463.97
03.08
m3
109,416.84
1.29
141,147.72
04
494,482.96
PAVIMENTOS
04.01
m2
74,113.17
1.31
97,088.25
04.02
m3
14,822.63
26.81
397,394.71
m3
14,822.63
18.69
05
05.01
06
06.01
06.01.01
277,034.95
TRANSPORTES
TRANSPORTE DE MATERIALES PARA BASE Y SUB BASE > 5KM
61,680.36
PONTON (L=9M)
30.19
TRABAJOS PRELIMINARES
06.01.01.01
m2
28.00
0.98
06.01.01.02
m2
6.25
0.44
06.01.02
06.01.02.01
06.01.02.02
60.57
30.29
1,834.67
m3
57.69
21.51
1,240.91
878.31
m3
35.82
24.52
06.01.02.04
m3
90.68
6.44
06.01.03.01
06.01.03.02
06.01.03.03
06.01.04
583.98
16,642.28
CONCRETO SIMPLE
SOLADO PARA CIMENTACIONES 1:10 + 10% PG, E=4"
2.75
m3
06.01.02.03
06.01.03
27.44
4,537.87
MOVIMIENTO DE TIERRAS
EXCAV. CON EQUIPO BAJO AGUA EN PONTON
277,034.95
638,198.53
m2
16.94
17.83
302.04
m3
61.59
196.86
12,124.61
m2
103.68
40.66
4,215.63
23,121.22
CONCRETO ARMADO
06.01.04.01
m3
15.48
510.75
06.01.04.02
m2
31.70
83.24
2,638.71
06.01.04.03
kg
1,614.39
7.79
12,576.10
06.01.05
06.01.05.01
7,906.41
15,165.36
OTROS
13,804.96
ACCESORIOS
06.01.05.01.01
4.00
1,220.44
06.01.05.01.02
4.00
205.36
821.44
06.01.05.01.03
BARANDAS METALICAS
32.00
253.18
8,101.76
8.00
170.05
06.01.05.02
06.01.05.02.01
06.01.06
1,360.40
JUNTAS DE DILATACIN
JUNTAS DE DILATACION METALICA
4,881.76
1,360.40
2,183.44
VARIOS
06.01.06.01
12.40
19.30
06.01.06.02
4.00
71.13
284.52
06.01.06.03
m2
36.00
46.10
1,659.60
06.02
06.02.01
06.02.01.01
58,030.14
PONTON (L=8M)
28.30
TRABAJOS PRELIMINARES
LIMPIEZA Y DEFORESTACION MANUAL
239.32
m2
26.52
0.98
Fecha :
25.99
12/05/2016 01:45:22p.m.
S10
Pgina
Presupuesto
Presupuesto
Cliente
Lugar
Item
06.02.01.02
06.02.02
06.02.02.01
06.02.02.02
1006009
Und.
m2
Precio S/.
Metrado
5.25
Parcial S/.
0.44
m3
58.77
30.29
1,780.14
m3
55.89
21.51
1,202.19
834.17
06.02.02.03
m3
34.02
24.52
06.02.02.04
m3
88.70
6.44
06.02.03
06.02.03.01
06.02.03.02
06.02.03.03
06.02.04
571.23
15,579.68
CONCRETO SIMPLE
SOLADO PARA CIMENTACIONES 1:10 + 10% PG, E=4"
2.31
4,387.73
MOVIMIENTO DE TIERRAS
EXCAV. CON EQUIPO BAJO AGUA EN PONTON
12/05/2016
m2
16.64
17.83
296.69
m3
57.12
196.86
11,244.64
m2
99.32
40.66
4,038.35
20,870.03
CONCRETO ARMADO
06.02.04.01
m3
13.76
510.75
06.02.04.02
m2
29.80
83.24
2,480.55
06.02.04.03
kg
1,458.48
7.79
11,361.56
06.02.05
06.02.05.01
7,027.92
15,165.36
OTROS
13,804.96
ACCESORIOS
06.02.05.01.01
4.00
1,220.44
06.02.05.01.02
4.00
205.36
821.44
06.02.05.01.03
BARANDAS METALICAS
32.00
253.18
8,101.76
8.00
170.05
06.02.05.02
06.02.05.02.01
06.02.06
1,360.40
JUNTAS DE DILATACIN
JUNTAS DE DILATACION METALICA
4,881.76
1,360.40
1,999.04
VARIOS
06.02.06.01
12.40
19.30
239.32
06.02.06.02
4.00
71.13
284.52
m2
32.00
46.10
06.02.06.03
06.03
06.03.01
28.30
TRABAJOS PRELIMINARES
06.03.01.01
m2
26.52
0.98
06.03.01.02
m2
5.25
0.44
06.03.02
06.03.02.01
06.03.02.02
58.77
30.29
1,780.14
m3
55.89
21.51
1,202.19
834.17
m3
34.02
24.52
06.03.02.04
m3
88.70
6.44
06.03.03.01
06.03.03.02
06.03.03.03
571.23
15,579.68
CONCRETO SIMPLE
SOLADO PARA CIMENTACIONES 1:10 + 10% PG, E=4"
2.31
m3
06.03.02.03
06.03.03
25.99
4,387.73
MOVIMIENTO DE TIERRAS
EXCAV. CON EQUIPO BAJO AGUA EN PONTON
1,475.20
53,611.26
PONTON (L=6M)
m2
16.64
17.83
296.69
m3
57.12
196.86
11,244.64
m2
99.32
40.66
4,038.35
06.03.04
CONCRETO ARMADO
06.03.05
m3
10.32
510.75
5,270.94
06.03.06
m2
26.00
83.24
2,164.24
06.03.07
kg
1,204.72
7.79
06.03.08
OTROS
06.03.08.01
9,384.77
15,165.36
13,804.96
ACCESORIOS
06.03.08.01.01
4.00
1,220.44
06.03.08.01.02
4.00
205.36
821.44
06.03.08.01.03
BARANDAS METALICAS
32.00
253.18
8,101.76
8.00
170.05
06.03.08.02
06.03.08.02.01
06.03.09
1,360.40
JUNTAS DE DILATACIN
JUNTAS DE DILATACION METALICA
4,881.76
1,360.40
1,630.24
VARIOS
06.03.09.01
12.40
19.30
06.03.09.02
4.00
71.13
284.52
06.03.09.03
m2
24.00
46.10
1,106.40
06.04
239.32
88,726.19
ALCANTARILLA TIPO I
Fecha :
12/05/2016 01:45:22p.m.
S10
Pgina
Presupuesto
Presupuesto
Cliente
Lugar
Item
06.04.01
1006009
Und.
Precio S/.
Metrado
Parcial S/.
1,392.08
TRABAJOS PRELIMINARES
06.04.01.01
m2
388.85
1.64
06.04.01.02
m2
388.85
1.94
06.04.02
06.04.02.01
637.71
754.37
4,962.02
MOVIMIENTO DE TIERRAS
m3
310.50
4.51
1,400.36
06.04.02.02
m3
31.05
40.56
1,259.39
06.04.02.03
m3
5.68
24.52
139.27
m3
335.87
6.44
06.04.02.04
06.04.03
12/05/2016
06.04.03.01
m3
98.23
307.29
06.04.03.02
m2
531.19
40.66
06.04.04
2,163.00
51,783.29
30,185.10
21,598.19
29,826.65
06.04.04.01
m3
24.29
395.49
06.04.04.02
ENCOFRADO Y DESENCOFRADO
m2
188.32
40.66
7,657.09
06.04.04.03
kg
2,267.71
5.54
12,563.11
388.85
1.96
06.04.05
06.04.05.01
06.05
06.05.01
762.15
VARIOS
PINTADO DE ALCANTARILLAS
3,682.25
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
1,028.56
1.64
06.05.01.02
m2
1,028.56
1.94
06.05.02.01
06.05.02.02
06.05.02.03
06.05.02.04
06.05.03
1,995.41
m3
684.42
4.51
3,086.73
m3
124.44
40.56
5,047.29
m3
147.68
24.52
3,621.11
m3
661.18
6.44
4,258.00
186,809.39
06.05.03.01
m3
369.79
307.29
06.05.03.02
m2
1,799.72
40.66
06.05.04
1,686.84
16,013.13
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO CON TRACTOR
762.15
300,710.88
ALCANTARILLA TIPO II
06.05.01.01
06.05.02
9,606.45
113,632.77
73,176.62
92,190.13
06.05.04.01
m3
100.46
395.49
39,730.93
06.05.04.02
ENCOFRADO Y DESENCOFRADO
m2
526.24
40.66
21,396.92
06.05.04.03
kg
5,606.91
5.54
31,062.28
1,028.56
1.96
06.05.05
06.05.05.01
06.06
06.06.01
2,015.98
VARIOS
PINTADO DE ALCANTARILLAS
356.39
TRABAJOS PRELIMINARES
06.06.01.01
m2
99.55
1.64
06.06.01.02
m2
99.55
1.94
06.06.02
2,015.98
8,024.79
BADENES
163.26
193.13
1,891.58
MOVIMIENTO DE TIERRAS
06.06.02.01
m3
41.39
32.21
1,333.17
06.06.02.02
m2
40.00
5.63
225.20
06.06.02.03
m3
51.74
6.44
06.06.03
333.21
5,776.82
06.06.03.01
m3
25.39
43.59
1,106.75
06.06.03.02
m2
49.68
40.66
2,019.99
06.06.03.03
m3
19.30
137.31
06.07
06.07.01
74.11
TRABAJOS PRELIMINARES
06.07.01.01
m2
20.70
1.64
06.07.01.02
m2
20.70
1.94
06.07.02
06.07.02.01
33.95
40.16
247.37
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA MUROS DE GRAVEDAD
2,650.08
6,968.90
MUROS DE GRAVEDAD
m3
5.66
32.21
Fecha :
182.31
12/05/2016 01:45:22p.m.
S10
Pgina
Presupuesto
Presupuesto
Cliente
Lugar
1006009
Item
Descripcin
06.07.02.02
06.07.02.03
06.07.03
Und.
Precio S/.
Metrado
12/05/2016
Parcial S/.
m3
1.18
24.52
m3
5.61
6.44
28.93
36.13
6,159.08
CONCRETO SIMPLE
06.07.03.01
m3
3.11
331.87
1,032.12
06.07.03.02
m3
11.95
244.92
2,926.79
06.07.03.03
m2
48.26
45.59
2,200.17
06.07.04
488.34
VARIOS
06.07.04.01
4.00
57.16
228.64
06.07.04.02
m2
4.00
58.75
235.00
06.07.04.03
PINTADO DE CORONA
12.60
1.96
06.08
24.70
60,446.01
CUNETAS
06.08.01
13,369.59
1.92
25,669.61
06.08.02
2,820.00
10.80
30,456.00
06.08.03
280.00
15.43
07
4,320.40
16,840.56
SEALIZACION
07.01
2.00
2,101.61
4,203.22
07.02
31.00
321.54
9,967.74
07.03
16.00
166.85
08
2,669.60
11,792.23
08.01
32.00
287.10
9,187.20
08.02
25.00
71.13
1,778.25
08.03
2.00
71.13
142.26
4.00
71.13
284.52
2.00
200.00
08.04
08.05
09
400.00
19,080.88
IMPACTO AMBIENTAL
09.01
m2
240.00
5.99
09.02
ha
1.20
2,722.73
3,267.28
09.03
CIERRE DE BOTADERO
m2
2,400.00
5.99
14,376.00
COSTO DIRECTO
1,437.60
2,727,272.15
272,727.22
UTILIDAD 8%
218,181.77
-----------------------
SUBTOTAL
3,218,181.14
IGV 18%
579,272.61
-----------------------
3,797,453.75
65,000.00
SUPERVISIN 5%
189,872.69
----------------------
TOTAL PRESUPUESTO
4,052,326.44
Fecha :
12/05/2016 01:45:22p.m.