JV Site ID Site State Site NameMilestone

L850

L850 Phase2449

NSW

West WyaloSD23.19 7.5

L850

L850 Phase2730

NSW

Gibralter HilSD23.19 7.5

L850

L850 Phase1828

ACT

West LynehaSD23.4

JC3035

Document Document Document


ORCA RF ReORCA RAN

640466

ORCA RF ReORCA RAN

640467

ORCA RF ReORCA RAN

640511

Document Name
L850_Phase2B_202449_West Wyalong_DSA24Hr Performance Report for Integration_V1.0.xlsx
L850_Phase2B_202730_Gibralter Hill_DSA24Hr Performance Report for Integration_V1.0.xlsx
L850P2B-552609-VHA-ACT-201828_West Lyneham - Narambi Pl-U900-DSA7 Report-28102015.xlsx

Document Submitted On

SubmittedSubmittedAssigned Noki

11/2/2015 Rocky Patri Huawei

madan mohan

11/2/2015 Rocky Patri Huawei

madan mohan

11/2/2015 Rocky Patri Huawei

madan mohan

Assigned Date

First Revi Latest RevNokia Status

11/5/2015 11/5/2015

11/5/2015

Approved

11/5/2015 11/5/2015

11/5/2015

Approved

11/5/2015 11/5/2015

11/5/2015

clarification required from huawei

Nokia Comments

05-11-2015
1)Report can be accepted
2)Minor step change in U9 RTWP, within acceptable range(ok in current trend also)
05-11-2015:
1) Report can be accepted
2) G900 -1 Drop rate for GPRS and EDGE(%) KPI following the pre kpi trend so it may be existing issue not related to ne
05-11-2015:
1) LSTANTENNAPORT:- No TMA power source "ON"when U900 and U850 both are prsent on the site
2) LSTRXBRANCH:- Attenuation value is "0" for U900.
3) LSTRET: Device name is not as per the guidline
4) Cross feeder suspected Huwaei has commented that NO required Handover samples for S2 But need further more clarifica

BAU INC
Required
(Yes/Blan
k)
yes

Project
INC
Required
(Yes/Blan
k)

DownTilt
required
(Yes/Blan
k)

Proposed
DownTilt
cell
Existing
name(s) E-Tilt

Proposed
E-Tilt (to
be filled
only if
propsed
by
Huawei) VHA Engine

VHA EnginVHA raised INC number