Item
Descripcin
01
OBRAS PRELIMINARES
Presupuesto
01.01
01.02
01.02.01
02
02.01
Und.
Metrado
Precio S/.
Parcial S/.
1,900.40
glb
1.00
500.00
m2
90.00
15.56
500.00
1,400.40
MOVIMIENTO DE TIERRAS
1,400.40
795.02
EXCAVACIONES
748.45
02.01.01
ZAPATAS
m3
2.00
23.28
46.56
02.01.02
CIMIENTOS CORRIDOS
m3
29.96
23.28
697.47
02.01.03
VIGA DE CIMENTACION
m3
0.19
23.28
02.02
02.02.01
02.03
02.03.01
03
03.01
03.01.01
03.02
03.02.01
03.03
RELLENOS
RELLENO CON MATERIAL PROPIO
m3
2.38
7.12
m2
26.45
1.12
29.62
8,013.27
3.48
m2
0.29
12.01
16.95
29.62
ZAPATAS
4.42
16.95
3.48
5,374.47
m3
26.63
201.82
5,374.47
1,549.95
03.03.01
ENCOFRADO Y DESENCOFRADO
m2
34.10
23.00
784.30
03.03.02
CONCRETO
m3
5.33
143.65
765.65
m2
49.38
21.98
03.04
03.05
04
1,085.37
12,271.46
04.01
ZAPATAS
04.02
m3
1.72
248.68
427.73
04.03
ACERO
kg
40.75
4.91
200.08
04.04
VIGA DE CIMENTACION
04.05
ENCOFRADO Y DESENCOFRADO
m2
2.10
23.00
48.30
04.06
m3
0.26
248.68
64.66
04.07
ACERO
kg
26.84
4.91
131.78
04.08
COLUMNAS
04.09
ENCOFRADO Y DESENCOFRADO
m2
40.50
23.00
931.50
04.10
m3
3.27
248.68
813.18
04.11
ACERO
kg
567.68
4.91
2,787.31
04.12
VIGAS
04.13
ENCOFRADO Y DESENCOFRADO
m2
13.07
34.61
452.35
04.14
m3
3.27
248.68
813.18
04.15
ACERO
kg
285.20
4.91
1,400.33
04.16
ALIGERADO
04.17
ENCOFRADO Y DESENCOFRADO
m2
43.62
34.11
1,487.88
04.18
m3
3.27
248.68
813.18
04.19
ACERO
kg
208.38
4.91
1,023.15
LADRILLO
pza
355.00
2.47
04.20
05
05.01
05.02
DE CABEZA
876.85
3,642.96
m2
5.48
31.29
171.47
05.03
06
DE SOGA
m2
111.48
31.14
3,471.49
4,027.52
06.01
TARRAGEO
06.02
06.03
PARED
COLUMNAS
m2
m2
157.81
22.38
16.75
16.75
2,643.32
374.87
06.04
VIGAS
m2
7.35
20.71
152.22
DERRAMES
m2
56.80
15.09
06.05
07
07.01
08
CIELO RASOS
CON MEZCLA DE CEMENTO
857.11
752.37
m2
42.70
17.62
PISOS Y CONTRAPISOS
752.37
1,385.55
08.01
m2
33.19
29.06
964.50
08.02
m2
2.70
44.65
120.56
08.03
m2
6.73
44.65
09
REVESTIMIENTOS
300.49
1,675.23
09.01
m2
1.70
229.42
390.01
09.02
m2
6.60
194.73
1,285.22
10
CARPINTERIA DE MADERA
1,647.63
10.01
und
3.00
420.55
1,261.65
10.02
und
1.00
385.98
385.98
11
CARPINTERIA DE ALUMINIO
173.32
11.01
pza
3.00
43.48
130.44
11.02
pza
1.00
42.88
42.88
VIDRIO DE 6mm
p2
8.06
24.70
199.08
p2
80.65
8.69
700.85
m2
6.00
15.66
pza
1.00
211.00
211.00
pza
1.00
348.67
348.67
12
12.01
12.02
13
13.01
14
14.01
14.02
899.93
PINTURA
PINTURA LATEX PARA MUROS EXTERIORES (FACHADA)
93.96
93.96
1,199.66
14.03
pza
1.00
246.17
246.17
14.04
pza
1.00
85.17
85.17
14.05
pza
1.00
111.74
111.74
14.06
pza
1.00
111.74
111.74
14.07
pza
1.00
85.17
85.17
15
15.01
INSTALACIONES SANITARIAS
3,202.15
DESAGUE
1,037.38
15.01.01
pto
7.00
31.01
217.07
15.01.02
pto
3.00
43.49
130.47
15.01.03
und
1.00
32.72
32.72
15.01.04
und
2.00
59.59
119.18
15.01.05
und
1.00
221.22
221.22
15.01.06
pto
1.00
316.72
316.72
15.02
AGUA
2,164.77
15.02.01
pto
7.00
288.39
2,018.73
15.02.02
und
3.00
48.68
146.04
16
INSTALACIONES ELECTRICAS
1,078.11
16.01
SALIDA DE TECHO
pto
6.00
56.78
340.68
16.02
SALIDA DE TELEFONO
pto
1.00
42.60
42.60
16.03
und
4.00
38.97
155.88
16.04
und
8.00
31.46
251.68
16.05
SALIDA DE TOMACORRIENTE
und
2.00
39.93
79.86
16.06
16.07
CABLE TW 4 mm2
CABLE TW 2.5 mm2
m
m
23.85
24.05
2.02
1.18
48.18
28.38
16.08
17
TABLERO GENERAL
glb
1.00
130.85
VARIOS
130.85
400.00
17.01
und
1.00
300.00
300.00
17.02
und
1.00
100.00
100.00
COSTO DIRECTO
SON :
43,158.54
Fecha :
06/10/2015 09:57:13 AM