PROPUESTA

PLAN DE EXPANSIN DEL SISTEMA DE TRANSMISIN TRONCAL 2015


INFORME PRELIMINAR

Direccin de Planificacin y Desarrollo


CDEC SIC
28 de Agosto de 2015

CDEC SIC
(Centro de Despacho Econmico de Carga del Sistema Interconectado Central)
Teatinos N280 Piso 12
Telfono: (56 2) 424 6300
Fax: (56 2) 424 6301
Santiago Chile
Cdigo Postal: 8340434

www.cdecsic.cl

Informe Preliminar Propuesta Plan de Expansin del Sistema de Transmisin Troncal


Rev
1

Fecha
26.08.2015

Comentario
Versin Preliminar DPD

28.08.2015

Versin Definitiva DPD

Realiz
Vannia Toro B.
Eduardo Esperguel G.
Mauricio Olivares A.
Cristin Torres B.
Vannia Toro B.
Eduardo Esperguel G.
Mauricio Olivares A.
Cristin Torres B.

Revis / Aprob
Deninson Fuentes del C.

Deninson Fuentes del C.


Gabriel Carvajal M.

NDICE DE CONTENIDOS
1

INTRODUCCIN

RESUMEN EJECUTIVO

CONSIDERACIONES GENERALES

10

3.1
3.2
3.3
3.4

SUPUESTOS DEL MODELO DE COORDINACIN HIDROTRMICA


REPRESENTACIN DE CENTRALES SOLARES
REPRESENTACIN DE CENTRALES ELICAS
PLAZOS ESTIMADOS DE PROCESOS ADMINISTRATIVOS

10
11
12
13

DEFINICIN DE ESCENARIOS ANALIZADOS

15

4.1
4.1.1
4.1.2
4.1.3
4.2

PREVISIN Y REPRESENTACIN DE LA DEMANDA


CONSIDERACIONES GENERALES PARA LA MODELACIN DE DEMANDA
AJUSTE DE CONSUMO EN BASE A PROYECTOS
DEMANDA PROYECTADA
PLAN DE OBRAS DE GENERACIN

18
18
18
19
21

5
ASPECTOS GENERALES Y METODOLGICOS PARA ANLISIS DE REQUERIMINETOS DE
EXPANSIN

27

5.1
5.2
5.3
5.4
5.4.1
5.5

DIAGNSTICO DE LA UTILIZACIN ESPERADA DEL SISTEMA DE TRANSMISIN


ESTUDIOS DE LIMITACIONES DE TRANSMISIN
METODOLOGA DE ANLISIS DE REQUERIMIENTOS EN SUBESTACIONES
METODOLOGA DE EVALUACIN ECONMICA
MIN MAX REGRET
DIAGRAMA DE FLUJO DEL PROCESO DE DETERMINACIN DE LA EXPANSIN TRONCAL

27
27
29
30
30
31

SISTEMA DE TRANSMISIN

32

6.1
6.2
6.3
6.4

OBRAS DE TRANSMISIN TRONCAL DECRETADAS


PROYECTOS DE TRANSMISIN
DIAGRAMA UNILINEAL SIMPLIFICADO
LIMITACIONES EN LA CAPACIDAD DE TRANSMISIN

32
34
37
38

7
UTILIZACIN ESPERADA Y RECOMENDACIN DE EXPANSIN DE LOS TRAMOS DEL
SISTEMA DE TRANSMISIN TRONCAL

42

7.1
7.1.1

42
44

ZONA NORTE
TRAMO CARDONES DIEGO DE ALMAGRO

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
3

7.1.2
7.1.3
7.1.4
7.1.5
7.1.6
7.1.7
7.1.8
7.1.9
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
7.2.9
7.2.10
7.2.11
7.2.12
7.2.13
7.3
7.3.1
7.3.2
7.3.3
7.3.4
7.3.5
7.3.6
7.3.7
7.3.8
7.3.9
7.3.10
7.4

TRAMO DIEGO DE ALMAGRO CUMBRES


LOS CHANGOS CUMBRES - CARDONES
TRAMO MAITENCILLO - CARDONES
TRAMO PAN DE AZCAR - PUNTA COLORADA MAITENCILLO
TRAMO PAN DE AZCAR NOGALES- POLPAICO
TRAMOS POLPAICO NOGALES - QUILLOTA
RESUMEN ANLISIS ZONA NORTE
EVALUACIN ECONMICA ZONA NORTE
ZONA CENTRO
TRAMO LAMPA POLPAICO
TRAMO POLPAICO TAP EL LLANO - LOS MAQUIS
TRAMO CHENA - CERRO NAVIA
TRAMO ALTO JAHUEL CHENA
TRAMOS RAPEL A. MELIPILLA LO AGUIRRE CERRO NAVIA
SISTEMA DE 500 KV ENTRE S.E. ALTO JAHUEL Y S.E. POLPAICO
SISTEMA ANCOA AL NORTE 500 KV
TRAMO ANCOA 500/220 KV
TRAMO ANCOA COLBN 220 KV
TRAMO COLBN CANDELARIA MAIPO ALTO JAHUEL 220 KV
TRAMO ANCOA ITAHUE
RESUMEN ANLISIS ZONA CENTRO
EVALUACIN ECONMICA ZONA CENTRO
ZONA SUR
TRAMO CHARRA ANCOA
TRAMO CHARRA 500/200
TRAMOS CHARRA - LAGUNILLAS 220 KV Y CHARRA - HUALPN 220 KV
TRAMO CAUTN MULCHN - CHARRA 220 KV
TRAMO CAUTN VALDIVIA
TRAMO CIRUELOS PICHIRROPULLI
TRAMO PUERTO MONTT - PICHIRROPULLI
TRAMO PUERTO MONTT MELIPULLI - CHILO
RESUMEN ANLISIS ZONA SUR
EVALUACIN ECONMICA ZONA SUR
ANLISIS PROYECTOS PRESENTADOS POR EMPRESAS PROMOTORAS

47
50
52
56
60
64
66
68
76
77
77
78
78
78
81
83
84
85
85
86
86
87
88
89
93
95
96
100
102
106
108
108
109
115

ANLISIS DE REQUERIMIENTOS DE CUMPLIMIENTO NORMATIVO EN S.E. TRONCALES 116

PROYECTOS RECOMENDADOS

118

9.1
9.1.1
9.1.2

PROYECTOS DE EXPANSIN DEL SISTEMA DE TRANSMISIN TRONCAL SIC


119
NUEVO TRANSFORMADOR 220/500 KV S.E CUMBRES
119
NUEVA LNEA NUEVA MAITENCILLO PUNTA COLORADA NUEVA PAN DE AZCAR 2X220 KV, 2X 500 MVA,
119
9.1.3 NUEVA LNEA CIRUELOS NUEVA CAUTN 2X500 KV, 2X 1700 MVA, ENERGIZADA EN 220 KV
121
9.1.4 MODIFICACIN DE LA COMPENSACIN SERIE DE LA NUEVA LNEA POLPAICO PAN DE AZCAR 2X500 KV Y
REACTORES DE 75 MVAR EN SS.EE. N. MAITENCILLO Y N. PAN DE AZCAR 500 KV
124

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
4

9.2
9.2.1
9.2.2
9.2.3
9.2.4
9.2.5
9.2.6
9.2.7
9.2.8
9.2.9

PROYECTOS DE NORMALIZACIN
NORMALIZACIN SUBESTACIN DIEGO DE ALMAGRO
NORMALIZACIN SUBESTACIN DON GOYO
NORMALIZACIN SUBESTACIN LA CEBADA
NORMALIZACIN SUBESTACIN LOS MAQUIS
NORMALIZACIN SUBESTACIN POLPAICO
NORMALIZACIN SUBESTACIN LO AGUIRRE
NORMALIZACIN SUBESTACIN CHENA
NORMALIZACIN SUBESTACIN ALTO JAHUEL
NORMALIZACIN SUBESTACIN PUERTO MONTT

126
126
127
127
128
129
129
130
130
131

ANEXO 1

132

ANEXO 2

133

ANEXO 3

134

ANEXO 4

135

ANEXO 5

136

ANEXO 6

137

ANEXO 7

138

ANEXO 8

139

ANEXO 9

140

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
5

INTRODUCCIN

De acuerdo a la letra c) del artculo 37 bis del Decreto 291/2007, la Direccin de Planificacin
y Desarrollo (DPD) tiene como obligacin prestar apoyo tcnico a la Direccin de Peajes (DP)
en el cumplimiento de la funcin correspondiente a la revisin anual del Estudio de
Transmisin Troncal (ETT).
Por otro lado, anualmente la (DP) del CDEC-SIC debe realizar, sobre la base del Informe
Tcnico sealado en el Artculo 91 de la ley, una propuesta a la Comisin Nacional de Energa
(CNE) de las obras de Transmisin Troncal que deban realizarse o iniciarse en el perodo
siguiente para posibilitar el abastecimiento de la demanda, considerando las exigencias de
calidad y seguridad de servicio vigentes; o la no realizacin de obras en ese perodo. Adems,
podr considerar tanto los proyectos de transmisin troncal contemplados en el Informe
Tcnico como los que sean presentados a la DP por sus promotores.
La revisin a realizar en el presente periodo 2015, se basa en el Informe Tcnico para la
determinacin del Valor Anual y Expansin de los Sistemas de Transmisin Troncal,
Cuatrienio 2015-2018 (Resolucin Exenta N390). El Informe Tcnico contiene las obras de
transmisin troncal que deben ser iniciadas dentro del Perodo Tarifario 2015-2018, en base
a los resultados del Estudio de Transmisin Troncal.
En el presente informe se describen los anlisis y conclusiones derivados de proyectar los
niveles de utilizacin del Sistema de Transmisin Troncal (STT) para determinar los tramos
sobre los cuales resultara pertinente evaluar proyectos y finalmente proponer expansiones.
Se ha realizado un anlisis de los flujos esperados por los elementos serie del sistema de
transmisin troncal, poniendo atencin en aquellos tramos en los que las transferencias sean
superiores a las mximas admisibles con el nivel de seguridad coherente con el criterio N-1.
Adicionalmente se realiza un anlisis del estado de cumplimiento normativo de las
subestaciones con instalaciones troncales, indicando los requerimientos de ampliacin que
normalizarn estas subestaciones. Dichos anlisis se encuentran resumidos en el captulo 8.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
6

RESUMEN EJECUTIVO

Con motivo del proceso de la revisin anual 2015 del Estudio de Transmisin Troncal, la
Direccin de Planificacin y Desarrollo del CDEC SIC ha elaborado una propuesta de
expansin del Sistema de Transmisin Troncal en base a una evaluacin tcnico - econmica
de las necesidades de desarrollo del SIC. Para determinar el plan de expansin propuesto, se
ha analizado el comportamiento de los tramos troncales del sistema y los posibles
requerimientos de expansin, considerando dentro del conjunto de proyectos posibles las
obras incorporadas en el Informe Tcnico de la Comisin Nacional de Energa (CNE) y
aquellos proyectos presentados por las empresas promotoras. Adicionalmente la DPD ha
determinado necesario analizar otras obras para cubrir los casos en que no se dispusiera de
propuestas de proyectos adecuados a los requerimientos del sistema.
Con el objetivo de determinar el comportamiento de los tramos troncales del SIC y las
opciones ptimas de expansin, el estudio considera el anlisis de escenarios de generacin y
demanda alternativos en base a la informacin recibida por la DPD en el contexto del catastro
pblico de proyectos de generacin y consumo. Con lo anterior se ha estudiado el sistema bajo
los supuestos de cinco escenarios (1 base y 4 alternativos), cuyos horizontes de modelacin
comienzan en abril de 2015 y finalizan en marzo de 2035:
i.

Escenario Base

El Escenario base considera los supuestos del plan de obras de generacin y consumo del
Informe tcnico de Precio de Nudo de Abril de 2015, ajustado con la mejor informacin
disponible por la DPD.
ii.

Escenario Norte ERNC Atacama

En el escenario alternativo Norte ERNC Atacama se reemplazan proyectos ERNC del plan
indicativo por proyectos informados a la DPD, lo que tiene como efecto un adelanto en la fecha
de puesta en servicio de las inyecciones ERNC. Los proyectos incorporados suman
aproximadamente 1500 MW de potencia de generacin y reemplazan centrales indicativas del
ITPN por un total de 500 MW, adicionalmente se incorporan al modelo proyectos mineros que
suman 250 MW de consumo.
iii.

Escenario Norte ERNC Coquimbo

En el escenario alternativo Norte ERNC Coquimbo tiene los mismos supuestos del Escenario
ERNC Norte Atacama, con la salvedad que se asume un mayor desarrollo ERNC en la zona de
Coquimbo. En este escenario se incorporan 300 MW elicos adicionales en la zona de Las
Palmas, los cuales reemplazan una central fotovoltaica indicativa de 300 MW en Diego de
Almagro.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
7

iv.

Escenario ERNC sur

En este escenario se incorporan al plan de obras las centrales elicas informadas a la DPD al
sur de Charra con un total aproximado de 1400 MW. Adicionalmente se adelanta la puesta en
servicio de la central Neltume a enero de 2023 y se desplaza la puesta en servicio de centrales
elicas indicativas en el ITPN por un total de 750 MW y de las centrales Carbn 1 VIII regin y
Carbn 2 IV Regin.

v.

Escenario ERNC + Hidro sur

En este escenario se asumen los mismos supuestos del Escenario ERNC Sur en cuanto a las
centrales ERNC, adems se incorpora la central Cuervo de 640 MW en enero de 2023 de
acuerdo a lo informado por la empresa propietaria y se desplaza la puesta en servicio de las
centrales Carbn 1 VIII regin, Carbn 2 IV Regin y Neltume.
Para la evaluacin de la conveniencia econmica de la materializacin de los proyectos, se
utiliz la metodologa consistente en determinar la diferencia entre los beneficios operativos
de expandir el sistema con el costo total actualizado de los proyectos en evaluacin. El
beneficio operativo se obtiene como el ahorro en costos de operacin y falla del sistema, al
comparar una simulacin con proyecto con otra sin proyecto. En aquellos casos en que los
resultados de los anlisis bajo los distintos escenarios originaron planes de expansin
distintos, se aplic la metodologa Minmax Regret para optar por la decisin que minimiza el
mximo arrepentimiento.
En lo que respecta a las obras necesarias para dar cumplimiento a las exigencias normativas,
se efectu un recorrido por las subestaciones troncales de sistema de transmisin analizando
el estado actual y futuro en cuanto a los requerimientos de diseo (art. 3-24 NT SyCS). En
aquellas subestaciones en que se detect la necesidad de realizar adecuaciones se elaboraron
proyectos de ampliacin que permitan dar cumplimiento a las exigencias normativas.
Adicionalmente, a parir de los estudios elctricos que se efectan para el SIC con motivo de la
presente revisin, se analiz la necesidad obras que permitan la operacin eficiente, desde el
punto de vista de requerimientos de potencia reactiva del sistema de 500 kV entre las SS.EE.
Polpaico y Cardones.
El conjunto de obras recomendadas a partir de las evaluaciones tcnico econmicas realizadas
consta de los siguientes proyectos:

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
8

Cuadro 1: Obras Troncales Recomendadas de acuerdo a evaluaciones tcnico - econmicas


N

Obras Troncales Recomendadas

Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres


Adecuacin de capacidad lnea Nueva Diego de Almagro Cumbres 2x220
kV (2)
Nueva lnea Nueva Maitencillo Punta Colorada Nueva Pan de Azcar
2x220 kV, 2x500 MVA
Ampliacin S.E. Nueva Maitencillo
Ampliacin S.E. Punta Colorada
Ampliacin S.E. Nueva Pan de Azcar
Nueva Lnea Ciruelos Nueva Cautn 2x500 kV, 2x 1700 MVA, energizada
en 220 kV + Seccionamiento lnea Cautn - Mulchn 2x220 kV + S.E Nueva
Cautn.
Ampliacin S.E. Ciruelos

2
3
4
5
6
7
8

Responsable
(1)
-

Fecha de
puesta en
servicio
Ene-20

Obra Nueva
Interchile S.A.
Transelec
Interchile S.A.
Obra Nueva

Transelec

36 meses

VI
miles de
USD
18.772

Ene-21

48 meses

106.893

Ene-21
Ene-21
Ene-21

24 meses
24 meses
24 meses

3.826
2.996
3.771

Ene-22

60 meses

130.264

Ene-22

24 meses

3.332

Plazo
constructivo

(1) Debido a que la construccin del primer transformador en S.E Cumbres an no ha superado la etapa de licitacin, se definir
el responsable una vez que finalicen los procesos de adjudicacin.
(2) Se ha estimado que el sobrecosto de adecuar la capacidad de la lnea entre 600 MVA y 750 MVA corresponde a 1.65 millones
de USD

A partir de los anlisis de requerimientos de obras para dar cumplimiento a exigencias


normativas se recomienda le ejecucin de las siguientes obras:
Cuadro 2: Obras Troncales Recomendadas por adecuaciones normativas
N

Obras Troncales Recomendadas

S/E Diego de Almagro 1: Aumento Capacidad Barras


S/E Diego de Almagro 2: Incorporacin Desconectador Circuito 1 Nueva
lnea D.Almagro-Cardones 2x220 kV
S/E Polpaico: Conexin J12 a la barra de transferencia
S/E Chena: Conexin J3 y J4 a la barra de transferencia
S/E Chena: Seccionamiento barra principal con incorporacin de un
interruptor seccionador de barra y un interruptor acoplador
S/E Alto Jahuel: Conexin J3 y J10 a la barra de transferencia
S/E Puerto Montt: Conexin a barras 1 y 2 del CER

2
4
5
6
7
8

Responsable

Plazo
constructivo

Transelec

24 meses

VI
miles de
USD
1.171

Eletrans

24 meses

497

Colbn
Transelec

24 meses
24 meses

344
1.461

Chilectra

24 meses

2.319

Colbn
Transelec

12 meses
24 meses

561
4.090

A partir de los anlisis de requerimientos de potencia reactiva, se recomienda la ejecucin de


las siguientes obras:
Cuadro 3: Obras Troncales Recomendadas por requerimientos de potencia reactiva
N

1
2

Obras Troncales Recomendadas


Modificacin de la compensacin serie de la Nueva Lnea Polpaico Pan
de Azcar 2x500 kV y reactores de 75 MVAr en SS.EE. N. Maitencillo y N.
Pan de Azcar 500 kV
Ampliacin S.E. Polpaico para dar cabida a equipos de Compensacin
Serie

Plazo
constructivo

VI
miles de
USD

Interchile S.A.

24 meses

44.916 (1)

Transelec

15 meses

542

Responsable

(1) Valor de inversin considera los costos informados por Interchile S.A para la modificacin de la compensacin serie con
motivo de la Revisin anual 2014 del ETT.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
9

CONSIDERACIONES GENERALES

3.1 Supuestos del modelo de coordinacin hidrotrmica


A continuacin se describen los principales supuestos empleados en la modelacin del
problema de coordinacin hidrotrmica multinodal multiembalse considerados para
representar la situacin de despacho y transferencias esperados.
-

Se considera un perodo de planificacin que se inicia en abril de 2015 y termina en


marzo de 2035. El software empleado para resolver el problema de coordinacin
hidrotrmica es PLP versin 2.18.

La modelacin considera el plan de obras de generacin, mantenimientos de centrales,


costos y disponibilidad de combustible de las bases OSE del Informe de Precios de
Nudo de abril de 2015 elaborado por la CNE.
Se han modelado las obras de transmisin troncal aprobadas por decreto a la fecha de
este informe, considerando las fechas estimadas de puesta en servicio informadas por
los propietarios de los sistemas de transmisin.
La aleatoriedad hidrolgica se ha considerado mediante series hidrolgicas,
construidas a partir de los aos hidrolgicos 1960/61 al 2013/14.
La aleatoriedad elica se ha considerado mediante series de ventosidad, construidas a
partir de la informacin histrica de las centrales actualmente en operacin.
La aleatoriedad solar se ha considerado mediante series de niveles de radiacin,
construidas a partir de mediciones de radiacin solar en la zona norte del SIC.
En general, hasta antes que puedan entrar en operacin obras de expansin, se aplican
los lmites de transmisin por lneas del Estudio de Restricciones en el Sistema de
Transmisin 2014 (ERST 2014) emitido por la Direccin de Operacin del CDEC SIC.
Lo anterior sin perjuicio de clculos de lmites distintos en algunos tramos para los
cuales se cuenta con informacin adicional a la utilizada en el ERST.
Para la modelacin de los transformadores desfasadores de la S.E. Cerro Navia se
realiza una simulacin de la operacin del SIC mediante el modelo de coordinacin
hidrotrmica, liberando las restricciones de transmisin de la lnea Cerro Navia
Polpaico 2x220 kV. De los resultados se determina cules son las etapas en que las
transferencias resultan mayores al lmite operativo esperado para el tramo. Luego,
sobre dichas etapas, y para todas las series hidrolgicas, se modela un aumento del
paso de derivacin en el transformador desfasador mediante la modificacin de la
reactancia del tramo, verificando posteriormente que con el paso asignado no se
supere el flujo mximo en ninguna de las hidrologas simuladas.

La reactancia a aplicar corresponde al valor equivalente al aumento de pasos en el


transformador desfasador. Esta se obtiene mediante la simulacin de flujos de
potencia AC de variados escenarios de despachos, con los cuales se extraen las
transferencias por los circuitos y los ngulos en los extremos del tramo calculando

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
10

algebraicamente la reactancia equivalente a partir de los pasos de operacin en el


transformador.
-

En cumplimiento con lo establecido en el artculo 5-5 de la Norma Tcnica de


Seguridad y Calidad de Servicio, se considera la aplicacin del criterio N-1 en las
alternativas estudiadas. Adems, de acuerdo a este mismo artculo, la aplicacin del
criterio sealado solo puede utilizar recursos EDAC, EDAG o ERAG supervisados por
frecuencia o por tensin.
En la modelacin se han incorporado los sistemas SIC y SING (231 barras, 460
centrales y, 293 lneas) con los datos provenientes del modelo correspondiente al
ITPN de abril de 2015.
En la modelacin se han considerado 10 bloques de demanda mensuales desde enero
de 2019 hasta diciembre de 2028, con la finalidad de representar adecuadamente las
transferencias esperadas para diversas condiciones de consumo durante el perodo
ms relevante de anlisis. Adems, esta representacin divide las horas de da y noche,
cuya finalidad es representar mejor la operacin esperada de las centrales solares.
Para el resto del horizonte se consider 2 bloques mensuales, igualmente dividiendo
las horas de da y noche.

3.2 Representacin de centrales solares


El proceso para modelar adecuadamente la generacin solar se divide en dos etapas, la
primera corresponde a la definicin de los bloques de demanda, en la cual se separan las
horas de da de las hora de noche para generar un conjunto de bloques Da y un conjunto de
bloques Noche; y la segunda corresponde al mtodo de asignacin de potencia de
generacin solar a cada bloque para la modelacin de las centrales.
En la segunda etapa, la generacin horaria de un perfil anual1 de central solar se relaciona a
cada bloque de acuerdo a las horas correspondientes, pues se conoce cul es la asignacin de
cada una de las horas del ao a cada bloque. Luego, se ordena de mayor a menor la generacin
horaria dentro del bloque, obteniendo as un conjunto de generaciones horarias, el cual se
separa en 6 partes de igual nmero de datos y posteriormente para cada uno de estos se
calcula el promedio de todos sus datos. Los niveles de generacin seleccionados son los que
definen los seis escenarios de generacin solar para cada bloque del horizonte de estudio,
denominados: radiacin 100%, radiacin 80%, radiacin 60%, radiacin 40%,
radiacin 20%, radiacin 0%, respectivamente, los cuales son normalizados en base a la
potencia mxima de la central modelo. Mayor detalle de la modelacin se encuentra
disponible en ANEXO 3.
Finalmente, se construye una matriz de generacin solar base, la cual contiene, para cada uno
de los bloques del horizonte y para cada una de las 54 hidrologas modeladas, un escenario de
radiacin escogido en forma aleatoria, respetando la diversidad de escenarios para cada tipo

Se seleccionaron los datos horarios disponibles para la estacin Inca de Oro, durante el ao 2010,
considerando tecnologa sin seguimiento y con seguimiento, para representar el perfil de generacin de
la central modelo.
1

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
11

de hidrologa. Posteriormente se construyen las series a incorporar al modelo de coordinacin


hidrotrmica, asignando a cada bloque de la primera serie los elementos correspondientes al
primer ao hidrolgico de la matriz base. El resto de las series se construyen de la misma
forma.

3.3 Representacin de centrales elicas


La variabilidad de los vientos incidentes a las centrales elicas, implica una considerable
volatilidad en la inyeccin de energa al sistema elctrico, lo cual influye en los flujos de
potencia a travs de las lneas del sistema de transmisin troncal. Debido a la inclusin de
proyectos elicos en el SIC, se efectu una modelacin ms detallada de la generacin de estas
centrales para dar cuenta de su estocasticidad. El procedimiento de modelacin se explica a
continuacin.
Para efectos de la modelacin elica, para cada mes y para cada uno de sus bloques, se
selecciona el conjunto de generaciones horarias una central modelo, correspondiente con las
horas del ao de dicho bloque. Luego, se ordena de mayor a menor la generacin horaria
dentro del bloque, obteniendo as un conjunto de generaciones del cual se extraen los 3
valores coincidentes con el percentil 86%, 53% y el promedio del ltimo tercio de la curva
obtenida. Los niveles de generacin seleccionados son los que definen los tres escenarios de
generacin elica para cada bloque del horizonte de estudio, denominados: ventoso,
medio y calmo respectivamente, los cuales son normalizados en base a la potencia mxima
de la central modelo2. As mismo se extrae el mximo y mnimo valor de cada bloque para
representar escenarios donde la generacin elica produce su peak de energa, escenario
mximo, y donde no existe ventosidad, escenario mnimo. Mayor detalle de la modelacin
se encuentra disponible en ANEXO 3.
En una segunda etapa, se construye una matriz de generacin elica base, la cual contiene,
para cada uno de los bloques del horizonte y para cada una de las 54 hidrologas modeladas,
un escenario de ventosidad escogido en forma aleatoria, respetando la diversidad de
escenarios para cada tipo de hidrologa. Posteriormente se construyen las series a incorporar
al modelo de coordinacin hidrotrmica, asignando a cada bloque de la primera serie los
elementos correspondientes al primer ao hidrolgico de la matriz base. El resto de las series
se construyen de la misma forma ajustando sus factores de planta a un valor predefinido
esperado.
La modelacin de la demanda puede realizarse con distinta cantidad de bloques para distintos
perodos del horizonte de planificacin, por lo que la metodologa descrita se realiza para cada
perodo en que se modifique el nmero de bloques mensuales.
Por otra parte, se agruparon las centrales elicas en 7 sectores, dando cuenta de la correlacin
de los vientos en centrales, tal que cada sector comprende una zona de aproximadamente 100
kilmetros de extensin, segn se muestra a continuacin:

Para incorporara la variabilidad del viento se ha usado la estadstica de la central Canela.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
12

Cuadro 4: Agrupacin de centrales elicas por sectores


Sector
Sector 1

Centrales
EOLICO SING I

EOLICO SING III

Elica IV Regin 09

EOLICO SING IV

VALLE VIENTOS SING

EOLICO SING II

Sector 2

EOLICA TALTAL

Sector 3

EOL P COLORADA

EOLICA CABO LEONES I

MONTEREDONDO

CANELA2

EOL IVREG07

PTA PALMERA

EOL TALINAY PONIENTE

EOL IVREG08

EOL TOTORAL

TALINAY ORIENTE

CHANARAL ACEITUNO

EOL IVREG01

PUNTA SIERRA

EOL III 02

EOL IVREG02

LOS CURUROS

EOL III 03

EOL IVREG03

EL ARRAYAN

EOL III 01

EOL IVREG04

EOL IV 01

CANELA

EOL IVREG05

EOL IVREG06

EOLICA LEBU

EOL CONCE06

Elica Charra 04

EOLICA UCUQUER

Elica Charra 01

EOL VIII 02

EOLICA P CHOME

Elica Charra 02

Elica Charra 03

EOLICA UCUQUER II

EOL CONCE01

EOL VIII 01

EOL BUENOS AIRES

EOL CONCE04

EOL CONCE05

NEGRETE CUEL

Elica Chilo 01

EOL RENAICO

Sector 6

EOL COLLIPULLI

Elica Chilo 02

Sector 7

EOL SAN PEDRO

EOL X 01

Sector 4

Sector 5

Para efecto de representar la variabilidad de una central respecto de aquellas que se


encuentran alejadas geogrficamente, los sectores se han construido de manera tal que las
centrales elicas pertenecientes a un mismo sector posean iguales series de ventosidad en
cada una de las hidrologas.

3.4 Plazos estimados de procesos administrativos


A partir de la experiencia obtenida en las licitaciones anteriores, se han estimado los
siguientes plazos para el proceso administrativo que media entre la publicacin del decreto de
expansin que corresponda y el inicio de la construccin de obras que se decretasen:
2013
E F M A M J J A S O N D

2014
E F M A M J J A S O N D

HITOS DEL PROCESO

Obra Ampliacin
5 meses
Obra Nueva
12 meses

Revisin 2015 del ETT CDEC

ago-15

Plan de Expansin CNE

2 meses

Panel de Expertos

2 meses

Decreto Ministerio de Energa

dic-15

Adjudicacin de la obra

4 meses

Inicio de la construccin

may-15

Proceso de llamado a licitacin

1 mes

Adjudicacin de la obra

8 meses

Publicacin del decreto de adjudicacin

2 meses

Inicio de la construccin

dic-16

Figura 1: Estimacin de plazos para los procesos administrativos

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
13

Para efectos estimar los plazos de construccin de los proyectos a evaluar se han considerado
los periodos indicados por el consultor, en el Informe Tcnico y en estimaciones de la DPD
para cada caso particular.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
14

DEFINICIN DE ESCENARIOS ANALIZADOS

A partir de la informacin recibida por este CDEC sobre los desarrollos futuros en materia de
generacin y consumo, se han evidenciado proyectos que pueden alcanzar la condicin de
desarrollo efectivo en el corto plazo. Producto del posible impacto agregado de estos
proyectos y sus potenciales efectos sobre las obras de expansin, se ha considerado la
elaboracin de un escenario base y cuatro escenarios alternativos.

i.

Escenario Base

El plan de obras de generacin para el caso base considera el plan de expansin de Generacin
definido en el Informe Tcnico de Precio de Nudo de Abril 2015 (Cuadro 9) ajustado de
acuerdo a la mejor informacin disponible por la DPD y los nuevos proyectos informados en
construccin de acuerdo a las resoluciones CNE y las obras de generacin incorporadas para
el periodo de relleno.
Evolucin de Costos Marginales
140

Costo Marginal [US$/MWh]

120

100

D. Almagro 220
Quillota220
Alto Jahuel 220
Charrua220
Cautn 220
P. Montt 220

80

60

40

20

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Figura 2: Evolucin costos marginales Escenario Base

ii.

Escenario Norte ERNC Atacama (Escenario ERNC NA)

En el escenario alternativo zona norte Atacama se toma como supuesto que se materializan
proyectos ERNC y mineros que han sido informados a la DPD para efectos del catastro pblico
de generacin y consumo, los cuales suman aproximadamente 1500 MW de potencia de
generacin instalada ubicados entre las subestaciones Diego de Almagro y Punta Colorada. Se
considera que estas centrales reemplazan algunas de las centrales indicativas del ITPN por un
total de 500 MW de acuerdo a lo indicado en el Cuadro 9 y se incorporan al modelo los
proyectos mineros del Cuadro 8, los cuales adicionan 250 MW de consumo concentrados en
S.E. Carrera Pinto y S.E. Punta Colorada.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
15

Evolucin de Costos Marginales


140

Costo Marginal [US$/MWh]

120

100

D. Almagro 220
Quillota220
Alto Jahuel 220
Charrua220
Cautn 220
P. Montt 220

80

60

40

20

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Figura 3: Evolucin costos marginales Escenario ERNC Norte Atacama

iii.

Escenario Norte ERNC Coquimbo (Escenario ERNC NC)

En el escenario alternativo zona norte Coquimbo se toma como supuesto que se materializan
proyectos ERNC y mineros que han sido informados a la DPD para efectos del catastro pblico
de generacin y consumo, los cuales suman aproximadamente 1800 MW de potencia de
generacin instalada ubicados entre las subestaciones Diego de Almagro y Los Vilos.
Adicionalmente en la base de modelacin se considera que estas centrales reemplazan
algunas de las centrales indicativas del ITPN por un total de 800 MW de acuerdo a lo indicado
en el Cuadro 9 y se incorporan al modelo los proyectos mineros del Cuadro 8, los cuales
adicionan 250 MW de consumo concentrados en S.E. Carrera Pinto y S.E. Punta Colorada.

Evolucin de Costos Marginales


140

Costo Marginal [US$/MWh]

120

100

D. Almagro 220
Quillota220
Alto Jahuel 220
Charrua220
Cautn 220
P. Montt 220

80

60

40

20

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Figura 4: Evolucin costos marginales Escenario ERNC Norte Coquimbo

iv.

Escenario ERNC sur (Escenario ERNC S)

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
16

En este escenario se incorporan al plan de obras las centrales elicas informadas a la DPD al
sur de Charra con un total aproximado de 1400 MW, los cuales se encuentran distribuidos
principalmente entre Charra y Cautn y ms al sur entre Valdivia y Puerto Montt.
Adicionalmente se adelanta la puesta en servicio de la central Neltume a enero de 2023. Para
mantener un equilibrio potencia instalada y demanda proyectada se considera que las
centrales incorporadas reemplazan algunas de las centrales elicas indicativas en el ITPN por
un total de 750 MW y adicionalmente se desplaza la puesta en servicio de las centrales Carbn
1 VIII regin y Carbn 2 IV Regin de acuerdo a lo indicado en el Cuadro 9.
Evolucin de Costos Marginales
150

Costo Marginal [US$/MWh]

130
110

D. Almagro 220
Quillota220
Alto Jahuel 220
Charrua220
Cautn 220
P. Montt 220

90
70
50

30
10
-10

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Figura 5: Evolucin costos marginales Escenario ERNC Sur

v.

Escenario ERNC + Hidro sur (Escenario ERNC+H S)

Al igual que en Escenario ERNC Sur se incorporan al plan de obras las centrales elicas
informadas a la DPD al sur de Charra con un total aproximado de 1400 MW, los cuales se
encuentran distribuidos principalmente entre Charra y Cautn y ms al sur entre Valdivia y
Puerto Montt. Para mantener un equilibrio potencia instalada y demanda proyectada se
considera que las centrales incorporadas reemplazan algunas de las centrales elicas
indicativas en el ITPN por un total de 750 MW. En este escenario adems se incorpora la
central Cuervo de 640 MW en enero de 2023 de acuerdo a lo informado por la empresa
propietaria. Se desplaza la puesta en servicio de las centrales Carbn 1 VIII regin y Carbn 2
IV Regin y Neltume de acuerdo a lo indicado en el Cuadro 9.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
17

Evolucin de Costos Marginales


140

Costo Marginal [US$/MWh]

120

100

D. Almagro 220
Quillota220
Alto Jahuel 220
Charrua220
Cautn 220
P. Montt 220

80

60

40

20

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Figura 6: Evolucin costos marginales Escenario ERNC+H Sur

4.1 Previsin y representacin de la demanda


4.1.1

Consideraciones generales para la modelacin de demanda

La previsin de demanda de energa y potencia por barra se desagreg hasta el nivel


modelado en el programa de coordinacin hidrotrmica, para el perodo comprendido entre
abril de 2015 y marzo de 2035, de acuerdo al tipo de consumo, diferenciando entre libre y
regulado. El comportamiento de cada tipo de consumo se caracteriza a travs de curvas de
duracin de dos o diez bloques mensuales de acuerdo a lo indicado en el captulo 3.1.
Para determinar los consumos del perodo 2015-2030, se han considerado las tasas de
crecimiento zonales definidas en el Informe Tcnico de Precios de Nudo Definitivo de la CNE
de Abril de 2015. Adems, para efectos de distribuir adecuadamente los consumos entre las
distintas barras de una misma zona, se ha realizado un ajuste del consumo industrial que
considera la informacin sobre proyectos en desarrollo efectivo. Para los efectos indicados
anteriormente, la DPD ha solicitado a los clientes libres, distribuidoras y a aquellas empresas
que han hecho pblica su intencin de desarrollar proyectos que involucran un aumento
relevante de demanda para el SIC, que informen a travs del catastro de proyectos que debe
mantener la DPD, el estado de avance, de tal forma de verificar si cumplen con los requisitos
para ser considerados como desarrollo efectivo o proyectan estarlo en el corto plazo.
4.1.2

Ajuste de consumo en base a proyectos

El ajuste del consumo industrial que considera la informacin sobre proyectos en desarrollo
efectivo, se realiza siguiendo el procedimiento que se describe a continuacin:
A todos los consumos de clientes libres se aplica una tasa de crecimiento base de 1,8%,
estimada a partir de la tasa de crecimiento promedio obtenida de la informacin histrica de
los consumos de los clientes libres, excluyndose los consumos de los clientes que ingresaron
o salieron en el perodo considerado.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
18

Luego se agregan los consumos considerados en desarrollo efectivo y, finalmente, se ajustan


los consumos del sistema (a excepcin de los considerados previamente) de forma de alcanzar
los niveles de consumo de energa anual que se muestran en el Cuadro 6 presentado ms
adelante.
Para efectos de aplicar los crecimientos a los consumos regulados, las cargas se agruparon
definiendo seis zonas:
1. Norte : considera los consumos del SIC ubicados desde Los Vilos al norte.
2. Centro : considera los consumos ubicados entre Nogales y Alto Jahuel, incluyendo los
consumos conectados a estas subestaciones.
3. Itahue : considera los consumos ubicados entre Alto Jahuel e Itahue en niveles de
tensin menor o igual a 154 kV, con excepcin del consumo ubicado en la subestacin
Parral.
4. Concepcin : considera los consumos ubicados en la zona de Concepcin en niveles de
tensin menor o igual a 154 kV, con excepcin del consumo ubicado en la subestacin
Chilln.
5. Sur : considera los consumos entre las subestaciones Ancoa y Charra incluida.
6. Austral : considera los consumos ubicados al sur de la subestacin Charra.

4.1.3

Demanda proyectada

A continuacin se presentan las tasas de crecimiento y las energas utilizadas para la


previsin de demanda del SIC:

Proyeccin Total de consumos SIC

6.0%

2035

2034

2033

2032

2031

2030

2029

2028

2027

2026

2025

2024

2023

0.0%
2022

1.0%

0
2021

2.0%

20,000

2020

40,000

2019

3.0%

2018

4.0%

60,000

2017

80,000

2016

5.0%

2015

100,000

Tasa de Crecimiento [%]

120,000

Energa [GWh]

Cuadro 5: Previsin Total de Consumo del SIC


Ao
Total (GWh)
Crecimiento
2015
50,157
2016
52,606
5.3%
2017
55,375
5.2%
2018
58,271
4.9%
2019
61,133
4.5%
2020
63,912
4.6%
2021
66,850
4.2%
2022
69,658
4.1%
2023
72,492
4.0%
2024
75,386
3.8%
2025
78,274
3.5%
2026
80,984
3.4%
2027
83,772
3.4%
2028
86,643
3.3%
2029
89,535
3.3%
2030
92,526
3.3%
2031
95,619
3.3%
2032
98,816
3.3%
2033
102,122
3.3%
2034
105,541
3.3%
2035
109,075
3.3%

Figura 7: Proyeccin Total de consumo SIC

En el caso de los consumos de clientes libres las tasas de crecimiento utilizadas y el consumo
industrial proyectado son los siguientes:
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
19

Cuadro 6: Previsin de consumo industrial del SIC

Proyeccin de consumo Industrial SIC

50,000

8.00%

45,000

7.00%

40,000

6.00%

35,000
30,000

5.00%

25,000

4.00%

20,000

3.00%

15,000

2.00%

10,000

2035

2034

2033

2032

2031

2030

2029

2028

2027

2026

2025

2024

2023

2022

2021

2020

2019

2018

0.00%
2017

1.00%

0
2016

5,000

Tasa de Crecimiento [%]

Crecimiento
7.00%
7.43%
7.26%
6.39%
5.44%
5.70%
5.00%
4.68%
4.48%
4.08%
3.19%
3.14%
3.10%
2.88%
2.89%
2.89%
2.89%
2.89%
2.89%
2.89%

2015

Total (GWh)
18,444
19,736
21,203
22,742
24,196
25,513
26,967
28,316
29,641
30,970
32,234
33,263
34,309
35,373
36,393
37,443
38,524
39,636
40,780
41,958
43,170

Energa [GWh]

Ao
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

Figura 8: Proyeccin Industrial de consumo SIC

Las tasas de crecimiento utilizadas y el consumo regulado proyectado por zona, para el
escenario base son los siguientes:
Cuadro 7: Previsin de Consumo Regulado por zona

2015

2,114,768

18,759,230

3,458,261

1,679,358

1,873,936

3,826,562

Energa
[MWh]

Tasa

TOTAL

Energa
[MWh]

Tasa

Austral

Energa
[MWh]

Tasa

Sur

Energa
[MWh]

Tasa

Concepcin

Energa
[MWh]

Tasa

Itahue

Energa
[MWh]

Tasa

Centro

Energa
[MWh]

Norte

Tasa

Ao

31,712,115

2016

4.40%

2,207,818

3.60%

19,434,562

3.70%

3,586,217

3.70%

1,741,494

3.70%

1,943,271

3.40%

3,956,665

3.65%

32,870,027

2017

4.30%

2,302,754

3.90%

20,192,510

4.10%

3,733,252

4.00%

1,811,153

4.00%

2,021,002

3.90%

4,110,975

3.96%

34,171,647

2018

4.30%

2,401,773

3.90%

20,980,018

4.10%

3,886,315

4.10%

1,885,411

4.10%

2,103,863

3.90%

4,271,303

3.97%

35,528,683

2019

4.20%

2,502,647

3.90%

21,798,239

4.10%

4,045,654

4.10%

1,962,713

4.10%

2,190,121

3.90%

4,437,884

3.96%

36,937,258

2020

4.20%

2,607,759

3.90%

22,648,370

4.10%

4,211,526

4.10%

2,043,184

4.00%

2,277,726

3.90%

4,610,961

3.96%

38,399,526

2021

4.00%

2,712,069

3.80%

23,509,008

4.00%

4,379,987

4.10%

2,126,954

4.00%

2,368,835

3.80%

4,786,178

3.86%

39,883,032

2022

3.90%

2,817,840

3.60%

24,355,332

3.90%

4,550,807

3.90%

2,209,906

3.80%

2,458,851

3.40%

4,948,908

3.66%

41,341,643

2023

3.80%

2,924,917

3.60%

25,232,124

3.90%

4,728,288

3.90%

2,296,092

3.80%

2,552,287

3.40%

5,117,171

3.65%

42,850,880

2024

3.80%

3,036,064

3.60%

26,140,481

3.90%

4,912,691

3.90%

2,385,639

3.80%

2,649,274

3.40%

5,291,154

3.65%

44,415,305

2025

3.90%

3,154,471

3.60%

27,081,538

3.90%

5,104,286

3.90%

2,478,679

3.80%

2,749,947

3.40%

5,471,054

3.66%

46,039,975

2026

3.80%

3,274,341

3.60%

28,056,473

3.90%

5,303,354

3.90%

2,575,348

3.80%

2,854,445

3.40%

5,657,069

3.65%

47,721,030

2027

3.80%

3,398,766

3.60%

29,066,506

3.90%

5,510,184

3.90%

2,675,786

3.80%

2,962,914

3.40%

5,849,410

3.65%

49,463,566

2028

3.80%

3,527,919

3.60%

30,112,901

3.90%

5,725,081

3.90%

2,780,142

3.80%

3,075,504

3.40%

6,048,290

3.65%

51,269,837

2029

3.80%

3,661,980

3.60%

31,196,965

3.90%

5,948,360

3.90%

2,888,568

3.80%

3,192,374

3.40%

6,253,932

3.65%

53,142,177

2030

3.80%

3,801,135

3.60%

32,320,056

3.90%

6,180,346

3.90%

3,001,222

3.80%

3,313,684

3.40%

6,466,565

3.65%

55,083,007

2031

3.80%

3,945,578

3.60%

33,483,578

3.90%

6,421,379

3.90%

3,118,270

3.80%

3,439,604

3.40%

6,686,428

3.65%

57,094,837

2032

3.80%

4,095,510

3.60%

34,688,987

3.90%

6,671,813

3.90%

3,239,882

3.80%

3,570,309

3.40%

6,913,767

3.65%

59,180,267

2033

3.80%

4,251,139

3.60%

35,937,790

3.90%

6,932,014

3.90%

3,366,237

3.80%

3,705,980

3.40%

7,148,835

3.65%

61,341,996

2034

3.80%

4,412,683

3.60%

37,231,551

3.90%

7,202,362

3.90%

3,497,521

3.80%

3,846,808

3.40%

7,391,896

3.65%

63,582,819

2035

3.80%

4,580,365

3.60%

38,571,887

3.90%

7,483,254

3.90%

3,633,924

3.80%

3,992,986

3.40%

7,643,220

3.65%

65,905,636

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
20

Proyeccin de Demanda de Energa Regulados


60,000,000

50,000,000

Energa [MWh]

40,000,000

30,000,000

20,000,000

10,000,000

0
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Norte

Centro

Itahue

Concepcin

Sur

Austral

Figura 9: Proyeccin de demanda consumos regulados SIC

De acuerdo a la informacin recibida se han incluido los siguientes proyectos:

Cuadro 8: Proyectos de Consumo (MW)


Consumo Estimado [MW]
Proyecto

Punto de Conexin

Caserones
Minero
PColorada

Maitencillo 220 kV

Inca de Oro

Carrera Pinto

Dominga

Punta Colorada

Punta Colorada 220 kV

Fecha Inicial

Fecha Final

Ene-2016
Ene-2018
Ene-2019
Ene-2018
Dic-2018
Ene-2019

Mar-2035
Dic-2018
Mar-2035
Mar-2035
Dic-2018
Mar-2035
TOTAL

Escenario
Base
150
95
117
362

Escenario 1

Escenario2

150
95
117
50
20
195
627

150
95
117
362

La potencia indicada en el cuadro anterior corresponde a la potencia media informada por las
empresas. Cabe sealar en todo caso, que al corresponder a consumos industriales mineros,
este nivel de potencia es muy similar a su demanda mxima.

4.2 Plan de obras de Generacin


El Informe Tcnico Definitivo de Precios de Nudo de Abril de 2015 (ITPN) establece un plan
de obras de generacin que contempla la instalacin de 7330 MW entre abril 2015 y
diciembre de 2030, de los cuales 2866 MW estn en construccin y 4464 MW corresponden al
plan indicativo, los cuales se consideran como base.
El plan de obras de generacin considera el plan de expansin de generacin definido en el
ITPN de Abril 2015 ajustado de acuerdo a la mejor informacin disponible por la DPD. Cabe
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
21

hacer notar que el horizonte considerado (2015-2035) es superior al del ITPN (2015-2030),
por lo que se han adicionado a las obras de generacin en construccin e indicativas, centrales
de medios de generacin convencionales y no convencionales.
El plan de obras en construccin se detalla en el Cuadro 9 y es equivalente para todos los
escenarios analizados.

Cuadro 9: Plan de obras de generacin en construccin modelado


Central

Potencia
[MW]

Barra

Escenario
BASA

Escenario
ERNC NA

Escenario
ERNC NC

Escenario
ERNC SUR

Ro Picoiqun
El Pilar Los Amarillos
Lalackama Etapa II
La Montaa I
El Paso
Los Guindos
Papeles Cordillera S.A
Conejo Etapa I
Luz del Norte Etapa I
Itata
Malalcahuello
Carilafqun
Luz del Norte Etapa II
Doa Carmen
CMPC Tissue
Chaka Etapa I
Chaka Etapa II
Quilapilun
Pampa Solar Norte
Guanaco Solar
Luz del Norte Etapa III
Guacolda V
Carrera Pinto
Luz del Norte Etapa IV
Valleland
Renaico
PFV Olmu
Los Buenos Aires
Ro Colorado
Ancoa
Pelcano
San Juan Aceituno
uble
CTM-3
Alto Maipo - Central Las Lajas
Alto Maipo - Central Alfalfal II
Los Cndores
CH San Pedro

19.2
3
16.3
3
60
132
50
108
36
20
9.2
19.8
38
66.5
5
23
27
110
90.6
50
36
139
97
31
67.4
88
144
24
15
27
100
180
136
251
267
264
150
144

Charra 220
Diego de Almagro 110
Paposo 220
Itahue 154
Tinguiririca 154
Charra 220
Florida 110
Diego de Almagro 220
Carrera Pinto 220
Chillan 154
Cautn 220
Cautn 220
Carrera Pinto 220
Doa Carmen 220
Melipilla 220
Diego de Almagro 110
Diego de Almagro 110
Los Maquis 220
Paposo 220
Diego de Almagro 110
Carrera Pinto 220
Maitencillo 220 kV
Carrera Pinto 220
Carrera Pinto 220
Cardones 220 (*)
Temuco 220
Olmu 220
Charra 154
Loma Alta 220
Ancoa 220
Pelicano 220
Punta Colorada 220
Ancoa 220
Los Changos 220
Florida 110
Los Almendros 220
Ancoa 220
Ciruelos 220

abr-15
abr-15
abr-15
abr-15
may-15
jun-15
jun-15
jun-15
jun-15
jul-15
jul-15
jul-15
jul-15
ago-15
sep-15
sep-15
sep-15
sep-15
oct-15
nov-15
nov-15
dic-15
dic-15
ene-16
sep-16
ene-16
mar-16
mar-16
jun-16
jun-16
jul-16
nov-16
jul-17
ene-18
feb-18
may-18
dic-18
jul-20

abr-15
abr-15
abr-15
abr-15
may-15
jun-15
jun-15
jun-15
jun-15
jul-15
jul-15
jul-15
jul-15
ago-15
sep-15
sep-15
sep-15
sep-15
oct-15
nov-15
nov-15
dic-15
dic-15
ene-16
sep-16
ene-16
mar-16
mar-16
jun-16
jun-16
jul-16
nov-16

abr-15
abr-15
abr-15
abr-15
may-15
jun-15
jun-15
jun-15
jun-15
jul-15
jul-15
jul-15
jul-15
ago-15
sep-15
sep-15
sep-15
sep-15
oct-15
nov-15
nov-15
dic-15
dic-15
ene-16
sep-16
ene-16
mar-16
mar-16
jun-16
jun-16
jul-16
nov-16

abr-15
abr-15
abr-15
abr-15
may-15
jun-15
jun-15
jun-15
jun-15
jul-15
jul-15
jul-15
jul-15
ago-15
sep-15
sep-15
sep-15
sep-15
oct-15
nov-15
nov-15
dic-15
dic-15
ene-16
sep-16
ene-16
mar-16
mar-16
jun-16
jun-16
jul-16
nov-16

Escenario
ERNC+Hidro
SUR
abr-15
abr-15
abr-15
abr-15
may-15
jun-15
jun-15
jun-15
jun-15
jul-15
jul-15
jul-15
jul-15
ago-15
sep-15
sep-15
sep-15
sep-15
oct-15
nov-15
nov-15
dic-15
dic-15
ene-16
sep-16
ene-16
mar-16
mar-16
jun-16
jun-16
jul-16
nov-16

jul-17
ene-18
feb-18
may-18
dic-18
jul-20

jul-17
ene-18
feb-18
may-18
dic-18
jul-20

jul-17
ene-18
feb-18
may-18
dic-18
jul-20

jul-17
ene-18
feb-18
may-18
dic-18
jul-20

(*) Punto de conexin provisorio sujeto a la definicin de puntos ptimos de por parte de la DPD.

En el Cuadro 10 se presentan las centrales adicionales a las en construccin modeladas. Estas


centrales corresponden a las del plan indicativo del ITPN Abril 2015 y algunos proyectos que
han sido informados a la DPD con motivo del catastro pblico de generacin y consumo.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
22

Cuadro 10: Plan de obras de generacin en construccin modelado


Central

Indicativo
plan CNE

Escenario
ERNC NA (*)

Escenario
ERNC NC (*)

Escenario
ERNC SUR
(*)

Escenario
ERNC
+
Hidro SUR(*)

Hidroelctrica VII Regin 02


Central Des.For. VIII Regin 01
Hidroelctrica VII Regin 03
Elica IV Regin 02
Elica Concepcin 04
Geotermica Calabozo 01
Central Des.For. VII Regin 01
Solar Cardones 02
Solar Diego de Almagro 02
Solar Cardones 03
Elica IV Regin 09
Elica IV Regin 01
Elica Concepcin 01
Central Des.For. VII Regin 02
Solar Diego de Almagro 03
Elica Charra 02
Elica Chilo 02
Solar Carrera Pinto 03
Carbn VIII Regin 01
Grupo MH X Regin 01
Elica Charra 04
Solar Carrera Pinto 04
Carbn Pan de Azcar 03
Solar Diego de Almagro 01
Hidroelctrica VIII Regin 03
Solar Ovalle 01
Carbn Maitencillo 02
Hidroelctrica VIII Regin 02
Elica Charra 01
Solar Diego de Almagro 05
Elica Charra 03
Solar Diego de Almagro 06
Solar Carrera Pinto 01
Elica Chilo 01
Solar Carrera Pinto 02
PV Abasol
FV Divisadero I
Desierto Atacama
PV El Romero
Inca Varas I
La Gorgonia
Elica Cabo Leones I
PV Luz De Oro
Sol Vallenar
PV Solar Andino
Camarico
Pedernales
Talinay II etapa 1
Talinay II etapa 2

Potencia
[MW]
20
9
20
50
50
40
15
100
100
100
50
50
50
10
100
100
100
200
400
60
100
300
400
300
20
100
335
20
100
250
250
300
100
100
100
61.5
65
120
196
50
40
170
250
273
150
39
100
207
105

Toplan
Aurora
PE Pin Blanco
PE Campo Lindo
PE Trigales
PE San Gabriel
PE Malleco
Llanquihue
PE Starkerwind

144
192
168
145
142
201
270
74
106

Cuervo

640

Barra
Ancoa 220
Arauco 66
Ancoa 220
Pan de Azcar 110
Concepcin 220
Calabozo 220
Itahue 154
Cardones 220
D. Almagro 220
Cardones 220
Pan de Azcar 220
Pan de Azcar 220
Concepcin 220
Itahue 154
D. Almagro 220
Nueva Charra 220
Puerto Montt 220
Carrera Pinto 220
Charra 500
Puerto Montt 500
Nueva Charra 220
Carrera Pinto 220
Pan de Azcar 220
D. de Almagro 220
Charra 220
Carrera Pinto 220
Maitencillo 220
Charra 220
Nueva Charra 220
D. de Almagro 220
Nueva Charra 220
D. de Almagro 220
Carrera Pinto 220
Puerto Montt 220
Carrera Pinto 220
Maitencillo 220
Maitencillo 220
Cardones 220
P. Colorada 220
Carrera Pinto220
Las Palmas 220
Maitencillo 220
Nva. DAlmagro220
Cardones220
Carrera Pinto 220
Las Palmas 220
Nva D.Almagro 220
Don
Goyo/Nva.
Talinay
La
Cebada/Nva.
Talinay
Mulchn 220
Rahue 220
Duqueco 220
Charra 220
Mulchn 220
Duqueco 220
Mulchn 220
Rahue 220
Rahue 220
Nva. Puerto Montt
220

Escenario
BASE

Escenario
ERNC NA

Escenario
ERNC NC

oct-19
jul-21
ene-22
ene-22
jul-22
ene-23
ene-23
ene-24
jul-24
dic-24
dic-24
ene-25
ene-25
ene-25
jul-25
jul-25
jul-25
sep-25
abr-26
ene-27
ene-27
ago-27
ene-28
ene-28
mar-28
mar-28
dic-28
ene-29
ene-29
feb-29
feb-29
oct-29
ene-30
ene-30
dic-30
-

oct-19
jul-21
ene-22
ene-22
jul-22
ene-23
ene-23
ene-24
dic-24
ene-25
ene-25
ene-25
jul-25
jul-25
sep-25
abr-26
ene-27
ene-27
ago-27
ene-28
ene-28
mar-28
ene-33
ene-29
ene-29
feb-29
feb-29
oct-29
ene-30
dic-30
mar-16
mar-16
jun-16
sep-16
sep-16
dic-16
ene-17
mar-18
mar-18
jul-18
jul-18
jul-18

oct-19
jul-21
ene-22
ene-22
jul-22
ene-23
ene-23
ene-24
dic-24
ene-25
ene-25
ene-25
jul-25
jul-25
sep-25
abr-26
ene-27
ene-27
ago-27
ene-28
mar-28
ene-33
ene-29
ene-29
feb-29
feb-29
oct-29
ene-30
dic-30
mar-16
mar-16
jun-16
sep-16
sep-16
dic-16
ene-17
mar-18
mar-18
jul-18
jul-18
jul-18

Escenario
ERNC
SUR
oct-19
jul-21
ene-22
ene-22
jul-22
ene-23
ene-23
ene-24
jul-24
ene-24
dic-24
ene-25
ene-25
ene-25
jul-25
sep-25
ene-27
ago-27
ene-28
ene-28
mar-28
mar-28
dic-30
ene-29
feb-29
oct-29
ene-30
dic-30
-

Escenario
ERNC+Hidro
SUR
oct-19
jul-21
ene-22
ene-22
jul-22
ene-23
ene-23
ene-24
jul-24
ene-24
dic-24
ene-25
ene-25
ene-25
jul-25
sep-25
ene-27
ago-27
ene-28
ene-28
mar-28
mar-28
dic-31
ene-29
feb-29
oct-29
ene-30
dic-30
-

ene-21

ene-21

feb-16
sep-16
oct-16
dic-16
jun-17
jun-17
dic-17
ene-19
feb-19

feb-16
sep-16
oct-16
dic-16
jun-17
jun-17
dic-17
ene-19
feb-19

ene-23

(*) El punto de conexin de las centrales incorporadas en los escenarios alternativos corresponde a ubicaciones referenciales.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
23

Del cuadro 7 se desprende que todos los escenarios cumplen con los requerimientos
sealados en la ley. Cabe sealar que estos porcentajes no son comparables entre si ya que la
demanda considerada difiere en cada uno de los escenarios.
Cuadro 11: Obras de Generacin incorporadas en el perodo de relleno SIC
Central
Solar III 02

Barra
Cardones220

Potencia [MW]
196

Fecha PES
ene-30

Neltume
Carbn Maitencillo 03

Ciruelos 220
Maitencillo 220

490
370

ene-31
abr-30

Hidro VII Regin

Ciruelos 220

490

ene-31

Carbn Ancoa

Ancoa 220

375

ene-31

Solar III 03

Maitencil220

114

abr-31

Eol III 02
Eol III 01
Eol VIII 01
Eol X 01
Solar III 04
Eol III 03
Hidro X Regin
Carbn Charra

PColorada220
Maitencil220
Charrua220
NvaPMontt220
Cardones220
Maitencil220
Pichirro 220
Nva_Charrua500

184.8
235
266
192
100
204
400
600

jul-31
oct-31
ene-32
may-32
ago-32
sep-32
ene-33
abr-33

Eol VIII 02
Solar V 01
Eol IV 01
Solar III 01
Solar RM 01

Charrua220
Quillota220
PColorada220
CPinto220
Polpaico220

184
100
128
200
120

ago-33
abr-34
ene-35
sep-35
oct-29

Las centrales sealadas se han escogido a fin de mantener el perfil de costos marginales sin
variaciones significativas en el SIC a partir del ao 2030.
Las centrales en construccin e indicativas modeladas para el SING en todos los escenarios
son las siguientes:

Cuadro 12: Obras de Generacin incorporadas SING


Proyecto

Fecha Inicio

Barra

Potencia (MW)

Jama (ex - San Pedro III)


Pular (ex - San Pedro IV)
Paruma (ex - San Pedro I)
Andes Solar
Arica Solar 1 (Etapa I)
Arica Solar 1 (Etapa II)
Lascar (ex - San Pedro II)
Saln (ex - Calama Sur)
Uribe Solar
Quillagua I
Atacama I
Quillagua II
Cochrane U1
Bolero I (ex - Laberinto I)
Finis Terrae
Huatacondo
Blue Sky 2
Bolero II (ex - Laberinto II)
Kelar

abr-15
oct-15
oct-15
may-15
sep-15
sep-15
Oct-15
ene-16
nov-15
dic-15
Dic-15
abr-16
may-16
may-16
jun-16
jul-16
ago-16
oct-16
oct-16

A110
A110
A110
Andes220
Parinacota220
Parinacota220
A110
Calama110
Esmeralda220
Crucero220
Encuentro220
Crucero220
Encuentro220
Laberinto220
Encuentro220
Lagunas220
Encuentro220
Laberinto220
Kapatur220

30
24
17
21
18
22
30
30
50
23
100
27
236
42
138
98
51
42
517

Cochrane U2

oct-16

Encuentro220

236

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
24

Blue Sky 1

oct-16

Encuentro220

34

Quillagua III
Cerro Dominador

feb-17
mar-17

Crucero220
Encuentro220

50
110

Infraestructura Energtica
Mejillones
Irruputuncu
Solar SING I

Jun-18

Los Changos

350

jun-21
mar-22

Collahuasi220
Lagunas220

50
150

Elico SING I
Solar SING IV

ene-23
ene-23

Laberinto220
Encuentro220

200
150

Solar SING II

ene-24

PozoAlmonte220

150

Elico SING II
Elico SING IV

sep-24
ene-25

Lagunas220
ElAbra220

200
200

Tarapac I
Solar SING III

ene-27
jul-27

Tarapaca220
Laberinto220

300
200

Solar SING V
Mejillones I
Elico SING III

mar-28
jun-28
jul-28

Calama110
Chacaya220
ElAbra220

75
350
300

Mejillones III
Elico SING V

dic-29
ene-30

Chacaya220
Encuentro220

380
300

Cabe indicar que con el Plan de Obras sealado se cumple con el abastecimiento de la
demanda del SIC y, por lo tanto, con lo indicado en el Oficio Circular SEC N10.666 del 27 de
octubre de 2010. Este Oficio seala que, los CDEC debern considerar en su anlisis todas
aquellas obras, ya sea existentes, en construccin, en proyecto, o bien formalmente
recomendadas, que tcnicamente permitan abastecer la demanda, cumpliendo las exigencias
de seguridad y calidad de servicio contenidas en la ley, esto para efectos de la interpretacin
de desarrollos efectivos en materia de generacin.
De esta forma, en consideracin al Oficio sealado, para efectos de las recomendaciones
realizadas en este informe, todas las obras de generacin indicadas en el Cuadro 9, el Cuadro
11 y el Cuadro 12 han sido consideradas en el anlisis.
En virtud de la obligacin establecida en el artculo 150 bis del DFL N4 de 2006 del
Ministerio de Minera, se han estimado los porcentajes de energa anual que deben ser
inyectados por medios de generacin renovables, de acuerdo a los criterios sealados en el
artculo 1 transitorio de la ley 20.257, modificado por el artculo 2 de la ley 20.698. De
acuerdo a lo indicado en la ley este aumento progresivo se aplicar de la siguiente forma:

Para los contratos celebrados con posterioridad al 31 agosto de 2007 y con


anterioridad al 1 de julio de 2013, los retiros afectos a la obligacin al ao 2015
debern cumplir con el 5,5%, los del ao 2016 con el 6% y as sucesivamente hasta
alcanzar el ao 2024 el 10%.
Para los contratos firmados con posterioridad al 1 de julio de 2013, la obligacin
aludida ser del 5% al ao 2013, con incrementos del 1% a partir del ao 2014 hasta
llegar al 12% el ao 2020, e incrementos del 1,5% a partir del ao 2021 hasta llegar al
18% el ao 2024, y un incremento del 2% al ao 2025 para llegar al 20% el ao 2025.

En base a la informacin disponible en el catastro de contratos de suministro del SIC, se


han calculado los porcentajes de requerimientos de energa en base a centrales ERNC de

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
25

acuerdo a las exigencias normativas. Adicionalmente se han calculado las cuotas


incorporadas en cada uno de los escenarios analizados.
Cuadro 13: Porcentajes de ERNC generada

Base
ERNC Norte A
ERNC Norte C
ERNC SUR
% requerido

2015
10.6%
10.4%
10.4%
10.2%
3.9%

2016
13.4%
13.2%
13.2%
12.8%
4.5%

2017
15.4%
15.6%
15.6%
15.5%
5.4%

2018
15.1%
16.8%
16.8%
16.5%
6.4%

2019
14.7%
16.9%
16.8%
16.6%
7.2%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

2020
14.3%
16.7%
16.6%
16.0%
8.5%

2021
14.1%
16.3%
17.1%
15.6%
10.3%

2022
14.4%
16.5%
17.2%
16.0%
12.1%

2023
14.7%
16.8%
17.5%
16.4%
13.7%

2024
15.2%
16.9%
17.6%
16.8%
15.5%

2025
16.2%
17.6%
18.3%
17.5%
17.7%

agosto de 2015
26

ASPECTOS GENERALES Y METODOLGICOS


REQUERIMINETOS DE EXPANSIN

PARA

ANLISIS

DE

5.1 Diagnstico de la utilizacin esperada del sistema de transmisin


En esta etapa del estudio descrito se proyecta la utilizacin esperada del sistema de
transmisin troncal, adems de otros tramos de relevancia para los anlisis. Para esto se
considera el criterio N-1 como lmite de transferencia para todos los tramos actuales del
sistema, aumentando el lmite de transferencia admisible en aquellos en que se observa
congestin, mediante el supuesto de un aumento de capacidad de transmisin acorde a la
ejecucin de una eventual obra propuesta y sus respectivos plazos, o bien por medio de la
adicin de circuitos o transformadores en paralelo a los existentes.
Los resultados por zona del sistema de transmisin troncal se presentan en los grficos de
probabilidad de excedencia mostrados en los puntos siguientes. Estos grficos para cada mes
se despliegan cuatro niveles de transmisin, correspondientes a transferencias con
probabilidad de excedencia de 0%, 20%, 80% y 100%. Estos valores se determinan a partir
del universo de transmisiones equiprobables resultantes para cada mes, considerando los 54
despachos por etapa y sus bloques de demanda modelados. De esta manera, las curvas no
representan trayectorias de transmisiones a lo largo del tiempo para una determinada
secuencia de operacin, sino transmisiones de igual probabilidad de excedencia que pueden
ocurrir en diversas condiciones hidrolgicas, de ventosidad y radiacin solar a lo largo del
horizonte de planificacin. En los grficos mencionados, adems de los flujos se presentan las
limitaciones de capacidad de cada tramo, identificando con lnea punteada el lmite asociado a
las instalaciones existentes y las que se encuentran en construccin cuando corresponda
(indicado en la leyenda bajo la nomenclatura sin proyecto s- y s+), mientras que en lnea
roja la nueva limitacin en caso de considerar el proyecto de expansin propuesto para el
tramo (nomenclatura de leyenda c- y c+).
Como parte del proceso anterior se analizan las transferencias esperadas en los tramos de
transmisin troncal, identificando aquellas instalaciones que presentan transferencias
restringidas considerando los valores permitidos por criterio de seguridad N-1.
Posteriormente en base a la informacin entregada por las empresas al CDEC SIC, se
determina si la posible incorporacin de generacin o demanda hace pertinente la definicin
de algn escenario alternativo de evaluacin.

5.2 Estudios de limitaciones de transmisin


La evaluacin de las restricciones en el sistema de transmisin contempla las limitaciones por
capacidad trmica de las lneas, transformadores u otros elementos serie del sistema de
transmisin, adems de las eventuales limitaciones por estabilidad y regulacin de tensin de
acuerdo a las exigencias contenidas en la Norma Tcnica de Seguridad y Calidad de Servicio
vigente.
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
27

A partir de las simulaciones realizadas con el modelo de coordinacin hidrotrmica se


determinan los tramos del sistema troncal que superaran sus capacidades de transferencia
en el futuro, requiriendo estudiar su expansin. Para los tramos en que se previera limitacin
por estabilidad de tensin, se procede a verificar su estabilidad antes y despus de ser
ampliados, y as determinar las mximas transferencias posibles a travs de ellos,
obtenindose as las limitaciones para los casos con y sin proyecto de expansin.
En trminos generales, para cada uno de los tramos de transmisin se seleccionan escenarios
de despacho y demanda que impliquen condiciones de operacin exigentes para el tramo y/o
su entorno, para lo cual se identifican aquellos escenarios que cumplan con los siguientes
requisitos:
-

Altas transferencias en el tramo en estudio

Configuraciones de demanda y generacin que representen condiciones de operacin


desfavorables desde el punto de vista de la estabilidad o regulacin de tensiones de la
zona en estudio.

Los escenarios seleccionados se simulan en el programa Power Factory de DigSILENT ,


procedindose en primer lugar a adaptar la condicin de operacin para obtener un punto de
operacin que cumpla con las exigencias de regulacin de tensin contenidos en la Norma
Tcnica de Seguridad y Calidad de Servicio, adems de corregir el despacho de las centrales
que se encuentren en operacin bajo su potencia de mnimo tcnico.
A partir del escenario adaptado se modifica el despacho de generacin con la finalidad de
aumentar las transferencias de potencia (en caso de ser posible) por el tramo en estudio hasta
alcanzar un cierto valor previamente estimado, que idealmente coincide con el lmite trmico
N-1 estricto del tramo o un valor superior en caso de un tramo enmallado.
A continuacin, para comprobar que la transferencia determinada cumpla con el criterio de
seguridad N-1 y las dems exigencias contenidas en la NTSyCS, se simulan contingencias de
severidad 4, 8 y 93 en el tramo (sin actuacin de EDAG, EDAC ni ERAG que no sean
supervisados por frecuencia o tensin) y su entorno, las que son seleccionadas de acuerdo a la
gravedad que podran generar sobre la zona en estudio. Adicionalmente se simula la
contingencia de la unidad de generacin de mayor impacto en la estabilidad o regulacin de
tensin de cada zona en estudio.
De esta forma, mediante un proceso iterativo se determina la transferencia mxima que
cumpla con el criterio de estabilidad de tensiones y con las exigencias de regulacin de
tensin contenidos en la Norma para estado normal (pre contingencia) o de alerta (post
contingencia), segn corresponda.

Las limitaciones de transmisin obtenidas por la aplicacin de contingencias de severidad 9 se encuentran en proceso de
implementacin, por lo que se han analizado las secciones de barra que se prev pudieran causar limitaciones producto de
contingencias sobre ellas, particularmente aquellas en que el nmero de secciones de barra es inferior al nmero de circuitos de
los tramos en anlisis.
3

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
28

5.3 Metodologa de anlisis de requerimientos en subestaciones


Con el fin de revisar el cumplimiento de los estndares de suficiencia y seguridad de las
subestaciones con instalaciones troncales del SIC, se realiza un recorrido por las instalaciones
del STT a fin de verificar el cumplimiento normativo de cada subestacin, y con ello realizar
un diagnstico que permita detectar los posibles requerimientos de obras de expansin.
Para cada subestacin se verifica el estado de cumplimiento respecto de las exigencias
normativas resumidas en el Cuadro 14, utilizando como antecedentes la informacin enviada
al CDEC SIC por los coordinados, los planes de obras en ejecucin fijadas en los decretos de
expansin correspondientes, visitas tcnicas a algunas subestaciones que en el anlisis
preliminar aparecieron con incumplimientos normativos y anlisis elctricos. Conjuntamente
con lo anterior, se revisan las propuestas de normalizacin contenidas en el ETT 2015-2018.

Cuadro 14: Resumen de Exigencias de Diseo para la Planificacin y Normalizacin de Subestaciones en el STT

Mantencin
Interruptores
3-24, II)

de
(Artculo

Secciones de Barra
(Artculo 3-24, II)

Configuracin
Transformadores
(Artculo 3-24, III)

Conexiones en STT
(Artculo 3-24, IV)

Planificacin STT
(Artculo 5-5 y Artculo 17 )

Excepciones Conexiones
al Troncal.
(Artculo 10-18 )

Configuracin de barras suficiente para que cada interruptor asociado a lneas,


transformadores u otros equipos, de manera que dichas instalaciones queden en
operacin durante el mantenimiento del interruptor asociado a ellas
el nmero de secciones de barra, deber ser tal que la falla de severidad 9 en
ellas pueda ser controlada sin propagarse a otras instalaciones no falladas
Para subestaciones existentes se deber verificar que la falla de severidad 8
pueda ser controlada sin propagarse a otras instalaciones no falladas, admitiendo la
utilizacin de Recursos Generales y Especiales de Control de Contingencias
los Coordinados que exploten transformadores de poder debern disponer de
transformadores de reserva, propios o de terceros, energizados o desenergizados, tal
que en caso de falla permanente de uno de los transformadores que implique
restricciones al suministro de clientes regulados , se pueda normalizar la
operacin antes de 96 horas .
En el caso de subestaciones de transformacin de tensin primaria mayor a 200
[kV] y tensin secundaria superior a 60 [kV] que enmallan sistemas, debern contar
con un nmero de transformadores tal que la falla de severidad 8 en uno de ellos
pueda ser controlada sin propagarse
conexiones en un punto intermedio de una lnea perteneciente al STT,
corresponder construir una subestacin que seccione al menos dos circuitos de
la lnea, la cual debe cumplir con los estndares mencionados en el punto II.
Configuracin de barras de subestaciones del presente artculo.
La planificacin para el desarrollo del SI deber ser realizada aplicando el Criterio N1.
En los estudios de planificacin, la aplicacin del Criterio N-1 slo podr utilizar
recursos EDAC, EDAG o ERAG supervisados por frecuencia o por tensin.
No se aplicar el Artculo 3-24 numeral IV aquellas instalaciones que se hayan
declarado en construccin con posterioridad a la entrada en vigencia de la NTSyCS y
hasta el 31 de diciembre de 2014.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
29

5.4 Metodologa de evaluacin econmica


En la etapa siguiente al diagnstico de utilizacin esperada por tramo, se llevan a cabo las
evaluaciones econmicas de pertinencia de recomendacin de los proyectos (las cuales se
presentarn en las siguientes versiones del presente informe).
En aquellas instalaciones troncales en que se detect la necesidad de evaluar una posible
expansin, se modelan los proyectos propuestos que permitan dar solucin a las saturaciones
presentadas. A continuacin se realizan dos simulaciones de operacin, para las situaciones
con y sin proyecto en base una misma poltica de gestin de embalses. Se obtienen de cada
simulacin los costos de generacin trmica, la energa de falla valorizada a costo de falla de
larga duracin y el agua embalsada al final del horizonte de planificacin valorizada a costo
marginal, consolidados como promedios sobre las hidrologas. Con los resultados obtenidos
de ambas simulaciones, se calcula el VAN de realizar el proyecto, restando los beneficios en
costo de operacin con el costo asociado a cubrir el AVI y el COMA.
La evaluacin del proyecto de expansin para un tramo en particular se realiza bajo distintas
alternativas de ampliacin en el resto de los tramos del sistema, por ende la determinacin de
la alternativa de expansin ms conveniente surge de un proceso iterativo de comparacin y
combinacin de las opciones posibles de desarrollo.

5.4.1

Min Max Regret

Para tomar la mejor decisin respecto de la alternativa ptima de expansin del sistema de
transmisin, considerando la incertidumbre asociada a los futuros escenarios de generacin
demanda, en casos especficos, se ha utilizado el criterio MinMax o bien el criterio de
minimizar el mximo arrepentimiento.
En una primera etapa cada uno de los escenarios generacin-demanda analizados se asumen
como certeros y se define bajo sus supuestos el plan ptimo de expansin en transmisin,
mediante la metodologa descrita en el punto 5.4. Cada plan ptimo de expansin encontrado
se considera como una posible alternativa de expansin en la transmisin que ser evaluada
considerando que se da un escenario distinto al que origina dicho plan, de modo de calcular el
arrepentimiento o aumento de costos en caso de haber escogido esa alternativa. Finalmente
se selecciona la alternativa que minimiza el mximo arrepentimiento.
Cabe sealar que para efectos de valorizar los arrepentimientos se ha supuesto que las
soluciones de expansin de la transmisin asociadas a una alternativa no necesariamente son
fijas en todo el horizonte, puesto que si en el futuro se presenta un escenario generacindemanda distinto, se pueden tomar medidas que permitan adaptar la transmisin al nuevo
escenario. Por ejemplo, si se estn calculando los costos de una alternativa de expansin que
implica la no realizacin de un obra de transmisin en todo el horizonte, pero bajo el

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
30

escenario en que se incorpora nueva generacin y demanda al sistema que hace evidente que
a partir de cierto ao se requiere de una expansin de transmisin, entonces sta se considera
con el retraso correspondiente, por lo que los costos de ese conjunto alternativa-escenario
deben representar los sobrecostos asociados al retraso.
Metodologa
Escenarios

Tramo
Congestionado

Gx-Dx
relevantes

Escenario
Base
Proyecto

Escenario
Alternativo

Simulacin

Evaluacin
econmica

Con
Proyecto

VAN

Sin
Proyecto

Con
Proyecto
Sin
Proyecto

Decisin
Se
Recomienda

signo

NO se
Recomienda

Anlisis de
Mnimo
arrepentimiento

signo

VAN

Figura 10: Metodologa de decisin de evaluacin econmica

5.5 Diagrama de Flujo del proceso de determinacin de la expansin troncal


En la Figura 11 se muestra mediante una representacin esquemtica, las distintas etapas que
constituyen el proceso con el cual la DPD define la recomendacin de expansin de la
transmisin troncal.
Simulacin de Alternativas de Expansin, Proceso Iterativo

Simulacin de la operacin en el Largo Plazo (20 aos)

Proyeccin Demanda
Plan de Obras Tx, Gx
Costo Combustibles
Variabilidad elica,
solar, hidrulica
Programa de
mantenimiento

Estudios de
Limitaciones
Transmisin

Verificacin
cumplimientos
NTSyCS

Obtencin de escenarios
de operacin

Simulacin
de operacin
del sistema

Flujos proyectadas
por Tramo Troncal
Diagnstico de
utilizacin esperada
Deteccin de
Tramos
Congestionados

Proyectos de Expansin

Catastro de Proyectos

Soluciones de
Expansin
Informe Tcnico
CNE
Propuesta
Empresas
Desarrollos DPD

Evaluaciones econmicas
Costos de
operacin y
falla por
casos

Valorizacin
de proyectos

Conveniencia
Econmica

Anlisis de
mnimo
arrepentimiento
Decisin de
Recomendacin

Figura 11: Diagrama de flujo recomendacin de la expansin troncal

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
31

SISTEMA DE TRANSMISIN

En los anlisis realizados se consideraron los proyectos del transmisin en el Sistema Troncal
actualmente en construccin, adjudicados y/o por adjudicar, que son modelados en el
programa de coordinacin hidrotrmica de acuerdo a lo establecido en el Estudio de
Transmisin Troncal del cuatrienio 2015-2018, los decretos de expansin N 115 y 116
exentos del 2 de mayo de 2011, el decreto de expansin N 82 exento del 24 de marzo de
2012, el N310 de agosto de 2013, el decreto de expansin N 201 del 2 de junio de 2014 y el
decreto de expansin N158 de abril de 2015 (desde el Cuadro 16 al Cuadro 21).
Las fechas de entrada de estos proyectos corresponden a las mejores estimaciones con que
cuenta la DPD abril de 2015 a partir de las respuestas a las solicitudes sobre el estado de
avance de las obras de transmisin y la informacin remitida con motivo del catastro pblico
que indica el artculo 37 bis del Reglamento de los CDEC (DS 291/2007).

6.1 Obras de transmisin troncal decretadas


A continuacin se detallan las obras que se encuentran decretadas o bien en construccin.
Cuadro 15: Obras de Transmisin Troncal en construccin a agosto de 2014.
Fecha de Entrada
Obra
Capacidad [MVA]
oct-2015

Lnea Ancoa - A. Jahuel 2x500 kV: primer circuito.

1x1732 (35 C, c/sol)

Cuadro 16: Obras de ampliacin y obras nuevas segn Decreto N 115 del 2 de mayo de 2011
Fecha estimada
Obra
Capacidad [MVA]
de entrada
oct-2015
Subestacin Seccionadora Lo Aguirre: Etapa I
750
sep-2015
Nueva Lnea Cardones Diego de Almagro 2x220 kV: tendido primer circuito
1 x 290
ene-2018
Nueva Lnea Cardones Maitencillo 2x500 kV
2 x 1500
ene-2018
Nueva Lnea Maitencillo Pan de Azcar 2x500 kV
2 x 1500
ene-2018
Nueva Lnea Pan de Azcar Polpaico 2x500 kV
2 x 1500
feb-2018
Nueva Lnea Charra Ancoa 2x500 kV: tendido primer circuito
1 x1400
may-2018
Nueva Lnea Ciruelos Pichirropulli 2x220 kV: tendido primer circuito
1 x 290

Cuadro 17: Obras de ampliacin y obras nuevas segn Decreto N 116 del 2 de mayo de 2011
Fecha estimada de
Obra
entrada
may-2015

Ampliacin de la S/E Ciruelos: Barra de Transferencia y Pao Acoplador 220 kV

jun-2015

Incorporacin de Barra de Transferencia en 220 kV en la S/E Diego de Almagro

may-2015

Incorporacin de Barra de Transferencia en 220 kV en la S/E Los Vilos

Cuadro 18: Obras de ampliacin y obras nuevas segn Decreto N 82 del 24 de marzo de 2012
Fecha estimada de entrada
Obra
Capacidad [MVA]
jun-2015
Segundo Transformador Ancoa 500/220 kV
750
oct-2018

Nueva Lnea Rapel A.Melipilla 1x220 kV

1 x290

oct-2018

Nueva Lnea Lo Aguirre A.Melipilla 2x220 kV. Tendido un circuito

1 x 290

Cuadro 19 : Obras de ampliacin y obras nuevas segn Decreto N 310 del 8 de agosto de 2013
Fecha estimada
Obra
Capacidad [MVA]
de entrada
1x1732 (35 C,
Feb-2016
Lnea Ancoa - A. Jahuel 2x500 kV: segundo circuito.
c/sol)

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
32

Ene-2017
Feb-2018
ene-2018
abr-2016
abr-2015
jul-2015
jul-2015
jul-2015
nov-2015
sep-2015
ene-2016
oct-2017
oct-15
oct-15

Seccionamiento S/E Ciruelos


Tercer Transformador A.Jahuel 500/220 kV
Banco Autotransformadores, 500/220 kV, 750
MVA. S/E Nueva Cardones, S/E Nueva Maitencillo y S/E Nueva Pan de Azcar
Ampliacin S/E Ancoa 500 kV
Ampliacin S/E Pan de Azcar 220 kV
Ampliacin S/E Cardones 220 kV
Ampliacin S/E Cerro Navia 220 kV
Ampliacin S/E Maitencillo 220 kV
Ampliacin S/E Polpaico 500 kV y cambio de interruptor pao acoplador 52JR
Ampliacin S/E Rapel 220 kV e instalacin de interruptor 52JS
Ampliacin S/E Charra 500 kV y cambio interruptor paos acopladores 52JR1, 52JR2,
52JR3
Ampliacin S/E Diego de Almagro 220 kV
Ampliacin S/E Las Palmas 220 kV
Cambio interruptor pao acoplador 52JR S/E Alto Jahuel

1x750
1x750

Cuadro 20: Obras de ampliacin y obras nuevas segn Decreto N 201 del 2 de junio de 2014
Fecha estimada
de entrada
feb-2017
ene-2017
dic-2016
mar-2017
mar-2017
mar-2017
may-2018
feb-2017
jul-2018
feb-2021

Obra
Tendido segundo circuito lnea 2x220 kV Cardones - Diego de Almagro, con seccionamiento en
S.E. Carrera Pinto
Seccionamiento barra principal en Carrera Pinto
Aumento de capacidad de lnea Maitencillo - Cardones 1x220 kV
Seccionamiento barras 500 kV subestacin Alto Jahuel
Seccionamiento barras 500 kV subestacin Ancoa
Seccionamiento barras 500 kV subestacin Charra
Tendido segundo circuito lnea 2x220 kV Ciruelos - Pichirropulli
Seccionamiento completo en subestacin Rahue
Subestacin Nueva Charra, seccionamiento de lneas 2x500 kV Charra - Ancoa 1 y 2 y nueva
lnea 2x220 kV Nueva Charra Charra y nuevo autotransformador 500/220 kV, 750 MVA
Lnea 2x500 kV Pichirropulli - Puerto Montt, energizada en 220 kV

Capacidad
[MVA]
1x290
1x260

1x290

2x1500

Cuadro 21: Obras de ampliacin y obras nuevas segn Decreto N 158 del 22 de abril de 2015
Fecha estimada
de entrada
oct-17
oct-17
mar-18
abr-17
oct-17
oct-17
oct-17
oct-17
oct-17
oct-17
Jul-17
may-18

Obra

Ampliacin S.E. Carrera Pinto 220 kV


Seccionamiento del circuito 1 Cardones Diego de Almagro en S.E. Carrera Pinto
r Pinto - Diego de Almagro
Ampliacin S.E. San Andrs 220 kV
Ampliacin S.E. Cardones 220 kV
Cambio de Interruptores 53J y 52J10 en S.E. Alto Jahuel 220 kV
Cambio de Interruptores 52JS, 52JCE1,52J6, 52JZ3 y 52J7 en S.E. Alto Jahuel
Cambio de Interruptores 52JT5, 52JT6 y 52J15 en S.E. Charra 220 kV
Cambio de Interruptores 52J23, 52J3 en S.E. Charra 220 kV
Nueva Subestacin seccionadora Puente Negro 220 kV
Ampliacin S.E. Temuco 220 kV
Subestacin seccionadora Nueva Diego de Almagro
Nueva lnea 2x220 kV entre S.E. Nueva Diego de Almagro Cumbres y Banco de
Nov-19
Autotransformadores 1x750 MVA 500/220 kV
Ene-18
Nueva Lnea 2x220 kV, 1500 MW entre S.E. Los Changos y S.E. Kapatur (*)
Nueva Lnea 2x500 kV, 1500 MW entre S.E. Los Changos y S.E. Nueva Crucero Encuentro, Bancos
Ene-20
de Autotransformadores 2x750 MVA 500/220 kV en S.E. Nueva Crucero Encuentro y Banco de
Autotransformadores 750 MVA 500/220 kV en S.E. Los Changos. (*)
(*) Estos proyectos corresponden a la denominada Obra Nueva de Interconexin Troncal SIC-SING

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Capacidad
[MVA]

400

600,1x750

agosto de 2015
33

Adicionalmente, en el Plan de Expansin correspondiente al decreto 158-2015 se indic que el


proyecto Sistema de Transmisin 500 kV, Mejillones Cardones de la empresa Transmisin
Elctrica del Norte S.A. (TEN) deba cumplir ciertas exigencias para que fuera efectivo el
desarrollo de la obra de interconexin entre los sistemas SIC y SING indicada en la tabla
anterior. De no cumplirse las condiciones referidas, la obra de interconexin entre los
sistemas elctricos a desarrollar corresponder a una Nueva Lnea de Interconexin Nueva
Cardones Nueva Crucero Encuentro HVDC en 500 kV, entre la S.E. Nueva Cardones y la S.E.
Nueva Crucero Encuentro, con sus estaciones conversoras correspondientes. Debido a que a la
fecha se han cumplido las exigencias indicadas, se ha considerado pertinente suponer la
ejecucin del proyecto de interconexin HVAC y de la obra de la empresa TEN con las
condiciones descritas en el decreto, incluyendo su puesta en servicio de acuerdo a lo indicado
en el Cuadro 29.

6.2 Proyectos de transmisin


i.

Proyectos del Plan Cuadrienal

A continuacin se describen las obras incorporadas en el Informe del consultor de ETT


cuadrienio 2015-2018. Se incluye la fecha estimada de puesta en servicio a partir de los plazos
contenidos en el Estudio de Transmisin Troncal y las fechas estimadas de inicio de los
procesos de adjudicacin (Figura 1) como consecuencia de la presente propuesta.
Cuadro 22: Proyectos de transmisin del plan cuadrienal, Resolucin Exenta N316/2015
Fecha
estimada
puesta
servicio

de
en

Proyecto

Tipo

VI ref
MUSD

AVI ref
MUSD

COMA
ref
MUSD

Cambio de conductor lnea 2x220 kV Maitencillo Pan de Azcar Don


Ampliacin
102.637
9.905
1.970
Goyo La Cebada Las Palmas Los Vilos Nogales para aumentar
(Transelec)
capacidad a 520 MVA.
Seccionamiento segundo circuito lnea 2x500 kV Polpaico Alto Jahuel en Ampliacin
13.380
1.309
256
Mar-2018
S/E Lo Aguirre.
(Transelec)
Seccionamiento completo del circuito Don Goyo - Las Palmas ms paos Ampliacin
Mar-2018
para interconectar el proyecto Talinay, en tecnologa AIS. (*)
(El Arrayn)
Seccionamiento completo del circuito Pan de Azcar La Cebada ms Ampliacin
Mar-2018
paos para interconectar el proyecto Monte Redondo, en tecnologa GIS.
(EPM Chile)
Nueva lnea 2x500 kV Polpaico Los Almendros Alto Jahuel 1800 MVA,
126.241
12.353
2.423
Mar-2020
Obra Nueva
tendido de un circuito.
Nueva lnea 2x500 kV CautnCiruelos 2500/1500 MVA, tendido de dos
115.044
11.257
2.208
Mar-2020
Obra Nueva
circuito energizados en 220 kV.
(*): Obras propuestas que debern someterse a la evaluacin de puntos ptimos de conexin al STT, llevado a cabo por la
Direccin de Planificacin y Desarrollo (DPD) de los CDEC, de acuerdo a las nuevas exigencias incluidas en la Norma Tcnica de
Seguridad y Calidad de Servicio (NTSyCS).
Mar-19

ii.

Proyectos Presentados por Empresas Promotoras

a. Proyectos de expansin
En el Cuadro 23 y se listan los proyectos presentados a la DPD como propuestas de expansin
troncal con motivo de la Revisin 2015 del ETT.
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
34

Cuadro 23: Proyectos de expansin de transmisin presentados por empresas proponentes


Fecha
estimada de
puesta en
servicio

Designacin

Proyecto

VI ref
MUSD

Proponente

18.66

Enel Green Power

2.09

Acciona Energa

RES Chile

12.5

Transnet

12

Transnet

(1)

May-18

ProyectoP.E 1

Jun-16

ProyectoP.E 2

Oct-16

ProyectoP.E 3

2017

ProyectoP.E 4

(1)

ProyectoP.E 5

(1)

ProyectoP.E 6

S.E. Seccionadora Talinay III Este 220 kV de la lnea Las Palmas


Pan de Azcar
S.E. Seccionadora El Romero 220 kV de la lnea Maitencillo
Pta. Colorada
S.E. Seccionadora Pion Verde de la lnea 220 kV Temuco
Duqueco
S.E. Seccionadora Lastarria 220 kV de la lnea Cautn - Ciruelos
S.E. Seccionadora Santa Isabel 2x220 kV de la lnea Ancoa Itahue
Subestacin seccionadora Nueva Cautn

(1)

ProyectoP.E 7

Nueva lnea Ciruelos Cautn 2x500 kV, energizada en 220 kV

(1)

Transelec
Transelec

(1)

ProyectoP.E 8

Nueva lnea 2x500 kV Alto Jahuel Polpaico, primer circuito

(1)

Transelec

(1)

ProyectoP.E 9

Subestacin seccionadora Nueva Las Palmas

(1)

Transelec

(1)

ProyectoP.E 10

Ampliacin S/E Ciruelos 220 kV

(1)

Transelec

May-19

ProyectoP.E 11

Seccionamiento lnea 1x220 kV Charra Hualpn en S/E


Concepcin

11

Transelec

(1)

ProyectoP.E 12

Ampliacin tramo 220 kV Nogales - Maitencillo

(1)

Transelec

(1) En desarrollo por parte de la empresa promotora

b. Proyectos de Normalizacin
Cuadro 24: Proyectos de ampliacin en subestaciones presentados por empresas proponentes
Fecha
estimada
de puesta
en servicio
(1)
(1)
(1)
(1)

VI ref
MUSD

Proponente

Ampliacin capacidad de barras y cambio a configuracin interruptor y


medio S/E Cardones
Ampliacin SE Polpaico 220 kV
Ampliacin SE Los Maquis 220 kV
Ampliacin capacidad de barras y cambio a configuracin interruptor y
medio S/E Pan de Azcar
Ampliacin capacidad de barras y cambio a configuracin interruptor y
medio S/E Alto Jahuel

(1)

Transelec

(1)
(1)
(1)

Colbn
Colbn
Transelec

(1)

Transelec

Cambio conexin transformacin en Alto Jahuel ATR 4 y 5

6.5

Transelec

Designacin

Proyecto

ProyectoP.N 1
ProyectoP.N 2
ProyectoP.N 3
ProyectoP.N 4

(1)

ProyectoP.N 5

Nov-18

ProyectoP.N 6

(1) En desarrollo por parte de la empresa promotora

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
35

iii.

Proyectos Direccin de Planificacin y Desarrollo


Cuadro 25: Proyectos de expansin de transmisin analizados por la DPD

Fecha
estimada de
puesta en
servicio
Jul-20

Nueva lnea 2x220 kV, 2x200 MVA Cardones - (Carrera Pinto) - Diego de Almagro

78.195

Jul-20

Cambio de Conductor Cardones - (Carrera Pinto) - Diego de Almagro 2x220 kV, 2x290 MVA a 2x400 MVA

40.304

Nov-19

Rediseo de capacidad Lnea Nueva Diego de Almagro Cumbres 2x220 kV a 600 MVA

13.579

Nov-19

Rediseo de capacidad Lnea Nueva Diego de Almagro Cumbres 2x220 kV a 750 MVA

15.232

Ene-20

Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres

18.772

Ene-21

Nueva lnea 2x220 kV, 2x500 MVA Nueva Maitencillo Punta Colorada -Nueva Pan de Azcar

117.488

Ene-21

Nueva lnea 2x220 kV, 2x500 MVA Pan de Azcar Las Palmas

79.860

Ene-21

Nueva lnea 2x220 kV, 2x500 MVA Las Palmas Nogales

91.931

Jun-19

Repotenciamiento a 2x500 MVA Tramo Maitencillo - Punta Colorada Pan de Azcar 2x220 kV

60.001

Jun-19

Repotenciamiento a 2x 500 MVA Tramo Pan de Azcar-Las Palmas 2x220 kV

48.001

Jun-19

Repotenciamiento a 2x 500 MVA Tramo Las Palmas-Los Vilos-Nogales 2x220 kV

53.311

Ene-22

Nueva lnea 2x500 [kV] Nueva Cautn - Ciruelos 1700 [MVA], tendido de dos circuitos energizados en 220
[kV]

133.597

Ene-22

Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli 1700 [MVA], tendido de dos circuitos energizado en 220 [kV]

87.740

Ene-23

Nueva lnea 2x500 [kV] Nueva Charra Mulchn 1700 [MVA], tendido de dos circuitos energizado en 220
[kV]

87.666

Ene-23

Nueva lnea 2x500 [kV] Nueva Mulchn Nueva Cautn 1700 [MVA], tendido de dos circuitos energizado en
220 [kV]

143.753

VI ref
MUSD

Proyecto

A partir de los anlisis de requerimientos normativos en las subestaciones, la DPD ha


elaborado y solicitado observaciones de proyectos de normalizacin a las respectivas
empresas propietarias de las instalaciones. Producto de lo anterior, en el Cuadro 24 se listan
los proyectos que han sido analizados como propuestas de normalizacin de instalaciones
troncales en la presente revisin del ETT.
Cuadro 26: Proyectos de normalizacin de subestaciones analizados por la DPD
Plazo
24 meses

Proyecto
S/E Diego de Almagro 1: Aumento Capacidad Barras

VI ref MUSD
1.171

Responsable
Transelec

24 meses

S/E Diego de Almagro 2: Incorporacin Desconectador Circuito 1 Nueva lnea


D.Almagro-Cardones 2x220 kV

497

Eletrans

24 meses
24 meses

S/E Don Goyo: seccionamiento tramo P. Azcar-Las Palmas 2x220 kV

(*)

P.E EL Arrayn

S/E La Cebada: seccionamiento tramo P. Azcar-Las Palmas 2x220 kV

(*)

24 meses

S/E Los Maquis: modificacin topologa subestacin

EPM CHILE

24 meses

S/E Polpaico: Conexin J12 a la barra de transferencia

24 meses

S/E Lo Aguirre: seccionamiento segundo circuito A.Jahuel-Polpaico 2x500 kV

24 meses
24 meses
12 meses

S/E Alto Jahuel: Conexin J3 y J10 a la barra de transferencia

24 meses

S/E Puerto Montt: Conexin a barras 1 y 2

9.834
344

Colbn
Colbn

13.380

Transelec

S/E Chena: Conexin J3 y J4 a la barra de transferencia

1.461

Transelec

S/E Chena: Seccionamiento barra principal con Incorporacin de un interruptor


seccionador de barra y un interruptor acoplador

2.319

Chilectra

561
3.262 / 4.090

Colbn
Transelec

(*) La elaboracin del proyecto se encuentra en desarrollo por la DPD

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
36

6.3 Diagrama unilineal simplificado


Obras Decretadas
Obras en evaluacin
Obras de Interconexin SIC - SING

Hacia Enlace
Kapatur220

NvaCruceroEncu220

LosChangos2200

NvaCruceroEncu500

LosChangos500

d.almag220

cumbres500

Nva.Dalmag220
290MVA

400MVA

c.pinto220
cardone500

1x750 MVA

s.andres220

2x1700 MVA

1x750 MVA

cardone220

maitenc500
maitenc220

1x750 MVA

p.colorada220
p.azuca500
1x750 MVA

p.azuca220

ElArrayan
Talinay220

L.Cururos220
M.Redondo220

2x1700 MVA

l.Palmas220
l.vilos220
nogales220

maquis220

quillot220

llano220

polpaic220

S/E Polpaico 500kV

lampa__220
melipilla220

aguirre220

c.navia220

rapel220
Los Almendros 500

aguirre500
c.chena220

Los Almendros220

a.jahue500
a.jahue220
maipo__220
candela220
PteNegro 220

ancoa__500

colbun220

ancoa__220

Nv a Charrua 500kV
Nv a. Charra 500kV

itahue_220
charrua500

Nv aCharra
220kV
Nv aCharra
220kV

charrua220
Mulchen 220kV

Linea de 500 kV
Energizada en 220 kV

esperan220
temuco_220

lagunil220

cautin_220

hualpen220

l.cirue220

Ancoa 500kV

Nv a. Charra 500kV
Charra 500kV

valdivi220

Pichirropu220
Rahue220
Linea de 500 kV
Energizada en 220 kV

Nv a.PMontt 220kV

p.montt220

Nv aCharra
220kV
Hualpen220kV
220kV
Charra
Esperanza 220kV
Energizada
en 220 kV
Mulchen
220kV
Temuco 220kV

Figura 12. Diagrama Unifilar Simplificado Sistema Interconectado Central

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
37

6.4 Limitaciones en la capacidad de transmisin


En el anlisis de flujos esperados, respecto de las limitaciones de transmisin utilizadas, se
considera lo siguiente:

Para el sistema de transmisin troncal se utilizan lmites de transmisin que consideran la


aplicacin del criterio N-1 por capacidad trmica de los circuitos u otras eventuales
limitaciones.
En los sistemas de subtransmisin y adicionales se suponen las ampliaciones que fueran
necesarias de tal forma de no restringir los flujos esperados en el sistema troncal.
Respecto de los grficos, el sentido de los flujos es positivo cuando coincide con la
definicin del nombre del tramo indicado en ellos. Para aquellos tramos en los que se ha
modelado una obra de expansin, en la grfica se muestra con lnea roja el nuevo lmite de
transmisin y en lnea punteada el lmite en caso de no ejecutar el proyecto, a menos que
se indique lo contrario.
Las limitaciones estimadas en el presente estudio no necesariamente coinciden con las
utilizadas en la operacin real, lo cual se debe a que la normativa vigente contempla
distintas exigencias para la planificacin, respecto de la operacin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
38

Cuadro 27: Resumen limitaciones de transmisin.


Lmite
Tramo

Ao

Mes

Desde el Norte a Cardones

2015
2017
2017

Feb
Nov

197
350
350

Origen de
la
limitacin4
LT-C
LT-C
LT-C

2018

Abr

580

LT-C

N-1/Ajus

Cardones 500/220 kV

2018

Ene

430

LT

N-1/Ajus

Maitencillo Cardones 220 kV

2015

420

LT

N-1/Ajus

2017

Ene

520

LT

N-1/Ajus

2018

Ene

660

LT

N-1/Ajus

Maitencillo 500/220 kV

2018

Ene

430

LT

N-1/Ajus

Maitencillo P. Colorada 220


kV

2015

197

LT-C

N-1 /Est

L. 2x220 kV, 2x197 MVA

2015
2018

Ene

394
265

LT-C
LT-C

N
N-1 / Ajus

+ Esquema EDAG zona Norte


+ Nueva L. 2x500 kV, 2x1500 MVA Mait. - P. de Azcar

2014

197

LT-C

N-1/Est

L. 2x220 kV, 2x197 MVA

2015
2018
2015
2015

Ene
Ene
-

394
265
224
400

LT-C
LT-C
LT-C
LT-C

N
N-1/Ajus
N-1 / Est
N

2018

Ene

270

LT-C

N-1 / Ajus

Pan de Azcar 500/220 kV

2018

Ene

430

LT

N-1/Ajus

+ Esquema EDAG zona Norte


+ Nueva L. 2x500 kV, 2x1500 MVA Mait. - P. de Azcar
L. 2x220 kV, 2x224 MVA
+ Esquema EDAG zona Norte
+Nueva L. 2x500 kV, 2x1500 MVA Polpaico - P. de
Azcar
Transformador 1x750 MVA

Las Palmas Los Vilos 220 kV

2015
2015

224
400

LT-C
LT-C

N-1 / Est
N

2018

Ene

270

LT-C

N-1 / Ajus

2015
2015

224
400

LT-C
LT-C

N-1 / Est
N

2018

Ene

270

LT-C

N-1 / Ajus

P. Colorada P. de Azcar 220


kV

P. Azcar Las Palmas 220 kV

Los Vilos Nogales 220 kV

MVA

Criterio
Seguridad
N
N-1/Ajus
N-1/Ajus

Instalaciones consideradas

Notas lmite de transmisin

L. 1x220 kV, 1x197 MVA


+ Nueva L. 2x220 kV, 2x290 MVA
+ Seccionamiento completo en C. Pinto
+ Aumento capacidad lnea 1x220 kV Cardones C.
Pinto Diego de Almagro (400MVA)

Dos circuitos secc. en S/E C. Pinto


Tres circuitos secc. en S/E C. Pinto

Transformador 1x750 MVA

Lim. Calculado en ANEXO 1

L. 2x220 kV, 2x290 MVA + L. 1x220 kV, 1x197 MVA

Lim. Vigente

+ Repot. L. 1x220 kV, 1x197 a 1x260 MVA


+ Nueva L. 2x500 kV, 2x1500 MVA Mait. - Cardones

Considera redistribucin por 500 kV

Transformador 1x750 MVA

Lim. Calculado en ANEXO 1

L. 2x220 kV, 2x224 MVA


+ Esquema EDAG zona Norte
+Nueva L. 2x500 kV, 2x1500 MVA Polpaico - P. de
Azcar
L. 2x220 kV, 2x224 MVA
+ Esquema EDAG zona Norte
+Nueva L. 2x500 kV, 2x1500 MVA Polpaico - P. de
Azcar

Aplica slo en sentido norte sur


Considera redistribucin por 500 kV

Aplica slo en sentido norte sur


Considera redistribucin por 500 kV
Aplica slo en sentido norte sur
Considera redistribucin por 500 kV
Lim. Calculado en ANEXO 1
Aplica slo en sentido norte sur
Considera redistribucin por 500 kV
Aplica slo en sentido norte sur
Se utiliza valor del tramo Las Palmas Los Vilos 220
kV.

LT: Lmite trmico, C: Conductor, ES: Equipo serie, ET: Estabilidad de tensin, Est: Estricto, Ajus: Ajustado (considera redistribucin post contingencia).

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
39

Tramo

Ao

Mes

Lmite

Nogales Quillota 220 kV


Polpaico Nogales 220 kV

2015
2015

448
1500

Origen de
la
limitacin4
LT-C
LT-C

Polpaico Quillota 220 kV

2015

1300

2016

Jul

2015
2019
2015
2015
2015
2018
2015
2018
2015
2015
2015
2015
2015
2018
2015
2015

Criterio
Seguridad

Instalaciones consideradas

Notas lmite de transmisin

N-1/Ajus
N-1 / Est

L. 2x220 kV, 2x224 MVA


L. 2x220 kV, 2x1500 MVA

Redist. post contingencia.

LT-ES

N-1 / Est

L. 2x220 kV, 2x1440 MVA

1422

LT-C

N-1 / Est

Ene
Oct
Jul
Jun
Jun
Jul
Oct

540
1500
750
197
197
394
197
394
510
1050
1870
1200
1500
2250
1810
21505

LT-C
LT-C
LT
LT-C
LT-C
LT-C
LT-C
LT-C
LT-C
LT-C
LT-C
LT
LT
LT
LT-C
LT-ES

N-1 / Ajus
N-1 / Est
N-1/Ajus
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Ajus
N-1 / Est
N-1 / Est
N-1/Ajus
N-1/Ajus
N-1/Ajus
N-1 / Ajus
N-1 / Ajus

2016
2018

Feb
May

2770
3550

LT-ES
RT

N-1 / Ajus
N-1 / Ajus

Ancoa Colbn 220 kV

2015
2016
2015
2018
2018
2015
2018
2018
2015

Sep
Feb
May
Feb
May
Abr

750
1150
1500
2100
2660
1500
2100
2660
600

LT
LT
LT - ES
LT - ES
LT - ES
LT
LT
LT
LT-C

N
N-1 / Ajus
N-1 / Ajus
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Ajus
N-1 / Ajus
N-1 / Ajus

+ cambio de desconectador en S/E Quillota y TT/CC en


ambas SS.EE.
L. 2x220 kV, 2x310 MVA
Nueva L. 2x220 kV, 2x1500 MVA
Transformador 1x750 MVA
L. 2x220 kV, 2x197 MVA
L. 2x220 kV, 2x197 MVA
+ Nueva L. 1(2)x220 kV, 1(2)x290 MVA
L. 2x220 kV, 2x197 MVA
+ Nueva L. 1x220 kV, 1x290 MVA
L. 2x220 kV, 2x400 MVA
L. 4x220 kV, 2x400 MVA + 2x350 MVA
+ Seccionamiento L. Ancoa Polpaico 1x500 kV
Transformadores 2x750 MVA
Transformadores 2x750 MVA
Transformadores 3x750 MVA
L. 1x500 kV, 1x1544 MVA + L. 1x500 kV, 1x1800 MVA
+ Nueva L. Ancoa A. Jahuel 1(2)x500 kV,
1(2)x1800MVA
+ 2do circuito Nueva L. Ancoa A. Jahuel 2x500 kV
+ Nueva L. Charra - Ancoa 1x500 kV, 1x1766 MVA
+ Nueva Charra 500/220 kV 1x750 MVA
Transformador 1x750 MVA
+ Transformador 1x750 MVA
L. 2x500 kV, 2x1766 MVA
+ Nueva L. Charra - Ancoa 1x500 kV, 1x1766 MVA
+ Nueva Charra 500/220 kV 1x750 MVA
Transformadores 3x750 MVA
+ Nueva L. Charra - Ancoa 1x500 kV, 1x1766 MVA
+ Nueva Charra 500/220 kV 1x750 MVA
L. 1x220 kV, 1x600MVA

Colbn Candelaria 220 kV


Candelaria Maipo 220 kV
Maipo Alto Jahuel 220 kV

2015
2015
2015

900
600
600

LT-C
LT-C
LT-C

N-1 / Ajus
N-1 / Est
N-1 / Est

+ Interconexin Ancoa Colbn


L. 2x220 kV, 2x600 MVA
L. 2x220 kV, 2x600 MVA

Cerro Navia Polpaico 220 kV


Lo Aguirre Cerro Navia
Lo Aguirre 500/220 kV
Melipilla C. Navia 220 kV
Melipilla Lo Aguirre 220 kV
Rapel Melipilla 220 kV
Chena Cerro Navia 220 kV
Alto Jahuel Chena 220 kV
Alto Jahuel al norte 500 kV
Polpaico 500/220 kV
Alto Jahuel 500/220 kV
Ancoa - Alto Jahuel 500 kV

Ancoa 500/220 kV
Charra Ancoa 500 kV

Charra 500/220 kV

MVA

Lmite por desconectador en S/E Quillota. Lmite


actual
Obra en construccin
Redist. post contingencia.
Redist. post contingencia.
Seccionamiento en S/E Lo Aguirre
Tendido primer circuito

Redist. post contingencia.


Cable Colbn E/S, redistribucin post contingencia

Lm. Conductor circuito 1 Ancoa A. Jahuel 500 kV.


Limitacin por tramo Charra Ancoa 500 kV
Limitacin por tramo Charra Ancoa 500 kV
Lm. Calculado en ANEXO 1

Sobrecarga admisible en CC.SS. (ms de 30 min)


Limitacin por tramo Charra 500/220 kV
Limitacin por tramo Charra 500/220 kV
Sobrecarga admisible (ms de 30 min.)
Sobrecarga admisible (ms de 30 min.)
Redist. post contingencia.

Lmite establecido por restricciones en tramos al sur de Ancoa.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
40

Tramo

Ao

Mes

Lmite

Ancoa Itahue 220 kV


Charra Lagunillas 220 kV
Charra Hualpn 220 kV
Charra - Mulchn 220 kV
Mulchn Cautn 220 kV
Charra - Temuco
Temuco - Cautn
Cautn al Sur
Cautn Ciruelos 220 kV
Ciruelos al Sur 220 kV

2015
2015
2015
2015
2015
2015
2015
2015
2017
2015
2017
2018

Ene
May

400
150
150
549
457
264
193
145
145
145
145
320

Origen de
la
limitacin4
LT-C
LT-C
LT-C
LT-ES
LT-ES
LT-C
LT-C
LT-C
LT-C
LT-C
LT-C
LT-C

2015
2016
2018
2021

Dic
May
Feb

145
145
145
435

LT-C
LT-C
LT-C
LT-C

Valdivia al Sur
Pichirropulli al Sur

MVA

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Criterio
Seguridad
N-1 / Est
N-1 / Ajus
N-1 / Ajus
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Est
N-1 / Ajus
N-1 / Est
N-1 / Ajus
N-1 / Est
N-1 / Ajus
N-1 / Ajus
N-1 / Est
N-1 / Ajus
N-1 / Ajus

Instalaciones consideradas

Notas lmite de transmisin

L. 2x220 kV, 2x400 MVA


L. 1x220 kV, 1x366 MVA
L. 1x220 kV, 1x227 MVA
L. 2x220 kV, 2x581 MVA
L. 2x220 kV, 2x581 MVA
L. 1x220 kV, 1x264 MVA
L. 2x220 kV, 2x193 MVA
L.2x220 kV, 1x193 MVA y 1x145 MVA
+ Seccionamiento completo en Ciruelos
L.2x220 kV, 1x193 MVA y 1x145 MVA
+ Seccionamiento completo S/E Ciruelos
+ Nueva L. Ciruelos Pichirropulli 2x220 kV, 2x290
MVA
L.2x220 kV, 1x193 MVA y 1x145 MVA
+ seccionamiento completo en S/E Rahue
L. 2x220 kV, 1x193 y 1x145MVA
Nueva L. P.Montt Pichirropulli 2x220(500)kV, 2x290
(1500) MVA

Redist. post contingencia.


Redist. post contingencia.
Lm. TTCC S/E Charra
Lm. TTCC S/E Cautn

Suma de ambos circuitos


Suma de ambos circuitos
Suma de los tres circuitos
Suma de ambos circuitos
Suma de ambos circuitos
Suma de los 4 circuitos

agosto de 2015
41

UTILIZACIN ESPERADA Y RECOMENDACIN DE EXPANSIN DE LOS


TRAMOS DEL SISTEMA DE TRANSMISIN TRONCAL

A continuacin se presenta la utilizacin esperada de los tramos del sistema de transmisin


troncal, incluyendo para cada uno de ellos un diagrama simplificado de las instalaciones
existentes, en construccin y las obras propuestas. Para efectos de determinar las
transferencias esperadas se consideran las expansiones necesarias aumentando el lmite
admisible en aquellos tramos en que se observa congestin, mediante el supuesto de un
aumento de capacidad de transmisin, acorde a la ejecucin de una eventual obra propuesta y
sus respectivos plazos estimados.
En aquellos tramos en que se observan saturaciones se obtiene un indicador de sobrecarga
anual para el tramo, el cual representa el porcentaje de horas en que el flujo superara el
lmite admisible sin considerar la materializacin de las obras propuestas, sobre el universo
del total de horas simuladas para el ao en cuestin (probabilidad de exceder la transferencia
mxima admisible).
Una vez identificados los tramos que presentaran congestin se analizan y evalan
econmicamente las alternativas de expansin que permite dar solucin a las problemticas
detectadas.

7.1 Zona norte


El anlisis de la zona norte muestra el estudio de los flujos esperados para los tramos
comprendidos entre las subestaciones Diego de Almagro y Polpaico.
El plan de obras de transmisin y los proyectos a considerar para la zona de detallan a
continuacin:
Cuadro 28: Obras Zona Norte
Obras Zona Norte
Obras
construccin

en

Obras en licitacin
o construccin

Proyectos
expansin
considerar

de
a

Lnea Cardones - (Carrera Pinto) - Diego de Almagro 2x220 kV, 2x290 MVA
Modificacin Lnea Maitencillo Cardones 1x220 kV, 1x197 MVA a 1x260 MVA
Sistema de 500 kV entre las SS.EE. Polpaico y Cardones
Seccionamiento del circuito 1 Cardones-Diego de Almagro en S.E. Carrera Pinto
Cambio conductor Cardones - Carrera Pinto - Diego de Almagro 1x220 kV
Subestacin seccionadora Nueva Diego de Almagro 220 kV
Nueva Lnea Diego de Almagro - Cumbres 2x220, 2x600MVA
Transformador 1x750, 500/220 kV en S.E. Cumbres
Seccionamiento completo S.E. San Andrs
ProyectoE. 1 - Cambio de conductor lnea 2x220 [kV] Maitencillo Pan de Azcar Don Goyo
La Cebada Las Palmas Los Vilos Nogales para aumentar capacidad a 520 [MVA]
Cambio de Conductor Cardones - (Carrera Pinto) - Diego de Almagro 2x220 kV, 2x290 MVA a
2x400 MVA
ProyectoE. 2 - Nueva lnea 2x220 [kV] Carrera Pinto San Andrs Nueva Cardones 290
[MVA], tendido de un circuito
Rediseo de capacidad Lnea Nueva Diego de Almagro Cumbres 2x220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Fecha estimada
de PES
Sep-2015
Dic-2016
Ene-2018
Oct-2017
Mar-2018
may-2018
Nov-2019
Nov-2019
Jun-2018
Jun-2019
Jul-2020
Ene-2021
Nov-19

agosto de 2015
42

Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres


Nueva lnea 2x220 kV, 2x500 MVA Maitencillo Punta Colorada - Pan de Azcar
Nueva lnea 2x220 kV, 2x500 MVA Pan de Azcar Las Palmas
Nueva lnea 2x220 kV, 2x500 MVA Las Palmas Nogales

Ene-20
Ene-21
Ene-21
Ene-21

Adicionalmente se considera en la modelacin los proyectos de la empresa TEN y las lneas de


interconexin SIC - SING:
Cuadro 29: Obras Zona Norte TEN e interconexin
Obras Zona Norte
Obras
construccin

en

Obras decretadas

Lnea Los Changos Cumbres - Nueva Cardones 2x500 kV, 2x1500 MVA
Bancos de Autotransformadores 2x 750 MVA 500/220 kV en Los Changos
Nueva Lnea Los Changos Nueva Crucero Encuentro 2x500 kV 1500 MVA
Bancos de Autotransformadores 2x750 MVA 500/220 kV en Nueva Crucero Encuentro
Bancos de Autotransformadores 750 MVA 500/220 kV en Los Changos
Nueva Lnea Los Changos Kapatur 2x220 kV, 1500 MW

Fecha estimada
de PES
Ene-18
Ene-18
Nov-20
Nov-20
Nov-20
May-18

Hacia Enlace
Kapatur220

NvaCruceroEncu220

LosChangos2200

NvaCruceroEncu500

Existente
En Licitacin o
Construccin

LosChangos500

Proyecto

d.almag220
cumbres500
Cumbres220

c.pinto220

cardone500
S.Andres220
2x1500 MVA

1x750 MVA

cardone220

maitenc500
1x750 MVA

p.azuca500

maitenc220

p.colorada220
ElArrayan
Talinay220
L.Cebada220
M.Redondo220

2x1500 MVA

p.azuca220

L.Palm220

l.vilos220
nogales220
quillot220

polpaic220

Ilustracin 1.Diagrama simplificado zona norte

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
43

7.1.1

Tramo Cardones Diego de Almagro

Instalaciones existentes:
Obras en construccin o
licitacin:

Obras a analizar:

(1) Lnea Cardones Carrera Pinto Diego de Almagro 1x220 kV, 1x197 MVA 25C
(2) Nueva Lnea 2x220 kV, 1x290 MVA 25C
(3) Tendido segundo circuito 1x290 MVA 25C, seccionado en S.E. Carrera Pinto
(4) Seccionamiento del circuito 1 de la Nueva lnea Cardones Diego de Almagro en
Subestacin Carrera Pinto
(5) Cambio de conductor por uno de alta capacidad Lnea Cardones Carrera Pinto Diego de
Almagro 1x220 kV, 1x197 MVA
(6) Seccionamiento completo S.E. San Andrs

Sep-15
Feb-17
abr-18
abr-18
jun-18

(7) Cambio de Conductor Cardones - (Carrera Pinto) - Diego de Almagro 2x220 kV, 2x290
MVA a 2x400 MVA
(8) Nueva lnea 2x220 [kV] Carrera Pinto San Andrs Nueva Cardones 290 [MVA], tendido
de un circuito

Abr-15 - Ago-15

Sep-15 - Ene-17

Feb-17 - Mar-18

d.almag220

d.almag220

Abr-18

May-18

d.almag220

d.almag220

d.almag220

Jun-18 - Oct-19

Nov-19 - Jun 20

d.almag220

d.almag220

Nv a.d.almag220

Nv a.d.almag220

Nv a.d.almag220

1x197 MVA

1x400 MVA
1x290 MVA

c.pinto220

1x197 MVA

2x290 MVA

c.pinto220
S.andres220

2x290 MVA

c.pinto220

S.andres220
2x290 MVA

cardone220

cardone220

c.pinto220
S.andres220
2x290 MVA

cardone220

cardone220

Jul-20 - Dic-20

jul-20
ene-21

Ene-21 - Mar-35

d.almag220
Cumbres

Nv a.d.almag220

d.almag220
Cumbres

Nv a.d.almag220

Cumbres

1x400 MVA

2x290 MVA

1x400 MVA

1x400 MVA

1x400 MVA

c.pinto220

1x400 MVA

c.pinto220

c.pinto220

c.pinto220

S.andres220

S.andres220

S.andres220

S.andres220

c.pinto220

Existente

S.andres220
2x290 MVA

cardone220

2x290 MVA

cardone220

2x290 MVA

cardone220

2x400 MVA

En Licitacin o
Construccin

Proyecto

cardone220

cardone220

Ilustracin 2.Diagrama de obras modeladas tramo Cardones Carrera Pinto Diego de Almagro

Fecha
Sep-15
Feb-17
Abr-18
Nov-19
jul-2020
ene-2021

Lmite Modelado MVA


Proyecto Considerado
Sin Proyecto
Con Proyecto
197
290
+Nva. lnea Cardones Diego de Almagro 2x290
+Tendido 2do cto. y Seccionamiento circuito N 1
290
350
Carrera Pinto Diego de Almagro
350
580
+ Cambio Conductor de 1x197 MVA a 1x400 MVA.
580
650
+ Nva Lnea Diego de Almagro - Cumbres
- Cambio de Conductor Cardones - (Carrera Pinto) Diego de Almagro 2x220 kV, 2x290 MVA a 2x400
650
1000
MVA
Nueva lnea 2x220 [kV] Carrera Pinto Nueva
650
1200
Cardones 290 [MVA], tendido de un circuito

Descripcin
Obra en construccin
Obra en construccin
Obra en construccin
Obra en construccin
Obra en evaluacin
Obra en evaluacin

Cuadro 30. Lmite modelado para tramo Desde el Norte a Cardones

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
44

0%

oct-20

20%

oct-21

80%

oct-23

-1200

100%

oct-25

c+

oct-27

s+

c-

oct-30

oct-32

oct-34

abr-34

oct-33

abr-33

c-

Mes
s-1200
0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%
100%
c+

oct-27

s+
c-

300

-200

-700

Mes

Figura 13: Flujos desde el sur a Diego de Almagro 220 kV para distintas probabilidades de excedencia
s-

Carrera Pinto - Diego de Almagro 220 kV (Carrera


Pinto - Nva Diego de Almagro 220 kV Nov-2019)

Escenario ERNC NA

oct-16

abr-33

abr-32
oct-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-34

800

oct-33

Desde el sur a Diego de Almagro 220 kV (Diego de


Almagro - Nva Diego de Almagro desde Nov-19)
abr-34

s-

oct-34

Escenario ERNC NC

oct-33

Mes

abr-34

abr-33

oct-32

abr-32

oct-31

c-

abr-31

oct-30

abr-30

s+

abr-29
oct-29

oct-28

-700

c+

abr-28

-700

abr-27

-200

100%

oct-25
abr-26
oct-26

-200

oct-24

-1200

abr-25

300

80%

abr-24

300

oct-23

Escenario Base

abr-23

800

20%

abr-22
oct-22

800

abr-16

[MW]

Escenario Base

oct-21

0%

abr-21

s-

oct-20

Carrera Pinto - Diego de Almagro 220 kV (Carrera


Pinto - Nva Diego de Almagro 220 kV Nov-2019)
oct-15

abr-15

oct-34

abr-34

oct-33

abr-33

-700

abr-20

oct-31

abr-32
oct-32

-700

oct-18
abr-19
oct-19

oct-34

abr-34

oct-33

abr-33

oct-30
abr-31

-200

oct-17

oct-31

abr-32
oct-32

oct-29
abr-30

-200

abr-18

oct-30
abr-31

oct-28
abr-29

300

abr-17

oct-29
abr-30

oct-27
abr-28

300

oct-16

oct-28
abr-29

oct-26
abr-27

800

oct-15

oct-27
abr-28

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]
800

abr-16

[MW]

oct-26
abr-27

Mes

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

c-

oct-31

oct-28

oct-25
abr-26

c-

abr-32

s+

abr-29
oct-29

s+

abr-31

oct-27
abr-28

oct-24
abr-25

s+

abr-30

c+

oct-28

oct-26
abr-27

c+

abr-29
oct-29

oct-25

oct-23
abr-24

c+

abr-28

100%

abr-26

100%

oct-26

oct-24

oct-22
abr-23

100%

abr-27

-1200

abr-25

oct-21
abr-22

-1200

abr-26

80%

oct-24

80%

abr-24

oct-23

abr-23

-1200

abr-25

oct-21

[MW]

80%

abr-24

20%

abr-22
oct-22

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

20%

abr-23

oct-20
abr-21

[MW]

20%

abr-22
oct-22

0%

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

abr-21

[MW]

0%

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Desde el sur a Diego de Almagro 220 kV (Diego de


Almagro - Nva Diego de Almagro desde Nov-19)
Desde el sur a Diego de Almagro 220 kV (Diego de
Almagro - Nva Diego de Almagro desde Nov-19)

Escenario ERNC NA

Mes

Escenario ERNC NC
s-

Carrera Pinto - Diego de Almagro 220 kV (Carrera


Pinto - Nva Diego de Almagro 220 kV Nov-2019)

800

300

-200

-700

Mes

Figura 14: Flujos desde Carrera Pinto - Diego de Almagro 220 kV para distintas probabilidades de excedencia

s-

agosto de 2015

45

Escenario Base

1000

1000

500

500

[MW]

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-28

abr-30

oct-27

abr-29
oct-29

abr-28

oct-26

oct-25

abr-27

Mes

Mes
0%

abr-26

oct-24

-1500

-1500

abr-25

oct-23

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

oct-34

oct-33

abr-34

oct-31
abr-32
oct-32
abr-33

oct-30

oct-29

abr-31

abr-30

oct-28

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-1000

abr-16

-500

-500

-1000

Desde el norte a Cardones 220 kV

abr-15

[MW]

Escenario ERNC NA
1500

Desde el norte a Cardones 220 kV

1500

0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
Desde el norte a Cardones 220 kV

1000

800

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

abr-32
oct-32
abr-33

oct-31

oct-30

abr-31

abr-30

oct-29

oct-28
abr-29

oct-27

abr-28

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

abr-24

oct-23

oct-22

abr-23

abr-22

oct-21

oct-20

abr-21

abr-20

oct-19

abr-19

oct-18

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

abr-15

-800

-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 15: Flujos desde el norte a Cardones 220 kV para distintas probabilidades de excedencia

i.

Escenario Base

La Figura 13 muestra que los mayores niveles de transferencias se originan en el sentido


norte sur, debido principalmente a la alta penetracin de ERNC en la zona de Diego de
Almagro6. Tal como se aprecia en la Figura 15 los altos niveles de flujo se ven acentuados para
los tramos ms cercanos a la S.E. Cardones debido a la adicin de generacin en Carrera Pinto
y San Andrs, que presiona an ms las transferencias hacia el sur, originando restricciones
en el tramo Carrera Pinto - Cardones en caso de no considerar un proyecto para el tramo a
partir del ao 2025.
ii.

Escenario ERNC Norte Atacama

En el Escenario ERNC Norte Atacama, el adelanto de generacin solar en la zona (respecto del
escenario base) se traduce en niveles de transferencia ms elevados y mayor presencia de
congestiones en el sentido Norte Sur a partir del ao 2025.

iii.

Escenario ERNC Norte Coquimbo

La limitacin considerada para el tramo Paposo Diego de Almagro 220 kV es de 570 MVA debido al
supuesto de implementacin de automatismos consiste con lo indicado en la carta DO N1030/2014.
6

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
46

Las conclusiones derivadas para el Escenario Norte Coquimbo son equivalentes a las
planteadas el Escenario Norte Atacama.

7.1.1.1 Necesidades de expansin Tramo Cardones Diego de Almagro


Con los proyectos de expansin que se encuentran actualmente en construccin o bien en
licitacin, la capacidad de transferencia resulta adecuada para los flujos proyectados hasta el
ao 2025 tanto en el escenario base como en los escenarios alternativos. Por lo anterior, la
pertinencia de recomendacin de materializacin de alguna de las dos posibilidades de
expansin propuestas para el tramo, puede ser postergada para futuras revisiones del ETT.
Respecto del proyecto de seccionamiento en San Andrs, la S.E. actualmente secciona el
circuito de la lnea existente de 1x197 MVA, la que aumentar su capacidad a 400 MVA de
acuerdo al decreto N158-2015. La conexin de este circuito con el paralelo de menor
capacidad (290 MVA) en S.E. San Andrs trae como implicancia una disminucin del lmite de
transferencia para un tramo que se encontrar con un uso cercano a su capacidad mxima
(Cuadro 31). Lo anterior se traduce en un aumento del costo operacin y falla del sistema, en
adicin a un costo de inversin que se debera efectuar para realizar el seccionamiento.
De acuerdo a los anlisis econmicos efectuados para el tramo se observa que para los niveles
de transferencias esperados conviene postergar las expansiones de la transmisin en lo que
respecta a San Andrs. En la medida que se realicen nuevas obras de ampliacin entre S.E.
Carrera Pinto y S.E. Cardones se deber reevaluar la conveniencia de efectuar obras que se
presenten como una solucin orgnica de expansin.
Circuitos
seccionados en San
Andrs

Lmite
para
suma
en
Cardones

Costo de
Operacin
MMUSD

1 circuito 1x400

650

23,444,932

Sobre Costo
de operacin
MMUSD

1 circuito 1x400
585
23,463,151 18,219
1 circuito 1x290
1 circuito 1x400
600
23,456,579 11,647
2 circuito 2x290
Cuadro 31. Anlisis seccionamiento San Andrs

7.1.2

Tramo Diego de Almagro Cumbres

Instalaciones existentes:
Obras en construccin o licitacin:

Obras a analizar:

Ninguna
(1) Nueva Lnea Diego de Almagro - Cumbres 2x220 kV, 2x600MVA

Nov-19

(2) Transformador 1x750 MVA, 500/220 kV en S.E. Cumbres

Nov-19

ProyectoE. 3 Rediseo de capacidad Lnea Nueva Diego de Almagro


Cumbres 2x220 kV

Nov-19

ProyectoE. 4 Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres

Ene-20

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
47

Nov-19 - Dic-19

Ene-20 - Jun-20

d.almag220

Jul-20 - Dic-20

d.almag220
Cumbres

Nv a.d.almag220

Cumbres

Nv a.d.almag220

Existente

d.almag220

En Licitacin o
Construccin

Cumbres

Nv a.d.almag220

Proyecto

1x400 MVA

1x400 MVA

c.pinto220

1x400 MVA

c.pinto220

c.pinto220

Ilustracin 3.Diagrama de obras modeladas tramo Cardones Carrera Pinto Diego de Almagro

Lmite Modelado MVA

Fecha

Sin Proyecto
468

Nov-19

Proyecto Considerado

Con Proyecto
468

Descripcin

Nva Lnea Diego de Almagro - Cumbres Obra en construccin


+2do transformador en cumbres
468
830
Obra en evaluacin
Con Rediseo de capacidad
+2do transformador en cumbres
468
700
Obra en evaluacin
Sin Rediseo de capacidad
Cuadro 32. Lmite modelado para Diego de Almagro Cumbres 220 kV

Ene-2020

Escenario Base

Escenario ERNC NA
1000

Nueva Diego de Almagro - Cumbres 200 kV

800

600

600

400

400

200

200

[MW]

800

-200

-200

-400

-400

-600

-600

Mes
0%

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

abr-28

abr-27

oct-25
abr-26
oct-26

oct-24

oct-23

abr-25

abr-24

oct-22

abr-23

oct-21

oct-20

abr-22

abr-21

oct-18
abr-19
oct-19
abr-20

oct-17

abr-18

oct-16

oct-15

abr-17

-1000

abr-16

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

-800

abr-16

-1000

abr-15

-800

Nueva Diego de Almagro - Cumbres 220 kV

abr-15

[MW]

1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
1000

Nueva Diego de Almagro - Cumbres 220 kV

800

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

abr-33

oct-32

abr-32

oct-31

oct-30

abr-31

abr-30

oct-29

oct-28

abr-29

abr-28

oct-27

abr-27

oct-25
abr-26
oct-26

abr-25

oct-24

oct-23

abr-24

oct-22

abr-23

oct-21

abr-22

oct-20

abr-21

oct-18
abr-19
oct-19
abr-20

oct-17

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-800

-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 16: Flujos Diego de Almagro Cumbres 220 kV para distintas probabilidades de excedencia

Escenario Base

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Escenario ERNC NA

agosto de 2015
48

1000

Cumbres 500/220 kV

800

600

600

400

400

200

200

[MW]

800

-200

-200

-400

-400

-600

-600

Mes
0%

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

-1000

abr-16

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

-800

abr-16

-1000

abr-15

-800

Cumbres 500/220 kV

abr-15

[MW]

1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
1000

Cumbres 500/220 kV

800

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

oct-32
abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

abr-28

oct-27

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

oct-23

abr-24

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

abr-20

oct-18
abr-19
oct-19

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

abr-15

-800

-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 17: Flujos Cumbres 500/220 kV para distintas probabilidades de excedencia

De acuerdo a los anlisis elctricos presentados en el ANEXO 1, las transferencias mximas del
enlace Nueva Diego de Almagro Cumbres se encuentran restringidas por la limitacin de
severidad 8 para el transformador Cumbres 500/220, la cual corresponde a 468 MVA. Ante la
incorporacin de un segundo transformador, el nuevo lmite para el tramo de transformacin
correspondera a 830 MVA, por lo que la nueva limitacin a los flujos sera atribuible a la
capacidad de diseo de la lnea que permite una transferencia mxima de 700 MVA
considerando redistribucin de flujos post contingencia.
En los grficos de la Figura 16 se presentan las transferencias esperadas considerando que se
materializa el proyecto de rediseo de capacidad y el nuevo transformador Cumbres 500/220
para efecto de explorar las mximas transferencias.
i.

Escenario Base

En el escenario base la capacidad del conjunto lnea - transformador (468 MVA) se


encontrara acorde a los niveles de transferencia esperados hasta el ao 2025. A partir de esta
fecha los flujos aumentan considerablemente debido a la incorporacin secuencial de
generacin en Nueva Diego de Almagro considerada en el plan de obras de generacin,
observando que en caso de no considerar el proyecto, aproximadamente el 20% de las
transferencias se veran restringidas.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
49

ii.

Escenario ERNC Norte Atacama

En el Escenario ERNC NA, ante la incorporacin de los proyectos ERNC en la zona norte, la
capacidad de transferencia del tramo de transformacin y de la lnea Nueva Diego de Almagro
Cumbres 220 kV se vera superada desde la fecha de entrada en operacin de las
instalaciones en caso de no considerar los proyectos analizados para el tramo.
iii.

Escenario ERNC Norte Coquimbo

En el Escenario ERNC NC, las conclusiones derivadas de los niveles de transferencia esperados
son equivalentes a las observadas en el Escenario ERNC NA.
7.1.2.1 Necesidades de expansin Tramo Cumbres Nueva Diego de Almagro
De acuerdo a lo presentado en los grficos se aprecia que las obras de expansin pueden ser
postergadas en el escenario Base. No obstante lo anterior, para los escenarios de mayor
desarrollo ERNC en la zona se detecta la necesidad de evaluar las obras de expansin en
anlisis para el tramo.
7.1.3

Los Changos Cumbres - Cardones

Instalaciones existentes:
Obras en construccin o
licitacin:

Obras a analizar:

Ninguna
Lnea Los Changos Cumbres - Nueva Cardones 2x500 kV, 2x1500 MVA
Bancos de Autotransformadores 2x 750 MVA 500/220 kV en Los Changos
Nueva Lnea Los Changos Kapatur 2x220 kV
Nueva Lnea Los Changos Nueva Crucero Encuentro 2x500 kV 1500 MVA
Bancos de Autotransformadores 2x750 MVA 500/220 kV en Nueva Crucero Encuentro
Bancos de Autotransformadores 750 MVA 500/220 kV en Los Changos
Ninguna

Ene-18 - Abr-18

May-18 - Oct-20

Kapatur220

Kapatur220

Ene-18
Ene-18
May-18
Nov-20
Nov-20
Nov-20

Nov-20 - Mar-35

Hacia Enlace

Kapatur220

NvaCruceroEncu220
LosChangos2200

LosChangos2200

LosChangos2200
NvaCruceroEncu500

LosChangos500

cumbres500

LosChangos500

cumbres500

LosChangos500
Existente
En Licitacin o
Construccin

cumbres500

Proyecto interconexin
SIC - SING

cardone500

cardone500

Hacia DAlmagro20

cardone500

Hacia DAlmagro20

Ilustracin 4.Diagrama de obras modeladas tramo Cardones Carrera Pinto Diego de Almagro

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
50

-1000

oct-15

0%

20%

80%

oct-23

-2000

100%

c+

s+

c-

oct-30

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

c-

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

-1500

Mes
-1000

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%

oct-23

-2000

100%

oct-25
c+
s+
c-

c-

Cumbres - Los Changos 500 kV

1000

500

-500
0

-1500

Mes

Figura 18: Flujos Cumbres Los Changos 500 kV para distintas probabilidades de excedencia
s-

Cardones - Cumbres 500 kV

Escenario ERNC NA

-500
0

oct-17

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-33
abr-34
oct-34

oct-33
abr-34
oct-34

abr-33

oct-32

1500

oct-31

s-

oct-32
abr-33

Escenario ERNC NC
abr-32

Mes

abr-32

-1500

oct-31

abr-31

oct-30

abr-30

s+

abr-29
oct-29

oct-28

abr-28

c+

oct-27

abr-27

oct-26

100%

abr-26

-2000

abr-25

oct-24

500

80%

abr-24

Escenario Base

abr-23

500
20%

abr-22
oct-22

1000

oct-16

Escenario Base

oct-21

1500

1000

oct-20

1500

abr-21

0%

abr-20

2000

oct-19

s-

oct-18

Cardones - Cumbres 500 kV


abr-17

2000

abr-19

Mes

abr-18

-1500

oct-17

-500
-1000

oct-15

-500

abr-16

500

abr-15

[MW]

500

abr-17

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

1000

oct-16

oct-28

abr-29
oct-29

1500

1000

oct-15

oct-27
abr-28

[MW]

1500

abr-16

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Cumbres - Los Changos 500 kV

abr-15

[MW]

c-

oct-31

oct-28

oct-27

abr-27

oct-26

c-

abr-31

s+

abr-29
oct-29

s+

abr-30

c+

abr-28

c+

oct-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

s+

abr-29
oct-29

oct-25

oct-23
abr-24

c+

abr-28

oct-27

abr-27

100%

abr-26

100%

oct-26

-2000

abr-25

-2000

oct-25

oct-24

100%

abr-26

oct-23

abr-23

abr-22
oct-22

-2000

abr-25

80%

abr-24

80%

oct-24

abr-23

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

80%

abr-24

20%

abr-22
oct-22

oct-21

20%

abr-23

oct-20

oct-15
abr-16

[MW]

20%

abr-22
oct-22

2000

oct-21

0%

abr-21

2000

abr-20

0%

oct-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

abr-15

2000

abr-21

oct-15
abr-16

[MW]

0%

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

-1000

abr-15

-1000

abr-16

[MW]
-1000

abr-15

2000

Cumbres - Los Changos 500 kV

Escenario ERNC NA

-500

-1500

Mes

Escenario ERNC NC
s-

1500

Cardones - Cumbres 500 kV

1000

500

-500

-1500

Mes

Figura 19: Flujos Cardones - Cumbres 500 kV para distintas probabilidades de excedencia

s-

agosto de 2015

51

Escenario Base

Escenario ERNC NA
2000

Cardones - Cumbres 500 kV

1500

1500

1000

1000

500

500

[MW]

-1500

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

oct-30

abr-32

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

abr-17

oct-15

-1000

abr-16

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

-1000

-500

abr-15

-500

Cardones - Cumbres 500 kV

abr-15

[MW]

2000

-1500

-2000

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
2000

Cardones - Cumbres 500 kV

1500

1000

[MW]

500

oct-34

oct-33

abr-34

oct-32
abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

abr-28

oct-27

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

oct-23

abr-24

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

abr-20

oct-18
abr-19
oct-19

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 20: Flujos Los Changos 500/220 kV para distintas probabilidades de excedencia

Desde la puesta en servicio de las obras, la capacidad de transferencia de las lneas se ver
restringida por el lmite de severidad 8 en los transformadores en S.E. Changos en 900 MVA. A
partir de noviembre de 2019, la lnea de enlace Nueva Diego de Almagro Cumbres 220 kV
permite una mayor utilizacin del tramo Cumbres Cardones 500 kV, mientras que la entrada
en operacin de un nuevo transformador en Los Changos 500/220 kV en Noviembre de 2020
(Decreto N158), permitir hacer uso de la mxima capacidad de transferencia de la lnea Los
Changos Cumbres Nueva Cardones 2x500 kV.
En todos los escenarios analizados se observan flujos en ambos sentidos haciendo uso de la
mxima capacidad de transferencia disponible para condiciones extremas con mayor
presencia en el sentido SING SIC.
7.1.4

Tramo Maitencillo - Cardones

Instalaciones
existentes:
Obras en construccin

Obras a analizar:

(1) Lnea 1x220 kV, 1x197 MVA 25C


(2) Lnea 2x220 kV, 2x290 MVA 25C
(3) CER en S.E. Cardones
(4) Modificacin lnea 1x220 kV, 1x197 MVA 25C a 1x260 MVA
(5) Nueva lnea Maitencillo Cardones 2x500 kV, 2x1500 MVA
(6) Transformador 500/220 kV, 1x750 MVA, S.E. Cardones
(7) Transformador 500/220 kV, 1x750 MVA S.E. Maitencillo
Ninguna

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

dic-16
ene-18
ene-18
ene-18

agosto de 2015
52

Ene-18 - Mar-18
Cardones500
Abr-15 - Nov-16

Dic-16 - Dic-17

Cardones220

Cardones220

Existente
1x750 MVA

En Licitacin o
Construccin

Cardone220
2x290 MVA

2x290 MVA

1x197 MVA

1x290 MVA

Proyecto
2x1700 MVA

1x290 MVA

Maitenc220

Maitenc220

Maitenc220
1x750 MVA
Maitenc500

Ilustracin 5.Diagrama para el tramo Maitencillo Cardones

Escenario Base

Escenario ERNC NA
800

600

400

400

200

200

20%

80%

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-22

oct-21

Mes
0%

abr-23

abr-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

abr-18

oct-16

-800

abr-17

-600

-800

oct-15

-400

-600

abr-16

-400

abr-15

-200

abr-18

-200

abr-17

oct-15

[MW]

600

Maitencillo - Cardones 220 kV

abr-16

Maitencillo - Cardones 220 kV

abr-15

[MW]

800

Mes

100%

c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
800

Maitencillo - Cardones 220 kV

600

400

[MW]

200

-200

-400

-600

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

oct-29

abr-30

abr-29

oct-28

oct-27

abr-28

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

abr-24

oct-23

oct-22

abr-23

abr-22

oct-21

oct-20

abr-21

abr-20

oct-19

oct-18

abr-19

oct-17

abr-18

oct-16

abr-17

abr-16

oct-15

abr-15

-800

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 21: Flujos Maitencillo Cardones 220 kV para distintas probabilidades de excedencia

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
53

0%

20%

80%

100%

c+

oct-27

s+

c-

oct-32

oct-34

abr-34

oct-33

abr-33

c-

oct-31

oct-30

Mes

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%
100%
c+

oct-27

s+
c-

c-

1500

Maitencillo - Cardones 500 kV

1000

500

-500
0

-1000

-1500

Mes
s-

Figura 22: Flujos Maitencillo Cardones 500 kV para distintas probabilidades de excedencia.
Cardones 500/220 kV

Escenario ERNC NA

-800

oct-18
oct-19

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-33
abr-34
oct-34

abr-34
oct-34

oct-32

oct-33

abr-33

oct-32
abr-33

oct-31

s-

abr-32

Escenario ERNC NC

oct-31

Mes

abr-32

abr-31

oct-30

abr-30

s+

oct-29

abr-29

oct-28

-600

c+

abr-28

-800
oct-26

-600

abr-27

-400

100%

abr-26

-400

oct-25

-2000

abr-25

-200

oct-24

-200

oct-23

200

80%

abr-24

800

oct-22

200
20%

abr-23

Escenario Base

oct-21

400

abr-19

Escenario Base

abr-22

600

400

oct-20

0%

abr-21

600

oct-19

Cardones 500/220 kV
oct-17

2000

abr-20

s-

abr-19

Mes

abr-18

-1500

oct-18

-1500

oct-16

-1000

oct-17

-1000

oct-15

-500

abr-17

-500

abr-16

[MW]

abr-15

oct-34

500

abr-18

oct-33
abr-34

500

oct-16

oct-32
abr-33

1000

abr-17

oct-31
abr-32

1500

1000

oct-15

oct-30
abr-31

[MW]

1500

abr-16

0
[MW]

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Maitencillo - Cardones 500 kV

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

c-

abr-32

abr-30

oct-29

abr-29

c-

abr-31

s+

oct-30

oct-27
abr-28
s+

abr-30

oct-28

s+

oct-29

abr-29

c+

abr-28

oct-27

abr-27

abr-27

c+

oct-28

oct-26

c+

abr-28

100%

abr-27

oct-25

100%

abr-26

oct-25
abr-26
oct-26

abr-25

oct-24

abr-24
100%

oct-26

abr-25

oct-24

-2000

abr-26

oct-23
abr-24

oct-23

abr-23

-2000

oct-25

80%

oct-24

oct-22
abr-23

oct-21

abr-22
oct-22
80%

abr-25

oct-21
abr-22

80%

abr-24

oct-23

800

abr-21

[MW]

20%

abr-23

20%

oct-22

oct-20

20%

abr-22

0%

abr-21

800

oct-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

abr-21

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]

0%

oct-20

abr-20

[MW]
2000

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

2000

Maitencillo - Cardones 500 kV

Escenario ERNC NA

Mes

s-

Cardones 500/220 kV

Escenario ERNC NC

600

400

200

-200

-400

-600

-800

Mes

s-

Figura 23: Flujos Cardones 500/220 kV para distintas probabilidades de excedencia

agosto de 2015

54

Escenario Base
1000

Escenario ERNC NA
1000

Maitencillo 500/220 kV

600

400

400

200

200

[MW]

800

600

-200

-200

-400

-400

-600

-600

Mes
0%

20%

80%

100%

c+

s+

c-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

oct-23

abr-25

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

Mes
0%

s-

abr-19

oct-17

abr-18

oct-16

oct-15

-1000

abr-17

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-1000

abr-16

-800

-800

abr-15

[MW]

800

Maitencillo 500/220 kV

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
1000

Maitencillo 500/220 kV

800

600

400

[MW]

200

-200

-400

-600

oct-34

abr-34

oct-33

oct-32

abr-33

oct-31

abr-32

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

oct-27

abr-28

abr-27

oct-25
abr-26
oct-26

oct-24

abr-25

abr-24

oct-23

abr-23

oct-21

abr-22
oct-22

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

oct-17

abr-18

oct-16

abr-17

abr-16

oct-15

abr-15

-800

-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 24: Flujos Maitencillo 500/220 kV para distintas probabilidades de excedencia

Para los tramos de transformacin se realiz el supuesto de incorporacin de las segundas


unidades hacia el ao 2025 en el caso de Cardones 500/220 y a fines del 2028 para el tramo
de transformacin en Maitencillo 500/220, debido a que en estas fechas su capacidad podra
verse alcanzada debido a la puesta en servicio de la central Carbn Maitencillo 1.

i.

Escenario Base

Para el tramo Maitencillo Cardones 500 kV (Figura 22) se observa un aumento importante
de las transferencias en sentido norte y sur a partir de noviembre del ao 2019 producto de la
conexin de la lnea Cumbres Nueva Diego de Almagro,

ii.

Escenario Alternativo Norte Atacama

En este escenario se aprecia que existe una mayor presin de flujos en los tramos de
transformacin desde 220 kV hacia 500 kV, que se hace particularmente relevante en el tramo
de transformacin Maitencillo 550/220 kV, llevndolo a alcanzar la capacidad mxima N-1 en
algunas condiciones extremas.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
55

7.1.4.1 Necesidades de expansin Tramo Maitencillo - Cardones


Respecto de las transferencias esperadas para la lnea Maitencillo Cardones 500 kV se
observa que los niveles de flujo se encuentran acorde a la capacidad del tramo tanto en el
escenario base como en los escenarios alternativos.
En cuanto a las necesidades de expansin en trasformacin se concluye que considerando un
plazo tpico de 36 meses de construccin, la recomendacin de estas obras en el escenario
base puede ser postergada para futuras revisiones del ETT. En todo caso, estas obras podran
gatillarse con la entrada en operacin de una central de envergadura y bajo costo en S.E.
Maitencillo 220 kV.

7.1.5

Tramo Pan de Azcar - Punta Colorada Maitencillo

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 2x220 kV, 2x197 MVA a 25C

(2) Nueva lnea 2x500 kV, 2x1500 MVA Pan de Azcar Maitencillo
(3)Transformador 500/220 kV, 1x750 MVA, S.E. Pan de Azcar
(4) ProyectoE. 1 - Cambio de conductor lnea 2x220 [kV] Maitencillo Pan de Azcar Don
Goyo La Cebada Las Palmas Los Vilos Nogales para aumentar capacidad a 520 [MVA]
(5) Nueva lnea Maitencillo Punta Colorada Pan de Azcar 2x220 kV

Ene-18 - May-19

Abr-15 - Dic-17

Maitenc500

ene-18
ene-18
Jun-19
Ene-21

Existente

Jun-19 - Dic-20

Ene-21 - Mar-35

Maitenc500

Maitenc500

En Licitacin o
Construccin
Proyecto

Maitenc220

1x750 MVA
Maitenc220

2x1700 MVA

1x750 MVA
Maitenc220

2x1700 MVA

1x750 MVA
Maitenc220

2x1700 MVA

2x197 MVA
Pelicano 220

Pelicano 220

P.Colorada220

P.Colorada220
2x197 MVA

Pelicano 220

Pelicano 220

P.Colorada220

P.Colorada220

2x197 MVA

2 x 520 MVA

2 x 520 MVA

P.Azucar220

1x750 MVA
P.Azucar500

P.Azucar220

P.Azucar220

P.Azucar220

1x750 MVA
P.Azucar500

1x750 MVA
P.Azucar500

Ilustracin 6.Diagrama de obras modeladas tramo Pan de Azcar - Punta Colorada Maitencillo

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
56

oct-18

0%

20%

oct-21

80%

100%

c+

s+

oct-28

c-

oct-34

abr-34

oct-33

abr-33

oct-32

c-

abr-32

oct-29

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%

oct-22

Mes

80%
100%

oct-24

c+
s+
c-

200

-200

-400

-600

Mes

s-

Figura 25: Flujos Punta Colorada Maitencillo 220 kV para distintas probabilidades de excedencia
Pan de Azcar - Punta Colorada 220 kV

Escenario ERNC NA

400

300
400

200

100
200

-100
0

-200

-300
-200

-400
-400

-600

oct-19

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-34

oct-34

abr-34

oct-33
abr-34

oct-33

400

oct-32

Escenario ERNC NC

abr-33

Punta Colorada - Maitencillo 220 kV


abr-33

s-

oct-32

Mes

abr-32

oct-31

abr-31

c-

oct-30

abr-30

oct-29

abr-29

s+

oct-28

abr-28

oct-27

c+

abr-27

oct-26

abr-26

100%

oct-25

abr-25

80%

oct-23

Mes

abr-24

Escenario Base

abr-23

20%

abr-22

oct-18

[MW]

Escenario Base

oct-21

abr-21

oct-20

-500

oct-19

0%

abr-20

600

oct-18

s-

abr-19

Pan de Azcar - Punta Colorada 220 kV


oct-17

-600

abr-19

-600

abr-18

-400

oct-16

-400

abr-17

-200

abr-16

-200

oct-15

abr-15

oct-34

oct-17

oct-33
abr-34

600

abr-18

oct-32
abr-33

200

oct-16

oct-31
abr-32

200

abr-17

oct-30
abr-31

400

oct-15

oct-29
abr-30

[MW]
400

abr-16

[MW]

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Punta Colorada - Maitencillo 220 kV

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

c-

oct-31

s+

oct-30

oct-29

abr-29

oct-28

abr-28

c-

abr-31

abr-29

oct-28

s+

abr-30

oct-27
abr-28

oct-27

abr-27

oct-26

abr-26

s+

oct-29

c+

abr-29

oct-26
abr-27

c+

abr-28

oct-25

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

c+

oct-27

abr-27

100%

abr-26

100%

oct-26

abr-25

oct-24

abr-24

oct-23

oct-22

100%

abr-26

oct-25

80%

abr-25

oct-22
abr-23

80%

oct-24

oct-21

abr-22

oct-21

abr-21

80%

abr-24

oct-23

abr-23

20%

abr-22

20%

oct-22

oct-20
abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

[MW]

20%

abr-22

0%

abr-21

0%

abr-20

oct-19

abr-19

oct-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

oct-20

abr-20

oct-19

oct-17
abr-18

500

abr-19

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]

600

abr-18

[MW]
600

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

600

Punta Colorada - Maitencillo 220 kV

Escenario ERNC NA

Mes

Escenario ERNC NC
s-

Pan de Azcar - Punta Colorada 220 kV

400

200

-200

-400

-600

Mes

Figura 26: Flujos Pan de Azcar Punta Colorada 220 kV para distintas probabilidades de excedencia.

s-

agosto de 2015

57

Escenario Base

Escenario ERNC NA
2000

Pan de Azcar - Maitencillo 500 kV

1500

1000

1000

500

500

[MW]

1500

-1500

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

-1000

abr-16

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

-500

abr-15

-500

-1000

Pan de Azcar - Maitencillo 500 kV

abr-15

[MW]

2000

-1500

-2000

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
2000

Pan de Azcar - Maitencillo 500 kV

1500

1000

[MW]

500

oct-34

oct-33

abr-34

oct-32
abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

abr-28

oct-27

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

oct-23

abr-24

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

abr-20

oct-18
abr-19
oct-19

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 27: Flujos Pan de Azcar Maitencillo 500 kV

i.

Escenario Base

En la Figura 25 se puede apreciar que las transferencias por el tramo Maitencillo Punta
Colorada 220 kV ocurren mayoritariamente en sentido Norte Sur, lo que refleja, en buena
medida, la abundante presencia de centrales elicas y solares al norte de Maitencillo, cuya
inyeccin se suma a la proveniente de las centrales trmicas del complejo Guacolda.
La ocurrencia de altas transferencias en sentido Norte Sur entre las SS.EE. Maitencillo y
Nogales ha motivado la implementacin del esquema de automatismos, cuya modelacin se
aprecia en la figura a partir de abril de 2015. Desde la puesta en servicio del sistema de 500
kV entre Polpaico y Cardones se considera que este esquema queda fuera de servicio, de modo
que la limitacin de transmisin correspondera a la calculada a partir de la redistribucin de
flujos por los circuitos en paralelo de 220 kV y 500 kV.
En la Figura 27 se aprecia que las transferencias mximas por el tramo Pan de Azcar Maitencillo 500 kV alcanzaran los lmites de transmisin a partir de comienzos del ao 2019
en caso de no considerar algn proyecto de expansin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
58

ii.

Escenario Alternativo Norte Atacama

En este escenario, la incorporacin de consumo en la S.E. Punta Colorada sumado a la mayor


inyeccin ERNC en el sistema de 220 kV se traduce en una mayor presin de los flujos sobre
los tramos Maitencillo Punta Colorada 220 kV de norte a sur y Pan de Azcar Punta
Colorada 220 kV en ambos sentidos. Al igual que en escenario base se aprecian saturaciones
en la lnea de 500 kV Pan de Azcar Maitencillo.
iii.

Escenario Alternativo Norte Coquimbo

Al igual que en el Escenario ERNC Atacama, bajo los supuestos del Escenario ERNC Coquimbo
los tramos de 220 kV y los de 500 kV presentan una capacidad mxima de transferencia
inferior a lo requerido por el sistema para operar de la forma ms econmica a partir del ao
2019.

7.1.5.1 Necesidades de expansin Pan de Azcar - Punta Colorada Maitencillo


Tanto las lneas de 220 kV como las de 500 kV presentan algn grado de congestin que hace
pertinente la evaluacin de un proyecto de expansin.
Cabe sealar que existe una relacin directa entre las transferencias observadas por el
sistema de 220 kV y de 500 kV, donde las limitaciones de capacidad en el sistema de 500 kV
son absorbidas por el sistema de 220 kV como aumento de flujos esperados por este ltimo y
viceversa. Por lo anterior, para el tramo se deben analizar como posibles alternativas de
expansin la combinacin de los proyectos para 220 y 500 kV, las cuales son estudiados tanto
desde el punto de vista sistmico elctrico como econmico.
Se analizan como posibilidades de expansin el proyecto (4) y el proyecto (5). En la Figura 28
se presentan las transferencias para el tramo en 220 kV y el paralelo de 500 kV en caso de
considerar cada una de las alternativas de expansin.
Caso: Nueva Lnea Maitencillo Punta Colorada Pan de Azcar 2x220 kV, 2x500 MVA
300

600

Punta Colorada - Pelcano 220 kV


2000

Nueva Maitencillo - Punta Colorada 2x220 kV

Pan de Azcar - Maitencillo 500 kV

200
400

1500

100
1000

200

[MW]

500

[MW]

[MW]

-100

-200

-200
-500

0%

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

oct-32

abr-34

oct-31

-400

20%

80%

100%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

oct-34

oct-33

oct-32

abr-34

oct-31

abr-33

oct-30

abr-32

oct-29

abr-31

oct-28

abr-30

oct-27

abr-29

oct-26

abr-28

oct-25

abr-27

oct-24

abr-26

oct-23

abr-25

oct-22

abr-24

oct-21

Mes

Mes
0%

abr-23

oct-20

abr-22

oct-19

abr-21

oct-18

abr-20

oct-17

abr-19

oct-16

abr-18

oct-15

abr-17

-2000

abr-16

abr-15

-600

oct-34

oct-33

oct-32

abr-34

oct-31

abr-33

oct-30

abr-32

oct-29

abr-31

oct-28

abr-30

oct-27

abr-29

oct-26

abr-28

oct-25

abr-27

oct-24

abr-26

oct-23

abr-25

oct-22

abr-24

oct-21

abr-23

oct-20

abr-22

oct-19

abr-21

oct-18

abr-20

oct-17

abr-19

oct-16

abr-18

abr-17

abr-16

oct-15

abr-15

Mes

abr-33

oct-30

-1500

-500

abr-32

abr-31

oct-28

abr-30

oct-27

abr-29
oct-29

oct-26

abr-28

oct-25

oct-24

abr-27

abr-26

oct-23

abr-25

abr-24

oct-21

abr-23

oct-20

abr-22
oct-22

oct-19

abr-21

oct-18

oct-17

abr-20

abr-19

oct-16

abr-18

abr-17

abr-16

oct-15

-1000

-400

abr-15

-300

c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

agosto de 2015
59

Caso: Repotenciamiento Maitencillo Punta Colorada Pan de Azcar 2x220 kV


600

2000

Punta Colorada - Pelcano 220 kV

Pan de Azcar - Maitencillo 500 kV

600

Nueva Lnea Maitencillo - Punta Colorada 2x220 kV

1500

400

400

1000
200
200

[MW]

[MW]

-200

-500

oct-34

oct-33

oct-32

abr-34

oct-31

abr-33

oct-30

abr-32

abr-31

oct-28

abr-30

oct-27

abr-29
oct-29

oct-26

abr-28

oct-25

abr-27

oct-24

abr-26

oct-23

abr-25

abr-24

oct-21

abr-23

oct-20

abr-22
oct-22

oct-19

abr-21

oct-18

abr-20

oct-17

abr-19

oct-16

abr-18

oct-15

abr-17

abr-16

-1000

-400

-200

abr-15

[MW]

500
0

-400

-1500

0%

20%

80%

100%

c+

s+

c-

s-

0%

20%

80%

100%

oct-34

oct-33

oct-32

abr-34

oct-31

abr-33

oct-30

abr-32

oct-29

abr-31

oct-28

abr-30

oct-27

abr-29

oct-26

abr-28

oct-25

abr-27

oct-24

abr-26

oct-23

abr-25

oct-22

abr-24

oct-21

oct-20

Mes

abr-23

abr-22

oct-19

abr-21

oct-18

abr-20

oct-17

abr-19

oct-16

abr-18

abr-17

oct-15

-2000

abr-16

-600

abr-15

oct-34

oct-33

oct-32

abr-34

oct-31

abr-33

oct-30

Mes

abr-32

oct-29

abr-31

oct-28

abr-30

oct-27

abr-29

oct-26

abr-28

oct-25

abr-27

oct-24

abr-26

oct-23

abr-25

oct-22

abr-24

oct-21

abr-23

oct-20

abr-22

oct-19

abr-21

oct-18

abr-20

oct-17

abr-19

oct-16

abr-18

abr-17

abr-16

oct-15

abr-15

-600

Mes

c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 28: Anlisis de transferencias esperadas para proyectos en tramo Maitencillo Pan de Azcar 220 kV

La incorporacin de una nueva lnea Maitencillo Punta Colorada Pan de Azcar 2x220 kV
permite eliminar en buena medida la saturacin por los tramos existentes de 220 kV, debido a
que aproximadamente 400 MVA peak se trasportaran por los nuevos circuitos de 220 kV.
Adicionalmente existe un efecto agregado de descongestin de los circuitos de 500 kV debido
a un aumento del lmite de transferencias por efecto de los circuitos paralelos, sumado a la
reduccin de los flujos circulantes en 500 kV.
Se observa que una nueva lnea tiene ventajas respecto de un repotenciamiento, toda vez que
aumenta la capacidad de transferencia en los tramos de 220 kV y adicionalmente tiene un
efecto de redistribucin de flujos desde el sistema de 500 kV hacia el de 220 kV debido a la
disminucin de reactancia en 220 kV, que permite aliviar los niveles de congestin por el
sistema de 500 kV. No obstante lo anterior, mediante la evaluacin econmica respectiva se
definir la alternativa que se presente como solucin ms eficiente.

7.1.6

Tramo Pan de Azcar Nogales- Polpaico

Instalaciones
existentes:
Obras en construccin:
Obras a analizar:

(1) Lnea 2x220 kV, 2x197 MVA a 25C


(1) Lneas 2x220 kV, 2x224 MVA 25C, Nogales Los Vilos Las Palmas - Pan de Azcar
(2) Nueva lnea 2x500 kV, 2x1500 MVA, Polpaico Pan de Azcar
(3) Transformador 500/220 kV, 1x750 MVA, S.E. Pan de Azcar
(4) ProyectoE. 1- Cambio de conductor lnea 2x220 [kV] Maitencillo Pan de Azcar Don Goyo
La Cebada Las Palmas Los Vilos Nogales para aumentar capacidad a 520 [MVA]
(5) Nueva Lnea Las Palmas Pan de Azcar 2x220 kV, 2x500 MVA
(6) Nueva Lnea Las Palmas Nogales 2x220 kV, 2x500 MVA

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

ene-18
ene-18
Jun-19
Ene-21
Ene-21

agosto de 2015
60

Ene-18 - May-19

Abr-15 - Dic-17

Jun-19 - Dic 20

Ene-21 - Mar -2035


Existente

p.azuca220

P.Azuca220

P.Azuca220

L.Cebada220

L.Cebada220

L.Cebada220
Talinay220

Talinay220

DonGoyo220
M.Redondo220

2x224 MVA

2x224 MVA

l.Vilos220

Nogales220

2x224 MVA

2x1500 MVA

2x1500 MVA

2x224 MVA

2x1500 MVA

Quillot220

Quillota220

Quillota220

L.Vilos220
D.Carmen220

Nogales220

Nogales220

Quillot220

Olmue220

Olmue220

Olmue220

L.Palmas220
2x224 MVA

D.Carmen220

2x224 MVA

2x224 MVA

DonGoyo220
M.Redondo220

2x 500 MVA

l.Vilos220

D.Carmen220

Nogales220
2x1500 MVA

2x 1700 MVA

L.Palmas220
2x224 MVA

l.Vilos220

D.Carmen220

Talinay220

DonGoyo220
M.Redondo220

2x 1700 MVA

L.Palmas220

L.Palmas220

Proyecto *

L.Cebada220

Talinay220

DonGoyo220
M.Redondo220

2x 1700 MVA

En Licitacin o
Construccin

P.Azuca220

2x1090 MVA

Olmue220

2x1090 MVA

2x1090 MVA

2x1090 MVA

Polpaico220

Polpaico220

Polpaico220
Polpaico220

Polpaico500

Polpaico500

Polpaico500

Ilustracin 7.Diagrama de obras modeladas tramo Polpaico - Pan de Azcar

Escenario Base

Escenario ERNC NA
800

Pan de Azcar 500/220 kV

600

400

400

200

200

[MW]

600

-200

-200

-400

-400

-600

-600

0%

20%

80%

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

oct-23

Mes

abr-25

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

abr-16

-800

abr-15

-800

Pan de Azcar 500/220 kV

abr-15

[MW]

800

Mes

100%

c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
800

Pan de Azcar 500/220 kV

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

abr-33

oct-32

abr-32

oct-31

oct-30

abr-31

abr-30

oct-29

oct-28

abr-29

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

oct-23

abr-24

abr-23

oct-22

oct-21

abr-22

abr-21

oct-20

abr-20

oct-19

oct-18

abr-19

abr-18

oct-17

oct-16

oct-15

abr-17

abr-16

abr-15

-800

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 29: Flujos transformacin Pan de Azcar 500/220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
61

oct-16

0%

20%

oct-21

80%

100%

c+

s+

c-

oct-34

abr-34

oct-33

abr-33

oct-32

c-

abr-32

oct-29

Mes

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%
100%
c+

oct-26

s+
c-

Escenario ERNC NC
s-

2000

Polpaico - Pan de Azcar 500 kV

1500

1000

500

-500
0

-1500

-2000

Mes

Figura 30: Flujos Polpaico Pan de Azcar 500 kV, para distintas probabilidades de excedencia
s-

Escenario Base
Escenario ERNC NA

Desde el sur a Pan de Azcar 220 kV

-600

oct-16
oct-17

oct-18

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-34

oct-34

oct-33
abr-34

abr-33
oct-33

oct-32

abr-34

oct-32
abr-33

abr-32

abr-32

Mes

oct-31

abr-31

c-

oct-30

abr-30

oct-29

abr-29

s+

oct-28

abr-28

oct-27

c+

abr-27

-600

abr-26

-400

100%

oct-25

-400

abr-25

-2500

oct-24

-200

oct-23

-200
80%

abr-24

200

abr-23

200

oct-22

400

20%

oct-21

400

abr-18

Escenario Base

abr-22

600

abr-21

Desde el sur a Pan de Azcar 220 kV

oct-20

0%

abr-20

s-

oct-19

Mes

oct-18

-2000

abr-19

-1500

-2000

abr-17

2500

abr-18

-1000

oct-17

-1500

oct-16

-500

abr-17

500

oct-15

1000

500

abr-16

[MW]
1500

1000

abr-15

2000

1500

oct-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

[MW]
2000

abr-16

[MW]

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Polpaico - Pan de Azcar 500 kV

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

c-

oct-31

s+

oct-30

abr-29
oct-29

oct-28

abr-28

c-

abr-31

abr-29

oct-28

s+

abr-30

oct-27
abr-28

oct-27

abr-27
s+

oct-29

abr-29

c+

oct-28

abr-28

oct-26

c+

abr-27

oct-26

abr-26

oct-25

abr-25
c+

oct-27

abr-27

100%

abr-26

oct-25

100%

oct-26

oct-24
abr-25

-2500

oct-25

oct-24

abr-24

oct-23

abr-23
100%

abr-26

80%

abr-24

oct-23

-2500

abr-25

oct-22
abr-23

80%

oct-24

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

80%

abr-24

oct-23

abr-23

20%

abr-22

oct-21

abr-21

20%

oct-22

0%

oct-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

20%

abr-22

oct-19
abr-20

0%

abr-21

abr-19

oct-15
abr-16

[MW]

0%

oct-20

abr-20

oct-19

oct-18

abr-18

600

oct-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

abr-15

2500

abr-19

600

abr-18

oct-17

abr-17

[MW]

-1000

abr-16

[MW]
-1000

oct-15

abr-15

2500

Polpaico - Pan de Azcar 500 kV

Escenario ERNC NA

-500

Mes

Escenario ERNC NC
s-

400

Desde el sur a Pan de Azcar 220 kV

200

-200

-400

-600

Mes

Figura 31: Flujos desde el sur a Pan de Azcar 220 kV, para distintas probabilidades de excedencia.

s-

agosto de 2015

62

0%

20%

oct-22

80%

100%

c+

s+

c-

oct-30

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

c-

oct-30

Mes

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%
100%
c+

oct-26
oct-27

s+
c-

c-

Escenario ERNC NC

400

200

-200

-400

-600

Mes

s-

Figura 32: Flujos Los Vilos -Las Palmas 220 kV, para distintas probabilidades de excedencia.
Nogales - Los Vilos 220 kV

Escenario ERNC NA

oct-18
oct-19

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-33
abr-34

oct-33
abr-34
oct-34

oct-34

oct-32
abr-33

abr-33

oct-31

Los Vilos - Las Palmas 220 kV


abr-32

s-

oct-32

Mes

abr-32

oct-31

abr-31

oct-30

s+

abr-30

oct-29

abr-29

c+

oct-28

abr-28

100%

abr-27

-600

abr-26

Mes

oct-25

-600

oct-24

-400

80%

abr-25

-400

abr-24

-200

oct-23

Escenario Base

oct-22

-200
20%

abr-23

200

abr-19

Escenario Base

abr-22

200

oct-21

0%

abr-21

600

oct-20

s-

oct-19

400

oct-17

[MW]
600

abr-20

400

abr-19

Nogales - Los Vilos 220 kV


oct-16

-600

abr-18

-600

abr-17

-400

abr-16

-400

oct-15

abr-15

oct-34

-200

oct-18

oct-33
abr-34

-200

oct-17

oct-32
abr-33

abr-18

oct-31
abr-32

200

oct-16

oct-30
abr-31

200

abr-17

oct-29
abr-30

400

abr-16

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

[MW]
400

oct-15

[MW]

oct-30
abr-31

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Los Vilos - Las Palmas 220 kV

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

c-

oct-31

oct-29

c-

abr-31

s+

abr-30

oct-25
abr-26

s+

abr-30

abr-29

s+

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26
c+

oct-28

c+

abr-28

oct-25
c+

oct-27

abr-27

100%

abr-26

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

100%

oct-26

abr-25

oct-24

100%

abr-26

oct-25

abr-25

80%

abr-24

oct-23

oct-20
abr-21

[MW]

80%

oct-24

oct-22
abr-23

80%

abr-24

oct-23

20%

abr-22

oct-21

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

20%

abr-23

oct-20
abr-21

20%

abr-22

0%

oct-21

0%

oct-20

abr-20

[MW]

0%

abr-21

600

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

600

abr-20

[MW]
600

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

600

Los Vilos - Las Palmas 220 kV

Escenario ERNC NA

Mes

Escenario ERNC NC
s-

Nogales - Los Vilos 220 kV

400

200

-200

-400

-600

Mes

Figura 33: Flujos Nogales Los Vilos 220 kV, para distintas probabilidades de excedencia

s-

agosto de 2015

63

i.

Escenario Base

En los tramos en 220 kV se esperan saturaciones en el sentido sur norte desde la S.E. Las
Palmas hacia a la S.E. Pan de Azcar, mientras que desde la S.E. Nogales hacia Las Palmas las
saturaciones se originan en sentido norte sur.
En la Figura 30 se presentan las transferencias esperadas para el tramo Polpaico Pan de
Azcar 500 kV las cuales presentaran saturaciones en caso de no considerar algn proyecto
de expansin.
ii.

Escenario Alternativo ERNC Norte Atacama

Para el Escenario ERNC Norte Atacama se aprecia un incremento importante en las


transferencias sur norte para el tramo desde el sur a Pan de Azcar, y por ende un aumento
de los niveles esperados de congestin los cuales se originaran por la incorporacin de
consumo en Punta Colorada y la mayor disponibilidad de energa de bajo costo en las Palmas
220 kV.

7.1.6.1 Necesidades de expansin Tramo Nogales Pan de Azcar


Para el tramo Nogales Pan de Azcar 220 kV y Polpaico Pan de Azcar 500 kV se
presentaran saturaciones an en caso de considerar el proyecto propuesto (ProyectoE. 1)
por lo que al igual que en el tramo Maitencillo Pan de Azcar se requerira como posible
alternativa un aumento de capacidad del sistema de 220 kV que se acompae de una
disminucin de su reactancia equivalente de modo que la redistribucin de flujos por este
tramo sea superior.
Adicionalmente y conforme a la Resolucin N390 y al anlisis de puntos ptimos de conexin
al sistema troncal realizado por la DPD, en los puntos 9.2.2 y 9.2.3 se estudi la pertinencia
de efectuar la normalizacin de las conexiones en Don Goyo y La Cebada.

7.1.7

Tramos Polpaico Nogales - Quillota

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lneas 2x220 kV, 2x224 MVA 25C, Quillota Nogales


(2) Lnea 2x220 kV, 2x1500 MVA 30C, Polpaico Nogales
(3) Lnea 2x220 kV, 2x1400 MVA 25C, Quillota - Polpaico
(4) Nueva lnea 2x500 kV, 2x1500 MVA, Polpaico Pan de Azcar
(5) Reemplazo de desconectadores SS.EE. Quillota y Polpaico
Ninguna

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

ene-18
oct-15
jun-18

agosto de 2015
64

oct-16

0%

20%

80%

oct-23

100%

c+

s+

oct-28

c-

oct-30

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

c-

Mes

s0%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


20%
80%
100%
c+

oct-27

s+
c-

cs-

1500

1000

500

-500
0

-1500

Mes

Figura 34: Flujos Polpaico Nogales 220 kV, para distintas probabilidades de excedencia
s-

Quillota - Nogales 220 kV

Escenario ERNC NA

oct-16
oct-17

oct-18

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-33
abr-34
oct-34

abr-34
oct-34

oct-32

oct-33

abr-33

oct-32
abr-33

oct-31

Polpaico - Nogales 220 kV


abr-32

Mes

abr-32

-1500

oct-31

abr-31

oct-30

abr-30

oct-29

s+

abr-29

oct-28

c+

abr-28

-500

abr-27

-400

-500

oct-26

-300

-400

oct-25

-200

-300
100%

abr-26

-2000

abr-25

-200

oct-24

-100

oct-23

-100
80%

abr-24

Escenario Base

oct-22

100

abr-18

Escenario Base

abr-23

200

100
20%

abr-22

300

200

oct-21

400

300

oct-20

500

abr-21

0%

abr-20

400

abr-17

2000

oct-19

Quillota - Nogales 220 kV

oct-18

s-

abr-19

Mes

oct-17

-1500

abr-18

-1000

abr-17

-500

oct-15

500

abr-16

500

oct-16

[MW]
1000

abr-15

1500

1000

oct-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

[MW]

1500

abr-16

[MW]

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Polpaico - Nogales 220 kV

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

c-

oct-31

abr-29
oct-29

oct-28

abr-28

c-

abr-31

s+

abr-30

s+

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

s+

oct-29

abr-29

c+

abr-28

c+

oct-27

abr-27

oct-26

oct-23
abr-24

c+

oct-27

abr-27

100%

abr-26

oct-25

abr-25

oct-24

100%

oct-26

oct-23

-2000

oct-25

80%

abr-24

abr-23

abr-22
oct-22

100%

abr-26

oct-22
abr-23

oct-21

abr-21

oct-20

abr-20

-2000

abr-25

oct-21
abr-22
80%

oct-24

oct-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

80%

abr-24

20%

oct-22

0%

abr-21

20%

abr-23

500

abr-20

oct-19

500

oct-21

oct-18
abr-19

oct-15
abr-16

[MW]

20%

abr-22

oct-17
abr-18
0%

oct-20

oct-16
abr-17

abr-15

0%

abr-21

oct-15
abr-16

[MW]
2000

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

abr-15

-1000

abr-16

[MW]
-1000

oct-15

abr-15

2000

Polpaico - Nogales 220 kV

Escenario N2

-500

Mes

Escenario ERNC NC
s-

400

Quillota - Nogales 220 kV

300

200

100

-100

-200

-300

-400

-500

Mes

Figura 35: Flujos Quillota Nogales 220 kV, para distintas probabilidades de excedencia

s-

agosto de 2015

65

Escenario Base
Polpaico - Quillota

Escenario ERNC NA
2000

220 kV

1500

1000

1000

500

500

[MW]

1500

220 kV

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-1500

-1000

abr-16

-500

-500

-1000

Polpaico - Quillota

abr-15

[MW]

2000

-1500

-2000

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC NC
2000

Polpaico - Quillota

220 kV

1500

1000

[MW]

500

oct-34

oct-33

abr-34

oct-32
abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

abr-28

oct-27

abr-27

oct-26

oct-25

abr-26

abr-25

oct-24

oct-23

abr-24

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

abr-20

oct-18
abr-19
oct-19

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 36: Flujos Polpaico Quillota 220 kV, para distintas probabilidades de excedencia

i.

Escenario Base

La Figura 35 muestra las transferencias para el tramo Quillota Nogales 220 kV, cuya
capacidad mxima de transmisin con criterio N-1 sera suficiente para transferir los niveles
de flujo esperado hasta comienzos del ao 2028. A partir de esta fecha, en algunas ocasiones
puntuales se alcanzara el lmite para el tramo, situacin que podra ser resuelta mediante
medidas operativas tales como abrir el tramo, condicin en la que no se sobrecargan las lneas
Polpaico Nogales 220 kV (2) ni la lnea Polpaico Quillota 220 kV (3).
7.1.7.1 Necesidades de expansin Tramo Polpaico Nogales - Quillota
Los tramos en 220 kV entre la S.E. Polpaico y la S.E. Nogales presentan holguras de capacidad,
de modo que no se considera necesaria la evaluacin de alguna obra de expansin.

7.1.8

Resumen anlisis zona norte

A partir de los anlisis realizados para la zona norte se presenta el Cuadro 33, en l se
muestran los tramos que presentaran algn grado de saturacin y los niveles de congestin
esperada.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
66

Cuadro 33: Niveles de congestin esperada zona norte


Escenario
Base
ERNC NA
ERNC NC

2020
0%
11%
11%

2021
0%
9%
10%

2022
0%
8%
8%

2023
0%
7%
7%

Escenario
Base
ERNC NA
ERNC NC

2020
0%
4%
4%

2021
0%
3%
4%

2022
0%
2%
2%

2023
0%
1%
2%

Escenario
Base
ERNC NA
ERNC NC

2020
0%
0%
0%

2021
0%
0%
0%

2022
0%
0%
0%

2023
0%
0%
0%

2024
0%
7%
7%

Cumbres 500/220 kV
2025
0%
7%
8%

2026
0%
8%
9%

Nva Diego de Almagro Cumbres 220 kV


2024
2025
2026
0%
0%
0%
1%
3%
4%
2%
3%
4%

2024
0%
0%
0%

Cardones al norte
2025
2%
0%
0%

2026
4%
0%
0%

2027
4%
11%
11%

2028
13%
18%
13%

2029
24%
27%
22%

2030
29%
31%
28%

2027
1%
5%
5%

2028
7%
12%
7%

2029
16%
20%
13%

2030
26%
21%
16%

2027
12%
4%
3%

2028
20%
11%
7%

2029
28%
21%
14%

2030
29%
17%
12%

Escenario
Base
ERNC NA
ERNC NC

2020
3%
16%
16%

2021
0%
20%
6%

2022
0%
26%
9%

2023
0%
30%
11%

Pelcano Maitencillo 220 kV


2024
2025
2026
0%
0%
1%
34%
33%
30%
13%
13%
12%

2027
1%
35%
16%

2028
0%
20%
2%

2029
0%
21%
0%

2030
0%
42%
10%

Escenario
Base
ERNC NA
ERNC NC

2020
16%
42%
43%

2021
11%
47%
36%

2022
13%
54%
41%

2023
14%
58%
45%

Punta Colorada Pelcano 220 kV


2024
2025
2026
18%
17%
17%
62%
60%
56%
49%
47%
45%

2027
20%
61%
49%

2028
15%
48%
29%

2029
23%
51%
32%

2030
34%
71%
50%

Escenario
Base
ERNC NA
ERNC NC

2020
1%
1%
1%

2021
0%
2%
0%

2022
0%
3%
0%

2023
0%
4%
0%

2027
0%
6%
0%

2028
0%
1%
0%

2029
0%
0%
0%

2030
0%
0%
0%

Punta Colorada Pan de Azcar 220 kV


2024
2025
2026
0%
0%
0%
5%
5%
5%
0%
0%
0%

Escenario
Base
ERNC NA
ERNC NC

2020
5%
10%
10%

2021
4%
11%
22%

2022
3%
9%
21%

2023
3%
8%
20%

Las Palmas Pan de Azcar 220 kV


2024
2025
2026
3%
4%
4%
7%
8%
9%
19%
20%
22%

2027
4%
9%
21%

2028
1%
4%
14%

2029
1%
5%
15%

2030
0%
3%
11%

Escenario
Base
ERNC NA
ERNC NC

2020
0%
1%
0%

2021
1%
2%
3%

2022
1%
3%
5%

2023
1%
3%
5%

Los Vilos Las Palmas 220 kV


2024
2025
2026
1%
1%
1%
3%
3%
2%
5%
5%
5%

2027
1%
3%
5%

2028
4%
6%
9%

2029
7%
9%
12%

2030
9%
10%
14%

En general para el escenario base se observa que los niveles de congestin antes del ao 2025
no seran relevantes, por lo que es de esperar que las evaluaciones econmicas respectivas
indiquen la conveniencia de postergacin de las obras. No obstante lo anterior, se observa que
bajo los supuestos de los escenarios con mayor penetracin ERNC, existira una mayor
presin de flujos sobre algunos de los tramos, encontrando niveles de congestin para el
tramo Cumbres Diego de Almagro, Cardones Diego de Almagro y Pan de Azcar
Maitencillo 220 kV a partir del ao 2020, que podran indicar la conveniencia econmica de
ejecucin de proyectos de expansin en estos escenarios.
En el Cuadro 34 se presenta un resumen de los tramos del sistema en los cuales se detectan
congestiones y las posibles alternativas de solucin que se analizarn.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
67

Cuadro 34: Resumen de requerimientos de expansin zona norte

Tramo Troncal

Cumbres Nueva Diego de


Almagro 220 kV

Alternativas de expansin

Diagnstico

Escenarios
requirentes

Rediseo de capacidad Lnea Nueva Diego de Almagro Cumbres


2x220 kV

Sobrecarga D. de
Almagro
Cumbres
Sobrecarga
severidad 8

ERNC NA y ERNC
NC

Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres


Cardones Diego de Almagro
220 kV

Pan de Azcar Punta Colorada


- Maitencillo 220 kV

Las Palmas Pan de Azcar 220


kV

Nogales - Los Vilos Las Palmas


220 kV

7.1.9

Cambio de Conductor Cardones - (Carrera Pinto) - Diego de


Almagro 2x220 kV, 2x290 MVA a 2x400 MVA

Sobrecarga
norte sur

-Nueva lnea 2x220 [kV] Carrera Pinto San Andrs Nueva


Cardones 290 [MVA], tendido de un circuito

Sobrecarga
norte sur

Cambio de conductor lnea 2x220 [kV] Maitencillo Pan de Azcar


para aumentar capacidad a 520 [MVA]

Sobrecarga
norte sur

Nueva Lnea Maitencillo Punta Colorada Pan de Azcar 2x220


kV, 2x500 MVA
Cambio de conductor lnea 2x220 [kV] Pan de Azcar Don Goyo
La Cebada Las Palmas para aumentar capacidad a 520 [MVA]

Sobrecarga
norte sur
Sobrecarga
sur norte
Sobrecarga
sur norte
Sobrecarga
norte sur
Sobrecarga
norte sur

Nueva Lnea Las Palmas Pan de Azcar 2x220 kV, 2x500 MVA
Cambio de conductor lnea 2x220 [kV] Las Palmas Los Vilos
Nogales para aumentar capacidad a 520 [MVA]
Nueva Lnea Nogales Los Vilos - Las Palmas 2x220 kV, 2x500
MVA

ERNC NA y ERNC
NC

Base, ERNC NA y
ERNC NC

ERNC NA y ERNC
NC

ERNC NA y ERNC
NC

Evaluacin econmica zona norte

Se lleva a cabo la evaluacin econmica de los proyectos sealados en el Cuadro 34 para cada
uno de los 3 escenarios analizados en la zona norte.
7.1.9.1 Anlisis Rediseo de capacidad nueva lnea Diego de Almagro Cumbres
2x220 kV
Debido a que la Lnea Nueva Diego de Almagro Cumbres 2x220 kV se encuentra
recientemente decretada y an no han finalizado los procesos de licitacin de la obra, se
realiza un anlisis de la conveniencia de efectuar un rediseo de capacidad a 750 MVA de la
lnea previa a su construccin, con los ahorros que esto representara versus efectuar en el
futuro una obra de ampliacin, toda vez que en el escenario base se observa que la necesidad
de aumento de capacidad se requerira aproximadamente 5 aos despus de su puesta en
servicio, mientras que en los escenarios alternativos la mayor capacidad se requerira de
forma inmediata.
Para lo anterior se realiza un anlisis de sensibilidad en escenario el base en el cual se ha
considerado como caso sin proyecto la puesta en servicio de la lnea con sus caractersticas
actualmente decretadas (Nueva Diego de Almagro Cumbres 2x220 kV, 2x600 MVA). Para el
caso del proyecto de rediseo de capacidad previo a su construccin se ha estimado un costo
1,65 millones de USD asociado al diseo en una capacidad de 750 MVA, mientras que para el
caso de una futura ampliacin se ha estimado una inversin de 10,28 millones de USD.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
68

Caso

Proyecto

Sin Proyecto
Proyecto 1
Proyecto 2

Nva. Diego de Almagro Cumbres 2x600


MVA
Rediseo Nva Diego de Almagro
Cumbres 2x750 MVA
Ampliacin Nva Diego de Almagro
Cumbres 2x750 MVA

Lmite del tramo

Costo
de
Operacin
MMUSD

700

26,134,975

840 (nov-19)

26,117,589

840 (nov-20)

26,117,587

Ahorro
Costo
de
operacin
MMUSD

Costo
de
inversin
MMUSD

VAN
MMUSD

17,386

-1,142

16,244

17,388

-6,300

11,088

Se observa que ambas medidas resultaran beneficiosas para el sistema en cuanto representan
un ahorro en costo de operacin y falla, no obstante la economa de inversin que implica
modificar las caractersticas de diseo de la lnea previo a su construccin se traduce en que el
Proyecto 1 se presente como mejor alternativa.
7.1.9.1 Anlisis de proyectos en zona norte
Para cada escenario se evalan los proyectos considerando su puesta en servicio en la fecha
ms prxima posible de acuerdo a los plazos constructivos para efectos de determinar la
pertinencia de su recomendacin en la presente revisin.
Cabe sealar que los datos del Cuadro 35 se obtienen como resultado de un proceso iterativo,
donde las evaluaciones presentadas consideran el hecho de que existe interdependencia en el
sentido que la ejecucin de alguno de ellos condiciona la conveniencia de la materializacin de
otro/os.
Cuadro 35: Evaluaciones econmicas zona norte escenario Base
Valores presente en USD
Tramo

Proyecto

Diego de Almagro
- Cumbres 220
Maitencillo - Pan
de azcar
Pan de Azcar Las Palmas

Costo de
Inv.

VAN

Transformador 500/220 kV S.E. Cumbres

Repotenciamiento Tramo Cardones -Carrera Pinto 2x220 kV, 2x290 MVA

Nueva Lnea Cardones - Carrera Pinto 2x220 kV

Repotenciamiento Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

278,521,744

44,735,411

233,786,334

Nueva Tramo Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

317,024,551

69,360,216

247,664,336

Repotenciamiento Las Palmas Pan de Azcar 2x220 kV

21,539,393

35,196,598

- 13,657,205

Nueva Las Palmas Pan de Azcar 2x220 kV

30,551,111

43,786,986

- 13,235,875

- 10,169,668

43,183,058

- 53,352,726

Repotenciamiento Nogales - Las Palmas 2x220 kV

12,781,861

39,090,141

- 26,308,279

Nueva Nogales - Las Plamas 2x220 kV

46,700,502

52,562,734

- 5,862,232

Nueva El Mauro-Las Palmas 2x220 kV

35,674,904

37,906,895

- 2,231,991

S.E. Seccionadora Las Palmas + transformador Las Palmas 500/220 kV


Las
Palmas
Nogales

ESCENARIO BASE
Costo
Operacin y
falla

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
69

Cuadro 36: Evaluaciones econmicas zona norte escenario ERNC Atacama


Valores presente en USD
Tramo

ESCENARIO ERNC NORTE ATACAMA


Costo
Costo de
VAN
Operacin y falla
Inv.

Proyecto

Diego de Almagro Cumbres 220


Maitencillo - Pan de
Azucar
Pan de Azcar - Las
Palmas

Las Palmas -Nogales

Transformador 500/220 kV S.E. Cumbres

81,592,014

11,505,113

Repotenciamiento Tramo Cardones -Carrera Pinto 2x220 kV, 2x290 MVA

24,350,761

24,695,216

Nueva Lnea Cardones - Carrera Pinto 2x220 kV

24,902,414

42,344,710

- 17,442,296

Repotenciamiento Tramo Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

569,791,097

44,735,411

525,055,687

Nueva Lnea Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

600,995,809

69,360,216

531,635,593

Repotenciamiento Las Palmas Pan de Azcar 2x220 kV

32,572,954

35,196,598

- 2,623,644

Nueva Lnea Las Palmas Pan de azcar 2x220 kV (*)

45,724,829

43,786,986

1,937,843

- 21,270,936

34,044,900

- 55,315,835

Repotenciamiento Nogales - Las Palmas 2x220 kV

17,433,584

39,090,141

- 21,656,557

Nueva Lnea Nogales - Las Palmas 2x220 kV (*)

60,746,926

52,562,734

8,184,192

S.E. Seccionadora Las Palmas + transformador Las Palmas 500/220 kV

70,086,902
344,454

Nueva Lnea El Mauro-Las Palmas 2x220 kV

(*) Si bien el VAN es positivo, al revisar el detalle de la evaluacin ao a ao (ANEXO 8) se detecta que resulta ms eficiente la
postergacin a aos que los beneficios econmicos operativos compensen los costos de inversin anualizados.
Cuadro 37: Evaluaciones econmicas zona norte escenario ERNC Coquimbo
Valores presente en USD
Tramo

Proyecto
Transformador 500/220 kV S.E. Cumbres

Diego de Almagro
- Cumbres 220

Las
Palmas
Nogales

11,505,113

38,859,494

2,137,213

24,695,216

- 22,558,003

42,344,710

- 25,514,859

Repotenciamiento Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

520,026,844

69,360,216

450,666,628

Nueva Tramo Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

496,951,866

44,735,411

452,216,455

64,321,785

35,196,598

29,125,187

Nueva Las Palmas - Pazucar 2x220 kV

101,227,151

43,786,986

57,440,165

S.E. Seccionadora Las Palmas + transformador Las Palmas 500/220 kV

- 2,923,775

34,044,900

- 36,968,674

Repotenciamiento Nogales - Las Palmas 2x220 kV

22,715,246

39,090,141

- 16,374,895

Nueva Nogales - Las Palmas 2x220 kV

98,916,989

52,562,734

46,354,255

Repotenciamiento Las Palmas - Pazucar 2x220 kV


Pan de Azcar Las Palmas

50,364,607
16,829,850

Repotenciamiento Tramo Cardones -Carrera Pinto 2x220 kV, 2x290 MVA


Nueva Lnea Cardones - Carrera Pinto 2x220 kV

Maitencillo - Pan
de Azcar

ESCENARIO ERNC NORTE COQUIMBO


Costo
Costo de Inv.
VAN
Operacin y falla

Nueva El Mauro-Las Palmas 2x220 kV

Para aquellos tramos en que ms de una solucin de expansin resulta conveniente, se escoge
la que posee un VAN ms elevado. De acuerdo a lo anterior, en caso de considerar como
certero cada uno de los escenarios, en la presente revisin correspondera realizar las
siguientes recomendaciones por escenario:
Escenario Base:
Tramo

Proyectos a recomendar Escenario Base

Maitencillo - Pan de Azcar

Nueva Lnea Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Fecha estimada de
PES
Ene-21

agosto de 2015
70

Escenario ERNC Norte Atacama:


Tramo

Proyectos a recomendar /escenario

Diego de Almagro - Cumbres


Maitencillo - Pan de azcar

Segundo Transformador 500/220 kV S.E. Cumbres


Nueva Lnea Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV

Fecha estimada de
PES
Ene-20
Ene-21

Escenario ERNC Norte Coquimbo:


Tramo

Proyectos a recomendar /escenario

Diego de Almagro - Cumbres


Maitencillo - Pan de azcar
Pan de Azcar - Las Palmas
Las Palmas -Nogales

Segundo Transformador 500/220 kV S.E. Cumbres


Nueva Lnea Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV
Nueva Lnea Las Palmas Pan de Azucar 2x220 kV
Nueva Lnea Nogales - Las Palmas 2x220 kV

Fecha estimada
PES
Ene-20
Ene-21
Ene-21
Ene-21

En el Cuadro 38 se presenta un cuadro resumen de los proyectos que correspondera


recomendar y excluir en la presente recomendacin en cada uno de los escenarios analizados.
Tramo
Diego de Almagro Cumbres 220
Maitencillo - Pan de
azcar
Pan de Azcar - Las
Palmas

Las Palmas -Nogales

Fecha ms
prxima de PES
Ene-20
Jun-19
Ene-21
Jun-19
Ene-21
Jun-19
Ene-21
Ene-20
Jun-19
Ene-21
Ene-21

Proyectos a recomendar /escenario

BASE

Segundo Transformador 500/220 kV S.E. Cumbres


Repotenciamiento Tramo Cardones -Carrera Pinto 2x220 kV, 2x290 MVA
Nueva Lnea Cardones - Carrera Pinto 2x220 kV
Repotenciamiento Tramo Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV
Nueva Lnea Maitencillo - Punta Colorada - Pan de Azcar 2x220 kV
Repotenciamiento Las Palmas Pan de Azcar 2x220 kV
Nueva Lnea Las Palmas Pan de Azcar 2x220 kV
S.E. Seccionadora Las Palmas + transformador Las Palmas 500/220 kV
Repotenciamiento Nogales - Las Palmas 2x220 kV
Nueva Lnea Nogales - Las Palmas 2x220 kV
Nueva Lnea El Mauro-Las Palmas 2x220 kV

X
X
X
X

X
X
X
X
X
X

ERNC
NA

X
X
X

X
X
X
X
X
X

ERNC
NC

X
X
X

X
X

Cuadro 38: Resumen de obras recomendables por escenario

Debido a que los resultados obtenidos para los distintos escenarios no son coincidentes
respecto de la conveniencia de ejecucin de los proyectos, se efectuar un anlisis de mnimo
arrepentimiento para determinar la recomendacin de expansin. Para llevar a cabo este
anlisis es necesario definir el plan ptimo de inversiones de cada uno de los escenarios, el
cual corresponder a un tren de obras, cuyos aos de puesta en servicio se determinan a
partir de la evaluaciones econmicas realizadas en cada escenario.
Para determinar la fecha ptima de entrada en operacin se analiza el detalle por ao de las
evaluaciones econmicas (ANEXO 8), donde se desprende que para algunos de los proyectos,
la ejecucin inmediata de la obra genera un costo de inversin (VATT) que no compensa los
beneficios econmicos operativos de los primeros aos. Ante la postergacin de la entrada en
operacin existe un ao a partir del cual se justifica la conveniencia de materializacin del
proyecto a partir de dicho ao.
A modo de ejemplo se presenta el detalle de la evaluacin del tramo Nueva Lnea Las Palmas
Pan de Azcar 2x220 kV en el escenario ERNC NA, en donde se aprecia que al considerar la
entrada en operacin del proyecto el ao 2021 este no resulta conveniente, no obstante si se
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
71

posterga su puesta en servicio al ao 2027 el VAN se invierte indicado este ao como ptimo
de inversin:
Evaluacin Pycto Nueva Las Palmas - Pan de Azucar 220
Ao
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

Con Proyecto
1,410,998,671
1,873,743,341
1,980,446,344
1,829,714,992
2,027,633,805
2,239,586,514
2,444,963,625
2,705,363,176
3,003,888,776
3,335,320,037
3,582,917,958
3,850,422,578
4,156,716,470
4,372,208,874
4,586,514,915
4,731,791,776
4,872,010,611
5,149,150,696
5,401,869,379
6,005,578,330
1,624,930,710

Valores Presentes a 2014


VAN

Evaluacin Pycto Nueva Las Palmas - Pan de Azucar 220

Costos de operacin
Inversin
Costos de operacin
Inversin
Ao
Con Proyecto
Sin Proyecto
Beneficio (US$) Anualidad VI (US$)
Sin Proyecto
Beneficio (US$) Anualidad VI (US$)
2015
1,410,998,671
1,410,998,671
0
0
1,410,998,671
0
0
2016
1,873,743,341
1,873,743,341
0
0
1,873,743,341
0
0
2017
1,980,446,344
1,980,446,344
0
0
1,980,446,344
0
0
2018
1,829,714,992
1,829,714,992
0
0
1,829,714,992
0
0
2019
2,027,633,805
2,027,633,805
0
0
2,027,633,805
0
0
2,239,586,514
0
0
2020
2,239,586,514
2,239,586,514
0
0
2,445,234,756
271,131
9,652,123
2021
2,444,963,625
2,445,234,756
0
0
2,708,408,711
3,045,534
9,652,123
2022
2,705,363,176
2,708,408,711
0
0
3,008,303,490
4,414,714
9,652,123
2023
3,003,888,776
3,008,303,490
0
0
3,339,758,519
4,438,482
9,652,123
2024
3,335,320,037
3,339,758,519
0
0
3,587,772,204
4,854,246
9,652,123
2025
3,582,917,958
3,587,772,204
0
0
3,856,830,083
6,407,505
9,652,123
2026
3,850,422,578
3,856,830,083
0
0
4,164,963,479
8,247,009
9,652,123
2027
4,156,716,470
4,164,963,479
0
0
4,388,065,026
15,856,152
9,652,123
2028
4,372,208,874
4,388,065,026
15,856,152
9,652,123
4,601,969,458
15,454,544
9,652,123
2029
4,586,514,915
4,601,969,458
15,454,544
9,652,123
4,751,020,642
19,228,866
9,652,123
2030
4,731,791,776
4,751,020,642
19,228,866
9,652,123
4,890,865,587
18,854,976
9,652,123
2031
4,872,010,611
4,890,865,587
18,854,976
9,652,123
5,176,489,348
27,338,652
9,652,123
2032
5,149,150,696
5,176,489,348
27,338,652
9,652,123
5,438,273,648
36,404,269
9,652,123
2033
5,401,869,379
5,438,273,648
36,404,269
9,652,123
6,043,431,663
37,853,333
9,652,123
2034
6,005,578,330
6,043,431,663
37,853,333
9,652,123
1,635,704,098
10,773,388
9,652,123
2035
1,624,930,710
1,635,704,098
10,773,388
9,652,123
Valor agua ene 2035
-10,023,181
Valor agua ene 2035
-10,023,181
Valor agua ene 2015
-1,489,882
Valor agua ene 2015
-1,489,882
VP Beneficio
VP Anualidad Valores Presentes a 2014
VP Beneficio
VP Anualidad
US$ 45,724,829
US$ 43,463,424
US$ 33,899,225
US$ 15,643,816
$ 2,261,405 VAN
$ 18,255,409

En base a lo anteriormente descrito, los planes de obras a considerar para cada escenario se
presentan en el Cuadro 39.
Cuadro 39: Planes de expansin de la transmisin a considerar, zona norte
Tramo
Diego de Almagro Cumbres 220
Maitencillo - Pan de
Azucar
Pan de Azcar - Las
Palmas
Las Palmas -Nogales

Alternativas de Expansin
Transformador en Cumbres
Repotenciamiento Cardones -Carrera Pinto
Nueva Cardones - Carrera Pinto
Repotenciamiento Maitencillo - Pta Colorada Pan de Azcar
NVA Maitencillo - Pta Colorada Pan de azcar
Repotenciamiento Las Palmas Pan de Azcar
NVA Las Palmas Pan de Azcar
S.E. Seccionadaora Las Palmas + transformador Las Palmas 500/220 kV
Repotenciamiento Nogales - Las Palmas
Nueva Nogales - Las Palmas
Nueva Mauro-Las Palmas

Fecha de puesta en servicio


Plan Base
Plan ERNC NA
ene-27
ene-20

Plan ERNC NC
ene-20

ene-27

ene-27

ene-27

ene-21

ene-21

ene-21

ene-28

ene-21

ene-28

ene-21

(*) Las celdas en blanco indican que el proyecto no resulta conveniente en todo el horizonte de evaluacin o bien
que el proyecto alternativo de expansin arroja un VAN mayor por ende se escoge este como solucin.

Las principales diferencias entre los planes ptimos encontrados para cada escenario radican
en la conveniencia de recomendacin en la presente revisin de un nuevo Transformador
500/220 kV en S.E. Cumbres (Plan ERNC NA y Plan ERNC NC) y la postergacin o construccin
inmediata de una nueva lnea 2x220 kV entre la S.E. Pan de Azcar y la S.E. Nogales (Plan
ERNC NC).
Una vez definidos los planes ptimos por escenario se modelan las distintas combinaciones
Escenario Plan de expansin que permiten determinar los arrepentimientos. Para lo
anterior se supone el escenario generacin demanda analizado como certero en todo el
horizonte, determinndose los costos de operacin e inversin que se originaran en caso
haber decidido ejecutar hoy un plan distinto al plan ptimo de dicho escenario y tener que
tomar la decisin de correccin con el retraso asociado una recomendacin en el siguiente
proceso de revisin del ETT.
Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
72

Cuadro 40: Combinaciones escenario generacin -demanda versus planes de expansin de la transmisin
Escenario BASE
Escenario ERNC NA
Escenario ERNC NC
Proyectos de Expansin

VI miles
USD

Plan Base

Plan ERNC
NA

Plan ERNC
NC

Plan Base

Plan ERNC
NA

Plan ERNC
NC

Plan Base

Plan ERNC
NA

Plan ERNC
NC

Nuevo Transformador en Cumbres

18,777

ene-27

ene-20

ene-20

may-21

ene-20

ene-20

may-21

ene-20

ene-20

Nueva Lnea Cardones - Carrera Pinto 2x220

78,195

ene-27

ene-27

ene-27

ene-27

ene-27

ene-27

ene-27

ene-27

ene-27

Nva lnea Maitencillo - Pta Colorada - Pazucar

117,488

ene-21

ene-21

ene-21

ene-21

ene-21

ene-21

ene-21

ene-21

ene-21

Nva lnea Las Palmas - Pazucar

79,920

ene-21

ene-28

ene-28

ene-21

may-22

may-22

ene-21

Nva lnea Nogales - Las Plamas

91,931

ene-21

ene-28

ene-28

ene-21

may-22

may-22

ene-21

A continuacin se presentan el detalle de las modelaciones efectuadas para elaborar la matriz


de arrepentimientos:
Alternativas de expansin para Escenario Base:

Esc. Base Plan Base: Corresponde al plan ptimo encontrado para Escenario Base.
La obras a recomendar en la presente revisin bajo los supuestos de este escenario
slo correspondera a una Nueva Lnea Maitencillo Punta Colorada Pan de Azcar
2x220 KV, mientras que en las prxima revisiones se recomendaran expansiones en
la zona de Diego de Almagro para su puesta en servicio en el ao 2027.

Esc. Base Plan ERNC NA: Ante la ejecucin del plan ERNC NA, se recomendara el
inicio de la construccin la nueva Lnea Maitencillo Punta Colorada Pan de Azcar
2x220 kV y del nuevo transformador en S.E. Cumbres. Debido a que bajo los supuestos
de generacin y demanda del escenario base no se requiere hasta el 2027 del nuevo
transformador, el arrepentimiento queda representado en el sobre costo de inversin
efectuado entre el ao 2020 y el ao 2027.

Esc. Base Plan ERNC NC: Ante la ejecucin del plan ERNC NC, se recomendara la
ejecucin inmediata de la nueva Lnea de 2x220 kV para los tramos comprendidos
entre S.E. Maitencillo y S.E. Nogales y del nuevo transformador en S.E. Cumbres.
Debido a que bajo los supuestos de generacin y demanda del escenario base no se
requiere del nuevo transformador en cumbre hasta el ao 2027, ni resulta
econmicamente conveniente la ejecucin de la nueva lnea, el arrepentimiento queda
representado en el sobre costo de inversin realizado.

Alternativas de expansin para Escenario ERNC Norte Atacama:

Esc. ERNC NA Plan Base: Para el escenario ERNC NA se determin que resulta
conveniente dar inicio inmediato a la construccin de un nuevo Transformador en S.E.
Cumbres y de la Nueva Lnea entre Maitencillo y Pan de Azcar. En caso de haber
decidido en la presente revisin por el plan de expansin Plan Base, no se
construira el nuevo transformador en cumbres de forma inmediata, por lo que su
recomendacin se tomara en el siguiente proceso de revisin del ETT. Con lo anterior,
la obra entrara en operacin aproximadamente con un ao de retraso respecto de los
requerimientos del escenario ERNC NA. El arrepentimiento entonces est asociado al

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
73

sobre costo de operacin del sistema por efecto de operar un ao con flujos
restringidos. Debido a que la recomendacin del resto de las obras se realiza en el
futuro, el efecto de optar por el Plan base no representa arrepentimientos respecto del
plan ptimo para el escenario ERNC NA (Plan ERNC NA).

Esc. ERNC NA Plan ERNC NA: Corresponde al plan ptimo encontrado para
Escenario ERNC NA. Bajo los supuestos del escenario ERNC norte Atacama, el adelanto
en la incorporacin de las Centrales solares en la zona de Atacama hace conveniente la
ejecucin inmediata de un nuevo Transformador 500/220 kV en S.E. Cumbres para su
puesta en operacin en enero de 2020. Adicionalmente, los consumos y generacin en
la zona de Punta Colorada hace an ms beneficiosa la materializacin de la nueva
lnea 2x220 kV entre Maitencillo y Pan de Azcar, determinando como ao ptimo de
materializacin del restos de los tramos de lnea hacia Nogales a partir del ao 2027.

Esc. ERNC NA Plan ERNC NC: Al optar hoy por el plan ERNC NC, se recomendara la
ejecucin inmediata de la nueva lnea entre Maitencillo y Nogales para su puesta en
servicio en enero de 2021, estas obras no son requeridas por el Escenario ERNC NA
hasta el ao 2028. Por lo anterior, el adelanto en la inversin representa un
arrepentimiento que bajo los supuestos de este escenario la decisin ms eficiente
corresponda a una postergacin y no a una ejecucin inmediata.

Alternativas de expansin para Escenario ERNC Norte Coquimbo:

Esc. ERNC NC Plan Base: En el Escenario ERNC NC, la incorporacin de centrales


elicas en la zona de Coquimbo gatilla como obras adicionales a los otros dos
escenarios, la conveniencia de ejecucin inmediata de una nueva lnea 2x220 kV,
2x500 MVA para los tramos comprendidos entre Pan de Azcar y Nogales para su
puesta en servicio en enero de 2021 y un nuevo transformador en S.E. Cumbres. En
caso de recomendar hoy el plan de expansin Plan base, y que se den los supuestos
del escenario norte Coquimbo, se presentara un sobre cotso de operacin debido a
las restricciones a la inyeccin de energa ERNC en la zona por aproximadamente un
ao. Lo anterior debido al retraso en la ejecucin de las lneas entre Pan de Azcar y
Nogales2x220 kV y el trasnformacdor en S.E. Cumbres que tendran que ser
recomendadas en la prxima revisin del ETT.

Esc. ERNC NC Plan ERNC NA: Al igual que lo descrito en el caso anterior, existira un
retraso en los proyectos de Nueva lneas 2x220 kV entre Pan de Azcar y Nogales, no
as en el transformador en S.E. Cumbres. Lo anterior debido a que tanto el escenario
ERNC NA, como en el escenario ERNC NC resulta conveniente la ejecucin inmediata
de esta obra.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
74

Esc. ERNC NC Plan ERNC NC: Corresponde al Plan ptimo del escenario ERNC norte
Coquimbo. Bajo los supuestos de este escenario correspondera recomendar en la
presente revisin del nuevo transformador 500/220 kV en S.E. Cumbres y un nuevo
sistema paralelo 2x220 kV entre S.E. Maitencillo y S.E. Nogales.

Considerando el detalle del Cuadro 40 se obtiene la matriz de costos, en la que se destaca


el plan de expansin que minimiza los costos totales de cada escenario:
Cuadro 41: Matriz de Costos zona norte
Esc. Base
Esc. ERNC NA

Esc. ERNC NC

Valores presentes en miles de USD

Plan Base

Plan ERNC NA

Plan ERNC NC

25,960,526
132,032
26,092,559
25,958,921
139,191
26,098,113
25,895,320
253,313
26,148,632

Cop
VATT
COSTO Total
Cop
VATT
COSTO Total
Cop
VATT
COSTO Total

25,146,772
217,099
25,363,871
25,143,766
205,229
25,348,995
25,111,473
253,313
25,364,786

24,903,605
253,710
25,157,315
24,900,401
255,047
25,155,448
24,890,487
253,313
25,143,800

A partir del Cuadro 41 se construye la matriz de arrepentimientos, restando para cada


escenario el sobrecosto que significara elegir un plan distinto al de menor costo de dicho
escenario.
Cuadro 42: Matriz de Arrepentimiento
Valores presentes en miles de USD

Plan Base

Esc. Base

Esc. ERNC NA

Max
Arrepentimiento

Esc. ERNC NC

14,876

13,516

14,876

Plan ERNC NA

5,554

11,649

11,649

Plan ERNC NC

56,074

15,791

56,074

Se escoge la alternativa de expansin Plan ERNC NA (correspondiente al plan diseando


para el Escenario Norte Atacama) que minimiza el mximo arrepentimiento. Las obras a
recomendar en la presente revisin de este plan corresponden a la nueva lnea Maitencillo
Punta Colorada Pan de Azcar 2x220 kV, 2x500 MVA y un nuevo transformador 500/220
kV, 750 MVA en S.E. Cumbres. Adicionalmente en el captulo 7.1.9.1, se determin la
conveniencia de recomendacin de un rediseo de capacidad para la nueva lnea Cumbres
Nueva Diego de Almagro 2x220 kV
Cuadro 43: Obras a recomendar zona Norte
Proyectos a recomendar zona norte
Nueva lnea Maitencillo Punta Colorada Pan de Azcar 2x220 kV, 2x500 MVA
Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres
Rediseo de capacidad lnea Nueva Diego de Almagro Cumbres 2x220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Fecha PES
Ene-21
Ene-20
-

agosto de 2015
75

7.2 Zona centro


El anlisis de la zona centro comprende el estudio de los flujos esperados para los tramos
entre las subestaciones Polpaico y Ancoa, incluyendo los tramos en 220 kV entre Alto Jahuel y
Colbn y Ancoa Itahue.
El plan de obras de transmisin y los proyectos a considerar para la zona se detallan a
continuacin:
Cuadro 44: Obras Zona Centro
Obras Zona Centro

Obras
construccin

en

Obras decretadas
Proyectos
expansin
considerar

de
a

Tendido primer circuito Nueva Lnea Ancoa Alto Jahuel 2x500 kV


Segundo transformador Ancoa 500/220 kV
Tendido segundo circuito Nueva Lnea Ancoa Alto Jahuel 2x500 kV
Lnea Rapel Alto Melipilla 1x220 kV
Nueva Lnea A. Melipilla - Lo Aguirre 1(de 2)x220 kV
Aumento de capacidad Lnea Lo Aguirre Cerro Navia 2x220 kV
Nueva subestacin Puente Negro 220 [kV]
Seccionamiento lnea 2x220 [kV] Colbn - Candelaria en Puente Negro
ProyectoE. 5- Nueva lnea 2x500 [kV] Polpaico Lo Almendros Alto Jahuel 1800 [MVA],
tendido de un circuito
ProyectoE. 6- Seccionamiento segundo circuito lnea 2x500 kV Polpaico Alto Jahuel en S/E
Lo Aguirre

Fecha estimada
de PES
Oct-2015
Ene-2016
Feb-2016
Oct-2018
Oct-2018
Ene-2019
Oct-2017
Oct-2017
Ene-2022
Jun-2018

Nota: El seccionamiento completo en S.E. Lo Aguirre de la lnea 2x500 kV Polpaico Alto Jahuel es una obra que ser recomendada por
cumplimiento normativo.

Polpaico 220kV

S/E Polpaico 500kV

Rapel220

Existente
En Licitacin o
Construccin

Lampa 220

L.Aguirre220

Proyecto

Almendros 500

A.Melipilla220

C.Nav ia220

L.Aguirre500
Almendros 220

Chena 220

S/E A.Jahuel 500kV

A.Jahuel 220
Maipo 220
Candelaria 220
PteNegro 220

Ancoa 500kV

Colbn 220

Ancoa 220
Itahue 220

Ilustracin 8.Diagrama simplificado zona centro

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
76

7.2.1

Tramo Lampa Polpaico


(1) Lnea 2x220 kV, 2x310 MVA 25C

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

Ninguna
Ninguna
800

Lampa - Polpaico 220 kV

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30
s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-26

oct-27
abr-28
oct-28

c+

Mes

abr-27

oct-25

abr-26

oct-24

oct-23

100%

abr-25

abr-24

oct-22

80%

abr-23

20%

oct-20
abr-21
oct-21
abr-22

oct-19

oct-18

abr-20

0%

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-800

Figura 37: Flujos Lampa Polpaico 220 kV, para distintas probabilidades de excedencia.

Tramo Polpaico Tap El Llano - Los Maquis


(1) Lnea 2x220 kV, 2x318 MVA 25C

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

400

200

200

100

100

20%

80%

100%

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

abr-24

oct-22

Mes
0%

abr-23

oct-21

abr-22

abr-21

oct-20

abr-20

oct-19

oct-18

abr-19

oct-17

abr-18

oct-34

oct-33

abr-34

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

oct-27

abr-28

abr-27

oct-26

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

abr-18

-400

oct-16

-300

-400

abr-17

-200

-300

oct-15

-200

abr-16

-100

oct-16

-100

abr-17

Tap El Llano - Los Maquis 220 kV

abr-16

[MW]

300

oct-15

Polpaico - Los Maquis 220 kV

300

abr-15

[MW]

400

Ninguna
Ninguna

abr-15

7.2.2

Mes
c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 38: Flujos Lampa Polpaico 220 kV, para distintas probabilidades de excedencia.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
77

7.2.3

Tramo Chena - Cerro Navia

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 2x220 kV, 2x400 MVA 30C


Ninguna
Ninguna
600

Chena - Cerro Navia 220 kV

400

[MW]

200

-200

-400

Mes

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30
s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-26

oct-27
abr-28
oct-28

c+

abr-27

oct-25

abr-26

oct-24

oct-23

100%

abr-25

abr-24

oct-22

80%

abr-23

20%

oct-20
abr-21
oct-21
abr-22

oct-19

oct-18

abr-20

0%

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-600

Figura 39: Flujos Chena Cerro Navia 220 kV para distintas probabilidades de excedencia.

7.2.4

Tramo Alto Jahuel Chena

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 2x220 kV, 2x350 MVA 30C (A.Jahuel-Rodeo-Chena)


(2) Lnea 2x220 kV, 2x400 MVA 30C
Ninguna
Ninguna
1500

Alto Jahuel - Chena 220 kV

1000

[MW]

500

-1500

oct-34

abr-34

oct-33

abr-33

oct-31
abr-32
oct-32

abr-31

oct-30

oct-29

abr-30

abr-29

oct-27
abr-28
oct-28

abr-27

oct-26

abr-26

oct-25

oct-24

abr-25

abr-24

oct-23

oct-22

abr-23

abr-21
oct-21
abr-22

oct-20

oct-19

abr-20

abr-19

oct-18

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

-1000

abr-15

-500

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 40: Flujos Alto Jahuel Chena 220 kV para distintas probabilidades de excedencia.

7.2.5

Tramos Rapel A. Melipilla Lo Aguirre Cerro Navia

Instalaciones
existentes:
Obras en construccin

Obras a analizar:

(1) Lnea 2x220 kV, 2x197 MVA 25C


(2) Nuevo transformador 500/220 kV, 1x750 MVA, Lo Aguirre, junto con el seccionamiento de
un circuito Alto Jahuel Polpaico 500 kV y seccionamiento completo de Rapel C.Navia
(3) Lnea 1x220 kV, 1x290 MVA 25C, Rapel A. Melipilla
(4) Lnea 2x220 kV, 2x290 MVA 25C, A. Melipilla Lo Aguirre, 1 circuito
(5) Aumento de capacidad lnea 2x220 kV, 2x1500 MVA 25C, Lo Aguirre C.Navia
ProyectoE. 6- Seccionamiento segundo circuito lnea 2x500 kV Polpaico Alto Jahuel en S/E Lo
Aguirre

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Oct-15
Oct-18
Oct-18
Ene-19
Jun-18

agosto de 2015
78

Cautn220

Cautn220

Abr-15 - Sep-15
Rapel220

Oct-15 - Sep-18
Rapel220

Oct-18 - Dic-18
Rapel220

Ene-19 - Mar-35
Rapel220

Existente
En Licitacin o
Construccin
Proyecto

A.Melipilla220

A.Melipilla220

A.Melipilla220

L.Aguirre220

L.Aguirre220

C.Nav ia220

C.Nav ia220

A.Melipilla220

C.Nav ia220

L.Aguirre220

C.Nav ia220

Ilustracin 9.Diagrama de obras modeladas tramo Rapel - Cerro Navia

500

Rapel - Alto Melipilla 220 kV

400

300

200

[MW]

100

-100

-200

-300

-400

Mes

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30
s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-26

oct-27
abr-28
oct-28

c+

abr-27

oct-25

abr-26

oct-24

oct-23

100%

abr-25

abr-24

oct-22

80%

abr-23

20%

oct-20
abr-21
oct-21
abr-22

oct-19

oct-18

abr-20

0%

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-500

Figura 41: Flujos Rapel Alto Melipilla 220 kV, para distintas probabilidades de excedencia

500

Alto Melipilla - Cerro Navia 220 kV (A.


Melipilla - Lo Aguirre desde oct-15)

400

300

200

[MW]

100

-100

-200

-300

-400

Mes

oct-34

abr-34

oct-33

abr-33

oct-31
abr-32
oct-32

s-

abr-31

oct-30

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

abr-27

c+

oct-26

abr-26

oct-25

oct-24

100%

abr-25

abr-24

oct-23

oct-22

80%

abr-23

abr-21
oct-21
abr-22

20%

oct-20

oct-19

abr-20

0%

abr-19

oct-18

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

abr-15

-500

Figura 42: Flujos Alto Melipilla Lo Aguirre 220 kV, para distintas probabilidades de excedencia

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
79

2000

Lo Aguirre - Cerro Navia 220 kV

1500

1000

[MW]

500

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

oct-25

abr-27

abr-26

oct-24

oct-23

abr-25

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

abr-18

oct-16

oct-15

abr-17

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 43: Flujos tramo Lo Aguirre Cerro Navia 220 kV para distintas prob. de excedencia

2000

Lo Aguirre 500/220 kV

1500

1000

[MW]

500

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

oct-27

abr-28

abr-27

oct-25
abr-26
oct-26

abr-25

oct-24

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

oct-16

oct-15

abr-17

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 44: Flujos Lo Aguirre 500/220 kV para distintas probabilidades de excedencia.

De la Figura 41 se observa que la capacidad N-1 del tramo entre Rapel y Alto Melipilla se ve
sobrepasada desde el inicio del horizonte de estudio hasta la puesta en servicio de la obra (3)
en octubre de 2018. Lo mismo ocurre con el tramo Alto Melipilla Lo Aguirre 220 kV (Figura
42) y la respectiva nueva obra (4) que aumenta su capacidad de transferencia.
Como se puede apreciar de la Figura 43, la lnea existente (1) se considera operando abierta
en el tramo Lo Aguirre Cerro Navia desde la puesta en servicio de la subestacin
seccionadora Lo Aguirre en 220 kV en octubre de 2015, debido a las saturaciones que se
presentaran en caso de mantener el tramo cerrado. En el Informe Propuesta de Expansin
Troncal 2014 se describen los anlisis elctricos que justifican esta posibilidad de operacin
para los efectos de su incorporacin en el modelo de coordinacin hidrotrmica7.
A partir de noviembre de 2018, los flujos presentados corresponden a los transitados por la
Nueva Lnea 2x220 kV, 2x1500 MVA 25C, Lo Aguirre C.Navia, la cual aportara capacidad
suficiente al tramo en todo el horizonte de anlisis.

Cabe sealar que la representacin descrita, representa una simplificacin de la modelacin del tramo vlida para el presente anlisis, sin
perjuicio de que la operacin real de esta lnea deber ser evaluada de acuerdo a las condiciones particulares del momento.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
80

En la Figura 44, se aprecia que para el transformador 500/220 kV de la S.E. Lo Aguirre los
flujos aumentan progresivamente desde la puesta en servicio del proyecto Nueva lnea Lo
Aguirre C.Navia en noviembre de 2018, sin alcanzar la capacidad mxima para el tramo en
todo el horizonte de estudio.
7.2.5.1 Necesidades de expansin Tramo Rapel A. Melipilla Lo Aguirre Cerro
Navia
Para el tramo se presenta como propuesta el ProyectoE. 6 el cual se evala desde el punto de
vista de requerimiento normativo en el captulo 8. Adicionalmente, de acuerdo a las
transferencias esperadas en la Figura 44, se observa que no se requiere llevar a cabo la
evaluacin econmica del proyecto de un segundo transformador en S.E Lo Aguirre.
7.2.6

Sistema de 500 kV entre S.E. Alto Jahuel y S.E. Polpaico

Instalaciones
existentes:

Obras en construccin
Obras a analizar:

Abr-15 - May-15

(1) Lnea 2x500 kV, 2x1800 MVA 25C


(2) Transformadores 2x500/220 kV, 2x750 MVA, Polpaico
(3) Transformadores 2x500/220 kV, 2x750 MVA, A. Jahuel
(4) Seccionamiento de Ancoa Polpaico 1x500 kV
(5) Seccionamiento de un circuito Alto Jahuel Polpaico 500 kV en S.E. Lo Aguirre.
(6) Tercer transformador 500/220 kV, 1x750 MVA, A. Jahuel
ProyectoE. 5 - Nueva lnea 2x500 [kV] Polpaico Lo Almendros Alto Jahuel 1800 [MVA],
tendido de un circuito
(7) Seccionamiento segundo circuito lnea 2x500 kV Polpaico Alto Jahuel en S/E Lo Aguirre.

Jun-15 - Abr-17

S/E Polpaico 500kV

S/E Polpaico 500kV

S/E Lo Aguirre 500kV

Sep-17 - May-18

Jun-18 - Dic-21

S/E Polpaico 500kV

Jun-18

Ene-22- Mar-35

S/E Polpaico 500kV

S/E Lo Aguirre 500kV

jun-15
feb-18
ene-22

S/E Polpaico 500kV

S/E Lo Aguirre 500kV

S/E Lo Aguirre 500kV

Existente
En Licitacin o
Construccin

Los Almendros 500kV

S/E A.Jahuel 500kV

Hacia S/E Ancoa 500kV

S/E A.Jahuel 500kV

Hacia S/E Ancoa 500kV

S/E A.Jahuel 500kV

Hacia S/E Ancoa 500kV

S/E A.Jahuel 500kV

Hacia S/E Ancoa 500kV

Proyecto

S/E A.Jahuel 500kV

Hacia S/E Ancoa 500kV

Ilustracin 10.Diagrama de obras modeladas Sistema de 500 kV entre Alto Jahuel y Polpaico 500 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
81

-1000

oct-15

0%
20%
80%

-3000

100%

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


c+
s+
c-

oct-30

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

c-

oct-31

s+

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

c-

abr-31

oct-27
abr-28

s+

abr-30

abr-29
oct-29

oct-28

c+

oct-27

c+

abr-28

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

100%

abr-27

100%

oct-25
abr-26
oct-26

oct-23

abr-24

-1500

abr-25

80%

oct-24

oct-22
abr-23

80%

abr-24

oct-23

abr-23

20%

abr-22

oct-21

abr-21

oct-20

20%

abr-22
oct-22

oct-21

abr-21

0%

abr-20

[MW]
2500

oct-20

4000

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

abr-16

[MW]

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

-1000

abr-15

[MW]
1500

Polpaico 500/220 kV

1000

500

-500

Mes

Figura 45: Flujos Polpaico 500/220 kV para distintas probabilidades de excedencia.


s-

Alto Jahuel 500/220 kV

2000

1500

1000

500

Mes

s-

Figura 46: Flujos Alto Jahuel 500/220 kV para distintas probabilidades de excedencia.

3000

Alto Jahuel al Norte 500 kV

2000

1000

-2000

Mes

Figura 47: Flujos Alto Jahuel al Norte 500 kV para distintas probabilidades de excedencia.
s-

agosto de 2015

82

2000

1000

Los Almendros - Polpaico 500 kV

Los Almendros 500/220 kV

800

1500

600
1000
400

200

[MW]

[MW]

500

-200

-500

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

-600

-1500

Mes
0%

20%

80%

100%

c+

s+

c-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

oct-23

abr-25

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

s-

abr-18

oct-16

oct-15

abr-17

-1000

abr-16

-800

-2000

abr-15

oct-15

abr-16

abr-15

-400
-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 48: Flujos Los Almendros Polpaico 500 kV y Los Almendros 500/220 kV para distintas probabilidades de excedencia.

El grfico de la Figura 47 muestra los flujos y los lmites de transmisin con criterio N-1 de la
S.E. Alto Jahuel al norte. En lnea roja se presenta la capacidad mxima de transferencia entre
la S.E. Alto Jahuel y la S.E. Polpaico en caso de considerar el ProyectoE. 5 y en lnea punteada
en caso contrario.
Se observa un aumento en los flujos esperados a partir de febrero de 2018 con la puesta en
servicio del primer circuito de la nueva lnea 2x500 kV Charra Ancoa, llegando a alcanzar la
capacidad mxima de transferencia hacia fines del mismo ao y superndola hacia fines del
ao 2019.
7.2.6.1 Necesidades de expansin Sistema de 500 kV entre S.E. Alto Jahuel y S.E.
Polpaico
De acuerdo al anlisis de transferencias esperadas, en caso de no contar con el proyecto de
expansin para el tramo se presentaran saturaciones, por lo que se realizar una evaluacin
econmica para determinar la pertinencia de incorporar el ProyectoE. 5.
7.2.7

Sistema Ancoa al Norte 500 kV

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 1x500 kV, 1x1544 MVA 25C, Ancoa Alto Jahuel
(2) Lnea 1x500 kV, 1x1800 MVA 25C, Ancoa Alto Jahuel
(3) Secc. L. Ancoa Polpaico 1x500 kV, en S.E. Alto Jahuel
(4) Lnea 2x500 kV, 1x1732 MVA 35C, Ancoa Alto Jahuel
(5) Tendido del segundo circuito Ancoa - Alto Jahuel 2x500 kV, 1x1732 MVA 35C
Ninguna
Abr-15 - sep-15
A.Jahuel 500kV

oct-15
feb-16

Feb-16 - Mar-35
oct-15 - Ene-16
A.Jahuel 500kV
A.Jahuel 500kV
Existente
En Licitacin o
Construccin

Proyecto
Ancoa 500kV

Ancoa 500kV

Ancoa 500kV

Ilustracin 11.Diagrama de obras a considerar para el tramo Ancoa al Norte 500 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
83

4000

Ancoa - Alto Jahuel 500 kV

3000

2000

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

oct-25

abr-27

abr-26

oct-24

oct-23

abr-25

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

abr-18

oct-16

oct-15

abr-17

abr-16

-1000

abr-15

[MW]

1000

-2000

-3000

-4000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 49: Flujos Ancoa al Norte 500 kV para distintas probabilidades de excedencia, con 4to Transf. Charra 500/220 kV.

En febrero de 2018, la puesta en servicio de la nueva lnea 1(2)x500 kV Charra Ancoa


produce un incremento importante en las transferencias hacia el norte, las cuales aumentan
progresivamente y llevan al tramo Ancoa Alto Jahuel 500 kV a operar a su mxima capacidad
para algunas hidrologas extremas hacia comienzos del ao 2021.

7.2.8

Tramo Ancoa 500/220 kV

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Transformador 1x500/220 kV, 1x750 MVA


(2) Nuevo transformador 1x500/220 kV, 1x750 MVA
Ninguna

2000

Jun-15
Ene-22

Ancoa 500/220 kV

1500

1000

[MW]

500

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

oct-27

abr-28

abr-27

oct-25
abr-26
oct-26

abr-25

oct-24

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

oct-16

oct-15

abr-17

abr-16

abr-15

-500

-1000

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 50: Flujos Ancoa 500/220 kV para distintas probabilidades de excedencia.

En la Figura 50 se observa que luego de la materializacin de la obra (2), la capacidad de


transmisin es suficiente para los flujos proyectados.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
84

7.2.9

Tramo Ancoa Colbn 220 kV

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Cable 1x220 kV, 1x600 MVA

Ninguna
Ninguna

1000

Ancoa - Colbun 220 kV

800

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

oct-26

abr-28

oct-25

abr-27

abr-26

oct-24

oct-23

abr-25

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-800

-1000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 51: Flujos Ancoa - Colbn 220 kV para distintas probabilidades de excedencia.

7.2.10 Tramo Colbn Candelaria Maipo Alto Jahuel 220 kV


(1) Lnea Colbn Candelaria 2x220 kV, 2x600 MVA
(2) Lnea Candelaria Alto Jahuel 2x220 kV, 2x600 MVA
Nueva subestacin Puente Negro 220 [kV]
Ninguna

800

600

600

400

400

200

200

-200

-200

-400

-400

-600

-600

0%

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

abr-20

abr-18

oct-17

abr-17

oct-16

-800

-1000

Mes

abr-16

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

oct-23

abr-25

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

-1000

abr-15

-800

oct-15

Oct-17
-

Puente Negro - Candelaria 220 kV

1000

oct-18
abr-19
oct-19

Colbn - Puente Negro 220 kV

800

[MW]

[MW]

1000

abr-15

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 52: Flujos Colbn Puente Negro Candelaria 220 kV para distintas probabilidades de excedencia.8

En la simulacin presentada se ha considerado la modelacin del seccionamiento de la lnea 2x154 [kV] La Higuera
Tinguiririca en Puente Negro y un transformador 220/154 kV.
8

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
85

800

Candelaria - Alto Jahuel 220 kV

600

400

[MW]

200

-200

-400

-600

oct-34

oct-33

abr-34

oct-32

oct-31

abr-33

abr-32

oct-30

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-800

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 53: Flujos Candelaria Alto Jahuel 220 kV para distintas probabilidades de excedencia.

7.2.11 Tramo Ancoa Itahue


Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 2x220 kV, 2x400 MVA 25C


Ninguna
Ninguna
500

Ancoa - Itahue 220 kV

400

300
200

[MW]

100
0
-100
-200

-300
-400

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

abr-31

oct-30

oct-29

abr-30

abr-29

oct-28

oct-27

abr-28

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

oct-22

abr-23

abr-22

oct-21

oct-20

abr-21

abr-20

oct-19

abr-19

oct-18

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

abr-15

-500

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 54: Flujos Ancoa Itahue 220 kV para distintas probabilidades de excedencia.

7.2.12 Resumen anlisis zona centro


A partir de los anlisis realizados para la zona centro se presenta el Cuadro 45, en l se
muestra el nivel de congestin esperada para el tramo Alto Jahuel Polpaico 500 kV, que
presentara algn grado de saturacin y a continuacin en el Cuadro 46 se identifican las
posibles obras de expansin de que daran solucin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
86

Cuadro 45: Niveles de congestin esperada zona centro

Escenario
Base

2020
0%

2021
0%

2022
1%

2023
3%

2024
2%

Alto Jahuel al norte


2025
2026
1%
2%

2027
3%

2028
1%

2029
0%

2030
0%

Cuadro 46: Resumen de requerimientos de expansin zona centro

Tramo Troncal

Proyectos

Diagnostico

Escenarios
requirente

Tramo 500 kV entre S.E. Alto


Jahuel y S.E. Polpaico

ProyectoE. 5- Nueva lnea 2x500 [kV] Polpaico Lo


Almendros Alto Jahuel 1800 [MVA], tendido de un
circuito

Sobrecarga
desde A.Jahuel al
norte

Base

7.2.13 Evaluacin econmica zona centro


Para la zona centro se realiza la evaluacin econmica del proyecto Nueva lnea 2x500 [kV]
Alto Jahuel Lo Almendros Polpaico 1800 [MVA]. Adicionalmente se realiza una sensibilidad
bajo el supuesto de incorporacin de la central El Campesino en S.E. Nueva Charra 500 kV,
en enero de 2022, en donde se verifica que en ambos escenarios la recomendacin es
postergar la ejecucin del proyecto.
Cuadro 47: Evaluacin Proyecto Alto Jahuel Los Almendros Polpaico 2x500 kV
Costo Operacin y
Costo de Inv.
VAN
falla
MMUSD
MMUSD
MMUSD
27,073,257
80,547,266
- 53,474,009
Esc. Base
Sensibilidad GNL
28,812,563
80,547,266
- 51,734,703
Charra

Cabe sealar que la evaluacin econmica considera el VI de 126 millones de USD indicado en
el informe tcnico en que se basa la presente revisin (Resolucin N390), no obstante lo
anterior, la DPD en forma preliminar ha estimado un valor de inversin de 190 millones de
USD, lo que acentuara an ms la decisin de postergacin del proyecto.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
87

7.3 Zona sur


En la zona sur se analizan los flujos esperados para los tramos comprendidos entre Charra y
Puerto Montt.
Los proyectos propuestos por el consultor del ETT para la zona sur se dividen en dos etapas:
en la primera, las lneas se construyen en torres para 500 kV pero se energizan en 220 kV de
acuerdo al esquema presentado en la Ilustracin 12 y posteriormente en una segunda etapa,
cuya fecha se encuentra fuera del horizonte de decisin del presente cuatrienio, se lleva a
cabo el tendido de los segundos circuitos, la energizacin en 500 kV y los transformadores de
enlace 220/500 kV.
Cuadro 48: Obras Zona Sur
Obras Zona Sur

Obras
en
construccin

Obras
decretadas
Proyectos de
expansin a
considerar

Ampliacin y seccionamiento completo en S.E. Ciruelos


Seccionamiento completo en S.E. Rahue
Subestacin Nueva Charra, seccionamiento de lneas 2x500 kV Charra - Ancoa 1 y 2
Tendido segundo circuito 2x220 kV Ciruelos Pichirropulli kV
Nueva lnea 2x220 kV Nueva Charra Charra y nuevo autotransformador 500/220 kV
Lnea 2x500 kV Pichirropulli Nueva Puerto Montt, energizada en 220 kV

Fecha estimada de
PES
Ene-2017
Feb-2017
Jul-2017
May-2018
Jul-2018
Feb-2021

Nueva lnea 2x500 [kV] Cautn - Ciruelos 1700 [MVA], tendido de dos circuitos
energizada en 220 [kV]

Ene-2022(*)

Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli 1700 [MVA], tendido de un circuito
energizado en 220 [kV]
Nueva lnea 2x500 [kV] Nueva Charra Mulchn 1700 [MVA], tendido de un circuito
energizado en 220 [kV]

Ene-2022(*)
Ene-2023(*)

(*) La fecha estimada de PES se ha considerado como la ms prxima en caso de que el proyecto sea
recomendado en la presente revisin.
Existente
En Licitacin o
Construccin

Escenario Base y 2
Ancoa 500kV

Proyecto

Ancoa 500kV

Nv a. Charra 500kV
Nv a. Charra 500kV

Nv a. Charra 500kV

Charra 500kV
Charra 500kV

Proyecto

Linea de 500 kV
Linea
500
Energizada
ende
220
kVkV
Energizada en 220 kV

Nv aCharra
220kV
Nv aCharra
220kV
Charra 220kV
Charra 220kV

Hualpen 220kV
Hualpen 220kV

Mulchen 220kV
Mulchen 220kV

Esperanza 220kV
Esperanza 220kV
Temuco 220kV
Temuco 220kV

Nuev a Cautn

Cautn 220kV
Cautn 220kV

Charra 500kV

Energizacin 500 kV

Existente
En Licitacin o
Construccin

Escenario 3

Ancoa 500kV

Nv aCharra
220kV
Charra 220kV
Mulchen 220kV

Temuco 220kV

Cautn 220kV

S.E.Nv a Ciruelos

Ciruelos 220kV
Ciruelos 220kV

Valdiv ia 220kV
Valdiv ia 220kV

Ciruelos 220kV
Valdiv ia 220kV

Pichirropulli
220kV
Pichirropulli
220kV
LineaLinea
de 500
dekV
500 kV
Energizada
en 220
Energizada
enkV
220 kV

Hualpen 220kV
Esperanza 220kV

Rahue
220kV
Rahue
220kV
Nv Nv
a.PMontt
220kV
a.PMontt
220kV
P. Montt
220kV
P. Montt
220kV

Pichirropulli 220kV
Rahue 220kV
Nv a.PMontt 220kV
P. Montt 220kV

Ilustracin 12.Diagrama simplificado zona sur

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
88

Cabe sealar que debido a los niveles de transferencias observados en el Escenario


ERNC+Hidro Sur, en las grficas presentadas a continuacin se considera la energizacin en
500 kV a partir de enero del ao 2023 en dicho escenario. Las subestaciones de enlace
500/220 kV consideradas se utilizan slo como supuestos para efectos de realizar los anlisis
de arrepentimientos que se desprendern de las evaluaciones econmicas. La decisin de los
puntos ptimos de enlace 500/220 kV se deber determinar en revisiones futuras del ETT,
cuando la puesta en servicio esperada para los transformadores y subestaciones de 500 kV,
concuerden con los requerimientos de energizacin en 500 kV del sistema considerando los
plazos de ejecucin de las obras.
Se han realizado algunas modificaciones a los proyectos a considerar en el plan cuadrienal.
Los cambios se efectan en cuanto a la capacidad de diseo de las lneas considerando su
futura energizacin en 500 kV. Si bien los niveles mximos de transferencias observados an
para el escenario de mayor desarrollo de generacin zona Sur Escenario 3 no superaran los
1300 MVA en todo el horizonte modelado, se considera como solucin de expansin una lnea
de 1700 MVA en vez de 1500 MVA, debido a que la diferencia en el valor de inversin entre
estas dos capacidades no superara el 5%, adicionalmente de acuerdo la indicado en el estudio
de potencial hidrolgico de las cuencas de la zona sur realizado por el Ministerio de Energa,
existira un alto potencial de generacin. Por otro lado, actualmente se encuentra en
construccin el sistema de 500 kV entre Polpaico y Cardones con una capacidad igualmente
de 1700 MVA lo que representa una ventaja en cuanto la experiencia nacional en la
construccin y operacin de lneas de estas caractersticas.

7.3.1

Tramo Charra Ancoa

Instalaciones
existentes:
Obras en construccin

Obras a analizar:

(1) Lnea Charra Ancoa 2x500 kV, 2x1766 MVA 25.


(2) Transformadores 3x500/220 kV, 3 x 750 MVA S.E. Charra
(3) Nueva lnea Charra Ancoa 2x500 kV, 1x1766 MVA 25C
(4) Subestacin Nueva Charra, seccionamiento de lneas 2x500 kV Charra - Ancoa 1 y 2
(5) Nueva lnea 2x220 kV Nueva Charra Charra y nuevo autotransformador 500/220 kV,
750 MVA
Ninguna

Abr-15 - Jun-17

Jul-17 - Ene-18

Ancoa 500kV

Ancoa 500kV

Feb-18 - Jun-18
Ancoa 500kV

feb-18
jul-17
jul-18
-

Jul-18 - mar-35
Ancoa 500kV
Existente

Nv a Charrua 500kV

Nv a Charrua 500kV

Nv a Charrua 500kV Nv a Charrua 500kV

En Licitacin o
Construccin

Proyecto
Charrua 500kV

Charrua 220kV

Charrua 500kV

Charrua 220kV

Charrua 500kV

Charrua 220kV

Charrua 500kV

Charrua 220kV

Ilustracin 13.Diagrama de obras modeladas tramo Charra Ancoa 500 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
89

-1000

0%
20%
80%

-4000

100%
c+

oct-26

s+
c-

Mes

oct-34

abr-34

oct-33

-2000

-1000

-2000

-3000

-3000

s-

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


0%
20%
80%

-4000

100%
c+
s+
c-

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

1000

oct-21

1000

abr-21

Escenario ERNC Sur

oct-20

2000

c-

abr-20

4000

oct-18
abr-19
oct-19

2000

s+

abr-18

3000

oct-17

3000

abr-17

Desde el sur a S/E Ancoa 500 kV


c+

oct-16

100%

abr-16

80%

oct-15

-4000

abr-15

[MW]

20%

abr-33

oct-32

abr-32

0%

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

-1000

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

[MW]
4000

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]
4000

Desde el sur a S/E Ancoa 500 kV

Escenario Base

3000

2000

1000

-2000

-3000

Mes
s-

Desde el sur a S/E Ancoa 500 kV

Escenario ERNC+Hidro Sur

Mes
s-

Figura 55: Flujos Desde el sur a S/E Ancoa 500 kV para distintas probabilidades de excedencia

agosto de 2015

90

-1000

oct-15

0%

20%

oct-20

80%

-2000

100%

oct-25

c+

s+

c-

oct-30

-1500

Mes

oct-32

oct-34

abr-34

-1000

s-

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

0%

20%

80%

-2000

100%

oct-25

c+

s+

c-

c-

Escenario Base

1500

1000

500

-500
0

-1500

Mes
s-

Nueva Charra 500 kV - Ancoa 500 kV

Escenario ERNC+Hidro Sur

-500

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-33
abr-34
oct-34

oct-33

abr-34

oct-34

abr-33

oct-32

Nueva Charra 500 kV - Ancoa 500 kV


oct-31

s-

oct-32
abr-33

Figura 56: Flujos Charra Nueva Charra 500 kV para distintas probabilidades de excedencia
abr-32

Mes

abr-32

-1500

oct-31

abr-31

oct-30

abr-30

s+

abr-29
oct-29

oct-28

abr-28

c+

oct-27

abr-27

oct-26

100%

abr-26

oct-34

abr-34

oct-33

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

-2000

abr-25

oct-24

2000
80%

abr-24

c-

oct-23

Escenario ERNC Sur

abr-23

500
s+
20%

abr-22
oct-22

500

oct-28

0%

oct-21

1000

abr-29
oct-29

s-

abr-21

1500

1000

oct-16

Escenario ERNC Sur

oct-20

c+

c-

abr-20

1500

abr-16

2000

oct-18
abr-19
oct-19

Nueva Charra 500 kV - Ancoa 500 kV


s+

abr-18

100%

abr-28

Mes

oct-27

-1500

oct-17

-500

-1000

abr-27

500

oct-15

1000

500

abr-15

[MW]

1000

abr-17

80%

c+

oct-16

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

1500

abr-16

oct-26
abr-27

1500

oct-26

oct-25
abr-26

-500

oct-25

oct-24
abr-25

Charrua500- kV - Nueva Charrua 500 kV

abr-26

oct-23
abr-24

100%

oct-15

-2000

abr-25

oct-21

abr-23

abr-22
oct-22

oct-24

oct-20
abr-21

-2000

abr-15

[MW]

oct-19
abr-20

80%

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19

20%

oct-33

20%

abr-33

0%

oct-31

oct-17
abr-18

0%

abr-32

oct-19

c-

abr-31

oct-18
abr-19

2000

abr-18

oct-17

abr-17

s+

abr-30

abr-29
oct-29

oct-28

oct-16

abr-16

oct-15

abr-15

c+

abr-28

oct-27

-1000

oct-26

100%

abr-27

oct-16
abr-17

[MW]

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

-1000

abr-26

[MW]

-2000

abr-25

oct-24

80%

abr-24

oct-23

abr-23

20%

abr-22
oct-22

oct-21

abr-21

0%

abr-20

oct-18
abr-19
oct-19

2000

abr-18

abr-16

oct-15

abr-15

2000

oct-17

abr-17

oct-16

abr-16

[MW]
-1000

abr-15

[MW]
2000

Charrua500- kV - Nueva Charrua 500 kV

Escenario Base

1500

1000

500

-500

-1500

Mes
s-

Charrua500 kV - Nueva Charrua 500 kV

Escenario ERNC+Hidro Sur

-500
0

-1500

Mes

Figura 57: Flujos Nueva Charra Ancoa 500 kV para distintas probabilidades de excedencia

s-

agosto de 2015

91

Escenario Base
2000

Nueva Lnea Charra - Ancoa 500 kV

1500

1000

[MW]

500

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

abr-17

oct-15

abr-16

-1000

abr-15

-500

-1500

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC Sur


2000

Escenario ERNC+Hidro Sur


2000

Nueva Lnea Charra - Ancoa 500 kV

1000

1000

500

500

[MW]

1500

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-28

abr-30

abr-29
oct-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

abr-16

-1000

oct-15

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

abr-29
oct-29

abr-28

oct-27

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

abr-24

abr-23

oct-21

oct-20

abr-22
oct-22

abr-21

oct-19

oct-18

abr-20

abr-19

oct-17

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-1000

-500

-500

abr-15

[MW]

1500

Nueva Lnea Charra - Ancoa 500 kV

-1500

-1500

-2000

-2000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 58: Flujos Charra Ancoa 500 kV para distintas probabilidades de excedencia

i.

Escenario Base

Debido a que las mayores transferencias se dan en el sentido sur norte y que la Subestacin
Nueva Charra 500 kV permitir adicionar flujos al tramo Charra -Ancoa, la limitacin se ha
modelado como la suma de flujos que llegan desde el sur a la S.E. Ancoa 500 kV.
La Figura 55 muestra una alta congestin del tramo entre el ao 2015 y el ao 2018 debido a
la capacidad trmica de los equipos de compensacin serie (1368 MVA). Con la entrada en
servicio de la nueva lnea Charra Ancoa 2x500 kV (3) en febrero de 2018, la mxima
transferencia se ve limitada por los tres transformadores Charra 500/200 kV (2150 MVA). A
partir de Julio de 2018, la materializacin del transformador en la S.E. Nueva Charra permite
la liberacin de las restricciones desde 220 kV hacia 500 kV, siendo la compensacin serie de
la lnea la que impone nuevamente la limitacin en 2860 MVA para el tramo, la cual se vera
alcanzada a partir del ao 2027.
ii.

Escenario ERNC Sur

La incorporacin de generacin de bajo costo al sur de Charra se traduce en una mayor


presin de las trasferencias en los tramos de 500 kV desde el sur a la S.E. Ancoa.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
92

7.3.1.1 Necesidades de expansin Tramo Charra Ancoa


Para el tramo Charra Ancoa 500 kV se esperan transferencias que bordean la capacidad
mxima del tramo. En el Escenario ERNC Sur podran originarse saturaciones en algunas
hidrologas extremas a partir del ao 2022, para lo cual se podra tomar como medida en las
futuras revisiones del ETT un cambio en la compensacin serie que impone la limitacin para
el tramo.
7.3.2

Tramo Charra 500/200


Escenario Base
4000

Charra 220/500 kV (suma Charra 220/500 kV y Nva


Charra 220/500 kV desde jul-2018)

3000

2000

[MW]

1000

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

abr-17

oct-15

abr-16

abr-15

-1000

-2000

-3000

-4000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC Sur

Escenario ERNC+Hidro Sur


4000

3000

2000

2000

1000

1000

[MW]

3000

-2000

-2000

-3000

-3000

-4000

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

oct-30

abr-32

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

oct-25

abr-27

abr-26

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

-4000

Mes
0%

abr-16

-1000

oct-15

oct-34

abr-34

oct-33

oct-32

abr-33

oct-31

abr-32

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

-1000

Charra 220/500 kV (suma Charra 220/500 kV y Nva


Charra 220/500 kV desde jul-2018)

abr-15

Charra 220/500 kV (suma Charra 220/500 kV y Nva


Charra 220/500 kV desde jul-2018)

abr-15

[MW]

4000

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 59: Flujos Charra 220 kV al norte para distintas probabilidades de excedencia.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
93

Escenario Base
1500

Nueva Charra 220 kV - Charra 220 kV

1000

[MW]

500

20%

80%

100%

c+

s+

c-

oct-34

oct-33

oct-32

abr-34

Escenario ERNC+Hidro Sur


1500

Nueva Charra 220 kV - Charra 220 kV

1000

500

500

[MW]

1000

Nueva Charra 220 kV - Charra 220 kV

20%

80%

100%

c+

s+

c-

s-

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

oct-30

abr-32

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

oct-25

abr-27

abr-26

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

abr-18

oct-17

abr-17

oct-16

abr-16

oct-34

abr-34

oct-33

oct-32

abr-33

oct-31

-1500

Mes
0%

abr-32

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

abr-24

oct-21

abr-23

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-1500

-1000

oct-15

-500

-500

abr-15

[MW]

abr-33

s-

Escenario ERNC Sur

-1000

oct-31

Mes
0%

1500

abr-32

oct-30

abr-31

abr-30

oct-28

oct-27

abr-29
oct-29

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

-1500

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

abr-17

oct-15

abr-16

-1000

abr-15

-500

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 60: Flujos Nueva Charra 220 kV - Charra 220 kV para distintas probabilidades de excedencia.

i.

Escenario Base

La Figura 59 muestra los flujos proyectados que llegan a Charra 220 kV con direccin hacia
Charra 500 kV. De acuerdo a los criterios utilizados en la planificacin del sistema de
transmisin, para mantener la operacin con criterio N-1 en la lnea Charra Ancoa, durante
los primeros aos de anlisis, el flujo no puede sobrepasar los 1500 MVA, por lo que a pesar
de contar con un tercer transformador no se permiten mayores niveles de transmisin.
Con la puesta en servicio de la nueva lnea 2x500 kV Charra Ancoa tendido un circuito en
febrero de 2018, la liberacin de restricciones en 500 kV se traducira en una aumento del
flujo esperado desde 220 kV a 500 kV, observando algn grado de saturaciones en las
transferencias esperadas hasta julio de 2018, fecha en la que se espera la materializacin del
nuevo transformador 500/220 kV en S.E. Nueva Charra. Con la incorporacin de esta ltima
obra se elevara el lmite a 2915 MVA, el cual no es alcanzado en el periodo restante del
horizonte de estudio.
ii.

Escenario ERNC Sur

La conclusiones derivadas del escenario base son igualmente vlidas para el escenario
alternativo, observando un incremento en los niveles de flujo.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
94

7.3.3

Tramos Charra - Lagunillas 220 kV y Charra - Hualpn 220 kV


(1) Lnea Charra Lagunillas 1x220 kV, 1x366VA
(2) Lnea Charra Hualpn 1x220 kV, 1x227 MVA
(3) Lnea Hualpn - Lagunillas 1x220 kV, 1x276 MVA
Ninguna
Ninguna

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

Escenario Base
200

Charra - Hualpn 220 kV

150

100

[MW]

50

-50

-100

-150

oct-34

oct-33

oct-32

abr-34

abr-33

Escenario ERNC+Hidro Sur


200

Charra - Hualpn 220 kV

150

150

100

100

50

50

[MW]

-50

-50

-100

-100

-150

-150

-200

Charra - Hualpn 220 kV

Mes

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

oct-26

oct-25

c+

abr-27

abr-26

100%

oct-24
abr-25

abr-24

oct-23

abr-23

80%

oct-22

abr-21
oct-21
abr-22

20%

oct-20

abr-20

oct-19

oct-18

0%

abr-19

oct-17
abr-18

abr-17

oct-16

abr-16

oct-15

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30
s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

abr-27

c+

oct-26

oct-25

oct-24

Mes

abr-26

100%

abr-25

oct-23

abr-24

oct-22

80%

abr-23

oct-19

20%

oct-20
abr-21
oct-21
abr-22

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-200

0%

abr-15

[MW]

200

oct-31

oct-30

Escenario ERNC Sur

abr-32

s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

oct-26

c+

abr-27

oct-25

oct-24

Mes

abr-26

100%

abr-25

oct-23

oct-22

abr-24

80%

abr-23

oct-19

20%

oct-20
abr-21
oct-21
abr-22

abr-20

oct-18

oct-17

0%

abr-19

abr-18

oct-16

abr-17

oct-15

abr-16

abr-15

-200

Figura 61: Flujos Charra Hualpn 220 kV para distintas probabilidades de excedencia.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
95

Escenario Base
200

Charra - Lagunillas 220 kV

150

100

[MW]

50

-50

-100

-150

oct-34

oct-33

oct-32

abr-34

abr-33

Escenario ERNC+Hidro Sur


200

Charra - Lagunillas 220 kV

150

150

100

100

50

50

[MW]

-50

-50

-100

-100

-150

-150

-200

Charra - Lagunillas 220 kV

Mes

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

oct-26

oct-25

c+

abr-27

abr-26

100%

oct-24
abr-25

abr-24

oct-23

abr-23

80%

oct-22

abr-21
oct-21
abr-22

20%

oct-20

abr-20

oct-19

oct-18

0%

abr-19

oct-17
abr-18

abr-17

oct-16

abr-16

oct-15

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30
s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

abr-27

c+

oct-26

oct-25

oct-24

Mes

abr-26

100%

abr-25

oct-23

abr-24

oct-22

80%

abr-23

oct-19

20%

oct-20
abr-21
oct-21
abr-22

abr-20

oct-18

abr-19

oct-17

oct-16

abr-18

abr-17

oct-15

abr-16

abr-15

-200

0%

abr-15

[MW]

200

oct-31

oct-30

Escenario ERNC Sur

abr-32

s-

abr-31

oct-29

c-

abr-30

s+

abr-29

oct-27
abr-28
oct-28

oct-26

c+

Mes

abr-27

oct-25

oct-24

abr-26

100%

abr-25

oct-23

oct-22

abr-24

80%

abr-23

oct-19

20%

oct-20
abr-21
oct-21
abr-22

abr-20

oct-18

oct-17

0%

abr-19

abr-18

oct-16

abr-17

oct-15

abr-16

abr-15

-200

Figura 62: Flujos Charra Lagunillas 220 kV para distintas probabilidades de excedencia.

En la Figura 61 y la Figura 62 se observa que los flujos proyectados no presentaran


saturaciones en todo el horizonte de planificacin.
7.3.4

Tramo Cautn Mulchn - Charra 220 kV

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea 2x220 kV Cautn Mulchn - Charra, 2x500 MVA 40C


(2) Lnea 1x220 kV Charra Temuco, 1x264 MVA 25C
(3) Lnea 1x220 kV Cautn Temuco, 2x193 MVA 25C
Ninguna
(4)Nueva lnea 2x500 [kV] Nueva Charra Mulchn 1700 [MVA], tendido de un circuito
energizado en 220 [kV].

Abr-15 - Dic-22
Charra220

Ene-23

Ene-23 - Mar-35
Charra220
Existente
En Licitacin o
Construccin

Mulchn220

Mulchn220

Temuco220

Cautn220

Proyecto

Temuco220

Cautn220

Ilustracin 14.Diagrama de obras modeladas tramo Cautn Charra 220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
96

0%

20%

oct-22

80%

oct-23

oct-24

100%

c+

s+

oct-29

c-

oct-30

oct-32

s-

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

0%

20%

Mes

80%

oct-24

100%

c+

s+

c-

oct-31

oct-32

oct-34

abr-34

oct-33

abr-33

1000

500

-500
-500

oct-15

abr-31

oct-30

abr-30

abr-29
oct-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-34

abr-34

oct-34

abr-34

oct-33

oct-32

500

oct-31

1000

abr-33

Ciruelos - Nueva Charra 500 kV

abr-32

1500

oct-33

Escenario ERNC+Hidro Sur

oct-32

s-

abr-33

Mes

abr-32

oct-31

abr-31

oct-30

abr-30

c-

abr-32

c-

abr-31

s+

oct-30

abr-29
oct-29

s+

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

c+

oct-28

c+

abr-28

oct-27

100%

abr-27

100%

oct-26

oct-25
abr-26
oct-26

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-18
abr-19
oct-19

-1500

abr-26

-2000

oct-25

oct-17
abr-18

80%

abr-25

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

80%

abr-24

Escenario ERNC Sur

oct-23

600

oct-31

abr-31

oct-30

abr-30

oct-29

20%

abr-23

-400

c20%

oct-22

-400

oct-16

[MW]

Escenario Base

abr-22

-200

abr-17

0%

oct-21

-200

abr-15

1500

abr-21

200
s+

abr-29
0%

oct-20

200

abr-16

2000

abr-20

400

oct-28

s-

oct-19

400

oct-27

s-

abr-19

Cautn - Mulchn 220 kV


c+

oct-18

100%

abr-28

Mes

oct-15

[MW]

oct-34

-1000

abr-27

-1000

abr-15

oct-26

Mes

abr-26

Mulchn - Charra 220 kV

oct-25

abr-25

oct-34

-500

abr-18

-600

oct-24

500

oct-17

oct-23

oct-33
abr-34

500

oct-16

80%

abr-24

oct-33
abr-34

oct-32
abr-33

1000

abr-17

oct-22
abr-23

oct-32
abr-33

abr-32

oct-31

abr-31

oct-30

abr-30

1000

abr-16

oct-21
abr-22

abr-32

oct-31

abr-31

oct-30

abr-30

oct-28

abr-29
oct-29

[MW]
0

oct-15

[MW]

oct-20

oct-28

abr-29
oct-29

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

Mulchn - Charra 220 kV

abr-15

oct-34

abr-34

20%

oct-33

abr-33

0%

abr-21

600

oct-31

abr-20

oct-19

c-

abr-32

oct-18
abr-19

oct-27
abr-28
c-

abr-31

oct-17
abr-18

s+

abr-30

oct-16
abr-17

abr-27
s+

abr-29

oct-28

c+

abr-28

oct-15
abr-16

oct-25
abr-26
oct-26
c+

oct-27

abr-27

abr-15

100%

oct-26

oct-24
abr-25

100%

abr-26

[MW]

-1500

oct-25

-1500

abr-25

80%

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

abr-21

oct-20
80%

abr-24

20%

abr-23

oct-19
20%

abr-22

oct-21

0%

abr-21

600

abr-20

1500

oct-20

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

-1000

abr-16

[MW]

-1000

oct-15

abr-15

[MW]
1500

Mulchn - Charra 220 kV

Escenario ERNC Sur

-500

-1500

Mes

Figura 63: Flujos Mulchn Charra 220 kV para distintas probabilidades de excedencia.
s-

Cautn - Mulchn 220 kV

Escenario Base

400

200

-200

-400

-600

Mes

s-

Cautn - Mulchn 220 kV

Escenario ERNC+Hidro Sur

-600

Mes

s-

Figura 64: Flujos Cautn Mulchn 220 kV para distintas probabilidades de excedencia.

agosto de 2015

97

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

oct-18

20%

oct-20
abr-21
oct-21
abr-22

80%

oct-22
oct-23

100%
Mes
c+

abr-27
s+

oct-27
abr-28
oct-28

c-

oct-29
oct-30

s-

oct-31
oct-32

Informe Preliminar Propuesta Plan de Expansin del STT del SIC


0%
20%
80%
100%

oct-24

Mes

oct-25

c+

abr-27
s+

abr-28
oct-28

oct-27

c-

oct-29
oct-30

s-

oct-34

abr-34

oct-33

abr-33

oct-31
abr-32
oct-32

oct-25

oct-24
abr-25

abr-24

abr-27

oct-26

abr-26

oct-27
abr-28
oct-28

oct-30

abr-30

oct-29

abr-29

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

s-

abr-31

oct-23

abr-23

oct-22

c-

abr-30

abr-21
oct-21
abr-22

oct-20

abr-20

oct-19

s+

abr-29

oct-18

c+

oct-26

-300
Mes

abr-26

-200
100%

abr-25

-200

abr-24

-100

oct-23

-100

abr-23

100
80%

oct-22

100

abr-21
oct-21
abr-22

300
20%

oct-20

200

abr-19

300

oct-19

200
0%

oct-19
oct-20
abr-21
oct-21
abr-22

abr-20

oct-22
oct-23

abr-23

oct-25

abr-25

oct-24

abr-24

abr-27

oct-26

abr-26

oct-27
abr-28
oct-28

oct-30

abr-30

oct-29

abr-29

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

s-

abr-20

Temuco - Duqueco 220 kV

oct-18

-300

c-

abr-19

-200

oct-17
abr-18

-200

abr-17

-100

s+

oct-17
abr-18

-100

abr-17

100

oct-16

100

abr-16

200

oct-16

200

abr-16

[MW]

Temuco - Duqueco 220 kV


c+

oct-15

abr-15

oct-34

Mes

oct-15

[MW]

oct-33
abr-34

100%

abr-15

oct-34

oct-32
abr-33

oct-18

abr-19

80%

abr-34

oct-33

abr-33

oct-31
abr-32

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

20%

abr-32

abr-31

oct-30

abr-30

oct-29

abr-29

oct-27
abr-28
oct-28

s-

abr-31

abr-27

oct-26

c-

0%

abr-30

oct-25

abr-26

s+

abr-29

oct-24
abr-25

c+

oct-26

Mes

abr-26

oct-23

abr-24

100%

oct-25

oct-24
abr-25

abr-23

oct-22

80%

abr-24

oct-19
oct-20
abr-21
oct-21
abr-22

abr-20

20%

abr-23

oct-18

abr-19

[MW]
300

abr-20

300

oct-19

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

0%

abr-19

[MW]

[MW]
300

Temuco - Charra 220 kV

Escenario Base

200

100

-100

-200

-300

Escenario ERNC Sur


Duqueco - Charrua 220 kV

-300

Escenario ERNC+Hidro Sur

Duqueco - Charrua 220 kV

-300

Figura 65: Flujos Temuco Charra 220 kV para distintas probabilidades de excedencia.

agosto de 2015

98

Escenario Base
300

Cautn - Temuco 220 kV

200

[MW]

100

-100

-200

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-300

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC Sur

Escenario ERNC+Hidro Sur


400

300

200

200

100

100

[MW]

300

Mes
0%

20%

80%

100%

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

oct-28

abr-30

abr-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

oct-19

abr-20

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

oct-29

abr-30

oct-28

abr-29

abr-28

oct-27

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

-400

oct-16

-300

-400

abr-17

-200

-300

oct-15

-100

-200

abr-16

-100

abr-16

oct-15

Cautn - Temuco 220 kV

abr-15

Cautn - Temuco 220 kV

abr-15

[MW]

400

Mes
c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 66: Flujos Cautn - Temuco 220 kV para distintas probabilidades de excedencia.

i.

Escenario Base

En el escenario base los niveles de trasferencia esperados para los tramos entre la S.E. Cautn
y S.E. Charra se encontraran por debajo de las capacidades mximas de las lneas a
excepcin del tramo Cautn Temuco 220 kV el cual presentara saturaciones a partir del ao
2023.9
ii.

Escenario ERNC Sur

En el Escenario ERNC Sur, la incorporacin de las centrales ERNC elicas entre Cautn y
Charra se traducen en mayores niveles de transferencia en el sentido sur norte, dando
origen a congestiones para los tramos Mulchn Charra 220 kV (Figura 63) y Temuco
Charra 220 kV (Figura 65). Cabe sealar que los tramos en los cuales se presentaran
saturaciones dependen de los puntos de conexin de las centrales modeladas.
iii.

Escenario ERNC+Hidro Sur

En el Escenario ERNC+Hidro Sur, las centrales ERNC incorporadas en la zona de Mulchn


sumadas a la mayor generacin hidrulica disponible desde Puerto Montt hacia el norte, se
En la simulacin se ha modelado una elevacin de la capacidad mxima mediante el supuesto de una obra que deber ser
definida en los procesos de revisin troncal futuros.
9

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
99

traducen en mayores niveles de transferencia en el sentido Sur norte. De la Figura 63 se


desprenden que en caso de considerar el proyecto en su etapa de energizacin en 500 kV
como parte del sistema completo entre Puerto Montt Ciruelos Nueva Charra 500 kV, se
otorgara capacidad suficiente para los flujos esperados en el tramo Mulchn Charra 220
kV. Lo anterior se debe a que de la lnea paralela de 500 kV entre S.E. Ciruelos y S.E. Charra
acta como corredor directo hasta Nueva Charra 500 kV reduciendo el uso de los tramos de
220 kV.

7.3.4.1 Necesidades de expansin Tramo Cautn Mulchn Charra


El anlisis de utilizacin esperada para el escenario base indica que no resultara pertinente
llevar a cabo una evaluacin econmica del proyecto propuesto para el tramo. No obstante lo
anterior, en el Escenario ERNC Sur y Escenario ERNC+Hidro Sur las saturaciones esperadas en
el tramo Mulchn Charra muestran que se deber definir mediante una evaluacin
econmica la pertinencia de la recomendacin del proyecto (4). Adicionalmente se podra
requerir de obras de expansin para el tramo Temuco - Charra 220 kV.

7.3.5

Tramo Cautn Valdivia

Instalaciones
existentes:

Obras en construccin
Obras a analizar:

(1) Circuito N1 Lnea Valdivia Cautn 2x220 kV

Tramo Valdivia Ciruelos 1x220 kV, 1x193 MVA.

Tramo Ciruelos - Cautn 1x220 kV, 1x193 MVA.


(2) Circuito N2 Valdivia Cautn 1x220 kV:

Tramo Cautn Loncoche 1x220, 1x193 MVA

Tramo Loncoche Valdivia 1x220, 1x145 MVA.


(3) Seccionamiento del circuito N 2 Valdivia Cautn en S.E. Ciruelos
Nueva lnea 2x500 [kV] Cautn - Ciruelos 2500/1500 [MVA], tendido dos circuitos energizados
en 220 [kV]
Abr-15 - Dic-16
Cautin220

Ene-17 - Abr-18
Cautin220

Ene-22 - Mar-35
Cautin220
Existente

Loncoche

Ciruelos220

Ene-17
Ene-22

Ciruelos220

Ciruelos220

En Licitacin o
Construccin
Proyecto

Valdiv ia220

Valdiv ia220

Valdiv ia220
Hacia
Pichirropulli220

Ilustracin 15.Diagrama de obras a considerar para el Sistema al sur de S/E Cautn

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
100

Lmite Modelado MVA

Fecha

Sin Proyecto

Proyecto Considerado

Con Proyecto

+Seccionamiento circuito N 2 Valdivia Cautn


Obra en Construccin
en S.E. Ciruelos
145
500
+ Nueva L. Cautn Ciruelos 2x500 kV (220)
Obra Propuesta
Cuadro 49: Lmites de Transferencia a considerar para el Tramo Cautn al Sur

Ene-17

145

Ene-22

145

Escenario Base
800

Descripcin

Escenario ERNC Sur


800

Desde el Sur a S/E Cautn (Ciruelos - Cautn 220


kV desde ene-17)

600

400

400

200

200

oct-33

abr-34
oct-34

oct-34

oct-32

abr-34

oct-31

abr-33

abr-32

oct-33

oct-32

oct-30

abr-31

oct-29

abr-30

oct-28

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

oct-24

abr-33

80%

abr-32

20%

abr-26

Mes

Mes
0%

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

abr-18

oct-16

abr-17

oct-15

abr-15

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-16

oct-18

-600

oct-17

-600

abr-19

-400

abr-18

-400

oct-15

-200

abr-17

-200

abr-16

abr-15

abr-16

[MW]

[MW]

600

Desde el Sur a S/E Cautn (Ciruelos - Cautn 220


kV desde ene-17)

100%

c+

s+

c-

0%

s-

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC+Hidro Sur


800

2000

Desde el Sur a S/E Cautn (Ciruelos - Cautn 220


kV desde ene-17)

600

Nva Pto Montt - Ciruelos 500 kV

1500

400

1000

200

[MW]

500

[MW]

-200
-500

oct-31

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

oct-27

abr-28

abr-27

oct-26

oct-25

abr-26

oct-24

abr-25

abr-24

oct-23

abr-23

abr-22
oct-22

oct-21

oct-20

abr-21

oct-19

abr-20

oct-18

abr-19

oct-17

abr-18

oct-16

abr-17

abr-16

oct-15

-1000
-600

abr-15

-400

-1500

Mes
0%

20%

80%

100%

c+

s+

c-

oct-34

oct-33

abr-34

oct-32

abr-33

oct-31

abr-32

abr-31

oct-30

oct-29

abr-30

abr-29

oct-28

oct-27

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

abr-24

oct-23

oct-22

abr-23

oct-21

abr-22

oct-20

abr-21

oct-19

abr-20

abr-19

oct-18

oct-17

abr-18

oct-16

abr-17

oct-15

abr-16

abr-15

-800
-2000

s-

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Figura 67: Flujos desde el sur a S.E. Cautn para distintas probabilidades de excedencia.

i.

Escenario Base

La Figura 67 muestra el flujo proyectado que llega desde el sur a S.E. Cautn hasta enero de
2017, fecha en la cual se lleva a cabo la materializacin del seccionamiento de ambos circuitos,
posteriormente muestra las transferencias en el tramo Ciruelos Cautn 220 kV.
Se observa que las transferencias esperadas dan origen a saturaciones en ambos sentidos, las
cuales se incrementan a partir del ao 2020.
ii.

Escenario ERNC Sur

La incorporacin de centrales al norte de Cautn y al sur de Ciruelos se traducen en mayores


niveles de flujo en ambos sentidos, siendo relevante las magnitudes esperadas hacia el norte
debido principalmente a que los requerimientos de demanda neta al sur de Ciruelos se ven
disminuidos por la generacin incorporada en la zona, y a su vez aumentan los
requerimientos de energa al norte de la S.E Cautn.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
101

iii.

Escenario ERNC+Hidro Sur

La conexin de la central hidrulica en la S.E. Nueva Puerto Montt en enero de 2023 impulsa
niveles de flujos que superaran las mximas capacidades de las lneas en su etapa de
energizacin en 220 kV, por lo que para efectos de explorar las mximas transferencias en
este escenario se modelan las lneas propuestas considerando la energizacin 500 kV. De
acuerdo a lo presentado en la Figura 67, la Nueva lnea Ciruelos Cautn alcanzara a operar
en 220 kV desde enero de 2022 hasta su requerimiento de energizacin en 500 kV en enero
de 2023, para pasar a formar parte del sistema completo entre Puerto Montt y Nueva Charra,
reduciendo con ello la capacidad disponible en 220 kV10. No obstante lo anterior, se aprecia
que considerando la redistribucin de flujos entre el sistema de 220 kV y el paralelo de 500
KV, las capacidades en cada uno ellos resultaran suficientes.
7.3.5.1 Necesidades de expansin Tramo Cautn Valdivia
Se observa que en caso de no considerar la obra de expansin se presentara un alto grado de
saturacin en el tramo en los tres escenarios analizados por lo que se evaluar
econmicamente el proyecto propuesto.

7.3.6

Tramo Ciruelos Pichirropulli

Instalaciones
existentes:
Obras en construccin

Obras a analizar:

(1) Circuito N1 Valdivia Ciruelos 1x220 kV, 1x193 MVA.


Circuito N2 Valdivia Cautn 1x220 kV, 1x145 MV
(2) Nueva lnea Ciruelos Pichirropulli 2x220 kV, 1x290 MVA 25C
(3) Seccionamiento del circuito Valdivia Cautn en S.E. Ciruelos
(4)Nueva lnea Ciruelos Pichirropulli 2x220 kV, 1x290 MVA, (tendido segundo circuito)
Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli 1500 [MVA], tendido de un circuito energizado
en 220 [kV]

Abr-15 -Dic-16
Hacia S/E
Cautin220

Ene-17-Abr-18
Hacia S/E
Cautin220

May-18 -Dic-21
Hacia S/E
Cautin220

Ene-22 -Mar-35
Hacia S/E
Cautin220

may-18
Ene-17
may-18
Ene-22

Existente
En Licitacin o
Construccin
Proyecto

Ciruelos220

Ciruelos220

Ciruelos220

Ciruelos220

Valdiv ia220

Valdiv ia220

Valdiv ia220

Valdiv ia220

Pichirropulli220

Pichirropulli220

Hacia S/E
Rahue220

Hacia S/E
Rahue220

Hacia S/E
Rahue220

Hacia S/E
Rahue220

Linea (1) 2x500 kV


(energizada en 220)

Ilustracin 16.Diagrama de obras a considerar para el Sistema al sur de S/E Ciruelos

10

La nueva capacidad del tramo en 220 kV corresponde a la de la actual lnea Ciruelos Cautn 2x220 kV, 2x145 MVA, ms un
incremento asociado a la redistribucin de flujos postcontingencia, debido al sistema paralelo de 500 kV.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
102

Lmite Modelado MVA


Sin Proyecto
Con Proyecto

Fecha

Proyecto Considerado

Descripcin

+Seccionamiento circuito N 2 Valdivia Cautn


Obra en Construccin
en S.E. Ciruelos
145
325
+ Nueva lnea Ciruelos Pichirropulli 2x220 kV Obra en Construccin
325
500
+ Nueva lnea Ciruelos Pichirropulli 2x500 kV Obra Propuesta
Cuadro 50: Lmites de Transferencia a considerar para el Tramo Desde Ciruelos al Sur

ene-17

145

may-18
Ene-22

145

Escenario Base
600

Desde el Sur S/E Ciruelos

400

[MW]

200

-200

-400

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-600

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC Sur

Escenario ERNC+Hidro Sur


600

400

200

200

[MW]

400

Mes
0%

20%

80%

100%

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

abr-30

oct-28

abr-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

oct-19

abr-20

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

oct-29

abr-30

oct-28

abr-29

abr-28

oct-27

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

-600

abr-18

-600

oct-16

-400

abr-17

-400

oct-15

-200

abr-16

-200

abr-16

oct-15

Desde el Sur S/E Ciruelos

abr-15

Desde el Sur S/E Ciruelos

abr-15

[MW]

600

Mes
c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 68: Suma de flujos desde S.E. Ciruelos al sur

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
103

0%

20%

80%

100%

c+

oct-26

s+

oct-29

c-

oct-30

Mes

s-

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

0%

20%

80%

oct-24

100%

c+

oct-25

oct-26

s+

c-

c-

200

-200

-400

-600

-800

Mes

s-

Nueva Pichirropulli - Ciruelos 220 kV

Escenario ERNC+Hidro Sur

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-33
abr-34
oct-34

oct-33

abr-34

oct-34

oct-32

400

abr-33

600

abr-33

Escenario Base
oct-31

Nueva Pichirropulli - Ciruelos 220 kV

oct-32

s-

abr-32

Figura 69: Flujos Pichirropulli Ciruelos 220 kV, para distintas probabilidades de excedencia

oct-31

Mes

abr-32

abr-31

oct-30

abr-30

s+

oct-29

abr-29

oct-28

abr-28

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

c+

oct-27

abr-27

oct-30
abr-31

100%

abr-26

-800

abr-30

Mes

abr-25

-600

-800

80%

abr-24

-400

-600

oct-23

-400

abr-23

-200
20%

oct-22

-200
c-

abr-22

Escenario ERNC Sur

oct-21

200
s+

oct-29
0%

abr-21

400

200

oct-28

Escenario ERNC Sur

oct-20

800

abr-29

s-

oct-19

400

c-

abr-20

600

abr-28

[MW]
400

abr-19

600

s+

oct-18

Nueva Pichirropulli - Ciruelos 220 kV


c+

abr-18

100%

oct-17

-400

abr-17

-300

-400

oct-16

-200

-300

abr-16

-100

-200

oct-27

-100

oct-15

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

c+

oct-16

oct-26
abr-27

100

abr-16

oct-25
abr-26

200

100

oct-26

oct-24
abr-25

300

200

abr-27

oct-23
abr-24

300

abr-26

oct-22
abr-23

Pichirropulli - Ciruelos 220 kV

oct-25

oct-21
abr-22

abr-25

oct-24

oct-20
abr-21

100%

oct-15

[MW]

80%

abr-24

oct-23

abr-23

oct-19
abr-20

80%

abr-15

oct-34

abr-34

20%

oct-22

abr-22

oct-21

abr-21

oct-18
abr-19

20%

oct-33

abr-33

oct-32

abr-32

0%

oct-20

abr-20

oct-17
abr-18

[MW]

0%

oct-31

oct-19

c-

abr-31

abr-19

oct-18

abr-18

s+

abr-30

oct-17

abr-17

800

abr-29

oct-28

abr-28

oct-16

abr-16

oct-15

abr-15
c+

oct-27

abr-27

[MW]

100%

abr-26

oct-25

abr-25

oct-24

80%

abr-24

oct-23

abr-23

oct-22

20%

abr-22

oct-21

abr-21

0%

oct-20

abr-20

oct-19

abr-19

abr-17

oct-16

abr-16

oct-15

abr-15

400

oct-18

abr-18

[MW]
800

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]
400

Pichirropulli - Ciruelos 220 kV

Escenario Base

300

200

100

-100

-200

-300

-400

Mes
s-

Pichirropulli - Ciruelos 220 kV

Escenario ERNC+Hidro Sur

Mes

Figura 70: Flujos Nueva lnea Pichirropulli Ciruelos 220 kV, para distintas probabilidades de excedencia

s-

agosto de 2015

104

Escenario Base
400

Rahue - Valdivia 220 kV (Pichirropulli - Valdivia


desde may-18)

300

200

[MW]

100

-100

-200

-300

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

-400

Mes
0%

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC Sur

Escenario ERNC+Hidro Sur


400

300

200

200

100

100

[MW]

300

Mes
0%

20%

80%

100%

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

oct-30

abr-32

abr-31

oct-29

abr-30

oct-28

abr-29

oct-27

abr-28

oct-26

oct-25

abr-27

abr-26

oct-24

abr-25

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

oct-19

abr-20

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

oct-34

abr-34

oct-33

oct-32

abr-33

abr-32

oct-31

oct-30

abr-31

oct-29

abr-30

oct-28

abr-29

abr-28

oct-27

oct-26

abr-27

oct-25

oct-24

abr-26

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

oct-17

abr-19

abr-18

-400

oct-16

-300

-400

abr-17

-200

-300

oct-15

-100

-200

abr-16

-100

abr-16

oct-15

Rahue - Valdivia 220 kV (Pichirropulli - Valdivia


desde may-18)

abr-15

Rahue - Valdivia 220 kV (Pichirropulli - Valdivia


desde may-18)

abr-15

[MW]

400

Mes
c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 71: Flujos Barro Blanco Valdivia 220 kV para distintas probabilidades de excedencia.

i.

Escenario Base

La Figura 68 muestra los flujos desde el sur hacia S.E. Ciruelos una vez efectuado el
seccionamiento completo en enero de 2017 (3). Se visualizan congestiones en el tramo para
los flujos que van de norte a sur hasta la fecha de entrada en servicio de la lnea Ciruelos Pichirropulli 2x220 kV en mayo de 2018 (2).
A comienzo del ao 2021, el aumento progresivo de los flujos hacia el sur, promovidos por la
liberacin de limitaciones en los tramos Puerto Montt Pichirropulli 220 kV conllevara a
sobrepasar nuevamente el lmite con criterio N-1 en el tramo Ciruelos Pichirropulli, para lo
cual se ha modelado el propuesto para el tramo.
ii.

Escenario ERNC Sur

Para el Escenario ERNC Sur igualmente se presentan saturaciones de Ciruelos hacia el sur
(Figura 68), los cuales alcanzaran en algunas condiciones la capacidad mxima de
transferencia en caso de no considerar el proyecto de expansin.
iii.

Escenario ERNC+Hidro Sur

En el Escenario ERNC+Hidro Sur, para completar el sistema de 500 kV Puerto Montt


Ciruelos - Charra se modela para el tramo la nueva lnea Ciruelos Pichirropulli energizada

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
105

en 500 kV. Con la incorporacin de este proyecto, la distribucin de flujos hacia este sistema
500 kV permite la operacin sin saturaciones del sistema de 220 kV.

7.3.6.1 Necesidades de expansin Tramo Ciruelos - Pichirropulli


Las transferencias esperadas para el tramo dan cuanta de la necesidad de evaluacin de una
obra de expansin a partir del ao 2021. Considerando los plazos involucrados de la obra
expansin propuesta se realizar la respectiva evaluacin econmica.

7.3.7

Tramo Puerto Montt - Pichirropulli


(1) Lnea Puerto Montt Valdivia 1x220 kV, 1x145 MVA
(2) Lnea Puerto Montt Rahue 1x220 kV, 1x193 MVA
(3) Lnea Rahue Valdivia 1x220 kV, 1x193 MVA
(4) Nueva lnea Puerto Montt Pichirropulli 2x500 (220) kV, 2x1500(290) MVA
(5) Seccionamiento completo S.E. Rahue
Ninguna

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

Escenario Base

Nva Puerto Montt - Pichirropulli 220 kV

800

600

400

400

200

200

[MW]

600

-200

-200

-400

-400

-600

-600

oct-33

abr-34
oct-34

oct-34

oct-32

abr-34

oct-31

abr-33

abr-32

oct-33

oct-32

oct-30

abr-31

oct-29

abr-30

oct-28

abr-29

oct-27

oct-26

abr-28

abr-27

oct-25

oct-24

abr-33

80%

abr-32

20%

abr-26

Mes

Mes
0%

abr-25

oct-23

abr-24

oct-22

oct-21

abr-23

abr-22

oct-20

oct-19

abr-21

abr-20

oct-18

abr-19

oct-17

abr-18

oct-16

abr-17

abr-15

oct-34

oct-33

oct-32

abr-34

abr-33

oct-31

abr-32

oct-30

oct-29

abr-31

abr-30

oct-28

oct-27

abr-29

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

oct-22

abr-24

abr-23

oct-21

oct-20

abr-22

abr-21

oct-19

abr-20

oct-18

oct-17

abr-19

abr-18

oct-16

oct-15

abr-17

abr-16

abr-15

oct-15

-800

-800

abr-16

[MW]

feb-21
feb-17
-

Escenario ERNC Sur

Nva Puerto Montt - Pichirropulli 220 kV

800

100%

c+

s+

c-

0%

s-

20%

80%

100%

c+

s+

c-

s-

Escenario ERNC+Hidro Sur


2000

Nva Puerto Montt - Pichirropulli 220 kV

800

600

400

1000

200

500

[MW]

[MW]

Nva Puerto Montt - Nva Ciruelos 500 kV

1500

-200
-500

oct-31

oct-30

abr-31

abr-30

abr-29
oct-29

oct-28

oct-27

abr-28

oct-26

abr-27

oct-25

abr-26

oct-24

abr-25

oct-23

abr-24

abr-23

oct-21

abr-22
oct-22

oct-20

abr-21

oct-19

abr-20

oct-18

abr-19

oct-17

abr-18

oct-16

abr-17

abr-16

oct-15

-1000
-600

abr-15

-400

-1500

oct-34

abr-34

oct-33

oct-32

abr-33

oct-31

abr-32

abr-31

oct-30

oct-29

abr-30

abr-29

oct-28

oct-27

abr-28

abr-27

oct-26

oct-25

abr-26

oct-24

abr-25

abr-24

oct-23

oct-22

abr-23

abr-22

oct-21

oct-20

abr-21

oct-19

abr-20

abr-19

oct-18

oct-17

abr-18

abr-17

oct-16

oct-15

abr-16

abr-15

-800
-2000

Mes

Mes
0%

20%

80%

100%

c+

s+

c-

s-

0%

20%

80%

100%

c+

s+

c-

s-

Figura 72: Flujos Nueva Puerto Montt Pichirropulli 220 kV, para distintas probabilidades de excedencia

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
106

0%

20%

80%

100%

c+

oct-26

s+

c-

Mes

s-

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

0%

20%

80%

100%

c+

oct-25

oct-26

s+

c-

600

400

200

-200

-400

-600

Mes

s-

Puerto Montt - Rahue 220 kV (Puerto Montt - Nueva


Puerto Montt 220 kV desde noviembre 2021)

Escenario ERNC+Hidro Sur

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-34

Escenario Base
oct-33

Puerto Montt - Rahue 220 kV (Puerto Montt - Nueva


Puerto Montt 220 kV desde febrero 2021)

oct-34

s-

abr-34

Figura 73: Flujos Nueva Puerto Montt Rahue 220 kV, para distintas probabilidades de excedencia

oct-33

Mes

abr-34

abr-33

oct-32

abr-32

c-

oct-31

abr-31

oct-30

abr-30

s+

oct-29

abr-29

oct-28

abr-28

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

c+

oct-27

abr-27

oct-30
abr-31

100%

abr-26

-600

oct-24

-400

-600

abr-30

Mes

abr-25

-400

80%

abr-24

-200

oct-23

-200

abr-23

20%

oct-22

c-

abr-22

Escenario ERNC Sur

oct-21

200

s+

oct-29
0%

abr-21

400

200

oct-17

Escenario ERNC Sur

oct-20

400

abr-17

400

oct-19

600

c-

abr-20

600

oct-28

s-

abr-19

800

s+

oct-18

Puerto Montt - Rahue 220 kV (Puerto Montt - Nueva


Puerto Montt 220 kV desde febrero 2021)
c+

abr-18

100%

abr-29

-400

abr-28

-300

-400

oct-17

-200

-300

abr-17

-200

oct-16

-100

abr-16

-100

oct-27

c+

oct-16

100

abr-16

[MW]
200

100

oct-15

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

200

oct-26

oct-26
abr-27

300

abr-27

oct-25
abr-26

300

abr-26

oct-24
abr-25

Puerto Montt - Rahue 220 kV

oct-25

oct-23
abr-24

abr-25

oct-24

oct-22
abr-23

100%

oct-15

[MW]

80%

abr-24

oct-23

abr-23

oct-21
abr-22

80%

abr-15

oct-34

abr-34

20%

oct-22

abr-22

oct-21

abr-21

oct-20
abr-21

20%

oct-33

abr-33

oct-32

abr-32

0%

oct-20

abr-20

oct-19
abr-20

[MW]

0%

oct-31

oct-19

abr-19

oct-18

abr-18
c-

abr-31

oct-30

abr-30

oct-17

abr-17

s+

oct-29

abr-29

oct-28

abr-28

oct-16

abr-16

oct-15

abr-15
c+

oct-27

800

abr-27

[MW]

100%

abr-26

oct-25

abr-25

oct-24

80%

abr-24

oct-23

abr-23

oct-22

20%

abr-22

oct-21

abr-21

0%

oct-20

abr-20

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

400

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

[MW]
800

oct-15

abr-15

oct-34

abr-34

oct-33

abr-33

oct-32

abr-32

oct-31

abr-31

oct-30

abr-30

oct-29

abr-29

oct-28

abr-28

oct-27

abr-27

oct-26

abr-26

oct-25

abr-25

oct-24

abr-24

oct-23

abr-23

oct-22

abr-22

oct-21

abr-21

oct-20

abr-20

oct-19

abr-19

oct-18

abr-18

oct-17

abr-17

oct-16

abr-16

oct-15

abr-15

[MW]
400

Puerto Montt - Rahue 220 kV

Escenario Base

300

200

100

-100

-200

-300

-400

Mes
s-

Puerto Montt - Rahue 220 kV

Escenario ERNC+Hidro Sur

Mes

Figura 74: Flujos Puerto Montt - Nueva Puerto Montt 220 kV, para distintas probabilidades de excedencia

s-

agosto de 2015

107

i.

Escenario Base

Para la suma de flujos de S.E. Pichirropulli al sur se observa que la capacidad adicionada por el
proyecto en licitacin Nueva lnea Puerto Montt Pichirropulli 2x500 (220) kV, 2x1500
(290) MVA (feb-2021), permitira operar el tramo sin restricciones en todo el horizonte de
estudio. Cabe indicar que esta lnea se considera energizada en 220 kV para todo el horizonte
de estudio en que se encuentra disponible.

ii.

Escenario ERNC Sur

Las conclusiones presentadas para el escenario bases son equivalentes a las del Escenario
ERNC Sur.
iii.

Escenario ERNC+Hidro Sur

En el Escenario ERNC+Hidro Sur la Lnea Nueva Puerto Montt Pichirropulli 2x500 kV,
alcanzara a operar en 220 kV desde su puesta en servicio en nov-2021 hasta enero de 2023
cuando se requerira su energizacin en 500 kV.

7.3.8

Tramo Puerto Montt Melipulli - Chilo

Instalaciones
existentes:
Obras en construccin
Obras a analizar:

(1) Lnea Puerto Montt Melipulli 2x220 kV, 1x145 MVA


(2) Lnea Melipulli - Chilo, 1x193 MVA
Ninguna
Ninguna

El tramo Puerto Montt Melipulli Chilo ha sido recientemente incluido en la calificacin de


instalaciones del STT, lo que sumado a la no recepcin de propuestas de expansiones para el
tramo y al abanico de posibles soluciones posibles con diversos niveles de complejidad, esta
Direccin ha optado por recabar ms antecedentes para posteriormente emitir los anlisis
correspondientes.

7.3.9

Resumen anlisis zona sur

A partir de los anlisis realizados para la zona sur se presenta el Cuadro 51, en el cual se
muestran los tramos que presentaran algn grado de saturacin y los niveles de congestin
esperada, y a continuacin en el Cuadro 52 se identifican las posibles obras de expansin que
daran solucin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
108

Cuadro 51: Niveles de congestin esperada zona Sur

Escenario
Base
ERNC sur
ERNC-hidro

2020
0%
0%
0%

2021
0%
0%
0%

2022
0%
0%
0%

2023
0%
18%
56%

Mulchn Charra 220 kV


2024
2025
2026
0%
0%
0%
15%
14%
14%
56%
53%
53%

2027
0%
12%
51%

2028
0%
11%
47%

2029
0%
10%
46%

2030
0%
9%
42%

Escenario
Base
ERNC sur
ERNC-hidro

2020
0%
0%
6%

2021
0%
0%
6%

2022
0%
0%
7%

2023
0%
0%
22%

Temuco Charra 220 kV


2024
2025
2026
0%
0%
0%
0%
0%
0%
23%
21%
21%

2027
0%
0%
21%

2028
0%
0%
19%

2029
0%
0%
19%

2030
0%
0%
18%

Escenario
Base
ERNC sur
ERNC-hidro

2020
16%
36%
35%

2021
21%
43%
42%

2022
25%
49%
46%

2023
23%
49%
97%

Desde el sur a Cautn 220 kV


2024
2025
2026
20%
19%
19%
47%
44%
45%
98%
98%
97%

2027
24%
40%
97%

2028
27%
39%
96%

2029
27%
32%
95%

2030
26%
33%
94%

Escenario
Base
ERNC sur
ERNC-hidro

2020
0%
0%
0%

2021
0%
0%
0%

2022
1%
1%
0%

2023
2%
1%
61%

Desde el sur a Ciruelos 220 kV


2024
2025
2026
3%
3%
3%
2%
3%
3%
60%
57%
55%

2027
5%
3%
53%

2028
8%
4%
48%

2029
12%
5%
44%

2030
9%
6%
41%

Para los tramos comprendidos entre Cautn y Mulchn se aprecian congestiones para los
escenarios en lo que se supone la ejecucin de los proyectos ERNC catastrados en la zona.
Para el tramo ciruelos cautn se observan elevados niveles de saturacin en todos los
escenarios analizados, lo que indicara el requerimiento de una obra de expansin para el
tramo. Para el tramo Ciruelos - Pichirropulli se observa que con las lneas que se encuentran
actualmente en construccin se dispondra de capacidad suficiente para las transferencias que
se originaran en el Escenario Base y el Escenario ERNC sur, no as para el escenario de
desarrollo de generacin hidrulica en la zona de Puerto Montt que podra requerir del
desarrollo de un sistema ms robusto entre Puerto Montt y Charra.

Cuadro 52: Resumen de requerimientos de expansin zona sur

Proyectos

Fecha
PES

Nueva lnea 2x500 [kV] Nueva Charra Mulchn 1700 [MVA],


tendido de dos circuitos energizados en 220 [kV]

Ene-23

Nueva lnea 2x500 [kV] Cautn - Ciruelos 1700 [MVA], tendido


dos circuitos energizados en 220 [kV]
Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli 1700 [MVA],
tendido de dos circuitos energizados en 220 [kV]

Ene-22
Ene-23

Diagnostico
Sobrecarga sur
norte
Centrales
ERNC
Sobrecarga ambos
sentidos
Sobrecarga norte sur

Escenarios
posible
requerimiento
Escenario ERNC Sur y
3
Escenario base , 2 y 3
Escenario base, 2 y 3

La determinacin de la conveniencia de ejecucin de los proyectos sealados depender de la


evaluacin econmica correspondiente, suponiendo que la puesta en servicio de stos se
efecta en la fecha ms prxima considerando los plazos administrativos y de construccin.
7.3.10 Evaluacin econmica zona sur
Se lleva a cabo la evaluacin econmica de los proyectos sealados en el Cuadro 52 para cada
uno de los 3 escenarios analizados en la zona sur. Los datos presentados en el Cuadro 53 se

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
109

obtienen como resultado de un proceso iterativo. Para cada escenario se evalan los
proyectos considerando que existe interdependencia, en el sentido que la ejecucin de alguno
de ellos condiciona la conveniencia de la materializacin de otro/os. De esta forma, por
ejemplo para el Escenario ERNC Sur, la evaluacin del proyecto N. L. Cautn - Ciruelos 2x500,
2x1700 se realiza bajo el supuesto que no se ejecutan los otros dos proyectos; esto porque al
realizar las combinatoria de los 3 proyectos, se concluye que estos ltimos no resultan
conveniente
Cuadro 53: Evaluaciones econmicas zona sur
Valores presentes en miles de USD

Proyecto evaluado
N. L 2x500 [kV] Nueva Charra
Mulchn 1700 [MVA] (**)
N. L. Cautn - Ciruelos 2x500 kV,
2x1700 MVA
N. L. 2x500 [kV] Ciruelos - Pichirropulli
1700 [MVA]

Escenario base
Costo
Costo
Operacin
de Inv.
y falla

Escenario ERNC Sur


Costo
Costo
Operacin
de Inv.
y falla

VAN

VAN

Escenario ERNC+Hidro S (*)


Costo
Costo
Operacin
VAN
de Inv.
y falla

30,248

36,823

- 6,575

166,995

36,823

130,172

73,698

64,759

8,939

116,129

64,759

51,370

720,756

64,759

655,997

2,548

42,530

- 39,982

5,929

42,530

- 36,601

43,783

42,530

1,253

(*) Las evaluaciones por tramo consideran los valores de inversin para los proyectos en 500 kV pero energizados en 220 kV.
(**) El proyecto no se evala en el escenario 0 debido a que no se presentan saturaciones.

Proyectos a recomendar por escenario


N. L 2x500 [kV] Nueva Charra Mulchn 2500 [MVA] (**)
N. L. Cautn - Ciruelos 2x500 kV, 2x1500 MVA
N. L. 2x500 [kV] Ciruelos - Pichirropulli 1500 [MVA]

Escenario
base
X

Escenario
ERNC S
X

Escenario
ERNC+H S

Debido a que los resultados obtenidos para los distintos escenarios no son coincidentes
respecto de la conveniencia de ejecucin de los proyectos, se efectuar un anlisis de mnimo
arrepentimiento para determinar la recomendacin de expansin.
A partir de lo presentado en el Cuadro 53 se definen los planes ptimos a considerar para
cada escenario generacin demanda.
Cuadro 54: Planes de expansin de la transmisin a considerar, zona sur
Plan
Plan
Base
ERNC S
Nueva lnea 2x500 [kV] Nueva Charra Mulchn 1700 [MVA],
ene-26
energizado en 220 [kV]
Nueva lnea 2x500 [kV] Mulchn 1700 Cautn 1700 [MVA],
energizado en 220 [kV]
Nueva Lnea Cautn - Ciruelos 2x500, 2x1700, dos circuitos
ene-22
ene-22
Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli 1700 [MVA],
tendido de un circuito energizado en 220 [kV]

1
2
3
4

Plan
ERNC+H S
ene-23
ene-23(*)
ene-22
ene-23

(*) El tramo de lnea se requerira en el plan ERNC+H S para permitir la inyeccin hasta Charra de las centrales que inyectan Puerto Montt Charra.

Plan Base: Se observa que para el Escenario base slo resulta conveniente la
ejecucin del proyecto 3, el cual conformar el plan de expansin que se denominar
Plan Base.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
110

Plan ERNC S: Para el Escenario ERNC S y para efectos de la recomendacin del


presente ao se incluira igualmente slo la ejecucin del proyecto 3, pero en el detalle
de la evaluacin econmica presentada en el ANEXO 8 se observa que el proyecto para
el tramo Charra - Mulchn resulta conveniente su puesta en servicio a partir del ao
2026, por lo que se incluye en dicha fecha en el plan ptimo definido para el Escenario
ERNC Sur el cual se denomina Plan ERNC S.

Plan ERNC+H S: Para el Escenario ERNC + Hidro Sur las evaluaciones econmicas
indican que se deberan materializar los 3 tres proyectos evaluados. Para verificar la
conveniencia de ejecucin de cada una de las obras evaluadas, en el Cuadro 53 se
consideran los VATT para los proyectos en 500 kV pero se modelan energizados en
220 kV aun cuando conviene energizarlos en 500kV, a fin evitar el efecto de subsidios
cruzados que un tramo podra originar sobre otro en caso de evaluar el plan completo
en 500 kV.
Una vez definido que todos los tramos del plan requerido son necesarios, igualmente
se evala el proyecto completo energizado en 500 kV, para lo que se requiere incluir el
tramo Cautn Charra 2x500 kV, de modo de completar el corredor entre Nueva
Puerto Montt y Nueva Charra, sumando adems la inversin de 2 subestaciones
seccionadoras de 500 kV con 1 transformador de bajada de 750 MVA cada una y una
inversin en compensacin reactiva, verificando as la conveniencia de la futura
energizacin en 500 kV. A continuacin se muestra la evaluacin del Plan ERNC+H S
completo, incluyendo la energizacin en 500 kV.
Valores presentes en miles de USD

Cop y Falla
VATT
VAN

Plan 3
1,067,285
317,971
749,314

As, el detalle de cada plan ptimo de expansin que correspondera recomendar para cada
escenario, en la presente revisin se presenta en el Cuadro 55:
Una vez definidos los planes ptimos por escenario se modelan las distintas combinaciones
Escenario Plan de expansin que permiten determinar los arrepentimientos. Para lo
anterior se supone el escenario analizado como certero en todo el horizonte, determinndose
los costos de operacin e inversin que se originaran en caso haber decidido ejecutar hoy un
plan distinto al plan ptimo de dicho escenario.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
111

Cuadro 55: Combinaciones escenario vs plan


Proyectos de Expansin
-

VI
miles
USD

Plan
Base

Escenario Base
Plan
Plan
ERNC S ERNC+H

Escenario ERNC Sur


Plan
Plan
Plan
Base
ERNC S
ERNC+H

Escenario ERNC+Hidro Sur


Plan
Plan
Plan Base
ERNC S
ERNC+H

Nueva lnea 2x500 [kV] Nueva Charra Mulchn


ene-23
ene-26
ene-26 ene-23
2500 [MVA], operada en 220 kV
87,666
Nueva lnea 2x500 [kV] Nueva Charra Mulchn
may-24
may-24
2500 [MVA], operacin en 500 kV
Nueva Lnea Cautn - Ciruelos 2x500, 2x1500,
ene-22
ene-22
ene-22
ene-22
ene-22
ene-22
ene-22
ene-22
operada en 220 kV
133,597
Nueva Lnea Cautn - Ciruelos 2x500, 2x1500,
may-24
may-24
operacin en 500 kV
Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli
ene-23
ene-23
1500 [MVA], operada en 220 kV
87,739
Nueva lnea 2x500 [kV] Ciruelos - Pichirropulli
may-24
may-24
1500 [MVA], operacin en 500 kV
Nueva lnea 2x500 [kV] Mulchn - Cautn 1700
ene-23
ene-23
[MVA], operada en 220 kV
143,752
Nueva lnea 2x500 [kV] Mulchn - Cautn 1700
may-24
may-24
[MVA], operacin en 500 kV
Equipos de compensacin para 500 kV (*)
153,460
may-24
may-24
S.E. y Transformacin 220/500 kV S.E. P.Montt
64,050
may-24
may-24
S.E. Transformacin 220/500 kV S.E. Ciruelos
64,050
may-24
may-24
(*) Para valorizar la futura energizacin en 500 kV se ha considerado como supuesto un requerimiento de 4x75 MVAr + 4x175 MAr en reactores de
lnea y 2 plataformas de compensacin serie. Lo anterior corresponde una estimacin preliminar, ya que los requerimientos definitivos
dependern, entre otros, de la definicin futura de las subestaciones de enlace 500/220 kV.

Esc. Base Plan Base: Corresponde al plan ptimo encontrado para Escenario Base.

Esc. Base Plan ERNC S: Se construye la Nueva Lnea Ciruelos Cautn 2x500, y no se
ejecuta la lnea Nueva Charra Mulchn 2x500 kV (perteneciente al Plan ERNC S),
debido a que el Escenario Base nunca la requiere.

Esc. Base Plan ERNC+H S: Se construye la Nueva Lnea Ciruelos Cautn 2x500 y los
tramos de lnea Nueva Charra Mulchn - Cautn 2x500 kV y Ciruelos Pichirropulli
2x500 kV, representando estas inversiones un arrepentimiento puesto que el
escenario no lo requiere en todo su horizonte.

Esc. ERNC Plan Base: Se construye la Nueva Lnea Ciruelos Cautn 2x500 y
posteriormente se incorpora la nueva lnea Nueva Charra Mulchn 2x500 kV
(2026), puesto que el escenario lo requiere en el futuro.

Esc. ERNC S Plan ERNC S: Corresponde al plan ptimo encontrado para Escenario
ERNC S.

Esc. ERNC S Plan ERNC+H S: Se construye la Nueva Lnea Ciruelos Cautn 2x500 y
se alcanza a construir el tramo de lnea Nueva Charra Mulchn - Cautn 2x500 kV y
Ciruelos Pichirropulli 2x500 kV, representando estas inversiones un
arrepentimiento puesto que el escenario lo requiere slo el tramo Charra Mulchn
a partir del ao 2026.

Esc. ERNC+H S Plan Base: Se construye la Nueva Lnea Ciruelos Cautn 2x500.
Bajo los supuestos del Plan 0, en la recomendacin del presente ao no se incluira la

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

ene-23
ene-22
ene-23

ene-23

ene-23
ene-23
ene-23
ene-23

agosto de 2015
112

ejecucin de la nueva lnea Nueva Charra Mulchn - Cautn 2x500 kV, pero en caso
de que suceda el Escenario ERNC+H S en el futuro, en la prxima recomendacin se
debera incluir la lnea lo que se traducira en un ao aproximado de retraso respecto
del Plan ERNC+H S. Lo anterior se debe a que la lnea podra entrar en operacin
recin a partir de mayo de 2024, observando as un arrepentimiento asociado al
sobrecosto que implica no poder evacuar la energa barata en el sur desde el ao
2023.
La lnea Ciruelos Pichirropulli 500 kV retrasa igualmente su puesta en servicio
debido a que no se justifica en tanto no se permitan mayores niveles de transferencias
desde Puerto Montt a Nueva Charra.
Posteriormente, a partir del ao 2024 una vez que se cuenta con el sistema completo
Nueva Puerto Montt Nueva Charra se incorporan los transformadores para la
energizacin en 500 kV para conseguir los 1700 MVA de manera que no se produzcan
congestiones.

Esc. ERNC+H S Plan ERNC S: Ocurre lo mismo que en el caso anterior.

Esc. ERNC+H S Plan ERNC+H S: En la presente recomendacin se incluira la Nueva


Lnea Ciruelos Cautn 2x500 para su puesta en servicio el ao 2022 y la lnea Nueva
Charra Mulchn - Cautn 2x500 kV y el tramo Ciruelos Pichirropulli 2x500 kV
para su fecha ms prxima de puesta en servicio, la cual coincide con la llegada de la
central Cuervo en enero de 2023.

Considerando el detalle del Cuadro 55 se obtiene la matriz de costos, en la que se destaca


el plan de expansin que minimiza los costos totales de cada escenario:
Cuadro 56: Matriz de Costos
Esc. Base
Esc. ERNC S
Valores presentes en miles de USD
Plan Base

Plan ERNC S

Plan
ERNC+H S

Cop
VATT
COSTO Total
Cop
VATT
COSTO Total
Cop
VATT
COSTO Total

23,395,161
64,759
23,459,920
23,395,161
64,759
23,459,920
23,387,557
199,946
23,587,502

22,741,319
88,690
22,830,009
22,741,319
88,690
22,830,009
22,733,794
162,664
22,896,458

Esc. ERNC+H S
21,631,127
286,356
21,917,483
21,631,127
286,356
21,917,483
21,473,915
318,878
21,792,793

A partir del Cuadro 56 se construye la matriz de arrepentimientos, restando para cada


escenario el sobrecosto que significara elegir un plan distinto al de menor costo de dicho
escenario.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
113

Cuadro 57: Matriz de Arrepentimiento


Valores presentes en miles de USD

Esc. Base

Esc. ERNC S

Esc. ERNC+H S

Max

Plan Base

124,690

124,690

Plan ERNC S

124,690

124,690

127,583

66,449

127,583

Plan ERNC+H S

Se escoge la alternativa de expansin Plan Base o bien Plan ERNC S (ambas iguales
respecto de las obras a ejecutar en el presente periodo), que minimiza el mximo
arrepentimiento. Es decir, es mayor el arrepentimiento que se producira al invertir en las
lneas de transmisin en caso de que no se materialicen las centrales de generacin del
Escenario ERNC+Hidro Sur y que por ende estas no hayan sido requeridas (Plan ERNC+H S Esc. ERNC+HS); que el aumento de costos de operacin que significara el retraso de la
transmisin en 1 ao en caso de que s entren en servicio las centrales del Escenario
ERNC+Hidro Sur y no se haya decidido hoy ejecutar las lneas (Plan Base Esc. ERNC+H S).
Por lo anterior, la obra a recomendar para la zona sur en la presente propuesta de expansin
corresponde a la Nueva Lnea Cautn - Ciruelos 2x500, 2x1700, energizado en 220 [kV]. En el
Ttulo 9 del presente informe y en el ANEXO 6 se efecta un mayor detalle y descripcin de los
proyectos evaluados y el recomendado para la zona.
Cuadro 58: Obras a recomendar zona Sur

Proyectos a recomendar zona sur


Nueva Lnea Cautn - Ciruelos 2x500, 2x1700, energizado en 220 [kV]

Fecha estimada PES


Ene-22

Cabe sealar que para el tramo Charra Mulchn se presentaran saturaciones de acuerdo a
los niveles de flujos esperados en el escenario 2 (Figura 63 y Figura 65). A pesar de lo
anterior, la evaluacin econmica del proyecto presentado para este tramo indica que no es
conveniente realizar el proyecto de lnea Mulchn Nueva Charra 2x500 kV, energizada en
220 kV, con un VAN negativo de aproximadamente 7 millones de USD (Cuadro 53), debido
principalmente a que los beneficios operativos de liberar las restricciones no alcanzan a
compensar los elevados costos de inversin de la lnea en 500 kV.
En relacin a lo anterior se observa que como solucin alternativa existira la posibilidad de
efectuar una obra de ampliacin de la lnea existente Charra Temuco 1x220 kV en conjunto
con la definicin de un seccionamiento y enlace a la lnea paralela Charra Mulchn Cautn
220 kV, lo anterior condicionado a la definicin de los puntos de conexin de los proyectos
Elicos considerados en la zona en el escenario sealado.
Debido a que para efectos de la presente revisin no se cuenta con los antecedentes
suficientes de conexin de las centrales elicas, ni de factibilidad de un proyecto como el
sealado, se estudiar la pertinencia de recomendar una obra para el tramo en conjunto con la
definicin de los puntos ptimos de conexin a realizar por la DPD, o bien en la prxima
revisin del ETT.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
114

7.4 Anlisis Proyectos Presentados por Empresas Promotoras


A continuacin se indica los criterios utilizados para el tratamiento de los proyectos
presentados por las empresas promotoras en el contexto de la revisin de la expansin del
sistema troncal.
Proyecto Propuesto
ProyectoP.E 13, Seccionadora Talinay II
Este 220 kV
ProyectoP.E 2, Seccionadora El Romero
ProyectoP.E 3, Seccionadora El Pion
Verde
ProyectoP.E 5, Seccionadora Santa Isabel
ProyectoP.E 4, Seccionadora Lastarria
ProyectoP.E 11, Seccionamiento Lnea
Charra-Hualpn 1x220 kV
ProyectoP.E 7, Nueva Lnea CiruelosCautn 2x500 kV
ProyectoP.E 6, Seccionadora Nueva
Cautn
ProyectoP.E 10, Ampliacin S/E Ciruelos
ProyectoP.E 8, Nueva Lnea A.JahuelPolpaico 2x500 kV
ProyectoP.E 9, Seccionadora Nueva Las
Palmas
ProyectoP.E 12, Ampliacin Lnea
Nogales-Maitencillo 2x220 kV
ProyectoP.N 1, Cambio Conexin
Transformadores ATR4 y ATR5:
ProyectoP.N 2, Ampliacin Capacidad
Barra y Cambio Configuracin
Interruptor y Medio S.E Alto Jahuel
ProyectoP.N 3, Ampliacin Capacidad
Barra y Cambio Configuracin
Interruptor y Medio S.E Pan de Azcar
ProyectoP.N 4, Ampliacin Capacidad
Barra y Cambio Configuracin
Interruptor y Medio S.E Cardones
ProyectoP.N 5, Ampliacin S.E Chena
ProyectoP.N 6, Ampliacin S.E Los
Maquis
ProyectoP.N 7, Ampliacin S.E Polpaico

Proponente
Enel Green
Power
Acciona
Energa
RES Chile
Transnet
Transnet
Transelec

Recomendacin
El proyecto presentado corresponde a un requerimiento de punto de
conexin al STT, en tal caso, el desarrollo de ste deber ser revisado
conforme a los procedimientos y metodologas estipuladas en la
revisin de puntos ptimos de conexin al sistema troncal.
El proyecto se presenta como obra para dar solucin a problemas de
sistemas de subtransmisin. Por lo anterior, el anlisis de
conveniencia de su recomendacin ser desarrollado en el contexto
del estudio de recomendaciones de expansin de instalaciones de
subtransmisin que elaborar la DPD.

Transelec
Transelec

Producto de los anlisis y evaluaciones econmicas respectivas, se


incorpora la obra como parte de la recomendacin.

Transelec
Transelec
Transelec

Producto de los anlisis y evaluaciones econmicas respectivas, no se


justifica la inclusin de esta obra en el presente estudio de expansin.

Transelec
Transelec

Transelec

Transelec

Transelec
Chilectra
Colbn
Colbn

Producto de los anlisis elctricos presentados en el ANEXO 5, no se


justifica la necesidad de esta obra de ampliacin en el presente estudio
de expansin.
Producto de los anlisis elctricos y normativos presentados en el
ANEXO 5, no se justifica la condicin topolgica propuesta. Respecto al
aumento de capacidad de barra esta se analizar en futuros estudios
de expansin.
Producto de las obras de ampliacin recientemente fijadas para la S.E.
Cardones en el Decreto N158/2015 se posterga el anlisis de la
propuesta para los prximos estudios de expansin.
Producto de los anlisis elctricos y normativos presentados en el
ANEXO 5, y posterior a un trabajo conjunto con la empresa
proponente, se recomienda la obra de ampliacin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
115

ANLISIS DE REQUERIMIENTOS DE CUMPLIMIENTO NORMATIVO EN S.E. TRONCALES

La NTSyCS establece estndares para el diseo y desarrollo del sistema de transmisin, los cuales corresponden entre otros a criterios
de configuracin de subestaciones para el mantenimiento de interruptores y para el desempeo de las instalaciones frente a fallas en
transformadores y secciones de barra (severidades 8 y 9). Por esta razn se han realizado anlisis detallados que consideran estos
criterios de desarrollo del sistema, los cuales se encuentran cometidos en el ANEXO 4.
En virtud de la revisin y anlisis desarrollados en cada subestacin del STT, a continuacin se presenta una tabla resumen que
contiene los requerimientos de cada una y sobre los cuales la DPD est analizando recomendar ampliaciones.

N1

S/E TRONCAL

INCUMPLIMIENTO

REQUERIMIENTO PRELIMINAR

S.E DIEGO DE ALMAGRO 220


kV

1.
Falla de severidad 9 se propaga con llegada de nueva
lnea D.Almagro-Cardones 2x220 kV
2.
Posible sobrecarga esperada del 20% en barras
3.
Falla de severidad 8 en transformadores 220/110 kV se
propagara a los sistemas de subtransmisin

1.
Conexin del pao del primer circuito nueva Cardones Diego de Almagro 2x220 kV,
con flexibilidad de conectarse a ambas secciones.
2.
Repotenciamiento de barras

S.E SAN ANDRS 220 kV

1.
Incumplimiento en criterio de conexin, no se admite el
seccionamiento de un solo circuito en el STT.

Se podra estudiar el desarrollo de un proyecto que contemple soluciones al


incumplimiento., sin embargo de acuerdo a lo indicado en no se considera necesario proponer un
proyecto.

S.E MAITENCILLO 220 kV

1.
2.
1.
4

S.E PAN DE AZCAR 220 kV

S.E QUILLOTA 220 kV

2.

1.
6

S.E LOS MAQUIS

2.
3.

Falla de severidad 9 se propagara a los sistemas de


subtransmisin
Posible sobrecarga esperada del 150%
No existe posibilidad de mantenimiento de Interruptores
JT5(CER 1), JT6(CER 2) y JCE5(CCEE)
Falla de severidad 8 y 9 se propagara a los sistemas de
subtransmisin
Falla de severidad 9 se propagara provocando sobrecargas
Falla de severidad 9 se propaga dejando sin abastecimiento la
zona de Aconcagua
Falla de severidad 8 se propaga dejando sin abastecimiento la
zona de Aconcagua
No existe posibilidad de mantenimiento a todos los
interruptores de la subestacin

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

3.

Proyecto para cumplimiento ante falla de severidad 8, se analizar en los estudios de


expansin de la subtransmisin a realizar posteriormente.

1. Proyecto se analizar en los estudios de expansin de la subtransmisin a realizar


posteriormente.
2. Posible repotenciamiento de barras
1.
2.

Se debe normalizar conexin de interruptores JT5(CER 1), JT6(CER 2) y JCE5(CCEE)


Proyecto para cumplimiento ante falla de severidad 8 y 9, se analizar en los estudios de
expansin de la subtransmisin a realizar posteriormente.

Proyecto para cumplimiento ante falla de severidad 9, se analizar en los estudios de


expansin de la subtransmisin a realizar posteriormente.

1.

Se deber realizar proyecto de ampliacin que permita mantenimiento de los interruptores


y que evite la propagacin de la falla de severidad 8 y 9.

agosto de 2015
116

S.E POLPAICO 220 kV

No existe posibilidad de mantenimiento de interruptor J12,


perteneciente a lnea Polpaico-Los Maquis.

S.E CHENA 220 kV

1.
2.

S.E CERRO NAVIA 220 kV

10

S.E ALTO JAHUEL 220 kV

S.E COLBN 220 kV

11

S.E CANDELARIA 220 kV

Falla de severidad 9 se propaga.


No existe posibilidad de mantenimiento de los interruptores
J3 y J4 (pertenecientes a L3 y L4 Alto Jahuel-Chena).
1. No existe posibilidad de mantenimiento de Interruptor JCE1,
banco condensador 50 MVAr.
2. Falla de severidad 9 se propagara provocando sobrecargas en
el sistema de transformacin 220/110 kV.
1. No existe posibilidad de mantenimiento de Interruptores CE1
(CCEE 65 MVAr), JCE2 (CCEE 50 MVAr), JZ3 (Reactor 90
MVAr), J3 (lnea 2 Maipo-Alto Jahuel) y J10 (lnea 1 Maipo-Alto
Jahuel).
2. Posible sobrecarga esperada del 120% en 220 kV y 80% en 500
kV

Se debe normalizar conexin de interruptor J12.

Se deber realizar proyecto de ampliacin que permita mantenimiento de los interruptores


y que evite la propagacin de la falla de severidad 9.
1.
2.

Se debe normalizar conexin de interruptor JCE1.


Proyecto para cumplimiento ante falla de severidad 9, se analizar en los estudios de
expansin de la subtransmisin a realizar posteriormente.

1.

Se debe normalizar conexin de interruptores CE1 (CCEE 65 MVAr), JCE2 (CCEE 50 MVAr),
JZ3 (Reactor 90 MVAr), J3 (lnea 2 Maipo-Alto Jahuel) y J10 (lnea 1 Maipo-Alto Jahuel).
Posible repotenciamiento de barras.

2.

Se debe analizar la normalizacin de la conexin de interruptor J7.

No existe posibilidad de mantenimiento del interruptor J7,


perteneciente a la lnea (2) de Candelaria-Maipo 2x220 kV
La subestacin no posee barra de transferencia, interruptores J1
(Maipo-Candelaria 1x220 kV), J2 (A.Jahuel-Candelaria 1x220 kV),
J3 (C1 Candelaria-Colbn 2x220 kV), J4 (C1 Candelaria-Colbn
2x220 kV), J5 (C1 Candelaria-Minero 2x220 kV) y J6(C2 Candelaria
- Colbn 2x220 kV) no cumplen con criterio de mantenimiento de
interruptores.
No existe posibilidad de mantenimiento de interruptor J9,
perteneciente a la lnea 1x220 [kV] Candelaria Colbn

12

S.E ANCOA 220 kV

13

S.E CHARRA 220 kV

La falla de severidad 9 en la segunda seccin de barra deja sin


abastecimiento la zona de Concepcin.

14

S.E VALDIVIA 220 kV

La falla de severidad 9 se propagara a los sistemas de


subtransmisin

15

S.E RAHUE 220 kV

La falla de severidad 9 se propagara a los sistemas de


subtransmisin

16

S.E PUERTO MONTT 220 kV

No existe posibilidad de mantenimiento de interruptor JT4,


perteneciente al CER.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

Se debe analizar el desarrollo de un proyecto de ampliacin troncal que permita el


mantenimiento de todos los interruptores troncales.

Se debe analizar el desarrollo de un proyecto de normalizacin de la conexin de interruptor


J9.

Se debe analizar el desarrollo de un proyecto de ampliacin tronca y de subtransmisin que


no permita la propagacin de la falla y prdida del consumo.
Proyecto se analizar en los estudios de expansin de la subtransmisin a realizar
posteriormente.
Proyecto se analizar en los estudios de expansin de la subtransmisin a realizar
posteriormente.
Se debe analizar el desarrollo de un proyecto para dar cumplimiento a la mantencin del
interruptor JT4.

agosto de 2015
117

PROYECTOS RECOMENDADOS

A continuacin se presentan los proyectos de expansin y normalizacin a recomendar en la


presente revisin del ETT. Mayores detalles respecto de las caractersticas de los proyectos y
definiciones se pueden encontrar en el Anexo 6.
Cuadro 59: Proyectos de expansin a recomendar
N

Obra de expansin recomendadas

Responsable
Licitacin Obra
Nueva

VI miles de
USD

36 meses

Nuevo transformador 500/220 kV, 750 MVA en S.E. Cumbres

(1)

Adecuacin de capacidad lnea Nueva Diego de Almagro Cumbres 2x220 kV


Nueva lnea Nueva Maitencillo Punta Colorada Nueva Pan de azcar
2x220 kV, 2x500 MVA
Ampliacin S.E. Nueva Maitencillo

3.826

24 meses (2)

Ampliacin S.E. Punta Colorada

Transelec

2.996

24 meses (2)

Ampliacin S.E. Nueva Pan de Azcar


Nueva Lnea Ciruelos Nueva Cautn 2x500 kV, 2x 1700 MVA, energizada en
220 kV (Incluye paos de lnea, seccionamiento y enlace a Charra-Mulchn
2x220 kV) + S.E. Nueva Cautn
Ampliacin S.E. Ciruelos
Modificacin de la compensacin serie de la Nueva Lnea Polpaico Pan de
Azcar 2x500 kV y reactores de 75 MVAr en SS.EE. N. Maitencillo y N. Pan de
Azcar 500 kV

Interchile S.A.

3.771

24 meses (2)

Ampliacin S.E. Polpaico para dar cabida a equipos de Compensacin Serie

Transelec

7
8
9
10

Licitacin Obra
Nueva
Interchile S.A.

Licitacin Obra
Nueva
Transelec
Interchile S.A.

18.772

Plazo
Constructivo

(1)
106.893

130.264
3.332

(1)
48 meses

60 meses
24 meses (3)

44.916 (4)

24 meses

542

24 meses

(1) Se ha estimado que el sobrecosto de adecuar la capacidad de la lnea entre 600 MVA y 750 MVA corresponde a 1.65 millones de USD.
(2) Las obras deben estar disponible en la fecha de entrada del proyecto 3, cuya fecha estimada de puesta en servicio corresponde a enero 2021.
(3) La obra deben estar disponible en la fecha de entrada del proyecto 7, cuya fecha estimada de puesta en servicio corresponde a enero 2022.
(4) Valor de inversin considera los costos informados por Interchile S.A para la modificacin de la compensacin serie con motivo de la Revisin
anual 2014 del ETT.

Cuadro 60: Proyectos de normalizacin SS.EE


N

Obra de Normalizacin

S/E Diego de Almagro 1: Aumento Capacidad Barras


S/E Diego de Almagro 2: Incorporacin Desconectador Circuito 1 Nueva lnea
D.Almagro-Cardones 2x220 kV
S/E Don Goyo: seccionamiento tramo P. Azcar-Las Palmas 2x220 kV
S/E La Cebada: seccionamiento tramo P. Azcar-Las Palmas 2x220 kV
S/E Los Maquis: modificacin topologa subestacin
S/E Polpaico: Conexin J12 a la barra de transferencia
S/E Lo Aguirre: seccionamiento segundo circuito A.Jahuel-Polpaico 2x500 kV
S/E Chena: Conexin J3 y J4 a la barra de transferencia
S/E Chena: Seccionamiento barra principal con incorporacin de un
interruptor seccionador de barra y un interruptor acoplador
S/E Alto Jahuel: Conexin J3 y J10 a la barra de transferencia
S/E Puerto Montt: Conexin a barras 1 y 2 CER

2
3
4
5
6
7
8
9
10
11

Transelec

1.171

Plazo
constructivo
24 meses

Eletrans

497

24 meses

P.E EL Arrayn
EPM Chile
Colbn
Colbn
Transelec
Transelec

(*)
(*)
9.834
344
13.380
1.461

24 meses
24 meses
24 meses
24 meses
24 meses
24 meses

Chilectra

2.319

24 meses

Colbn
Transelec

561
3.262

12 meses
24 meses

Responsable

VI miles de USD

(*) La elaboracin del proyecto se encuentra en desarrollo por la DPD.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
118

9.1 Proyectos de Expansin del Sistema de Transmisin Troncal SIC

9.1.1

Nuevo Transformador 220/500 kV S.E Cumbres

9.1.1.1 Justificacin
El proyecto corresponde a una de las obras recomendadas en la zona norte del SIC y se
justifica producto de los requerimientos de transmisin debido a la alta penetracin de
proyectos ERNC en la regin de Atacama. Esta obra de expansin permitir la capacidad de
transformacin hacia el sistema de 500 kV.
9.1.1.2 Descripcin General
La obra propuesta consiste en la construccin de un segundo transformador 220/500 kV en la
futura S.E Cumbres a fin de ampliar la capacidad de transferencias requerida por la fuentes
ERNC. La topologa de conexin del transformador se consider en interruptor y medio para
los dos patios.
9.1.1.3 Valor de inversin y Plazos
Para efectos de las evaluaciones econmicas se ha considerado el Valor de Inversin asociado
a la construccin de transformador 220/500 kV con sus respectivos paos en ambos patios
por un total de 18.772 MUSD y un plazo constructivo de 27 meses.

9.1.2

Nueva Lnea Nueva Maitencillo Punta Colorada Nueva Pan de Azcar 2x220
kV, 2x 500 MVA,

9.1.2.1 Justificacin
El proyecto corresponde a una de las expansiones a recomendar en la zona norte del SIC y se
justifica producto de los requerimientos de capacidad adicional del tramo Maitencillo-Punta
Colorada-Pan de Azcar debido a la conexin de generacin ERNC y proyectos de consumo en
la zona norte del sistema de transmisin troncal.
9.1.2.2 Descripcin General
La obra propuesta consiste en la construccin de una lnea de doble circuito entre la
subestacin Nueva Maitencillo y Nueva Pan de Azcar 2x220 kV, ambas en construccin, y un
seccionamiento en la actual subestacin Punta Colorada. El proyecto considera una longitud
aproximadamente de 197 kilmetros, y una capacidad de transmisin de 500 MVA.
Teniendo en cuenta que la S.E Nueva Maitencillo y la S.E Nueva Pan de Azcar estn en
construccin y tendrn una topologa de interruptor y medio, al igual que la actual S.E Punta

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
119

Colorada, se considera que las ampliaciones en todas estas subestaciones se desarrollarn


manteniendo la misma configuracin.
9.1.2.3 Valor de inversin
Para efectos de las evaluaciones econmicas se ha considerado el Valor de Inversin asociado
a la construccin de las lneas con sus respectivos paos, y las obras de ampliacin requeridas
en las subestaciones para conectar los nuevos circuitos.
Cuadro 61: Valor de inversin proyecto Nueva Lnea Nueva Maitencillo-Punta Colorada- Nueva Pan de Azcar 2x220 kV
Obra
VI miles de USD
Responsable
Lnea de Transmisin
89.687 Licitacin
Obra
Paos de Lnea
17.207 Nueva
Ampliacin S.E. Nueva Maitencillo
Ampliacin S.E. Punta Colorada
Ampliacin S.E. Nueva Pan de Azcar

3.827
2.996
3.772
Total

Interchile S.A
Transelec
Interchile S.A

117.488

9.1.2.4 Plazos
Se ha considerado un plazo constructivo segn lo indicado en el Cuadro 62. De acuerdo a lo
indicado en el ttulo 3.4, se ha supuesto la emisin del decreto de expansin en diciembre de
2015 y los plazos administrativos para obras nuevas se han estimado en 12 meses, con lo que
se ha calculado la fecha de puesta en servicio de cada uno de los tramos de lnea propuestos.
Cuadro 62: Plazos Nueva Lnea Nueva Maitencillo-Punta Colorada- Nueva Pan de Azcar 2x220 kV
Tramo
Plazo
Fecha estimada PES
S.E. N.Maitencillo- S.E. P.Colorada S.E. N. P.Azcar
48 meses
Ene-2021

9.1.2.5 Ampliacin S.E. Nueva Maitencillo


La ampliacin en esta subestacin es necesaria para la acometida de los dos circuitos nuevos
que provienen desde la S.E Punta Colorada, en ese contexto se consideraron dos nuevos
interruptores centrales que posibiliten la construccin de dos medias diagonales y con ello
conectar la nueva lnea en topologa de doble interruptor, dejando disponible la ubicacin
para la conexin de nuevos elementos que podran conectarse y con ello mantener la
configuracin de interruptor y medio en todas las diagonales de la subestacin.
9.1.2.6 Ampliacin S.E. Punta Colorada
La ampliacin en esta subestacin es necesaria para la acometida de los 4 circuitos del
proyecto propuesto (dos desde S/E Nueva Maitencillo y dos desde S/E Nueva Pan de Azcar),
en ese contexto se consideraron dos nuevos interruptores centrales que posibiliten la
construccin de dos diagonales y con ello conectar los cuatro circuitos en configuracin de
interruptor y medio, manteniendo la topologa de la subestacin.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
120

9.1.2.7 Ampliacin S.E. Nueva Pan de Azcar


La ampliacin en esta subestacin es necesaria para la acometida de los dos circuitos que
provienen desde la S.E Punta Colorada, en ese contexto se consideraron dos nuevos
interruptores centrales que posibiliten la construccin de dos medias diagonales y con ello
conectar nueva lnea en topologa de doble interruptor, dejando disponible la ubicacin para
la conexin de nuevos elementos que podran conectarse y con ello mantener la configuracin
de interruptor y medio en todas las diagonales de la subestacin.
9.1.3

Nueva Lnea Ciruelos Nueva Cautn 2x500 kV, 2x 1700 MVA, energizada en
220 kV

9.1.3.1 Justificacin
El proyecto corresponde a las obras de expansin a recomendar en la zona sur del SIC y se
justifica en los requerimientos de capacidad adicional del tramo Ciruelos Cautn debido al
aumento de demanda en la zona sur y la incorporacin de nuevas centrales hidrulicas.
9.1.3.2 Descripcin general
La obra propuesta consiste en una nueva lnea de 115 kilmetros S.E. Ciruelos S.E. Nueva
Cautn 2x500 kV, 2x1700 MVA, la cual se energizara en una primera etapa en 220 kV.
Debido a las dificultades de acceso que presentara la S.E. Cautn existente de acuerdo a lo
informado por el propietario, se propone construir S.E Nueva Cautn que se ubicara en un
radio aproximado de 10 km en direccin al oriente de la torre 521 de la lnea 2x220 kV Cautn
Mulchn Charra 2x220 kV. La configuracin de esta subestacin se propone en
interruptor y medio y recibir los dos circuitos Ciruelos Nueva Cautn 220 kV desde el
extremo Ciruelos y los 4 circuitos de enlace desde la S.E. Nueva Cautn al punto de
seccionamiento de la lnea existente Cautn Mulchn Charra 2x220 kV.
Asimismo, en la S.E Ciruelos se requerira de una ampliacin para permitir la conexin de los
Nuevos circuitos Ciruelos Nueva Cautn 2x500 kV (220 kV) y las obras asociadas a la
adecuacin de conexin de los circuitos de la lnea en construccin Ciruelos Pichirropulli
2x220 kV para el cumplimiento de las exigencias normativas respecto de la falla severidad 9,
que se gatillaran cuando entre en operacin la nueva lnea Ciruelos Cautn recomendada.
A fin de optimizar los proyectos de transmisin, en trminos de espacio e inversin, se
propone que los tramos terminales que permiten la acometida del sistema de transmisin en
las subestaciones Ciruelos y Nueva Cautn se deberan realizar en torres de 220 kV, ya que en
el futuro el sistema deber operar en una tensin de 500 kV, por lo cual dichos tramos
terminales se tendrn que desconectar, o bien, en caso de requerir la subestacin como punto
de enlace al sistema de 220 kV, se utilizara el tramo de lnea terminal de 220 kV construido
como parte del enlace del transformador de 220 kV hacia la nueva S.E. de 500/220 kV.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
121

9.1.3.3 Valor de inversin


Para efectos de las evaluaciones econmicas se ha considerado el Valor de Inversin asociado
a la construccin de las lneas con sus respectivos paos, las nuevas subestaciones y las obras
de ampliacin requeridas en las subestaciones existentes para conectar los nuevos circuitos.
Cuadro 63: Valor de inversin proyecto Nueva Lnea Ciruelos Cautn 2x500 kV
Obra
VI miles de USD
Responsable
Lnea de Transmisin
93.540
Licitacin
Paos de Lnea
8.603
Nueva
S.E. Nueva Cautn
9.934
Lnea de enlace a S.E. Nueva Cautn
18.187
Ampliacin S.E. Ciruelos 1
641
Transelec
Ampliacin S.E. Ciruelos 2
2.690
Transelec
Total 133.597

Obra

9.1.3.4 Plazos
Se han considerados los plazos constructivos indicados por el consultor del ETT 2015-2018.
De acuerdo a lo indicado en el ttulo 3.4, se ha supuesto la emisin del decreto de expansin
en diciembre de 2015 y los plazos administrativos para obras nuevas se han estimado en 12
meses, con lo que se ha calculado la fecha de puesta en servicio de cada uno de los tramos de
lnea propuestos.
Cuadro 64: Plazos Nueva Lnea Ciruelos Cautn 2x500 kV
Tramo
Plazo
Fecha estimada PES
S.E. Ciruelos S.E. Nueva Cautn
60 meses
Ene-2022

9.1.3.5 Ampliacin S.E. Ciruelos


La obra de ampliacin de la S.E. Ciruelos se origina producto de dos requerimientos que
guardan relacin con el proyecto Ciruelos- Nueva Cautn 2x500 kV (Energizado en 200 kV):
a) Ampliacin S.E Ciruelos 1: Se requiere ampliar en espacio e infraestructura la
subestacin ciruelos para dar cabida a los dos paos de lnea del proyecto CiruelosNueva Cautn 2x500 (220) kV.
b) Ampliacin S.E Ciruelos 2: Producto de la incorporacin de la lnea Nueva Cautn
Ciruelos 500 kV, energizada en 220 kV, los flujos de potencia aumentarn por la lnea
Ciruelos Pichirropulli 2x220 kV, propiedad de Eletrans, que actualmente est en
construccin. En ese contexto, se revis el cumplimiento de la normativa en cuanto a
la falla de severidad 9 y se determin la necesidad de realizar una adecuacin para
evitar la propagacin de la falla. Como solucin, se propone modificar la conexin de la
lnea Ciruelos Pichirropulli 2x220 kV a configuracin de interruptor y medio en la
S.E. Ciruelos.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
122

En virtud de lo anterior y conforme a las caractersticas de cada obra, se determinaron los


valores de inversin esperados de las ampliaciones en la subestacin Ciruelos.
Cuadro 65: Valor de inversin proyecto Ampliacin S.E Ciruelos
Obra de Ampliacin
VI miles de USD Responsable
Ampliacin S.E. Ciruelos 1: dar cabida a paos nueva lnea Nueva Cautn641
Transelec
Ciruelos
Ampliacin S.E. Ciruelos 2: Modificacin conexin de la lnea Ciruelos
2.690
Transelec
Pichirropulli 2x220 kV, a configuracin de interruptor y medio en S.E. Ciruelos.
Total 3.332

Plazo (*)
24 meses
24 meses

(*) Las obras deben estar disponibles para su puesta en servicio en conjunto con la nueva lnea Nueva Cautn-Ciruelos 2x500 kV, operada en 220 kV

9.1.3.6 S.E. Nueva Cautn


Considerando la necesidad de un proyecto de transmisin entre la S.E Ciruelos y S.E Cautn, y
en vista de las dificultades de acceso a la actual S.E. Cautn, se propone el desarrollo de una
S.E. Nueva Cautn, en configuracin interruptor y medio con un total de 10 interruptores.
La subestacin Nueva Cautn tiene como objetivo recibir los dos circuitos de la lnea
propuesta y adems seccionar el actual tramo Mulchn-Cautn 2x220 kV, para lo cual se
deber construir una lnea de enlace de 220 kV entre la lnea Mulchn-Cautn 2x220 kV y la
Nueva Subestacin. La S.E. Nueva Cautn se propone en una ubicacin a 10 kilmetros hacia el
oriente de la torre N 521 del tramo previamente mencionado, sin perjuicio de que sta pueda
ser modificada producto de nuevos antecedentes.
Como parte de la nueva subestacin Nueva Cautn se considera la construccin de las barras y
de los interruptores centrales de las 4 diagonales. Es decir, se considera que los 6 paos de los
extremos de las lneas son propiedad del desarrollador de stas.
Obra de Ampliacin
Subestacin Nueva Cautn

Cuadro 66: Valor de inversin proyecto S.E Nueva Cautn


VI miles de USD Responsable
9.934
Obra Nueva
Total 9.934

Plazo (*)

(*) Las obras deben estar disponibles para su puesta en servicio en conjunto con la nueva lnea Nueva Cautn-Ciruelos 2x500 kV, operada en 220 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
123

9.1.3.7 Lnea de enlace a S.E. Nueva Cautn


Considerando el desarrollo de la S/E Nueva Cautn y la necesidad de conectarla
elctricamente al sistema troncal se contempla un proyecto de seccionamiento del tramo
Mulchn-Cautn 2x220 kV en la subestacin Nueva Cautn, para ello se considera el desarrollo
de dos lneas de transmisin de 220 kV de iguales caractersticas a la lnea existente MulchnCautn 2x220 kV de una longitud de 10 kilmetros desde la torre 521 hasta la mencionada S.E.
Nueva Cautn.
o

Torre N521 de la lnea Mulchn-Cautn 2x220 kV - S.E Nueva Cautn 2x220 kV (4


circuitos)

Para efectos de la valorizacin de los dos tramos nuevos de doble circuito, se consider
adems de la lnea de transmisin los 4 paos de lnea respectivos que se ubican fsicamente
en la subestacin Nueva Cautn.
Cuadro 67: Valor de inversin proyecto lnea enlace S/E Nueva Cautn
Obras Enlace S/E Nueva Cautn
VI miles de USD
Lnea Enlace: 2 tramos 2x220 kV, 10 km, desde torre N 521 hasta S/E Nueva
Cautn
4 paos de lnea en S/E Nueva Cautn

Total

9.1.4

9.584
8.603
18.187

Modificacin de la compensacin serie de la Nueva Lnea Polpaico Pan de


Azcar 2x500 kV y reactores de 75 MVAr en SS.EE. N. Maitencillo y N. Pan de
Azcar 500 kV

9.1.4.1 Justificacin
Se han actualizado los anlisis realizados en la revisin de expansin 2014 en lo referente a
los requerimientos de compensacin reactiva de la zona norte del sistema elctrico en vista de
entrada en operacin del sistema de 500 kV entre Polpiaco y Cardones y la nueva
interconexin SIC - SING. Estos anlisis ratifican las conclusiones alcanzadas en la
recomendacin de expansin del ao 2014.
Esta obra encuentra su justificacin en los elevados niveles de tensin que presentan algunos
nodos del futuro sistema de sistema de 500 kV Polpaico Cardones, las cuales resultan
crticas para numerosas condiciones de operacin, especialmente en horas de demanda baja
y/o bajas transferencias por dicho sistema. Estas sobretensiones tambin poseen efectos
sobre el proyecto de interconexin SIC-SING actualmente en desarrollo, de modo que la
adecuacin de los niveles de compensacin del tramo Polpaico Cardones 500 kV resulta
especialmente relevante.
El alto nivel de penetracin de ERNC en la zona norte, as como el mencionado proyecto de
interconexin de los sistemas SIC y SING, generan un abanico muy amplio de condiciones de

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
124

operacin esperadas, situacin que se traduce en flujos de potencia bidireccionales relevantes


a travs de los distintos tramos del sistema, especialmente desde Polpaico hacia el norte.

9.1.4.2 Descripcin General


La obra consiste en la adecuacin de la compensacin serie de la futura lnea Polpaico Pan
de Azcar 2x500 kV, manteniendo el nivel de compensacin del proyecto original (50%), pero
reubicando los equipos de compensacin en ambos extremos de la lnea y no en uno solo (Pan
de Azcar). De esta forma, ambos extremos de la lnea contarn con una plataforma de
compensacin serie de similares caractersticas, ya que el nivel de compensacin original se
dividir en partes similares, siendo ms alto el valor de la compensacin del lado del extremo
Polpaico (60% del total de compensacin).
Adicionalmente, el proyecto se complementa con la instalacin de dos reactores de 75 MVAr
cada uno, en las barras de las futuras SS.EE. Nueva Pan de Azcar y Nueva Maitencillo 500 kV,
incluidas sus respectivas diagonales, de modo de mantener la configuracin de diseo de las
mencionadas SS.EE.
9.1.4.3 Valor de inversin y Plazos
El valor de inversin y plazos considerados para el proyecto se presentan en el Cuadro 68.
Cuadro 68: Valor de inversin proyecto lnea enlace S/E Nueva Cautn
Valor de Inversin
Obra
Plazo
miles USD
Reactor 500 kV, 75 MVAr en S.E. Maitencillo
12.324
24 meses (**)
Reactor 500 kV, 75 MVAr en S.E. Pan de Azcar
12.324
24 meses (**)
Ampliacin S.E. Polpaico
542
15 meses (**)
Adecuacin de la compensacin serie Lnea Pan de
20.268(*)
(**)
Azcar Polpaico 2x500 kV
(*) Valor de inversin informado por Interchile S.A. con motivo de la Revisin anual 2014 del ETT
(**) Estas obras deben estar en servicio en conjunto con la Nueva Lnea Polpaico Pan de Azcar 2x500 kV

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
125

9.2 Proyectos de Normalizacin


Producto de la revisin de la NT de SyCS en cuanto al diseo que deben poseer las
subestaciones troncales, se detectaron incumplimientos normativos, sobre los cuales se
proponen proyectos de ampliacin que dan cuenta de las regularizaciones a proponer.
A continuacin se realiza una descripcin sobre la justificacin y recomendacin de cada uno
de los proyectos de normalizacin. Mayores detalles respecto de las caractersticas de los
proyectos y definiciones se pueden encontrar en el ANEXO 6.
9.2.1

Normalizacin Subestacin Diego de Almagro

9.2.1.1 Situacin Actual y Justificacin


Una vez que est en operacin la nueva lnea 2x220 kV Cardones Diego de Almagro,
propiedad de Eletrans, y segn la configuracin de conexin informada, se estar
vulnerando los criterios de seguridad ante falla de severidad 9.
Adicionalmente, y dado el aumento en el volumen de las transferencias por la zona, se
requerir de un repotenciamiento de las barras de la subestacin, adicionando un segundo
conductor por fase, de las mismas caractersticas que el conductor existente.
9.2.1.2 Recomendacin
Proyecto Eletrans: Se recomienda que el pao del primer circuito de la lnea 2x220 kV
Cardones Diego de Almagro, tenga la flexibilidad para permitir su conexin a ambas
secciones de la barra principal mediante un desconectador. El detalle del proyecto se
puede encontrar en el ANEXO 6.
Proyecto Transelec: repotenciar todas las secciones de barra de la subestacin,
adicionando un segundo conductor por fase (AAC Coreopsis 1540 MCM), de las mismas
caractersticas que el conductor existente. El detalle del proyecto se puede encontrar en el
ANEXO 6.
9.2.1.3 Responsable
Eletrans: conexin circuito 1 nueva lnea Cardones Diego de Almagro 2x220 kV con
flexibilidad para permitir su conexin a ambas secciones de barra.
Transelec: Repotenciamiento secciones de barra.
9.2.1.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial y plazos de estos proyectos se presentan a continuacin
separado por propietario responsable.
Eletrans: 497 MUSD con un plazo constructivo de 24 meses.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
126

Transelec: 1.171 MUSD con un plazo constructivo de 24 meses.


9.2.2

Normalizacin Subestacin Don Goyo

9.2.2.1 Situacin Actual y Justificacin


Actualmente esta subestacin slo secciona el circuito 2 del tramo Pan de Azcar-Las Palmas
2x220 kV.
Producto de lo estipulado 3-24, Titulo 4 de la normativa, en cuanto a que las conexiones en el
sistema de transmisin troncal deben seccionar al menos dos de los circuitos del respectivo
tramo y que adems esta subestacin fue definida como punto ptimo de Conexin por la DPD
segn lo estipulado en el artculo 2-7 letra e) de la mencionada norma tcnica, se requerir
modificar la configuracin actual de dicha subestacin para dar cumplimiento a la regulacin
vigente.
9.2.2.2 Recomendacin
Se propone normalizar esta subestacin mediante el seccionamiento de los dos circuitos del
tramo Pan de Azcar-Las Palmas 2x220 kV. La configuracin est siendo analizada por la DPD
a fin de proponer un proyecto que d cuenta del cumplimiento normativo y que posibilite el
libre acceso para nuevas instalaciones.
9.2.2.3 Responsable
P.E El Arrayn
9.2.2.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial de este proyecto est siendo elaborado por la DPD.
9.2.3

Normalizacin Subestacin La Cebada

9.2.3.1 Situacin Actual y Justificacin


Actualmente esta subestacin slo secciona el circuito 1 del tramo Pan de Azcar-Las Palmas
2x220 kV.
Producto de lo estipulado 3-24, Titulo 4 de la normativa, en cuanto a que las conexiones en el
sistema de transmisin troncal deben seccionar al menos dos de los circuitos del respectivo
tramo y que adems esta subestacin fue definida como punto ptimo de Conexin por la DPD
segn lo estipulado en el artculo 2-7 letra e) de la mencionada norma tcnica, se requerir
modificar la configuracin actual de dicha subestacin para dar cumplimiento a la regulacin
vigente.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
127

9.2.3.2 Recomendacin
Se propone normalizar esta subestacin mediante el seccionamiento de los dos circuitos del
tramo Pan de Azcar-Las Palmas 2x220 kV. La configuracin est siendo analizada por la DPD
a fin de proponer un proyecto que d cuenta del cumplimiento normativo y que posibilite el
libre acceso para nuevas instalaciones.
9.2.3.3 Responsable
EPM CHILE
9.2.3.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial de este proyecto est siendo elaborado por la DPD.

9.2.4

Normalizacin Subestacin Los Maquis

9.2.4.1 Situacin Actual y Justificacin


La configuracin actual de esta subestacin es de barra simple sin barra de transferencia,
ante falla de severidad 8 9 se desconectan todos los elementos y se provoca la prdida de
consumo de la zona de Aconcagua.
Por otro lado existe vulneracin respecto de la mantencin de los interruptores, ya que
ninguno de stos posee posibilidad de mantenimiento sin afectar la operacin de los
elementos que conectan.
9.2.4.2 Recomendacin
Se propone reconfigurar la topologa y tecnologa de la subestacin trasladando la actual
conexin de los paos troncales a una configuracin doble barra ms barra de
transferencia en tecnologa GIS.
9.2.4.3 Responsable
Colbn
9.2.4.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial de este proyecto es de 9.834 MUSD con un plazo
constructivo de 24 meses.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
128

9.2.5

Normalizacin Subestacin Polpaico

9.2.5.1 Situacin Actual y Justificacin


El interruptor del pao Los Maquis-Polpaico (J12) no cumple con criterio de
mantenimiento ya que no est conectado a la barra de transferencia.
9.2.5.2

Recomendacin

Conectar el interruptor J12 a la barra de transferencia para permitir el mantenimiento de


ste sin la desconexin de circuito. El detalle del proyecto se puede encontrar en el ANEXO
6.
9.2.5.3 Responsable
Colbn
9.2.5.4

Valor de Inversin Referencial y Plazos

El valor de inversin referencial de este proyecto es de 344 MUSD con un plazo


constructivo de 24 meses.

9.2.6

Normalizacin Subestacin Lo Aguirre

9.2.6.1 Situacin Actual y Justificacin


La subestacin actualmente secciona un circuito del tramo Polpaico-Alto Jahuel 2x500 kV, no
obstante, no cumple con lo estipulado en el artculo 3-24, Titulo 4 de la normativa, en cuanto a
que las conexiones en el sistema de transmisin troncal deben seccionar al menos dos de los
circuitos del respectivo tramo.
9.2.6.2

Recomendacin

Desarrollar un proyecto de seccionamiento del segundo circuito del tramo Polpaico-Alto


Jahuel 2x500 kV en la subestacin Lo Aguirre
9.2.6.3 Responsable
Transelec
9.2.6.4

Valor de Inversin Referencial y Plazos

El valor de inversin referencial de este proyecto es de 13.380 con un plazo constructivo de


24 meses.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
129

9.2.7

Normalizacin Subestacin Chena

9.2.7.1 Situacin Actual y Justificacin


Configuracin actual no cumple con criterio de seguridad en barras ante falla de severidad
9.
Adicionalmente, la subestacin no cumple con criterio de mantencin para interruptores
de los paos Alto Jahuel 3 (J3) y Alto Jahuel 4 (J4).
9.2.7.2 Recomendacin
Chilectra: Desarrollar una segunda seccin de barra a fin de modificar la conexin de los
elementos y evitar que la falla de severidad 9 se propague.
Transelec: Realizar conexin de los interruptores J3 y J4 a la barra de transferencia para
permitir mantenciones. El detalle del proyecto se puede encontrar en el ANEXO 6.
9.2.7.3 Responsable
Chilectra: Incorporacin de un interruptor seccionador de barra y un interruptor
acoplador.
Transelec: Normalizacin Interruptores J3 y J4 (Alto Jahuel-Chena 4x220 kV) mediante
conexin a barra de transferencia y conexin de la Barra de transferencia GIS con la barra
de transferencia AIS mediante desconectador GIS. El detalle del proyecto se puede
encontrar en el ANEXO 6.
9.2.7.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial y plazos de estos proyectos se presentan a continuacin
separado por propietario responsable.
Chilectra: 2.319 MUSD con un plazo constructivo de 24 meses.
Transelec: 1.461 MUSD con un plazo constructivo de 24 meses.

9.2.8

Normalizacin Subestacin Alto Jahuel

9.2.8.1

Situacin Actual y Justificacin

Los interruptores de los paos pertenecientes a los tramos Maipo-Alto Jahuel (J10) y
Candelaria-Alto Jahuel (J3) no cumplen con criterio de mantenimiento ya que no est
conectado a la barra de transferencia

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
130

9.2.8.2

Recomendacin

Conectar los interruptores J3 y J10, a la barra de transferencia para permitir el


mantenimiento de estos sin la desconexin de los respectivos circuitos. El detalle del
proyecto se puede encontrar en el ANEXO 6.
9.2.8.3 Responsable
Colbn
9.2.8.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial de este proyecto es de 561 MUSD con un plazo
constructivo de 24 meses.
9.2.9

Normalizacin Subestacin Puerto Montt

9.2.9.1 Situacin Actual y Justificacin


El interruptor JT4 que conecta el equipo CER no cumple con criterio de mantenimiento ya
que no est conectado a la barra de transferencia y por lo tanto ante la mantencin de ste,
el equipo CER queda fuera de operacin.
9.2.9.2 Recomendacin
El proyecto consiste en la conexin del equipo CER a las dos barras de la subestacin
mediante un esquema de doble interruptor. Con esta topologa de conexin se permitir
realizar mantenciones a los interruptores manteniendo la operacin del CER.
9.2.9.3 Responsable
Transelec
9.2.9.4 Valor de Inversin Referencial y Plazos
El valor de inversin referencial de este proyecto es de 3.262 MUSD con un plazo
constructivo de 24 meses.

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
131

ANEXO 1

ANEXO 1
ESTUDIO DE LIMITACIONES DE TRANSMISIN
Revisin ETT 2015

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
132

ANEXO 2

ANEXO 2
ESTUDIO DE LA OPERACIN DE LA ZONA NORTE DEL SIC
PERODO 2014-2017

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
133

ANEXO 3

ANEXO 3
METOLOGA DE INCORPORACIN DE LA GENERACION SOLAR
FOTOVOLTAICA Y ELICA AL MODELO PLP

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
134

ANEXO 4

ANEXO 4
REVISIN GENERAL DEL CUMPLIMIENTO DE ESTNADES DE
SEGURIDAD Y CALIDAD DEL SERVICIO EN SUBESTACIONES CON
INSTALACIONES TRONCALES

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
135

ANEXO 5

ANEXO 5
ANALISIS ELCTRICOS SEVERIDAD 9 SUBESTACIONES TRONCALES

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
136

ANEXO 6

ANEXO 6
PROYECTOS RECOMENDADOS

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
137

ANEXO 7

ANEXO 7
CURVAS DURACIN

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
138

ANEXO 8

ANEXO 8
EVALUACIONES ECONMICAS

Informe Preliminar Propuesta Plan de Expansin del STT del SIC

agosto de 2015
139

ANEXO 9