453 Benayat - PC 23

prev
SBG
main
additional 1
additional 2

current

to date

Sr

68,997,570
7,045,838
76,043,408

734,965
130,082
1,211,614
2,076,661

69,732,535
7,175,920
1,211,614
78,120,069

Sr

71,145,497
8,307,528
79,453,025

428,758
(1,021,079)
1,348,133
755,812

71,574,255
7,286,449
1,348,133
80,208,837

Benayat
main
additional 1
additional 2

1,320,849

(2,088,768)

Page 3 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

Item No.

Description

Unit

1
2
3
4

CONCRETE WORKS
Plain Concrete
Plain Concrete 20Mpa-SRC Thick = 50mm
Plain Concrete 20Mpa-SRC Thick = 100mm
5% Micro Silica
Mass concrete > 100mm

1
2
3
4
5
6
7
8
9

Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)


Isolated Footing
m3
Strip Footing
m3
Tie Beams / Grade Beams
m3
Column Neck
m3
Wall Neck
m3
Slab On Grade
m3
Vapour Barrier 300 micron Polyethylene under slab on gr m2
Damp Proofing
m2
5% Micro Silica
m3

1
2
3
4
5
6
7
8
9

1
2
3

Super Structure Concrete Works - 30Mpa OPC


Column / Beams / Walls
Column / Beams / Walls (with corbel)
Suspended Slab (Vary Thick)
Concrete Ramps, Step & Landing
Fairface Finish or Concrete ramps, steps & landing

Concrete Screed
Concrete Parapet
Concrete Coping
Mechanical Pad

m3
m3
m3
m3

m3
m3
m3
m3
m2
m3
m3
Lm
m3

Appro
Previous

2,110.69
1,616.81

4,016.75
2,268.59
2,387.26
276.17
827.61
7,268.25
64,682.38
49,431.19
-

6,234.21
747.48
7,605.65
534.01
435.64
8,169.26
9.07

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars


Supply, Cut, Bend & Installation
ton
4,382.28
Cut, Bend & Installation
ton
Installation only
ton
11.12

Page 4 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

1
2
3
4
5

Block Works
200mm thick (CMU) non fire rated
150mm thick (CMU) non fire rated
100mm thick (CMU) non fire rated
Additional rate for fire rated solid block
Supply & Apply backing rod

m2
m2
m2
m2
Lm

48,707.74
14,687.76
20,443.44
2,401.50
746.56

1
2
3

Plaster Works
Supply & Install of cement plaster (Internal)
Supply & Install of cement plaster (External)
Galvanized Steel Grooves in Plaster

m2
m2
Lm

72,044.72
60,218.07
25,745.98

Page 5 of 211

ng, Contract No. 453

Approved Quantity
Current

To Date

6.52
-

2,117.21
1,616.81

76.37
69.12
-

4,016.75
2,268.59
2,387.26
276.17
827.61
7,268.25
64,758.75
49,500.31
-

92.78
35.82
8.85
333.61
-

6,327.00
747.48
7,605.65
569.83
444.49
8,502.86
9.07

ight Reinforcement bars 8 & 10, 12, 14, 16mm


11.76
4,394.04
11.12

Remarks

Page 6 of 211

ng, Contract No. 453

687.69
121.90
447.45
95.42
46.90

49,395.42
14,809.66
20,890.89
2,496.92
793.46

4,888.85
2,121.34
957.60

76,933.57
62,339.42
26,703.58

Page 7 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

TOTAL QTY

100

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

2,117.21
1,989.00
128.21
1,616.81
-

108.35
104.62
3.73
104.82
-

4,016.75
2,268.59
2,387.26
276.17
827.61
7,268.25
64,758.75
21,863.85
40,392.79

456.57
171.18
22.58
12.92
380.50
3,710.08
1,411.70
2,222.23

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 8 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

TOTAL QTY

100

2,502.11
49,500.31
47,153.68
2,346.63
-

76.15
2,726.83
2,674.65
52.18
-

6,327.00
923.86
238.36
167.55
1,401.95
247.14
360.18
1,828.25
1,001.34
103.86
54.51

417.46
76.02
38.71
2.94
95.23
56.65
64.48
66.20
17.23

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 9 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

TOTAL QTY
747.48
13.51
185.73
269.99
278.25

100
-

Page 10 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

TOTAL QTY

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

7,605.65
5,105.63
202.47
2,297.55
569.83
444.49
228.25
216.24
8,502.86
9.07

ton

4,394.04
757.65

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

100
511.56
332.63
178.93
20.84
448.60
-

275.57
48.71

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 11 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

TOTAL QTY
629.03
254.22
558.40
45.37
427.67
286.56
777.22
151.68
339.81
38.16
33.04
8.64
46.52
23.10
16.97
11.12

100
25.26
26.39
35.59
1.68
24.02
17.71
51.06
9.76
30.96
2.68
1.76
-

Page 12 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

TOTAL QTY

100

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

49,395.42
14,809.66
20,890.89
2,496.92
793.46

3,136.50
1,350.03
1,547.07
204.82

76,933.57
62,339.42
26,703.58

6,185.04
4,117.22
1,720.60

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 13 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

201

202

400

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

135.81
125.36
10.45
143.92
-

83.50
78.54
4.96
-

87.49
78.89
8.60
49.75
-

644.09
202.10
32.27
10.67
493.50
4,794.93
1,903.50
2,697.78

612.03
112.26
13.62
10.49
299.70
1,764.61
1,671.92

145.12
115.87
16.50
232.88
2,450.90
720.27
1,577.89

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 14 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

201

202

400

193.65
2,088.40
1,840.61
247.79
-

92.69
2,353.95
2,235.68
118.27
-

152.74
1,438.11
1,299.87
138.24
-

486.29
97.48
93.98
11.69
94.73
95.83
37.19
37.58
17.81

385.41
48.47
45.86
6.73
81.75
76.86
52.91
53.36
19.47

253.82
60.86
9.74
183.22
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 15 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

201

202
-

400
-

Page 16 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

201

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

1,144.23
544.82
599.41
50.63
455.82
-

ton

414.60
51.31

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

202

400

471.07
236.93
234.14
22.12
286.30
-

146.05
146.05
34.96
247.71
-

288.51
46.62

139.52
17.98

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 17 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

201
52.55
36.42
41.85
2.49
30.79
15.96
79.95
16.75
80.12
2.50
3.92
-

202
52.83
14.13
28.99
2.00
20.61
17.94
39.55
16.75
43.62
3.46
2.02
-

400
11.81
25.34
0.82
11.57
37.30
32.17
2.55
-

Page 18 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

201

202

400

5,991.06
2,065.24
2,147.69
396.14

3,398.72
1,595.37
1,601.82
-

1,043.34
767.76
356.59
16.85

10,837.08
5,213.82
2,492.72

6,965.02
3,668.05
1,787.62

1,834.87
2,879.74
936.33

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 19 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

500

602

902

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

35.47
26.32
9.15
21.95
-

25.94
25.43
0.51
18.00
-

30.60
26.47
4.13
23.39
-

51.52
54.22
5.04
101.33
1,294.48
345.78
712.88

44.71
55.79
5.02
97.09
815.49
297.01
508.51

56.02
49.94
3.61
105.38
931.79
359.45
492.62

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 20 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

500

602

902

235.82
796.27
686.88
109.39
-

9.97
647.55
635.18
12.37
-

79.72
746.17
657.37
88.80
-

15.69
5.73
3.70
6.26
-

51.90
18.34
2.08
31.48
-

44.89
15.66
2.29
26.94
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 21 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

500
38.58
13.51
25.07
-

602

902
-

Page 22 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

500

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

25.26
25.26
35.28
24.30
24.30
111.00
-

ton

43.84
5.74

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

602

902

91.68
91.68
2.27
145.53
-

79.70
79.70
17.90
113.00
-

48.91
4.37

44.36
5.62

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 23 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

500
6.71
10.63
1.03
4.39
6.82
4.62
1.92
1.96
-

602
4.33
11.46
1.01
5.73
5.93
15.91
0.19
-

902
4.39
10.44
6.73
3.25
12.44
1.49
-

Page 24 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

500

602

902

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

852.66
120.83
174.51
50.60

717.90
5.75
43.18
-

558.97
258.58
246.51
66.80

961.69
1,105.83
525.20

1,186.09
849.22
436.32

1,168.63
798.89
242.91

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 25 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1002

1201-1

1201-2

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

61.55
61.55
54.90
-

150.49
143.83
6.66
152.40
-

150.49
143.83
6.66
152.40
-

44.36
115.24
44.18
4.95
34.58
229.96
2,007.13
776.19
1,230.94

154.72
375.57
73.80
7.99
100.54
506.94
4,930.30
1,935.45
2,876.54

154.72
375.57
73.80
7.99
100.54
506.94
4,930.30
1,935.45
2,876.54

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 26 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

1002

1201-1

1201-2

1,458.44
1,458.44
-

118.31
3,521.96
3,408.02
113.94
-

118.31
3,521.96
3,408.02
113.94
-

191.66
16.65
6.35
37.60
131.06
-

504.52
18.80
8.10
12.64
34.34
29.84
230.00
153.49
17.31
-

504.52
18.80
8.10
12.64
34.34
29.84
230.00
153.49
17.31
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 27 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

1002

1201-1
-

128.95
27.94
45.36
55.65

1201-2
128.95
27.94
45.36
55.65

Page 28 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1002

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

236.67
236.67
323.90
-

ton

110.29
25.44

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

1201-1

1201-2

448.83
274.60
174.23
30.28
54.06
54.06
468.91
-

448.83
274.60
174.23
30.28
100.98
46.92
54.06
625.21
-

314.09
63.11

314.09
63.11

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 29 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

1002
21.14
10.23
2.23
11.32
6.92
33.01
-

1201-1
55.25
35.68
24.85
4.61
28.10
9.02
43.26
4.50
24.28
7.51
2.69
2.94
4.05
4.24
-

1201-2
55.25
35.68
24.85
4.61
28.10
9.02
43.26
4.50
24.28
7.51
2.69
2.94
4.05
4.24
-

Page 30 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1002

1201-1

1201-2

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

1,642.11
243.54
477.88
124.45
-

2,325.41
609.50
1,770.25
344.92
-

2,447.80
609.50
1,770.25
363.07
-

1,783.22
2,091.12
947.05

2,425.42
1,067.55

4,532.92
4,608.30
2,028.34

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 31 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-3

1201-4

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

150.49
143.83
6.66
152.40
-

152.71
143.83
8.88
152.40
-

154.72
375.57
73.80
7.99
100.54
506.94
4,930.30
1,935.45
2,876.54

154.72
375.57
73.80
7.99
100.54
506.94
4,969.74
1,935.45
2,876.54

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 32 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

1201-3

1201-4

118.31
3,521.96
3,408.02
113.94
-

157.75
3,559.94
3,408.02
151.92
-

504.52
18.80
8.10
12.64
34.34
29.84
230.00
153.49
17.31
-

504.52
18.80
8.10
12.64
34.34
29.84
230.00
153.49
17.31
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 33 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

1201-3
128.95
27.94
45.36
55.65

1201-4
128.95
27.94
45.36
55.65

Page 34 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

448.83
274.60
174.23
30.28
100.98
46.92
54.06
625.21
-

ton

314.09
63.11

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

1201-4
448.83
274.60
174.23
40.37
100.98
46.92
54.06
625.21
-

315.07
63.11

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 35 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

1201-3
55.25
35.68
24.85
4.61
28.10
9.02
43.26
4.50
24.28
7.51
2.69
2.94
4.05
4.24
-

1201-4
55.25
35.68
24.85
4.61
28.10
9.02
43.26
4.50
24.28
7.51
2.69
3.92
4.05
4.24
-

Page 36 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-3

1201-4

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

2,447.80
609.50
1,770.25
363.07
-

2,447.80
609.50
1,770.25
363.07
-

5,741.70
4,850.84
2,135.09

5,741.70
4,850.84
2,135.09

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 37 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-14

1201-16

1302

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

2.22
2.22
-

2.22
2.22
-

87.60
87.60
82.80
-

39.44
-

39.44
-

86.42
159.34
62.58
7.87
59.49
291.29
2,906.47
1,154.47
1,752.00

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 38 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

1201-14

1201-16

1302

39.44
37.98
37.98
-

39.44
37.98
37.98
-

2,392.98
2,392.98
-

354.48
10.70
8.10
10.62
33.02
29.84
91.40
153.49
17.31
-

113.03
4.05
14.92
76.75
17.31
-

259.18
35.40
3.84
5.36
35.81
178.77
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 39 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

1201-14
128.95
27.94
45.36
55.65

1201-16
20.96
20.96
-

1302
-

Page 40 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-14

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

219.51
45.28
174.23
10.09
312.61
-

ton

82.56
-

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

1201-16

1302

87.12
87.12
10.09
-

399.28
248.84
150.44
354.00
-

18.82
-

169.30
36.01

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 41 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

1201-14
25.87
16.73
4.50
24.28
7.51
2.69
0.98
11.12

1201-16
17.84
0.98
-

1302
35.88
15.45
3.23
9.12
13.95
37.00
18.65
-

Page 42 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-14

1201-16

1302

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

2,203.02
548.55
1,593.23
326.76
-

734.34
182.85
531.08
108.92
-

343.11
264.77
541.36
46.60
-

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 43 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1400

1500

1601-1

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

142.14
142.14
135.90
-

144.71
144.71
87.73
-

145.41
118.33
27.08
-

103.63
309.44
110.02
10.66
137.77
555.22
4,697.51
1,854.80
2,842.71

193.90
228.42
29.59
570.51
4,228.68
1,385.11
2,843.57

195.29
206.28
18.42
473.56
2,914.77
2,399.87

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 44 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

1400

1500

1601-1

3,864.57
3,864.57
-

3,492.22
3,492.22
-

514.90
2,604.85
2,189.40
415.45
-

482.69
29.66
8.62
91.97
352.44
-

220.92
83.39
13.63
21.12
102.78
-

197.08
71.61
11.42
5.08
100.53
8.44
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 45 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

1400

1500
-

7.24
7.24
-

1601-1
-

Page 46 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1400

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

452.05
452.05
550.70
-

ton

273.41
70.02

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

1500

1601-1

173.83
30.09
143.74
11.51
11.51
480.00
-

498.71
472.44
26.27
113.48
480.70
-

179.92
23.11

251.31
22.66

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 47 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

1400
55.75
25.04
3.47
20.57
20.06
78.51
-

1500
20.39
48.15
2.29
34.86
3.50
4.34
20.97
21.29
1.02
-

1601-1
21.04
51.92
36.28
17.00
89.38
0.37
4.47
8.20
-

Page 48 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1400

1500

1601-1

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

2,710.21
1,073.10
1,738.88
456.06
-

3,093.99
394.32
360.87
-

2,893.92
1,529.67
742.13
58.25

4,160.57
4,036.62
2,328.60

4,019.70
5,384.90
2,117.94

6,807.19
2,901.37
694.95

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 49 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1701

1702

2201

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

133.88
127.38
6.50
-

97.84
85.36
12.48
68.09
-

71.62
66.80
4.82
57.25
-

245.26
256.62
29.61
473.02
2,670.84
2,547.60

161.38
154.23
14.22
324.76
3,034.46
1,052.99
1,707.23

134.48
113.38
8.73
230.51
2,324.82
887.53
1,336.07

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 50 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

1701

1702

2201

123.24
3,448.06
3,271.20
176.86
-

274.24
2,237.00
1,947.86
289.14
-

101.22
1,690.42
1,616.78
73.64
-

269.81
72.46
10.31
187.04
-

204.30
55.10
3.38
145.82
-

154.89
45.68
2.94
19.71
83.02
3.54
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 51 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

1701

1702
-

2201
-

Page 52 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1701

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

395.71
395.71
31.60
552.00
4.74

ton

235.04
26.90

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

1702

2201

265.77
265.77
56.12
403.60
4.33

250.27
41.45
202.47
6.35
21.17
201.26
-

161.72
16.34

140.87
17.09

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 53 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

1701
21.15
49.04
1.54
29.89
37.74
66.05
2.72
-

1702
13.84
31.09
25.87
29.65
40.06
4.88
-

2201
16.52
27.05
1.86
16.60
3.17
4.50
17.22
33.88
0.63
0.92
1.42
-

Page 54 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1701

1702

2201

3,142.37
1,121.17
936.36
-

2,387.12
632.87
627.98
-

2,009.84
119.57
84.38
-

3,402.75
3,597.93
1,499.00

3,615.16
2,618.85
1,062.94

3,413.39
2,389.08
659.74

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 55 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

2202

3202A-1

3202A-2

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

83.11
80.61
2.50
59.98
-

5.65
5.65
15.52
-

5.65
5.65
15.52
-

145.51
116.68
12.73
247.42
2,583.56
915.20
1,612.14

2.65
40.05
5.35
1.20
12.68
26.31
322.00
179.56
142.44

2.65
40.05
5.59
1.30
13.70
26.31
322.00
179.56
142.44

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 56 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

2202

3202A-1

3202A-2

56.22
1,768.38
1,713.58
54.80
-

276.75
276.75
-

283.82
283.82
-

134.67
64.48
9.41
44.70
16.08
-

14.35
8.21
0.40
5.74
-

14.35
8.21
0.40
5.74
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 57 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

2202
35.95
35.95
-

3202A-1

3202A-2

Page 58 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

2202

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

219.49
219.49
12.09
51.68
51.68
395.00
-

ton

122.63
15.42

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

3202A-1

3202A-2

29.64
29.64
52.60
-

29.64
29.64
52.60
-

23.70
10.80

23.76
10.86

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 59 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

2202
11.73
28.49
13.13
9.19
25.56
10.37
4.08
0.75
3.91
-

3202A-1
1.36
1.34
0.82
2.75
0.87
5.77
-

3202A-2
1.36
1.34
0.82
2.75
0.87
5.77
-

Page 60 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

2202

3202A-1

3202A-2

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

1,771.65
97.68
58.38
-

247.67
-

247.67
-

2,840.35
2,450.04
1,240.00

351.75
283.97
120.60

351.75
283.97
120.60

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Page 61 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3202A-7

3202A-8

3202B-1

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

5.65
5.65
15.52
-

5.65
5.65
15.52
-

5.22
5.22
9.63
-

2.65
40.05
8.72
2.54
26.88
26.31
322.00
179.56
142.44

2.65
40.05
8.24
2.35
24.86
26.31
322.00
179.56
142.44

2.65
22.09
5.43
0.97
3.92
24.05
249.62
117.85
131.77

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 62 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

3202A-7

3202A-8

3202B-1

375.64
375.64
-

361.52
361.52
-

189.47
189.47
-

14.35
8.21
0.40
5.74
-

14.35
8.21
0.40
5.74
-

8.86
6.16
0.40
2.30
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 63 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

3202A-7
-

3202A-8

3202B-1
-

Page 64 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3202A-7

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

29.64
29.64
52.60
-

ton

24.93
11.85

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

3202A-8

3202B-1

29.64
29.64
52.60
-

19.61
19.61
42.80
-

24.82
11.76

13.43
4.56

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

Page 65 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

3202A-7
1.36
1.52
0.82
2.75
0.87
5.77
-

3202A-8
1.36
1.50
0.82
2.75
0.87
5.77
-

3202B-1
1.00
1.35
2.54
0.63
3.35
-

Page 66 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3202A-7

3202A-8

3202B-1

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

247.67
-

247.67
-

351.75
283.97
120.60

351.75
283.97
120.60

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

270.37
257.39
100.80

Page 67 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3205

3210

Lift Sta 15

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

1.46
1.46
1.71
-

2.13
2.13
4.23
-

3.14
4.98
0.43
4.57
59.32
30.18
29.14

10.13
26.31
48.98
48.98
-

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 68 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

3205

3210

Lift Sta 15

57.13
57.13
-

4.49
1.97
0.12
2.40
-

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 69 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

3205

3210
-

Lift Sta 15
-

Page 70 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3205

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

4.20
4.20
22.40
-

ton

3.16
0.35

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

3210

Lift Sta 15

21.00
-

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

7.85
7.85

Page 71 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

3205
0.37
1.19
0.27
0.34
0.64
-

3210

Lift Sta 15
-

Page 72 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3205

3210

Lift Sta 15

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

54.94
-

50.16
-

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

59.15
108.07
62.40

Page 73 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

Lift Sta 16

Gas Tank

Concrete Work
1

Plain Concrete 20MPa Thk=50mm


- Isolated ftgs, Tie beams

m3

- Ramps, steps, landing

m3

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

2.16
2.16
4.36
-

16.72
-

11.07
26.26
49.80
49.80
-

39.99
24.92
93.00
93.00
-

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

Page 74 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description
- Ramps, steps, landing

Unit
m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- Ramps, steps, landing

m2

5% Micro silica

m3

Lift Sta 16

Gas Tank

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Page 75 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN
2

Description

Unit

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

Lift Sta 16
-

Gas Tank
-

Page 76 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Wall 1F

m3

- Wall RF

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

- Screed RF

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

Lift Sta 16

Gas Tank

7.94
7.94

5.96
5.96

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

Page 77 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- Ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Lift Sta 16
-

Gas Tank
-

Page 78 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

Lift Sta 16

Gas Tank

Blockworks
1

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

SAUDI BINLADEN GROUP - ABCD

Page 79 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

100

201

202

400

500

602

- Isolated ftgs, Tie beams

m3

100%

100%

100%

100%

100%

100%

- Ramps, steps, landing

m3

100%

100%

100%

100%

100%

50%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

SN

Description

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

100%

100%

100%

100%

100%

100%

Neck Column

m3

100%

100%

100%

100%

100%

100%

Wall Neck

m3

100%

100%

100%

m3

100%

100%

100%

100%

100%

100%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

100%

- SOG

m2

100%

100%

100%

100%

100%

100%

- ramps, steps, landing

m2

100%

100%

100%

100%

100%

50%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

100%

100%

- ramps, steps, landing

m2

100%

100%

100%

100%

100%

50%

100%

100%

100%

100%

100%

100%

6
7

Slab on Grade 30MPa


Vapor barrier 300microns Polyehtylene sheet

Damp proofing

5% Micro silica

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

SAUDI BINLADEN GROUP - ABCD

Page 80 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

100

201

202

400

500

602

- Columns 1F

m3

100%

100%

100%

- Columns RF

m3

100%

100%

100%

100%

100%

100%

- Beams 1F

m3

100%

100%

100%

100%

100%

100%

- Beams CL

m3

- Beams RF

m3

100%

100%

100%

- Wall GF

m3

100%

100%

100%

- Wall 1F

m3

100%

100%

100%

- Wall RF

m3

- Stair

m3

100%

100%

100%

SN

Description

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall CL

m3

100%

100%

Suspended slab

100%

100%

100%

m3

100%

100%

100%

100%

100%

100%

- Slab 1F

m3

- Slab CL

m3

- Slab RF
4

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

100%

100%

100%

100%

100%

50%

100%

SAUDI BINLADEN GROUP - ABCD

Page 81 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

100

201

202

400

500

602

100%

100%

100%

100%

100%

100%

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

100%

100%

100%

100%

100%

100%

- Col & Walls GF

ton

100%

100%

100%

100%

100%

100%

- Col & Walls 1F

ton

100%

100%

100%

- Tie beams

ton

100%

100%

100%

100%

100%

100%

- Add'l rebars around sleeves

ton

100%

100%

100%

100%

100%

100%

- Slab on grade

ton

100%

100%

100%

100%

100%

100%

- Beams 1F

ton

100%

100%

100%

100%

100%

100%

- Slab 1F

ton

100%

100%

100%

100%

100%

100%

- Beams CL

ton

100%

100%

100%

- Slab CL

ton

100%

100%

100%

- Beams RF

ton

- Slab RF

ton

- Stair

ton

100%

100%

100%

- ramps, steps, landing

ton

100%

100%

100%

100%

100%

50%

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

100%

SAUDI BINLADEN GROUP - ABCD

Page 82 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

100

201

202

400

500

602

Thk=200mm, non-fire rated

m2

100%

100%

100%

100%

100%

100%

Thk=150mm, non-fire rated

m2

100%

100%

100%

100%

100%

100%

Thk=100mm, non-fire rated

m2

100%

100%

100%

100%

100%

100%

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

100%

100%

100%

100%

Plasterworks
1

Internal

m2

100%

100%

100%

100%

100%

100%

External

m2

100%

100%

100%

100%

100%

100%

Galvanized steel grooves in plaster

Lm

100%

100%

100%

100%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 83 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

902

1002

1201-1

1201-2

1201-3

1201-4

- Isolated ftgs, Tie beams

m3

100%

100%

100%

100%

100%

100%

- Ramps, steps, landing

m3

100%

75%

75%

75%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

SN

Description

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

100%

100%

100%

100%

100%

100%

Neck Column

m3

100%

100%

100%

100%

100%

100%

Wall Neck

m3

100%

100%

100%

100%

100%

6
7

m3

100%

100%

100%

100%

100%

100%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

100%

100%

- SOG

m2

100%

100%

100%

100%

100%

100%

- ramps, steps, landing

m2

100%

75%

75%

75%

100%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

100%

- ramps, steps, landing

m2

100%

75%

75%

75%

100%

100%

100%

100%

100%

Slab on Grade 30MPa


Vapor barrier 300microns Polyehtylene sheet

Damp proofing

5% Micro silica

100%

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 84 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

902

1002

1201-1

1201-2

1201-3

1201-4

100%

100%

100%

100%

- Columns 1F

m3

- Columns RF

m3

100%

100%

100%

100%

100%

100%

- Beams 1F

m3

100%

100%

100%

100%

100%

100%

- Beams CL

m3

100%

100%

100%

100%

- Beams RF

m3

- Wall GF

m3

100%

100%

100%

100%

- Wall 1F

m3

100%

100%

100%

100%

- Wall RF

m3

100%

100%

100%

100%

- Stair

m3

100%

100%

100%

100%

100%

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

100%

100%

100%

100%

- Wall GF

m3

100%

100%

100%

100%

- Wall 1F

m3

- Wall CL

m3

100%

100%

100%

100%

100%

100%

100%

100%

75%

75%

75%

100%

0%

100%

100%

100%

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

100%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 85 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

902

1002

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

1201-1

1201-2

1201-3

1201-4

100%

100%

100%

100%

100%

100%

75%

100%

100%

100%

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

100%

100%

100%

100%

100%

100%

- Col & Walls GF

ton

100%

100%

100%

100%

100%

100%

- Col & Walls 1F

ton

100%

100%

100%

100%

- Tie beams

ton

100%

100%

100%

100%

100%

- Add'l rebars around sleeves

ton

100%

100%

100%

100%

100%

- Slab on grade

ton

100%

100%

100%

100%

100%

100%

- Beams 1F

ton

100%

100%

100%

100%

100%

100%

- Slab 1F

ton

100%

100%

100%

100%

100%

100%

- Beams CL

ton

100%

100%

100%

100%

- Slab CL

ton

100%

100%

100%

100%

- Beams RF

ton

100%

100%

100%

100%

- Slab RF

ton

100%

100%

100%

100%

- Stair

ton

- ramps, steps, landing

ton

75%

75%

75%

100%

- Screed 1F

ton

100%

100%

100%

100%

- Screed RF

ton

100%

100%

100%

100%

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 86 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

902

1002

1201-1

1201-2

1201-3

1201-4

Thk=200mm, non-fire rated

m2

100%

100%

95%

100%

100%

100%

Thk=150mm, non-fire rated

m2

100%

100%

100%

100%

100%

100%

Thk=100mm, non-fire rated

m2

100%

100%

100%

100%

100%

100%

Add'l rate for fire rated solid block

m2

100%

95%

100%

100%

100%

Backing rod (3cm thick) & fire rated sealant above block w Lm

75%

95%

95%

100%

Plasterworks
1

Internal

m2

100%

85%

External

m2

100%

100%

50%

95%

100%

100%

Galvanized steel grooves in plaster

Lm

100%

100%

50%

95%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 87 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

1201-14

- Isolated ftgs, Tie beams

m3

by AlDiar

- Ramps, steps, landing

m3

25%

SN

Description

1201-16

1302

1400

1500

1601-1

100%

100%

100%

100%

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

25%

95%
100%

100%

100%

100%

100%

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

by Canadian

100%

100%

Strip Footing

m3

by Canadian

100%

100%

Tie Beam/Grade Beam

m3

by Canadian

100%

100%

100%

100%

Neck Column

m3

by AlDiar

100%

100%

100%

100%

Wall Neck

m3

by AlDiar

100%

100%

m3

by AlDiar

100%

100%

100%

100%

- Isolated ftgs, Tie beams

m2

by Zahrani

100%

100%

100%

- SOG

m2

by AlDiar

100%

100%

100%

- ramps, steps, landing

m2

25%

- Isolated ftgs, Tie beams

m2

by AlDiar

- ramps, steps, landing

m2

25%

6
7

Slab on Grade 30MPa


Vapor barrier 300microns Polyehtylene sheet

25%

100%
95%

Damp proofing

5% Micro silica

100%

100%

100%

25%

100%
95%

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

100%

100%

100%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 88 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

1201-14

1201-16

1302

- Columns 1F

m3

100%

50%

100%

- Columns RF

m3

100%

100%

100%

100%

100%

- Beams 1F

m3

100%

100%

100%

100%

100%

- Beams CL

m3

100%

- Beams RF

m3

100%

100%

- Wall GF

m3

100%

- Wall 1F

m3

100%

50%

- Wall RF

m3

100%

100%

- Stair

m3

100%

75%

SN

Description

1400

1500

1601-1
100%

50%
100%

100%

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

100%

- Wall GF

m3

100%

- Wall 1F

m3

- Wall CL

m3

100%

Suspended slab

100%

100%

- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

100%

50%

25%

25%

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

100%

100%

100%

100%

100%

100%
95%

100%

SAUDI BINLADEN GROUP - ABCD

Page 89 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

1201-14

1201-16

1302

1400

1500

1601-1

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%
100%

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

50%

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

- Col & Walls GF

ton

100%

- Col & Walls 1F

ton

100%

- Tie beams

ton

100%

100%

100%

- Add'l rebars around sleeves

ton

100%

100%

100%

- Slab on grade

ton

100%

100%

100%

100%

- Beams 1F

ton

100%

100%

100%

100%

- Slab 1F

ton

100%

100%

100%

- Beams CL

ton

100%

100%

100%

- Slab CL

ton

100%

100%

100%

- Beams RF

ton

100%

- Slab RF

ton

100%

- Stair

ton

- ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

25%

50%

100%

100%
25%

100%
100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 90 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1201-14

1201-16

1302

1400

1500

1601-1

Thk=200mm, non-fire rated

m2

90%

30%

20%

100%

100%

100%

Thk=150mm, non-fire rated

m2

90%

30%

90%

95%

100%

100%

Thk=100mm, non-fire rated

m2

90%

30%

90%

100%

100%

100%

Add'l rate for fire rated solid block

m2

90%

30%

20%

100%

Backing rod (3cm thick) & fire rated sealant above block w Lm

100%

Plasterworks
1

Internal

m2

50%

95%

100%

External

m2

100%

100%

100%

Galvanized steel grooves in plaster

Lm

100%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 91 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

1701

1702

2201

2202

3202A-1

3202A-2

- Isolated ftgs, Tie beams

m3

100%

100%

100%

100%

100%

100%

- Ramps, steps, landing

m3

50%

95%

75%

50%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

SN

Description

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

Sub-structure Concrete 30MPa


100%

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

100%

100%

100%

100%

100%

100%

Neck Column

m3

100%

100%

100%

100%

100%

100%

Wall Neck

m3

100%

100%

6
7

Slab on Grade 30MPa

m3

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

100%

100%

100%

100%

- ramps, steps, landing

m2

50%

95%

75%

50%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

- ramps, steps, landing

m2

50%

95%

75%

50%

100%

100%

100%

100%

Damp proofing

5% Micro silica

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

SAUDI BINLADEN GROUP - ABCD

Page 92 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1701

1702

2201

2202

3202A-1

3202A-2

- Columns 1F

m3

- Columns RF

m3

100%

100%

100%

100%

100%

100%

- Beams 1F

m3

100%

100%

100%

100%

100%

100%

- Beams CL

m3

100%

- Beams RF

m3

100%

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

100%

100%

100%

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall CL

m3

100%

Suspended slab

100%

100%

100%

- Slab 1F

m3

- Slab CL

m3

100%

- Slab RF

m3

100%

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

50%

95%

75%

100%

50%

100%

SAUDI BINLADEN GROUP - ABCD

Page 93 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

1701

1702

2201

2202

3202A-1

3202A-2

100%

100%

100%

100%

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

100%

100%

Mechanical pad

m3

100%

100%

- Isolated ftgs, Strip, Raft

ton

100%

100%

100%

100%

100%

100%

- Col & Walls GF

ton

100%

100%

100%

100%

100%

100%

- Col & Walls 1F

ton

- Tie beams

ton

100%

100%

100%

100%

100%

100%

- Add'l rebars around sleeves

ton

100%

100%

100%

- Slab on grade

ton

100%

100%

100%

100%

100%

100%

- Beams 1F

ton

100%

100%

100%

100%

100%

100%

- Slab 1F

ton

100%

100%

100%

100%

100%

100%

- Beams CL

ton

100%

100%

- Slab CL

ton

100%

100%

- Beams RF

ton

100%

- Slab RF

ton

100%

- Stair

ton

- ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

50%

100%

95%

75%

50%
100%

SAUDI BINLADEN GROUP - ABCD

Page 94 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

1701

1702

2201

2202

3202A-1

3202A-2

100%

100%

Thk=200mm, non-fire rated

m2

100%

100%

100%

100%

Thk=150mm, non-fire rated

m2

100%

100%

100%

100%

Thk=100mm, non-fire rated

m2

100%

100%

100%

100%

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

Plasterworks
1

Internal

m2

50%

75%

95%

95%

100%

100%

External

m2

100%

100%

100%

100%

100%

100%

Galvanized steel grooves in plaster

Lm

100%

100%

100%

100%

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 95 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

3202A-7

3202A-8

3202B-1

3205

- Isolated ftgs, Tie beams

m3

100%

100%

100%

100%

100%

- Ramps, steps, landing

m3

100%

100%

100%

100%

100%

100%

100%

SN

Description

3210

Lift Sta 15

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

100%

100%

100%

Strip Footing

m3

100%

100%

100%

Tie Beam/Grade Beam

m3

100%

100%

100%

100%

Neck Column

m3

100%

100%

100%

100%

Wall Neck

m3

100%

100%

100%

m3

100%

100%

100%

100%

- Isolated ftgs, Tie beams

m2

100%

100%

100%

100%

- SOG

m2

100%

100%

100%

100%

- ramps, steps, landing

m2

100%

100%

100%

100%

100%

100%

100%

100%

6
7

Slab on Grade 30MPa

100%

Vapor barrier 300microns Polyehtylene sheet

Damp proofing
- Isolated ftgs, Tie beams

m2

- ramps, steps, landing

m2

5% Micro silica

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

100%

SAUDI BINLADEN GROUP - ABCD

Page 96 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3202A-7

3202A-8

3202B-1

3205

- Columns 1F

m3

- Columns RF

m3

100%

100%

100%

100%

- Beams 1F

m3

100%

100%

100%

100%

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

100%

100%

100%

100%

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall CL

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

3210

Lift Sta 15

SAUDI BINLADEN GROUP - ABCD

Page 97 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

3202A-7

3202A-8

3202B-1

3205

3210

100%

100%

100%

100%

100%

Lift Sta 15

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

100%

100%

100%

100%

- Col & Walls GF

ton

100%

100%

100%

100%

- Col & Walls 1F

ton

- Tie beams

ton

100%

100%

100%

100%

- Add'l rebars around sleeves

ton

100%

100%

- Slab on grade

ton

100%

100%

100%

100%

- Beams 1F

ton

100%

100%

100%

100%

- Slab 1F

ton

100%

100%

100%

100%

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

100%

SAUDI BINLADEN GROUP - ABCD

Page 98 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

3202A-7

3202A-8

100%

100%

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

3202B-1

3205

3210

100%

100%

Plasterworks
1

Internal

m2

100%

100%

100%

100%

External

m2

100%

100%

100%

100%

Galvanized steel grooves in plaster

Lm

100%

100%

100%

100%

Lift Sta 15

SAUDI BINLADEN GROUP - ABCD

Page 99 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016
Unit

Lift Sta 16

- Isolated ftgs, Tie beams

m3

100%

- Ramps, steps, landing

m3

SN

Description

Gas Tank

Concrete Work
1

Plain Concrete 20MPa Thk=50mm

Plain Concrete 20MPa Thk=100mm & > 100mm

m3

5% Micro silica

m3

Mass concrete > 100mm

m3

100%

100%

100%

100%

100%

100%

100%

100%

Sub-structure Concrete 30MPa


1

Isolated Footing

m3

Strip Footing

m3

Tie Beam/Grade Beam

m3

Neck Column

m3

Wall Neck

m3

6
7

Slab on Grade 30MPa

m3

Vapor barrier 300microns Polyehtylene sheet


- Isolated ftgs, Tie beams

m2

- SOG

m2

- ramps, steps, landing

m2

Damp proofing
- Isolated ftgs, Tie beams

m2

- ramps, steps, landing

m2

5% Micro silica

m3

Super-structure Concrete 30MPa


1

Columns/Beams/Walls without corbel


- Columns GF

m3

SAUDI BINLADEN GROUP - ABCD

Page 100 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall RF

m3

- Stair

m3

Columns/Beams/Walls with corbel


- Columns GF

m3

- Columns 1F

m3

- Columns RF

m3

- Beams 1F

m3

- Beams CL

m3

- Beams RF

m3

- Wall GF

m3

- Wall 1F

m3

- Wall CL

m3

Suspended slab
- Slab 1F

m3

- Slab CL

m3

- Slab RF

m3

Concrete ramps, steps, landing

m3

Fair face concrete (ramp, steps, landing)

m2

Concrete Screed
- Screed 1F

m3

Lift Sta 16

Gas Tank

SAUDI BINLADEN GROUP - ABCD

Page 101 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

- Screed RF

Unit

Lift Sta 16

Gas Tank

100%

100%

m3

Concrete Parapet

m3

Concrete Coping (incl galv acce)

Lm

Mechanical pad

m3

Steel Reinforcement
1

Supply, Cut, Bend & Install (dia 8,10,12,14,16)


- Isolated ftgs, Strip, Raft

ton

- Col & Walls GF

ton

- Col & Walls 1F

ton

- Tie beams

ton

- Add'l rebars around sleeves

ton

- Slab on grade

ton

- Beams 1F

ton

- Slab 1F

ton

- Beams CL

ton

- Slab CL

ton

- Beams RF

ton

- Slab RF

ton

- Stair

ton

- ramps, steps, landing

ton

- Screed 1F

ton

- Screed RF

ton

Install, Cut, Bend (dia 8,10,12,14,16)

ton

Install

ton

Blockworks

SAUDI BINLADEN GROUP - ABCD

Page 102 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Main Works
As of January 2016

SN

Description

Unit

Thk=200mm, non-fire rated

m2

Thk=150mm, non-fire rated

m2

Thk=100mm, non-fire rated

m2

Add'l rate for fire rated solid block

m2

Backing rod (3cm thick) & fire rated sealant above block w Lm

Plasterworks
1

Internal

m2

External

m2

Galvanized steel grooves in plaster

Lm

Lift Sta 16

Gas Tank

Page 103 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

Appro

Item No.

Description

Unit

A
1
2
3
4
5
6

BLOCKWORKS
Supply & install tie beam & post in blockworks
Supply & install 50mm insulation in blockworks
Extra over for supply & install 200mm filled blocks
Extra over for supply & install 200mm not filled blocks
Extra over for supply & install 150mm with conc walls
Extra over for blocks for scaffolding & handling 4.5 mtr

Lm
m2
m2
m2
m2
m2

97.41
6,203.58
2,603.25
46,104.48
2,557.29
1,349.18

B
1
2
3
4
5

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed
Extra over for above item for scaffolding & handling 4.5
Supply & install groove between ceiling & walls
Supply & install cement plaster to ceiling (external)
Extra over for plaster of walls for scaffolding & handlin

m2
m2
Lm
m2
m2

815.86
136.00

C
1
2
3
4
5

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext
Extra over for supply & install for plaster to parapet cop
Extra over for plastering to wall shaft
Extra over for external plaster for scaffolding & handli
Extra over for slabs & beams for scaffolding & handlin

Lm
Lm
m2
m2
m3

25,764.92
6,795.22
10,020.64
260.77

D
1
2
3
4
5
6
7
8
9

Additional Works - Concrete


Extra over for SOG rfom 20Mpa to 30Mpa
Supply & install precast lintel above openings
Reinforced conc beams & post for blocks walls incl rebar
Extra over for drop lintel in conc perimeter beams for bl
Extra over for conc negative in walls for doors & window
Supply & install reinf conc architrave around openings
Supply & install PVC waterstop 10mm & 15mm
Supply & install high rib construction joint
Bituminous high grade fiber filler bd joint 20mm
- Around SOG
- Over block walls

m3
Lm
Lm
ea
ea
Lm
Lm
m2
m2
m2
m2

7,268.25
8,038.52
1,043.16
730.00
2,004.61
146.70
2,795.99
2,795.99
-

Previous

Page 104 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

Item No.
Description
10
Supply & install filling tie rod holes w/ non-shrink grout
- For tie beams
- For walls
E
1
2
3
4

Unit
ea
ea
ea

Additional Works - Blockworks


Extra over due to using load bearing blocks
m2
Extra over for pre-insulated blocks walls
m2
Supply & install rigid thermal insulation board for block w m2
Supply & install 300mm CMU
m2

Appro
52,736.30
18,974.00
33,762.30

83,838.93
4,850.52
8,609.12
-

Page 105 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT

Project
SubCon
Al-Benayat
Subject
Period

: CORRECTIONAL FACILITIES P-1182, Dammam


Modern
: Al-Benayat
Building
Modern
For Contracting,
Building For Contract
Contracting,
No. Contract
453
No. 453
: Payment Certificate No. 23 - Additional Works 1
: As of January 2016
Approved Quantity
Unit
Current

Item No.

Description

A
1
2
3
4
5
6

BLOCKWORKS
Supply & install tie beam & post in blockworks
Supply & install 50mm insulation in blockworks
Extra over for supply & install 200mm filled blocks
Extra over for supply & install 200mm not filled blocks
Extra over for supply & install 150mm with conc walls
Extra over for blocks for scaffolding & handling 4.5 mtr

Lm
m2
m2
m2
m2
m2

19.19
105.18
582.51
(38.68)
-

B
1
2
3
4
5

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed
Extra over for above item for scaffolding & handling 4.5
Supply & install groove between ceiling & walls
Supply & install cement plaster to ceiling (external)
Extra over for plaster of walls for scaffolding & handlin

m2
m2
Lm
m2
m2

714.19
251.26

C
1
2
3
4
5

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext
Extra over for supply & install for plaster to parapet cop
Extra over for plastering to wall shaft
Extra over for external plaster for scaffolding & handli
Extra over for slabs & beams for scaffolding & handlin

Lm
Lm
m2
m2
m3

938.66
519.87
47.17
-

D
1
2
3
4
5
6
7
8
9

Additional Works - Concrete


Extra over for SOG rfom 20Mpa to 30Mpa
Supply & install precast lintel above openings
Reinforced conc beams & post for blocks walls incl rebar
Extra over for drop lintel in conc perimeter beams for bl
Extra over for conc negative in walls for doors & window
Supply & install reinf conc architrave around openings
Supply & install PVC waterstop 10mm & 15mm
Supply & install high rib construction joint
Bituminous high grade fiber filler bd joint 20mm
- Around SOG
- Over block walls

m3
Lm
Lm
ea
ea
Lm
Lm
m2
m2
m2
m2

144.66
22.86
72.89
-

Page 106 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT

Project
SubCon
Al-Benayat
Subject
Period

: CORRECTIONAL FACILITIES P-1182, Dammam


Modern
: Al-Benayat
Building
Modern
For Contracting,
Building For Contract
Contracting,
No. Contract
453
No. 453
: Payment Certificate No. 23 - Additional Works 1
: As of January 2016

Item No.
Description
10
Supply & install filling tie rod holes w/ non-shrink grout
- For tie beams
- For walls
E
1
2
3
4

Approved Quantity
Unit
ea
ea
ea
-

Additional Works - Blockworks


Extra over due to using load bearing blocks
m2
Extra over for pre-insulated blocks walls
m2
Supply & install rigid thermal insulation board for block w m2
Supply & install 300mm CMU
m2

1,257.04
159.08
-

Page 107 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016
Approved Quantity
Unit

Item No.

Description

A
1
2
3
4
5
6

BLOCKWORKS
Supply & install tie beam & post in blockworks
Supply & install 50mm insulation in blockworks
Extra over for supply & install 200mm filled blocks
Extra over for supply & install 200mm not filled blocks
Extra over for supply & install 150mm with conc walls
Extra over for blocks for scaffolding & handling 4.5 mtr

Lm
m2
m2
m2
m2
m2

116.60
6,203.58
2,708.44
46,686.99
2,518.61
1,349.18

B
1
2
3
4
5

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed
Extra over for above item for scaffolding & handling 4.5
Supply & install groove between ceiling & walls
Supply & install cement plaster to ceiling (external)
Extra over for plaster of walls for scaffolding & handlin

m2
m2
Lm
m2
m2

1,530.05
387.26

C
1
2
3
4
5

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext
Extra over for supply & install for plaster to parapet cop
Extra over for plastering to wall shaft
Extra over for external plaster for scaffolding & handli
Extra over for slabs & beams for scaffolding & handlin

Lm
Lm
m2
m2
m3

26,703.58
7,315.09
10,067.82
260.77

D
1
2
3
4
5
6
7
8
9

Additional Works - Concrete


Extra over for SOG rfom 20Mpa to 30Mpa
Supply & install precast lintel above openings
Reinforced conc beams & post for blocks walls incl rebar
Extra over for drop lintel in conc perimeter beams for bl
Extra over for conc negative in walls for doors & window
Supply & install reinf conc architrave around openings
Supply & install PVC waterstop 10mm & 15mm
Supply & install high rib construction joint
Bituminous high grade fiber filler bd joint 20mm
- Around SOG
- Over block walls

m3
Lm
Lm
ea
ea
Lm
Lm
m2
m2
m2
m2

7,268.25
8,183.18
1,066.02
730.00
2,077.49
146.70
2,795.99
2,795.99
-

To Date

Page 108 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

Approved Quantity
Item No.
Description
Unit
10
Supply & install filling tie rod holes w/ non-shrink grout
ea
- For tie beams
ea
- For walls
ea
E
1
2
3
4

Additional Works - Blockworks


Extra over due to using load bearing blocks
m2
Extra over for pre-insulated blocks walls
m2
Supply & install rigid thermal insulation board for block w m2
Supply & install 300mm CMU
m2

52,736.30
18,974.00
33,762.30

85,095.97
4,850.52
8,768.20
-

Page 109 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

Item No.

Description

Unit

A
1
2
3
4
5
6

BLOCKWORKS
Supply & install tie beam & post in blockworks
Supply & install 50mm insulation in blockworks
Extra over for supply & install 200mm filled blocks
Extra over for supply & install 200mm not filled blocks
Extra over for supply & install 150mm with conc walls
Extra over for blocks for scaffolding & handling 4.5 mtr

Lm
m2
m2
m2
m2
m2

B
1
2
3
4
5

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed
Extra over for above item for scaffolding & handling 4.5
Supply & install groove between ceiling & walls
Supply & install cement plaster to ceiling (external)
Extra over for plaster of walls for scaffolding & handlin

m2
m2
Lm
m2
m2

C
1
2
3
4
5

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext
Extra over for supply & install for plaster to parapet cop
Extra over for plastering to wall shaft
Extra over for external plaster for scaffolding & handli
Extra over for slabs & beams for scaffolding & handlin

Lm
Lm
m2
m2
m3

D
1
2
3
4
5
6
7
8
9

Additional Works - Concrete


Extra over for SOG rfom 20Mpa to 30Mpa
Supply & install precast lintel above openings
Reinforced conc beams & post for blocks walls incl rebar
Extra over for drop lintel in conc perimeter beams for bl
Extra over for conc negative in walls for doors & window
Supply & install reinf conc architrave around openings
Supply & install PVC waterstop 10mm & 15mm
Supply & install high rib construction joint
Bituminous high grade fiber filler bd joint 20mm
- Around SOG
- Over block walls

m3
Lm
Lm
ea
ea
Lm
Lm
m2
m2
m2
m2

Remarks

Page 110 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

Item No.
Description
10
Supply & install filling tie rod holes w/ non-shrink grout
- For tie beams
- For walls
E
1
2
3
4

Unit
ea
ea
ea

Additional Works - Blockworks


Extra over due to using load bearing blocks
m2
Extra over for pre-insulated blocks walls
m2
Supply & install rigid thermal insulation board for block w m2
Supply & install 300mm CMU
m2

Remarks

Page 111 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

1,309.16
3,136.50
-

1,795.24
5,991.06
94.45

122.63
8.83

75.82
-

1,720.60

2,492.72

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1,530.05
387.26

Extra over for supply & install 20mm galv grooves for ext w Lm

26,703.58

201

116.60
6,203.58
2,708.44
46,686.99
2,518.61
1,349.18

100

BLOCKWORKS

TOTAL QTY

EXTERNAL PLASTER

Page 112 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

TOTAL QTY

100

201

7,315.09
10,067.82
260.77

448.60
791.23
53.84

455.82
2,169.15
-

7,268.25
8,183.18
1,066.02
730.00
2,077.49
146.70
2,795.99
2,795.99
-

380.50
452.75
10.00
-

493.50
719.20
4.00
-

153.49
-

145.77
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 113 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

TOTAL QTY

100

201

52,736.30
18,974.00
33,762.30

1,147.00
580.00

1,218.00
513.00

85,095.97
4,850.52
8,768.20
-

6,033.60
-

10,203.99

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 114 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

1,043.34
63.74

120.83
852.66
12.15

15.72
83.62

10.02
5.97

936.33

525.20

INTERNAL PLASTER
Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

82.26
-

Extra over for supply & install 20mm galv grooves for ext w Lm

1,787.62

500

1,484.47
3,398.72
-

400

BLOCKWORKS

202

EXTERNAL PLASTER

Page 115 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

202

400

500

286.30
1,583.69
-

247.71
662.23
181.67

111.00
48.56
25.26

299.70
509.60
10.00
-

232.88
104.74
11.00
-

101.33
91.50
-

113.86
-

65.72
-

31.77
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 116 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

202

400

500

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

766.00
908.00

565.00
15.00

290.00
-

6,595.91
-

2,167.69
306.56
-

1,148.00
167.00
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 117 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1002

717.90
-

246.51
558.97
-

6.60
1,642.11
124.45
-

INTERNAL PLASTER

902

BLOCKWORKS

602

93.40
-

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext w Lm

436.32

242.91

947.05

Page 118 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

602

902

1002

145.53
41.99
-

113.00
-

323.90
235.12
-

97.09
98.90
-

105.38
110.65
-

229.96
157.00
78.51
28.00
71.20
-

41.15
-

32.42
-

82.68
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 119 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

602

902

1002

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

274.00
-

247.00
-

396.00
1,166.00

766.83
370.25
-

1,064.06
-

2,363.53
409.69
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 120 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1201-3

22.00
499.61
1,825.80
329.66
284.96

22.00
525.91
1,921.89
329.66
293.96

22.00
525.91
1,921.89
329.66
299.96

INTERNAL PLASTER

1201-2

BLOCKWORKS

1201-1

85.08
125.63

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext w Lm

1,067.55

2,028.34

2,135.09

Page 121 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

1201-1
-

1201-2

1201-3

593.95
614.75
-

625.21
647.10
-

506.94
530.70
124.43
131.00
287.22
-

506.94
530.70
124.43
131.00
287.22
-

506.94
530.70
124.43
131.00
287.22
-

232.85
-

232.85
-

232.85
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 122 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

1201-1

1201-2

1201-3

1,278.00
4,561.00

1,278.00
4,561.00

1,278.00
4,561.00

4,705.16
1,559.18
-

4,827.55
1,528.00
-

4,827.55
1,559.18
-

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 123 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

22.00
525.91
1,921.89
329.66
299.96

22.00
473.32
1,729.70
296.69
-

157.77
576.57
98.90
-

m2

85.08
125.63

Extra over for supply & install 20mm galv grooves for ext w Lm

2,135.09

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

1201-16

INTERNAL PLASTER

1201-14

BLOCKWORKS

1201-4

EXTERNAL PLASTER

Page 124 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

1201-4
625.21
647.10
-

1201-14

1201-16

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

506.94
530.70
124.43
131.00
287.22
232.85
-

477.63
258.50
-

159.21
86.17
-

Page 125 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

1201-4

1201-14

1201-16

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

1,278.00
4,561.00

4,561.00

1,368.30

4,827.55
1,559.18
-

4,344.80
-

1,448.27
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 126 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

2,710.21
498.75
-

m2

544.03
-

Extra over for supply & install 20mm galv grooves for ext w Lm

2,328.60

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

343.11
181.18
-

INTERNAL PLASTER

1400

BLOCKWORKS

1302

EXTERNAL PLASTER

Page 127 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

1302

1400
-

550.70
419.56
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

291.29
236.55
74.19
81.00
203.85
-

555.22
593.10
415.60
62.00
308.90
-

128.90
-

235.73
-

Page 128 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

1302

1400

658.00
2,167.00

1,709.00
4,058.00

1,149.24
530.52
-

5,522.19
1,622.45
-

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 129 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

1601-1

1701

3,093.99
-

713.46
2,893.92
-

3,142.37
-

4.26
-

17.42
-

694.95

1,499.00

BLOCKWORKS

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

1500

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

28.03
-

Extra over for supply & install 20mm galv grooves for ext w Lm

2,117.94

C
1

EXTERNAL PLASTER

Page 130 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

1500

1601-1

1701

480.00
407.04
-

480.70
282.69
-

552.00
523.89
-

570.51
322.30
-

473.56
668.00
-

473.02
339.25
-

188.80
-

105.57
-

119.60
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 131 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

1500

1601-1

1701

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

1,758.00
-

605.00
-

1,071.00
-

3,849.18
667.47
-

5,165.72
-

5,199.90
1,577.10
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 132 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

2201

2202

533.91
2,387.12
-

2,009.84
-

1,771.65
-

243.38
37.58

96.88
-

659.74

1,240.00

BLOCKWORKS

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

1702

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

26.05
-

Extra over for supply & install 20mm galv grooves for ext w Lm

1,062.94

C
1

EXTERNAL PLASTER

Page 133 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

1702

2201

2202

403.60
386.52
-

201.26
370.38
-

395.00
236.82
-

324.76
317.70
-

230.51
347.60
-

247.42
279.90
-

89.56
-

75.50
-

97.53
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 134 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

1702

2201

2202

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

628.00
-

512.00
-

499.00
-

3,647.97
-

2,213.79
644.06
-

1,927.71
545.96
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 135 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

3202A-7

247.67
-

247.67
-

247.67
-

INTERNAL PLASTER

3202A-2

BLOCKWORKS

3202A-1

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext w Lm

120.60

120.60

120.60

Page 136 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

3202A-1

3202A-2

3202A-7

52.60
-

52.60
-

52.60
-

26.31
18.00
-

26.31
18.00
-

26.31
18.00
-

35.33
-

35.33
-

35.33
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 137 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

3202A-1

3202A-2

3202A-7

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

182.00
-

194.00
-

348.00
-

247.67
143.03
-

247.67
143.03
-

247.67
143.03
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

Page 138 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

3205

247.67
-

54.94
-

INTERNAL PLASTER

3202B-1

BLOCKWORKS

3202A-8

EXTERNAL PLASTER
Extra over for supply & install 20mm galv grooves for ext w Lm

120.60

100.80

62.40

Page 139 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

3202A-8

3202B-1

3205

52.60
-

42.80
-

22.40
-

26.31
18.00
-

24.05
-

4.57
2.80
-

35.33
-

9.32
-

5.90
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

Page 140 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

3202A-8

3202B-1

3205

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

325.00
-

129.00
-

45.00
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

247.67
143.03
-

54.94
-

Page 141 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

Lift Sta 15 Lift Sta 16

BLOCKWORKS

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

3210
50.16
-

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

Extra over for supply & install 20mm galv grooves for ext w Lm

INTERNAL PLASTER

EXTERNAL PLASTER

Page 142 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

3210

Lift Sta 15 Lift Sta 16


-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

51.05
-

52.75
-

Page 143 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

3210

Lift Sta 15 Lift Sta 16

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

147.35
-

148.65
-

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

50.16
-

Page 144 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
A

Description

Unit

BLOCKWORKS

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks - 1201 o m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

Gas Tank
-

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

Extra over for supply & install 20mm galv grooves for ext w Lm

C
1

EXTERNAL PLASTER

Page 145 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

Gas Tank
-

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm


- Around SOG

m2

- Over block walls

m2

42.90
-

Page 146 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN
10

Description

Unit

Gas Tank

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

182.00

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

SAUDI BINLADEN GROUP - ABCD

Page 147 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

201

202

100%

100%

100%

100%

100%

100%

400

500

602

BLOCKWORKS

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

100

100%

100%
100%

100%

100%

100%

100%

100%

100%

100%

100%

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

100%

Extra over for plaster of walls for scaffolding & handling 4

m2

100%

Extra over for supply & install 20mm galv grooves for ext w Lm

100%

100%

100%

100%

100%

100%

Extra over for supply & install for plaster to parapet coping Lm

100%

100%

100%

100%

100%

100%

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

100%

100%

100%

100%

100%

100%

Extra over for slabs & beams for scaffolding & handling

m3

100%

100%

100%

100%

100%

EXTERNAL PLASTER

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

100%

100%

100%

100%

100%

100%

Supply & install precast lintel above openings

Lm

100%

100%

100%

100%

100%

100%

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

SAUDI BINLADEN GROUP - ABCD

Page 148 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

100

201

202

400

Extra over for conc negative in walls for doors & windows

ea

100%

100%

100%

100%

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

100%

100%

100%

10

- Around SOG

m2

- Over block walls

m2

500

602

100%

100%

100%

100%

100%

100%

100%

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

100%

100%

100%

100%

- For walls

ea

100%

100%

100%

100%

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

100%

SAUDI BINLADEN GROUP - ABCD

Page 149 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

1201-1

1201-2

1201-3

1201-4

100%

100%

100%

100%

100%

95%

100%

100%

100%

100%

95%

100%

100%

100%

100%

100%

100%

100%

100%

95%

98%

100%

100%

95%

95%

95%

95%

95%

100%

100%

100%
100%

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1002

BLOCKWORKS

902

85%

EXTERNAL PLASTER

Extra over for supply & install 20mm galv grooves for ext w Lm

100%

100%

Extra over for supply & install for plaster to parapet coping Lm

100%

100%

95%

100%

100%

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

100%

95%

100%

100%

Extra over for slabs & beams for scaffolding & handling

m3

50%

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

100%

100%

100%

100%

100%

100%

Supply & install precast lintel above openings

Lm

100%

100%

100%

100%

100%

100%

Reinforced conc beams & post for blocks walls incl rebars

Lm

100%

100%

100%

100%

100%

Extra over for drop lintel in conc perimeter beams for bldg

ea

SAUDI BINLADEN GROUP - ABCD

Page 150 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016
1002

1201-1

1201-2

1201-3

1201-4

ea

100%

100%

100%

100%

100%

Supply & install reinf conc architrave around openings

Lm

100%

100%

100%

100%

100%

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

98%

100%

100%

SN

Description

Unit

Extra over for conc negative in walls for doors & windows

10

- Around SOG

m2

- Over block walls

m2

902

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

SAUDI BINLADEN GROUP - ABCD

Page 151 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

1201-14
100%

1201-16

1302

1400

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

90%

30%

Extra over for supply & install 200mm not filled blocks

m2

90%

30%

20%

100%

Extra over for supply & install 150mm with conc walls

m2

90%

30%

90%

100%

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

100%
100%

100%

50%

95%

100%

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1601-1

BLOCKWORKS

1500

EXTERNAL PLASTER

Extra over for supply & install 20mm galv grooves for ext w Lm

100%

100%

100%

Extra over for supply & install for plaster to parapet coping Lm

100%

100%

100%

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

100%

100%

100%

Extra over for slabs & beams for scaffolding & handling

m3

100%

100%

100%

100%

67%

100%

100%

100%

67%

100%

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

90%

30%

SAUDI BINLADEN GROUP - ABCD

Page 152 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

10

- Around SOG

m2

- Over block walls

m2

1201-14
90%

1201-16
30%

1302

1400

1500

1601-1

100%

100%

90%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

100%

30%

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

100%
90%

100%

SAUDI BINLADEN GROUP - ABCD

Page 153 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

2201

2202

3202A-1

3202A-2

100%

100%

100%
100%

100%

100%

100%

50%

100%

100%

95%

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

1702

BLOCKWORKS

1701

95%

EXTERNAL PLASTER

Extra over for supply & install 20mm galv grooves for ext w Lm

100%

100%

100%

100%

100%

100%

Extra over for supply & install for plaster to parapet coping Lm

100%

100%

100%

100%

100%

100%

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

100%

100%

100%

100%

Extra over for slabs & beams for scaffolding & handling

m3

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

100%

100%

100%

100%

100%

100%

Supply & install precast lintel above openings

Lm

100%

100%

100%

100%

100%

100%

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

SAUDI BINLADEN GROUP - ABCD

Page 154 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

10

- Around SOG

m2

- Over block walls

m2

1701

1702

2201

2202

3202A-1

3202A-2

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

100%

SAUDI BINLADEN GROUP - ABCD

Page 155 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

3202B-1

3205

3210

Lift Sta 15

100%

100%

0%

100%

100%

0%

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

3202A-8

BLOCKWORKS

3202A-7

EXTERNAL PLASTER

Extra over for supply & install 20mm galv grooves for ext w Lm

100%

100%

100%

100%

Extra over for supply & install for plaster to parapet coping Lm

100%

100%

100%

100%

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

100%

100%

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

100%

100%

Supply & install precast lintel above openings

Lm

100%

100%

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

100%

SAUDI BINLADEN GROUP - ABCD

Page 156 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

10

- Around SOG

m2

- Over block walls

m2

3202A-7

3202A-8

3202B-1

3205

3210

Lift Sta 15

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

100%

SAUDI BINLADEN GROUP - ABCD

Page 157 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Supply & install tie beam & post in blockworks

Lm

Supply & install 50mm insulation in blockworks

m2

Extra over for supply & install 200mm filled blocks

m2

Extra over for supply & install 200mm not filled blocks

m2

Extra over for supply & install 150mm with conc walls

m2

Extra over for blocks for scaffolding & handling 4.5 mtr &

m2

INTERNAL PLASTER

Supply & install Vetonite repair to walls & ceiling exposed f m2

Extra over for above item for scaffolding & handling 4.5 m

m2

Supply & install groove between ceiling & walls

Lm

Supply & install cement plaster to ceiling (external)

m2

Extra over for plaster of walls for scaffolding & handling 4

m2

EXTERNAL PLASTER

Extra over for supply & install 20mm galv grooves for ext w Lm

Extra over for supply & install for plaster to parapet coping Lm

Extra over for plastering to wall shaft

m2

Extra over for external plaster for scaffolding & handling

m2

Extra over for slabs & beams for scaffolding & handling

m3

Gas Tank

0%

0%

BLOCKWORKS

Lift Sta 16

Additional Works - Concrete

Extra over for SOG rfom 20Mpa to 30Mpa

m3

Supply & install precast lintel above openings

Lm

Reinforced conc beams & post for blocks walls incl rebars

Lm

Extra over for drop lintel in conc perimeter beams for bldg

ea

SAUDI BINLADEN GROUP - ABCD

Page 158 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 1
As of January 2016

SN

Description

Unit

Extra over for conc negative in walls for doors & windows

ea

Supply & install reinf conc architrave around openings

Lm

Supply & install PVC waterstop 10mm & 15mm

Lm

Supply & install high rib construction joint

m2

Bituminous high grade fiber filler bd joint 20mm

10

- Around SOG

m2

- Over block walls

m2

Lift Sta 16

Gas Tank

100%

100%

Supply & install filling tie rod holes w/ non-shrink grout


- For tie beams

ea

- For walls

ea

Additional Works - Blockworks

Extra over due to using load bearing blocks

m2

Extra over for pre-insulated blocks walls

m2

Supply & install rigid thermal insulation board for block wal m2

Supply & install 300mm CMU

m2

100%
100%

Page 159 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

Item No.

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016
Description

Unit

3
3.1
3.2

Dome and Minaret


Dome R=4.307m, Ht=3.645m, Th=250~150mm
Minaret max ht=18m

4
4.1

Guard Room (B2501)


Concrete, blockworks & plaster

ea

5
5.1

Metal Windows
Installation of metal windows

ea

9
9.1
9.2
9.3
9.4
9.5

Wall
Ceramic tiles 100x100mm (install only)
Ceramic tiles 200x200mm (install only)
Ceramic cove corner (install only)
Blocks & plaster Ht=60cm around ducts open on roofs
Cement plaster to circular columns 400,H2.50m

m2
m2
Lm
Lm
ea

10
10.1
10.2
10.3
10.4

Wall Paint Works


Supply & installation of wall paint
Extra Over for above work Ht 4.5m~8.5m
Supply & installation of vetonite repair on wall
Supply & installation of epoxy paint

m2
m2
m2
m2

13
13.1

Gates
Concrete, blockworks & plaster

ea

CAR PARKING SHED

ea

13

ea

Appro
Previous

Page 160 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT

Project
SubCon
Al-Benayat
Subject
Period

Item No.

: CORRECTIONAL FACILITIES P-1182, Dammam


Modern
: Al-Benayat
Building
Modern
For Contracting,
Building For Contract
Contracting,
No. Contract
453
No. 453
: Payment Certificate No. 23 - Additional Works 2
: As of January 2016
Description

3
3.1
3.2

Dome and Minaret


Dome R=4.307m, Ht=3.645m, Th=250~150mm
Minaret max ht=18m

4
4.1

Approved Quantity
Unit
Current
ea

1.00

Guard Room (B2501)


Concrete, blockworks & plaster

ea

5.85

5
5.1

Metal Windows
Installation of metal windows

ea

430.00

9
9.1
9.2
9.3
9.4
9.5

Wall
Ceramic tiles 100x100mm (install only)
Ceramic tiles 200x200mm (install only)
Ceramic cove corner (install only)
Blocks & plaster Ht=60cm around ducts open on roofs
Cement plaster to circular columns 400,H2.50m

m2
m2
Lm
Lm
ea

2,511.61
-

10
10.1
10.2
10.3
10.4

Wall Paint Works


Supply & installation of wall paint
Extra Over for above work Ht 4.5m~8.5m
Supply & installation of vetonite repair on wall
Supply & installation of epoxy paint

m2
m2
m2
m2

4,483.02
-

13
13.1

Gates
Concrete, blockworks & plaster

ea

0.50

CAR PARKING SHED

ea

13

Page 161 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

Item No.

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016
Description

Approved Quantity
Unit

3
3.1
3.2

Dome and Minaret


Dome R=4.307m, Ht=3.645m, Th=250~150mm
Minaret max ht=18m

4
4.1

To Date

ea

1.00

Guard Room (B2501)


Concrete, blockworks & plaster

ea

5.85

5
5.1

Metal Windows
Installation of metal windows

ea

430.00

9
9.1
9.2
9.3
9.4
9.5

Wall
Ceramic tiles 100x100mm (install only)
Ceramic tiles 200x200mm (install only)
Ceramic cove corner (install only)
Blocks & plaster Ht=60cm around ducts open on roofs
Cement plaster to circular columns 400,H2.50m

m2
m2
Lm
Lm
ea

2,511.61
-

10
10.1
10.2
10.3
10.4

Wall Paint Works


Supply & installation of wall paint
Extra Over for above work Ht 4.5m~8.5m
Supply & installation of vetonite repair on wall
Supply & installation of epoxy paint

m2
m2
m2
m2

4,483.02
-

13
13.1

Gates
Concrete, blockworks & plaster

ea

0.50

CAR PARKING SHED

ea

13

Page 162 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

Item No.

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016
Description

Unit

3
3.1
3.2

Dome and Minaret


Dome R=4.307m, Ht=3.645m, Th=250~150mm
Minaret max ht=18m

4
4.1

Guard Room (B2501)


Concrete, blockworks & plaster

ea

5
5.1

Metal Windows
Installation of metal windows

ea

9
9.1
9.2
9.3
9.4
9.5

Wall
Ceramic tiles 100x100mm (install only)
Ceramic tiles 200x200mm (install only)
Ceramic cove corner (install only)
Blocks & plaster Ht=60cm around ducts open on roofs
Cement plaster to circular columns 400,H2.50m

m2
m2
Lm
Lm
ea

10
10.1
10.2
10.3
10.4

Wall Paint Works


Supply & installation of wall paint
Extra Over for above work Ht 4.5m~8.5m
Supply & installation of vetonite repair on wall
Supply & installation of epoxy paint

m2
m2
m2
m2

13
13.1

Gates
Concrete, blockworks & plaster

ea

CAR PARKING SHED

ea

13

ea

Remarks

Page 163 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

TOTAL QTY

100

201

Dome and Minaret

3.1

Unit

ea

1.00

ea

5.85

ea

430.00

2.00

2,511.61

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

88.76

69.14

Page 164 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit
ea

TOTAL QTY
-

100

201
-

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

4,483.02
-

ea

0.50

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea

Page 165 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

202

400

500

Dome and Minaret

3.1

Unit

ea

1.00

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

43.40

10.55

24.70

Page 166 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit
ea

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

13.1

400
-

500
-

Wall Paint Works

10.1

13

202

4,483.02
-

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea

ea

Page 167 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

602

902

1002

Dome and Minaret

3.1

Unit

ea

ea

ea

3.00

13.00

41.60

84.10

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

12.50

Page 168 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

602

902

1002

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 169 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

1201-1

1201-2

1201-3

ea

ea

Dome and Minaret

3.1

Unit

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

ea

60.00

60.00

60.00

322.70

322.70

322.70

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 170 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

1201-1

1201-2

1201-3

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 171 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

1201-4

1201-14

1201-16

ea

ea

Dome and Minaret

3.1

Unit

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

ea

60.00

36.00

322.70

161.35

24.00

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 172 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

1201-4

1201-14

1201-16

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 173 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

1302

1400

1500

Dome and Minaret

3.1

Unit

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

ea

34.00

50.00

68.55

183.88

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

56.60

Page 174 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

1302

1400

1500

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 175 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

1601-1

1701

1702

Dome and Minaret

3.1

Unit

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

ea

12.00

11.00

5.00

87.60

104.08

67.40

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 176 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

1601-1

1701

1702

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 177 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

2201

2202

2501-1

Dome and Minaret

3.1

Unit

ea

ea

1.00

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

67.50

49.10

Page 178 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

2201

2202

2501-1

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 179 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

2501-2

2501-3

2501-4

1.00

0.85

1.00

ea

Dome and Minaret

3.1

Unit

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 180 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

2501-2

2501-3

2501-4

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 181 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

2501-5

2501-6

2501-7

ea

ea

1.00

ea

Dome and Minaret

3.1

Unit

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 182 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

2501-5

2501-6

2501-7

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 183 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

2501-8

3202A-1

3202A-2

1.00

ea

Dome and Minaret

3.1

Unit

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 184 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

2501-8

3202A-1

3202A-2

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 185 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

3202A-7

3202A-8

3202B-1

ea

ea

ea

Dome and Minaret

3.1

Unit

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 186 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

3202A-7

3202A-8

3202B-1

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 187 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

3205

3210

Lift Sta 15

Dome and Minaret

3.1

Unit

ea

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 188 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit

3205

3210

Lift Sta 15

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

Page 189 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
3

Description

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

5
5.1

Gate

Dome and Minaret

3.1

Unit Lift Sta 16

ea

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

Metal Windows
Installation of metal windows

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

Page 190 of 211

SAUDI BINLADEN GROUP - ABCD


PAYMENT CERTIFICATE DEPARTMENT
Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN
9.5

10

Description
Cement plaster to circular columns 400,H2.50m

Unit Lift Sta 16

Gate

ea

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

10.4

Supply & installation of epoxy paint

m2

ea

0.50

ea

13
13.1

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

SAUDI BINLADEN GROUP - ABCD

Page 191 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm


ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

m3

ea

100%

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

ea

Dome and Minaret

3.1

4.1

ea

Inspection Chambers
Plain concrete 20Mpa below ADB

400

Heavy Duty ADB chamber wall thk = 40cm

2.1

202

Heavy Duty ADB chamber wall thk = 30cm

- RC 30Mpa (180x310x150~200), waterstop, DP

201

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

100

Area Drain Boxes, ADB

1.1

1.3

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

100%

500

602

SAUDI BINLADEN GROUP - ABCD

Page 192 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

400

500

602

100%

100%

100%

50%

100%

100%

Floor
m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

202

Internal Finishing Works


- Ceramic tile 100x100 (install only, excl grout)

201

Lm

7.1.1

100

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

75%

SAUDI BINLADEN GROUP - ABCD

Page 193 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

Ceiling

11.1

Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

12

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

100

201

202

400

500

602

SAUDI BINLADEN GROUP - ABCD

Page 194 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm


ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

100%

100%

100%

100%

100%

100%

ea

ea

m3

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

1201-4

Dome and Minaret

3.1

4.1

1201-3

Inspection Chambers
Plain concrete 20Mpa below ADB

1201-2

Heavy Duty ADB chamber wall thk = 40cm

2.1

1201-1

Heavy Duty ADB chamber wall thk = 30cm

- RC 30Mpa (180x310x150~200), waterstop, DP

1002

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

902

Area Drain Boxes, ADB

1.1

1.3

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

SAUDI BINLADEN GROUP - ABCD

Page 195 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

1201-2

1201-3

1201-4

100%

100%

100%

100%

100%

100%

Floor
m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

1201-1

Internal Finishing Works


- Ceramic tile 100x100 (install only, excl grout)

1002

Lm

7.1.1

902

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

SAUDI BINLADEN GROUP - ABCD

Page 196 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

Ceiling

11.1

Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

12

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

902

1002

1201-1

1201-2

1201-3

1201-4

SAUDI BINLADEN GROUP - ABCD

Page 197 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm


ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

100%

100%

100%

ea

ea

m3

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

100%

1601-1

Dome and Minaret

3.1

4.1

1500

Inspection Chambers
Plain concrete 20Mpa below ADB

1400

Heavy Duty ADB chamber wall thk = 40cm

2.1

1302

Heavy Duty ADB chamber wall thk = 30cm

- RC 30Mpa (180x310x150~200), waterstop, DP

1201-16

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

1201-14

Area Drain Boxes, ADB

1.1

1.3

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

100%

SAUDI BINLADEN GROUP - ABCD

Page 198 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

1400

1500

1601-1

50%

100%

100%

100%

Floor
m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

1302

Internal Finishing Works


- Ceramic tile 100x100 (install only, excl grout)

1201-16

Lm

7.1.1

1201-14

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

50%

SAUDI BINLADEN GROUP - ABCD

Page 199 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

Ceiling

11.1

Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

12

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

1201-14

1201-16

1302

1400

1500

1601-1

SAUDI BINLADEN GROUP - ABCD

Page 200 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm


ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

2501-3

100%

100%

85%

ea

ea

m3

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

2501-2

Dome and Minaret

3.1

4.1

2501-1

Inspection Chambers
Plain concrete 20Mpa below ADB

2202

Heavy Duty ADB chamber wall thk = 40cm

2.1

2201

Heavy Duty ADB chamber wall thk = 30cm

- RC 30Mpa (180x310x150~200), waterstop, DP

1702

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

1701

Area Drain Boxes, ADB

1.1

1.3

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

100%

100%

SAUDI BINLADEN GROUP - ABCD

Page 201 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

2202

100%

100%

100%

100%

Floor
m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

2201

Internal Finishing Works


- Ceramic tile 100x100 (install only, excl grout)

1702

Lm

7.1.1

1701

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

2501-1

2501-2

2501-3

SAUDI BINLADEN GROUP - ABCD

Page 202 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

Ceiling

11.1

Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

12

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

1701

1702

2201

2202

2501-1

2501-2

2501-3

SAUDI BINLADEN GROUP - ABCD

Page 203 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm


ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

100%

ea

m3

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

100%

ea

Dome and Minaret

3.1

4.1

2501-8

Inspection Chambers
Plain concrete 20Mpa below ADB

2501-7

Heavy Duty ADB chamber wall thk = 40cm

2.1

2501-6

Heavy Duty ADB chamber wall thk = 30cm

- RC 30Mpa (180x310x150~200), waterstop, DP

2501-5

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

2501-4

Area Drain Boxes, ADB

1.1

1.3

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

100%

3202A-1

3202A-2

SAUDI BINLADEN GROUP - ABCD

Page 204 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

Lm

Internal Finishing Works


Floor

7.1.1

- Ceramic tile 100x100 (install only, excl grout)

m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

2501-4

2501-5

2501-6

2501-7

2501-8

3202A-1

3202A-2

SAUDI BINLADEN GROUP - ABCD

Page 205 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13

2501-7

2501-8

Ceiling Paint Work

12.1

13.1

2501-6

Ceiling
Supply & install cement board single level thk=6mm

13

2501-5

m2

11.1

12

2501-4

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

100%

3202A-1

3202A-2

SAUDI BINLADEN GROUP - ABCD

Page 206 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Area Drain Boxes, ADB

1.1

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm

1.3

ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

Heavy Duty ADB chamber wall thk = 30cm

Plain concrete 20Mpa below ADB

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

m3

Dome and Minaret

3.1

ea

Inspection Chambers

2.1

ea

Heavy Duty ADB chamber wall thk = 40cm


- RC 30Mpa (180x310x150~200), waterstop, DP

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

3202A-7

3202A-8

3202B-1

3205

3210

Lift Sta 15

SAUDI BINLADEN GROUP - ABCD

Page 207 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

Lm

Internal Finishing Works


Floor

7.1.1

- Ceramic tile 100x100 (install only, excl grout)

m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

3202A-7

3202A-8

3202B-1

3205

3210

Lift Sta 15

SAUDI BINLADEN GROUP - ABCD

Page 208 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

m2

Ceiling

11.1

Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

12

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

3202A-7

3202A-8

3202B-1

3205

3210

Lift Sta 15

SAUDI BINLADEN GROUP - ABCD

Page 209 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

Description

Area Drain Boxes, ADB

1.1

Plain concrete 20Mpa below ADB

1.2

Heavy Duty ADB chamber wall thk = 20cm

1.3

ea

- RC 30Mpa (160x160x100~150), waterstop, DP

ea

Heavy Duty ADB chamber wall thk = 30cm

Plain concrete 20Mpa below ADB

2.2

Inspection chambers 100x100 up to 100 Ht


- B20 (100x100x100), plaster, DP

Dome R=4.307m, Ht=3.645m, Th=250~150mm

3.2

Minaret max ht=18m

4.1

ea

ea

Guard Room (B2501)


Concrete, blockworks & plaster

ea

Metal Windows

5.1

Installation of metal windows

Sidewalk Concrete Walk

6.1

m3

Dome and Minaret

3.1

ea

Inspection Chambers

2.1

ea

Heavy Duty ADB chamber wall thk = 40cm


- RC 30Mpa (180x310x150~200), waterstop, DP

m3

- RC 30Mpa (140x140x100~150), waterstop, DP

- RC 30Mpa (160x220x100~300), waterstop, DP


1.4

Unit

30Mpa concrete sidewalk th=100mm

ea

m2

Lift Sta 16

Gate

SAUDI BINLADEN GROUP - ABCD

Page 210 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

6.2

7
7.1

Description

Precast curbstone 50x30x15 chamfer

Unit

Lm

Internal Finishing Works


Floor

7.1.1

- Ceramic tile 100x100 (install only, excl grout)

m2

7.1.2

- Ceramic tile 200x200 (install only)

m2

7.1.3

- Ceramic tile 300x300 (install only)

m2

7.1.4

- Supply & install Concrete screed with hardener

m2

7.1.5

- Extra Over for hardener

m2

7.1.6

- Terrazzo tile 400x400 (install only, incl polish)

m2

7.1.7

- Supply & install Epoxy coating

m2

7.1.8

- Supply & install Self leveling above screed

m2

7.1.9

- Steel divider (install only)

Lm

Skirting

8.1

Ceramic cove base skirting (install only)

Lm

8.2

Supply & install Terrazzo base 100x200mm

Lm

8.3

Supply & install Epoxy coating base

Lm

Wall

9.1

Ceramic tiles 100x100mm (install only)

m2

9.2

Ceramic tiles 200x200mm (install only)

m2

9.3

Ceramic cove corner (install only)

Lm

9.4

Blocks & plaster Ht=60cm around ducts open on roofs

Lm

9.5

Cement plaster to circular columns 400,H2.50m

ea

10

Wall Paint Works

10.1

Supply & installation of wall paint

m2

10.2

Extra Over for above work Ht 4.5m~8.5m

m2

10.3

Supply & installation of vetonite repair on wall

m2

Lift Sta 16

Gate

SAUDI BINLADEN GROUP - ABCD

Page 211 of 211

PAYMENT CERTIFICATE DEPARTMENT


Project
SubCon
Subject
Period

:
:
:
:

CORRECTIONAL FACILITIES P-1182, Dammam


Al-Benayat Modern Building For Contracting, Contract No. 453
Payment Certificate No. 23 - Additional Works 2
As of January 2016

SN

10.4

11

Description

Supply & installation of epoxy paint

Unit

Ceiling
Supply & install cement board single level thk=6mm

m2

11.2

Supply & install cement board drop ht=400mm

Lm

11.3

Supply & install gypsum board ceiling level

m2

11.4

Acoustic board 600x600mm (install only)

m2

11.5

Coated Aluminum 100mm (install only)

m2

11.6

Supply & install vetonite repair to exposed fairface

m2

11.7

Extra Over for above work Ht=4.5~8.5m

m2

11.8

Supply & install gypsum bd access panel 450x250mm

ea

Ceiling Paint Work

12.1

Supply & install ceiling paint

m2

12.2

Extra Over for above work Ht=4.5~8.5m

m2

13
13.1

13

Gate

m2

11.1

12

Lift Sta 16

Gates
Concrete, blockworks & plaster

CAR PARKING SHED

ea
ea

50%