Documentos de Académico
Documentos de Profesional
Documentos de Cultura
fi=
20
h1=
1.8 m
de la tabla
Bx=
1.2 m
bx=
by=
N=
d=
sigma adm=
Cp=
cv=
Fy=
fc=
v=
e=(Bx-bx)/2
30 cm
30 cm
2 ton
2.6
35
20
3500
250
1.2
ton/m2
ton
ton
KG/cm2
KG/cm2
e=
By= Areq/Bx
By=
0.45 m
2.11538462 m
a
Pu=1.4*Cp+1.7*Cv
Pu=
u= Pu/(By*Bx)
u=
83 ton
50 cm
3.270 Kg/cm2
Mu a-a=u *(Bx-bx)*(Bx-by)*By/2
Mu a-a=
28.0125 T m
50 cm
Mu b-b=u *(By-by)*(By-by)*Bx/2
Mu b-b=
16.163524476 T m
se adopta
d=
h=
40 cm
50 cm
Verificacin a corte:
Vu 1-1=
4.8083778966 Kg/cm2
Vu 2-2=
4.8823529412 Kg/cm2
d
d
CUMPLIOR+
Vu
<
.=.
d
Vc
40+50=70
Vc=0.53* raiz(fc)
Vc=
OK
8.3800358
Verificacin a punzanamiento
bx+d/2
Vu=
81.855606061 t
Vu=
16.050118835 Kg/cm2
by+d
bo=50+40+50+40+50+20+50+2=0
es al area de punzonamiento bx+d/2+bx+d/2+by+d
bo=
150
Vc=1.06* raiz(fc)
Vu
<
16.0501188 <
Vc
16.7600716
26.0025063 cm2
As b-b=m Mu b-b-/(0.9*0.9* fy * d)
As b-b=
As a-a/By
12.2920939
As b-b/Bx
11.8779574
14.2535489 cm2
As min = 0.2*bx
as min=
14.2857143
6 cm2/m
diam 12 mm cada 10 cm
TENSOR
M vol= p*e
27.3
Mvol=
H=
24.75 T m
13.75 t=F
<
55 <
p tg fi
123.043852
fct=0.65*raiz(fc)
fct=
10.277402396 kg/cm2
se adopta
ti=
0.01
n=Es/Ec=21.1*10elevado6/(15100raiz(fc)
n=
8.8543774485
1120.2368611 Kg/cm2
fs
<
fy/2
1120.2368611 <
As=h/FS
As=
1750
12.2741899 cm2
ac=
>=
H*(1/fct-n/fs)
1227.41899 cm2
b= raiz(AC)
b=
delta L=
L=
longitud del tnsor
4 m
35.03454 cm
0.21 cm
50 cm
300cm
b
50 cm
120 cm
1
30
d/2
diametro 16mm c 15
iam 12 mm cada 10 cm
0.875
22.225
de la tabla
Bx=
1.2 m
bx=
by=
N=
d=
sigma adm=
Cp=
cv=
Fy=
fc=
v=
e=(Bx-bx)/2
50 cm
50 cm
2 ton
2.6
50
28
3500
250
1.2
ton/m2
ton
ton
KG/cm2
KG/cm2
e=
By= Areq/Bx
0.35 m
By=
3 m
a
Pu=1.4*Cp+1.7*Cv
Pu=
u= Pu/(By*Bx)
u=
117.6 ton
50 cm
3.267 Kg/cm2
Mu a-a=u *(Bx-bx)*(Bx-by)*By/2
Mu a-a=
24.01 T m
50 cm
Mu b-b=u *(By-by)*(By-by)*Bx/2
Mu b-b=
30.625 T m
se adopta
d=
h=
40 cm
50 cm
Verificacin a corte:
Vu 1-1=
2.8823529412 Kg/cm2
Vu 2-2=
8.1666666667 Kg/cm2
d
d
CUMPLIOR+
Vu
<
.=.
d
Vc
40+50=70
Vc=0.53* raiz(fc)
Vc=
OK
8.3800358
Verificacin a punzanamiento
bx+d/2
Vu=
115.542 t
Vu=
16.182352941 Kg/cm2
by+d
bo=50+40+50+40+50+20+50+2=0
es al area de punzonamiento bx+d/2+bx+d/2+by+d
bo=
210
Vc=1.06* raiz(fc)
Vu
<
16.1823529 <
Vc
16.7600716
22.2871995 cm2
As b-b=m Mu b-b-/(0.9*0.9* fy * d)
As b-b=
As a-a/By
7.42906649
As b-b/Bx
22.505144
27.0061728 cm2
As min = 0.2*bx
as min=
10 cm2/m
TENSOR
M vol= p*e
27.3
Mvol=
H=
27.3 T m
9.75 t=F
<
78 <
p tg fi
174.498554
fct=0.65*raiz(fc)
fct=
10.277402396 kg/cm2
se adopta
ti=
0.015
n=Es/Ec=21.1*10elevado6/(15100raiz(fc)
n=
8.8543774485
777.65678126 Kg/cm2
fs
<
fy/2
777.65678126 <
As=h/FS
As=
1750
12.5376647 cm2
Ac
ac=
>=
H*(1/fct-n/fs)
835.844315 cm2
b= raiz(AC)
b=
delta L=
L=
longitud del tnsor
4 m
28.9109722 cm
0.15 cm
50 cm
300cm
b
50 cm
120 cm
1
30
d/2